CN110565946B - Construction method for supporting post-cast strip of basement of large-scale overhanging structure building - Google Patents

Construction method for supporting post-cast strip of basement of large-scale overhanging structure building Download PDF

Info

Publication number
CN110565946B
CN110565946B CN201910698602.1A CN201910698602A CN110565946B CN 110565946 B CN110565946 B CN 110565946B CN 201910698602 A CN201910698602 A CN 201910698602A CN 110565946 B CN110565946 B CN 110565946B
Authority
CN
China
Prior art keywords
post
cast strip
layer
negative
steel pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201910698602.1A
Other languages
Chinese (zh)
Other versions
CN110565946A (en
Inventor
陈良
黄晖
王慧文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changzhou No1 Construction Group Co ltd
Original Assignee
Changzhou No1 Construction Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changzhou No1 Construction Group Co ltd filed Critical Changzhou No1 Construction Group Co ltd
Priority to CN201910698602.1A priority Critical patent/CN110565946B/en
Publication of CN110565946A publication Critical patent/CN110565946A/en
Application granted granted Critical
Publication of CN110565946B publication Critical patent/CN110565946B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/36Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings
    • E04G11/48Supporting structures for shutterings or frames for floors or roofs
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/36Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings
    • E04G11/48Supporting structures for shutterings or frames for floors or roofs
    • E04G11/483Supporting heads

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The invention provides a post-cast strip supporting construction method for a basement of a large cantilever structure building, which comprises the following steps of: firstly, detaching the support of the original post-cast strip of the negative second layer at intervals; two ends of two side beams of the post-cast strip are rigidly supported: thirdly, rigid support is implemented at the end parts of the floor panels at the two sides of the post-cast strip; fourthly, supporting and reinforcing the bottoms of the two side beams of the post-cast strip and the bottom of the floor panel; fifthly, repeating the steps from the first step to the fourth step to support and reinforce the post-cast strip bearing the first layer. According to the method, the steel structure and steel pipe combined supporting technology is adopted for the basement post-cast strip of the large-scale overhanging structure building, so that the technical problem that the construction operation requirement that a tower crane and a truck crane are adopted for construction of the outer overhanging steel structure at the upper part of the basement in the construction process cannot be met by commonly used steel pipe and fastener reinforcement of the basement post-cast strip can be effectively solved.

Description

Construction method for supporting post-cast strip of basement of large-scale overhanging structure building
Technical Field
The invention relates to a support construction method for a basement post-cast strip of a building, in particular to a support construction method for a basement post-cast strip of a large cantilever structure building.
Background
The large overhanging structure building is usually visible, the large overhanging structure building usually adopts a steel structure outer overhanging design, the outer overhanging steel structure is generally hoisted by a hoisting method taking a tower crane as a main part and an automobile crane as an auxiliary part during construction, the large overhanging structure building is generally provided with at least 2 layers of basements, a post-cast settlement belt is arranged between a main building and the basements of the building, the post-cast settlement belt is sealed after the construction of the main building structure is completed and the settlement is stable, the post-cast settlement belt cannot be sealed during the construction of the outer overhanging steel structure, so the post-cast settlement belt needs to be supported, the conventional post-cast settlement belt supporting method is usually a single steel pipe and fastener reinforcing method, however, the post-cast settlement belt supporting and reinforcing method cannot meet the construction requirements of the automobile crane when the outer overhanging steel structure construction is carried out in the face of a 130T automobile crane, so the steel structure outer overhanging structure of the large overhanging structure building is researched by adopting the tower crane as a main part, when the construction method of hoisting the truck crane is assisted, what method is adopted to reinforce the basement post-cast strip is necessary.
Disclosure of Invention
The purpose of the invention is: aiming at the problems in the prior art, the post-cast strip supporting construction method for the basement of the large cantilever structure building is provided.
The technical scheme of the invention is as follows: the invention relates to a post-cast strip supporting construction method for a basement of a large cantilever structure building, which comprises the following steps of:
firstly, detaching the support of the original post-cast strip of the negative second layer at intervals;
two ends of two side beams of the post-cast strip are rigidly supported: two ends of two side beams of the negative two-layer post-cast strip are provided with two side beam supporting structures of the post-cast strip, and the specific method comprises the following steps: a first main support steel pipe is arranged between two ends of two side beams of the negative two-layer post-cast strip and the negative two-layer bottom plate, the upper end and the lower end of the first main support steel pipe are respectively and fixedly provided with 1 first supporting steel plate which is respectively tightly propped against the two side beams of the negative two-layer post-cast strip and the negative two-layer bottom plate, the lower parts of the negative two-layer top plates at two ends of the two side beams of the negative two-layer post-cast strip are respectively provided with 1 first supporting steel plate, the lower parts of 2 first supporting steel plates are respectively provided with 1 first inclined support steel pipe, the upper end of each first inclined support steel pipe is fixedly connected with the first supporting steel plate, and the lower end of each first inclined support steel pipe is fixedly connected with the upper part of the first main support steel;
thirdly, rigid support is implemented at the end parts of the floor plates at two sides of the post-cast strip: the method comprises the following steps of arranging support structures for floor plates on two sides of a post-cast strip at the end parts of the floor plates on two sides of the post-cast strip, and specifically comprises the following steps: a second supporting steel plate is arranged below a second layer top plate of the two side beams of the second layer rear pouring belt, a second main supporting steel pipe is arranged between the second supporting steel plate and the second layer bottom plate, 1 second supporting steel plate is fixedly arranged at each of the upper end and the lower end of the second main supporting steel pipe, the second supporting steel plate at the upper end is welded with the second supporting steel plate, and the second supporting steel plate at the lower end is tightly propped against the second layer bottom plate;
fourthly, supporting and reinforcing the bottoms of the two side beams of the post-cast strip and the bottom of the floor panel: the bottom of the beam on two sides of the post-cast strip except 2 end parts and the bottom of the negative 2-layer top plate are provided with supports, and the concrete method comprises the following steps: a fastener-type steel pipe scaffold is erected on the bottom plate of the secondary loading layer, the fastener-type steel pipe scaffold comprises vertical support rods, channel steel is arranged at the bottoms of the beams at the two sides of the post-cast strip except for 2 end parts, the channel steel is connected with the corresponding vertical support rods of the fastener-type steel pipe scaffold by using adjustable U-shaped supports, and the U-shaped supports are adjusted to enable the channel steel to be tightly propped against the beams at the two sides of the secondary loading layer; arranging a batten support steel pipe at the lower part of the negative second-layer top plate, connecting the batten support steel pipe with a corresponding vertical support rod of a fastener type steel pipe scaffold through a U-shaped support, arranging a plurality of battens between the batten support steel pipe and the bottom of the negative second-layer top plate, and adjusting the U-shaped support to enable the battens to be tightly propped against the bottom of the negative second-layer top plate;
fifthly, repeating the steps from the first step to the fourth step to support and reinforce the post-cast strip bearing the first layer.
The further scheme is as follows: in the step IV, the channel steel is 8# channel steel, and the battens are arranged at a distance of 300 mm.
The invention has the positive effects that: according to the construction method for supporting the basement post-cast strip of the large-scale cantilever structure building, the steel structure and steel pipe combined supporting technology is adopted for the basement post-cast strip of the large-scale cantilever structure building, so that the technical problem that the construction operation requirement that the outer cantilever steel structure at the upper part of the basement is lifted by a tower crane and a truck during construction cannot be met by common steel pipe and fastener reinforcement of the basement post-cast strip can be effectively solved.
Drawings
FIG. 1 is a flow chart of a method of the present invention;
FIG. 2 is a schematic structural view of rigid supporting and reinforcing of two ends of a beam at two sides of a post-cast strip according to the present invention;
FIG. 3 is a schematic structural view of rigid supporting and reinforcing of the end portions of the floor panels on both sides of the post-cast strip according to the present invention;
FIG. 4 is a schematic structural view of the present invention for supporting and reinforcing the bottom of the beams at both sides of the post-cast strip;
FIG. 5 is a schematic structural view of the present invention for supporting and reinforcing the bottom of the floor panels on both sides of the post-cast strip;
fig. 6 is a schematic structural view of the basement negative 2-layer top plate supporting and reinforcing method.
The reference numbers in the above figures are as follows:
a layer of top plate 1 is arranged, and a layer of post-cast strip two side beams 11 are arranged; carrying a second-layer top plate 2 and carrying two side beams 21 of a second-layer post-cast strip; the post-cast strip comprises a post-cast strip two-side beam support structure 3, a first main support steel pipe 31, a first supporting steel plate 32, a first supporting steel plate 33 and an inclined support steel pipe 34; the post-cast strip comprises floor plate supporting structures 4 on two sides of a post-cast strip, a second main support steel pipe 41, a second supporting steel plate 42 and a second supporting steel plate 43; channel steel 5; a U-shaped rest 6; batten 7, batten support steel pipe 8, fastener type steel pipe scaffold 9, vertical support rod 91, horizontal support rod 92, vertical cross brace 93 and horizontal cross brace 94.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings and specific embodiments.
(example 1)
The construction method for supporting the post-cast strip of the basement of the large cantilever structure building in the embodiment is described by taking the example that the basement of the building is provided with 2 floors, and obviously, the basement is provided with 1 floor or more than 2 floors, and the method is basically the same.
Referring to fig. 1, the construction method for supporting the post-cast strip of the basement of the large cantilever structure building is implemented by the following steps:
firstly, detaching the support of the original post-cast strip of the negative two layers at intervals: and (4) controlling the dismantling within 2-3 spans each time, and carrying out the steel structure support construction of the subsequent steps in time after the dismantling.
Two ends of two side beams of the post-cast strip are rigidly supported: referring to fig. 2, post-cast strip two-side beam support structures 3 are arranged at two ends of a negative two-layer post-cast strip two-side beam 21, and the specific method is as follows: a first main supporting steel pipe 31 is arranged between two ends of the two side beams 21 of the negative two-layer post-cast strip and a negative two-layer bottom plate (not shown in the figure), the upper end and the lower end of the first main supporting steel pipe 31 are respectively fixedly provided with 1 first supporting steel plate 32 which is respectively tightly propped against the two side beams 21 of the negative two-layer post-cast strip and the negative two-layer bottom plate, the lower parts of the two top plates 2 at the two ends of the two side beams 21 of the negative two-layer post-cast strip are respectively provided with 1 first supporting steel plate 33, the lower parts of the 2 first supporting steel plates 33 are respectively provided with 1 first inclined supporting steel pipe 34, the upper end of each first inclined supporting steel pipe 34 is fixedly connected with the first supporting steel plate 33, and the lower end of each first inclined supporting steel pipe 34 is fixedly connected with the upper part of the first main supporting steel.
Thirdly, rigid support is implemented at the end parts of the floor plates at two sides of the post-cast strip: referring to fig. 3, the post-cast strip two-side floor panel supporting structure 4 is arranged at the end part of the floor panel at the two sides of the post-cast strip, and the specific method comprises the following steps: the second supporting steel plate 43 is arranged below the negative second-layer top plate 2 of the negative second-layer post-cast strip two-side beam 21, the second main supporting steel pipe 41 is arranged between the second supporting steel plate 43 and the negative second-layer bottom plate, 1 second supporting steel plate 42 is fixedly arranged at each of the upper end and the lower end of the second main supporting steel pipe 41, the second supporting steel plate 42 at the upper end is welded with the second supporting steel plate 43, and the second supporting steel plate 42 at the lower end is tightly propped with the negative second-layer bottom plate.
Fourthly, supporting and reinforcing the bottoms of the two side beams of the post-cast strip and the bottom of the floor panel: referring to fig. 4 to 6, supports are arranged at the bottoms of the beams on two sides of the post-cast strip except for 2 end parts and at the bottom of the negative 2-layer top plate, and the specific method is as follows: a fastener-type steel pipe scaffold 9 is erected on the bottom plate of the negative second floor, the fastener-type steel pipe scaffold 9 comprises a vertical supporting rod 91, a horizontal supporting rod 92, a vertical cross brace 93 and a horizontal cross brace 94, channel steel 5 is arranged at the bottoms of the beams at two sides of the post-cast strip except for 2 end parts, the channel steel 5 is connected with the vertical supporting rod 91 corresponding to the fastener-type steel pipe scaffold 9 through an adjustable U-shaped support 6 (commercially available products), and the U-shaped support 6 is adjusted to enable the channel steel 5 to be tightly propped against the beams 21 at two sides of the negative second floor post-cast strip; the lower part of the negative two-layer top plate 2 is provided with a batten support steel pipe 8, the batten support steel pipe 8 is connected with a vertical support rod 91 corresponding to a fastener type steel pipe scaffold 9 through a U-shaped support 6, a plurality of battens 7 are arranged between the batten support steel pipe 8 and the bottom of the negative two-layer top plate 2, and the U-shaped support 6 is adjusted to enable the battens 7 to be tightly propped against the bottom of the negative two-layer top plate 2. In the step, the channel steel 5 is preferably 8# channel steel, and the battens 7 are preferably arranged at a distance of 300 mm.
Fifthly, supporting and reinforcing the two side beams 11 of the one-layer rear pouring belt and the one-layer top plate according to the steps from the first step to the fourth step.
The above embodiments are illustrative of specific embodiments of the present invention, and are not restrictive of the present invention, and those skilled in the relevant art can make various changes and modifications without departing from the spirit and scope of the present invention to obtain corresponding equivalent technical solutions, and therefore all equivalent technical solutions should be included in the scope of the present invention.

Claims (2)

1. A post-cast strip supporting construction method for a basement of a large cantilever structure building is characterized by comprising the following steps:
firstly, detaching the support of the original post-cast strip of the negative second layer at intervals;
two ends of two side beams of the post-cast strip are rigidly supported: two ends of two side beams of the negative two-layer post-cast strip are provided with two side beam supporting structures of the post-cast strip, and the specific method comprises the following steps: a first main supporting steel pipe is arranged between two ends of two side beams of the negative two-layer post-cast strip and a negative two-layer bottom plate, the upper end and the lower end of the first main supporting steel pipe are respectively and fixedly provided with 1 first supporting steel plate which is respectively tightly propped against the two side beams of the negative two-layer post-cast strip and the negative two-layer bottom plate, the lower part of the negative two-layer top plate on each side of two end heads of the two side beams of the negative two-layer post-cast strip is respectively provided with 1 first supporting steel plate, the lower parts of 2 first supporting steel plates are respectively provided with 1 first inclined supporting steel pipe, the upper end of each first inclined supporting steel pipe is fixedly connected with the first supporting steel plate, and the lower end of each first inclined supporting steel pipe is fixedly connected with the upper part of the first main;
thirdly, rigid support is implemented at the end parts of the floor plates at two sides of the post-cast strip: the method comprises the following steps of arranging support structures for floor plates on two sides of a post-cast strip at the end parts of the floor plates on two sides of the post-cast strip, and specifically comprises the following steps: a second supporting steel plate is arranged below the end part of the top plate of the negative second layer close to the two side beams of the negative second layer post-cast strip, a second main supporting steel pipe is arranged between the second supporting steel plate and the bottom plate of the negative second layer, 1 second supporting steel plate is fixedly arranged at each of the upper end and the lower end of the second main supporting steel pipe, the second supporting steel plate at the upper end is welded with the second supporting steel plate, and the second supporting steel plate at the lower end is tightly propped against the bottom plate of the negative second layer;
fourthly, supporting and reinforcing the bottoms of the two side beams of the post-cast strip and the bottom of the floor panel: the bottom of the two side beams of the post-cast strip except 2 ends and the bottom of the negative 2-layer top plate except the end part of the negative two-layer top plate close to the two side beams of the negative two-layer post-cast strip are provided with supports, and the specific method comprises the following steps: a fastener-type steel pipe scaffold is erected on the bottom plate of the secondary loading layer, the fastener-type steel pipe scaffold comprises vertical support rods, channel steel is arranged at the bottoms of the beams at the two sides of the post-cast strip except for 2 end parts, the channel steel is connected with the corresponding vertical support rods of the fastener-type steel pipe scaffold by using adjustable U-shaped supports, and the U-shaped supports are adjusted to enable the channel steel to be tightly propped against the beams at the two sides of the secondary loading layer; arranging a batten support steel pipe at the lower part of the negative second-layer top plate, connecting the batten support steel pipe with a corresponding vertical support rod of a fastener type steel pipe scaffold through a U-shaped support, arranging a plurality of battens between the batten support steel pipe and the bottom of the negative second-layer top plate, and adjusting the U-shaped support to enable the battens to be tightly propped against the bottom of the negative second-layer top plate;
fifthly, repeating the steps from the first step to the fourth step to support and reinforce the post-cast strip bearing the first layer.
2. The large cantilever structure building basement post-cast strip supporting construction method according to claim 1, characterized in that: in the step IV, the channel steel is 8# channel steel, and the battens are arranged at a distance of 300 mm.
CN201910698602.1A 2019-07-31 2019-07-31 Construction method for supporting post-cast strip of basement of large-scale overhanging structure building Active CN110565946B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910698602.1A CN110565946B (en) 2019-07-31 2019-07-31 Construction method for supporting post-cast strip of basement of large-scale overhanging structure building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910698602.1A CN110565946B (en) 2019-07-31 2019-07-31 Construction method for supporting post-cast strip of basement of large-scale overhanging structure building

Publications (2)

Publication Number Publication Date
CN110565946A CN110565946A (en) 2019-12-13
CN110565946B true CN110565946B (en) 2021-03-26

Family

ID=68773872

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910698602.1A Active CN110565946B (en) 2019-07-31 2019-07-31 Construction method for supporting post-cast strip of basement of large-scale overhanging structure building

Country Status (1)

Country Link
CN (1) CN110565946B (en)

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3847340A (en) * 1972-02-14 1974-11-12 C Ficken Shoring fixture for poured concrete construction
DE4413931C1 (en) * 1994-04-21 1995-12-14 Doka Ind Gmbh Ceiling formwork system for formwork ceilings
CN201495772U (en) * 2009-03-13 2010-06-02 南通建筑工程总承包有限公司 Post-poured band formwork supporting device
CN201738575U (en) * 2010-06-25 2011-02-09 中天建设集团有限公司天津分公司 Beam-slab supporting system with post-cast strip
CN102561690A (en) * 2012-03-12 2012-07-11 中天建设集团有限公司 Construction method for supporting structures on two sides of post-cast strip by use of brick column
CN204825965U (en) * 2015-08-28 2015-12-02 中建三局第三建设工程有限责任公司 Support system for basement roof subsides post -cast strip department

Also Published As

Publication number Publication date
CN110565946A (en) 2019-12-13

Similar Documents

Publication Publication Date Title
CN103628680A (en) Construction method for large-area steel structure hanging layer
CN107338958B (en) Modular construction method for nuclear power reactor cavity pool
CN202337344U (en) Scaffold structure in cargo cabin of bulk cargo ship
CN112609598B (en) Rapid circulating construction method for upper structure of composite beam cable-stayed bridge
CN110565946B (en) Construction method for supporting post-cast strip of basement of large-scale overhanging structure building
CN114251518B (en) Pipeline installation structure of non-laminate closed pipe well and construction method thereof
CN215290244U (en) Construction elevator basis returns top device
CN115288504A (en) Construction method of concrete floor on top of large-scale bin body structure
CN210396093U (en) Double-shear wall deformation joint steel formwork
CN114934542A (en) Stress system conversion construction method for covering and digging top-down V-shaped column
CN219753961U (en) Novel formwork support system of large-span conversion structure based on steel pipe concrete column
CN111778832A (en) Steel pipe support shared by bridge deck system and arch rib of steel structure arch bridge
CN218522186U (en) Elevator shaft steel platform
CN206034486U (en) It consolidates to draw formula to one side system for major structure subsides post -cast strip department
CN212613049U (en) Assembly type box house floor structure
CN213868833U (en) Large-tonnage bearing operation platform for elevator shaft building
CN220336399U (en) Profile steel construction platform for high-altitude overhanging
JP3242893U (en) Portable Safe Operation Platform for High-Rise Building Elevator Shafts
CN217840891U (en) High-altitude large-span steel frame supporting platform
CN219826107U (en) Quick easy-to-install and-remove elevator shaft operation frame and template
CN111608270B (en) Prefabricated through long column concrete assembled frame structure and construction method thereof
CN109056741B (en) Method for dismantling lower steel support in multi-layer steel support
CN110625787B (en) Construction method for rapid whole-hole prefabrication in corrugated steel web beam factory
CN218990553U (en) Double-steel-plate shear wall structure easy for concrete pouring operation
CN218643857U (en) Safe in utilization's multilayer square steel construction

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant