- Publication number
- CN110565815A CN110565815A CN201910916996.3A CN201910916996A CN110565815A CN 110565815 A CN110565815 A CN 110565815A CN 201910916996 A CN201910916996 A CN 201910916996A CN 110565815 A CN110565815 A CN 110565815A
- Authority
- CN
- China
- Prior art keywords
- exterior wall
- wall cladding
- connecting piece
- balcony slab
- balcony
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000005253 cladding Methods 0.000 title claims abstract description 68
- 238000003466 welding Methods 0.000 claims description 48
- 210000001503 joint Anatomy 0.000 claims description 3
- 238000010276 construction Methods 0.000 abstract description 23
- 238000009434 installation Methods 0.000 abstract description 14
- 238000004519 manufacturing process Methods 0.000 description 4
- 238000000034 method Methods 0.000 description 3
- 229910000831 Steel Inorganic materials 0.000 description 2
- 238000005452 bending Methods 0.000 description 2
- 230000008901 benefit Effects 0.000 description 2
- 239000004567 concrete Substances 0.000 description 2
- 230000007547 defect Effects 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 230000002349 favourable effect Effects 0.000 description 2
- 230000008569 process Effects 0.000 description 2
- 239000010959 steel Substances 0.000 description 2
- 229910000746 Structural steel Inorganic materials 0.000 description 1
- 238000005266 casting Methods 0.000 description 1
- 238000007796 conventional method Methods 0.000 description 1
- 230000008878 coupling Effects 0.000 description 1
- 238000010168 coupling process Methods 0.000 description 1
- 238000005859 coupling reaction Methods 0.000 description 1
- 238000003912 environmental pollution Methods 0.000 description 1
- 238000009415 formwork Methods 0.000 description 1
- 238000010030 laminating Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000003825 pressing Methods 0.000 description 1
- 230000009467 reduction Effects 0.000 description 1
- 239000011150 reinforced concrete Substances 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/38—Connections for building structures in general
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/38—Connections for building structures in general
- E04B1/388—Separate connecting elements
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Joining Of Building Structures In Genera (AREA)
Abstract
the invention relates to a connecting node of an balcony slab and a prefabricated exterior wall cladding. This balcony board and prefabricated exterior wall cladding's connected node includes: the lower side of the balcony board is embedded with a first connecting piece; the lower-layer exterior wall cladding is supported and arranged at the lower side of the balcony slab, and a second connecting piece is embedded in the inner side of the lower-layer exterior wall cladding; and the pulling piece is fixedly connected between the first connecting piece and the second connecting piece. Above-mentioned balcony slab and prefabricated exterior wall cladding's connected node, only need during the installation with lower floor's exterior wall cladding and balcony slab hoist and mount target in place, then with drawknot spare respectively with pre-buried in balcony slab and lower floor's exterior wall cladding's first connecting piece and second connecting piece fixed connection, accomplished prefabricated exterior wall cladding's installation promptly, the installation and construction is simple, has reduced the construction volume, has shortened construction cycle.
Description
Technical Field
The invention relates to the field of assembly type buildings, in particular to a connecting node of an balcony slab and a prefabricated exterior wall cladding.
Background
The fabricated concrete building is a concrete structure type house building which is designed and built in a field assembly mode by mainly taking a reinforced concrete prefabricated part produced in a factory. The method has the advantages of high construction speed, contribution to winter construction, high production efficiency, good product quality, reduction of material loss and the like.
However, the conventional technique generally adopts a cast-in-place mode to form the exterior wall cladding of the balcony, and has the defects of large construction amount, complex process, slow progress and long construction period.
Disclosure of Invention
On the basis, the connecting node of the balcony slab and the prefabricated exterior wall cladding is needed to be formed in a cast-in-place mode aiming at the problems of large construction amount, complex process, slow progress and long construction period of the exterior wall cladding of the balcony in the prior art, and the connecting node of the balcony slab and the prefabricated exterior wall cladding overcomes the defects.
The utility model provides a connected node of balcony board and prefabricated exterior wall cladding, includes:
The lower side of the balcony plate is embedded with a first connecting piece;
The lower-layer exterior wall cladding is supported and arranged at the lower side of the balcony slab, and a second connecting piece is embedded in the inner side of the lower-layer exterior wall cladding;
and the pulling piece is fixedly connected between the first connecting piece and the second connecting piece.
Above-mentioned balcony slab and prefabricated exterior wall cladding's connected node, only need during the installation with lower floor's exterior wall cladding and balcony slab hoist and mount target in place, then with drawknot spare respectively with pre-buried in balcony slab and lower floor's exterior wall cladding's first connecting piece and second connecting piece fixed connection, accomplished prefabricated exterior wall cladding's installation promptly, the installation and construction is simple, has reduced the construction volume, has shortened construction cycle.
In one embodiment, the first connecting element has a welding surface for a welded connection to the pull element. So, with the bonding member laminating in the face of weld of first connecting piece, weld again for it is firm to connect, convenient operation.
In one embodiment, the first connecting piece comprises a first welding plate and at least one first fixing ring fixedly connected to one side of the first welding plate, and one side of the first welding plate, which is far away from the first fixing ring, is the welding surface; the first fixing ring and the first welding plate are both pre-embedded in the balcony slab, and the welding surface of the first welding block is exposed on the lower side surface of the balcony slab. So, with first connecting piece design for first welded plate and fixed ring's of fixed connection in the first fixed ring's of first welded plate one side form, existing welding quality who is favorable to guaranteeing first connecting piece and drawknot piece makes the pre-buried in the balcony board that first connecting piece can stabilize again, has improved balcony board and lower floor's exterior wall cladding's joint strength.
in one embodiment, the second connector has a threaded bore; the connecting node also comprises a threaded fastening component, and one end of the threaded fastening component penetrates through the pulling piece and is in threaded connection with the threaded hole of the second connecting piece so as to fasten the pulling piece to the second connecting piece. So, only need to twist the screw fastening subassembly and can realize will drawing the knot piece fixed connection in second connecting piece, construction easy operation, the construction volume is little.
In one embodiment, the threaded fastening component comprises a threaded rod and a fastener;
One end of the screw rod penetrates through the pulling piece and is in threaded connection with the threaded hole of the second connecting piece, and the fastening piece is in threaded connection with the screw rod and is abutted against one side, back to the second connecting piece, of the pulling piece. Thus, during installation construction, the screw rod penetrates through the pulling piece and is rotated, so that the screw rod is in threaded connection with the threaded hole of the second connecting piece. Then, the fastener is screwed on the screw rod so as to press one side of the drawknot member, which faces away from the second connecting member, so as to fasten the drawknot member to the second connecting member.
In one embodiment, the second connector is a sleeve.
In one embodiment, the connection node further comprises an upper exterior wall cladding arranged on the upper side of the balcony slab, a third connecting piece is embedded in the lower end of the upper exterior wall cladding, a fourth connecting piece corresponding to the third connecting piece is embedded in the upper side of the balcony slab, and the third connecting piece is fixedly connected with the fourth connecting piece.
In one embodiment, the connection node further comprises a welded connection member, one end of which is screwed to the third connection member and the other end of which is welded to the fourth connection member. Thus, during installation, the welded connection is first rotated so that the welded connection is screwed to the third connection. Then, the upper outer wall hanging plate is hoisted in place, and the welding connecting piece is connected with the fourth connecting piece in a welding mode, so that the upper outer wall hanging plate and the balcony slab are fixedly installed.
In one embodiment, the top end of the lower exterior wall cladding is provided with a positioning part, and the positioning part protrudes upwards from the end surface of the top end of the lower exterior wall cladding along the end surface of the balcony slab. Therefore, the balcony slab can be positioned by the positioning part so as to be convenient for the balcony slab to be matched and connected with the lower-layer exterior wall hanging plate.
In one embodiment, the butt joint interface of the positioning part and the upper outer wall hanging plate is provided with a waterproof tongue-and-groove, so that a good waterproof effect is achieved.
Drawings
FIG. 1 is a schematic structural view of a connection node of the balcony slab and the prefabricated exterior wall cladding;
FIG. 2 is a schematic structural view of a first connecting member of a connecting node of the balcony slab and the prefabricated exterior wall cladding shown in FIG. 1;
fig. 3 is a schematic structural view of a tie member of a connection node of the balcony slab and the prefabricated exterior wall cladding shown in fig. 1.
Detailed Description
To facilitate an understanding of the invention, the invention will now be described more fully with reference to the accompanying drawings. Preferred embodiments of the present invention are shown in the drawings. This invention may, however, be embodied in many different forms and should not be construed as limited to the embodiments set forth herein. Rather, these embodiments are provided so that this disclosure will be thorough and complete.
It will be understood that when an element is referred to as being "secured to" another element, it can be directly on the other element or intervening elements may also be present. When an element is referred to as being "connected" to another element, it can be directly connected to the other element or intervening elements may also be present. The terms "vertical," "horizontal," "left," "right," and the like as used herein are for illustrative purposes only.
Unless defined otherwise, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this invention belongs. The terminology used in the description of the invention herein is for the purpose of describing particular embodiments only and is not intended to be limiting of the invention. As used herein, the term "and/or" includes any and all combinations of one or more of the associated listed items.
As shown in fig. 1, the connection node of the balcony slab and the prefabricated exterior wall cladding provided in an embodiment of the present invention includes a balcony slab 10, a lower exterior wall cladding 20 and a tie member 30.
The lower side of the balcony slab 10 is embedded with a first connecting piece 16. The lower exterior wall cladding 20 is supported and arranged at the lower side of the balcony slab 10. That is, the balcony panel 10 is overlapped on the top end of the lower cladding panel 20. The inner side of the lower exterior wall cladding 20 is embedded with a second connecting piece 22. The tie member 30 is fixedly connected between the first connecting member 16 and the second connecting member 22, so that the lower cladding panel 20 is fixedly connected with the balcony slab 10 into a whole.
above-mentioned sun bedplate and prefabricated exterior wall cladding's connected node, only need during the installation with lower floor's exterior wall cladding 20 and sun bedplate 10 hoist and mount in place, then with drawknot spare 30 respectively with pre-buried in sun bedplate 10 and lower floor's exterior wall cladding 20's first connecting piece 16 and second connecting piece 22 fixed connection, accomplished the installation of lower floor's exterior wall cladding promptly, the installation construction is simple, has reduced the construction volume, has shortened construction cycle.
Referring also to fig. 2, in the embodiment of the present invention, the first connecting member 16 has a welding surface h for welding connection with the tie member 30. Therefore, the pulling piece 30 is attached to the welding surface h of the first connecting piece 16 and then welded, so that the welding quality is guaranteed, the connection is stable, and the operation is convenient.
in one embodiment, the first connecting member 16 includes a first welding plate 162 and at least one first fixing ring 164 fixedly connected to one side of the first welding plate 162. The side of the first welding plate 162 away from the first fixing ring 164 is a welding surface h. The first fixing ring 164 and the first welding plate 162 are embedded in the balcony panel 10, and the welding surface h of the first welding plate 162 is exposed on the lower surface of the balcony panel 10. So, with the first connecting piece 16 design for the first form of welding plate 162 and fixed ring 164 of fixed connection in the first fixed ring of first welding plate 162 one side, both be favorable to guaranteeing the welding quality of first connecting piece 16 and drawknot piece 30, make the pre-buried in balcony slab 10 that first connecting piece 16 can stabilize again, improved balcony slab 10 and lower floor's exterior wall cladding 20 joint strength.
Alternatively, the first fixing ring 164 may be formed by bending a rod-shaped member such as a steel bar, and both ends of the bent rod-shaped member are welded to the same side of the first welding plate 162, so that the first connecting member 16 is simple to manufacture and low in cost. In one embodiment, the number of securing rings may be two. However, the number of the fixing rings is not limited to two, and may be other numbers, and is not limited herein.
With continued reference to fig. 1, in an embodiment of the present invention, the second connecting member 22 has a threaded hole. The connection node further comprises a threaded fastening assembly 40, one end of the threaded fastening assembly 40 extending through the pulling element 30 and being threadedly connected with the threaded bore of the second connection element 22 to fasten the pulling element 30 to the second connection element 22. Therefore, the pulling piece 30 can be fixedly connected to the second connecting piece 22 only by screwing the threaded fastening component 40, the construction operation is simple, and the construction amount is small. Alternatively, the second connector 22 may be a sleeve.
In particular embodiments, the threaded fastening assembly 40 includes a threaded rod 42 and a fastener 44. One end of the screw rod 42 penetrates the pulling member 30 and is threadedly coupled to the threaded hole of the second coupling member 22. The fastener 44 is threaded on the screw 42 and abuts against a side of the fastener 30 facing away from the second connecting member 22. Thus, during the mounting operation, the screw rod 42 is inserted through the fastener 30 and the screw rod 42 is rotated so that the screw rod 42 is screwed into the screw hole of the second connector 22. The fastener 44 is then tightened on the threaded rod 42, pressing the side of the drawknot 30 facing away from the second connector 22, to fasten the drawknot 30 to the second connector 22. Alternatively, the fastener 44 may be a nut.
To prevent loosening of the fastener 44, in one embodiment, the fastener 44 may be welded to the threaded rod 42.
In particular embodiments, the threaded fastener assembly 40 further includes a backing plate 46. The backing plate 46 is disposed on the screw 42 and between the fastener 44 and the pulling member 30, and the backing plate 46 increases the force-bearing area, so that the locking structure between the pulling member 30 and the second connecting member 22 is more stable.
Referring to fig. 3, the pulling element 30 includes a first fixing portion 32 and a second fixing portion 34 perpendicular to the first fixing portion 32. The first fixing portion 32 is adapted to engage with the lower side of the balcony panel 10 so as to be fixedly connected to the first connecting member 16. The second fixing portion 34 is used for being attached to the inner side of the lower cladding panel 20 so as to be fixedly connected to the second connecting member 22. Alternatively, the pulling member 30 may be an angle iron.
With continued reference to fig. 1, in the embodiment of the present invention, the connection node between the balcony slab and the prefabricated exterior wall cladding further includes an upper exterior wall cladding 50 disposed on the upper side of the balcony slab 10. The lower end of the upper exterior wall cladding 50 is embedded with a third connecting piece 52. The upper side of the balcony slab 10 is embedded with the fourth connecting piece 18 corresponding to the third connecting piece 52, and the third connecting piece 52 is fixedly connected with the fourth connecting piece 18, so that the fixed installation of the upper exterior wall cladding 50 and the balcony slab 10 is realized.
It can be understood that the upper exterior wall hanging plate 50 and the lower exterior wall hanging plate 20 have the same structure, that is, the top ends of the upper exterior wall hanging plate 50 and the lower exterior wall hanging plate 20 are respectively and fixedly connected to the lower side of the balcony slab 10 above the upper exterior wall hanging plate through the tie members 30, and the bottom ends of the upper exterior wall hanging plate 50 and the lower exterior wall hanging plate 20 are respectively and fixedly connected to the upper side of the balcony slab 10 below the upper exterior wall hanging plate through the third connecting members 52 and the fourth connecting members 18.
In particular embodiments, the connection node further comprises a welded connection 60. The welded connector 60 is threaded to the third connector 52 at one end and welded to the fourth connector 18 at the other end. In this manner, at the time of installation construction, the weld connector 60 is first rotated so that the weld connector 60 is screwed to the third connector 52. And the upper layer exterior wall hanging plate 50 is hoisted in place, and then the welding connecting piece 60 is welded with the fourth connecting piece 18, thereby realizing the fixed installation of the upper layer exterior wall hanging plate 50 and the balcony slab 10. Alternatively, the third connector 52 may be a sleeve.
Further, the welded connector 60 includes a shaft portion 62 and a welding portion 64 fixedly connected to an end of the shaft portion 62, the shaft portion 62 having an external thread. The third connector 52 has a threaded hole. Shank 62 may be threadably connected to a threaded bore of third connector 52 via external threads. The welding portion 64 is used for welding connection with the fourth connection member 18. Alternatively, the weld connection 60 may be a bolt.
It will be appreciated that the cross-sectional area of the weld portion 64 is greater than the cross-sectional area of the shank portion 62, thereby increasing the weld area and facilitating the quality of the weld.
In one embodiment, the fourth connecting member 18 includes a second welding plate and at least one second fixing ring fixedly connected to one side of the second welding plate. The side of the second weld plate facing away from the second fastening ring has a welding surface for a welded connection to the welding portion 64 of the welded connection 60. The second fixing ring and the second welding plate are both pre-embedded in the balcony slab 10, and the welding surface of the second welding block is exposed on the upper side surface of the balcony slab 10. So, with the design of second connecting piece 22 for the solid fixed ring's of second welded plate and fixed connection in the second of second welded plate one side form, existing welding quality who does benefit to assurance fourth connecting piece 18 and welded connection 60 makes the pre-buried in balcony board 10 that fourth connecting piece 18 can stabilize again, has improved balcony board 10 and upper outer wall hang plate 50's joint strength. It will be appreciated that the fourth connector 18 may be identical in construction to the first connector 16. In other embodiments, the fourth connecting member 18 and the first connecting member 16 may have different structures, and are not limited herein.
Alternatively, the second fixing ring may be formed by bending a rod-shaped member such as a steel bar, and both ends of the bent rod-shaped member are welded to one side of the second welding plate, so that the fourth connecting member 18 is simple to manufacture and has a low cost. The fourth connector 18 may comprise two second fixing rings. The number of the second fixing rings is not limited to two, and may be other numbers, which is not limited herein.
In the embodiment, the top end of the lower cladding 20 has a positioning part 24. The positioning part 24 protrudes upwards from the top end surface of the lower exterior wall cladding 20 along the end surface of the balcony slab 10. Thus, the balcony slab 10 can be positioned by the positioning portion 24, so that the balcony slab 10 and the lower-layer exterior wall cladding 20 can be conveniently connected.
Furthermore, the butt joint interface of the positioning part 24 and the upper layer outer wall hanging plate 50 is provided with a waterproof rabbet g, so that a good waterproof effect is achieved.
In an embodiment of the invention, the balcony slab 10 may be a prefabricated laminated balcony slab. The prefabricated laminated balcony slab comprises a prefabricated layer 12 and a cast-in-place layer 14 formed on the prefabricated layer 12 in a pouring mode. Therefore, the balcony slab 10 and the exterior wall cladding (20 and 50) are prefabricated, the prefabricated rate of the assembled type of the building is improved, the construction efficiency is improved, formwork erecting is reduced, and environmental pollution and waste are reduced.
In particular embodiments, the preformed layer 12 of the preformed laminated balcony slab is provided with a flange 122. The flange 122 projects upwardly from the upper surface of the preformed layer 12 and extends lengthwise along the edge of the preformed layer 12. It will be appreciated that cast-in-place layer 14 is formed within the casting space defined by flange 122 and preform layer 12.
It should be noted that the fourth connecting member 18 is pre-embedded on the upper side of the flange 122, so as to be fixedly connected with the third connecting member 52 of the upper exterior wall cladding 50 by the welding connecting member 60. Therefore, the fourth connecting piece 18 is convenient to pre-embed when the prefabricated layer 12 is manufactured due to the arrangement of the turned-over edge 122, and the fourth connecting piece does not need to be pre-embedded when the prefabricated layer is cast in place, so that the manufacturing process of the balcony slab 10 is simplified, and the workload is further reduced.
the technical features of the embodiments described above may be arbitrarily combined, and for the sake of brevity, all possible combinations of the technical features in the embodiments described above are not described, but should be considered as being within the scope of the present specification as long as there is no contradiction between the combinations of the technical features.
the above-mentioned embodiments only express several embodiments of the present invention, and the description thereof is more specific and detailed, but not construed as limiting the scope of the invention. It should be noted that, for a person skilled in the art, several variations and modifications can be made without departing from the inventive concept, which falls within the scope of the present invention. Therefore, the protection scope of the present patent shall be subject to the appended claims.
Claims (10)
1. The utility model provides a connected node of balcony board and prefabricated exterior wall cladding which characterized in that includes:
The lower side of the balcony plate is embedded with a first connecting piece;
The lower-layer exterior wall cladding is supported and arranged at the lower side of the balcony slab, and a second connecting piece is embedded in the inner side of the lower-layer exterior wall cladding;
And the pulling piece is fixedly connected between the first connecting piece and the second connecting piece.
2. The connection node of a balcony slab and a prefabricated cladding panel according to claim 1, wherein said first connector has a welding surface for welded connection with said tie member.
3. The connection node of the balcony slab and the prefabricated exterior wall cladding as claimed in claim 2, wherein the first connecting member comprises a first welding plate and at least one first fixing ring fixedly connected to one side of the first welding plate, and one side of the first welding plate, which is far away from the first fixing ring, is the welding surface; the first fixing ring and the first welding plate are both pre-embedded in the balcony slab, and the welding surface of the first welding block is exposed on the lower side surface of the balcony slab.
4. the connection node of the balcony slab and the prefabricated exterior wall cladding as claimed in claim 1, wherein said second connector has a threaded hole; the connecting node further comprises a threaded fastening component, and one end of the threaded fastening component penetrates through the pulling piece and is in threaded connection with the threaded hole of the second connecting piece.
5. The connection node of the balcony slab and the prefabricated exterior wall cladding as claimed in claim 4, wherein said threaded fastening assembly comprises a screw and a fastener;
one end of the screw rod penetrates through the pulling piece and is in threaded connection with the threaded hole of the second connecting piece, and the fastening piece is in threaded connection with the screw rod and is abutted against one side, back to the second connecting piece, of the pulling piece.
6. The connection node of the balcony slab and the prefabricated exterior wall cladding as claimed in claim 4, wherein said second connecting member is a sleeve.
7. The connection node of the balcony slab and the prefabricated exterior wall cladding as claimed in claim 1, wherein the connection node further comprises an upper exterior wall cladding arranged on the upper side of the balcony slab, a third connecting piece is embedded in the lower end of the upper exterior wall cladding, a fourth connecting piece corresponding to the third connecting piece is embedded in the upper side of the balcony slab, and the third connecting piece is fixedly connected with the fourth connecting piece.
8. The connection node of the balcony slab and the prefabricated exterior wall cladding as claimed in claim 7, wherein said connection node further comprises a welded connection member, one end of said welded connection member is threadedly connected to said third connection member, and the other end thereof is welded to said fourth connection member.
9. The connection node of the balcony slab and the prefabricated exterior wall cladding as claimed in claim 7, wherein the top end of the lower exterior wall cladding is provided with a positioning part, and the positioning part protrudes upwards from the end surface of the top end of the lower exterior wall cladding along the end surface of the balcony slab.
10. The connection node of the balcony slab and the prefabricated exterior wall cladding as claimed in claim 9, wherein a butt joint interface of the positioning portion and the upper exterior wall cladding is provided with a waterproof tongue and groove.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910916996.3A CN110565815A (en) | 2019-09-26 | 2019-09-26 | Connection node of balcony slab and prefabricated exterior wall cladding |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910916996.3A CN110565815A (en) | 2019-09-26 | 2019-09-26 | Connection node of balcony slab and prefabricated exterior wall cladding |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110565815A true CN110565815A (en) | 2019-12-13 |
Family
ID=68782491
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910916996.3A Pending CN110565815A (en) | 2019-09-26 | 2019-09-26 | Connection node of balcony slab and prefabricated exterior wall cladding |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110565815A (en) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106759935A (en) * | 2017-01-19 | 2017-05-31 | 香港华艺设计顾问(深圳)有限公司 | A kind of attachment structure of precast concrete exterior wall cladding |
CN107190867A (en) * | 2017-04-21 | 2017-09-22 | 江苏宇辉住宅工业有限公司 | Assembling type outer wall body abutment joint seepage-proof structure |
CN107700676A (en) * | 2017-09-20 | 2018-02-16 | 中国建筑股份有限公司 | A kind of dry method connecting plate type structural system and its construction method |
CN207348231U (en) * | 2017-09-29 | 2018-05-11 | 远大住宅工业(天津)有限公司 | A kind of vertical connecting structure of Prefabricated stacking floor |
CN109322425A (en) * | 2018-09-29 | 2019-02-12 | 合肥工业大学 | A kind of plug-in connection system of combined wall board and preparation method thereof |
CN211341177U (en) * | 2019-09-26 | 2020-08-25 | 六安远大住宅工业有限公司 | Connection node of balcony slab and prefabricated exterior wall cladding |
-
2019
- 2019-09-26 CN CN201910916996.3A patent/CN110565815A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106759935A (en) * | 2017-01-19 | 2017-05-31 | 香港华艺设计顾问(深圳)有限公司 | A kind of attachment structure of precast concrete exterior wall cladding |
CN107190867A (en) * | 2017-04-21 | 2017-09-22 | 江苏宇辉住宅工业有限公司 | Assembling type outer wall body abutment joint seepage-proof structure |
CN107700676A (en) * | 2017-09-20 | 2018-02-16 | 中国建筑股份有限公司 | A kind of dry method connecting plate type structural system and its construction method |
CN207348231U (en) * | 2017-09-29 | 2018-05-11 | 远大住宅工业(天津)有限公司 | A kind of vertical connecting structure of Prefabricated stacking floor |
CN109322425A (en) * | 2018-09-29 | 2019-02-12 | 合肥工业大学 | A kind of plug-in connection system of combined wall board and preparation method thereof |
CN211341177U (en) * | 2019-09-26 | 2020-08-25 | 六安远大住宅工业有限公司 | Connection node of balcony slab and prefabricated exterior wall cladding |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107299699B (en) | Assembled cavity shear wall horizontal joint Alveolus type dry type connection structure | |
CN104563288A (en) | Reinforced concrete frame gridding slab prefabricated energy-saving house | |
CN102031866A (en) | Removal-free thermal insulation decorative template and mounting method thereof | |
CN208441231U (en) | A kind of beam column built from concrete dry method connecting node | |
CN211341177U (en) | Connection node of balcony slab and prefabricated exterior wall cladding | |
CN110424529B (en) | Prefabricated cantilever beam balcony and construction method | |
CN110284725B (en) | Reinforced concrete frame node beam hogging moment assembly steel structure and reinforcing method thereof | |
CN110565815A (en) | Connection node of balcony slab and prefabricated exterior wall cladding | |
CN211499320U (en) | Prefabricated partition plate structure of assembled balcony | |
CN210396132U (en) | Bracing fixed knot of prefabricated coincide floor of back trompil formula constructs | |
CN216587303U (en) | Wallboard coupling assembling and ALC side fascia | |
CN209817215U (en) | Connection assembly for laminated floor slab and wall | |
CN110056083A (en) | Can quick assembling self-locking FRP profile bean column node | |
CN211341295U (en) | Connecting joint of external wall board and beam | |
CN212957102U (en) | T-shaped prefabricated combined wallboard | |
CN209817222U (en) | Connection node of coincide floor and wall body | |
CN211114230U (en) | Horizontal connecting structure of shear wall | |
CN208700444U (en) | A kind of lattice tower crane attachment anchored platform | |
CN211200694U (en) | Prefabricated assembled plate type balcony | |
CN208267160U (en) | For connecting the tensioning rope connection component of concrete panel | |
CN110374193B (en) | Prefabricated assembled plate type balcony and construction method | |
CN212897328U (en) | Assembled steel construction building externally-hung wallboard | |
CN216948877U (en) | Horizontal piece joint connecting device of assembled shear force wall | |
CN208441288U (en) | A kind of connector construction for the connection of prefabricated assembled shear wall | |
CN110005214A (en) | A kind of hound support device and its construction method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |