CN110533198A - A kind of huge intelligent Acceptance Test System of hydroelectric power plant's maintenance - Google Patents

A kind of huge intelligent Acceptance Test System of hydroelectric power plant's maintenance Download PDF

Info

Publication number
CN110533198A
CN110533198A CN201910830444.0A CN201910830444A CN110533198A CN 110533198 A CN110533198 A CN 110533198A CN 201910830444 A CN201910830444 A CN 201910830444A CN 110533198 A CN110533198 A CN 110533198A
Authority
CN
China
Prior art keywords
module
power plant
hydroelectric power
data
test system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910830444.0A
Other languages
Chinese (zh)
Inventor
龚登位
乔进国
赵晓嘉
南冠群
赵华
曹一凡
杨春明
徐德新
郑智燊
张鹤鸣
张卫民
曾阳麟
刘啟文
杨波
辉金荣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huaneng Lancang River Hydropower Co Ltd
Original Assignee
Huaneng Lancang River Hydropower Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huaneng Lancang River Hydropower Co Ltd filed Critical Huaneng Lancang River Hydropower Co Ltd
Priority to CN201910830444.0A priority Critical patent/CN110533198A/en
Publication of CN110533198A publication Critical patent/CN110533198A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06KGRAPHICAL DATA READING; PRESENTATION OF DATA; RECORD CARRIERS; HANDLING RECORD CARRIERS
    • G06K17/00Methods or arrangements for effecting co-operative working between equipments covered by two or more of main groups G06K1/00 - G06K15/00, e.g. automatic card files incorporating conveying and reading operations
    • G06K17/0022Methods or arrangements for effecting co-operative working between equipments covered by two or more of main groups G06K1/00 - G06K15/00, e.g. automatic card files incorporating conveying and reading operations arrangements or provisious for transferring data to distant stations, e.g. from a sensing device
    • G06K17/0025Methods or arrangements for effecting co-operative working between equipments covered by two or more of main groups G06K1/00 - G06K15/00, e.g. automatic card files incorporating conveying and reading operations arrangements or provisious for transferring data to distant stations, e.g. from a sensing device the arrangement consisting of a wireless interrogation device in combination with a device for optically marking the record carrier
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • G06Q10/06395Quality analysis or management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/20Administration of product repair or maintenance
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Human Resources & Organizations (AREA)
  • Economics (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Strategic Management (AREA)
  • Physics & Mathematics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Marketing (AREA)
  • Tourism & Hospitality (AREA)
  • General Business, Economics & Management (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Health & Medical Sciences (AREA)
  • Development Economics (AREA)
  • Educational Administration (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • General Engineering & Computer Science (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Game Theory and Decision Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present invention relates to huge hydroelectric power plant's overhaul management technical fields, more particularly to intelligent Acceptance Test System is overhauled by a kind of huge hydroelectric power plant, including system control panel and handheld terminal, system control panel includes quality management module and data functional module, handheld terminal include can the locating module of acquisition and recording card position information, defect declare module, signal receiving module and communication module for receiving radiofrequency signal;Data flaw in handheld terminal declares module and sends signal to record of examination module, it realizes and is audited in the information-based typing and line of overhaul data registration card, and bring maintenance receipt, technical notes card content into history record of examination automatically, promote the level of IT application of overhaul management, the standard limited value library of overhaul data is recorded and formulated and solidified by data statistics module, and analogy analysis is carried out by analysis module, realize the automatic comparison of maintenance real time data and standard limited value, whether qualified intelligent decision overhauling project is checked and accepted.

Description

A kind of huge intelligent Acceptance Test System of hydroelectric power plant's maintenance
Technical field
The present invention relates to huge hydroelectric power plant's overhaul management technical fields more particularly to a kind of huge hydroelectric power plant's maintenance intelligence to test Receipts system.
Background technique
Full name hydraulic power plant, hydroelectric power plant is the factory that the position of water can be converted into kinetic energy electric energy, and worker is to equipment When maintenance, overhaul data registration card used in current maintenance needs service personnel's hand filling, later input computer system; When maintenance is checked and accepted, administrative staff need to consult corresponding standard according to data record card content, and whether artificial judgment is checked and accepted qualified, And receipt is overhauled in signing by hand, the level of informatization is low, and for the critical data of analysis main performance index before repairing, needs manually to sentence Whether disconnected to comply with standard, whether need overhaul plan, there are the risks of artificial judgment fault.
To solve the above problems, proposing that intelligent Acceptance Test System is overhauled by a kind of huge hydroelectric power plant in the application.
Summary of the invention
(1) goal of the invention
To solve technical problem present in background technique, the present invention proposes that a kind of huge hydroelectric power plant's maintenance intelligence checks and accepts system System is realized and is audited in the information-based typing and line of overhaul data registration card, and it is automatic to overhaul receipt, technical notes card content It brings history record of examination into, promotes the level of IT application of overhaul management, recorded and formulated by data statistics module and consolidated Change the standard limited value library of overhaul data, and analogy analysis is carried out by analysis module, realizes maintenance real time data and standard limited value Automatic comparison, whether intelligent decision overhauling project is checked and accepted qualified.
(2) technical solution
To solve the above problems, the present invention provides a kind of huge hydroelectric power plants to overhaul intelligent Acceptance Test System, including system control Platform and handheld terminal processed, system control panel include quality management module and data functional module, and handheld terminal includes that can adopt Collect the locating module of registration card location information, defect declares module, the signal receiving module for receiving radiofrequency signal and communication Module, communication module one end are connected with signal receiving module and locating module respectively.
Preferably, quality management module further includes scan module, and scan module is connected with data function module.
Preferably, scan module further includes photographing module, and photographing module is connected with data function module.
Preferably, data function module further includes analysis module, checks and accepts module and wireless radio frequency modules, wireless radio frequency modules It is connected with signal receiving module.
Preferably, analysis module further includes record of examination module, and record of examination module is connected with module is checked and accepted.
Preferably, quality management module includes data statistics module, and data statistics module is connected with analysis module.
Preferably, handheld terminal further includes that defect declares module, and defect declares module and is connected with record of examination module.
Above-mentioned technical proposal of the invention has following beneficial technical effect: passing through the scanning mould in quality management module Block and photographing module are scanned maintenance receipt, technical notes card, and carry out analogy analysis by analysis module, judge, And signal is sent to signal receiving module by wireless radio frequency modules, the data flaw in handheld terminal is declared module and is remembered to maintenance It records module and sends signal, realize and audited in the information-based typing and line of overhaul data registration card, and will maintenance receipt, technology note Record card content brings history record of examination into automatically, promotes the level of IT application of overhaul management, is remembered by data statistics module Record and the standard limited value library for formulating and solidifying overhaul data, and analogy analysis is carried out by analysis module, realize maintenance number in real time According to the automatic comparison with standard limited value, whether intelligent decision overhauling project is checked and accepted qualified.
Detailed description of the invention
Fig. 1 is system schematic of the invention.
Specific embodiment
In order to make the objectives, technical solutions and advantages of the present invention clearer, With reference to embodiment and join According to attached drawing, the present invention is described in more detail.It should be understood that these descriptions are merely illustrative, and it is not intended to limit this hair Bright range.In addition, in the following description, descriptions of well-known structures and technologies are omitted, to avoid this is unnecessarily obscured The concept of invention.
As shown in Figure 1, intelligent Acceptance Test System, including system control panel are overhauled by a kind of huge hydroelectric power plant proposed by the present invention And handheld terminal, system control panel include quality management module and data functional module, handheld terminal includes can acquisition and recording The locating module of card position information, defect declare module, signal receiving module and communication module for receiving radiofrequency signal, lead to News module one end is connected with signal receiving module and locating module respectively.
In the present embodiment, quality management module further includes scan module, and scan module is connected with data function module.
In the present embodiment, scan module further includes photographing module, and photographing module is connected with data function module.
In the present invention, by scan module in quality management module and photographing module to maintenance receipt, technical notes Card is scanned, and carries out analogy analysis, judgement by analysis module, and send out to signal receiving module by wireless radio frequency modules The number of delivering letters, the data flaw in handheld terminal declare module and send signal to record of examination module, realize overhaul data registration card Information-based typing and line on audit, and bring maintenance receipt, technical notes card content into history record of examination automatically, promoted The level of IT application of overhaul management is recorded by data statistics module and is formulated and solidified the standard limited value of overhaul data Library, and analogy analysis is carried out by analysis module, realize the automatic comparison of maintenance real time data and standard limited value, intelligent decision inspection Whether qualified repair the project acceptance inspection.
In the present embodiment, data function module further includes analysis module, checks and accepts module and wireless radio frequency modules, less radio-frequency Module is connected with signal receiving module.
Analysis module can judge analogy analysis is carried out, and be sent by wireless radio frequency modules to signal receiving module Analyze signal, convenient record in time and feedback.
In the present embodiment, analysis module further includes record of examination module, and record of examination module is connected with module is checked and accepted.
Data flaw declares module and sends signal to record of examination module, then carries out an acceptance inspection and count work by extension of module Industry, and bring maintenance receipt, technical notes card content into history record of examination automatically, promote the information-based water of overhaul management It is flat.
In the present embodiment, quality management module includes data statistics module, and data statistics module is connected with analysis module.
The standard limited value library of overhaul data is recorded and formulated and solidified by data statistics module, and passes through analysis mould Block carries out analogy analysis, realizes the automatic comparison of maintenance real time data and standard limited value, whether is the examination of intelligent decision overhauling project It is qualified.
In the present embodiment, handheld terminal further includes that defect declares module, and defect declares module and is connected with record of examination module.
Data flaw in handheld terminal declares module and sends flaw indication to record of examination module, makes record of examination module Defect maintenance can be recorded in real time in time, convenient record in time and feedback.
It should be understood that above-mentioned specific embodiment of the invention is used only for exemplary illustration or explains of the invention Principle, but not to limit the present invention.Therefore, that is done without departing from the spirit and scope of the present invention is any Modification, equivalent replacement, improvement etc., should all be included in the protection scope of the present invention.In addition, appended claims purport of the present invention Covering the whole variations fallen into attached claim scope and boundary or this range and the equivalent form on boundary and is repairing Change example.

Claims (7)

1. intelligent Acceptance Test System is overhauled by a kind of huge hydroelectric power plant, which is characterized in that including system control panel and handheld terminal, be System control platform includes quality management module and data functional module, handheld terminal include can acquisition and recording card position information determine Position module, defect declare module, signal receiving module and communication module for receiving radiofrequency signal, communication module one end difference It is connected with signal receiving module and locating module.
2. intelligent Acceptance Test System is overhauled by a kind of huge hydroelectric power plant according to claim 1, which is characterized in that quality management mould Block further includes scan module, and scan module is connected with data function module.
3. intelligent Acceptance Test System is overhauled by a kind of huge hydroelectric power plant according to claim 2, which is characterized in that scan module is also Including photographing module, photographing module is connected with data function module.
4. intelligent Acceptance Test System is overhauled by a kind of huge hydroelectric power plant according to claim 1, which is characterized in that data function mould Block further includes that analysis module, examination module and wireless radio frequency modules, wireless radio frequency modules are connected with signal receiving module.
5. intelligent Acceptance Test System is overhauled by a kind of huge hydroelectric power plant according to claim 4, which is characterized in that analysis module is also Including record of examination module, record of examination module is connected with module is checked and accepted.
6. intelligent Acceptance Test System is overhauled by a kind of huge hydroelectric power plant according to claim 1, which is characterized in that quality management mould Block includes data statistics module, and data statistics module is connected with analysis module.
7. intelligent Acceptance Test System is overhauled by a kind of huge hydroelectric power plant according to claim 1, which is characterized in that handheld terminal is also Module is declared including defect, defect declares module and is connected with record of examination module.
CN201910830444.0A 2019-09-04 2019-09-04 A kind of huge intelligent Acceptance Test System of hydroelectric power plant's maintenance Pending CN110533198A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910830444.0A CN110533198A (en) 2019-09-04 2019-09-04 A kind of huge intelligent Acceptance Test System of hydroelectric power plant's maintenance

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910830444.0A CN110533198A (en) 2019-09-04 2019-09-04 A kind of huge intelligent Acceptance Test System of hydroelectric power plant's maintenance

Publications (1)

Publication Number Publication Date
CN110533198A true CN110533198A (en) 2019-12-03

Family

ID=68666663

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910830444.0A Pending CN110533198A (en) 2019-09-04 2019-09-04 A kind of huge intelligent Acceptance Test System of hydroelectric power plant's maintenance

Country Status (1)

Country Link
CN (1) CN110533198A (en)

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN206921161U (en) * 2016-12-22 2018-01-23 河南威斯盾电子科技有限公司 It is a kind of to include inspection management and defect processing and the intelligent inspection system of examination

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN206921161U (en) * 2016-12-22 2018-01-23 河南威斯盾电子科技有限公司 It is a kind of to include inspection management and defect processing and the intelligent inspection system of examination

Similar Documents

Publication Publication Date Title
CN106971351B (en) The automatic Acceptance Test System of intelligent substation regulation and controlling of information integration and method
CN110135538A (en) The full life store management method of live working tools and its system based on RFID
CN102436624A (en) Method for processing flow and standard of power-marketing site services on basis of handheld terminal
CN111161445A (en) Electric power inspection system
CN106969924A (en) A kind of test system and method that track traffic brakes is detected and safeguarded
CN103941240B (en) A kind of detection method of the extension set detecting device that communicates based on radar system
CN105678357A (en) Electric multiple unit maintenance operation process management and control system and method
CN206728059U (en) A kind of electric communication operation and maintenance mobile job-oriented terminal
CN110989413A (en) Rail transit electromechanical equipment operation and maintenance management method based on mobile equipment
CN103847764A (en) Detecting system for vehicle equipment in wireless shunting locomotive signaling and monitoring system
CN103442079A (en) Power transmission and transformation key device management and control system
CN104794771B (en) One kind patrols inspection automatic planning and a device
CN108933482B (en) Power distribution terminal equipment off-line reason analysis method based on wireless signal intensity
CN109657926A (en) O&M closed-loop management method
CN110533198A (en) A kind of huge intelligent Acceptance Test System of hydroelectric power plant's maintenance
CN108681596A (en) A kind of electric device maintenance report automated analysis method and system
Hu et al. Research on intelligent inspection technology of distribution network based on RFID
CN115880803A (en) Intelligent inspection system and method
CN108846552B (en) Distribution network automation terminal defect analysis system and method thereof
CN101365212A (en) Indoor coverage maintenance management system
CN111062825A (en) Low-voltage fault diagnosis and rapid power restoration method based on mobile App
CN109165753B (en) Transformer substation defect management method based on mobile platform
CN110942163A (en) Intelligent maintenance method and system based on big data
CN116208537A (en) Portable general finger detector
CN109934950A (en) APP and method are maked an inspection tour in a kind of standardization of transmission line of electricity

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20191203