CN110531680A - Power supply system and control method are biased in a kind of monitoring of intelligent electric power - Google Patents

Power supply system and control method are biased in a kind of monitoring of intelligent electric power Download PDF

Info

Publication number
CN110531680A
CN110531680A CN201910876143.1A CN201910876143A CN110531680A CN 110531680 A CN110531680 A CN 110531680A CN 201910876143 A CN201910876143 A CN 201910876143A CN 110531680 A CN110531680 A CN 110531680A
Authority
CN
China
Prior art keywords
power supply
offset
biased
power
deviation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910876143.1A
Other languages
Chinese (zh)
Other versions
CN110531680B (en
Inventor
张明
蔡章强
龙辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Sichuan Electric Power Co Ltd
Original Assignee
State Grid Sichuan Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Sichuan Electric Power Co Ltd filed Critical State Grid Sichuan Electric Power Co Ltd
Priority to CN201910876143.1A priority Critical patent/CN110531680B/en
Publication of CN110531680A publication Critical patent/CN110531680A/en
Application granted granted Critical
Publication of CN110531680B publication Critical patent/CN110531680B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/04Programme control other than numerical control, i.e. in sequence controllers or logic controllers
    • G05B19/042Programme control other than numerical control, i.e. in sequence controllers or logic controllers using digital processors
    • G05B19/0423Input/output
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B2219/00Program-control systems
    • G05B2219/20Pc systems
    • G05B2219/25Pc structure of the system
    • G05B2219/25257Microcontroller

Abstract

It is monitored the invention discloses a kind of intelligent electric power and is biased to power supply system, it solves when carrying out domain power supply to bottom end from top, the problem of electric energy can not power on demand in real time in specific region, the present invention include multiple information acquisition devices, processor, server and are biased to power supply unit.It is monitored the invention also discloses a kind of intelligent electric power and is biased to method for controlling power supply, by multiple information acquisition devices by power information be sent to processor modeled, comparison handle, obtain offset, offset obtains feedback signal by the threshold value comparison with server, processor obtains the deviation power supply offset for carrying out being biased to power supply based on the feedback signal, and it is sent to server, power supply unit, which is finally biased to, according to deviation power supply offset and feedback signal carries out deviation power supply;The present invention has many advantages, such as that real-time and precise carries out electric energy distribution, active control accurate electric energy distributes, is energy saving.

Description

Power supply system and control method are biased in a kind of monitoring of intelligent electric power
Technical field
The present invention relates to power supply fields, and in particular to power supply system and controlling party are biased in a kind of monitoring of intelligent electric power Method.
Background technique
In recent years, national most area load rises year by year, and power grid is making huge tribute for regional economy social development It offers, but there is also some relatively distinct issues, especially city electricity consumptions and electricity consumption from far-off regions in power supply use, it is existing Have in technology, block supply general plan mode is carried out to lower end using by upper end, this is in the whole power supply macroscopically solved Needs of problems.But be not resolved in the power supply of specific region distribution, it is true with timeliness and not due to power demand The special circumstances such as qualitative cause the certain areas period to supply so will result in the feature difference of electricity consumption total amount and electricity consumption period It is electric excessively or certain areas electricity shortage, the problem of causing inconvenient waste of energy, life and production loss.
Summary of the invention
For the prior art to peak times of power consumption and trough period by the way of block supply, from power supply system top pair Bottom carries out Distributed Area power supply deployment, and this mode integrally solves peak times of power consumption and low power consumption to a certain extent The general orientation control of phase electricity consumption, but peak of power consumption and low ebb have special timeliness and irreproducible characteristic, using area Domain power supply or grade power supply, cannot accurately solve this problem, especially the power supply of certain areas period excessively or certain The problem of a little regional power supplies are insufficient, cause inconvenient waste of energy, life and production loss, the present invention provides a kind of intelligent electric powers Power supply system and control method are biased in monitoring.
Inventive principle: block supply can macroscopically realize area differentiation power supply, but in the specific power supply in region But it can not accomplish real-time monitoring, the present invention is being divided the same area as different classes of by carrying out piecemeal to multiple regions Block, from user level, to each piece of installation signal picker, for acquiring the electricity consumption situation of certain time in the region, and Processor is sent with electric signal by this, and the processor is modeled to this time with electric signal, the processor pair The model and original library model compare processing, and processing signal is sent to server, and the server is to the processing Comparing result is sent to deviation power supply unit by signal and threshold comparison, if necessary to be biased to power supply, then carries out deviation power supply, If it is not required, then end operation, the present invention is from power supply end, that is, user terminal triggering, by the practical electricity consumption situation of user, Electricity conveying is adjusted according to power demand in time;The present invention can also carry out multiple power supply areas and be powered integration point Match, realizes electric energy allocation optimum.
A kind of intelligent electric power monitoring deviation power supply system, which is characterized in that including multiple information acquisition devices, processor, clothes Business device and deviation power supply unit;
Multiple information acquisition devices respectively correspond different electricity consumption regions, obtain electricity consumption region according to the information acquisition device Power information, a plurality of power information constitutes an information group, and the power information group is sent to the processor;
The processor includes modeling module, model library, processing module, receiving module and sending module;
The power information group is sent to the modeling module by the receiving module;
The modeling module obtains electricity consumption model group by the power information group, and the electricity consumption model group is sent to The processing module;
The model library includes multiple for electric model, and the processing module is according to the electricity consumption model group from the model library Reference model group is obtained, it is described to be compared with electric model and the reference model, offset is obtained, and the offset is sent to The server;
The server is provided with deviation power supply threshold value, and deviation power supply threshold value and the offset are compared The processor is sent to feedback signal, and by the feedback signal;
The processor obtains the power supply offset for needing to be biased to power supply according to the feedback signal and the offset, And the power supply offset is sent to the server;
The power supply offset and the feedback signal are sent to the deviation power supply unit by the server, described It is biased to power supply unit and deviation power supply is carried out to power supply area according to the power supply offset and the feedback signal, the deviation supplies Electricity adjustment different electricity consumption regions electricity conveying.
Further, the feedback signal includes:
When the offset is in the threshold range, be maintained electrical output signal;
When the offset is lower than the threshold range, it is reduced electrical output signal;
When the offset is higher than the threshold range, it is reduced electrical output signal.
Further, the power supply offset includes:
When the feedback information is described keeps for electricity output, output power supply offset, the deviation power supply are not generated Device is powered without being biased to;
It when the feedback information is the reduction electrical output signal, generates and reduces power supply offset, the deviation supplies Electric installation carries out reducing electricity conveying;
It when the feedback information is the increase electrical output signal, generates and increases power supply offset, the deviation supplies Electric installation carries out increasing electricity conveying.
Further, described instruction includes that the preset acquisition instructions of program and the server are issued and actively instructed in real time, The server issues the active instruction to the processor, and the processor receives the active instruction, the acquisition Device acquisition electric signal, and the processor is sent to electric signal by described.
The control method for being biased to power supply system is monitored the present invention also provides a kind of intelligent electric power, this method includes following step It is rapid:
S1: power information is carried out to electricity consumption area and is acquired by the period, power information is obtained;
S2: modeling the power information, obtains with electric model, described described to carry out with electric model and for electric model Compare, obtains offset;
S3: the offset and the threshold value are compared, feedback signal is obtained;
S4: according to the feedback signal, power supply offset is obtained;
S5: according to the feedback signal and the power supply offset, deviation power supply is carried out, operation terminates.
Further, the step S3 includes following sub- content:
S301: according to the offset in the threshold value, the holding power supply signal is obtained;
S302: the threshold value is lower than according to the offset, obtains the reduction electrical output signal;
S303: the threshold value is higher than according to the offset, obtains the increase electrical output signal.
Further, the step S4 includes following sub- content:
S401: according to the former power supply signal of the holding, not output offset amount;
S402: according to the reduction electrical output signal, output reduces power supply offset;
S403: according to the increase electrical output signal, output increases power supply offset.
Further, the step S5 includes following sub- content:
S501: it according to the former power supply signal of the holding, powers without being biased to, operation terminates;
S502: it according to the reduction electrical output signal and reduction power supply offset, carries out reducing electricity conveying, behaviour Work terminates;
S503: it according to the increase electrical output signal and increase power supply offset, carries out increasing electricity conveying, behaviour Work terminates.
The present invention has the advantage that and the utility model has the advantages that
1, the information in electricity consumption region is acquired according to pre-set programs by acquisition module, establishes and uses electric model, it is remote by server End adjustment powering mode, can save electric energy to the full extent, especially under special circumstances, solve partial region power supply surplus, The case where partial region electricity shortage, realizes the allocation optimum of resource.
2, it is issued and is instructed by server, actively acquire power information and acquisition journey can be set on demand according to program needs Sequence, power supply can be improved can mastery.
Detailed description of the invention
Attached drawing described herein is used to provide to further understand the embodiment of the present invention, constitutes one of the application Point, do not constitute the restriction to the embodiment of the present invention.In the accompanying drawings:
Fig. 1 is that power supply flow chart is biased in intelligent monitoring of the invention.
Fig. 2 is that power supply flow chart is biased in instruction control of the invention.
Specific embodiment
Hereinafter, the term " includes " that can be used in various embodiments of the present invention or " may include " instruction are invented Function, operation or the presence of element, and do not limit the increase of one or more functions, operation or element.In addition, such as existing Used in various embodiments of the present invention, term " includes ", " having " and its cognate are meant only to indicate special characteristic, number Word, step, operation, the combination of element, component or aforementioned item, and be understood not to exclude first one or more other Feature, number, step, operation, element, component or aforementioned item combined presence or increase one or more features, number, Step, operation, element, component or aforementioned item combination a possibility that.
In various embodiments of the present invention, it states "or" or " at least one of A or/and B " includes listing file names with Any combination of text or all combinations.For example, statement " A or B " or " at least one of A or/and B " may include A, may include B may include A and B both.
The statement (" first ", " second " etc.) used in various embodiments of the present invention can be modified in various implementations Various constituent element in example, but respective sets can not be limited into element.For example, the above statement is not intended to limit the suitable of the element Sequence and/or importance.The above statement is only used for the purpose for differentiating an element and other elements.For example, the first user fills It sets and indicates different user device with second user device, although the two is all user apparatus.For example, of the invention each not departing from In the case where the range of kind embodiment, first element is referred to alternatively as second element, and similarly, second element is also referred to as first Element.
It should also be noted that the one-tenth element directly can be connected if description ' attach ' to a constituent element separately into element Be connected to the second constituent element, and can between the one-tenth element and the second constituent element " connection " third constituent element.On the contrary, When by a constituent element " being directly connected to " to separately at element when, it will be appreciated that between the one-tenth element and the second constituent element not There are third constituent element.
The term used in various embodiments of the present invention is used only for the purpose of describing specific embodiments and not anticipates In limitation various embodiments of the present invention.As used herein, singular is intended to also include plural form, unless context is clear Chu it is indicated otherwise.Unless otherwise defined, otherwise all terms (including technical terms and scientific terms) used herein have There is meaning identical with the normally understood meaning of various embodiments of the present invention one skilled in the art.The term (term such as limited in the dictionary generally used) is to be interpreted as having and situational meaning in the related technical field Identical meaning and it will be interpreted as having Utopian meaning or meaning too formal, unless of the invention various It is clearly defined in embodiment.
To make the objectives, technical solutions, and advantages of the present invention clearer, below with reference to embodiment and attached drawing, to this Invention is described in further detail, and exemplary embodiment of the invention and its explanation for explaining only the invention, are not made For limitation of the invention.
Embodiment 1
Power supply system and control method are biased in a kind of monitoring of intelligent electric power.
As shown in Figure 1, the designated order that information acquisition device is issued according to processor blas or server is to electricity consumption Region carries out power information acquisition, carries out power information acquisition to multiple electricity consumption regions, and is sent to processor, processor to Power information carries out a series of processing and obtains offset, and offset is sent to server, and server is by offset and threshold value pair Than obtaining feedback signal, feedback signal is sent to processor, processor obtains power supply offset based on the feedback signal, and will be for Electric deflection amount is sent to server, and feedback signal and power supply offset are issued deviation power supply unit by server simultaneously, is biased to supply Electric installation carries out deviation power supply, operation knot to power supply area.
Feedback signal includes: to keep electrical output signal, reduce electrical output signal and increase electrical output signal;
Power supply offset includes: to reduce power supply offset and increase power supply offset;
It reduces electrical output signal and is reduced power supply offset, increase electrical output signal and obtain increasing for electric deflection Amount keeps electrical output signal not generate power supply output offset amount;
Power supply unit is biased to according to electrical output signal power supply area corresponding with power supply offset is reduced is reduced, is subtracted Few electricity output;
Power supply unit is biased to according to electrical output signal power supply area corresponding with power supply offset is increased is increased, is increased The amount of power added output;
Power supply unit is biased to according to the corresponding power supply area of electrical output signal is kept, is powered without being biased to.
As shown in Fig. 2, processing of the processor to power information.
Multiple information acquisition devices respectively correspond different electricity consumption regions, obtain multiple electricity consumption regions according to multiple information acquisition devices Power information, multiple power informations constitute an information group, and power information is sent to receiving module;
Receiving module receives power information, and power information is sent to modeling module;
Modeling module receives power information, and obtains using electric model by power information, and will be sent to place with electric model Manage module;
Processing module obtains reference model from model library according to electric model, is compared, is obtained with electric model and reference model Offset, and the offset is sent to server;
Server is provided with deviation power supply threshold value, threshold value and offset is compared to obtain feedback signal, and will feedback Signal is sent to processor;
Processor based on the feedback signal after, obtain power supply offset from offset, and will power supply offset be sent to it is described Server.
Above-described specific embodiment has carried out further the purpose of the present invention, technical scheme and beneficial effects It is described in detail, it should be understood that being not intended to limit the present invention the foregoing is merely a specific embodiment of the invention Protection scope, all within the spirits and principles of the present invention, any modification, equivalent substitution, improvement and etc. done should all include Within protection scope of the present invention.

Claims (8)

1. power supply system is biased in a kind of intelligent electric power monitoring, which is characterized in that including multiple information acquisition devices, processor, service Device and deviation power supply unit;
Multiple information acquisition devices respectively correspond different electricity consumption regions, obtain the use in electricity consumption region according to the information acquisition device Power information, a plurality of power information constitutes an information group, and the power information group is sent to the processor;
The processor includes modeling module, model library, processing module, receiving module and sending module;
The power information group is sent to the modeling module by the receiving module;
The modeling module obtains electricity consumption model group by the power information group, and the electricity consumption model group is sent to described Processing module;
The model library includes multiple for electric model, and the processing module is obtained according to the electricity consumption model group from the model library Reference model group, it is described to be compared with electric model and the reference model, offset is obtained, and the offset is sent to described Server;
The server is provided with deviation power supply threshold value, deviation power supply threshold value and the offset is compared to obtain anti- Feedback signal, and the feedback signal is sent to the processor;
The processor obtains the power supply offset for needing to be biased to power supply according to the feedback signal and the offset, and will The power supply offset is sent to the server;
The power supply offset and the feedback signal are sent to the deviation power supply unit, the deviation by the server Power supply unit carries out deviation power supply to power supply area according to the power supply offset and the feedback signal, and the deviation power supply is adjusted Whole difference electricity consumption region electricity conveying.
2. power supply system is biased in a kind of intelligent electric power monitoring according to claim 1, which is characterized in that the feedback signal Include:
When the offset is in the threshold range, be maintained electrical output signal;
When the offset is lower than the threshold range, it is reduced electrical output signal;
When the offset is higher than the threshold range, it is reduced electrical output signal.
3. power supply system is biased in a kind of intelligent electric power monitoring according to claim 2, which is characterized in that described for electric deflection Amount includes:
When the feedback information is described keeps for electricity output, output power supply offset, the deviation power supply unit are not generated Without being biased to power;
When the feedback information is the reduction electrical output signal, generates and reduce power supply offset, the deviation is for Denso It sets and reduce electricity conveying;
When the feedback information is the increase electrical output signal, generates and increase power supply offset, the deviation is for Denso It sets and increase electricity conveying.
4. power supply system is biased in a kind of intelligent electric power monitoring according to claim 3, which is characterized in that described instruction includes The preset acquisition instructions of program and the server issue actively to be instructed in real time, and the server issues the active instruction and arrives The processor, the processor receives the active instruction, the collector acquisition electric signal, and uses telecommunications for described Number it is sent to the processor.
5. being biased to the control method of power supply system using a kind of intelligent electric power monitoring described in claim 4, which is characterized in that the party Method the following steps are included:
S1: power information is carried out to electricity consumption area and is acquired by the period, power information is obtained;
S2: modeling the power information, obtains with electric model, described described to be compared with electric model and for electric model Compared with obtaining offset;
S3: the offset and the threshold value are compared, feedback signal is obtained;
S4: according to the feedback signal, power supply offset is obtained;
S5: according to the feedback signal and the power supply offset, deviation power supply is carried out, operation terminates.
6. method for controlling power supply is biased in a kind of intelligent electric power monitoring according to claim 5, which is characterized in that the step S3 includes following sub- content:
S301: according to the offset in the threshold value, the holding power supply signal is obtained;
S302: the threshold value is lower than according to the offset, obtains the reduction electrical output signal;
S303: the threshold value is higher than according to the offset, obtains the increase electrical output signal.
7. method for controlling power supply is biased in a kind of intelligent electric power monitoring according to claim 6, which is characterized in that the step S4 includes following sub- content:
S401: according to the former power supply signal of the holding, not output offset amount;
S402: according to the reduction electrical output signal, output reduces power supply offset;
S403: according to the increase electrical output signal, output increases power supply offset.
8. the control method that power supply is biased in a kind of intelligent electric power monitoring according to claim 7, which is characterized in that the step Rapid S5 includes following sub- content:
S501: it according to the former power supply signal of the holding, powers without being biased to, operation terminates;
S502: it according to the reduction electrical output signal and reduction power supply offset, carries out reducing electricity conveying, operation knot Beam;
S503: it according to the increase electrical output signal and increase power supply offset, carries out increasing electricity conveying, operation knot Beam.
CN201910876143.1A 2019-09-17 2019-09-17 Intelligent power monitoring deviation power supply system and control method Active CN110531680B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910876143.1A CN110531680B (en) 2019-09-17 2019-09-17 Intelligent power monitoring deviation power supply system and control method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910876143.1A CN110531680B (en) 2019-09-17 2019-09-17 Intelligent power monitoring deviation power supply system and control method

Publications (2)

Publication Number Publication Date
CN110531680A true CN110531680A (en) 2019-12-03
CN110531680B CN110531680B (en) 2021-04-06

Family

ID=68669078

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910876143.1A Active CN110531680B (en) 2019-09-17 2019-09-17 Intelligent power monitoring deviation power supply system and control method

Country Status (1)

Country Link
CN (1) CN110531680B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113542218A (en) * 2021-06-07 2021-10-22 南京地铁建设有限责任公司 Data transmission method, power monitoring equipment, operation and maintenance equipment and storage medium

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103543678A (en) * 2013-10-15 2014-01-29 上海交通大学 Controller with configurable demand on power demand side
CN107547207A (en) * 2016-06-28 2018-01-05 中兴通讯股份有限公司 A kind of active Ethernet method of supplying power to, power receiving equipment and power supply unit
CN108258678A (en) * 2018-04-02 2018-07-06 杨广凌 A kind of solar energy system and its method for supplying electricity to multi-load unit
CN109038692A (en) * 2018-06-27 2018-12-18 浙江大华技术股份有限公司 A kind of power supply unit

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103543678A (en) * 2013-10-15 2014-01-29 上海交通大学 Controller with configurable demand on power demand side
CN107547207A (en) * 2016-06-28 2018-01-05 中兴通讯股份有限公司 A kind of active Ethernet method of supplying power to, power receiving equipment and power supply unit
CN108258678A (en) * 2018-04-02 2018-07-06 杨广凌 A kind of solar energy system and its method for supplying electricity to multi-load unit
CN109038692A (en) * 2018-06-27 2018-12-18 浙江大华技术股份有限公司 A kind of power supply unit

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113542218A (en) * 2021-06-07 2021-10-22 南京地铁建设有限责任公司 Data transmission method, power monitoring equipment, operation and maintenance equipment and storage medium

Also Published As

Publication number Publication date
CN110531680B (en) 2021-04-06

Similar Documents

Publication Publication Date Title
Luna et al. Online energy management systems for microgrids: Experimental validation and assessment framework
CN106410966B (en) A kind of energy management apparatus applied to the system of providing multiple forms of energy to complement each other
CN103297505B (en) The On-Line Control Method of data center's multiple-energy-source and system under dynamic cloud service request
US20230110198A1 (en) Control method and system for distribution network with distributed mobile energy storage systems
Ahmad et al. Dynamic economic dispatch and transient control of distributed generators in a microgrid
CN102832614A (en) Robust optimizing method for power generation plan under uncertain environment
CN102244677A (en) Green energy Cloud computing method and system
CN109636228A (en) A kind of new energy station is rationed the power supply period active distribution method
CN114362238B (en) Photovoltaic control system and method
Zhang et al. Optimal price-controlled demand response with explicit modeling of consumer preference dynamics
Zhu et al. Energy optimal dispatch of the data center microgrid based on stochastic model predictive control
US20170346283A1 (en) Systems and Methods for Modular DC Microgrids with Control of Loads
Farzin et al. A hierarchical scheme for outage management in multi‐microgrids
CN110531680A (en) Power supply system and control method are biased in a kind of monitoring of intelligent electric power
CN110957807B (en) System and method for managing and controlling energy information of power distribution network of distributed energy
CN107887975B (en) Demand side resource regulation and control method and system
DE102015102430A1 (en) Autonomous and cooperatively controlled energy feeding in a virtual power plant
CN115983612B (en) Distributed source network charge storage scheduling optimization method based on virtual power plant
CN110808616A (en) Micro-grid frequency control method based on power shortage distribution
CN103532172A (en) Multistage reserve coordination method based on set dynamic classification
CN115459258A (en) Load accurate regulation and control method and system based on distribution automation
CN113541206B (en) Power supply system and control method
Mudumbai et al. Distributed control for the smart grid: The case of economic dispatch
CN104753066A (en) Parameter fitting-based voltage controlling method for active distribution feeders
CN112636334A (en) Solar-based micro-grid system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant