CN110528545B - Construction method of foundation deep-buried drainage blind ditch - Google Patents

Construction method of foundation deep-buried drainage blind ditch Download PDF

Info

Publication number
CN110528545B
CN110528545B CN201810510755.4A CN201810510755A CN110528545B CN 110528545 B CN110528545 B CN 110528545B CN 201810510755 A CN201810510755 A CN 201810510755A CN 110528545 B CN110528545 B CN 110528545B
Authority
CN
China
Prior art keywords
blind ditch
excavation area
excavation
foundation
full
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201810510755.4A
Other languages
Chinese (zh)
Other versions
CN110528545A (en
Inventor
姚裕春
李安洪
龚建辉
谢毅
陈伟志
袁碧玉
李宁
唐第甲
张耀
高继涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Eryuan Engineering Group Co Ltd CREEC
Original Assignee
China Railway Eryuan Engineering Group Co Ltd CREEC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Eryuan Engineering Group Co Ltd CREEC filed Critical China Railway Eryuan Engineering Group Co Ltd CREEC
Priority to CN201810510755.4A priority Critical patent/CN110528545B/en
Publication of CN110528545A publication Critical patent/CN110528545A/en
Application granted granted Critical
Publication of CN110528545B publication Critical patent/CN110528545B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • E02D19/06Restraining of underground water
    • E02D19/10Restraining of underground water by lowering level of ground water

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Hydrology & Water Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

A construction method of a foundation deep-buried drainage blind ditch is used for effectively improving the construction safety of the deep-buried drainage blind ditch with a small cross section, ensuring the construction quality and the drainage performance and saving the engineering cost. The method is mainly characterized in that a blind ditch excavation area is marked in a partitioning mode and divided into a full-section excavation area and a local excavation area which are separated from each other along the length direction of the blind ditch excavation area, a full-section excavation area blind ditch foundation pit is constructed in a layered excavation mode firstly, hollow permeable anchor rods are adopted for supporting the foundation pit on two sides in a layered mode, and then the bottom of the foundation pit excavated in the full-section excavation area is excavated to the two sides of the blind ditch undermining excavation area.

Description

Construction method of foundation deep-buried drainage blind ditch
Technical Field
The invention relates to geotechnical engineering, in particular to a construction method of a foundation deep-buried drainage blind ditch.
Background
The drainage blind ditch is widely applied to the expansive rock soil foundation of the high-speed railway and the foundation with a higher underground water level, the underground water level can be effectively reduced by arranging the drainage blind ditch, the influence of the underground water on the roadbed structure of the high-speed railway is reduced, and the expansion rock soil is prevented from causing overlarge upwarp deformation of the high-speed railway under the action of water and being difficult to repair. In order to reduce the influence of underground water level on a roadbed structure under many conditions, particularly to construct a ballastless track high-speed railway in an expansive rock-soil area, the depth of the arranged drainage blind ditch is large, sometimes reaches 4-5m, but the cross section of the drainage blind ditch is usually about 1m, so that how to realize the rapid and safe construction of the drainage blind ditch with a deep-buried small cross section and ensure the construction quality are problems which need to be solved urgently.
Disclosure of Invention
The invention aims to solve the technical problem of providing a construction method of a foundation deep-buried drainage blind ditch, so as to effectively improve the construction safety of the deep-buried drainage blind ditch with small cross section, ensure the construction quality and the drainage performance and save the labor cost.
The technical scheme adopted by the invention for solving the technical problems is as follows:
the invention relates to a construction method of a foundation deep-buried drainage blind ditch, which comprises the following steps:
firstly, displaying a set boundary line of a drainage blind ditch on a ground mark line at the position of the drainage blind ditch;
secondly, marking the blind ditch excavation area in a partitioning manner, and dividing the blind ditch excavation area into a full-section excavation area and a local excavation area which are spaced along the length direction of the blind ditch excavation area;
thirdly, carrying out layered excavation construction on the blind ditch foundation pit in the full-section excavation area, and carrying out foundation pit supporting by adopting hollow permeable anchor rods on two sides in layers until the bottom of the foundation pit;
fourthly, performing blind trench cut excavation on the bottom of the local excavation region to two sides at the bottom of the foundation pit excavated in the full-section excavation region;
constructing a blind ditch waterproof foundation at the bottoms of the full-section excavation area and the local excavation area;
placing a drainage pipe with an opening in the waterproof foundation, filling the fixed drainage pipe with the cleaned crushed stone, and filling the cleaning crushed stone in the excavation groove of the local excavation area;
seventhly, placing bagged medium coarse sand wrapped by water-permeable geotextile bags on two sides of the foundation pit in layers at the top of the waterproof foundation of the full-section excavation area, and filling and cleaning broken stones in the middle until the top surface of the construction is high;
constructing a concrete sealing layer on the top of the blind ditch of the full-section excavation area.
The invention has the advantages that the excavation range of the foundation pit is reduced by arranging the full-section excavation area and the local excavation area, the excavation construction safety of the foundation pit is improved, and the engineering investment is saved; the blind ditches are arranged at intervals of full depth and local depth, so that the effect of reducing the underground water level can be achieved, and meanwhile, the full depth and local depth of the blind ditches can be arranged at intervals of full depth and local depth so as to prevent the underground water of the upper foundation from moving to the inner rock-soil body; the two sides of the foundation pit of the full-section excavation area are supported by the hollow permeable anchor rods, so that the safety of the foundation pit support can be ensured, the drainage effect can be realized, and the problem that the drainage channel needs to be drilled again for drainage because the traditional support structure seals the drainage channel is solved; the construction method has the characteristics of simple construction, good economy, good precipitation effect, environmental protection and the like, and has popularization and application values.
Drawings
The specification includes the following three drawings:
FIG. 1 is a plan sectional view of a construction method of a deep-buried drainage blind ditch for a foundation according to the present invention.
FIG. 2 is a schematic sectional view A-A of a method for constructing a deep foundation drainage blind ditch according to the present invention.
FIG. 3 is a schematic cross-sectional view B-B of the construction method of the foundation deep-buried drain blind ditch of the present invention.
The component names and corresponding labels are shown in the figure: the water-proof foundation comprises a water-proof foundation 1, a water drainage pipe 2, bagged medium coarse sand 3, cleaned broken stone 4, a sealing layer 5, a foundation rock-soil body 6, a hollow permeable anchor rod 7, a full-section excavation area I and a local excavation area II.
Detailed Description
The invention is further described below with reference to the accompanying drawings and examples.
Referring to fig. 1 to 3, a construction method of a foundation deep-buried drainage blind ditch comprises the following steps:
firstly, displaying a set boundary line of a drainage blind ditch on a ground mark line at the position of the drainage blind ditch;
secondly, marking the blind ditch excavation area in a partitioning manner, and dividing the blind ditch excavation area into a full-section excavation area I and a local excavation area II which are spaced along the length direction of the blind ditch excavation area;
thirdly, carrying out layered excavation construction on the blind ditch foundation pit in the full-section excavation area I, and carrying out foundation pit supporting on two sides by layers by adopting hollow permeable anchor rods 7 until the bottom of the foundation pit;
fourthly, performing blind ditch undermining excavation on the bottom of the local excavation region II from the bottom of the foundation pit excavated in the full-section excavation region I to two sides;
constructing a blind ditch waterproof foundation 1 at the bottoms of the full-section excavation area I and the local excavation area II;
placing the drainage pipe 2 with the opening in the waterproof foundation 1, filling the fixed drainage pipe with the cleaned crushed stone 4, and filling the cleaned crushed stone 4 in the excavation groove of the local excavation area II;
seventhly, placing bagged medium coarse sand 3 wrapped by permeable geotextile bags on two sides of the foundation pit in layers at the top of the waterproof foundation 1 of the full-section excavation area I, and filling and cleaning broken stones 4 in the middle until the top surface of the construction is high;
constructing a concrete sealing layer 5 on the top of the blind ditch of the full-section excavation area I.
In the fourth step, the excavation height of blind ditches at the bottom of the local excavation area II is generally not less than 0.5 m. The cross section of the waterproof foundation 1 is U-shaped.
Referring to fig. 1, the length direction of the blind ditch excavation area is divided into a full-section excavation area I and a local excavation area II which are separated from each other, so that the excavation range of the foundation pit is reduced, the construction safety of the foundation pit excavation is improved, and the engineering investment is saved. Referring to fig. 2 and 3, the blind ditches are arranged at intervals of full depth and local depth, so that the effect of reducing the underground water level can be achieved, and meanwhile, the movement of the ground rock-soil groundwater of the upper part of the foundation to the inner rock-soil body can be prevented due to the fact that the water permeability of the ground rock-soil body and the material of the full-depth blind ditches is obviously different. Excavation foundation ditch adopts cavity stock 7 that permeates water to strut, both can guarantee the safety of excavation supporting, can play the drainage effect again, has avoided traditional supporting construction to seal the problem that drainage channel need drill hole drainage again.
The construction method has the characteristics of simple construction, good economical efficiency, good precipitation effect, environmental protection and the like, and has popularization and application values.
The foregoing is only illustrative of the principles and operational steps of the method for constructing a blind drain for deep foundation burial, and is not intended to limit the invention to the specific constructions and steps shown and described, and accordingly all modifications and equivalents that may be employed fall within the scope of the claims.

Claims (3)

1. A construction method of a foundation deep-buried drainage blind ditch comprises the following steps:
firstly, displaying a set boundary line of a drainage blind ditch on a ground mark line at the position of the drainage blind ditch;
secondly, marking the blind ditch excavation area in sections, and dividing the blind ditch excavation area into a full-section excavation area (I) and a local excavation area (II) which are spaced along the length direction of the blind ditch excavation area;
thirdly, carrying out layered excavation construction on a blind ditch foundation pit in the full-section excavation area (I), and carrying out foundation pit support by using hollow permeable anchor rods (7) in layers until the bottom of the foundation pit is reached;
fourthly, performing blind trench cut excavation on the bottom of the local excavation region (II) from the bottom of the foundation pit excavated in the full-section excavation region (I) to two sides;
constructing blind ditch waterproof foundations (1) at the bottoms of the full-section excavation area (I) and the local excavation area (II);
placing a drain pipe (2) in the waterproof foundation (1), filling the fixed drain pipe with cleaned crushed stone (4), and filling the cleaned crushed stone (4) in an excavation groove of the local excavation area (II);
seventhly, placing bagged medium coarse sand (3) wrapped by permeable geotextile bags on two sides of the foundation pit in layers at the top of the waterproof foundation (1) of the full-section excavation area (I), and filling and cleaning broken stones (4) in the middle until the top surface elevation is constructed;
constructing a concrete sealing layer (5) on the top of the blind ditch of the full-section excavation area (I).
2. The construction method of the foundation deep-buried drain blind ditch according to claim 1, characterized in that: in the fourth step, the excavation height of blind ditches at the bottom of the local excavation area (II) is not less than 0.5 m.
3. The construction method of the foundation deep-buried drain blind ditch according to claim 1, characterized in that: the cross section of the waterproof foundation (1) is U-shaped.
CN201810510755.4A 2018-05-24 2018-05-24 Construction method of foundation deep-buried drainage blind ditch Active CN110528545B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810510755.4A CN110528545B (en) 2018-05-24 2018-05-24 Construction method of foundation deep-buried drainage blind ditch

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810510755.4A CN110528545B (en) 2018-05-24 2018-05-24 Construction method of foundation deep-buried drainage blind ditch

Publications (2)

Publication Number Publication Date
CN110528545A CN110528545A (en) 2019-12-03
CN110528545B true CN110528545B (en) 2021-03-26

Family

ID=68656546

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810510755.4A Active CN110528545B (en) 2018-05-24 2018-05-24 Construction method of foundation deep-buried drainage blind ditch

Country Status (1)

Country Link
CN (1) CN110528545B (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104314090A (en) * 2014-08-29 2015-01-28 中铁八局集团建筑工程有限公司 Deep foundation pit bedrock drainage culvert and drainage system and drainage construction method thereof
KR20150065475A (en) * 2013-12-05 2015-06-15 한국도로공사 Side gutter for mountain ridge and construction method
CN107201908A (en) * 2017-06-16 2017-09-26 中铁五局集团有限公司 A kind of construction method of the regional buried Central drain in tunnel of bitter cold
CN107780425A (en) * 2017-09-20 2018-03-09 太原理工大学 A kind of large-scale yard drain french drain method to set up of banketing in Gullied Rolling Loess Region

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20150065475A (en) * 2013-12-05 2015-06-15 한국도로공사 Side gutter for mountain ridge and construction method
CN104314090A (en) * 2014-08-29 2015-01-28 中铁八局集团建筑工程有限公司 Deep foundation pit bedrock drainage culvert and drainage system and drainage construction method thereof
CN107201908A (en) * 2017-06-16 2017-09-26 中铁五局集团有限公司 A kind of construction method of the regional buried Central drain in tunnel of bitter cold
CN107780425A (en) * 2017-09-20 2018-03-09 太原理工大学 A kind of large-scale yard drain french drain method to set up of banketing in Gullied Rolling Loess Region

Also Published As

Publication number Publication date
CN110528545A (en) 2019-12-03

Similar Documents

Publication Publication Date Title
CN105863671B (en) Frame-type subdrain system tunnel lining structure
CN101139838B (en) Construction method for high artesian area ultra-deep foundation pit
CN102071607B (en) Railroad bed repair method without affecting existing running conditions
CN103510528B (en) For the blind drainage structure of underground structure anti-floating
CN106640091B (en) A kind of shallow tunnel section construction method
LU500273B1 (en) New comprehensive dewatering and drainage method and drainage device for mudstone subway station
CN107905811A (en) The hollow longeron of foundation carries domes without the lining cutting of inverted arch type and its drainage system
CN108570997A (en) Cofferdam and construction method are built in returning for seabed tunnel point storehouse construction
CN210002425U (en) structure of seepage roadbed side slope drainage system
CN113818300B (en) Sponge city ecological roadbed structure based on original road and construction method thereof
CN208982109U (en) A kind of tunnel structure with antiseepage drain function
CN103590390B (en) A kind of stream is moulded shape reinforced soft soil ground structure and adds solid method
CN102425179B (en) Reinforced soil infiltration ditch structure supported by miniature steel pipe cast-in-place pile
CN107905809A (en) Diplopore hollow, rectangular section load bearing beam road cutting type protecting arched tunnel liner structure and separate type drainage system
CN110528545B (en) Construction method of foundation deep-buried drainage blind ditch
CN217760383U (en) Enclosure structure arranged on slope support
JP6782404B2 (en) Groundwater level lowering method, groundwater drainage channel construction method and groundwater drainage channel structure
CN216275788U (en) Drainage device used after failure of water interception curtain of deep foundation pit
CN214738189U (en) Bucket waterproof curtain and hole digging pile supporting structure of water-rich sand layer
CN208266895U (en) Cofferdam is built in returning for seabed tunnel point storehouse construction
CN107975378A (en) The U-shaped wall base with architecture separates bearing type liner structure with bottom plate sound
CN110043272B (en) Method for controlling gushing in tunneling process of shield tunneling machine
CN107119716A (en) Tidal land tidal bore area vcehicular tunnel builds structure and its method
CN210561967U (en) Channel structure for improving flood control standard of existing river levee
CN113863076A (en) Construction method of sunken road under sandbar bridge

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant