CN110514530A - A kind of casting iron well lid bearing capacity change rate monitoring method - Google Patents

A kind of casting iron well lid bearing capacity change rate monitoring method Download PDF

Info

Publication number
CN110514530A
CN110514530A CN201910805547.1A CN201910805547A CN110514530A CN 110514530 A CN110514530 A CN 110514530A CN 201910805547 A CN201910805547 A CN 201910805547A CN 110514530 A CN110514530 A CN 110514530A
Authority
CN
China
Prior art keywords
change rate
bearing capacity
capacity change
under
test environment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910805547.1A
Other languages
Chinese (zh)
Inventor
李启龙
吴少斌
朱志雄
戴俭文
张德华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Preming Precision Machinery Co Ltd
Original Assignee
Anhui Preming Precision Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Preming Precision Machinery Co Ltd filed Critical Anhui Preming Precision Machinery Co Ltd
Priority to CN201910805547.1A priority Critical patent/CN110514530A/en
Publication of CN110514530A publication Critical patent/CN110514530A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N3/00Investigating strength properties of solid materials by application of mechanical stress
    • G01N3/08Investigating strength properties of solid materials by application of mechanical stress by applying steady tensile or compressive forces
    • G01N3/18Performing tests at high or low temperatures
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N2203/00Investigating strength properties of solid materials by application of mechanical stress
    • G01N2203/02Details not specific for a particular testing method
    • G01N2203/0202Control of the test
    • G01N2203/0212Theories, calculations
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N2203/00Investigating strength properties of solid materials by application of mechanical stress
    • G01N2203/02Details not specific for a particular testing method
    • G01N2203/06Indicating or recording means; Sensing means
    • G01N2203/067Parameter measured for estimating the property
    • G01N2203/0676Force, weight, load, energy, speed or acceleration

Abstract

The invention discloses a kind of casting iron well lid bearing capacity change rate monitoring methods, the stage is monitored including environmental parameter calibration phase and change rate, set the detection environment of different temperatures and different humidity, and the well lid bearing capacity change rate under respective environment is monitored, realize low temperature, room temperature and high temperature and drying, bearing capacity change rate monitoring under comfortable and wet condition, deepen the understanding to well lid service condition under varying environment, municipal personnel targetedly safeguard well lid according to different installation environments, extend the service life of well lid, according to the result of the weighted differences summation of the bearing capacity change rate threshold value under actual carrying capacity change rate and corresponding detection environment, determine whether the bearing capacity under the detection environment is in limiting condition, in actual use, this monitoring method is combined with warning system, it can be real The monitoring of existing well lid operating status, practicability is more preferably.

Description

A kind of casting iron well lid bearing capacity change rate monitoring method
Technical field
The present invention relates to casting iron well lid bearing capacity change rate monitoring technical field, specially a kind of casting iron well lid bearing capacity becomes Rate monitoring method.
Background technique
Casting iron well lid has the characteristics that hardness is high, bearing capacity is good as equipment common in municipal works, but according to well The physical property of the difference of lid installation environment, well lid is also varied, the well lid carrying under the conditions of different temperatures and different humidity Power is also different, and the existing most maintenance of machine modes using basis of well lid maintenance mainly add antitheft and abrasion aspect By force, the well lid maintenance mode and under different regions, different installation environments is identical, and municipal personnel use feelings to well lid under varying environment Condition not enough understands, and can not targetedly be safeguarded according to different installation environments to well lid, reduce the service life of well lid.
Summary of the invention
The purpose of the present invention is to provide a kind of casting iron well lid bearing capacity change rate monitoring methods, by different test wrappers The well lid bearing capacity change rate in border is monitored, and realizes low temperature, room temperature and high temperature and drying, holding comfortably and under wet condition The monitoring of power change rate is carried, the understanding to well lid service condition under varying environment is deepened, allows municipal personnel according to different Installation environment targetedly safeguards well lid, extends the service life of well lid, this monitoring method is mutually tied with warning system It closes, can be realized the monitoring of well lid operating status, to solve municipal personnel mentioned above in the background art under varying environment Well lid service condition not enough understands, and can not targetedly be safeguarded according to different installation environments to well lid, reduce well lid The problem of service life.
To achieve the above object, the invention provides the following technical scheme: a kind of casting iron well lid bearing capacity change rate monitoring side Method, monitoring method include environmental parameter calibration phase and change rate monitoring stage, and environmental parameter calibration phase includes:
Benchmark is set and monitors environment, test environment temperature setting is 25 degrees Celsius, adjusts and surveys under conditions of 25 degrees Celsius Trying ambient humidity is 40%, gives well lid stable pressure, measures the well under multiple 25 degrees Celsius and 40% environmental damp condition Lid bearing capacity forms the bearing capacity sequence under reference atmosphere, is calculated according to the bearing capacity sequence under reference atmosphere in reference atmosphere Under average bearing capacity, using the average bearing capacity measured as benchmark bearing capacity;
Benchmark monitoring cycle is set, monitoring cycle is 2 minutes, give well lid stable pressure in the case where benchmark monitors environment, The bearing capacity change rate of well lid each point in multiple monitoring cycles is measured, reference period bearing capacity change rate sequence is formed, according to base Bearing capacity change rate sequence paracycle calculates the average bearing capacity change rate in reference period, and the average bearing capacity measured is become Rate is as benchmark bearing capacity change rate;
The change rate monitoring stage includes the bearing capacity change rate monitoring stage under temperature environment and the carrying under humidity environment Power change rate monitors the stage, and the bearing capacity change rate monitoring stage under temperature environment includes:
Setting test environment temperature is 0 degree Celsius, and adjustment test ambient humidity is 40% under conditions of 0 degree Celsius, is given The stable pressure of well lid is given, the bearing capacity change rate of the well lid each point under multiple test environment conditions in reference period, shape are measured At the bearing capacity change rate sequence under test environment, calculated under test environment according to the bearing capacity change rate sequence under test environment Average bearing capacity change rate, using the average bearing capacity change rate measured as test environment bearing capacity change rate A;
Setting test environment temperature is 50 degrees Celsius, and adjustment test ambient humidity is 40% under conditions of 50 degrees Celsius, It gives well lid stable pressure, measures the bearing capacity change rate of the well lid each point under multiple test environment conditions in reference period, The bearing capacity change rate sequence under test environment is formed, test environment is calculated according to the bearing capacity change rate sequence under test environment Under average bearing capacity change rate, using the average bearing capacity change rate measured as test environment bearing capacity change rate B;
Under humidity environment bearing capacity change rate monitoring the stage include:
Setting test environment temperature is 0 degree Celsius, and adjustment test ambient humidity is 20% under conditions of 0 degree Celsius, is given The stable pressure of well lid is given, the bearing capacity change rate of the well lid each point under multiple test environment conditions in reference period, shape are measured At the bearing capacity change rate sequence under test environment, calculated under test environment according to the bearing capacity change rate sequence under test environment Average bearing capacity change rate, using the average bearing capacity change rate measured as test environment bearing capacity change rate C;
Setting test environment temperature is 0 degree Celsius, and adjustment test ambient humidity is 70% under conditions of 0 degree Celsius, is given The stable pressure of well lid is given, the bearing capacity change rate of the well lid each point under multiple test environment conditions in reference period, shape are measured At the bearing capacity change rate sequence under test environment, calculated under test environment according to the bearing capacity change rate sequence under test environment Average bearing capacity change rate, using the average bearing capacity change rate measured as test environment bearing capacity change rate D;
Setting test environment temperature is 25 degrees Celsius, and adjustment test ambient humidity is 20% under conditions of 25 degrees Celsius, It gives well lid stable pressure, measures the bearing capacity change rate of the well lid each point under multiple test environment conditions in reference period, The bearing capacity change rate sequence under test environment is formed, test environment is calculated according to the bearing capacity change rate sequence under test environment Under average bearing capacity change rate, using the average bearing capacity change rate measured as test environment bearing capacity change rate E;
Setting test environment temperature is 25 degrees Celsius, and adjustment test ambient humidity is 70% under conditions of 25 degrees Celsius, It gives well lid stable pressure, measures the bearing capacity change rate of the well lid each point under multiple test environment conditions in reference period, The bearing capacity change rate sequence under test environment is formed, test environment is calculated according to the bearing capacity change rate sequence under test environment Under average bearing capacity change rate, using the average bearing capacity change rate measured as test environment bearing capacity change rate F;
Setting test environment temperature is 50 degrees Celsius, and adjustment test ambient humidity is 20% under conditions of 50 degrees Celsius, It gives well lid stable pressure, measures the bearing capacity change rate of the well lid each point under multiple test environment conditions in reference period, The bearing capacity change rate sequence under test environment is formed, test environment is calculated according to the bearing capacity change rate sequence under test environment Under average bearing capacity change rate, using the average bearing capacity change rate measured as test environment bearing capacity change rate G;
Setting test environment temperature is 50 degrees Celsius, and adjustment test ambient humidity is 70% under conditions of 50 degrees Celsius, It gives well lid stable pressure, measures the bearing capacity change rate of the well lid each point under multiple test environment conditions in reference period, The bearing capacity change rate sequence under test environment is formed, test environment is calculated according to the bearing capacity change rate sequence under test environment Under average bearing capacity change rate, using the average bearing capacity change rate measured as test environment bearing capacity change rate H;
Will test environment bearing capacity change rate A, test environment bearing capacity change rate B, test environment bearing capacity change rate C, Test environment bearing capacity change rate D, test environment bearing capacity change rate E, test environment bearing capacity change rate F, test environment are held Carry power change rate G, test environment bearing capacity change rate H compared with benchmark bearing capacity change rate, is completed under varying environment respectively Well lid bearing capacity change rate monitoring.
Further, according to the bearing capacity change rate sequence under each detection environment, using the bearing capacity of sequence critical point Change rate is as the bearing capacity change rate threshold value under the detection environment.
Further, the actual carrying capacity change rate in continuous three reference periods is individually subtracted under corresponding detection environment Bearing capacity change rate threshold value, obtain weighted differences summation, if obtain weighted differences summation result be more than or equal to Zero, then determine that the bearing capacity under the detection environment is in limiting condition, if obtain weighted differences summation result less than zero, Determine that the bearing capacity under the detection environment is in non-limit state.
Further, the loading test process of the well lid is detected suffered by multiple sampling points using infrared pressure sensor Pressure forms sampling point pressure sequence, average sampling point pressure value is calculated according to sampling point pressure sequence, by average sampling point pressure value Bearing capacity as well lid.
Compared with prior art, the beneficial effects of the present invention are:
1, a kind of casting iron well lid bearing capacity change rate monitoring method provided by the invention passes through the well to different test environment Lid bearing capacity change rate is monitored, and realizes that the bearing capacity under low temperature, room temperature and high temperature and drying, comfortable and wet condition becomes Rate monitoring, deepens the understanding to well lid service condition under varying environment, allows municipal personnel according to different mounting rings Well lid is targetedly safeguarded in border, extends the service life of well lid.
2, a kind of casting iron well lid bearing capacity change rate monitoring method provided by the invention, according to actual carrying capacity change rate with The weighted differences summation of bearing capacity change rate threshold value under corresponding detection environment as a result, determining the bearing capacity under the detection environment Whether this monitoring method is combined in actual use in limiting condition with warning system, can be realized well lid fortune The monitoring of row state, practicability is more preferably.
Detailed description of the invention
Fig. 1 is environmental parameter calibration phase schematic diagram of the invention;
Fig. 2 is that change rate of the invention monitors stage schematic diagram;
Fig. 3 is monitoring decision process schematic diagram of the invention.
In figure: 1, environmental parameter calibration phase;2, change rate monitors the stage;21, the bearing capacity change rate under temperature environment The monitoring stage;22, the bearing capacity change rate under humidity environment monitors the stage.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
Referring to Fig. 1, a kind of casting iron well lid bearing capacity change rate monitoring method, monitoring method includes environmental parameter calibration rank Section 1 and change rate monitor the stage 2, and environmental parameter calibration phase 1 includes:
Benchmark is set and monitors environment, test environment temperature setting is 25 degrees Celsius, adjusts and surveys under conditions of 25 degrees Celsius Trying ambient humidity is 40%, gives well lid stable pressure, measures the well under multiple 25 degrees Celsius and 40% environmental damp condition Lid bearing capacity forms the bearing capacity sequence under reference atmosphere, is calculated according to the bearing capacity sequence under reference atmosphere in reference atmosphere Under average bearing capacity, using the average bearing capacity measured as benchmark bearing capacity, the loading test process of well lid is using red External pressure sensor detects multiple sampling point pressures, forms sampling point pressure sequence, is calculated according to sampling point pressure sequence flat Equal sampling point pressure value, using average sampling point pressure value as the bearing capacity of well lid;
Benchmark monitoring cycle is set, monitoring cycle is 2 minutes, give well lid stable pressure in the case where benchmark monitors environment, The bearing capacity change rate of well lid each point in multiple monitoring cycles is measured, reference period bearing capacity change rate sequence is formed, according to base Bearing capacity change rate sequence paracycle calculates the average bearing capacity change rate in reference period, and the average bearing capacity measured is become Rate is as benchmark bearing capacity change rate.
Referring to Fig. 2, the change rate monitoring stage 2 includes bearing capacity change rate monitoring stage 21 and humidity under temperature environment Bearing capacity change rate under environment monitors the stage 22, and the bearing capacity change rate monitoring stage 21 under temperature environment includes:
Setting test environment temperature is 0 degree Celsius, and adjustment test ambient humidity is 40% under conditions of 0 degree Celsius, is given The stable pressure of well lid is given, the bearing capacity change rate of the well lid each point under multiple test environment conditions in reference period, shape are measured At the bearing capacity change rate sequence under test environment, calculated under test environment according to the bearing capacity change rate sequence under test environment Average bearing capacity change rate, using the average bearing capacity change rate measured as test environment bearing capacity change rate A;
Setting test environment temperature is 50 degrees Celsius, and adjustment test ambient humidity is 40% under conditions of 50 degrees Celsius, It gives well lid stable pressure, measures the bearing capacity change rate of the well lid each point under multiple test environment conditions in reference period, The bearing capacity change rate sequence under test environment is formed, test environment is calculated according to the bearing capacity change rate sequence under test environment Under average bearing capacity change rate, using the average bearing capacity change rate measured as test environment bearing capacity change rate B;
Under humidity environment bearing capacity change rate monitoring the stage 22 include:
Setting test environment temperature is 0 degree Celsius, and adjustment test ambient humidity is 20% under conditions of 0 degree Celsius, is given The stable pressure of well lid is given, the bearing capacity change rate of the well lid each point under multiple test environment conditions in reference period, shape are measured At the bearing capacity change rate sequence under test environment, calculated under test environment according to the bearing capacity change rate sequence under test environment Average bearing capacity change rate, using the average bearing capacity change rate measured as test environment bearing capacity change rate C;
Setting test environment temperature is 0 degree Celsius, and adjustment test ambient humidity is 70% under conditions of 0 degree Celsius, is given The stable pressure of well lid is given, the bearing capacity change rate of the well lid each point under multiple test environment conditions in reference period, shape are measured At the bearing capacity change rate sequence under test environment, calculated under test environment according to the bearing capacity change rate sequence under test environment Average bearing capacity change rate, using the average bearing capacity change rate measured as test environment bearing capacity change rate D;
Setting test environment temperature is 25 degrees Celsius, and adjustment test ambient humidity is 20% under conditions of 25 degrees Celsius, It gives well lid stable pressure, measures the bearing capacity change rate of the well lid each point under multiple test environment conditions in reference period, The bearing capacity change rate sequence under test environment is formed, test environment is calculated according to the bearing capacity change rate sequence under test environment Under average bearing capacity change rate, using the average bearing capacity change rate measured as test environment bearing capacity change rate E;
Setting test environment temperature is 25 degrees Celsius, and adjustment test ambient humidity is 70% under conditions of 25 degrees Celsius, It gives well lid stable pressure, measures the bearing capacity change rate of the well lid each point under multiple test environment conditions in reference period, The bearing capacity change rate sequence under test environment is formed, test environment is calculated according to the bearing capacity change rate sequence under test environment Under average bearing capacity change rate, using the average bearing capacity change rate measured as test environment bearing capacity change rate F;
Setting test environment temperature is 50 degrees Celsius, and adjustment test ambient humidity is 20% under conditions of 50 degrees Celsius, It gives well lid stable pressure, measures the bearing capacity change rate of the well lid each point under multiple test environment conditions in reference period, The bearing capacity change rate sequence under test environment is formed, test environment is calculated according to the bearing capacity change rate sequence under test environment Under average bearing capacity change rate, using the average bearing capacity change rate measured as test environment bearing capacity change rate G;
Setting test environment temperature is 50 degrees Celsius, and adjustment test ambient humidity is 70% under conditions of 50 degrees Celsius, It gives well lid stable pressure, measures the bearing capacity change rate of the well lid each point under multiple test environment conditions in reference period, The bearing capacity change rate sequence under test environment is formed, test environment is calculated according to the bearing capacity change rate sequence under test environment Under average bearing capacity change rate, using the average bearing capacity change rate measured as test environment bearing capacity change rate H;
Will test environment bearing capacity change rate A, test environment bearing capacity change rate B, test environment bearing capacity change rate C, Test environment bearing capacity change rate D, test environment bearing capacity change rate E, test environment bearing capacity change rate F, test environment are held Carry power change rate G, test environment bearing capacity change rate H compared with benchmark bearing capacity change rate, is completed under varying environment respectively Well lid bearing capacity change rate monitoring.
Referring to Fig. 3, according to the bearing capacity change rate sequence under each detection environment, using the bearing capacity of sequence critical point Change rate changes the actual carrying capacity in continuous three reference periods as the bearing capacity change rate threshold value under the detection environment The bearing capacity change rate threshold value under corresponding detection environment is individually subtracted in rate, obtained weighted differences summation, if obtained difference adds The result of power summation is more than or equal to zero, then determines that the bearing capacity under the detection environment is in limiting condition, if obtained difference It is worth the result of weighted sum less than zero, then determines that the bearing capacity under the detection environment is in non-limit state.
In summary: a kind of casting iron well lid bearing capacity change rate monitoring method provided by the invention, setting different temperatures and The detection environment of different humidity, and the well lid bearing capacity change rate under respective environment is monitored, realize low temperature, room temperature and height Temperature and bearing capacity change rate monitoring dry, under comfortable and wet condition, deepen to well lid service condition under varying environment Understand, municipal personnel targetedly safeguard well lid according to different installation environments, extend the use of well lid Service life, according to the knot of the weighted differences summation of the bearing capacity change rate threshold value under actual carrying capacity change rate and corresponding detection environment Fruit, determines whether the bearing capacity under the detection environment is in limiting condition, if obtain weighted differences summation result be greater than or Person is equal to zero, then determines that the bearing capacity under the detection environment is in limiting condition, if the result of obtained weighted differences summation is small In zero, then determine that the bearing capacity under the detection environment is in non-limit state, in actual use, by this monitoring method with Warning system combines, and can be realized the monitoring of well lid operating status, practicability is more preferably.
The foregoing is only a preferred embodiment of the present invention, but scope of protection of the present invention is not limited thereto, Anyone skilled in the art in the technical scope disclosed by the present invention, according to the technique and scheme of the present invention and its Inventive concept is subject to equivalent substitution or change, should be covered by the protection scope of the present invention.

Claims (4)

1. a kind of casting iron well lid bearing capacity change rate monitoring method, it is characterised in that: the monitoring method includes environmental parameter mark Determine the stage (1) and change rate monitoring stage (2), the environmental parameter calibration phase (1) includes:
Benchmark is set and monitors environment, the test environment temperature setting is 25 degrees Celsius, adjusts and surveys under conditions of 25 degrees Celsius Trying ambient humidity is 40%, gives well lid stable pressure, measures the well under multiple 25 degrees Celsius and 40% environmental damp condition Lid bearing capacity forms the bearing capacity sequence under reference atmosphere, is calculated according to the bearing capacity sequence under the reference atmosphere in institute The average bearing capacity under reference atmosphere is stated, using the average bearing capacity measured as benchmark bearing capacity;
Benchmark monitoring cycle is set, the monitoring cycle is 2 minutes, give well lid stable pressure in the case where benchmark monitors environment, The bearing capacity change rate of well lid each point in multiple monitoring cycles is measured, reference period bearing capacity change rate sequence is formed, according to institute The reference period bearing capacity change rate sequence stated calculates the average bearing capacity change rate in reference period, and being averaged of measuring is held Power change rate is carried as benchmark bearing capacity change rate;
Change rate monitoring stage (2) includes under bearing capacity change rate monitoring stage (21) and humidity environment under temperature environment Bearing capacity change rate monitor stage (22), bearing capacity change rate monitoring stage (21) under the temperature environment includes:
Setting test environment temperature is 0 degree Celsius, and adjustment test ambient humidity is 40% under conditions of 0 degree Celsius, gives well Stable pressure is covered, the bearing capacity change rate of the well lid each point under multiple test environment conditions in reference period is measured, is formed and surveyed Bearing capacity change rate sequence under test ring border calculates test environment according to the bearing capacity change rate sequence under the test environment Under average bearing capacity change rate, using the average bearing capacity change rate measured as test environment bearing capacity change rate A;
Setting test environment temperature is 50 degrees Celsius, and adjustment test ambient humidity is 40% under conditions of 50 degrees Celsius, is given The stable pressure of well lid measures the bearing capacity change rate of the well lid each point under multiple test environment conditions in reference period, is formed The bearing capacity change rate sequence under environment is tested, test wrapper is calculated according to the bearing capacity change rate sequence under the test environment Average bearing capacity change rate under border, using the average bearing capacity change rate measured as test environment bearing capacity change rate B;
Bearing capacity change rate under the humidity environment monitors stage (22)
Setting test environment temperature is 0 degree Celsius, and adjustment test ambient humidity is 20% under conditions of 0 degree Celsius, gives well Stable pressure is covered, the bearing capacity change rate of the well lid each point under multiple test environment conditions in reference period is measured, is formed and surveyed Bearing capacity change rate sequence under test ring border calculates test environment according to the bearing capacity change rate sequence under the test environment Under average bearing capacity change rate, using the average bearing capacity change rate measured as test environment bearing capacity change rate C;
Setting test environment temperature is 0 degree Celsius, and adjustment test ambient humidity is 70% under conditions of 0 degree Celsius, gives well Stable pressure is covered, the bearing capacity change rate of the well lid each point under multiple test environment conditions in reference period is measured, is formed and surveyed Bearing capacity change rate sequence under test ring border calculates test environment according to the bearing capacity change rate sequence under the test environment Under average bearing capacity change rate, using the average bearing capacity change rate measured as test environment bearing capacity change rate D;
Setting test environment temperature is 25 degrees Celsius, and adjustment test ambient humidity is 20% under conditions of 25 degrees Celsius, is given The stable pressure of well lid measures the bearing capacity change rate of the well lid each point under multiple test environment conditions in reference period, is formed The bearing capacity change rate sequence under environment is tested, test wrapper is calculated according to the bearing capacity change rate sequence under the test environment Average bearing capacity change rate under border, using the average bearing capacity change rate measured as test environment bearing capacity change rate E;
Setting test environment temperature is 25 degrees Celsius, and adjustment test ambient humidity is 70% under conditions of 25 degrees Celsius, is given The stable pressure of well lid measures the bearing capacity change rate of the well lid each point under multiple test environment conditions in reference period, is formed The bearing capacity change rate sequence under environment is tested, test wrapper is calculated according to the bearing capacity change rate sequence under the test environment Average bearing capacity change rate under border, using the average bearing capacity change rate measured as test environment bearing capacity change rate F;
Setting test environment temperature is 50 degrees Celsius, and adjustment test ambient humidity is 20% under conditions of 50 degrees Celsius, is given The stable pressure of well lid measures the bearing capacity change rate of the well lid each point under multiple test environment conditions in reference period, is formed The bearing capacity change rate sequence under environment is tested, test wrapper is calculated according to the bearing capacity change rate sequence under the test environment Average bearing capacity change rate under border, using the average bearing capacity change rate measured as test environment bearing capacity change rate G;
Setting test environment temperature is 50 degrees Celsius, and adjustment test ambient humidity is 70% under conditions of 50 degrees Celsius, is given The stable pressure of well lid measures the bearing capacity change rate of the well lid each point under multiple test environment conditions in reference period, is formed The bearing capacity change rate sequence under environment is tested, test wrapper is calculated according to the bearing capacity change rate sequence under the test environment Average bearing capacity change rate under border, using the average bearing capacity change rate measured as test environment bearing capacity change rate H;
It will test environment bearing capacity change rate A, test environment bearing capacity change rate B, test environment bearing capacity change rate C, test Environmental carrying capacity change rate D, test environment bearing capacity change rate E, test environment bearing capacity change rate F, test environmental carrying capacity Change rate G, test environment bearing capacity change rate H compared with benchmark bearing capacity change rate, complete the well under varying environment respectively The monitoring of lid bearing capacity change rate.
2. a kind of casting iron well lid bearing capacity change rate monitoring method as described in claim 1, it is characterised in that: according to each inspection The bearing capacity change rate sequence under environment is surveyed, using the bearing capacity change rate of sequence critical point as the carrying under the detection environment Power change rate threshold value.
3. a kind of casting iron well lid bearing capacity change rate monitoring method as described in claim 1, it is characterised in that: by continuous three The bearing capacity change rate threshold value under corresponding detection environment, obtained difference is individually subtracted in actual carrying capacity change rate in reference period It is worth weighted sum, if the result of obtained weighted differences summation is more than or equal to zero, determines the carrying under the detection environment Power is in limiting condition, if the result of obtained weighted differences summation determines at the bearing capacity under the detection environment less than zero In non-limit state.
4. a kind of casting iron well lid bearing capacity change rate monitoring method as described in claim 1, it is characterised in that: the well lid Loading test process is to detect multiple sampling point pressures using infrared pressure sensor, forms sampling point pressure sequence, according to Average sampling point pressure value is calculated in the sampling point pressure sequence, using average sampling point pressure value as the bearing capacity of well lid.
CN201910805547.1A 2019-08-29 2019-08-29 A kind of casting iron well lid bearing capacity change rate monitoring method Pending CN110514530A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910805547.1A CN110514530A (en) 2019-08-29 2019-08-29 A kind of casting iron well lid bearing capacity change rate monitoring method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910805547.1A CN110514530A (en) 2019-08-29 2019-08-29 A kind of casting iron well lid bearing capacity change rate monitoring method

Publications (1)

Publication Number Publication Date
CN110514530A true CN110514530A (en) 2019-11-29

Family

ID=68627755

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910805547.1A Pending CN110514530A (en) 2019-08-29 2019-08-29 A kind of casting iron well lid bearing capacity change rate monitoring method

Country Status (1)

Country Link
CN (1) CN110514530A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112181033A (en) * 2020-10-28 2021-01-05 苏州知瑞光电材料科技有限公司 Adjusting method and device for cast iron environment control equipment

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4971149A (en) * 1989-09-28 1990-11-20 Charles Wayne Roberts Flush mount monitoring well cover
CN101172834A (en) * 2007-10-24 2008-05-07 沈阳北方建设股份有限公司 Magnesite composite material manhole and production technology thereof
CN101289290A (en) * 2007-04-20 2008-10-22 天津市奥立纤维水泥制品厂 Complex fiber cement well lid and method for preparing same
CN204940370U (en) * 2015-09-02 2016-01-06 临沂天方建设研究试验有限公司 A kind of well lid pressure test device
CN107421877A (en) * 2017-07-07 2017-12-01 同济大学 Simulate the concrete durability experiment apparatus and method of stray electrical current and tunnel air environment
CN207197808U (en) * 2017-09-22 2018-04-06 昌邑市检验检测中心 A kind of mobile well lid test of bearing capacity instrument
CN209198106U (en) * 2019-01-03 2019-08-02 重庆市华测检测技术有限公司 A kind of well lid loading test instrument

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4971149A (en) * 1989-09-28 1990-11-20 Charles Wayne Roberts Flush mount monitoring well cover
CN101289290A (en) * 2007-04-20 2008-10-22 天津市奥立纤维水泥制品厂 Complex fiber cement well lid and method for preparing same
CN101172834A (en) * 2007-10-24 2008-05-07 沈阳北方建设股份有限公司 Magnesite composite material manhole and production technology thereof
CN204940370U (en) * 2015-09-02 2016-01-06 临沂天方建设研究试验有限公司 A kind of well lid pressure test device
CN107421877A (en) * 2017-07-07 2017-12-01 同济大学 Simulate the concrete durability experiment apparatus and method of stray electrical current and tunnel air environment
CN207197808U (en) * 2017-09-22 2018-04-06 昌邑市检验检测中心 A kind of mobile well lid test of bearing capacity instrument
CN209198106U (en) * 2019-01-03 2019-08-02 重庆市华测检测技术有限公司 A kind of well lid loading test instrument

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
中华人民共和国国家质量监督检验检疫总局 等: "《中华人民共和国国家标准 GB/T 23858-2009 检查井盖》", 27 May 2009 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112181033A (en) * 2020-10-28 2021-01-05 苏州知瑞光电材料科技有限公司 Adjusting method and device for cast iron environment control equipment

Similar Documents

Publication Publication Date Title
CN105841661B (en) A kind of bridge dynamical health real-time monitoring device
CN105807685B (en) A kind of intelligent monitor-type curtain wall system
CN110514530A (en) A kind of casting iron well lid bearing capacity change rate monitoring method
US20160060805A1 (en) Dryer monitoring
RU2009110986A (en) METHOD FOR SAFETY MONITORING OF LOAD-BEARING STRUCTURES, STRUCTURAL ELEMENTS OF BUILDINGS AND CONSTRUCTIONS AND SYSTEM FOR ITS IMPLEMENTATION
CN105783856B (en) The building sloping roof beam of shelf-life can be predicted in real time
WO2008024399B1 (en) Water quality monitoring device and method
CN116365716B (en) Electricity inspection system based on internet of things platform
WO2010032134A2 (en) Wind turbine rotor blade comprising an edge-wise bending insensitive strain sensor system
CN106573614B (en) Stress monitor during component work
CN109916326A (en) A kind of stage Payload Monitoring And Control method for early warning
CN106952029A (en) A kind of method and system for being evaluated substation equipment condition monitoring device
Su et al. Research on the wear model of carbon/carbon composite finger seal
JP6896071B2 (en) Bearing life evaluation method and equipment
CN112362335A (en) System and method for monitoring working state of anti-seismic support and hanger of electromechanical pipeline in real time on line
CN105987821B (en) The accelerated storage test method of single machine product under hypobaric stress
CN107101800A (en) The wind-force measuring apparatus and its measuring method of transmission tower model
CN116961130A (en) Multi-node control-based power scheduling method and device
CN108277747B (en) Cantilever pouring unbalance loading monitoring method based on Hanging Basket deformation
CN105333961A (en) System achieving non-contact temperature measurement of high-voltage isolating switch on basis of thermo-electric pile principle
ES2950366T3 (en) Method and system for measuring interference in a weight control device
CN109758703A (en) A kind of error correction systems and method for fire-fighting scene of a fire pressure-altitude sensor
KR101549543B1 (en) A power state diagnosis method using kalman estimation process and measuring the relative probability by the metric defined by functional mapping
Kurganska et al. Effects of physical properties of clothes on parameters of the microclimate layer
Soman et al. Kalman filter based neutral axis tracking under varying temperature conditions

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20191129