Prior art keywords
card slot
plate
connecting plate
assembly
shear wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910624226.1A
Other languages
Chinese (zh)
Other versions
CN110512880B (en
Inventor
余同德
周丽栋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC17 Group Co Ltd
Original Assignee
China MCC17 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC17 Group Co Ltd filed Critical China MCC17 Group Co Ltd
Priority to CN201910624226.1A priority Critical patent/CN110512880B/en
Publication of CN110512880A publication Critical patent/CN110512880A/en
Application granted granted Critical
Publication of CN110512880B publication Critical patent/CN110512880B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/18Adjusting tools; Templates
    • E04G21/1841Means for positioning building parts or elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Clamps And Clips (AREA)
  • Joining Of Building Structures In Genera (AREA)

Abstract

The invention discloses a kind of assembly of integral shearing wall structure convenient for accurate positionin, including upper shear wall, connecting column, card slot and lower shear wall, the bottom of the upper shear wall is fixedly installed with the first connecting plate, and first is provided with the second connecting plate below connecting plate, and the inside of the first connecting plate and the second connecting plate offers limit hole, the limit hole is internally connected with gag lever post, the card slot is set between groove, and card slot is internally provided with bottom plate, and bottom plate is connected by elastic spring with the inner wall of card slot, the top of the lower shear wall is connected with fixed plate.This is convenient for the assembly of integral shearing wall structure being accurately positioned, it is provided with connecting column, and the height of connecting column is greater than the height of connecting rod, in this way in assembly, connecting column and fixture block can be made to be slided along card slot, consequently facilitating offering convenience to location and installation is carried out between connecting column and groove for staff.

Description

A kind of assembly of integral shearing wall structure convenient for accurate positionin
Technical field
The present invention relates to assembly of integral shearing wall structure mounting technique field, specially a kind of dress convenient for accurate positionin With monoblock type shear wall structure.
Background technique
Shear wall is referred to as structural wall or seismic structural wall, earthquake resistant wall, is generally made into armored concrete, the construction party of shear wall Formula is divided into cast-in-place and assembly, and assembling is the primary structure form for realizing modernization of architecture industry, usually that upper and lower two panels is pre- Fixation is attached by attachment device after shear wall installation processed is in place, compared to cast-in-place mode, assembles shear wall production effect Rate is high, high-quality.
But in place of existing shear wall still has several drawbacks during installation, such as assembly process is cumbersome, and it is fixed to be not easy to Position is made troubles for the installation of staff, so that entire job schedule is reduced, so we have proposed one kind convenient for accurate The assembly of integral shearing wall structure of positioning, in order to solve the problems, such as to propose among the above.
Summary of the invention
It is above-mentioned to solve the purpose of the present invention is to provide a kind of assembly of integral shearing wall structure convenient for accurate positionin The shear wall assembly process currently on the market that background technique proposes is cumbersome, is not easy to position, and brings for the installation of staff Inconvenience, thus the problem of reducing entire job schedule.
To achieve the above object, the invention provides the following technical scheme: a kind of cut convenient for the assembled integral of accurate positionin The bottom of power wall construction, including upper shear wall, connecting column, card slot and lower shear wall, the upper shear wall is fixedly mounted There is the first connecting plate, and is provided with the second connecting plate below the first connecting plate, and the first connecting plate and the second connecting plate Inside offers limit hole, and the limit hole is internally connected with gag lever post, and the bottom of first connecting plate is fixed with company Extension bar, and connecting rod is connected by groove with fixed plate, and the inside of connecting rod and groove is provided with fixation hole, it is described The top of connecting column is connected with the first connecting plate, and connecting column is set between connecting rod, and the front and rear sides of connecting column It is respectively and fixedly provided with fixture block, the card slot is set between groove, and card slot is internally provided with bottom plate, and bottom plate passes through elastic force bullet Spring is connected with the inner wall of card slot, and the top of the lower shear wall is connected with fixed plate.
Preferably, first connecting plate and upper shear wall are an integral structure, and the first connecting plate and the second connection The limit hole of intralamellar part is to be threadedly coupled, and the second connecting plate and fixed plate are integral type knot with the connection type of gag lever post Structure.
Preferably, the connecting rod is provided with five groups, and the height of every group of connecting rod is equal to the groove in fixed plate Depth.
Preferably, the cross section of the connecting column is rectangular-shaped, and the height of connecting column is greater than the height of connecting rod.
Preferably, the fixture block and connecting column are an integral structure, and fixture block constitutes sliding knot by card slot and fixed plate Structure.
Preferably, the bottom plate is by elastic spring in the Inner Constitution stretching structure of card slot, and bottom plate and card slot is interior There is interval between wall.
It compared with prior art, the beneficial effects of the present invention are: should be convenient for the assembled integral shear wall knot of accurate positionin Structure;
(1) it is provided with connecting column, and the height of connecting column is greater than the height of connecting rod, in this way in assembly, can makes to connect It connects column and fixture block is slided along card slot, consequently facilitating being staff to location and installation is carried out between connecting column and groove It offers convenience;
(2) it is provided with bottom plate, and bottom plate passes through elastic spring in the Inner Constitution stretching structure of card slot, when connecting column and card When slot is installed, it can be buffered by stress degree of the elastic spring to bottom plate, and then be effectively relieved and card slot bottom is rushed It hits, reduces the probability that is damaged of card slot;
(3) bottom of shear wall is provided with the first connecting plate on, and the inside of the first connecting plate and the second connecting plate is equal Limit hole is offered, and limit hole and gag lever post are threadedly coupled, is convenient for after assembling cutting upper shear wall under in this way Power wall body is fixed again, guarantees the stability when shear wall uses.
Detailed description of the invention
Fig. 1 is that the whole master of the present invention cuts open structural schematic diagram;
Fig. 2 is that the upper shear wall of the present invention and the first connecting plate connect present invention looks up structural representation;
Fig. 3 connects overlooking structure diagram with lower shear wall for fixed plate of the present invention;
Fig. 4 is the first connecting plate of the invention and the second connecting plate attachment structure schematic diagram.
In figure: 1, upper shear wall;2, the first connecting plate;3, the second connecting plate;4, limit hole;5, gag lever post;6, it connects Bar;7, groove;8, fixed plate;9, fixation hole;10, connecting column;11, fixture block;12, card slot;13, bottom plate;14, elastic spring;15, Lower shear wall.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
Fig. 1-4 is please referred to, the present invention provides a kind of technical solution: a kind of assembled integral shear wall convenient for accurate positionin Structure, including it is upper shear wall 1, the first connecting plate 2, the second connecting plate 3, limit hole 4, gag lever post 5, connecting rod 6, groove 7, solid Fixed board 8, fixation hole 9, connecting column 10, fixture block 11, card slot 12, bottom plate 13, elastic spring 14 and lower shear wall 15, upper shear wall The bottom of body 1 is fixedly installed with the first connecting plate 2, and the lower section of the first connecting plate 2 is provided with the second connecting plate 3, and first The inside of connecting plate 2 and the second connecting plate 3 offers limit hole 4, and limit hole 4 is internally connected with gag lever post 5, the first connection The bottom of plate 2 is fixed with connecting rod 6, and connecting rod 6 is connected by groove 7 with fixed plate 8, and connecting rod 6 and groove 7 Inside is provided with fixation hole 9, and the top of connecting column 10 is connected with the first connecting plate 2, and connecting column 10 is set to connecting rod 6 Between, and the front and rear sides of connecting column 10 are respectively and fixedly provided with fixture block 11, and card slot 12 is set between groove 7, and card slot 12 is interior Portion is provided with bottom plate 13, and bottom plate 13 is connected by elastic spring 14 with the inner wall of card slot 12, the top of lower shear wall 15 Portion is connected with fixed plate 8;
First connecting plate 2 and upper shear wall 1 are an integral structure, and inside the first connecting plate 2 and the second connecting plate 3 Limit hole 4 is to be threadedly coupled, and the second connecting plate 3 and fixed plate 8 are an integral structure with the connection type of gag lever post 5, just It is fixed in the first connecting plate 2 and the second connecting plate 3, to guarantee between upper shear wall 1 and lower shear wall 15 Stability;
Connecting rod 6 is provided with five groups, and the height of every group of connecting rod 6 is equal to the depth of the groove 7 in fixed plate 8, easily In carrying out installation fixation to the first connecting plate 2 and fixed plate 8, offer convenience for the installment work of staff;
The cross section of connecting column 10 is rectangular-shaped, and the height of connecting column 10 is greater than the height of connecting rod 6, convenient for cutting to this Power wall is positioned when installing, and then facilitates the operation of staff, improves progress when shear wall installation;
Fixture block 11 and connecting column 10 are an integral structure, and fixture block 11 constitutes slide construction by card slot 12 and fixed plate 8, The phenomenon that connecting column 10 can be made more steady when installing, connecting column 10 is effectively prevent to shake during the installation process;
Inner Constitution stretching structure of the bottom plate 13 by elastic spring 14 in card slot 12, and the inner wall of bottom plate 13 and card slot 12 Between exist interval, in this way when connecting column 10 is installed into card slot 12, can pass through elastic spring 14 effectively buffering connection Column 10 is to the impact dynamics of card slot 12, to reduce the damage probability to card slot 12, it is ensured that the shear wall installment work it is normal It carries out.
Working principle: when being convenient for the assembly of integral shearing wall structure being accurately positioned using this, firstly, staff is quasi- It gets shear wall 1 and lower shear wall 15 ready, lower shear wall 15 is then fixed on corresponding position, then by upper shear wall First connecting plate 2 of 1 bottom of body is inserted into the second connecting plate 3, makes 4 phase of limit hole on the first connecting plate 2 and the second connecting plate 3 Mutually alignment, because the bottom of the first connecting plate 2 is provided with connecting rod 6 and connecting column 10, and the height of connecting column 10 is greater than connecting rod 6 Height, and the front and rear sides of connecting column 10 are provided with the fixture block 11 of T shape, and in assembly, staff can at place Connecting column 10 and fixture block 11 to be aligned with card slot 12, then the first connecting plate 2 is slowly moved down, it in this way can be so that even Column 10 is connect first to be inserted into card slot 12, and connecting rod 6 can be also gradually inserted in groove 7 with the decline of connecting column 10;
It, can because the shape of card slot 12 matches with the shape of connecting column 10 and fixture block 11, therefore when connecting column 10 declines So that mobile more steady of the first connecting plate 2, the phenomenon that effectivelying prevent the first connecting plate 2 to shake, while because of card slot 12 The bottom of internal bottom plate 13 is provided with elastic spring 14, so after the decline of connecting column 10 is contacted with bottom plate 13, with connection The continuous decline of column 10 can press elastic spring 14, so that the assembly of connecting column 10 be effectively reduced by elastic spring 14 When the damage probability caused by the bottom of card slot 12, it is ensured that the shear wall installment work is normally carried out;
After upper shear wall 1 and lower shear wall 15 complete assembly, gag lever post 5 is rotated into limit hole 4 by staff In, then preprepared fixing bolt is installed into fixation hole 9 again, further to upper shear wall 1 and lower shear wall It is fixed between body 15, guarantees that stablizing for shear wall later period uses, be the course of work of whole device, this explanation above The content being not described in detail in book belongs to the prior art well known to professional and technical personnel in the field.
The above content is just an example and description of the concept of the present invention, not detailed place, is the art Well-known technique, affiliated those skilled in the art make various modifications or additions to the described embodiments or It is substituted in a similar manner, it as long as it does not deviate from the concept of invention or beyond the scope defined by this claim, should all It belongs to the scope of protection of the present invention.

Claims (6)

1. a kind of assembly of integral shearing wall structure convenient for accurate positionin, including upper shear wall (1), connecting column (10), card Slot (12) and lower shear wall (15), it is characterised in that: the bottom of the upper shear wall (1) is fixedly installed with the first connecting plate (2), it and below the first connecting plate (2) is provided with the second connecting plate (3), and the first connecting plate (2) and the second connecting plate (3) Inside offer limit hole (4), the limit hole (4) is internally connected with gag lever post (5), first connecting plate (2) Bottom be fixed with connecting rod (6), and connecting rod (6) is connected by groove (7) with fixed plate (8), and connecting rod (6) and The inside of groove (7) is provided with fixation hole (9), and the top of the connecting column (10) is connected with the first connecting plate (2), and even It connects column (10) to be set between connecting rod (6), and the front and rear sides of connecting column (10) are respectively and fixedly provided with fixture block (11), the card slot (12) it is set between groove (7), and card slot (12) is internally provided with bottom plate (13), and bottom plate (13) passes through elastic spring (14) it is connected with the inner wall of card slot (12), the top of the lower shear wall (15) is connected with fixed plate (8).
2. a kind of assembly of integral shearing wall structure convenient for accurate positionin according to claim 1, it is characterised in that: institute It states the first connecting plate (2) and upper shear wall (1) is an integral structure, and the first connecting plate (2) and the second connecting plate (3) are internal Limit hole (4) and the connection type of gag lever post (5) be to be threadedly coupled, and the second connecting plate (3) and fixed plate (8) are integrated Formula structure.
3. a kind of assembly of integral shearing wall structure convenient for accurate positionin according to claim 1, it is characterised in that: institute It states connecting rod (6) and is provided with five groups, and the height of every group of connecting rod (6) is equal to the depth of the groove (7) on fixed plate (8).
4. a kind of assembly of integral shearing wall structure convenient for accurate positionin according to claim 1, it is characterised in that: institute It is rectangular-shaped for stating the cross section of connecting column (10), and the height of connecting column (10) is greater than the height of connecting rod (6).
5. a kind of assembly of integral shearing wall structure convenient for accurate positionin according to claim 1, it is characterised in that: institute It states fixture block (11) and connecting column (10) is an integral structure, and fixture block (11) is made up of card slot (12) and fixed plate (8) and slides Structure.
6. a kind of assembly of integral shearing wall structure convenient for accurate positionin according to claim 1, it is characterised in that: institute State the Inner Constitution stretching structure of bottom plate (13) by elastic spring (14) in card slot (12), and bottom plate (13) and card slot (12) There is interval between inner wall.
CN201910624226.1A 2019-07-11 2019-07-11 Assembled integral shear wall structure convenient for accurate positioning Active CN110512880B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910624226.1A CN110512880B (en) 2019-07-11 2019-07-11 Assembled integral shear wall structure convenient for accurate positioning

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910624226.1A CN110512880B (en) 2019-07-11 2019-07-11 Assembled integral shear wall structure convenient for accurate positioning

Publications (2)

Publication Number Publication Date
CN110512880A true CN110512880A (en) 2019-11-29
CN110512880B CN110512880B (en) 2021-06-01

Family

ID=68622626

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910624226.1A Active CN110512880B (en) 2019-07-11 2019-07-11 Assembled integral shear wall structure convenient for accurate positioning

Country Status (1)

Country Link
CN (1) CN110512880B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112252485A (en) * 2020-10-22 2021-01-22 闫锋 Anti-cracking prestressed precast concrete member

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2541764A1 (en) * 1983-02-24 1984-08-31 Arnoux Gaston Device making the use of a plumb-line, a rule and a mason's level redundant during the construction of masonry walls
US20070144102A1 (en) * 2000-03-24 2007-06-28 Baij Fred C Method of fabricating a dimension lumber product
CN207376953U (en) * 2017-08-25 2018-05-18 江西中云建设有限公司 A kind of combinable building wall board
CN109469229A (en) * 2018-12-25 2019-03-15 天津陆腾低碳建材科技有限公司 A kind of environment friendly light partition wall batten for building
CN208702054U (en) * 2018-07-09 2019-04-05 江苏兴邦建工集团有限公司 A kind of assembled architecture wallboard

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2541764A1 (en) * 1983-02-24 1984-08-31 Arnoux Gaston Device making the use of a plumb-line, a rule and a mason's level redundant during the construction of masonry walls
US20070144102A1 (en) * 2000-03-24 2007-06-28 Baij Fred C Method of fabricating a dimension lumber product
CN207376953U (en) * 2017-08-25 2018-05-18 江西中云建设有限公司 A kind of combinable building wall board
CN208702054U (en) * 2018-07-09 2019-04-05 江苏兴邦建工集团有限公司 A kind of assembled architecture wallboard
CN109469229A (en) * 2018-12-25 2019-03-15 天津陆腾低碳建材科技有限公司 A kind of environment friendly light partition wall batten for building

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112252485A (en) * 2020-10-22 2021-01-22 闫锋 Anti-cracking prestressed precast concrete member

Also Published As

Publication number Publication date
CN110512880B (en) 2021-06-01

Similar Documents

Publication Publication Date Title
CN110512880A (en) A kind of assembly of integral shearing wall structure convenient for accurate positionin
CN113605592A (en) Assembled falls grade light trough furred ceiling structure
CN215888831U (en) Assembled falls grade light trough furred ceiling structure
CN214994728U (en) Steel structure beam column connecting structure
CN212405804U (en) Stone toilet wall assembly
CN108767037A (en) A kind of solar double-glass assemblies
CN208588357U (en) A kind of horizontal ruler
CN209369053U (en) A kind of sun roof bindiny mechanism
CN112360049A (en) Modeling ceiling Mobius strip hoisting device and installation process thereof
CN207048320U (en) A kind of metal aluminium stencil fixture
CN217151468U (en) Cover plate mounting connection node for tower crown construction
CN218668085U (en) Curtain convenient to installation
CN214462605U (en) Light building template frame with plywood protection device
CN218563062U (en) Aluminum alloy template fixing mechanism for house building
CN220441069U (en) Divide accuse case mounting structure
CN104695599B (en) The construction method of glass curtain wall middle cross beam and upright post connection structure
CN218292757U (en) Climbing frame net convenient to dismantle fast
CN218091432U (en) Assembled high safe type prefabricated outer shear wall
CN218447600U (en) Switch box prosthetic devices convenient to installation
CN212453246U (en) Curtain wall beam mounting system
CN109386080A (en) A kind of mounting structure of curtain wall sunshading board
CN215976850U (en) Anchor beam steel bracket positioning device
CN221165541U (en) Elevator landing door transformation structure
CN218149107U (en) Curtain board is with general fixed knot structure
CN219241308U (en) Hanging steel beam type formwork structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant