CN110510843A - A kind of riverway sludge heavy metal processing equipment - Google Patents

A kind of riverway sludge heavy metal processing equipment Download PDF

Info

Publication number
CN110510843A
CN110510843A CN201910843457.1A CN201910843457A CN110510843A CN 110510843 A CN110510843 A CN 110510843A CN 201910843457 A CN201910843457 A CN 201910843457A CN 110510843 A CN110510843 A CN 110510843A
Authority
CN
China
Prior art keywords
chamber
fixedly connected
spline
face
mixing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910843457.1A
Other languages
Chinese (zh)
Other versions
CN110510843B (en
Inventor
崔洁洁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Guohui Environmental Technology Co.,Ltd.
Original Assignee
Longyou Kay Environmental Protection Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Longyou Kay Environmental Protection Technology Co Ltd filed Critical Longyou Kay Environmental Protection Technology Co Ltd
Priority to CN201910843457.1A priority Critical patent/CN110510843B/en
Publication of CN110510843A publication Critical patent/CN110510843A/en
Priority to JP2019225926A priority patent/JP2021041392A/en
Application granted granted Critical
Publication of CN110510843B publication Critical patent/CN110510843B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F11/00Treatment of sludge; Devices therefor
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F2101/00Nature of the contaminant
    • C02F2101/10Inorganic compounds
    • C02F2101/20Heavy metals or heavy metal compounds
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F2103/00Nature of the water, waste water, sewage or sludge to be treated
    • C02F2103/007Contaminated open waterways, rivers, lakes or ponds

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Hydrology & Water Resources (AREA)
  • Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Water Supply & Treatment (AREA)
  • Chemical & Material Sciences (AREA)
  • Organic Chemistry (AREA)
  • Treatment Of Sludge (AREA)
  • Mixers With Rotating Receptacles And Mixers With Vibration Mechanisms (AREA)
  • Accessories For Mixers (AREA)
  • Solid-Sorbent Or Filter-Aiding Compositions (AREA)
  • Mixers Of The Rotary Stirring Type (AREA)

Abstract

A kind of riverway sludge heavy metal processing equipment disclosed by the invention, including mixing tank, mixing chamber is equipped in the mixing tank, adsorption box is fixedly connected on end face on the downside of the mixing tank, the adsorbent chamber communicated with the mixing chamber is equipped in the adsorption box, the mixing arrangement for being stirred is equipped in the mixing chamber, the mixing chamber right end face is equipped with charging device, locking device is equipped on the downside of the charging device, vibration device is set in the adsorbent chamber, the adsorbent equipment being located on the downside of the vibration device is equipped in the adsorbent chamber, the adsorbent equipment adsorbs the heavy metal in mud by zeolite, the present invention carries out heavy metals removal processing to mud using two methods, so that treatment effect is preferable, passivator delivery device can manually set different amounts of dispensing dosage, mud mobility is improved by vibrating mechanism, shortening processing Time, therefore the present invention has the processing time shorter, treatment effect is preferable, and can replace zeolite automatically.

Description

A kind of riverway sludge heavy metal processing equipment
Technical field
The present invention relates to mud heavy metal processing technology field, specially a kind of riverway sludge heavy metal processing equipment.
Background technique
Mud deposits in hydrostatic or slow flowing water environment, is formed through physical chemistry and biological chemistry action, not solid Weak particulate or the superfine particle soil of knot, belong to modern recent deposit object, mud accumulation for a long time in river meeting so that aggrade, Reservoir storage reduces, and needs periodically to clear up riverway sludge, part riverway sludge can not be carried out directly due to heavy metals exceeding standard It utilizes, therefore needs to be removed riverway sludge heavy metal, current riverway sludge heavy metal processing equipment mainly passes through zeolite Equal adsorbent materials carry out heavy metals removal to mud, but the adsorbent materials such as zeolite needs are manually replaced, and use single suction Attached processing method, so that the processing time is longer, treatment effeciency is lower, and what the present invention illustrated a kind of can solve setting for the above problem It is standby.
Summary of the invention
Technical problem: current riverway sludge heavy metal processing equipment mainly passes through adsorbent material and handles mud, The adsorbent materials such as zeolite needs are manually replaced, and use single adsorption processing method, so that the processing time is longer, processing effect Rate is lower.
To solve the above problems, this example devises a kind of riverway sludge heavy metal processing equipment, a kind of river of this example becomes silted up Mud heavy metal processing equipment, including mixing tank, the mixing tank is interior to be equipped with mixing chamber, fixed on end face on the downside of the mixing tank to connect It is connected to adsorption box, the adsorbent chamber communicated with the mixing chamber is equipped in the adsorption box, is equipped in the mixing chamber for stirring Mixed mixing arrangement, the mixing chamber right end face are equipped with charging device, and the charging device includes being set to described mix The cunning cylinder outside chamber right end face, the spline chamber being set in the sliding cylinder are closed, is set in the sliding cylinder and is located at the spline Cavity on the left of chamber, can spline be connected to the intracavitary spline wheel of the spline, be fixedly connected in the spline wheel left end face And extended to outside the sliding cylinder end face to the left splined shaft, be fixedly connected in the sliding cylinder right end face and with the spline chamber The steel pipe communicated, and it is intracavitary using the steel pipe air-flow that the mixing arrangement produces to be transported to the spline, pushes institute It states spline wheel to move to left to the cavity, is disconnected the spline wheel with the spline chamber, to be able to achieve described feed intake Device quantitatively launches function, and the locking dress for being capable of automatic locking the charging device feeding port chamber door is equipped on the downside of the charging device It sets, vibration device is set in the adsorbent chamber, the vibration device can generate the mobility for vibrating up and down to improve mud, described The adsorbent equipment being located on the downside of the vibration device is equipped in adsorbent chamber, the adsorbent equipment adsorbs the weight in mud by zeolite Metal.
It may be preferred that the mixing chamber is open towards a left side, and the mixing chamber opening is rotatably connected to cover board, the absorption Chamber is opening down.
Wherein, the mixing arrangement includes getting into the motor shaft being connected in the mixing chamber upper inside walls, the motor It is connected by power the motor being fixedly connected in the mixing chamber upper inside walls on axis, is fixedly connected with and is located on the motor shaft Bevel gear on the downside of the motor is fixedly connected with air pump on inner wall on the right side of the mixing chamber, is rotatably connected in the air pump Left and right extends to the shaft outside the air pump end face, and the shaft extends right up to outside the mixing resonator end surface, the shaft On be fixedly connected with the belt wheel outside the mixing resonator end surface, be fixedly connected in the shaft and engage company with the bevel gear The secondary bevel gear connect, is fixedly connected with ramp blocks in the pair bevel gear left end face, fixed in the ramp blocks left end face It is connected with the slide-bar extended to the left, the gear on the left of the ramp blocks is slidably connected on the mixing chamber rear side inner wall Case is connected with extension spring between the gear-box and the ramp blocks, be fixedly connected in the gear-box right end face with The follower lever that the ramp blocks abut, and under extension spring elastic force effect, the follower lever and the ramp blocks are always It abuts, gear cavity is equipped in the gear-box, and the slide-bar extends in the gear cavity, on the right side of the gear cavity on inner wall It is rotatably connected to bevel gear, and the bevel gear is connect with the slide-bar feather key, is rotatablely connected on inner wall on the downside of the gear-box Have and extend and extend downward into the agitating shaft in the mixing chamber up and down, is fixedly connected on the agitating shaft and the bevel gear The secondary bevel gear of connection is engaged, is fixedly connected with the agitator arm in the mixing chamber, the stirring on the agitating shaft The secondary screw rod for conveying mud downwards being fixedly connected on axis on the downside of the agitator arm.
It may be preferred that the mixing chamber is rotatably connected to sealing plate, the sealing plate rotation with the adsorbent chamber phase port Junction is equipped with torsionspring.
Wherein, the charging device includes being fixedly connected on storage bin in the mixing chamber right end face, the storage bin Interior be equipped with communicates with the mixing chamber and is open towards right storage chamber, and the storage chamber makes heavy metal be converted to hydrogen-oxygen for storing The passivator of the precipitatings such as compound, opening is rotatably connected to odd-side door on the left of the storage chamber, in the storage chamber right end face It is fixedly connected with the cross bar being located on the downside of the storage chamber right openings, is fixedly connected on end face positioned at institute on the downside of the cross bar The boss on the right side of sliding cylinder is stated, air cavity is equipped in the boss, interlinks between the air cavity and the air pump and be connected to tracheae, it is described Steel pipe is rotationally connected in the air cavity left end face, and the steel pipe is communicated with the air cavity, is fixedly connected on the steel pipe There is the secondary pulley being located on the right side of the sliding cylinder, V band, the cavity upper inside walls are connected between the secondary pulley and the belt wheel It is equipped with opening up gas vent, left and right is rotatably connected on inner wall on the right side of the storage chamber and extends and extend right up to described The screw rod outside resonator end surface is stored, the turntable being fixedly connected on the screw rod outside the storage resonator end surface, described turn Spline tube is fixedly connected on disk right-hand end, and the splined shaft is extended to the left in the spline tube, spiral shell on the splined shaft Line is connected with the nut on the left of the sliding cylinder, is fixedly connected in the nut left end face and connects with the spline tube spline The secondary spline wheel connect, and the secondary spline wheel is slidably connected with the splined shaft, on the left of the pair spline wheel and the spline tube It is connected with compression spring between inner wall, is fixedly connected with the electromagnetism that can be communicated with the spline chamber on end face on the upside of the spline chamber Valve.
It may be preferred that the storage chamber is rotatably connected to chamber door with the mixing chamber place of communicating, by rotating the nut Secondary the distance between the spline wheel and the spline tube are adjusted, changes the initial pressure of the compression spring, so as to change The spline wheel is moved to left to air pressure required in the cavity, so that the spline wheel, which is detached from spline with the spline chamber, connect institute The time needed changes, so that injected volume be made to change, therefore can set different injected volumes.
Wherein, the locking device includes being slidably connected on the right side of the mixing chamber on inner wall and can supporting with the odd-side door The limited block connect, and the limited block can limit the odd-side door and rotate into the mixing chamber, the limited block right end face On be fixedly connected with the elevating lever extended right up to outside the mixing resonator end surface, be fixedly connected in the mixing chamber right end face Fixed link on the downside of the elevating lever is connected with compressed spring, the turntable between the fixed link and the elevating lever Opening that there are six circumferential array distributions is directed away from the secondary spline wheel of the center point, and slidably connecting in the pair spline wheel can be with institute The sliding block of elevating lever abutting is stated, the sliding block and the secondary spline wheel are connected with gas vent between the inner wall of center of circle side.
Wherein, the vibration device includes the secondary air pump being fixedly connected on rear side of the adsorbent chamber on inner wall, the pair gas It is rotatably connected to front and back in pump to extend and extand rearward to the rotation axis outside the absorption resonator end surface, power connects in the rotation axis It is connected to the auxiliary-motor being fixedly connected in the adsorbent chamber back end surface, is slidably connected in the rotation axis positioned at the secondary gas The circular cone of front side is pumped, and the rotation axis is unable to drive the circular cone rotation, is fixedly connected with and is located in the rotation axis Eccentric wheel on front side of the circular cone slidably connects the limit plate that can be abutted with the sealing plate on the mixing resonator end surface, And the limit plate can limit the sealing plate and rotate down, and be connected between inner wall on the right side of the limit plate and the adsorbent chamber Secondary compressed spring, the limit plate downside are fixedly connected with the push rod abutted with the circular cone on end face, and the adsorbent chamber is right It is fixedly connected with piston cylinder on the inner wall of side, plunger shaft is equipped in the piston cylinder, is fixedly connected in the plunger shaft front end face There is the secondary solenoid valve that can be communicated with the plunger shaft, slidably connect piston in the plunger shaft, in the piston back end surface It is fixedly connected with the piston rod extanded rearward in the adsorbent chamber, is connected between inner wall on rear side of the piston and the plunger shaft Have auxiliary spring, be fixedly connected with fixed block between the piston rod and the circular cone front end face, on front side of the plunger shaft in It interlinks between wall and the secondary air pump and is connected to accessory trachea, slidably connected and the eccentric wheel on inner wall on the right side of the adsorbent chamber The oscillating plate of abutting, and the oscillating plate is located on the downside of the eccentric wheel, is fixedly connected with position on inner wall on the right side of the adsorbent chamber Fixed station on the downside of the oscillating plate is connected with vibrating spring between the fixed station and the oscillating plate, in the vibration Under spring force effect, the eccentric wheel abuts always with the oscillating plate.
Wherein, the adsorbent equipment includes the S being fixedly connected on rear side of the adsorbent chamber on inner wall and for storing zeolite Shape delivery pipe, and the S-shaped delivery pipe is located on the downside of the fixed station, the S-shaped delivery pipe is metal mesh structure, makes the suction Attached intracavitary mud can flow into the S-shaped delivery pipe and zeolitic contact, is fixedly connected in the adsorbent chamber right end face useful The object being connected with the S-shaped delivery pipe is fixedly connected in the zeolite case of storage zeolite, in the adsorbent chamber right end face Material pump, and the product pump is communicated with the zeolite case, is fixedly connected in the adsorbent chamber left end face and is conveyed with the S-shaped The recycling bins for being used to store discarded zeolite that pipe communicates.
The beneficial effects of the present invention are: the present invention carries out weight to mud using two methods of passivator reaction and zeolite absorption Metal removal processing, so that treatment effect is preferable, passivator delivery device can manually set different amounts of dispensing dosage, and with it is mixed Close rabbling mechanism linkage, can be carried out passivator while agitating and quantitatively launch, be mixed mechanism stirring simultaneously drive stir Impeller side-to-side vibrations is mixed, mud mobility is improved, to improve mud and passivator mixing velocity, shortens passivator and heavy metal In the reaction time, after completing preliminary heavy metal processing, mud is transported in zeolite adsorption box by the screw rod being mixed in mechanism, Vibrating mechanism generates up-down vibration, improves mud mobility, to improve the contact area of mud and zeolite, zeolite absorption is made to become silted up Time needed for heavy metal in mud shortens, and the zeolite that adsorption capacity is lost in adsorption box can be discharged for conveying mechanism, mends simultaneously New zeolite is filled, therefore the present invention has the processing time shorter, treatment effect is preferable, and can replace zeolite automatically.
Detailed description of the invention
The present invention is described in detail by following specific embodiments and drawings for ease of explanation,.
Fig. 1 is a kind of overall structure diagram of riverway sludge heavy metal processing equipment of the invention;
Fig. 2 is the structural schematic diagram in direction " A-A " of Fig. 1;
Fig. 3 is the structure enlargement diagram at " B " of Fig. 1;
Fig. 4 is the structure enlargement diagram at " C " of Fig. 1;
Fig. 5 is the structural schematic diagram in direction " D-D " of Fig. 1;
Fig. 6 is the structure enlargement diagram at " E " of Fig. 1.
Specific embodiment
Below with reference to Fig. 1 to Fig. 6, the present invention is described in detail, for sake of convenience, now advises to hereafter described orientation Fixed as follows: hereafter described front-rear direction up and down is consistent with the front-rear direction up and down of Fig. 1 projection relation itself.
The present invention relates to a kind of riverway sludge heavy metal processing equipments, are mainly used in the processing of mud heavy metal, below will In conjunction with attached drawing of the present invention, the present invention will be further described:
A kind of riverway sludge heavy metal processing equipment of the present invention, including mixing tank 11, interior be equipped with of mixing tank 11 are mixed Chamber 12 is closed, adsorption box 66 is fixedly connected on the 11 downside end face of mixing tank, is equipped in the adsorption box 66 and is mixed with described The adsorbent chamber 67 that chamber 12 communicates, the interior mixing arrangement 101 being equipped with for being stirred of the mixing chamber 12, the mixing chamber 12 are right Side end face is equipped with charging device 102, and the charging device 102 includes the cunning cylinder being set to outside 12 right end face of mixing chamber 55, the spline chamber 56 being set in the sliding cylinder 55, the sky for being set in the sliding cylinder 55 and being located at 56 left side of spline chamber Chamber 58, can spline be connected in the spline chamber 56 spline wheel 57, be fixedly connected in 57 left end face of spline wheel and The splined shaft 60 that is extended to outside 55 end face of sliding cylinder to the left, be fixedly connected in 55 right end face of sliding cylinder and with the flower The steel pipe 52 that key chamber 56 communicates, and the air-flow that the mixing arrangement 101 produces is transported to the flower using the steel pipe 52 In key chamber 56, the spline wheel 57 is pushed to move to left to the cavity 58, is detached from the spline wheel 57 with the spline chamber 56 Connection is equipped on the downside of the charging device 102 and is capable of automatic locking so that being able to achieve the charging device 102 quantitatively launches function The locking device 103 of the 102 feeding port chamber door of charging device sets vibration device 104, the vibration dress in the adsorbent chamber 67 The mobility for vibrating up and down to improve mud can be generated by setting 104, be equipped in the adsorbent chamber 67 and be located at the vibration device 104 The adsorbent equipment 105 of downside, the adsorbent equipment 105 adsorb the heavy metal in mud by zeolite.
Valuably, the opening of mixing chamber 12 is towards a left side, and 12 opening of the mixing chamber is rotatably connected to cover board 86, described Adsorbent chamber 67 is opening down.
According to embodiment, mixing arrangement 101 is described in detail below, the mixing arrangement 101 includes getting into connection Motor shaft 17 in 12 upper inside walls of mixing chamber has been connected by power on the motor shaft 17 and has been fixedly connected on the mixing Motor 18 in 12 upper inside walls of chamber is fixedly connected with the bevel gear 16 positioned at 18 downside of motor on the motor shaft 17, It is fixedly connected with air pump 21 on the 12 right side inner wall of mixing chamber, left and right is rotatably connected in the air pump 21 and extends to the gas The shaft 20 outside 21 end faces is pumped, and the shaft 20 extends right up to outside 12 end face of mixing chamber, it is fixed in the shaft 20 It is connected with the belt wheel 26 being located at outside 12 end face of mixing chamber, is fixedly connected in the shaft 20 and is engaged with the bevel gear 16 The secondary bevel gear 19 of connection is fixedly connected with ramp blocks 43,43 left side of ramp blocks in pair bevel gear 19 left end face It is fixedly connected with the slide-bar 46 extended to the left on end face, slidably connects on the 12 rear side inner wall of mixing chamber positioned at the inclined-plane The gear-box 15 in 43 left side of block, is connected with extension spring 44, the gear-box between the gear-box 15 and the ramp blocks 43 It is fixedly connected with the follower lever 45 abutted with the ramp blocks 43 in 15 right end faces, and is acted in 44 elastic force of extension spring Under, the follower lever 45 abuts always with the ramp blocks 43, and gear cavity 50, and the slide-bar 46 are equipped in the gear-box 15 It extends in the gear cavity 50, is rotatably connected to bevel gear 47, and the bevel gear 47 on the 50 right side inner wall of gear cavity It connect, is rotatably connected on the 15 downside inner wall of gear-box described in extending up and down and extending downward into 46 feather key of slide-bar Agitating shaft 14 in mixing chamber 12 is fixedly connected with the secondary bevel gear that connection is engaged with the bevel gear 47 on the agitating shaft 14 48, it is fixedly connected with the agitator arm 13 in the mixing chamber 12 on the agitating shaft 14, it is fixed on the agitating shaft 14 It is connected with the secondary screw rod 49 for conveying mud downwards for being located at 13 downside of agitator arm, it can band by the motor 18 It moves the secondary bevel gear 19 and the ramp blocks 43 rotates, under 44 elastic force of extension spring effect, 43 energy of ramp blocks It drives the follower lever 45 and the gear-box 15 and the agitator arm 13 to move left and right, vibration motion is realized, to improve The mobility of mud, while being connect by the bevel gear 47 with the engagement of the secondary bevel gear 48 and can drive the agitating shaft 14 It is rotated with the agitator arm 13, realizes agitating function.
Valuably, the mixing chamber 12 is rotatably connected to sealing plate 37, the sealing plate with the 67 phase port of adsorbent chamber Torsionspring 85 is equipped at 37 rotation connections.
According to embodiment, charging device 102 is described in detail below, the charging device 102 includes being fixedly connected In storage bin 23 in 12 right end face of mixing chamber, it is equipped with and is communicated with the mixing chamber 12 and the court that is open in the storage bin 23 Right storage chamber 24, the storage chamber 24 are used to store the passivator for making the precipitatings such as heavy metal conversion hydrate, the storage It deposits 24 left side opening of chamber and is rotatably connected to odd-side door 35, be fixedly connected in 24 right end face of storage chamber positioned at the storage The cross bar 28 on the downside of 24 right openings of chamber is deposited, is fixedly connected on the 28 downside end face of cross bar positioned at sliding 55 right side of cylinder Boss 29, the boss 29 is interior to be equipped with air cavity 51, interlinks between the air cavity 51 and the air pump 21 and is connected to tracheae 22, described Steel pipe 52 is rotationally connected in 51 left end face of air cavity, and the steel pipe 52 is communicated with the air cavity 51, the steel pipe 52 On be fixedly connected with the secondary pulley 53 positioned at 55 right side of sliding cylinder, be connected with V between the secondary pulley 53 and the belt wheel 26 Band 27,58 upper inside walls of cavity are equipped with opening up gas vent 64, the company of rotation on the 24 right side inner wall of storage chamber It is connected to left and right to extend and extend right up to the screw rod 31 outside 24 end face of storage chamber, be fixedly connected on the screw rod 31 Turntable 62 outside 24 end face of storage chamber is fixedly connected with spline tube 30, and the flower on 62 right-hand end of turntable Key axis 60 is extended to the left in the spline tube 30, and the spiral shell positioned at sliding 55 left side of cylinder is threaded on the splined shaft 60 Mother 61 is fixedly connected with the secondary spline wheel 65 connecting with 30 spline of spline tube in 61 left end face of nut, and described Secondary spline wheel 65 is slidably connected with the splined shaft 60, connects between the pair spline wheel 65 and 30 inner left wall of the spline tube There is compression spring 54, be fixedly connected with the solenoid valve 42 that can be communicated with the spline chamber 56 on the 56 upside end face of spline chamber, The mixing arrangement 101 drives the steel pipe 52 to rotate by V belt translation, so as to drive the rotation of screw rod 31 will be described Passivator in storage chamber 24 is launched into the mixing chamber 12.
Valuably, the storage chamber 24 is rotatably connected to chamber door 25 with 12 place of communicating of mixing chamber, by described in rotation Nut 61 adjusts the distance between the secondary spline wheel 65 and described spline tube 30, changes the initial pressure of the compression spring 54 Power moves to left so as to change the spline wheel 57 to air pressure required in the cavity 58 so that the spline wheel 57 with it is described Time needed for spline chamber 56 is detached from spline connection changes, so that injected volume be made to change, therefore can set different Injected volume.
According to embodiment, locking device 103 is described in detail below, the locking device 103 includes being slidably connected In on the 12 right side inner wall of mixing chamber and the limited block 36 that can abut with the odd-side door 35, and the limited block 36 can limit The odd-side door 35 is rotated into the mixing chamber 12, is fixedly connected in 36 right end face of limited block and is extended right up to institute The elevating lever 32 outside 12 end face of mixing chamber is stated, is fixedly connected under the elevating lever 32 in 12 right end face of mixing chamber The fixed link 34 of side is connected with compressed spring 33, the circumferential battle array of the turntable 62 between the fixed link 34 and the elevating lever 32 There are six openings to be directed away from the secondary spline wheel 65 of the center point for column distribution, slidably connected in the pair spline wheel 65 can with it is described The sliding block 63 that elevating lever 32 abuts, the sliding block 63 and the secondary spline wheel 65 are connected with exhaust between the inner wall of center of circle side Hole 64 drives the turntable 62 to rotate by the screw rod 31, and under the action of the centrifugal force, the sliding block 63 is to far from the center of circle one Side is mobile, and the sliding block 63 abuts with the elevating lever 32 and the elevating lever 32 is pushed to move down, and makes the limited block 36 and institute It states odd-side door 35 to disengage, to release the rotation limitation of the odd-side door 35.
According to embodiment, vibration device 104 is described in detail below, the vibration device 104 includes being fixedly connected Secondary air pump 74 on the 67 rear side inner wall of adsorbent chamber, it is described pair air pump 74 in be rotatably connected to front and back extend and extend back To the rotation axis 68 outside 67 end face of adsorbent chamber, it has been connected by power in the rotation axis 68 and has been fixedly connected on the adsorbent chamber 67 Auxiliary-motor 75 in back end surface slidably connects the circular cone 73 positioned at secondary 74 front side of air pump in the rotation axis 68, And the rotation axis 68 is unable to drive the circular cone 73 and rotates, and is fixedly connected in the rotation axis 68 positioned at the circular cone The eccentric wheel 69 of 73 front sides, slidably connects the limit plate 78 that can be abutted with the sealing plate 37 on 12 end face of mixing chamber, And the limit plate 78 can limit the sealing plate 37 and rotate down, the limit plate 78 and the 67 right side inner wall of adsorbent chamber it Between be connected with secondary compressed spring 87, be fixedly connected with the push rod abutted with the circular cone 73 on the 78 downside end face of limit plate 77, it is fixedly connected with piston cylinder 70 on the 67 right side inner wall of adsorbent chamber, is equipped with plunger shaft 71, the work in the piston cylinder 70 The secondary solenoid valve 88 that can be communicated with the plunger shaft 71, sliding in the plunger shaft 71 are fixedly connected in plug 71 front end face of chamber It is connected with piston 81, is fixedly connected with the piston rod extanded rearward in the adsorbent chamber 67 in 81 back end surface of piston 80, auxiliary spring 72, the piston rod 80 and the taper are connected between 71 rear side inner wall of the piston 81 and the plunger shaft It is fixedly connected with fixed block 79 between 73 front end face of block, is communicated between 71 front inner wall of plunger shaft and the secondary air pump 74 It is connected with accessory trachea 76, slidably connects the oscillating plate 84 abutted with the eccentric wheel 69 on the 67 right side inner wall of adsorbent chamber, And the oscillating plate 84 is located at 69 downside of eccentric wheel, is fixedly connected on the 67 right side inner wall of adsorbent chamber positioned at the vibration The fixed station 82 of 84 downside of movable plate, is connected with vibrating spring 83 between the fixed station 82 and the oscillating plate 84, in the vibration Under 83 elastic force of spring of moving effect, the eccentric wheel 69 abuts always with the oscillating plate 84, drives institute by the auxiliary-motor 75 It states rotation axis 68 and the eccentric wheel 69 rotates, the oscillating plate 84 can be driven to move up and down, to generate up-down vibration, and led to Cross the mobility that vibration improves mud.
According to embodiment, adsorbent equipment 105 is described in detail below, the adsorbent equipment 105 includes being fixedly connected In the S-shaped delivery pipe 38 on the 67 rear side inner wall of adsorbent chamber and for storing zeolite, and the S-shaped delivery pipe 38 is positioned at described 82 downside of fixed station, the S-shaped delivery pipe 38 is metal mesh structure, and the mud in the adsorbent chamber 67 is enable to flow into the S-shaped In delivery pipe 38 and zeolitic contact, the zeolite case 40 for storing zeolite is fixedly connected in 67 right end face of adsorbent chamber, The product pump 39 being connected with the S-shaped delivery pipe 38, and the object are fixedly connected in 67 right end face of adsorbent chamber Material pump 39 is communicated with the zeolite case 40, is fixedly connected in 67 left end face of adsorbent chamber and 38 phase of S-shaped delivery pipe The logical recycling bins 41 for being used to store discarded zeolite, since mud flows from top to bottom, in the S-shaped delivery pipe 38 of upside Zeolite first contacts with mud and adsorbs heavy metal, so that zeolite of the zeolite in the S-shaped delivery pipe 38 of upside prior to downside Adsorption capacity is lost, is transported to the zeolite in the zeolite case 40 in the S-shaped delivery pipe 38 simultaneously by the product pump 39 It is gradually moved up along the S-shaped delivery pipe 38, and the zeolite for losing adsorption capacity is transported in recycling bins 41.
It is carried out below in conjunction with use step of the Fig. 1 to Fig. 6 to one of this paper riverway sludge heavy metal processing equipment detailed It describes in detail bright:
When beginning, odd-side door 35 is in closed state, under the effect of 33 elastic force of compressed spring, 12 downside of elevating lever 32 and mixing chamber End face contact, limited block 36 abut with odd-side door 35 and limit odd-side door 35 and turn left, sliding under the effect of 64 elastic force of gas vent Block 63 is not contacted with elevating lever 32, and solenoid valve 42 and secondary solenoid valve 88 are in close state, and by manual rotating nut 61, is changed Secondary spline wheel 65 and 3
The distance between 0 right side inner wall, sets required injected volume, under the effect of 54 elastic force of compression spring, secondary 65 He of spline wheel Spline wheel 57 is located at right limit, and spline wheel 57 is contacted with 56 right side inner wall of spline chamber, acts in 85 twisting resistance of torsionspring Under, sealing plate 37 is in closed state, and under the effect of 72 elastic force of auxiliary spring, piston 81 and circular cone 73 are located at front limit, limit Position plate 78 is abutted with sealing plate 37, and is limited sealing plate 37 and rotated down, and passivator is filled in storage chamber 24, zeolite is filled Mud to be processed is transported in mixing chamber 12 by zeolite case 40 by opening cover board 86, and the starting of product pump 39 will be in zeolite case 40 Zeolite be transported in S-shaped delivery pipe 38 and fill S-shaped delivery pipe 38.
When work, start motor 18, motor 18 drives motor shaft 17 to rotate, and motor shaft 17 passes through bevel gear 16 and secondary cone tooth The engagement connecting band turn axis 20 and slide-bar 46 of wheel 19 rotate, and slide-bar 46 is connected by feather key drives bevel gear 47 to rotate, umbrella tooth Wheel 47 drives secondary bevel gear 48, agitating shaft 14, agitator arm 13 and secondary screw rod 49 to rotate by engagement connection, realizes to mud Agitating function, while secondary bevel gear 19 drives ramp blocks 43 to rotate, under the effect of 44 elastic force of extension spring, follower lever 45 and tiltedly Face block 43 abuts always, enables ramp blocks 43 to drive follower lever 45 and gear-box 15 or so slightly mobile, to make paddle 13 side-to-side vibrations are taken turns, so that mud viscosity Doenward flow improves, to improve mud and passivator mixing rate, shorten a huge sum of money Belong to the processing time, while shaft 20 drives the work of air pump 21 to generate air-flow, air-flow is transported in air cavity 51 by tracheae 22, then is led to It crosses steel pipe 52 to convey in spline chamber 56, gradually spline wheel 57 is pushed to be moved to the left, while shaft 20 is rotated with movable belt pulley 26, belt wheel 26 drive secondary pulley 53 and steel pipe 52 to rotate by V band 27, and steel pipe 52 drives sliding cylinder 55 to rotate, and sliding cylinder 55 passes through 56 He of spline chamber The spline connection of spline wheel 57 drives spline wheel 57 and splined shaft 60 to rotate, and splined shaft 60, which is connected through a screw thread, drives 61 He of nut Secondary spline wheel 65 rotates, and secondary spline wheel 65 is connected by spline drives spline tube 30 and turntable 62 to rotate, and the rotation of turntable 62 generates Centrifugal force keeps sliding block 63 mobile to separate center of circle side and abuts with elevating lever 32, makes elevating lever 32 that limited block 36 be driven to move down, It is disconnected limited block 36 with odd-side door 35, releases the rotary spacing to odd-side door 35, while turntable 62 drives screw rod 31 Passivator in storage chamber 24 is transported in mixing chamber 12 by rotation, after spline wheel 57 is shifted to the right in cavity 58, completes setting The passivator of amount is launched, so that spline wheel 57, secondary spline wheel 65, turntable 62, spline tube 30 and screw rod 31 stall, is stopped to mixed It closes and continues to launch passivator in chamber 12, so that the passivator for completing set amount is launched, while acting on and gliding in 64 elastic force of gas vent Block 63 is resetted and is disengaged with elevating lever 32, reset is moved up in 33 elastic force of compressed spring effect lower position block 36, with odd-side door 35 abut, and avoid odd-side door 35 from surprisingly opening and launch excessive passivator, and air extra in sliding cylinder 55 passes through gas vent 64 It is discharged to the external world, after passivator completes the preliminary treatment to the heavy metal in mud, auxiliary-motor 75 starts, and auxiliary-motor 75 drives Rotation axis 68 rotates, and rotation axis 68 drives the secondary work of air pump 74 to generate air-flow, and air-flow is transported to piston by accessory trachea 76 In chamber 71, piston 81, piston rod 80 and fixed block 79 is pushed to move backward, fixed block 79 drives circular cone 73 along rotation axis 68 It moves backward, circular cone 73 pushes push rod 77 to move right, and push rod 77 drives limit plate 78 to move right, and releases to sealing plate 37 Limit, sealing plate 37 rotates down unlatching under the gravity of mud in mixing chamber 12, and secondary screw rod 49 rotates downwards It conveys in mud to adsorbent chamber 67, while improving mud mobility in 13 side-to-side vibrations of agitator arm, so that in mixing chamber 12 Mud can be flow to faster in adsorbent chamber 67, and so as to shorten the disposed of in its entirety time, motor 18 is stalled after completing conveying mud, be become silted up Mud flows downward and the zeolitic contact in S-shaped delivery pipe 38, and zeolite adsorbs remaining heavy metal in mud, to realize to mud In heavy metal carry out secondary treatment, while rotation axis 68 with movable eccentric wheel 69 rotate, 83 elastic force of vibrating spring effect under, vibration Movable plate 84 abuts always with eccentric wheel 69, so that the rotation of eccentric wheel 69 can drive oscillating plate 84 to move up and down, in adsorbent chamber 67 Mud generate vibration and improve mud mobility, enable mud and zeolite come into full contact with and improves zeolite adsorption area, so as to shorten The time required to zeolite adsorbs heavy metal, the zeolite in zeolite case 40 is transported to S-shaped conveying by the starting of product pump 39 after a period of time In zeolite conveying recycling bins 41 in pipe 38, and after being scrapped in S-shaped delivery pipe 38, realizes automatic replacement zeolite function, complete Treated, and mud is flowed out at external storage by 67 lower opening of adsorbent chamber, while auxiliary-motor 75 stalls, secondary solenoid valve 88 It opens, under the effect of auxiliary spring 72, the Forward of piston 81 resets, and solenoid valve 42 is opened, under the effect of compression spring 54, secondary spline wheel 65 and spline wheel 57 move to right reset, secondary solenoid valve 88 and compression spring 54 are again switched off later, and whole equipment restPoses.
The beneficial effects of the present invention are: the present invention carries out weight to mud using two methods of passivator reaction and zeolite absorption Metal removal processing, so that treatment effect is preferable, passivator delivery device can manually set different amounts of dispensing dosage, and with it is mixed Close rabbling mechanism linkage, can be carried out passivator while agitating and quantitatively launch, be mixed mechanism stirring simultaneously drive stir Impeller side-to-side vibrations is mixed, mud mobility is improved, to improve mud and passivator mixing velocity, shortens passivator and heavy metal In the reaction time, after completing preliminary heavy metal processing, mud is transported in zeolite adsorption box by the screw rod being mixed in mechanism, Vibrating mechanism generates up-down vibration, improves mud mobility, to improve the contact area of mud and zeolite, zeolite absorption is made to become silted up Time needed for heavy metal in mud shortens, and the zeolite that adsorption capacity is lost in adsorption box can be discharged for conveying mechanism, mends simultaneously New zeolite is filled, therefore the present invention has the processing time shorter, treatment effect is preferable, and can replace zeolite automatically.
In the above manner, those skilled in the art can be made within the scope of the invention according to operating mode it is various Change.

Claims (9)

1. a kind of riverway sludge heavy metal processing equipment, including mixing tank;
It is equipped with mixing chamber in the mixing tank, is fixedly connected with adsorption box on the downside of the mixing tank on end face, in the adsorption box The mixing arrangement for being stirred, the mixing are equipped with equipped with the adsorbent chamber communicated with the mixing chamber, in the mixing chamber Chamber right end face is equipped with charging device, and the charging device includes the cunning cylinder being set to outside the mixing chamber right end face, sets The spline chamber that is placed in the sliding cylinder, the cavity for being set in the sliding cylinder and being located on the left of the spline chamber, can spline connection In the intracavitary spline wheel of the spline, it is fixedly connected in the spline wheel left end face and extends to the sliding cylinder end face to the left Outer splined shaft is fixedly connected on the steel pipe communicated in the sliding cylinder right end face and with the spline chamber, and described in utilizing It is intracavitary that the air-flow that the mixing arrangement produces is transported to the spline by steel pipe, and the spline wheel is pushed to move to left to the cavity It is interior, it is disconnected the spline wheel with the spline chamber, so that being able to achieve the charging device quantitatively launches function, the throwing It is equipped with the locking device for being capable of automatic locking the charging device feeding port chamber door on the downside of material device, vibration dress is set in the adsorbent chamber It sets, the vibration device can generate the mobility for vibrating up and down to improve mud, be equipped in the adsorbent chamber and be located at the vibration Adsorbent equipment on the downside of dynamic device, the adsorbent equipment adsorb the heavy metal in mud by zeolite.
2. a kind of riverway sludge heavy metal processing equipment as described in claim 1, it is characterised in that: mixing chamber opening court A left side, and the mixing chamber opening is rotatably connected to cover board, the adsorbent chamber is opening down.
3. a kind of riverway sludge heavy metal processing equipment as described in claim 1, it is characterised in that: the mixing arrangement includes The motor shaft being connected in the mixing chamber upper inside walls is got into, has been connected by power on the motor shaft and has been fixedly connected on described mix Close the motor in chamber upper inside walls, the bevel gear being fixedly connected on the downside of the motor on the motor shaft, the mixing It is fixedly connected with air pump on inner wall on the right side of chamber, turn that left and right extends to outside the air pump end face is rotatably connected in the air pump Axis, and the shaft extends right up to outside the mixing resonator end surface, is fixedly connected in the shaft positioned at the mixing chamber end Belt wheel outside face, the secondary bevel gear that connection is engaged with the bevel gear is fixedly connected in the shaft, and the pair bevel gear is left It is fixedly connected with ramp blocks on side end face, the slide-bar extended to the left is fixedly connected in the ramp blocks left end face, it is described mixed The gear-box slidably connected on inner wall on the left of the ramp blocks on rear side of chamber is closed, between the gear-box and the ramp blocks It is connected with extension spring, the follower lever abutted with the ramp blocks is fixedly connected in the gear-box right end face, and in institute It states under the effect of extension spring elastic force, the follower lever abuts always with the ramp blocks, gear cavity is equipped in the gear-box, and The slide-bar extends in the gear cavity, is rotatably connected to bevel gear, and the bevel gear on inner wall on the right side of the gear cavity It is connect with the slide-bar feather key, is rotatably connected on inner wall on the downside of the gear-box and extends up and down and extend downward into the mixing Intracavitary agitating shaft is fixedly connected with the secondary bevel gear that connection is engaged with the bevel gear, the agitating shaft on the agitating shaft On be fixedly connected with the agitator arm in the mixing chamber, be fixedly connected on the agitating shaft positioned at the agitator arm The secondary screw rod for conveying mud downwards of downside.
4. a kind of riverway sludge heavy metal processing equipment as claimed in claim 3, it is characterised in that: the mixing chamber with it is described Adsorbent chamber phase port is rotatably connected to sealing plate, is equipped with torsionspring at the sealing plate rotation connection.
5. a kind of riverway sludge heavy metal processing equipment as claimed in claim 3, it is characterised in that: the charging device includes It is fixedly connected on storage bin in the mixing chamber right end face, is equipped with and is communicated with the mixing chamber and the court that is open in the storage bin Right storage chamber, the storage chamber are used to store the passivator for making the precipitatings such as heavy metal conversion hydrate, the storage chamber Left side opening is rotatably connected to odd-side door, is fixedly connected in the storage chamber right end face positioned at the storage chamber right side opening The cross bar of mouthful downside, the boss being fixedly connected on end face on the downside of the cross bar on the right side of the sliding cylinder are set in the boss There is air cavity, interlink between the air cavity and the air pump and be connected to tracheae, the steel pipe is rotationally connected with the air cavity left-hand end On face, and the steel pipe is communicated with the air cavity, the secondary pulley being fixedly connected on the right side of the sliding cylinder on the steel pipe, institute It states and is connected with V band between secondary pulley and the belt wheel, the cavity upper inside walls are equipped with opening up gas vent, the storage It deposits and is rotatably connected to left and right extension on the right side of chamber on inner wall and extends right up to the screw rod outside the storage resonator end surface, the spiral It is fixedly connected on bar and is fixedly connected with spline tube on the turntable stored outside resonator end surface, the turntable right-hand end, and The splined shaft is extended to the left in the spline tube, the spiral shell being threaded on the left of the sliding cylinder on the splined shaft Mother is fixedly connected with the secondary spline wheel connecting with the spline tube spline, and the secondary spline wheel in the nut left end face It is slidably connected with the splined shaft, is connected with compression spring between the pair spline wheel and the spline tube inner left wall, it is described The solenoid valve that can be communicated with the spline chamber is fixedly connected on end face on the upside of spline chamber.
6. a kind of riverway sludge heavy metal processing equipment as claimed in claim 5, it is characterised in that: the storage chamber with it is described The mixing chamber place of communicating is rotatably connected to chamber door, is adjusted between the secondary spline wheel and the spline tube by rotating the nut Distance changes the initial pressure of the compression spring, moves to left so as to change the spline wheel to gas required in the cavity Pressure, so that the time that the spline wheel is detached from needed for spline is connect with the spline chamber changes, to make injected volume Variation, therefore different injected volumes can be set.
7. a kind of riverway sludge heavy metal processing equipment as claimed in claim 5, it is characterised in that: the locking device includes The limited block that can be abutted on inner wall and with the odd-side door is slidably connected on the right side of the mixing chamber, and the limited block can limit The odd-side door is rotated into the mixing chamber, is fixedly connected in the limited block right end face and is extended right up to the mixing Elevating lever outside resonator end surface, the fixed link being fixedly connected in the mixing chamber right end face on the downside of the elevating lever, institute It states and is connected with compressed spring between fixed link and the elevating lever, there are six openings to be directed away from for the turntable circumferential direction array distribution The secondary spline wheel of the center point, slidably connects the sliding block that can be abutted with the elevating lever in the pair spline wheel, the sliding block and The pair spline wheel is connected with gas vent between the inner wall of center of circle side.
8. a kind of riverway sludge heavy metal processing equipment as claimed in claim 4, it is characterised in that: the vibration device includes It is fixedly connected on the secondary air pump on rear side of the adsorbent chamber on inner wall, front and back is rotatably connected in the pair air pump and extends and prolong backward The rotation axis outside the absorption resonator end surface is extended to, has been connected by power in the rotation axis and has been fixedly connected on the adsorbent chamber rear side end Auxiliary-motor on face, slidably connects the circular cone on front side of the secondary air pump in the rotation axis, and the rotation axis without Method drives the circular cone rotation, and the eccentric wheel being fixedly connected on front side of the circular cone in the rotation axis is described mixed Close and slidably connect the limit plate that can be abutted with the sealing plate on resonator end surface, and the limit plate can limit the sealing plate to Secondary compressed spring, end face on the downside of the limit plate are connected on the right side of lower rotation, the limit plate and the adsorbent chamber between inner wall On be fixedly connected with the push rod abutted with the circular cone, be fixedly connected with piston cylinder on inner wall on the right side of the adsorbent chamber, it is described It is equipped with plunger shaft in piston cylinder, is fixedly connected with the secondary electromagnetism that can be communicated with the plunger shaft in the plunger shaft front end face Valve slidably connects piston in the plunger shaft, is fixedly connected in the piston back end surface and extands rearward to the absorption Auxiliary spring, the piston rod and the cone are connected on rear side of intracavitary piston rod, the piston and the plunger shaft between inner wall It is fixedly connected with fixed block between shape block front end face, interlinks and is connected between the plunger shaft front inner wall and the secondary air pump Accessory trachea slidably connects the oscillating plate abutted with the eccentric wheel, and the oscillating plate position on inner wall on the right side of the adsorbent chamber On the downside of the eccentric wheel, the fixed station being fixedly connected on the inner wall of the adsorbent chamber right side on the downside of the oscillating plate, institute State and be connected with vibrating spring between fixed station and the oscillating plate, the vibrating spring elastic force effect under, the eccentric wheel with The oscillating plate abuts always.
9. a kind of riverway sludge heavy metal processing equipment as claimed in claim 8, it is characterised in that: the adsorbent equipment includes It is fixedly connected on the S-shaped delivery pipe on rear side of the adsorbent chamber on inner wall and for storing zeolite, and the S-shaped delivery pipe is located at institute It states on the downside of fixed station, the S-shaped delivery pipe is metal mesh structure, and the mud in the adsorbent chamber is enable to flow into the S-shaped conveying Interior and zeolitic contact is managed, the zeolite case for storing zeolite, the adsorbent chamber are fixedly connected in the adsorbent chamber right end face The product pump being connected with the S-shaped delivery pipe, and the product pump and the zeolite case are fixedly connected in right end face It communicates, time for being used to store discarded zeolite communicated with the S-shaped delivery pipe is fixedly connected in the adsorbent chamber left end face Receive case.
CN201910843457.1A 2019-09-06 2019-09-06 River silt heavy metal treatment facility Active CN110510843B (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201910843457.1A CN110510843B (en) 2019-09-06 2019-09-06 River silt heavy metal treatment facility
JP2019225926A JP2021041392A (en) 2019-09-06 2019-12-13 Heavy metal treatment facility for river silt

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910843457.1A CN110510843B (en) 2019-09-06 2019-09-06 River silt heavy metal treatment facility

Publications (2)

Publication Number Publication Date
CN110510843A true CN110510843A (en) 2019-11-29
CN110510843B CN110510843B (en) 2020-07-24

Family

ID=68630286

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910843457.1A Active CN110510843B (en) 2019-09-06 2019-09-06 River silt heavy metal treatment facility

Country Status (2)

Country Link
JP (1) JP2021041392A (en)
CN (1) CN110510843B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114768593A (en) * 2022-05-31 2022-07-22 陈秀清 Phosphate slurry treatment device based on industrial waste recovery

Families Citing this family (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113321389A (en) * 2021-05-22 2021-08-31 秦超 Reservoir silt processing apparatus that hydraulic engineering used
CN113477145B (en) * 2021-08-09 2023-05-19 重庆工程职业技术学院 Smoke suppression asphalt mixing device
CN114100450A (en) * 2021-11-09 2022-03-01 梁启鑫 Swing type mixing device for external liquid medicine preparation in burn department
CN114105358B (en) * 2021-11-24 2023-11-07 嘉应学院 Small-size city river water ammonia nitrogen treatment device
CN114315060B (en) * 2021-12-13 2022-12-13 中铁二局集团建筑有限公司 Silt solidification equipment
CN116216095B (en) * 2023-02-08 2024-01-19 连云港市兆昱新材料实业有限公司 Feed liquid metering pushing equipment of rare earth extraction tank
CN116514355B (en) * 2023-07-03 2023-09-05 湖南亿康环保科技有限公司 Solidification equipment of mud innocent treatment
CN116750935B (en) * 2023-08-16 2023-11-03 山东中治环境工程设备有限公司 Environment-friendly water environment treatment equipment
CN117965892B (en) * 2024-01-31 2024-08-13 湖南信力新材料有限公司 Oxygen-enriched oxidation recovery device for tungsten-containing waste
CN118130382B (en) * 2024-05-07 2024-07-05 吉林省白城市农业科学院(吉林省向日葵研究所) Rye bread microorganism content fluorescence detector

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN206937452U (en) * 2017-07-18 2018-01-30 河南省奥林特药业有限公司 For to stalk straightening device before Chinese medicine cutting
CN108310843A (en) * 2018-04-25 2018-07-24 广州奇达瑞盛环保科技有限公司 A kind of low-carbon economy automation Chinese medicine removes removing heavy metals device
CN108927038A (en) * 2018-08-03 2018-12-04 绍兴初汇纺织有限公司 A kind of preparation method of novel reactive dye
US20190017092A1 (en) * 2017-07-14 2019-01-17 American Sterilizer Company Process for determining viability of test microorganisms of biological indicator and sterilization detection device for determining same

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5886229U (en) * 1982-08-03 1983-06-11 京阪煉炭工業株式会社 Dry dust collection powder humidification device
JP2529212B2 (en) * 1986-07-16 1996-08-28 株式会社竹中工務店 Contaminated soil treatment equipment
JPH05105769A (en) * 1991-10-17 1993-04-27 Nkk Corp Batch type production device for high viscosity resin
JP5931597B2 (en) * 2011-09-29 2016-06-08 株式会社神鋼環境ソリューション Stirrer

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20190017092A1 (en) * 2017-07-14 2019-01-17 American Sterilizer Company Process for determining viability of test microorganisms of biological indicator and sterilization detection device for determining same
CN206937452U (en) * 2017-07-18 2018-01-30 河南省奥林特药业有限公司 For to stalk straightening device before Chinese medicine cutting
CN108310843A (en) * 2018-04-25 2018-07-24 广州奇达瑞盛环保科技有限公司 A kind of low-carbon economy automation Chinese medicine removes removing heavy metals device
CN108927038A (en) * 2018-08-03 2018-12-04 绍兴初汇纺织有限公司 A kind of preparation method of novel reactive dye

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114768593A (en) * 2022-05-31 2022-07-22 陈秀清 Phosphate slurry treatment device based on industrial waste recovery

Also Published As

Publication number Publication date
CN110510843B (en) 2020-07-24
JP2021041392A (en) 2021-03-18

Similar Documents

Publication Publication Date Title
CN110510843A (en) A kind of riverway sludge heavy metal processing equipment
CN110180826A (en) A kind of processing of crude drugs system
CN110090701A (en) A kind of broken and construction material fabricated device for cinder
CN111977406A (en) Inclination-adjustable feed processing charging bucket discharging device and method
CN201244460Y (en) Horizontal type tumbling cylinder double-movement spiral material-mixing machine without blind angle
CN218144562U (en) Polyurethane resin production batching is with ration feeding device
CN211302807U (en) Feeding and mixing device
CN113198385A (en) Automatic feeding device for wet granulator for pharmacy and application process
CN219248528U (en) Be used for land to renovate with spraying and seeding device
CN116513649A (en) Fertilizer bin
CN109835907A (en) A kind of device improving silicon materials purity
CN110280380A (en) A kind of afforestation waste sorting crushing system
CN112892454B (en) Bleaching powder product production equipment and method
CN109016002A (en) A kind of method of timber floor waterproof and anticorrosion
CN111742632B (en) Polarized soil remediation agent sowing device and use method thereof
CN211813631U (en) New energy battery effluent treatment plant based on fenton treatment process
CN211920188U (en) Automatic rice fertilizing device
CN209275561U (en) A kind of batch bin efficiently conveyed
CN113799252A (en) Production process of cement-based conductive composite material based on graphene particles
CN217098267U (en) Concrete distributing vehicle
CN208809869U (en) Automatic recipe maker is used in a kind of production of calcium carbonate superfine powder
CN109079986A (en) A kind of wetting stirrer
CN111569729A (en) High-efficient coating mixing machine
CN110205974A (en) A kind of sandy beach refuse collector
CN110773429A (en) Device for separating sand and stone in grades

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Yu Ningrui

Inventor after: Liang Wan

Inventor after: Cui Jiejie

Inventor before: Cui Jiejie

CB03 Change of inventor or designer information
TA01 Transfer of patent application right

Effective date of registration: 20200701

Address after: 200120 room 205, west area, 2f, No. 707, Zhangyang Road, China (Shanghai) pilot Free Trade Zone, Pudong New Area, Shanghai

Applicant after: Shanghai xingguohui Environmental Protection Technology Co., Ltd

Address before: 324000 Inter-Village Shangmayuan Road, Fenglin Town, Xikou Town, Longyou County, Quzhou City, Zhejiang Province

Applicant before: Longyou Kay Environmental Protection Technology Co.,Ltd.

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: Room 205, West District, 2nd floor, no.707 Zhangyang Road, China (Shanghai) pilot Free Trade Zone, Pudong New Area, Shanghai, 200120

Patentee after: Shanghai Guohui Environmental Technology Co.,Ltd.

Address before: Room 205, West District, 2nd floor, no.707 Zhangyang Road, China (Shanghai) pilot Free Trade Zone, Pudong New Area, Shanghai, 200120

Patentee before: Shanghai xingguohui Environmental Protection Technology Co., Ltd

CP01 Change in the name or title of a patent holder