CN110508955A - A kind of wind power foundation slab submerged arc welding new process - Google Patents

A kind of wind power foundation slab submerged arc welding new process Download PDF

Info

Publication number
CN110508955A
CN110508955A CN201910758840.7A CN201910758840A CN110508955A CN 110508955 A CN110508955 A CN 110508955A CN 201910758840 A CN201910758840 A CN 201910758840A CN 110508955 A CN110508955 A CN 110508955A
Authority
CN
China
Prior art keywords
welding
arc welding
slab
submerged arc
wind power
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910758840.7A
Other languages
Chinese (zh)
Inventor
夏小勇
刘云飞
葛纯亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGSU HAILI WIND POWER EQUIPMENT TECHNOLOGY Co Ltd
Original Assignee
JIANGSU HAILI WIND POWER EQUIPMENT TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU HAILI WIND POWER EQUIPMENT TECHNOLOGY Co Ltd filed Critical JIANGSU HAILI WIND POWER EQUIPMENT TECHNOLOGY Co Ltd
Priority to CN201910758840.7A priority Critical patent/CN110508955A/en
Publication of CN110508955A publication Critical patent/CN110508955A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K28/00Welding or cutting not covered by any of the preceding groups, e.g. electrolytic welding
    • B23K28/02Combined welding or cutting procedures or apparatus

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Arc Welding In General (AREA)
  • Butt Welding And Welding Of Specific Article (AREA)

Abstract

The invention discloses a kind of wind power foundation slab submerged arc welding new processes, comprising the following steps: blanking processing, the preceding groove processing of weldering, assembly is welded, temperature control, welded, appearance detects and non-destructive testing.The invention has the advantages that the method for taking " stationary point blanking ", can preferably guarantee blank size;Assembled using solid gas shielded arc welding GMAW, apolegamy -40 DEG C of reinspections of carbon dioxide gas arc welding welding wire ER50-6(warp are qualified), this welding wire is consistent with base material performance, requirement needed for capable of reaching welding procedure;It is combined using F5A4-H10Mn2/SJ101 welding wire solder flux, production efficiency is higher, while also ensuring weldquality requirement;Heating tooling is designed according to tube structure, there is straight round steel pipe connection to make oxygen-propane gas passage among two arc round steel pipes, under have A-frame support, guarantee its stability, prepare gas reservoir before work, ventilation igniting can start to work, and can accomplish uniformly preheating and postweld heat preservation, can preferably guarantee welding quality and improve efficiency.

Description

A kind of wind power foundation slab submerged arc welding new process
Technical field
The present invention relates to welding technology fields, and in particular to a kind of wind power foundation slab submerged arc welding new process.
Background technique
With constantly improve for wind power foundation technology, big megawatt of serial tower is come into being, constantly in practice To application.Such as Huaneng Group great Feng Hai dress 5MW and Three Gorges great Feng gold wind 6.45MW achieves preferable practical function.Big megawatt is Column wind power foundation compared to common tower for, maximum feature is exactly that plate thickness is larger, is conducive to the stabilization of tower foundation in this way Performance and security performance.And Weld quality level must meet existing national standards " bearing device non-destructive testing " (NB/ T47013-2015 it) provides, reaches level-one qualification.But thicker steel plate weld seam welding has following features and difficult point: 1, welding When compared with fusion penetration, the molten wide for being difficult to guarantee weld seam;2, since plank thickness is larger, easily there is dimension overproof situation, need strictly to control Blanking deformation processed, groove size;3, component thickness is big, assembly weldering and submerged arc welding process in, be easy to produce welding deformation and Weld crack.
Summary of the invention
Existing difficulties are welded to solve above-mentioned thicker steel plate weld seam, it is thick that the present invention provides a kind of wind power foundations Plate submerged arc welding new process.
The technical solution adopted by the present invention is that:
A kind of wind power foundation slab submerged arc welding new process, comprising the following steps:
A, blanking is handled: slab is sucked with magnetic iron and places on the table, recalls slab blanking program and leads into digital control flame and cut On cutting mill, NC flame cutting machine carries out blanking operation according to program, and cylinder cut lengths deviation radical length deflection error is wanted Ask 0-2mm, plate wide difference≤2mm, difference≤3mm of diagonal line;
B, groove processing before weldering: with sanding machine polishing steel plate edge, form root face preferably with groove, and clear up near groove Impurity within the scope of 25mm;
C, assembly weldering: assembling positioning is carried out between slab and slab using solid gas shield welding GMAW, determines one every 120mm Assembly solder joint is reinforced, and 60mm long is welded in every section of assembly, assembles the gap of 0 ~ 1mm of root at weldering;
D, temperature controls: being heated within the scope of the 120mm of groove two sides with Ethylene Oxide even flame, with thermometer pair after the completion of heating Groove temperature measures, and just can be carried out weld job after temperature is up to standard, by preheating temperature control at 110-160 DEG C, interlayer temperature Degree control is at 110-200 DEG C;
E, weld: slab and slab are welded, and first carry out submerged arc welding in inner barrel, inside is welded and is completed, until lid Face is carried out the carburized layer of back chipping rear surface and molten slag with sanding machine after then using carbon arc air gouging back chipping on the outside of cylinder again Polishing then carries out submerged arc welding until exposing metallic luster again, and after the completion of cover welding, welding terminates, and longitudinal joint will with asbestos Weld seam covering, after the completion of girth welding, heater is housed on fixed bracket, open turning rolls take two turns to circumferential weld surface into Row is evenly heated, and keeps the temperature the generation of the pre- Anti-cracking of slow cooling;
F, appearance detects: before quality inspection carries out VT, welder needs first self-test, guarantees that weld appearance situation is intact, face of weld Must not there are slag inclusion, crackle, undercut and gas hole defect;
G, after VT is qualified, UT detection, T-shaped seam plus survey RT, MT non-destructive testing: are after 48 hours.
Further, the welding procedure of the solid gas shield welding GMAW in step c are as follows: using CO 2 gas-shielded Solid welding wire ER50-6, gage of wire Φ 1.2, electric current 220-260A, voltage 29-33V, speed of welding 25-35cm/min are welded, is protected Protect gas CO2, protection air-flow amount 20-25L/min.
Further, the submerged arc welding in step e is Lincoln weld SAW, welding parameter are as follows: welding wire F5A4- H10Mn2, solder flux SJ101, gage of wire Φ 4.0, solder flux specification 8-40 mesh, electric current 650-750A, voltage 29-36V, welding speed 25-32m/h is spent, dries 300-350 DEG C of heat preservation 2h before solder flux weldering.
Further, the groove docked between the slab is by following conceptual design: internal groove width is 45 ± 1mm, slope 54 ± 5 ° of bicker degree, 45 ± 1mm of depth;Outer groove width is 22 ± 1mm, 60 ± 5 ° of bevel angle, 19 ± 1mm of depth, intermediate 3 ± 1mm of root face.
It further, is 200mm around welded seam area with the longitudinal joint range that asbestos cover in step e.
Further,.
Further, the heating tooling includes two arc round steel pipes, is provided among two arc round steel pipes Straight round steel pipe as oxygen-propane gas passage is provided with A-frame, the heating below two arc round steel pipes Tooling use process is as follows: heater is put and is placed in cylinder side, at cylinder hot-zone side 150-200mm to be added, Ethylene Oxide gas cylinder is connect with the suction nozzle that heater is loaded into appendix, valve is opened, lights Ethylene Oxide, then use remote controler Control turning rolls is rotated, and allows cylinder to rotate with turning rolls, flame is evenly heated heating zone, during which with infrared survey Wen Yi stops heating to thermometric at heating after temperature reaches 110-160 degree.
The beneficial effects of the present invention are: the 1, method that takes " stationary point blanking ", can preferably guarantee blank size;2, It is assembled using solid gas shielded arc welding GMAW, apolegamy -40 DEG C of reinspections of carbon dioxide gas arc welding welding wire ER50-6(warp are closed Lattice), this welding wire is consistent with base material performance, requirement needed for capable of reaching welding procedure;3, buried arc welding method is used, is adopted It is combined with F5A4-H10Mn2/SJ101 welding wire solder flux, production efficiency is higher, while also ensuring weldquality requirement;4, it designs Dedicated heating tooling is made, heating tooling is designed according to tube structure, has straight round steel pipe among two arc round steel pipes Oxygen-propane gas passage is made in connection, under have A-frame support, guarantee its stability, prepare gas reservoir before working, point of ventilating Fire can start to work, and can accomplish uniformly preheating and postweld heat preservation, can preferably guarantee welding quality and improve efficiency.
Detailed description of the invention
Fig. 1 is the structural schematic diagram for heating tooling.
Wherein: 1, arc round steel pipe, 2, straight round steel pipe, 3, A-frame.
Specific embodiment
In order to make the object, technical scheme and advantages of the embodiment of the invention clearer, below in conjunction with the embodiment of the present invention, Technical scheme in the embodiment of the invention is clearly and completely described, it is clear that described embodiment is the present invention one Divide embodiment, instead of all the embodiments.Based on the embodiments of the present invention, those of ordinary skill in the art are not making Every other embodiment obtained, shall fall within the protection scope of the present invention under the premise of creative work.
A kind of wind power foundation slab submerged arc welding new process, comprising the following steps:
A, blanking is handled: slab is sucked with magnetic iron and places on the table, recalls slab blanking program and leads into digital control flame and cut On cutting mill, NC flame cutting machine carries out blanking operation according to program, and cylinder cut lengths deviation radical length deflection error is wanted Seek 0-2mm, plate wide difference≤2mm, difference≤3mm of diagonal line are controlled using the technological measure of " stationary point blanking " in this step Blanking deformation, the concrete operation step of the technological measure of " stationary point blanking " are not cut every 2 meter Liu Yi sections of 50mm, eventually Gas flame cuttiug, the method for taking " stationary point blanking ", can preferably guarantee blank size;
B, groove processing before weldering: with sanding machine polishing steel plate edge, form root face preferably with groove, and clear up near groove Impurity within the scope of 25mm;
C, assembly weldering: assembling positioning is carried out between slab and slab using solid gas shield welding GMAW, determines one every 120mm Assembly solder joint is reinforced, and 60mm long is welded in every section of assembly, assembles the gap of 0 ~ 1mm of root at weldering;
D, temperature controls: being heated within the scope of the 120mm of groove two sides with Ethylene Oxide even flame, with thermometer pair after the completion of heating Groove temperature measures, and just can be carried out weld job after temperature is up to standard, by preheating temperature control at 110-160 DEG C, interlayer temperature Degree control is at 110-200 DEG C;
E, weld: slab and slab are welded, and first carry out submerged arc welding in inner barrel, inside is welded and is completed, until lid Face is carried out the carburized layer of back chipping rear surface and molten slag with sanding machine after then using carbon arc air gouging back chipping on the outside of cylinder again Polishing then carries out submerged arc welding until exposing metallic luster again, and after the completion of cover welding, welding terminates, and longitudinal joint will with asbestos Weld seam covering, is 200mm around welded seam area with the longitudinal joint range that asbestos cover, after the completion of girth welding, heater is put On fixed bracket, as shown in Figure 1, heating tooling includes two arc round steel pipes 1, it is provided among two arc round steel pipes 1 Straight round steel pipe 2 as oxygen-propane gas passage, the lower section of two arc round steel pipes 1 are provided with A-frame 3, open idler wheel Frame, which takes two turns, is evenly heated circumferential weld surface, keeps the temperature the generation of the pre- Anti-cracking of slow cooling;
F, appearance detects: before quality inspection carries out VT, welder needs first self-test, guarantees that weld appearance situation is intact, face of weld Must not there are slag inclusion, crackle, undercut and gas hole defect;
G, after VT is qualified, UT detection, T-shaped seam plus survey RT, MT non-destructive testing: are after 48 hours.
Wherein, the welding procedure of the solid gas shield welding GMAW in step c are as follows: real using carbon dioxide gas arc welding Cored welding wire ER50-6, gage of wire Φ 1.2, electric current 220-260A, voltage 29-33V, speed of welding 25-35cm/min protect gas Body CO2, protection air-flow amount 20-25L/min are assembled using solid gas shielded arc welding GMAW, and apolegamy carbon dioxide gas is protected It is qualified to protect -40 DEG C of reinspections of welding wire ER50-6(warp), this welding wire is consistent with base material performance, can reach needed for welding procedure It is required that;The submerged arc welding in step e is Lincoln weld SAW, welding parameter are as follows: welding wire F5A4-H10Mn2, solder flux SJ101, gage of wire Φ 4.0, solder flux specification 8-40 mesh, electric current 650-750A, voltage 29-36V, speed of welding 25-32m/h, 300-350 DEG C of heat preservation 2h is dried before solder flux weldering, buried arc welding method is used, using F5A4-H10Mn2/SJ101 welding wire solder flux Combination, production efficiency is higher, while also ensuring weldquality requirement;The groove docked between slab is by following conceptual design: Internal groove width be 45 ± 1mm, 54 ± 5 ° of bevel angle, 45 ± 1mm of depth;Outer groove width is 22 ± 1mm, bevel angle 60 ± 5 °, depth 19 ± 1mm, intermediate 3 ± 1mm of root face;Blanking change is controlled in step a using the technological measure of " stationary point blanking " Shape, the concrete operation step of the technological measure of " the stationary point blanking " are not cut every 2 meter Liu Yi sections of 50mm, eventually flame Cutting.
Dedicated heating tooling is designed and produced in the present invention, heating tooling is designed according to tube structure, two arcs There is the connection of straight round steel pipe to make oxygen-propane gas passage among round steel pipe, under have A-frame support, guarantee its stability, work Preceding preparation gas reservoir, ventilation igniting can start to work, and can accomplish uniformly preheating and postweld heat preservation, can preferably guarantee to weld It connects quality and improves efficiency.

Claims (7)

1. a kind of wind power foundation slab submerged arc welding new process, which comprises the following steps:
A, blanking is handled: slab is sucked with magnetic iron and places on the table, recalls slab blanking program and leads into digital control flame and cut On cutting mill, NC flame cutting machine carries out blanking operation according to program, and cylinder cut lengths deviation radical length deflection error is wanted Ask 0-2mm, plate wide difference≤2mm, difference≤3mm of diagonal line;
B, groove processing before weldering: with sanding machine polishing steel plate edge, form root face preferably with groove, and clear up near groove Impurity within the scope of 25mm;
C, assembly weldering: assembling positioning is carried out between slab and slab using solid gas shield welding GMAW, determines one every 120mm Assembly solder joint is reinforced, and 60mm long is welded in every section of assembly, assembles the gap of 0 ~ 1mm of root at weldering;
D, temperature controls: being heated within the scope of the 120mm of groove two sides with Ethylene Oxide even flame, with thermometer pair after the completion of heating Groove temperature measures, and just can be carried out weld job after temperature is up to standard, by preheating temperature control at 110-160 DEG C, interlayer temperature Degree control is at 110-200 DEG C;
E, weld: slab and slab are welded, and first carry out submerged arc welding in inner barrel, inside is welded and is completed, until lid Face is carried out the carburized layer of back chipping rear surface and molten slag with sanding machine after then using carbon arc air gouging back chipping on the outside of cylinder again Polishing then carries out submerged arc welding until exposing metallic luster again, and after the completion of cover welding, welding terminates, and longitudinal joint will with asbestos Weld seam covering, after the completion of girth welding, heater is housed on fixed bracket, open turning rolls take two turns to circumferential weld surface into Row is evenly heated, and keeps the temperature the generation of the pre- Anti-cracking of slow cooling;
F, appearance detects: before quality inspection carries out VT, welder needs first self-test, guarantees that weld appearance situation is intact, face of weld Must not there are slag inclusion, crackle, undercut and gas hole defect;
G, after VT is qualified, UT detection, T-shaped seam plus survey RT, MT non-destructive testing: are after 48 hours.
2. a kind of wind power foundation slab submerged arc welding new process according to claim 1, which is characterized in that in step c The welding procedure of the solid gas shield welding GMAW are as follows: use carbon dioxide gas arc welding solid welding wire ER50-6, gage of wire Φ 1.2, electric current 220-260A, voltage 29-33V, speed of welding 25-35cm/min, protective gas CO2, protection air-flow amount 20- 25L/min。
3. a kind of wind power foundation slab submerged arc welding new process according to claim 1, which is characterized in that in step e The submerged arc welding is Lincoln weld SAW, welding parameter are as follows: welding wire F5A4-H10Mn2, solder flux SJ101, gage of wire Φ 4.0, solder flux specification 8-40 mesh, electric current 650-750A, voltage 29-36V, speed of welding 25-32m/h dry 300- before solder flux weldering 350 DEG C of heat preservation 2h.
4. a kind of wind power foundation slab submerged arc welding new process according to claim 1, which is characterized in that the slab it Between the groove that docks by following conceptual design: internal groove width is 45 ± 1mm, 54 ± 5 ° of bevel angle, 45 ± 1mm of depth;Outside Groove width be 22 ± 1mm, 60 ± 5 ° of bevel angle, depth 19 ± 1mm, intermediate 3 ± 1mm of root face.
5. a kind of wind power foundation slab submerged arc welding new process according to claim 1, which is characterized in that used in step e The longitudinal joint range of asbestos covering is 200mm around welded seam area.
6. a kind of wind power foundation slab submerged arc welding new process according to claim 1, which is characterized in that adopted in step a Blanking deformation is controlled with the technological measure of " stationary point blanking ", the concrete operation step of the technological measure of " the stationary point blanking " is It is not cut every 2 meter Liu Yi sections of 50mm, eventually gas flame cuttiug.
7. a kind of wind power foundation slab submerged arc welding new process according to claim 1, which is characterized in that the heater Dress includes two arc round steel pipes, is provided with the straight round steel as oxygen-propane gas passage among two arc round steel pipes It manages, is provided with A-frame below two arc round steel pipes.
CN201910758840.7A 2019-08-16 2019-08-16 A kind of wind power foundation slab submerged arc welding new process Pending CN110508955A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910758840.7A CN110508955A (en) 2019-08-16 2019-08-16 A kind of wind power foundation slab submerged arc welding new process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910758840.7A CN110508955A (en) 2019-08-16 2019-08-16 A kind of wind power foundation slab submerged arc welding new process

Publications (1)

Publication Number Publication Date
CN110508955A true CN110508955A (en) 2019-11-29

Family

ID=68626349

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910758840.7A Pending CN110508955A (en) 2019-08-16 2019-08-16 A kind of wind power foundation slab submerged arc welding new process

Country Status (1)

Country Link
CN (1) CN110508955A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112518243A (en) * 2020-11-23 2021-03-19 江苏海力海上风电装备制造有限公司 Novel manufacturing process of long and narrow thick plate transition section of wind power tower
CN114147324A (en) * 2021-11-10 2022-03-08 大连船舶重工集团有限公司 High-efficiency welding method for large perforated flange and thick-wall pipe
CN114985881A (en) * 2022-06-09 2022-09-02 江苏海力风电设备科技股份有限公司 Novel CTOD sample preparation process for thick plate welding seam area of wind power single-pile foundation

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101288919A (en) * 2007-12-27 2008-10-22 中铁四局集团有限公司 Welding method for thick plate and ultra-thick plate of 50-120 mm
CN204999942U (en) * 2015-10-10 2016-01-27 兰州兰石重型装备股份有限公司 Major diameter barrel circumferential weld preheating device
CN206779654U (en) * 2017-05-25 2017-12-22 兰州兰石重型装备股份有限公司 A kind of pressure vessel welding groove preheats frock
CN208262133U (en) * 2018-04-24 2018-12-21 兰州兰石重型装备股份有限公司 Circumferential Welds In Cylinders weld preheating and postwelding disappear hydrogen tooling
CN110091037A (en) * 2019-04-30 2019-08-06 江苏海力风电设备科技股份有限公司 Offshore wind farm tower elastic support reinforced welding new process

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101288919A (en) * 2007-12-27 2008-10-22 中铁四局集团有限公司 Welding method for thick plate and ultra-thick plate of 50-120 mm
CN204999942U (en) * 2015-10-10 2016-01-27 兰州兰石重型装备股份有限公司 Major diameter barrel circumferential weld preheating device
CN206779654U (en) * 2017-05-25 2017-12-22 兰州兰石重型装备股份有限公司 A kind of pressure vessel welding groove preheats frock
CN208262133U (en) * 2018-04-24 2018-12-21 兰州兰石重型装备股份有限公司 Circumferential Welds In Cylinders weld preheating and postwelding disappear hydrogen tooling
CN110091037A (en) * 2019-04-30 2019-08-06 江苏海力风电设备科技股份有限公司 Offshore wind farm tower elastic support reinforced welding new process

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
侯兆欣,何奋韬: "《钢结构工程施工质量验收规范实施指南》", 31 December 2002 *
康学军,等.: "埋弧自动焊在风电塔筒生产中的应用", 《机电产品开发与创新》 *
石南辉,等.: "厚壁大直径风塔的焊接", 《电焊机》 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112518243A (en) * 2020-11-23 2021-03-19 江苏海力海上风电装备制造有限公司 Novel manufacturing process of long and narrow thick plate transition section of wind power tower
CN114147324A (en) * 2021-11-10 2022-03-08 大连船舶重工集团有限公司 High-efficiency welding method for large perforated flange and thick-wall pipe
CN114147324B (en) * 2021-11-10 2023-10-24 大连船舶重工集团有限公司 High-efficiency welding method for large-sized perforated flange and thick-wall pipe
CN114985881A (en) * 2022-06-09 2022-09-02 江苏海力风电设备科技股份有限公司 Novel CTOD sample preparation process for thick plate welding seam area of wind power single-pile foundation

Similar Documents

Publication Publication Date Title
CN110508955A (en) A kind of wind power foundation slab submerged arc welding new process
Gourd Principles of welding technology
CN107984105A (en) The welding procedure of wind power tower S355NL steel
WO2021179675A1 (en) Welding process for molten salt pipeline in tower-type photothermal power generation in high-cold area
CN105750717B (en) A kind of welding procedure being used between connecting plate and cylinder
CN108723557A (en) A kind of welding method of cylinder
CN112894087B (en) Tube plate nickel-based alloy double-tungsten-electrode single-hot-wire automatic tungsten electrode argon arc welding surfacing process
CN106735760A (en) A kind of welding procedure of 15CrMo heat-resisting alloy steels
CN102107312B (en) Butt welding and T-shaped welding construction method for thick steel plate in normal temperature state
CN110434497A (en) A kind of welding method of cylinder one side welding with back formation
CN102259231A (en) Overhead wielding technology for rotary kiln cylinder
CN111347131A (en) CLF-1 and 316L dissimilar steel TIG welding method
CN108890092B (en) Method for single-side welding and double-side forming of fusion electrode MAG welding tube plate
CN108436271B (en) Welding method for reducing number of weld pores of laser deep fusion welding
CN101352785A (en) Method for welding pressing sleeve of large-sized hydraulic press
CN112518243A (en) Novel manufacturing process of long and narrow thick plate transition section of wind power tower
CN110695563A (en) Welding method for tank wall plate of soil covering tank
CN110508954A (en) A kind of wind power foundation thin plate submerged-arc welding process
CN105436815A (en) Method for repairing caterpillar crane jib truss
WO2021139080A8 (en) Welding method of iron-aluminum-based intermetallic compound microporous material and welded piece thereof
CN110666313A (en) Welding process for thick-wall beam column of ocean engineering equipment
CN112475561B (en) Automatic welding process for main steam pipeline
CN109746544A (en) A kind of welding procedure of ultrahigh vacuum stainless steel chamber
CN109483057A (en) Circumferential weld laser-MAG compound welding method
CN102941399A (en) Gas-shielded welding method for pearlite heat-resistant steel structural members

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination