CN110500126A - Hollow bolt filling adaptor and hollow bolt construction technology - Google Patents

Hollow bolt filling adaptor and hollow bolt construction technology Download PDF

Info

Publication number
CN110500126A
CN110500126A CN201910892949.XA CN201910892949A CN110500126A CN 110500126 A CN110500126 A CN 110500126A CN 201910892949 A CN201910892949 A CN 201910892949A CN 110500126 A CN110500126 A CN 110500126A
Authority
CN
China
Prior art keywords
hollow bolt
filling adaptor
inner sleeve
outer tube
grouting pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910892949.XA
Other languages
Chinese (zh)
Other versions
CN110500126B (en
Inventor
郭得福
石国成
刘龙卫
董富萍
张恒
独小明
宗利军
龙海涛
王勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Tunnel Group Yichu Co Ltd
Original Assignee
China Railway Tunnel Group Yichu Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Tunnel Group Yichu Co Ltd filed Critical China Railway Tunnel Group Yichu Co Ltd
Priority to CN201910892949.XA priority Critical patent/CN110500126B/en
Publication of CN110500126A publication Critical patent/CN110500126A/en
Application granted granted Critical
Publication of CN110500126B publication Critical patent/CN110500126B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D20/00Setting anchoring-bolts
    • E21D20/02Setting anchoring-bolts with provisions for grouting
    • E21D20/021Grouting with inorganic components, e.g. cement
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D20/00Setting anchoring-bolts
    • E21D20/02Setting anchoring-bolts with provisions for grouting
    • E21D20/028Devices or accesories for injecting a grouting liquid in a bore-hole
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D21/00Anchoring-bolts for roof, floor in galleries or longwall working, or shaft-lining protection
    • E21D21/0026Anchoring-bolts for roof, floor in galleries or longwall working, or shaft-lining protection characterised by constructional features of the bolts

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Chemical & Material Sciences (AREA)
  • Inorganic Chemistry (AREA)
  • Lining And Supports For Tunnels (AREA)
  • Joining Of Building Structures In Genera (AREA)

Abstract

The invention discloses a kind of hollow bolt filling adaptors, including inner sleeve and outer tube, front and back is arranged at intervals with limited step and Grouting Pipe binding slot on the outer wall of the inner sleeve, thread segment is divided into before and after the inner wall of the outer tube, unthreaded hole section and necking section, the thread segment is used to screw fixation with the ends screw of hollow bolt, the diameter of unthreaded hole section is greater than thread segment, the diameter of necking section, the housing pipe sleeve is on interior casing, limited step can slide in unthreaded hole section, realize back-and-forth motion of the outer tube with respect to inner sleeve, the front end of the inner sleeve is provided with conical head, the internal diameter of hollow bolt is between the internal diameter and outer diameter of conical head, conical head is partially inserted into hollow bolt and realizes Butt sealing.Meanwhile the invention also discloses a kind of hollow bolt construction technologies.It is easy to operate, practical, save the cost, safe and reliable when carrying out empty anchor bolt construction using the filling adaptor, connector spillage can be prevented, it is ensured that slip casting is full, avoids plugging, booster.

Description

Hollow bolt filling adaptor and hollow bolt construction technology
Technical field
The invention belongs to technical field of tunnel construction, and in particular to use when a kind of pair of tunnel hollow bolt progress slip casting Filling adaptor, and the technique for carrying out hollow bolt construction using the filling adaptor.
Background technique
Hollow bolt is widely used in constructing tunnel, for example, main cavern's anchor pole take Φ 28*5.5mm, long 6m specification it is general Logical hollow bolt.The quality critical of hollow bolt is bolt grouting, and the plumpness of slip casting directly affects whether rockbolt installation closes Lattice, full slip casting is to starch so that anchor pole hole wall is counter as judgment basis.Grouting Pipe is connected with hollow bolt by filling adaptor, and slip casting The connecting portion where filling adaptor plays key effect in the process.
Fig. 5 show the filling adaptor generally used during cave depot bolt grouting, by adapter tube bolt 5,6 groups of adapter tube of auxiliary At.The leading portion of adapter tube bolt 5 is provided with internal screw thread and connect for screwing with the external screw thread of hollow bolt 3, the back segment of adapter tube bolt 5 It is provided with external screw thread to connect for screwing with the internal screw thread of auxiliary 6 leading portion of adapter tube, if being provided on the outer wall of auxiliary 6 back segment of adapter tube Dry annular groove, 4 sets of Grouting Pipe in annular groove section and binding and fixing, the cross section of annular groove are that pawl can prevent from binding Grouting Pipe 4 afterwards exits.Two operating stick 5a are also welded on the outer wall of adapter tube bolt 5.Its purpose is to every for hollow bolt 3 Secondary remove is equivalent between hollow bolt 3 and Grouting Pipe 4 in addition to binding position there are two interface, and spillage is tighter during slip casting Weight, anti-effect of starching is not fine.
Illustrate main problem existing for the structure in terms of following four:
1, operational
The precession or when screwing out from hollow bolt by filling adaptor, Grouting Pipe from rotating with it and knots to prevent, then Before the slip casting for carrying out next hollow bolt, need filling adaptor and Grouting Pipe to separate carry out again binding is combined ability slip casting, It is very troublesome.Also, filling adaptor with hollow bolt none it is corresponding to interface, reserving gaps are larger, interface is more, is difficult It is whole to form a closure, slip casting each time has to manpower and helps operating stick, operates in entire use process more complicated.
2, practicability
Two interface spillages are than more serious during slip casting, lead to when slip casting in hollow bolt hole the anti-effect starched not It is very well, slip casting is not full;Spillage also results in that operating platform sizing liquor is too many, is unfavorable for the operating and cleaning of equipment, such as pulp Liquid the case where being frequently present of plugging, is caused time-consuming and laborious by design mixture proportion stirring.
3, economy
Spillage causes the consumption of cement to increase than more serious during slip casting, 6 meters of hollow bolt, and scene is practical The bagged cement energy of 50kg slip casting 2-3, linear meter(lin.m.) waste are larger (note: the proportion of water and cement is 0.45:1).
4, safety
Operator needs to help filling adaptor, and slip casting machine has certain pressure during slip casting, because joint is docked It is not in place, blocking is easy to appear in the position of auxiliary adapter tube, grouting pressure and inner air tube is excessive is easy to cause booster, to operation Personnel have some potential safety problems, and have certain damage to equipment.
Summary of the invention
The present invention is intended to provide a kind of economic, practical, highly-safe, easy to operate hollow bolt filling adaptor, can prevent Only connector spillage, it is ensured that slip casting is full, avoids plugging, booster.
For this purpose, the technical scheme adopted by the invention is as follows: a kind of hollow bolt filling adaptor, including inner sleeve and housing Pipe, front and back is arranged at intervals with limited step and Grouting Pipe binding slot on the outer wall of the inner sleeve, before the inner wall of the outer tube After be divided into thread segment, unthreaded hole section and necking section, the thread segment is used to screw fixation, light with the ends screw of hollow bolt The diameter of hole section is greater than the diameter of thread segment, necking section, and for the housing pipe sleeve on interior casing, limited step can be in unthreaded hole section Back-and-forth motion of the outer tube with respect to inner sleeve is realized in sliding, and the front end of the inner sleeve is provided with conical head, hollow bolt it is interior Diameter enables conical head to be partially inserted into hollow bolt and realizes Butt sealing between the internal diameter and outer diameter of conical head.
The outer tube uses two sections of front and back to be welded as a preferred embodiment of the above solution, and welding surface just constitutes light The front end face of hole section.Using two-part welding structure, facilitate processing and manufacturing, welding surface is arranged in the initial position of unthreaded hole section Place, the outer tube integral strength closer to the middle part of outer tube, after can guarantee welding.
Further preferably, the left and right sides of the outer wall of the outer tube is opposite is welded with gripping baffle, the holding stop Two sections of weld seam intersects vertically before and after the weld seam of piece and outer tube.Gripping baffle is added, operator is more advantageous to and is wearing rubber Filling adaptor is tightened in the case where Rubber gloves;The weld seam of baffle is held across two sections before and after outer tube, more can ensure that integral strength.
Meanwhile the present invention also provides a kind of hollow bolt construction technologies, comprising the following steps:
The first step, anchor pole hole location setting-out;
Second step, bolthole drilling and forming hole;
Third step, installation hollow bolt;
Hollow bolt is connected by the 4th step by filling adaptor with Grouting Pipe;
5th step, hollow bolt slip casting;
6th step, filling adaptor are separated with the end of hollow bolt;
7th step, the construction for carrying out next hollow bolt, until the construction of all hollow bolts finishes;
Above-mentioned hollow bolt filling adaptor is used in 4th step, first by the outer tube of filling adaptor with respect to inner sleeve It slides backward, exposes the conical head of inner sleeve and be partially inserted into the end inner hole of hollow bolt to realize Butt sealing, then to Before turn outer tube and be locked together by the external screw thread of thread segment and hollow bolt, to realize filling adaptor and middle spare anchor The connection of bar;The rear end of inner sleeve is inserted in the front end of the Grouting Pipe, and is fixed on Grouting Pipe by steel wire lashing and binds on slot, To realize the connection of filling adaptor and Grouting Pipe;The connection of filling adaptor and hollow bolt both can be in filling adaptor and slip casting It carries out, can also be carried out after the connection of filling adaptor and Grouting Pipe before the connection of pipe;
In 5th step, air when slip casting in filling adaptor is under the pressure of slurries directly along hollow bolt inner hole It is flowed out again through hollow bolt outer wall, until the anti-slurry of the full formation of slurries, slip casting are completed;
In 6th step, when filling adaptor is separated with the end of hollow bolt, do not need Grouting Pipe from filling adaptor On remove, first turn outer tube backward and separate thread segment with the external screw thread of hollow bolt, inner sleeve does not rotate at this time, then will in The conical head of casing takes out from the end inner hole of hollow bolt;
In 7th step, when carrying out the construction of next hollow bolt, it is only necessary to filling adaptor and corresponding hollow bolt Connection does not need the connection for carrying out filling adaptor and Grouting Pipe.
The utility model has the advantages that the filling adaptor is easy to operate, practical, save the cost, safe and reliable, it is embodied in following Aspect:
1, operational
Filling adaptor is an entirety, and the front end of connector and hollow bolt reserve end by threaded engagement, after connector End and Grouting Pipe binding and fixing, since the opposite inner sleeve of outer tube energy rotates 360 °, then outer tube and hollow bolt phase It can be rotated at random after connecing and link closely with hollow bolt according to the actual situation, the activity for making three form a closure is whole, when installation It will realize and dock in the conical head insertion hollow bolt of inner sleeve first, then outer tube is released forward with respect to inner sleeve, make outer The thread segment is exposed and passed through to casing threads section and the ends screw of hollow bolt screws fixation, and ensure Grouting Pipe binding including On the Grouting Pipe binding slot of casing, slip casting for the first time can be carried out, does not have to worry that Grouting Pipe knots in outer tube rotation process, slip casting It when carrying out the slip casting of next hollow bolt after the completion, does not need to remove Grouting Pipe yet and is bound again, operating seems more Add simple.
2, practicability
The front end of inner sleeve is provided with conical head, the internal diameter of hollow bolt between the internal diameter and outer diameter of conical head, Conical head is partially inserted into hollow bolt and realizes Butt sealing, it is close conducive to underflow is pressed into the inner hole to hollow bolt Closing property is stronger, and slip casting process center tap will not spillage, it is ensured that the plumpness of slip casting, and worker can obviously judge that anchor pole is anti- Starch the time.One hole slip casting deadline also shortens nearly half the time than before and (improves previous hole and need 50 seconds or so, change Into rear need 30 seconds or so).
3, economy
The airtightness of the filling adaptor is preferable, and slurries will not be omitted easily, same 6 meters of anchor pole, the bagged cement of 50kg Can be note 4~5, the anchor pole than every 6 meters before improving can save the bagged cement of 6kg or so, be equivalent to every linear meter(lin.m.) and save 1kg The bagged cement of (0.56 yuan), has saved cost, and reached slip casting effect.
4, safety
After improvement, when carrying out the construction of hollow bolt by the filling adaptor, construction personnel infuses without helping filling adaptor Slurry connector and Grouting Pipe be initially formed an entirety, because the conical head of inner sleeve is relatively large in diameter, directly with hollow bolt inner hole pair It connects, then is nested by the thread segment of movable outer tube with hollow bolt, pressure of air when slip casting in filling adaptor in slurries It is directly flowed out again through hollow bolt outer wall along hollow bolt inner hole under power, until the anti-slurry of the full formation of slurries, effectively prevents Spillage, plugging and booster reduce security risk and the influence to equipment.
Tie it is described, when which is used for the construction of hollow bolt, can preferably embody it is easy to operate, practical, Save the cost, safe and reliable characteristic, can prevent connector spillage, it is ensured that slip casting is full, avoids plugging, booster.
Detailed description of the invention
Fig. 1 is the main view of this hollow bolt filling adaptor.
Fig. 2 is the A-A cross-sectional view of Fig. 1.
Fig. 3 is perspective view of the invention.
Fig. 4 is hollow bolt construction technology process schematic diagram.
Fig. 5 is the usage state diagram of existing filling adaptor.
Specific embodiment
By way of example and in conjunction with the accompanying drawings, the invention will be further described:
In conjunction with shown in Fig. 1-3, a kind of hollow bolt filling adaptor is mainly made of inner sleeve 1 and outer tube 2.
Front and back is arranged at intervals with limited step 1a and Grouting Pipe binding slot 1b on the outer wall of inner sleeve 1.
Thread segment 2a, unthreaded hole section 2b and necking section 2c are divided into before and after the inner wall of outer tube 2.Thread segment 2a is used for in The ends screw of spare anchor bar screws fixation, and the ends screw of hollow bolt is external screw thread.The diameter of unthreaded hole section 2b is greater than thread segment The diameter of 2a, necking section 2c, 2 sets of outer tube on inner sleeve 1, limited step 1a can be slided in unthreaded hole section 2b, realize housing Back-and-forth motion of the pipe 2 with respect to inner sleeve 1.The back-and-forth motion amount of the opposite inner sleeve 1 of outer tube 2, is determined by the length of unthreaded hole section 2b, It is designed according to the ends screw section of hollow bolt.
The front end of inner sleeve 1 is provided with conical head 1c, the internal diameter of hollow bolt between conical head 1c internal diameter and outer diameter it Between, conical head 1c is partially inserted into hollow bolt and realizes Butt sealing.
Preferably, outer tube 2 uses two sections of front and back to be welded, and welding surface just constitutes the front end face of unthreaded hole section 2b, So that welding surface is closer to the middle part of outer tube 2.
In addition, opposite be welded in the left and right sides of the outer wall of outer tube 2 holds baffle 2d, the weld seam of baffle 2d and outer is held The weld seam of 2 two sections of front and back of casing intersects vertically, so that each leading portion for holding baffle 2d is welded on 2 leading portion of outer tube, holds The back segment of baffle 2d is welded on 2 back segment of outer tube.
In conjunction with shown in Fig. 1-Fig. 4, a kind of hollow bolt construction technology, comprising the following steps:
The first step, anchor pole hole location setting-out.
Second step, bolthole drilling and forming hole.
Third step, installation hollow bolt.
Hollow bolt is connected by the 4th step by filling adaptor with Grouting Pipe.Above-mentioned hollow bolt is used in the step Filling adaptor first slides backward the outer tube of filling adaptor 2 with respect to inner sleeve 1, and the conical head 1c of inner sleeve 1 is made to expose simultaneously office Portion insertion hollow bolt end inner hole in realize Butt sealing, turn further along outer tube 2 and by thread segment 2a with it is hollow The external screw thread of anchor pole is locked together, to realize the connection of filling adaptor and hollow bolt.It is inserted in inner sleeve in the front end of Grouting Pipe The rear end of pipe 1, and Grouting Pipe is fixed on by steel wire lashing and is bound on slot 1b, to realize the company of filling adaptor and Grouting Pipe It connects.The connection of filling adaptor and hollow bolt can both carry out before the connection of filling adaptor and Grouting Pipe, can also infuse The connection for starching connector and Grouting Pipe carries out later.
5th step, hollow bolt slip casting.When slip casting, the air in filling adaptor is under the pressure of slurries directly along hollow Anchor pole inner hole is flowed out through hollow bolt outer wall again, until the anti-slurry of the full formation of slurries, slip casting are completed.
6th step, filling adaptor are separated with the end of hollow bolt.When filling adaptor is separated with the end of hollow bolt, no It needs to remove Grouting Pipe from filling adaptor, first turning outer tube 2 backward makes the external screw thread of thread segment 2a and hollow bolt point From inner sleeve 1 does not rotate at this time, then the conical head 1c of inner sleeve 1 is taken out from the end inner hole of hollow bolt.
7th step, the construction for carrying out next hollow bolt, until the construction of all hollow bolts finishes.Carry out next middle spare anchor When the construction of bar, it is only necessary to which filling adaptor is connected with corresponding hollow bolt, does not need to carry out filling adaptor and Grouting Pipe Connection.I.e. except the binding for before first hollow bolt slip casting, needing to carry out filling adaptor and Grouting Pipe connects, remaining hollow bolt When construction, the binding for no longer needing to carry out filling adaptor and Grouting Pipe is connected, and can improve construction efficiency and repeatedly Occurs the loosening at lashing location in binding, it is only necessary to bind for the first time firm.

Claims (4)

1. a kind of hollow bolt filling adaptor, it is characterised in that: including inner sleeve (1) and outer tube (2), the inner sleeve (1) Outer wall on front and back be arranged at intervals with limited step (1a) and Grouting Pipe binding slot (1b), the outer tube (2) inner wall front and back It is divided into thread segment (2a), unthreaded hole section (2b) and necking section (2c), the thread segment (2a) is for the end with hollow bolt Threaded engagement is fixed, and the diameter of unthreaded hole section (2b) is greater than the diameter of thread segment (2a), necking section (2c), outer tube (2) set On inner sleeve (1), limited step (1a) can slide in unthreaded hole section (2b), realize outer tube (2) with respect to before inner sleeve (1) After move, the front end of the inner sleeve (1) is provided with conical head (1c), the internal diameter of the internal diameter of hollow bolt between conical head (1c) Between outer diameter, so that conical head (1c) can be partially inserted into hollow bolt and realize Butt sealing.
2. hollow bolt filling adaptor described in accordance with the claim 1, it is characterised in that: the outer tube (2) uses front and back two Section is welded, and welding surface just constitutes the front end face of unthreaded hole section (2b).
3. hollow bolt filling adaptor according to claim 2, it is characterised in that: a left side for the outer wall of the outer tube (2) Opposite be welded in right two sides holds baffle (2d), two sections of weld seam before and after the weld seam for holding baffle (2d) and outer tube (2) It intersects vertically.
4. a kind of hollow bolt construction technology, comprising the following steps:
The first step, anchor pole hole location setting-out;
Second step, bolthole drilling and forming hole;
Third step, installation hollow bolt;
Hollow bolt is connected by the 4th step by filling adaptor with Grouting Pipe;
5th step, hollow bolt slip casting;
6th step, filling adaptor are separated with the end of hollow bolt;
7th step, the construction for carrying out next hollow bolt, until the construction of all hollow bolts finishes;
It is characterized by:
Using hollow bolt filling adaptor described in any one of claim 1-3 in 4th step, first by filling adaptor Outer tube (2) is slided backward with respect to inner sleeve (1), and the conical head (1c) of inner sleeve (1) is made to expose and be partially inserted into hollow bolt End inner hole in realize Butt sealing, turn outer tube (2) further along and by the outer spiral shell of thread segment (2a) and hollow bolt Line is locked together, to realize the connection of filling adaptor and hollow bolt;It is inserted in inner sleeve (1) in the front end of the Grouting Pipe Rear end, and be fixed in Grouting Pipe binding slot (1b) by steel wire lashing, to realize the connection of filling adaptor and Grouting Pipe;Note The connection of slurry connector and hollow bolt can both carry out before the connection of filling adaptor and Grouting Pipe, can also be in filling adaptor It is carried out after connection with Grouting Pipe;
In 5th step, air when slip casting in filling adaptor is directly passed through along hollow bolt inner hole again under the pressure of slurries Hollow bolt outer wall outflow, until the anti-slurry of the full formation of slurries, slip casting are completed;
In 6th step, when filling adaptor is separated with the end of hollow bolt, do not need to take Grouting Pipe from filling adaptor Under, first turning outer tube (2) backward separates thread segment (2a) with the external screw thread of hollow bolt, and inner sleeve (1) does not rotate at this time, The conical head (1c) of inner sleeve (1) is taken out from the end inner hole of hollow bolt again;
In 7th step, when carrying out the construction of next hollow bolt, it is only necessary to which filling adaptor is connected with corresponding hollow bolt , do not need the connection for carrying out filling adaptor and Grouting Pipe.
CN201910892949.XA 2019-09-20 2019-09-20 Grouting joint for hollow anchor rod and construction process for hollow anchor rod Active CN110500126B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910892949.XA CN110500126B (en) 2019-09-20 2019-09-20 Grouting joint for hollow anchor rod and construction process for hollow anchor rod

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910892949.XA CN110500126B (en) 2019-09-20 2019-09-20 Grouting joint for hollow anchor rod and construction process for hollow anchor rod

Publications (2)

Publication Number Publication Date
CN110500126A true CN110500126A (en) 2019-11-26
CN110500126B CN110500126B (en) 2024-03-15

Family

ID=68592275

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910892949.XA Active CN110500126B (en) 2019-09-20 2019-09-20 Grouting joint for hollow anchor rod and construction process for hollow anchor rod

Country Status (1)

Country Link
CN (1) CN110500126B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111877566A (en) * 2020-08-07 2020-11-03 山东建筑大学 Microbial grouting anchoring method and structure for grouting in cavity
WO2022007694A1 (en) * 2020-07-06 2022-01-13 青岛理工大学 Grouting apparatus for highly coagulative grouting material

Citations (23)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1007392A (en) * 1962-07-05 1965-10-13 Chester Irving Williams Groutable rock bolt assembly
KR950009352U (en) * 1993-09-27 1995-04-19 Flush Injection Slip Joint Device
WO1996023959A1 (en) * 1995-02-01 1996-08-08 Reburg-Patentverwertungsgesellschaft Mbh Injection anchor
CN2622391Y (en) * 2003-03-20 2004-06-30 付庆福 Self-drilling type sand grouting anchor
CN2721712Y (en) * 2004-09-06 2005-08-31 李晓峰 Intelligent hollow slip casting joint of rockbolt
EP1939394A2 (en) * 2006-12-19 2008-07-02 Minova International Limited Anchor with grout jacket
CN201343894Y (en) * 2008-12-02 2009-11-11 李成熙 Tent extension pipe structure
US20100003088A1 (en) * 2006-12-19 2010-01-07 Marek Grocholewski Anchor with grout jacket
CN102051880A (en) * 2010-12-31 2011-05-11 杭州图强工程材料有限公司 Detachable anchor
CN104154083A (en) * 2014-08-06 2014-11-19 胡建明 Telescopic pipe
CN105114109A (en) * 2015-09-18 2015-12-02 洛阳中岩工程材料有限公司 Self-drilling type hollow anchor rod grouting connector
CN105673055A (en) * 2016-01-28 2016-06-15 山东科技大学 Novel composite grouting anchor rod suitable for roadway floor
CN106640159A (en) * 2016-10-31 2017-05-10 洛阳中岩工程材料有限公司 Connecting sleeve sealing structure for self-drilling type hollow grouting anchors
CN206874296U (en) * 2017-06-06 2018-01-12 中铁建大桥工程局集团第四工程有限公司 A kind of tunnel hollow bolt grouting device
CN207332917U (en) * 2017-06-06 2018-05-08 李华诚 Hole interior sealing grouting cable anchor
CN109026101A (en) * 2018-09-13 2018-12-18 于守东 A kind of mining anchor dispensing device and its application method
CN109268048A (en) * 2018-11-05 2019-01-25 中建三局第三建设工程有限责任公司 A kind of construction method improving tunnel anchorage hollow bolt grouting quality
CN208472707U (en) * 2018-05-25 2019-02-05 中国建筑第七工程局有限公司 A kind of combined type grout pipe for pile end post jacking
CN208934722U (en) * 2018-11-01 2019-06-04 中国建筑材料工业地质勘查中心辽宁总队 Grouting equipment for anchor cable construction
CN109882225A (en) * 2019-04-04 2019-06-14 河南理工大学 It is extending to repeat Grouting Pipe and the repeatable grouted anchor bar of double circles
CN209277920U (en) * 2018-12-07 2019-08-20 西安科技大学 A kind of reaming type anchoring body anchor pole
US20200056479A1 (en) * 2017-09-12 2020-02-20 China University Of Mining And Technology Self-drilling differential grouting combined bolt and anchoring method therefor
CN210622828U (en) * 2019-09-20 2020-05-26 中铁隧道集团一处有限公司 Hollow anchor rod grouting joint

Patent Citations (23)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1007392A (en) * 1962-07-05 1965-10-13 Chester Irving Williams Groutable rock bolt assembly
KR950009352U (en) * 1993-09-27 1995-04-19 Flush Injection Slip Joint Device
WO1996023959A1 (en) * 1995-02-01 1996-08-08 Reburg-Patentverwertungsgesellschaft Mbh Injection anchor
CN2622391Y (en) * 2003-03-20 2004-06-30 付庆福 Self-drilling type sand grouting anchor
CN2721712Y (en) * 2004-09-06 2005-08-31 李晓峰 Intelligent hollow slip casting joint of rockbolt
EP1939394A2 (en) * 2006-12-19 2008-07-02 Minova International Limited Anchor with grout jacket
US20100003088A1 (en) * 2006-12-19 2010-01-07 Marek Grocholewski Anchor with grout jacket
CN201343894Y (en) * 2008-12-02 2009-11-11 李成熙 Tent extension pipe structure
CN102051880A (en) * 2010-12-31 2011-05-11 杭州图强工程材料有限公司 Detachable anchor
CN104154083A (en) * 2014-08-06 2014-11-19 胡建明 Telescopic pipe
CN105114109A (en) * 2015-09-18 2015-12-02 洛阳中岩工程材料有限公司 Self-drilling type hollow anchor rod grouting connector
CN105673055A (en) * 2016-01-28 2016-06-15 山东科技大学 Novel composite grouting anchor rod suitable for roadway floor
CN106640159A (en) * 2016-10-31 2017-05-10 洛阳中岩工程材料有限公司 Connecting sleeve sealing structure for self-drilling type hollow grouting anchors
CN206874296U (en) * 2017-06-06 2018-01-12 中铁建大桥工程局集团第四工程有限公司 A kind of tunnel hollow bolt grouting device
CN207332917U (en) * 2017-06-06 2018-05-08 李华诚 Hole interior sealing grouting cable anchor
US20200056479A1 (en) * 2017-09-12 2020-02-20 China University Of Mining And Technology Self-drilling differential grouting combined bolt and anchoring method therefor
CN208472707U (en) * 2018-05-25 2019-02-05 中国建筑第七工程局有限公司 A kind of combined type grout pipe for pile end post jacking
CN109026101A (en) * 2018-09-13 2018-12-18 于守东 A kind of mining anchor dispensing device and its application method
CN208934722U (en) * 2018-11-01 2019-06-04 中国建筑材料工业地质勘查中心辽宁总队 Grouting equipment for anchor cable construction
CN109268048A (en) * 2018-11-05 2019-01-25 中建三局第三建设工程有限责任公司 A kind of construction method improving tunnel anchorage hollow bolt grouting quality
CN209277920U (en) * 2018-12-07 2019-08-20 西安科技大学 A kind of reaming type anchoring body anchor pole
CN109882225A (en) * 2019-04-04 2019-06-14 河南理工大学 It is extending to repeat Grouting Pipe and the repeatable grouted anchor bar of double circles
CN210622828U (en) * 2019-09-20 2020-05-26 中铁隧道集团一处有限公司 Hollow anchor rod grouting joint

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
丁謇等: "WSS双重管注浆工艺在盾构端头井加固中的应用", 《江苏建筑职业技术学院学报》, vol. 17, no. 02, 15 June 2017 (2017-06-15), pages 18 - 22 *
周泉吉;: "软土富水地层全断面管撑法的水平往复注浆装置设计研究", 建筑施工, vol. 39, no. 01, 25 January 2017 (2017-01-25), pages 17 - 23 *
张杰;秦亮;刘龙卫;: "帷幕注浆施工在地下水发育段的实用技术", 山西建筑, vol. 35, no. 33, 20 November 2009 (2009-11-20), pages 344 - 345 *
煤炭工业部地质局: "《煤田地质小口径钻探 泥浆及堵漏》", vol. 1, 31 May 1978, 煤炭工业出版社, pages: 62 - 70 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2022007694A1 (en) * 2020-07-06 2022-01-13 青岛理工大学 Grouting apparatus for highly coagulative grouting material
US11702936B2 (en) 2020-07-06 2023-07-18 Qingdao university of technology Grouting device for high-coagulability grouting material
CN111877566A (en) * 2020-08-07 2020-11-03 山东建筑大学 Microbial grouting anchoring method and structure for grouting in cavity
CN111877566B (en) * 2020-08-07 2021-07-16 山东建筑大学 Microbial grouting anchoring method and structure for grouting in cavity

Also Published As

Publication number Publication date
CN110500126B (en) 2024-03-15

Similar Documents

Publication Publication Date Title
CN110500126A (en) Hollow bolt filling adaptor and hollow bolt construction technology
CN108799639A (en) A kind of frp lining concrete supplying drainage and its preparation process
CN206495423U (en) Line bar connector
CN210622828U (en) Hollow anchor rod grouting joint
CN213393997U (en) Double-arm type crude oil closed recovery device
CN208364982U (en) A kind of frp lining concrete supplying drainage
CN109163123A (en) A kind of integral type butterfly valve check-valves loose joint structure
CN106639165A (en) Butt muff
CN106640159A (en) Connecting sleeve sealing structure for self-drilling type hollow grouting anchors
CN207863974U (en) A kind of quick coupling device for tunnel per-fore pouring liquid with small pipe
CN212900269U (en) Convenient recycling joint device for connecting grouting pipe and advanced small catheter
CN108915158A (en) A kind of Separated type combination grout sleeve and connection method
CN202914110U (en) Anchor rod grouting joint
CN209041657U (en) A kind of integral type butterfly valve check-valves loose joint structure
CN211924132U (en) Well cementation check valve
CN113202513A (en) Novel double-liquid grouting mixer for shield
CN209723404U (en) Large-size rebar threaded connector
CN208486894U (en) A kind of tunnel trolley auxiliary milk injector
CN213332493U (en) Ball valve for preventing fluid from flowing backwards
CN216788424U (en) Leakage plugging device for shield tunnel segment bolt hole
CN205935423U (en) Construction steel bar connects external member
CN202845843U (en) Drilling equipment for branch pipeline connection
CN209293804U (en) Magnetize self-priming partition spiral shell formula radial lining arch heading tape of bolting the door and is molded into slurry attachment device
CN210766786U (en) Perfusion catheter quick joint
CN109930660A (en) Quickly open the riser outlet of fire hydrant

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant