CN110500096B - Method for determining production scale of hard rock type uranium mine - Google Patents

Method for determining production scale of hard rock type uranium mine Download PDF

Info

Publication number
CN110500096B
CN110500096B CN201810469569.0A CN201810469569A CN110500096B CN 110500096 B CN110500096 B CN 110500096B CN 201810469569 A CN201810469569 A CN 201810469569A CN 110500096 B CN110500096 B CN 110500096B
Authority
CN
China
Prior art keywords
mine
ore
production scale
determining
ore body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201810469569.0A
Other languages
Chinese (zh)
Other versions
CN110500096A (en
Inventor
孙刚友
王合祥
于宝民
程光华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
FOURTH INSTITUTE OF NUCLEAR ENGINEERING OF CNNC
Original Assignee
FOURTH INSTITUTE OF NUCLEAR ENGINEERING OF CNNC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by FOURTH INSTITUTE OF NUCLEAR ENGINEERING OF CNNC filed Critical FOURTH INSTITUTE OF NUCLEAR ENGINEERING OF CNNC
Priority to CN201810469569.0A priority Critical patent/CN110500096B/en
Publication of CN110500096A publication Critical patent/CN110500096A/en
Application granted granted Critical
Publication of CN110500096B publication Critical patent/CN110500096B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C41/00Methods of underground or surface mining; Layouts therefor
    • E21C41/16Methods of underground mining; Layouts therefor
    • E21C41/22Methods of underground mining; Layouts therefor for ores, e.g. mining placers

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • Remote Sensing (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Manufacture And Refinement Of Metals (AREA)
  • Geophysics And Detection Of Objects (AREA)

Abstract

The invention relates to the technical field of hard rock type uranium mine production scale determination, and particularly discloses a hard rock type uranium mine production scale determination method. The method comprises the following steps: 1. acquiring corresponding mine recovery reserves by using the existing geological exploration data of the ore deposit; 2. determining the vertical annual descending speed of a mine according to the ore body characteristics of the ore deposit; 3. acquiring the height of a mine stoping space by using the existing geological exploration data of the ore deposit; 4. determining the production scale of the obtained mine according to the mine stoping reserve, the vertical annual descending speed of the mine and the mine stoping space height obtained in the step; the method for determining the production scale of the hard rock type uranium mine has the advantages of few parameters, simplicity and convenience in calculation, reliable results and the like, and can be used for determining the scale of the hard rock type uranium mine by establishing a rational production scale model of the uranium mine and providing reference for development and utilization of the mine.

Description

Method for determining production scale of hard rock type uranium mine
Technical Field
The invention belongs to the technical field of hard rock type uranium mine production scale determination, and particularly relates to a hard rock type uranium mine production scale determination method.
Background
The method for determining the production scale of the metallurgical mine mainly adopts a calculation method of the former Soviet Union in China, but because the resource conditions of China are poor, the management level is low, and the mining technology and the mine equipment are backward, a plurality of mines put into production for years can not reach the production all the time, and even can only reach half of the design scale. The research results in China are summarized, and four different ways are mainly used for determining the production scale of the mine: technical analysis, economic analysis, statistical analysis, and comprehensive factor analysis. The method for calculating the production scale of the mine in the metallurgical pit in China mainly comprises the steps of calculating according to the annual descent speed of mine mining, calculating according to a mining intensity method, calculating according to the number of ore distributable blocks, calculating according to the economic reasonable mine service life, calculating according to the new level preparation time and determining the production capacity of the mine by using a reserve power method.
The reasonable scale calculation method of comparatively advocated mine economy in developed western countries is a formula proposed by U.S. mining engineers h.k. taylor in 1986 for the optimal productivity of mines, and is generally called taylor formula. The Taylor formula is a matching relation between the deposit reserves summarized by Taylor according to years of design experience of the Taylor and reasonable mine production scale and mine economic life, is an experience formula which is practical, simple and practical, and in industrially developed countries, the actual life of the mine is quite consistent with the result calculated by the Taylor formula; in developing countries, the life of a mine calculated by the taylor formula is 20% shorter than the actual life of the mine. In addition, the foreign countries also pay great attention to the research on the relationship between the annual mining decline speed of the mine and the reasonable mine scale. According to actual experience of numerous mines, the recommended annual descent speed of the mine is 25-40 m in the United states of Hard Rock mine's Handbook, and the optimal annual vertical descent speed of the mine is considered to be 30m in the Seo gold mine according to the relationship between stoping, mining accuracy and equipment efficiency. Then the annual decline speed is multiplied by the strike length and the thickness of the mineral deposit of the mine to be evaluated, so that the reasonable production scale of the mine can be quickly predicted.
The method for calculating the production capacity of the metal mine is various, the production capacity calculation formulas are mainly summarized and summarized by the characteristics of metallurgy, nonferrous metal and gold mines, and the formulas are mainly referred to for the calculation of the production capacity of the uranium mine at present. Because the selection of calculation formulas and calculation parameters in different industries is different, the mine production capacity calculated by the uranium mine by using the formulas is generally large, so that the actual production scale of the uranium deposit is difficult to reach the design scale. Particularly, in the project proposal compiling stage, the construction period is very short, the working degree is shallow, and the research on the production process is not deep, so that the determined production scale of the mine is often not in line with the objective actual conditions and is often questioned by all parties, and the determined production scale can not be changed after the project proposal is repeated. Therefore, the subsequent feasibility research and the production scale demonstration work in the initial design stage are very passive and strong, sometimes, the calculated results of different personnel are greatly different even under the same condition, and the design file lacks due scientificity and seriousness. The hard rock uranium mine in China has the characteristics of complex geological structure of ore deposit, small ore body, large form grade change, unclear ore rock boundary, short working time and low working efficiency, and the physical exploration is required for finding the edge. At present, a production scale calculation formula adopted in metal mine design is mainly summarized and summarized by the characteristics of metallurgical mines, non-ferrous mines and gold mines, is not suitable for uranium deposit, the actual production scale is difficult to reach the design scale, and the uranium deposit has to be modified in production practice, so that the production is delayed, a large amount of funds are wasted, and the economic benefit of enterprises and the national natural uranium production plan are influenced.
In order to quickly and reasonably determine the feasible production scale in the early stage planning or project recommendation stage of uranium mining and metallurgy projects, the actual production scale of uranium mines developed and built in China over the years and the design production are compared and researched, main factors influencing the production scale of the mines are analyzed, a simple and feasible method is screened from the existing mine production scale calculation method, actual data is used for fitting, relevant technical parameters are optimized, a simple and feasible calculation model is provided for quickly and accurately determining the reasonable production scale in the early stage consultation stage of uranium deposits in China, the work of determining the production scale of the mines in the early stage work of the uranium mining and metallurgy projects is quick and convenient, and the result is reasonable and feasible.
Disclosure of Invention
The invention aims to provide a method for determining the production scale of a hard rock type uranium mine, which can be used for fitting by using the existing actual data, optimizing related technical parameters and providing a simple and feasible evaluation method for determining the reasonable production scale quickly and accurately in the early stage consultation stage of uranium deposits in China.
The technical scheme of the invention is as follows: a method for determining production scale of a hard rock type uranium mine specifically comprises the following steps:
step 1, acquiring corresponding mine stoping reserves by using the existing geological exploration data of the ore deposit;
step 2, determining the vertical annual descending speed of a mine according to the ore body characteristics of the ore deposit;
step 3, acquiring the height of a mining space of a mine by using the existing geological exploration data of the ore deposit;
step 4, determining the production scale of the obtained mine according to the mine stoping reserve, the mine vertical annual descent speed and the mine stoping space height obtained in the step;
mine stoping reserve Q obtained by the stepshMine shaftThe annual descending speed V and the mine stoping space height H are obtained, and the mine production scale A is as follows:
Figure BDA0001662840580000031
wherein A is the reasonable production scale of the mine, and the unit is ten thousand t/a; qhThe unit is ten thousand t for the mine recovery reserve; h is the height of the mining space of the mine, and the unit is m; v is the vertical annual descent speed in m/a.
The step 1 of obtaining the mine stoping reserve comprises the following specific steps:
step 1.1, collecting geological exploration data of a mineral deposit with a to-be-determined production scale to obtain the geological resource reserve of the mineral deposit;
step 1.2, acquiring the resource reserves of design utilization;
step 1.3, on the basis of considering the loss rate and the dilution rate in the process of mining the ore deposit, carrying out data conversion on the designed and utilized resource reserves to obtain the stope reserves of the mine;
the concrete formula for converting the designed and utilized resource reserves into the mine recovery reserves is as follows:
Figure BDA0001662840580000032
wherein Q ishThe reserve is the mine recovery reserve; qsUtilizing resource reserves for design; alpha is the loss rate of the mine; beta is the dilution rate of the mine.
The specific steps for determining the vertical annual descending speed of the mine in the step 2 are as follows:
step 2.1, acquiring the ore amount and the inclination angle value of main ore bodies in the ore deposit according to geological exploration data of the ore deposit;
step 2.2, obtaining the average inclination angle of the ore body by using a weighted average method;
step 2.3, obtaining the vertical annual descending speed of the mine in the ore body according to the average inclination angle of the ore body;
for ore bodies with the average inclination angle of more than 30 degrees, the vertical annual descending speed V of the mine is 10.6 m/a; for a slowly inclined ore body with the average inclination angle of the ore body smaller than 30 degrees, taking the vertical annual descending speed V of a mine as 7.5 m/a; when the ore body with the steep inclination is provided as well as the ore body with the gentle inclination, the average value of the two ore bodies can be taken, namely the vertical annual descending speed V of the mine is 9.1 m/a.
The specific steps of obtaining the mine stoping space height in the step 3 are as follows:
step 3.1, acquiring occurrence elevation parameters of ore bodies according to geological exploration data of ore deposits;
3.2, obtaining the mining space height of the mine by using the obtained ore body occurrence elevation parameters;
and performing data analysis on the obtained ore body occurrence elevation parameters to obtain the height H of the mining space of the mine as follows:
H=h1-h2
wherein H is the height of the mining space of the mine; h is1Locating the vertical highest stoping elevation of a mine; h is2The lowest vertical extraction elevation of the mine.
The specific steps of obtaining the reserve of the geological resources of the ore deposit in the step 1.1 are as follows:
collecting geological exploration data of the mineral deposit with the production scale to be determined, obtaining ascertained and controlled economic basic reserves and the built-in economic resource amount in the main types of the resource reserves, and using the inferred built-in economic resource amount partially; the inferred credibility coefficient of the intrinsic economic resource quantity can be selected to be 0.5-0.8 according to the occurrence characteristics and the exploration degree of the ore deposit.
The specific steps of obtaining the resource reserves for designing and utilizing in the step 1.2 are as follows:
and acquiring the sum of the design utilization resource reserve as the economic basic reserve, the internal economic resource amount of the heuristic control and the inferred internal economic resource amount and the reliability coefficient.
The step 2.2 of obtaining the average dip angle of the ore body comprises the following specific steps:
and obtaining the average inclination angle gamma of the ore body by using a weighted average method as follows:
Figure BDA0001662840580000041
wherein, TnIs the ore amount of the nth main ore body, gammanIs the inclination angle of the nth main ore body.
The invention has the following remarkable effects: the method for determining the production scale of the hard rock type uranium mine has the advantages of few parameters, simplicity and convenience in calculation, reliable result and the like, and can be used for determining the scale of the hard uranium mine by establishing a reasonable production scale model of the uranium mine and providing a reference for development and utilization of the mine; the method fills the empty energy of the existing method for determining the production scale of the hard uranium ore, and the production scale of the hard uranium mine can be simply, quickly and accurately obtained by the method.
Drawings
Fig. 1 is a flow chart of a method for determining production scale of a hard rock type uranium mine according to the invention.
Detailed Description
The invention is described in further detail below with reference to the figures and the embodiments.
As shown in fig. 1, a method for determining the production scale of a hard rock type uranium mine specifically includes the following steps:
step 1, acquiring corresponding mine stoping reserves by using the existing geological exploration data of the ore deposit;
step 1.1, collecting geological exploration data of a mineral deposit with a to-be-determined production scale to obtain the geological resource reserve of the mineral deposit;
collecting geological exploration data of the mineral deposit with the production scale to be determined, obtaining ascertained and controlled economic basic reserves and the built-in economic resource amount in the main types of the resource reserves, and using the inferred built-in economic resource amount partially; the inferred credibility coefficient of the intrinsic economic resource quantity can be selected to be 0.5-0.8 according to the occurrence characteristics and the exploration degree of the ore deposit;
step 1.2, acquiring the resource reserves of design utilization;
acquiring the design utilization resource reserve as the sum of the economic basic reserve, the internal economic resource amount of the heuristic control and the inferred internal economic resource amount and the reliability coefficient;
step 1.3, on the basis of considering the loss rate and the dilution rate in the process of mining the ore deposit, carrying out data conversion on the designed and utilized resource reserves to obtain the stope reserves of the mine;
the concrete formula for converting the designed and utilized resource reserves into the mine recovery reserves is as follows:
Figure BDA0001662840580000051
wherein Q ishThe reserve is the mine recovery reserve; qsUtilizing resource reserves for design; alpha is the loss rate of the mine; beta is the dilution rate of the mine;
step 2, determining the vertical annual descending speed of a mine according to the ore body characteristics of the ore deposit;
step 2.1, acquiring the ore amount and the inclination angle value of main ore bodies in the ore deposit according to geological exploration data of the ore deposit;
obtaining the ore amount and the dip angle value of a main ore body in the ore deposit with the production scale to be determined by using geological exploration data of the ore deposit;
step 2.2, obtaining the average inclination angle of the ore body by using a weighted average method;
and obtaining the average inclination angle gamma of the ore body by using a weighted average method as follows:
Figure BDA0001662840580000052
wherein, TnIs the ore amount of the nth main ore body, gammanIs the inclination angle of the nth main ore body;
step 2.3, obtaining the vertical annual descending speed of the mine in the ore body according to the average inclination angle of the ore body;
for ore bodies with the average inclination angle of more than 30 degrees, the vertical annual descending speed V of the mine is 10.6 m/a; for a slowly inclined ore body with the average inclination angle of the ore body smaller than 30 degrees, taking the vertical annual descending speed V of a mine as 7.5 m/a; when the steeply inclined ore body and the slowly inclined ore body exist, the average value of the steeply inclined ore body and the slowly inclined ore body is taken, namely the descending speed V of the mine in vertical years is 9.1 m/a;
step 3, acquiring the height of a mining space of a mine by using the existing geological exploration data of the ore deposit;
step 3.1, acquiring occurrence elevation parameters of ore bodies according to geological exploration data of ore deposits;
3.2, obtaining the mining space height of the mine by using the obtained ore body occurrence elevation parameters;
and performing data analysis on the obtained ore body occurrence elevation parameters to obtain the height H of the mining space of the mine as follows:
H=h1-h2
wherein H is the height of the mining space of the mine; h is1Locating the vertical highest stoping elevation of a mine; h is2The vertical lowest stoping elevation of the mine is obtained;
step 4, determining the production scale of the obtained mine according to the mine stoping reserve, the mine vertical annual descent speed and the mine stoping space height obtained in the step;
mine stoping reserve Q obtained by the stepshThe vertical annual descending speed V of the mine and the stoping space height H of the mine, and the obtained production scale A of the mine is as follows:
Figure BDA0001662840580000061
wherein A is the reasonable production scale of the mine, and the unit is ten thousand t/a; qhThe unit is ten thousand t for the mine recovery reserve; h is the height of the mining space of the mine, and the unit is m; v is the vertical annual descent speed in m/a.

Claims (5)

1. A method for determining production scale of a hard rock type uranium mine is characterized by comprising the following steps: the method specifically comprises the following steps:
step 1, acquiring corresponding mine stoping reserves by using the existing geological exploration data of the ore deposit;
step 1.1, collecting geological exploration data of a mineral deposit with a to-be-determined production scale to obtain the geological resource reserve of the mineral deposit;
step 1.2, acquiring the resource reserves of design utilization;
step 1.3, on the basis of considering the loss rate and the dilution rate in the process of mining the ore deposit, carrying out data conversion on the designed and utilized resource reserves to obtain the stope reserves of the mine;
the concrete formula for converting the designed and utilized resource reserves into the mine recovery reserves is as follows:
Figure FDA0002693458060000011
wherein Q ishThe reserve is the mine recovery reserve; qsUtilizing resource reserves for design; alpha is the loss rate of the mine; beta is the dilution rate of the mine;
step 2, determining the vertical annual descending speed of a mine according to the ore body characteristics of the ore deposit;
step 2.1, acquiring the ore amount and the inclination angle value of main ore bodies in the ore deposit according to geological exploration data of the ore deposit;
step 2.2, obtaining the average inclination angle of the ore body by using a weighted average method;
step 2.3, obtaining the vertical annual descending speed of the mine in the ore body according to the average inclination angle of the ore body;
step 3, acquiring the height of a mining space of a mine by using the existing geological exploration data of the ore deposit;
step 3.1, acquiring occurrence elevation parameters of ore bodies according to geological exploration data of ore deposits;
3.2, obtaining the mining space height of the mine by using the obtained ore body occurrence elevation parameters;
and performing data analysis on the obtained ore body occurrence elevation parameters to obtain the height H of the mining space of the mine as follows:
H=h1-h2
wherein H is the height of the mining space of the mine; h is1The vertical highest stoping elevation of the mine; h is2The vertical lowest stoping elevation of the mine is obtained;
step 4, determining the production scale of the obtained mine according to the mine stoping reserve, the mine vertical annual descent speed and the mine stoping space height obtained in the step;
mine stoping reserve Q obtained by the stepshThe vertical annual descending speed V of the mine and the stoping space height H of the mine, and the obtained mine production scale A is as follows:
Figure FDA0002693458060000012
wherein A is the production scale of a mine, and the unit is ten thousand t/a; qhThe unit is ten thousand t for the mine recovery reserve; h is the height of the mining space of the mine, and the unit is m; v is the descending speed of the mine in vertical years and has the unit of m/a.
2. The method for determining the production scale of a hard rock uranium mine according to claim 1, wherein: in the step 2, for ore bodies with the average inclination angle of more than 30 degrees, the vertical annual descending speed V of the mine is 10.6 m/a; for a slowly inclined ore body with the average inclination angle of the ore body smaller than 30 degrees, taking the vertical annual descending speed V of a mine as 7.5 m/a; when the ore body with the steep inclination is provided as well as the ore body with the gentle inclination, the average value of the two ore bodies can be taken, namely the vertical annual descending speed V of the mine is 9.1 m/a.
3. The method for determining the production scale of a hard rock uranium mine according to claim 1, wherein: the specific steps of obtaining the reserve of the geological resources of the ore deposit in the step 1.1 are as follows:
collecting geological exploration data of the mineral deposit with the production scale to be determined, obtaining ascertained and controlled economic basic reserves and the built-in economic resource amount in the main types of the resource reserves, and using the inferred built-in economic resource amount partially; the inferred credibility coefficient of the intrinsic economic resource quantity can be selected to be 0.5-0.8 according to the occurrence characteristics and the exploration degree of the ore deposit.
4. The method for determining the production scale of a hard rock uranium mine according to claim 1, wherein: the specific steps of obtaining the resource reserves for designing and utilizing in the step 1.2 are as follows:
and acquiring the sum of the design utilization resource reserve as the economic basic reserve, the internal economic resource amount of the heuristic control and the inferred internal economic resource amount and the reliability coefficient.
5. The method for determining the production scale of a hard rock uranium mine according to claim 1, wherein: the step 2.2 of obtaining the average dip angle of the ore body comprises the following specific steps:
and obtaining the average inclination angle gamma of the ore body by using a weighted average method as follows:
Figure FDA0002693458060000021
wherein, TnIs the ore amount of the nth main ore body, gammanIs the inclination angle of the nth main ore body.
CN201810469569.0A 2018-05-16 2018-05-16 Method for determining production scale of hard rock type uranium mine Active CN110500096B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810469569.0A CN110500096B (en) 2018-05-16 2018-05-16 Method for determining production scale of hard rock type uranium mine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810469569.0A CN110500096B (en) 2018-05-16 2018-05-16 Method for determining production scale of hard rock type uranium mine

Publications (2)

Publication Number Publication Date
CN110500096A CN110500096A (en) 2019-11-26
CN110500096B true CN110500096B (en) 2020-12-15

Family

ID=68584899

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810469569.0A Active CN110500096B (en) 2018-05-16 2018-05-16 Method for determining production scale of hard rock type uranium mine

Country Status (1)

Country Link
CN (1) CN110500096B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111753382B (en) * 2020-07-03 2024-04-19 中国化学赛鼎宁波工程有限公司 Engineering amplification method and engineering amplification system for organosilicon fluidized bed

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102047145A (en) * 2008-03-27 2011-05-04 佩尔德利压力国际有限公司 Prospect stress prediction
CN102913244A (en) * 2012-09-29 2013-02-06 中国高岭土有限公司 Underground mining method for kaolin mine
CN104239664A (en) * 2013-06-14 2014-12-24 中核第四研究设计工程有限公司 Method for determining production scale of leachable sandstone-type uranium deposit
CN106988746A (en) * 2017-05-04 2017-07-28 云南华联锌铟股份有限公司 A kind of outdoor mining methods that become more meticulous of slight slope and thin ore body
CN107766999A (en) * 2016-08-18 2018-03-06 中核第四研究设计工程有限公司 A kind of integrated evaluating method of sandrock-type uranium deposit utilization

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102047145A (en) * 2008-03-27 2011-05-04 佩尔德利压力国际有限公司 Prospect stress prediction
CN102913244A (en) * 2012-09-29 2013-02-06 中国高岭土有限公司 Underground mining method for kaolin mine
CN104239664A (en) * 2013-06-14 2014-12-24 中核第四研究设计工程有限公司 Method for determining production scale of leachable sandstone-type uranium deposit
CN107766999A (en) * 2016-08-18 2018-03-06 中核第四研究设计工程有限公司 A kind of integrated evaluating method of sandrock-type uranium deposit utilization
CN106988746A (en) * 2017-05-04 2017-07-28 云南华联锌铟股份有限公司 A kind of outdoor mining methods that become more meticulous of slight slope and thin ore body

Also Published As

Publication number Publication date
CN110500096A (en) 2019-11-26

Similar Documents

Publication Publication Date Title
Harmsen et al. The impact of copper scarcity on the efficiency of 2050 global renewable energy scenarios
CN104929687B (en) Mine digitalization produces management and control system and method
CN107977749B (en) Prediction analysis method for oil field development index
CN106680894B (en) A kind of tunnel geological advanced prediction method based on C/S framework
WO2024031778A1 (en) Method for determining mining value of alaskite-type uranium ore
CN102968686B (en) A kind of digital mine Production Scheduling System
Gu et al. Dynamic optimization of cutoff grade in underground metal mining
CN105956928A (en) Metal open-pit mine 5D temporal-spatial dynamic production scheduling plan model building method
CN110847968A (en) Periodic pressure-bearing dividing method based on maximum working resistance curve of support cycle
CN110555559A (en) Ground settlement prediction method under insufficient mining condition of thick unconsolidated formation
Chi et al. Research on prediction model of mining subsidence in thick unconsolidated layer mining area
CN110500096B (en) Method for determining production scale of hard rock type uranium mine
CN115470261A (en) Gold mine big data analysis method based on ore flow
CN116658246A (en) Coal mine water damage monitoring and early warning system and method
Jenner et al. Mining investment beyond the boom
CN102693289A (en) Simulation method for high arch dam construction
CN101334486A (en) Gas hydrate lowest economic reserve measuring and calculating method
CN112836863B (en) Mine associated mineral exploration system and method
CN114140027A (en) Evaluation method for closing coal mine residual coal resource reutilization
CN107767282B (en) Evaluation method for uranium resource distribution
McAllister Price, technology, and ore reserves
Wang et al. A dynamic optimization method for determining cutoff grades in underground mines
CN116127788B (en) Intelligent prediction method for surface damage of directional cutting, roof crushing, expanding and filling mining working face
Wang et al. Preliminary application of grade equivalent theory in a local section of a mine and economic estimation of the deposit
CN108804748B (en) Large-scale surface mine slope service period dynamic design safety factor value taking method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant