CN110499927A - A kind of filling wall masonry top mortar fill method - Google Patents

A kind of filling wall masonry top mortar fill method Download PDF

Info

Publication number
CN110499927A
CN110499927A CN201810478246.8A CN201810478246A CN110499927A CN 110499927 A CN110499927 A CN 110499927A CN 201810478246 A CN201810478246 A CN 201810478246A CN 110499927 A CN110499927 A CN 110499927A
Authority
CN
China
Prior art keywords
mortar
chock plug
cylinder
shooting machine
pulp shooting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810478246.8A
Other languages
Chinese (zh)
Inventor
田春峰
杜行伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
DONGHONG CONSTRUCTION Co Ltd
Original Assignee
DONGHONG CONSTRUCTION Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by DONGHONG CONSTRUCTION Co Ltd filed Critical DONGHONG CONSTRUCTION Co Ltd
Priority to CN201810478246.8A priority Critical patent/CN110499927A/en
Publication of CN110499927A publication Critical patent/CN110499927A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • E04G23/0203Arrangements for filling cracks or cavities in building constructions

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Electrochemistry (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses a kind of filling walls to build top mortar fill method, be intended to provide it is a kind of have cement mortar can be filled inside lesser gap, and the fill method the advantages of later period is not easy into transverse crack, its key points of the technical solution are that including the following steps, S1, pre-cast concrete mortar;Cement mortar is packed into pulp shooting machine by S2;S3 is irrigated mortar along gap at the top of wall with the cement mortar in pulp shooting machine pulp shooting machine;S4 roots out the cement mortar on gap both sides, is smoothed out with scraper plate after perfusion is closely knit;The pulp shooting machine includes cylinder and push rod, the cylinder stack shell is cylinder, one end face of stack shell is taper, and both ends of the surface are provided with through-hole, and described push rod one end is chock plug, the other end is the handle of push rod, it is connected between chock plug and handle by connecting rod, the section of the chock plug is identical as cylinder interior diameter, and push rod slides on inner barrel, the chock plug is additionally provided with seal cap on perfusing hole towards perfusing hole is additionally provided on the side of handle.

Description

A kind of filling wall masonry top mortar fill method
Technical field
The present invention relates to mortar padding field, in particular to a kind of filling wall builds top mortar fill method.
Background technique
Currently, the Chinese patent of Publication No. CN103821253A discloses a kind of Infill Wall with Aerated Concrete Block masonry Technique, it include cleaning base → line setting → vertical marked rod → postposition steel tie → wall Kan Tai constructs → select building block → Match at the top of wet → full mortar laying → pendulum building block → installation lintel → casting concrete constructional column of watering, linking beam → masonry Cover building block.
Have in " code for construction and acceptance of masonry structure engineering " and " decoration construction inspection of quality specification " Clear stipulaties: " when filling wall is built to beam, board bottom, mono- fixed gap of Ying Liuyou, after wall to be filled has built and should at least be spaced 7 days, Mended again and build jam-packed ", it mends after building, the gap at the top of wall between superstructure, Normal practice is artificial plug back-up sand slurry, by It is smaller in gap, and operating space very little, it tends not to reach closely knit, the later period will form transverse crack.
Summary of the invention
The object of the present invention is to provide a kind of filling walls to build top mortar fill method, and having can be in lesser seam The advantages of cement mortar is filled in gap the inside, and the later period is not easy into transverse crack.
Above-mentioned technical purpose of the invention has the technical scheme that
A kind of filling wall masonry top mortar fill method, includes the following steps,
S1, pre-cast concrete mortar;
Cement mortar is packed into pulp shooting machine by S2;
S3 is irrigated mortar along gap at the top of wall with the cement mortar in pulp shooting machine pulp shooting machine;
S4 roots out the cement mortar on gap both sides, is smoothed out with scraper plate after perfusion is closely knit;
The pulp shooting machine includes cylinder and push rod, and the cylinder stack shell is cylinder, and one end face of stack shell is taper, both ends of the surface It is provided with through-hole, described push rod one end is chock plug, and the other end is the handle of push rod, it is connected between chock plug and handle by connecting rod, institute The section for stating chock plug is identical as cylinder interior diameter, and push rod slides on inner barrel, and the chock plug is towards also setting on the side of handle There is perfusing hole, is additionally provided with seal cap on perfusing hole.
It is preferred: to be connected through a screw thread between the perfusing hole and seal cap.
It is preferred: to be enclosed with sealing ring on the outside of the chock plug, the sealing ring is between chock plug and stack shell.
Preferred: the opening diameter of the pulp shooting machine tapered end is 5cm.
Preferred: the tapered end opening is additionally provided with clamping cap, and the diameter of the clamping cap is greater than pulp shooting machine tapered end Opening diameter.
Preferably, the cylinder stack shell inside diameter is 20cm, barrel length 50cm.
Preferably, being additionally provided with non-slip texture on the handle.
In conclusion the invention has the following advantages: construction saves the time, can guarantee construction matter because easy to operate It measures and has a clear superiority.
Detailed description of the invention
Fig. 1 is pulp shooting machine schematic diagram of internal structure.
In figure, 1, pulp shooting machine;2, cylinder;3, push rod;4, chock plug;5, handle;6, connecting rod;7, perfusing hole;8, seal cap;9, Sealing ring;10, clamping cap;11, non-slip texture;
Specific embodiment
Below in conjunction with attached drawing, invention is further described in detail.
Embodiment 1: a kind of filling wall masonry top mortar fill method, as shown in Figure 1, include the following steps,
S1, pre-cast concrete mortar;
Cement mortar is packed into pulp shooting machine 1 by S2;
S3 is irrigated mortar along gap at the top of wall with the cement mortar in 1 pulp shooting machine 1 of pulp shooting machine;
S4 roots out the cement mortar on gap both sides, is smoothed out with scraper plate after perfusion is closely knit;
The pulp shooting machine 1 include cylinder 2 and push rod 3,2 stack shell of cylinder be cylinder, one end face of stack shell be taper, two End face is provided with through-hole, and described 3 one end of push rod is chock plug 4, and the other end is the handle 5 of push rod 3, passes through company between chock plug 4 and handle 5 Bar 6 is connected, and the section of the chock plug 4 is identical as 2 interior diameter of cylinder, and push rod 3 slides on inside cylinder 2, and the chock plug 4 is towards handle It is additionally provided with perfusing hole 7 on the side of hand 5, seal cap 8 is additionally provided on perfusing hole 7.
It is preferred: to be connected through a screw thread between the perfusing hole 7 and seal cap 8.
It is preferred: sealing ring 9 to be enclosed on the outside of the chock plug 4, the sealing ring 9 is between chock plug 4 and stack shell.
Preferred: the opening diameter of 1 tapered end of pulp shooting machine is 5cm.
Preferred: the tapered end opening is additionally provided with clamping cap 10, and the diameter of the clamping cap 10 is bored greater than pulp shooting machine 1 The opening diameter at shape end.
Preferably, the 2 stack shell inside diameter of cylinder is 20cm, barrel length 50cm.
Preferably, being additionally provided with non-slip texture 11 on the handle 5.
In conclusion easy to operate when construction save the time, can guarantee construction quality and have a clear superiority.
It should be noted that term " center ", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outside" etc. The orientation or positional relationship of instruction is to be based on the orientation or positional relationship shown in the drawings, and is merely for convenience of the description present invention and letter Change description, rather than the device or element of indication or suggestion meaning must have a particular orientation, with specific orientation construct and Operation, therefore be not considered as limiting the invention.In addition, term " first ", " second ", " third " are only used for description mesh , it is not understood to indicate or imply relative importance.
Finally, it should be noted that the above embodiments are only used to illustrate and not limit the technical solutions of the present invention, although reference Above-described embodiment describes the invention in detail, those skilled in the art should understand that: it still can be to this hair Bright to be modified or replaced equivalently, without departing from the spirit and scope of the present invention, and appended claims are intended to fall into These modifications or equivalent replacement in spirit and scope of the invention.

Claims (7)

1. a kind of filling wall builds top mortar fill method, it is characterised in that: include the following steps,
S1, pre-cast concrete mortar;
Cement mortar is packed into pulp shooting machine (1) by S2;
Cement mortar in pulp shooting machine (1) is irrigated mortar along gap at the top of wall with pulp shooting machine (1) by S3;
S4, after perfusion is closely knit, that roots out gap both sides returns your mortar, is smoothed out with scraper plate;
The pulp shooting machine (1) includes cylinder (2) and push rod (3), and cylinder (2) stack shell is cylinder, and one end face of stack shell is cone Shape, both ends of the surface are provided with through-hole, and described push rod (3) one end is chock plug (4), and the other end is the handle (5) of push rod (3), chock plug (4) with It is connected between handle (5) by connecting rod (6), the section of the chock plug (4) is identical as cylinder (2) interior diameter, and push rod (3) slides on Cylinder (2) is internal, and the chock plug (4) is additionally provided with close towards being additionally provided with perfusing hole (7) on the side of handle (5) on perfusing hole (7) Sealing cap (8).
2. a kind of filling wall according to claim 1 builds top mortar fill method, it is characterised in that: the perfusing hole (7) it is connected through a screw thread between seal cap (8).
3. a kind of filling wall according to claim 1 builds top mortar fill method, it is characterised in that: the chock plug (4) outside is enclosed with sealing ring (9), and the sealing ring (9) is located between chock plug (4) and stack shell.
4. a kind of filling wall according to claim 1 builds top mortar fill method, it is characterised in that: the pulp shooting machine (1) opening diameter of tapered end is 5cm.
5. a kind of filling wall according to claim 1 builds top mortar fill method, it is characterised in that: the tapered end Opening is additionally provided with clamping cap (10), and the diameter of the clamping cap (10) is greater than the opening diameter of pulp shooting machine (1) tapered end.
6. a kind of filling wall according to claim 1 builds top mortar fill method, it is characterised in that: the cylinder (2) stack shell inside diameter is 20cm, barrel length 50cm.
7. a kind of filling wall according to claim 1 builds top mortar fill method, it is characterised in that: the handle (5) non-slip texture (11) are additionally provided on.
CN201810478246.8A 2018-05-18 2018-05-18 A kind of filling wall masonry top mortar fill method Pending CN110499927A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810478246.8A CN110499927A (en) 2018-05-18 2018-05-18 A kind of filling wall masonry top mortar fill method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810478246.8A CN110499927A (en) 2018-05-18 2018-05-18 A kind of filling wall masonry top mortar fill method

Publications (1)

Publication Number Publication Date
CN110499927A true CN110499927A (en) 2019-11-26

Family

ID=68584117

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810478246.8A Pending CN110499927A (en) 2018-05-18 2018-05-18 A kind of filling wall masonry top mortar fill method

Country Status (1)

Country Link
CN (1) CN110499927A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111472570A (en) * 2020-04-29 2020-07-31 山东贝克特智能科技有限公司 Intelligent portable automatic plugging device for building pile hole
CN111962889A (en) * 2020-07-29 2020-11-20 中冶天工集团天津有限公司 Outdoor gap plugging device for masonry wall and construction method

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2218224Y (en) * 1994-11-18 1996-01-24 郑海衍 Mortar filler
CN202450534U (en) * 2012-03-04 2012-09-26 葛洲坝集团第五工程有限公司 Grouting device of mortar bolt
CN102877652A (en) * 2012-10-19 2013-01-16 厦门特房建设工程集团有限公司 Construction method for post-injection cement mortar masonry brickwork
CN103397781A (en) * 2013-07-11 2013-11-20 广西建工集团第三建筑工程有限责任公司 Portable cement paste injection pressure gun
CN203640321U (en) * 2013-11-26 2014-06-11 浙江正华装饰设计工程有限公司 Building wall body filling repair device
CN105715062A (en) * 2014-12-05 2016-06-29 重庆嵩华建筑工程有限公司 Wall pointing device
CN106049869A (en) * 2016-06-29 2016-10-26 浙江省建工集团有限责任公司 Construction method aiming at subsequently built filling wall beam bottom seam plugging
CN205857783U (en) * 2016-05-25 2017-01-04 中建三局第二建设工程有限责任公司 Simple portable screw rod hole slurry casting machine
CN206034947U (en) * 2016-08-30 2017-03-22 浙江中屹建设集团有限公司 Concrete crack prosthetic devices
CN106812219A (en) * 2017-03-14 2017-06-09 中国十七冶集团有限公司 Filling wall top stuff up a crack construction method
CN206233627U (en) * 2016-11-07 2017-06-09 中国建筑第八工程局有限公司 Split bolt hole plugging device
CN206942195U (en) * 2017-07-20 2018-01-30 黑龙江建筑职业技术学院 Cement mortar for constructional engineering joint filling device

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2218224Y (en) * 1994-11-18 1996-01-24 郑海衍 Mortar filler
CN202450534U (en) * 2012-03-04 2012-09-26 葛洲坝集团第五工程有限公司 Grouting device of mortar bolt
CN102877652A (en) * 2012-10-19 2013-01-16 厦门特房建设工程集团有限公司 Construction method for post-injection cement mortar masonry brickwork
CN103397781A (en) * 2013-07-11 2013-11-20 广西建工集团第三建筑工程有限责任公司 Portable cement paste injection pressure gun
CN203640321U (en) * 2013-11-26 2014-06-11 浙江正华装饰设计工程有限公司 Building wall body filling repair device
CN105715062A (en) * 2014-12-05 2016-06-29 重庆嵩华建筑工程有限公司 Wall pointing device
CN205857783U (en) * 2016-05-25 2017-01-04 中建三局第二建设工程有限责任公司 Simple portable screw rod hole slurry casting machine
CN106049869A (en) * 2016-06-29 2016-10-26 浙江省建工集团有限责任公司 Construction method aiming at subsequently built filling wall beam bottom seam plugging
CN206034947U (en) * 2016-08-30 2017-03-22 浙江中屹建设集团有限公司 Concrete crack prosthetic devices
CN206233627U (en) * 2016-11-07 2017-06-09 中国建筑第八工程局有限公司 Split bolt hole plugging device
CN106812219A (en) * 2017-03-14 2017-06-09 中国十七冶集团有限公司 Filling wall top stuff up a crack construction method
CN206942195U (en) * 2017-07-20 2018-01-30 黑龙江建筑职业技术学院 Cement mortar for constructional engineering joint filling device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111472570A (en) * 2020-04-29 2020-07-31 山东贝克特智能科技有限公司 Intelligent portable automatic plugging device for building pile hole
CN111962889A (en) * 2020-07-29 2020-11-20 中冶天工集团天津有限公司 Outdoor gap plugging device for masonry wall and construction method

Similar Documents

Publication Publication Date Title
CN106013800B (en) Constructional Col-umn Construction method based on 3D printing filled wall
CN208235906U (en) It is a kind of for filling the pulp shooting machine of mortar
CN204386614U (en) Realize the lining trolley of lining cutting vault filling and injecting slurry and tunnel lining synchronization implementation
CN103114578B (en) Grouting molding pedestal pile and construction method thereof and pedestal expanding device
CN110499927A (en) A kind of filling wall masonry top mortar fill method
CN104153295A (en) Self-compacting concrete jack-up pouring construction method for steel tube arch bridges
CN203741828U (en) Novel openable reinforcement cage structure
CN105804403A (en) Rolling ball type concrete pouring structure and method for overground large special-shaped stiff column
CN205577430U (en) Concrete placement structure is managed to big scale of construction composite steel concrete column body swift current ball formula pipe cluster in ground
CN201406834Y (en) Reserved opening die for top plate
CN109853730A (en) A kind of novel precast reinforced concrete frame joint and its method of construction
CN105178451A (en) Corrosion-resistant structure of assembled building exterior wall dry hanging node and construction method of corrosion-resistant structure
CN207582369U (en) A kind of hard shoulder concrete pours into a mould longitudinal reinforcement intermittence sealing device
CN204960322U (en) Water -stopping screw rod
CN205296841U (en) A stagnant water structure that is used for in floor and wall body drawing screw rod hole
CN105003036A (en) Prefabricated rail and its manufacturing method
CN106836228A (en) Filling type stake hollow drill
CN204738468U (en) Prefabricated railing
CN106088482A (en) A kind of fixed grout sleeve and using method
CN205444253U (en) Transverse joint waterproof construction based on water -swelling rubber sealing rod
CN102852333B (en) Continuous pouring construction method of high concrete column
CN215211038U (en) Plain type concrete dado pours auxiliary device
CN109930712A (en) The cast-in-place double mesh sheet of one kind exempt from the plaster dedicated framework of partition wall construction and its construction method
CN107964949A (en) A kind of pile foundation lining material and apply the pile foundation lining material prefabricated prestressing pipe pile construction method
CN204782924U (en) Gun drilling sleeve pipe check valve for grouting behind shaft and drift lining

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: No. 199-2 Chengnan Road, Wuxi, Jiangsu Province, Jiangsu

Applicant after: Donghong Construction Co.,Ltd.

Address before: No. 199-2 Chengnan Road, Wuxi, Jiangsu Province, Jiangsu

Applicant before: DONGHONG CONSTRUCTION Co.,Ltd.

CB02 Change of applicant information
RJ01 Rejection of invention patent application after publication

Application publication date: 20191126

RJ01 Rejection of invention patent application after publication