CN110497924A - A kind of empty rail pipeline transportation system for tunnel - Google Patents

A kind of empty rail pipeline transportation system for tunnel Download PDF

Info

Publication number
CN110497924A
CN110497924A CN201910772624.8A CN201910772624A CN110497924A CN 110497924 A CN110497924 A CN 110497924A CN 201910772624 A CN201910772624 A CN 201910772624A CN 110497924 A CN110497924 A CN 110497924A
Authority
CN
China
Prior art keywords
tunnel
track
transportation system
pipeline transportation
empty rail
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910772624.8A
Other languages
Chinese (zh)
Inventor
王鑫敏
张敏
司小伟
孙继辉
李治国
赵建阳
武长虹
沈子钿
王鑫宏
张兴洪
岳渠德
陈亚军
董小鹏
李自峰
何海洋
王浩东
冯昭君
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Airlines (beijing) Engineering Design Research Institute Co Ltd
Original Assignee
China Construction Airlines (beijing) Engineering Design Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Airlines (beijing) Engineering Design Research Institute Co Ltd filed Critical China Construction Airlines (beijing) Engineering Design Research Institute Co Ltd
Priority to CN201910772624.8A priority Critical patent/CN110497924A/en
Publication of CN110497924A publication Critical patent/CN110497924A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61BRAILWAY SYSTEMS; EQUIPMENT THEREFOR NOT OTHERWISE PROVIDED FOR
    • B61B13/00Other railway systems
    • B61B13/10Tunnel systems
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61BRAILWAY SYSTEMS; EQUIPMENT THEREFOR NOT OTHERWISE PROVIDED FOR
    • B61B3/00Elevated railway systems with suspended vehicles
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B1/00Ballastway; Other means for supporting the sleepers or the track; Drainage of the ballastway
    • E01B1/002Ballastless track, e.g. concrete slab trackway, or with asphalt layers
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B2/00General structure of permanent way
    • E01B2/003Arrangement of tracks on bridges or in tunnels
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B25/00Tracks for special kinds of railways
    • E01B25/22Tracks for railways with the vehicle suspended from rigid supporting rails
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B25/00Tracks for special kinds of railways
    • E01B25/22Tracks for railways with the vehicle suspended from rigid supporting rails
    • E01B25/24Supporting rails; Auxiliary balancing rails; Supports or connections for rails
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/10Tunnels or galleries specially adapted to house conduits, e.g. oil pipe-lines, sewer pipes ; Making conduits in situ, e.g. of concrete ; Casings, i.e. manhole shafts, access or inspection chambers or coverings of boreholes or narrow wells
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B2204/00Characteristics of the track and its foundations
    • E01B2204/06Height or lateral adjustment means or positioning means for slabs, sleepers or rails
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B2204/00Characteristics of the track and its foundations
    • E01B2204/09Ballastless systems

Landscapes

  • Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Architecture (AREA)
  • Transportation (AREA)
  • Mining & Mineral Resources (AREA)
  • Oil, Petroleum & Natural Gas (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • General Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The invention belongs to technical field of rail traffic, more particularly to a kind of empty rail pipeline transportation system for tunnel, aim to solve the problem that the design difficulty in prior art centre mounted type sky iron tunnel is big, the problem of work progress difficulty, the present invention provides a kind of empty rail pipeline transportation system for tunnel, including track board mounting stand, track plates, attachment beam, built-in fitting and train, the track board mounting stand is fixedly arranged on tunnel vault by the built-in fitting, is connected between the adjacent track board mounting stand of any two by the attachment beam;The track plate bracing frame is for setting up the track plates;The train can walk along the extending direction of the track plates, the empty rail pipeline transportation system that the present invention is used for tunnel solves the installation problem in empty rail road in tunnel by simple structure, structure is simple, improve engineering efficiency, it makes rational planning for tunnel space, guarantee to reduce traffic congestion risk while safety, reduces tunnel construction cost.

Description

A kind of empty rail pipeline transportation system for tunnel
Technical field
The invention belongs to technical field of rail traffic, and in particular to a kind of empty rail pipeline transportation system for tunnel.
Background technique
As urbanization process is constantly accelerated, city size is grown rapidly, the quickening and urban population of urban life rhythm Quantity sharply increases, and the travel amount of people is increasing, the increase of this travel amount, it is not limited in single city, but It has diffused between city and rural area, between city and city.Existing traffic has been unable to satisfy the trip of people, and the world is major There is different degrees of automobile congestion phenomenon in city.Therefore, people always search for various modes solve it is growing go out Row measures brought traffic jam issue.
Suspension monorail traffic system is referred to as empty iron, its track is to stop top track in vehicle up direction and hold List the gravity and Train induced load of vehicle;Train is suspended below track, and the rectangular box of under shed is arranged in the bogie of train In beam, there are track plates in track girder, provides bearing capacity for the bogie of train.Empty iron car belongs to rail traffic vehicles, needs It is travelled on the track of relatively flat, the track of rail traffic is hard track, usually steel track, such as railway track Deng.The frictional force that hard track is supplied to wheel of vehicle is relatively small, thus rail traffic can have higher speed and it is low at This traction power.Empty iron moves to traffic above-ground in the air, and construction cost is low, has in construction and operational process to surface structures Facility influences that small, to open that rear train running speed is fast, track move towards to be laid with no pollution to the environment etc. in flexible, operational process excellent Gesture, therefore it is rapidly developed in many cities, between city and city.Germany, Japan realize earlier The R & D design of suspension type rail railway and highway system, in recent years, the country have also carried out corresponding research.
When empty iron needs to cross over mountain or other obstacles, need to excavate simultaneously crossing-river tunnel, it cannot be in common tunnel The interior special construction for building empty iron, cannot be as the track structure outside tunnel, in below ground construction pile foundation: first: tunnel Ground (inverted arch) geology in road is hard, and the pile foundation construction that can reach design insertion degree is extremely difficult.Second: cannot will stand Column is directly installed on tunnel double-lining (in main structure), and two lining local pressures are easier to damage.Third: track column volume is huge It is unfavorable for the work such as later period dismounting, transport, maintenance, maintenance greatly.4th: column occupies the space of tunnel internal preciousness, tunnel Expanding hole diameter causes construction cost to increase accordingly.Therefore empty iron tunnel, which becomes, restricts what whether empty iron wire road can build in mountain area Bottleneck, how how the connection structure between the dedicated empty iron tunnel of design-build, empty rail road and tunnel designs suspension type sky Iron tunnel is those skilled in the art's technical problem urgently to be resolved.
Summary of the invention
In order to solve the above problem in the prior art, in order to solve how the hollow iron of the prior art passes through massif tunnel The design difficulty in road, suspension type sky iron tunnel is big, and the problem of work progress difficulty, the present invention provides a kind of suspension type sky rails Road comprising: track board mounting stand, track plates, attachment beam, built-in fitting and train, the track board mounting stand pass through described pre- Embedded part is fixedly arranged on tunnel vault, is connected between the adjacent track board mounting stand of any two by the attachment beam;It is described Track plate bracing frame is for setting up the track plates;The train can walk along the extending direction of the track plates.
In some optimal technical schemes, the track plates are prefabricated components comprising: bearing plate, guide plate, floor, Wherein:
The guide plate is vertically installed on the bearing plate as train leading plate, and the bearing plate is divided into load-bearing Wheel steps on portion and support interconnecting piece, and the floor is fixedly arranged on the lower surface that the carrying roller steps on portion as longitudinally reinforced plate, in which:
The carrying roller steps on track structure plate of the portion as offer train carrying roller traveling;
The support interconnecting piece connects end as the support for transmitting load and power to supporting element.
In some optimal technical schemes, the empty rail pipeline transportation system for tunnel further includes supporting element, described Pass through several supporting element connections, transmitting of the supporting element as load and power between track installation frame and the track plates Load on track plates is transmitted to tunnel vault by component.
In some optimal technical schemes, described two track plates are symmetrical arranged composition track board group along train central axes, It is close to each other or away from one another that the carrying roller of two track plates in the track board group steps on portion, one track board mounting stand The track board group there are two being above symmetrical arranged.
In some optimal technical schemes, the empty rail pipeline transportation system for tunnel further includes pipeline piping lane, institute Pipeline piping lane is stated to be set on the attachment beam for mentioning for power cable, light conduits, signal cable, optical cable, communication cable For gantry.
In some optimal technical schemes, the empty rail pipeline transportation system for tunnel further includes inspection platform, institute It states inspection platform to be set between the two tracks board group by adjacent described two attachment beams, the inspection platform can double as Fire-fighting evacuation platform.
In some optimal technical schemes, be set to tunnel face vault track board mounting stand one end and the track Plate connection, the other end are connect by track girder with column, and the train can walk along the extending direction of the track girder.
In some optimal technical schemes, the attachment beam can install video camera, air duct, signal lamp, guide plate and Any one in tripartite's conductor rail or any combination.
In some optimal technical schemes, be respectively provided in the track plate bracing frame of two of arbitrary neighborhood there are two connection Beam group, described two attachment beam groups include along symmetrically arranged two attachment beams in track board group two sides.
In some optimal technical schemes, the track board mounting stand is connected by reinforcing bar in the built-in fitting and tunnel double-lining It connects.Beneficial effects of the present invention:
Empty rail pipeline transportation system of the present invention for tunnel passes through track board mounting stand, track plates, attachment beam, built-in fitting And the structure of supporting element solves the installation question in empty rail road in tunnel, and empty rail road can not set up column in tunnel To support the problem of empty iron train, structure of the invention material is easily obtained, and construction cost is low, and structure is simple, improve construction efficiency and It is not high to the technical requirements of construction personnel, while the present invention can effectively reduce the line spacing of two-wire without column, and it is wide to reduce tunnel Degree saves tunnel construction cost.
The present invention makes full use of the setting inspection of the space between track board mounting stand for the empty rail pipeline transportation system in tunnel Equating platform doubles as roof evacuation platform, provides platform and channel to open up fire-fighting evacuation in tunnel;It is rationally empty using tunnel-side Between side evacuation platform is set, pass through roof evacuation platform and side evacuation platform and improve tunnel emergency evacuation efficiency, guarantee tunnel The safety of traffic system in road avoids that accident occurs when evacuation.
The present invention passes through for the empty rail pipeline transportation system in tunnel calculates tunnel vault at a distance from the ground of bottom, rationally It plans tunnel internal space, empty rail pipeline transportation system is set in tunnel top, does not interfere tunnel ground pavement, car lane Deng the problem of providing the condition of other vehicles and pedestrians, peak time communications and transportation blocking be effectively relieved.
Detailed description of the invention
By reading a detailed description of non-restrictive embodiments in the light of the attached drawings below, the application's is other Feature, objects and advantages will become more apparent upon:
Fig. 1 is empty rail pipeline transportation system one embodiment and tunnel outer space rail pipeline transportation system of the present invention for tunnel The overall structure diagram of one embodiment connection;
Fig. 2 is the attachment structure schematic diagram one of one embodiment of track board mounting stand of the invention;
Fig. 3 is the attachment structure schematic diagram two of one embodiment of track board mounting stand of the invention;
Fig. 4 is the attachment structure schematic diagram three of one embodiment of track board mounting stand of the invention;
Fig. 5 is overall structure diagram of the present invention for empty one embodiment of rail pipeline transportation system in tunnel;
Fig. 6 is track board group structural schematic diagram one of the invention;
Fig. 7 is track board group structural schematic diagram two of the invention;
Fig. 8 is track plates structural schematic diagram one of the invention;
Fig. 9 is track plates structural schematic diagram two of the invention;
Figure 10 is track plates structural schematic diagram three of the invention;
Figure 11 is track plates structural schematic diagram four of the invention.
Reference signs list:
1- track board mounting stand;2- track plates, 21- bearing plate, 21a- support interconnecting piece 21b- carrying roller step on portion, and 22- is led To plate, 23- floor, 24- ribs;3- attachment beam;4- built-in fitting, 41- vault built-in fitting 42- side wall built-in fitting;5- train, 51- bogie, 52- sunpender;6- supporting element;7- pipeline piping lane;8- inspection platform;9- limit;10- bis- serves as a contrast (secondary main structure Lining cutting);11- massif;12- drainage pipeline;The side 13- evacuation platform;14- just props up (first excavation supporting structure in hole);15- is vertical Column;16- track girder.
Specific embodiment
To keep the embodiment of the present invention, technical solution and advantage more obvious, below in conjunction with attached drawing to skill of the invention Art scheme carries out clear, complete description, it is clear that and the embodiment described is a part of the embodiments of the present invention, rather than all Embodiment.It will be apparent to a skilled person that these embodiments are used only for explaining technical principle of the invention, and It is not intended to be limiting protection scope of the present invention.It is track board mounting stand, track plates, attachment beam, pre- in some embodiments of the present invention Embedded part and train, the track board mounting stand are fixedly arranged on tunnel vault, the adjacent rail of any two by the built-in fitting It is connected between road board mounting stand by the attachment beam;The track plate bracing frame is for setting up the track plates;The train It can walk along the extending direction of the track plates.
In some embodiments of the present invention, the track plates are prefabricated components comprising: bearing plate, guide plate, floor, Wherein:
The guide plate is vertically installed on the bearing plate as train leading plate, and the bearing plate is divided into load-bearing Wheel steps on portion and support interconnecting piece, and the floor is fixedly arranged on the lower surface that the carrying roller steps on portion as longitudinally reinforced plate, in which:
The carrying roller steps on track structure plate of the portion as offer train carrying roller traveling;
The support interconnecting piece connects end as the support for transmitting load and power to supporting element.
In some embodiments of the present invention, the empty rail pipeline transportation system for tunnel further includes supporting element, described Pass through several supporting element connections, transmitting of the supporting element as load and power between track installation frame and the track plates Load on track plates is transmitted to tunnel vault by component.
In some embodiments of the present invention, described two track plates are symmetrical arranged composition track board group along train central axes, It is close to each other or away from one another that the carrying roller of two track plates in the track board group steps on portion, one track board mounting stand The track board group there are two being above symmetrical arranged.
In some embodiments of the present invention, the empty rail pipeline transportation system for tunnel further includes pipeline piping lane, institute Pipeline piping lane is stated to be set on the attachment beam for mentioning for power cable, light conduits, signal cable, optical cable, communication cable For gantry.
In some embodiments of the present invention, the empty rail pipeline transportation system for tunnel further includes inspection platform, institute It states inspection platform to be set between the two tracks board group by adjacent described two attachment beams, the inspection platform can double as Fire-fighting evacuation platform.
In some embodiments of the present invention, be set to tunnel face vault track board mounting stand one end and the track Plate connection, the other end are connect by track girder with column, and the train can walk along the extending direction of the track girder.
In some embodiments of the present invention, the attachment beam can install video camera, air duct, signal lamp, guide plate and Any one in tripartite's conductor rail or any combination.
In some embodiments of the present invention, be respectively provided in the track plate bracing frame of two of arbitrary neighborhood there are two connection Beam group, described two attachment beam groups include along symmetrically arranged two attachment beams in track board group two sides.
In some embodiments of the present invention, the track board mounting stand is connected by reinforcing bar in the built-in fitting and tunnel double-lining It connects.
Empty iron tunnel there is native stone to excavate, is anchor rod anchored, preliminary supporting, isolation waterproof, master as common railway tunnel The lining of body two, in hole charge for remittance gutter, measures and the facility such as divulge information in hole intraoral illumination, hole.It will be appreciated by those skilled in the art that To be above-mentioned be this field technical term, concrete operations in present invention description range, well-known technique progress not can be used.
Empty rail road in empty iron tunnel, cannot be as outside tunnel, in below ground construction pile foundation, tunnel Ground (inverted arch) geology is hard, and the pile foundation construction that can reach design insertion degree is extremely difficult.Column can not directly be pacified On tunnel double-lining (in main structure), two lining local pressures are easier to damage.Third, track column is bulky to be unfavorable for The work such as later period dismounting, transport, maintenance, maintenance;Need thus a kind of simple installation, maintenance it is convenient, not to tunnel structure The empty rail road structure type affected greatly;Empty rail road in order to reach the above effect, in tunnel, it is only necessary to installation foot The track plates of bearing capacity can be provided to empty iron.Track plates are assembled and fixed using the completion of track board mounting stand.Track plates The preburying part quartile of mounting rack is connect inside tunnel vault and with reinforcing bar in two linings, and track board mounting stand and arch item become one It is whole, the load of track plates and empty iron train is carried and dispersed using the domes of tunnel vault.Tunnel vault is this field Technical staff's well known structures, repeat no more.
In order to be more clearly illustrated to empty rail pipeline transportation system of the invention, with reference to the accompanying drawing to we's invention one Kind preferred embodiment carries out expansion detailed description.
As a preferred embodiment of the present invention, a kind of empty rail pipeline transportation system for tunnel of the invention is as schemed Shown in 1-5, tunnel of the present invention inside massif 11 is built after 10 construction of just branch 14 and two linings, and the just branch is as preliminary Supporting after referring to tunnel excavation cavitation, carries out the preliminary supporting of armored concrete to hole wall first, prevents hole wall from collapsing.Two lining It is as secondary just to build, refer to that the tunnel main structure of construction, the main structure is mainly by armored concrete knot on the basis of first branch Structure and waterproof layer composition.Present invention pump concrete after Tunnel Second Lining assembling reinforcement has to wall to concrete setting After the ability for having stronger carrying built-in fitting, track board mounting stand of the present invention is installed, mounting means in this way is the present invention Track board mounting stand provides better mounting condition, it is ensured that the safety of present invention sky rail pipeline transportation system and reliable Property.
A kind of empty rail pipeline transportation system for tunnel of the invention is based on building on two linings 10, specifically includes that rail Road board mounting stand 1, track plates 2, attachment beam 3, built-in fitting 4, train 5 and supporting element 6, wherein track board mounting stand 1 passes through pre- Embedded part 4 is fixedly arranged on the lining of main structure two 10 of tunnel vault, passes through company between the adjacent track board mounting stand 1 of any two Connect the connection of beam 3;Track plate bracing frame 1 is for setting up track plates 2;Train 5 can walk along the extending direction of track plates 2, need Illustrate, above-mentioned track board mounting stand 1, track plates 2, attachment beam 3 quantity depend on tunnel physical length and internal junction Structure, the too long then rigidity of 2 length of track plates is low, stability is poor;The too short correspondingly track board mounting stand 1 of 2 length of track plates and connection The quantity of beam 3 increases therewith, wastes material, expends working hour.The track board mounting stand 1, track plates 2, attachment beam 3, supporting element 6 Between connection structure as shown, be disposed with 4 track plates 2 on one track board mounting stand 1, track installation frame 1 with It is connected, is connected between the track board mounting stand 1 of arbitrary neighborhood by attachment beam 3, attachment beam 3 by supporting element 6 between track plates 2 The stability and overall structure rigidity of track board mounting stand group can be improved;Attachment beam 3 is preferably 4, described 4 in the present embodiment Track plates 2 and attachment beam 3 are divided into pairs, respectively constitute track board group and attachment beam group, track board group described in every group In two track plates 2 be arranged symmetrically along train central axes, between two track plates 2 being arranged symmetrically in the track board group There are gap, which is limit space required for sunpender between sky iron train and its bogie.Two groups of track board group edges 1 central axes of track board mounting stand are arranged symmetrically, and train 5 is walked along the extending direction of track board group, two on track board mounting stand 1 Group track board group can make train is two-way to pass through tunnel.Further, two attachment beams in the attachment beam group are arranged in described The two sides of track board group, 3 both ends of attachment beam are connect with track board mounting stand 1 respectively, reinforce track board mounting stand by attachment beam 2 Between structure, improve the rigidity of structure, enhance stability.
Specifically, track board mounting stand 1 is fixedly arranged on the lining of tunnel main structure two 10 by built-in fitting 4, track plates peace 1 preburying part quartile is shelved inside tunnel vault and connect with reinforcing bar in two linings 10, as shown in Fig. 2, the tool of track board mounting stand 1 Have and serve as a contrast the domes that reinforcing bar is connect in 10 with vault two, is provided with several vault built-in fittings 41 on the domes, and The extended structure that interior reinforcing bar is connect is served as a contrast with tunnel-side two, several side wall built-in fittings 42, track are provided on the extended structure Board mounting stand 1 is fixed on tunnel vault by side wall built-in fitting 42 and vault built-in fitting 41, and track board mounting stand 1 becomes with vault One entirety carries using the domes of tunnel vault and disperses the load of track plates and empty iron train.The built-in fitting 4 is It is multiple, and be evenly arranged on track board mounting stand 1, built-in fitting 4 can be pre-embedded bolt or other structures, those skilled in the art Member can be according to the type and structure of practical application flexible choice built-in fitting 4, as long as track board mounting stand 1 can be made to be capable of fixing in tunnel Road vault.The domes span ability of track board mounting stand 1 is larger, compared with steel bridge and Concrete beam bridge, Ke Yijie Great deal of steel and cement are saved, the design of arch can bear the pressure bigger than crossbeam, while more preferably more steady with tunnel vault Solid connection.
Further, it is additionally provided with limit 9 on the track board mounting stand, the limit is horizontally set at the track plates It between group, is fixed on track board mounting stand 1, it is bogie needed for that limit 9, which is used to limit the height dimension of train to be detected, It wants, on the one hand limit 9 plays cross-brace booster action, also mountable camera (not shown), Laser Measuring in another aspect limit Distance meter (not shown), radar (not shown) detection device etc. arrange traveling to sky and carry out precise measurement, ensure the safety of train operation.
Pass through the fixed support of multiple supporting elements 6 between track plates 2 and track plate bracing frame 1.When train passes through track plates, For track plates by power by 6 track board mounting stand 1 of supporting element, transmission member of the supporting element 6 as load and power will be on track plates 2 Load power is dispersed by track board mounting stand 1 and is uniformly transmitted to tunnel vault, to bear rail system and train Load guarantees train smooth, safely runs.Those skilled in the art can pass through according to the load of track strip profile and train Quantity, structure and the type of attachment of scientific calculating and optimization and practical application flexible design supporting element 6 are crossed, to realize rail Connection, support and conduction between guidance tape 2 and track board mounting stand 1, this adjustment to quantity, structure and type of attachment Without departing from the principle and scope of the present invention, should all limit within protection scope of the present invention.
Specifically, track plates 2 are prefabricated components, and as illustrated in figs. 6-11, track plates 2 include: bearing plate 21, guiding to structure Plate 22, floor 23, wherein the guide plate 22 is vertically installed on the bearing plate 21, and the bearing plate 21 is divided into and is held Roller steps on portion 21b and support interconnecting piece 21a, wherein the carrying roller steps on track of the portion 21b as offer train carrying roller traveling Structural slab, the support interconnecting piece 21a connect end as the support for transmitting load and power to supporting element, it is to be understood that Carrying roller steps on portion 21b and is used to carry train, therefore its loaded area is greater than support interconnecting piece 21a, and the floor 23 adds as longitudinal Strong plate is fixedly arranged on the lower surface that the carrying roller steps on portion 21b, and the shape of floor can be illustrated in figure 8 "-" type structure;One word The design of type floor improves the bending stiffness of track plates 2, or T-shaped structure as shown in Figure 9, the design of inverted T shaped floor mention The high bending stiffness and hardness of track plates 2;Or V-shaped structure as shown in Figure 10, oblique V-shaped structure improve track The bending stiffness and torsional rigidity of plate 2.Guide plate 22 is vertically installed on bearing plate 21 as train leading plate, works as train driving When, the load-bearing tyre tread as train directive wheel is train leading, guide plate 22 described in the present embodiment and bearing plate 21 and Floor 23 is integrally formed processing, and integrally formed structure is higher compared to later period combined strength, structure is more stable, reduces simultaneously The site-assembled cumbersome degree of construction personnel, improves construction efficiency.The guide plate 22 can also be used as independent component not with rail Guidance tape setting is integrated,, can be in the opposite of guide plate stress surface in order to enhance its stress when guide plate 22 is as independent component Ribs 24 is arranged in face, and specific structure is as shown in figure 11.Connection type or fixation side between track installation frame 1 and track plates 2 Formula, as each supporting element 6, the fixed structure that attached drawing is drawn only is illustrated, and specific connection, fixed form can be by these Field technical staff is arbitrarily arranged according to practical application, specifically should be according to the load of track strip profile and train by science Calculating and optimization depending on, details are not described herein for the calculation method of specific steel construction, but calculate in any case and obtain how Version, do not depart from the principle and scope of the present invention, should all limit within protection scope of the present invention.
Generally there are outer suspension type (bogie of empty iron is set to the outside of track girder) and interior suspension in common empty rail road Formula (the hollow inside that the bogie of empty iron is set to track girder).
Country's outer space iron generally uses interior suspension type at present, and interior suspension type sky rail pipeline transportation system is refering to Fig. 5.Track board group In the carrying rollers of two track plates 2 to step on portion 21b close to each other as shown in Figure 6, further, train 5 is set by bogie 51 It is placed between track board group, 51 carrying roller of bogie is set to carrying roller and steps on portion 21b at this time, and guide plate 22 is used as bogie 51 Guiding wheel tread be 51 leading of bogie, connected between bogie 51 and train 5 by sunpender 52, carrying roller is along track plates 2 Length direction rolls, and train 5 is driven to move ahead, and is symmetrical arranged on a track board mounting stand 1 there are two track board group, so this hair Bright sky rail pipeline transportation system can accommodate the train of two way in tunnel, since empty rail pipeline transportation system of the invention is used for In tunnel, and pillar construction is eliminated, then can effectively reduce the line spacing of two-wire when those skilled in the art design, be conducive to Tunnel width is reduced, that is, reduces tunnel construction cost.
Outer suspension type sky iron is divided into unilateral externally-hanging type and bilateral externally-hanging type, the bogie and railway carriage of unilateral outer suspension type sky iron Between an only C-shaped sunpender, C-shaped sunpender is located at the side of track plates;Between the bogie and railway carriage of bilateral externally-hanging type sky iron There are two sunpenders or connector, sunpender or connector are located at the two sides of track plates.Externally-hanging type track plate arrangement such as Fig. 7 Shown, the carrying roller of two track plates 2 in track board group steps on portion 21b away from one another, and bogie carrying roller, which is set to, at this time holds Roller is stepped on portion 21b, and guide plate 22 is bogie leading as the guiding wheel tread of bogie, is passed through between bogie and train C-shaped sunpender or connector connection, carrying roller are rolled along 2 length direction of track plates, and train is driven to move ahead, one track plates peace Track board group there are two being symmetrical arranged is shelved, so externally-hanging type sky rail pipeline transportation system of the present invention can also accommodate in tunnel The train of two way, it is to be understood that the interior suspension type sky rail road due to other structures with aforementioned present invention description It is identical, so no longer carry out drawings in detail explanation.
With continued reference to Fig. 3, a kind of empty rail pipeline transportation system for tunnel of the present invention further includes pipeline piping lane 7 and maintenance Platform 8, the pipeline piping lane 7 are hollow structure, are set on attachment beam 3 for being power cable, light conduits, signal electricity Cable, optical cable, communication cable etc. provide gantry, and those skilled in the art can be according to the number of practical application flexible design pipeline piping lane 7 Amount and structure.Further, two adjacent attachment beams of the present invention between two track board groups are provided with inspection platform 8, institute More people can be carried to provide platform to open up fire-fighting evacuation in tunnel and lead to as roof fire-fighting evacuation platform by stating inspection platform 8 Road.Further, using the attachment beam between each track board mounting stand, other equipment can be installed, such as third party's conductor rail (not shown) provides operation power for train;Such as video camera (not shown), image is provided for monitoring of tools;Air duct is such as installed (not Show), it is displaced air in tunnel;Such as signal lamp (not shown), signal designation is provided for train driving;It even can be by train Guide plate required for bogie is set on connection beam, mountable any one or any group among the above of attachment beam of the present invention It closes, setting in this way, the present invention realizes the space made full use of between track board mounting stand, reaches space efficiency utilization It maximizes.
Being set to the track board mounting stand 1 of the present invention at the vault of tunnel face can connect with tunnel internal rail guidance tape 2, can also To be connected with tunnel outside track beam 16, specifically, referring back to Fig. 1,1 one end of track board mounting stand and track plates at tunnel face 2 connections, the other end are connect with the track girder 16 of the empty iron rail system outside tunnel with column 15, and train 5 can be along track girder 16 Extending direction walking.The track girder 16 is conventional empty rail road system structure with column 15, separately there is patent description before, this Place repeats no more.Through the invention empty rail pipeline transportation system can realize it is external be connected with good in tunnel, guarantee train is just Often operation.
Sky rail pipeline transportation system of the invention further includes drainage pipeline 12 and side evacuation platform 13 as shown in Figure 5, institute It states drainage pipeline 12 to be set to below tunnel ground, the ground in tunnel can be built jointly with ground pavement, car lane, provide it The condition of his vehicles and pedestrians, the reserved gutter when tunnel is built, water flow can be guided to from all quarter tunnel by gutter The drainage pipeline 12 of longitudinal charge for remittance, arrangement form, sectional dimension and the longitudinal slope of drainage pipeline 12 is arranged in road bottom, tunnel bottom Degree is determined according to water size, the factors such as line slope, tunnel construction requirement.Sky rail pipeline transportation system of the invention fills Point tunnel-side is utilized, is arranged with Train door to just and the side evacuation platform 13 concordant with load carrying floor, utilization is limited Tunnel emergency evacuation efficiency is improved in space, guarantees the safety of traffic system in tunnel, avoids that accident occurs when evacuation.
The present invention can also be reduced to single-track tunnel, i.e., one group of track board group is only arranged on track board mounting stand, for train list Line traveling.No matter double track tunnel or single-track tunnel, belong to design philosophy of the present invention, all fall in the scope of protection of the present invention.This Track switch (not shown) in invention tunnel not necessarily like tunnel outside track switch equally there is huge volume, the maintenance on turnout of being more convenient for And maintenance work.
In technical solution in above-mentioned the embodiment of the present application, at least have the following technical effect that and advantage:
Empty rail pipeline transportation system of the present invention for tunnel passes through track board mounting stand, track plates, attachment beam, built-in fitting And the structure of supporting element solves the installation question in empty rail road in tunnel, and empty rail road can not set up column in tunnel To support the problem of empty iron train, structure of the invention material is easily obtained, and construction cost is low, and structure is simple, improve construction efficiency and It is not high to the technical requirements of construction personnel, while the present invention can effectively reduce the line spacing of two-wire without column, and it is wide to reduce tunnel Degree saves tunnel construction cost.
The present invention makes full use of the setting inspection of the space between track board mounting stand for the empty rail pipeline transportation system in tunnel Equating platform doubles as roof evacuation platform, provides platform and channel to open up fire-fighting evacuation in tunnel;It is rationally empty using tunnel-side Between side evacuation platform is set, pass through roof evacuation platform and side evacuation platform and improve tunnel emergency evacuation efficiency, guarantee tunnel The safety of traffic system in road avoids that accident occurs when evacuation.
The present invention passes through for the empty rail pipeline transportation system in tunnel calculates tunnel vault at a distance from the ground of bottom, rationally It plans tunnel internal space, empty rail pipeline transportation system is set in tunnel top, does not interfere tunnel ground pavement, car lane Deng the problem of providing the condition of other vehicles and pedestrians, peak time communications and transportation blocking be effectively relieved.
It should be noted that in the description of the present invention, term " center ", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outside" etc. indicate that the term of direction or positional relationship is direction based on the figure or positional relationship, this is only It is merely for convenience of describing, rather than indication or suggestion described device or element must have a particular orientation, with specific side Position construction and operation, therefore be not considered as limiting the invention.In addition, term " first ", " second ", " third " are only used for Purpose is described, relative importance is not understood to indicate or imply.
In addition it is also necessary to explanation, in the description of the present invention unless specifically defined or limited otherwise, term " peace Dress ", " connected ", " connection " shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or integrally Connection;It can be mechanical connection, be also possible to be electrically connected;Can be directly connected, can also indirectly connected through an intermediary, It can be the connection inside two elements.To those skilled in the art, it can understand that above-mentioned term exists as the case may be Concrete meaning in the present invention.
Term " includes " or any other like term are intended to cover non-exclusive inclusion, so that including a system Process, article or the equipment/device of column element not only include those elements, but also other are wanted including what is be not explicitly listed Element either further includes these processes, article or the intrinsic element of equipment/device.
So far, it has been combined preferred embodiment shown in the drawings and describes technical solution of the present invention, still, this field Technical staff is it is easily understood that protection scope of the present invention is expressly not limited to these specific embodiments.Without departing from this Under the premise of the principle of invention, those skilled in the art can make equivalent change or replacement to the relevant technologies feature, these Technical solution after change or replacement will fall within the scope of protection of the present invention.

Claims (10)

1. a kind of empty rail pipeline transportation system for tunnel characterized by comprising
Track board mounting stand, track plates, attachment beam, built-in fitting and train, the track board mounting stand are solid by the built-in fitting Set on tunnel vault, connected between the adjacent track board mounting stand of any two by the attachment beam;
The track plate bracing frame is for setting up the track plates;The train can be along the extending direction row of the track plates It walks.
2. the empty rail pipeline transportation system according to claim 1 for tunnel, which is characterized in that the track plates are pre- Component processed comprising: bearing plate, guide plate, floor, in which:
The guide plate is vertically installed on the bearing plate as train leading plate, and the bearing plate is divided into carrying roller and is stepped on Portion and support interconnecting piece, the floor are fixedly arranged on the lower surface that the carrying roller steps on portion as longitudinally reinforced plate, in which:
The carrying roller steps on track structure plate of the portion as offer train carrying roller traveling;
The support interconnecting piece connects end as the support for transmitting load and power to supporting element.
3. the empty rail pipeline transportation system according to claim 1 for tunnel, which is characterized in that described for tunnel Empty rail pipeline transportation system further includes supporting element, passes through several supporting elements between the track installation frame and the track plates Load on track plates is transmitted to tunnel vault by connection, transmission member of the supporting element as load and power.
4. the empty rail pipeline transportation system according to claim 2 for tunnel, which is characterized in that described two track plates It is symmetrical arranged composition track board group along train central axes, the carrying roller portion of stepping on of two track plates in the track board group is leaned on each other Closely or away from one another, the track board group there are two being symmetrical arranged on one track board mounting stand.
5. the empty rail pipeline transportation system according to claim 1 for tunnel, which is characterized in that described for tunnel Empty rail pipeline transportation system further includes pipeline piping lane, the pipeline piping lane be set on the attachment beam for for power cable, Light conduits, signal cable, optical cable, communication cable provide gantry.
6. the empty rail pipeline transportation system according to claim 4 for tunnel, which is characterized in that described for tunnel Empty rail pipeline transportation system further includes inspection platform, and the inspection platform is set to described by adjacent described two attachment beams Between two track board groups, the inspection platform can double as fire-fighting evacuation platform.
7. the empty rail pipeline transportation system according to claim 1 for tunnel, which is characterized in that be set to tunnel face arch The track board mounting stand one end on top is connect with the track plates, and the other end is connect by track girder with column, the train It can walk along the extending direction of the track girder.
8. the empty rail pipeline transportation system according to claim 1 for tunnel, which is characterized in that the attachment beam can Any one in video camera, air duct, signal lamp, guide plate and third party's conductor rail or any combination are installed.
9. the empty rail pipeline transportation system according to claim 4 for tunnel, which is characterized in that two of arbitrary neighborhood Attachment beam group there are two being respectively provided in the track plate bracing frame, described two attachment beam groups include along the track board group two Symmetrically arranged two attachment beams in side.
10. the empty rail pipeline transportation system according to claim 1 for tunnel, which is characterized in that the track plates peace It shelves and is connect by the built-in fitting with reinforcing bar in tunnel double-lining.
CN201910772624.8A 2019-08-21 2019-08-21 A kind of empty rail pipeline transportation system for tunnel Pending CN110497924A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910772624.8A CN110497924A (en) 2019-08-21 2019-08-21 A kind of empty rail pipeline transportation system for tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910772624.8A CN110497924A (en) 2019-08-21 2019-08-21 A kind of empty rail pipeline transportation system for tunnel

Publications (1)

Publication Number Publication Date
CN110497924A true CN110497924A (en) 2019-11-26

Family

ID=68588652

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910772624.8A Pending CN110497924A (en) 2019-08-21 2019-08-21 A kind of empty rail pipeline transportation system for tunnel

Country Status (1)

Country Link
CN (1) CN110497924A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110497923A (en) * 2019-08-21 2019-11-26 中建空列(北京)工程设计研究院有限公司 Empty rail pipeline transportation system

Citations (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3559583A (en) * 1967-04-10 1971-02-02 Safege Transport Overhead railway
GB1600008A (en) * 1977-04-12 1981-10-14 Edbro Ltd Machines for positioning supports in a tunnel
WO2000063499A1 (en) * 1999-04-17 2000-10-26 Sijin Liu Individual ground type subway station
US20070227393A1 (en) * 2006-04-03 2007-10-04 Fulgosi Giovanni De Cerri Corrado & C.S.N.C. Hatch for the opening and closing of pressurised pipes, in particular for the opening and closing of branch pipes for the introduction of pipe cleaning and inspection apparatus
CN105564442A (en) * 2016-01-15 2016-05-11 彭红廷 Air-rail transportation system and method
CN205771319U (en) * 2016-05-26 2016-12-07 广州市捷丰自动化设备有限公司 A kind of realize the shifting apparatus that piler switches tracks
CN206328646U (en) * 2016-12-26 2017-07-14 中铁十一局集团电务工程有限公司 A kind of novel rail two-wire track girder
CN107215341A (en) * 2017-06-20 2017-09-29 中建空列(北京)科技有限公司 Built-in suspension formula track girder and the empty iron traffic system of built-in suspension formula
CN107268352A (en) * 2017-08-03 2017-10-20 中国铁道科学研究院铁道建筑研究所 Refoot the fixed track usage plan device of operation for tunnel
WO2018076836A1 (en) * 2016-10-24 2018-05-03 中车长江车辆有限公司 Aerial railway-based multimodal transport interconnecting system
US20180257677A1 (en) * 2017-03-08 2018-09-13 Amsted Rail Company, Inc. Railway car truck friction shoe spring group
CN108842533A (en) * 2018-07-20 2018-11-20 中建空列(北京)科技有限公司 Empty iron series system
CN208586476U (en) * 2018-05-16 2019-03-08 中唐空铁科技有限公司 A kind of sky iron track girder
CN110080806A (en) * 2019-05-05 2019-08-02 中交第三航务工程局有限公司 A kind of construction technology of tunnel trunk secondary lining
CN110497923A (en) * 2019-08-21 2019-11-26 中建空列(北京)工程设计研究院有限公司 Empty rail pipeline transportation system
CN210416546U (en) * 2019-08-21 2020-04-28 中建空列(北京)工程设计研究院有限公司 Air-rail track traffic system for tunnel

Patent Citations (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3559583A (en) * 1967-04-10 1971-02-02 Safege Transport Overhead railway
GB1600008A (en) * 1977-04-12 1981-10-14 Edbro Ltd Machines for positioning supports in a tunnel
WO2000063499A1 (en) * 1999-04-17 2000-10-26 Sijin Liu Individual ground type subway station
US20070227393A1 (en) * 2006-04-03 2007-10-04 Fulgosi Giovanni De Cerri Corrado & C.S.N.C. Hatch for the opening and closing of pressurised pipes, in particular for the opening and closing of branch pipes for the introduction of pipe cleaning and inspection apparatus
CN105564442A (en) * 2016-01-15 2016-05-11 彭红廷 Air-rail transportation system and method
CN205771319U (en) * 2016-05-26 2016-12-07 广州市捷丰自动化设备有限公司 A kind of realize the shifting apparatus that piler switches tracks
WO2018076836A1 (en) * 2016-10-24 2018-05-03 中车长江车辆有限公司 Aerial railway-based multimodal transport interconnecting system
CN206328646U (en) * 2016-12-26 2017-07-14 中铁十一局集团电务工程有限公司 A kind of novel rail two-wire track girder
US20180257677A1 (en) * 2017-03-08 2018-09-13 Amsted Rail Company, Inc. Railway car truck friction shoe spring group
CN107215341A (en) * 2017-06-20 2017-09-29 中建空列(北京)科技有限公司 Built-in suspension formula track girder and the empty iron traffic system of built-in suspension formula
CN107268352A (en) * 2017-08-03 2017-10-20 中国铁道科学研究院铁道建筑研究所 Refoot the fixed track usage plan device of operation for tunnel
CN208586476U (en) * 2018-05-16 2019-03-08 中唐空铁科技有限公司 A kind of sky iron track girder
CN108842533A (en) * 2018-07-20 2018-11-20 中建空列(北京)科技有限公司 Empty iron series system
CN110080806A (en) * 2019-05-05 2019-08-02 中交第三航务工程局有限公司 A kind of construction technology of tunnel trunk secondary lining
CN110497923A (en) * 2019-08-21 2019-11-26 中建空列(北京)工程设计研究院有限公司 Empty rail pipeline transportation system
CN210416546U (en) * 2019-08-21 2020-04-28 中建空列(北京)工程设计研究院有限公司 Air-rail track traffic system for tunnel

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
唐飞: "悬挂式单轨车辆系统动力学参数优化研究", 中国优秀硕士学位论文全文数据库 工程科技Ⅱ辑, 16 January 2019 (2019-01-16), pages 6 *
赵立才等: "大跨径框架隧道中继间顶进既有铁路施工技术", 铁道标准设计, vol. 8, no. 58, 31 August 2014 (2014-08-31), pages 128 - 132 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110497923A (en) * 2019-08-21 2019-11-26 中建空列(北京)工程设计研究院有限公司 Empty rail pipeline transportation system

Similar Documents

Publication Publication Date Title
CA2456145C (en) Y-shaped support structure for elevated railed-vehicle guideway
CN104816732B (en) A kind of quick interval single-hole double-layer track subway
CN108482391B (en) A kind of magnetcisuspension floating rail train
CN101634126A (en) Ground-road combined comprehensive tunnel for underground pipeline and trolley bus
EP1075397B1 (en) Support structure for elevated railed-vehicle guideway
US6564516B1 (en) Support structure for elevated railed-vehicle guideway
WO2023198136A1 (en) Composite special-shaped flange track system
JPH01304294A (en) Underground railway of shielded tunnel as two-layer double track
CN110497924A (en) A kind of empty rail pipeline transportation system for tunnel
CN214273648U (en) Three-circle shield constructs construction subway station structure
CN101311413A (en) Process for using underground passage combined with roads on ground as passage of trolley bus
CN112109736B (en) Multi-type combined transport rail transport system
CN110497923A (en) Empty rail pipeline transportation system
CN210416546U (en) Air-rail track traffic system for tunnel
CN207405419U (en) A kind of novel truss track for empty iron
CN210554784U (en) Air rail traffic system
CN202401382U (en) A W-shaped beam for an urban rail transit overhead line system power supply mode
CN110374641B (en) Construction method of tunnel lining
CN210506997U (en) Beam-on-beam type composite track beam for magnetic suspension line
RU2710915C1 (en) Light-span structure
CN111417558B (en) String type track structure
CN112030712A (en) Cable-stay bridge suitable for rubber tyer tram is built with municipal administration passageway altogether
CN101372825A (en) Method for using underground passage combined with ground road as trolley bus passage
CN220057500U (en) Parking structure of guide rail type rubber wheel system vehicle in parking garage
CN110306387A (en) The beam type composite orbit beam on the beam on magnetic flotation line road

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: Room 11, floor 7, building 5, zone 4, No. 186, South Fourth Ring West Road, Fengtai District, Beijing 100070

Applicant after: China Construction Airlines (Beijing) Engineering Design Research Institute Co., Ltd.

Address before: 100094 Beijing City Zhuang Haidian District Town Road No. 115 two floor of No. 175

Applicant before: China Construction Airlines (Beijing) Engineering Design Research Institute Co., Ltd.

CB02 Change of applicant information