CN110496550A - A kind of construction of hydro project powder puddling device - Google Patents

A kind of construction of hydro project powder puddling device Download PDF

Info

Publication number
CN110496550A
CN110496550A CN201910881194.3A CN201910881194A CN110496550A CN 110496550 A CN110496550 A CN 110496550A CN 201910881194 A CN201910881194 A CN 201910881194A CN 110496550 A CN110496550 A CN 110496550A
Authority
CN
China
Prior art keywords
chamber
mixing chamber
belt
shaft
rotation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201910881194.3A
Other languages
Chinese (zh)
Inventor
张叶莎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jinyun Relaxation Automation Technology Co Ltd
Original Assignee
Jinyun Relaxation Automation Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jinyun Relaxation Automation Technology Co Ltd filed Critical Jinyun Relaxation Automation Technology Co Ltd
Priority to CN201910881194.3A priority Critical patent/CN110496550A/en
Publication of CN110496550A publication Critical patent/CN110496550A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01FMIXING, e.g. DISSOLVING, EMULSIFYING OR DISPERSING
    • B01F27/00Mixers with rotary stirring devices in fixed receptacles; Kneaders
    • B01F27/60Mixers with rotary stirring devices in fixed receptacles; Kneaders with stirrers rotating about a horizontal or inclined axis
    • B01F27/75Mixers with rotary stirring devices in fixed receptacles; Kneaders with stirrers rotating about a horizontal or inclined axis with stirrers having planetary motion, i.e. rotating about their own axis and about a sun axis
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01FMIXING, e.g. DISSOLVING, EMULSIFYING OR DISPERSING
    • B01F35/00Accessories for mixers; Auxiliary operations or auxiliary devices; Parts or details of general application
    • B01F35/75Discharge mechanisms
    • B01F35/754Discharge mechanisms characterised by the means for discharging the components from the mixer

Landscapes

  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

The present invention relates to hydraulic engineering apparatus fields, especially a kind of construction of hydro project powder puddling device, including the mixing chamber being arranged in fuselage and the fuselage, the agitating device to misplace up and down is provided in end wall at left and right sides of the mixing chamber, the agitating device includes the internal spline for the connection mixing chamber being arranged in end wall at left and right sides of the mixing chamber, the internal spline is far from being provided with the first belt chamber in the end wall of the mixing chamber side, rotation is provided with first rotating shaft between the first belt chamber and the internal spline, a kind of construction of hydro project provided by the invention powder puddling device, it can be realized being sufficiently mixed for powder, it drives when equipment of the invention mixes while agitating paddle rotation and is had enough to meet the need in mixing chamber, to guarantee that powder is sufficiently mixed in mixing chamber, device bottom of the invention simultaneously is provided with material-receiving device, Equivalent separation can be carried out to mixed sub-material, be convenient for subsequent use.

Description

A kind of construction of hydro project powder puddling device
Technical field
The present invention relates to hydraulic engineering apparatus field, especially a kind of construction of hydro project powder puddling device.
Background technique
When people are when carrying out construction of hydro project, it is often necessary to use, pass after being mixed well to different powders The evenly mixing device of system leads to undercompounding there is many dead angles, influences quality of materials, so as to cause hydraulic engineering intensity by To influence, and traditional mixing device cannot quantitatively separate mixing separation, be unfavorable for subsequent transport and use, therefore having must A kind of construction of hydro project powder puddling device improvement above problem is set.
Summary of the invention
The purpose of the present invention is to provide a kind of construction of hydro project powder puddling devices, can overcome the prior art Drawbacks described above, to improve the practicability of equipment.
The technical solution adopted by the present invention to solve the technical problems is: a kind of construction of hydro project powder of the invention Puddling device is provided in end wall at left and right sides of the mixing chamber including the mixing chamber being arranged in fuselage and the fuselage The agitating device of lower dislocation, the agitating device include the connection mixing chamber being arranged in end wall at left and right sides of the mixing chamber Internal spline, the internal spline far from being provided with the first belt chamber in the end wall of the mixing chamber side, the first belt chamber with Rotation is provided with first rotating shaft between the internal spline, and the intracavitary first rotating shaft end of first belt is fixedly installed First pulley, the first rotating shaft end in the internal spline is fixedly installed first gear, described in the internal spline The rotation of first rotating shaft outer surface is provided with planet carrier, planet carrier setting symmetrical above and below in the end wall of the mixing chamber side There is a rotatable agitating shaft, agitating shaft rotation while has enough to meet the need around the first rotating shaft, while two stirrings in left and right Device dislocation stirring, so that the more abundant of the mixture mixing in the mixing chamber be set in end wall on the left of the mixing chamber It is equipped with worm gear chamber, valve system is provided between the worm gear chamber and the mixing chamber, the valve system includes the worm gear Two symmetrical second shafts in front and back of setting, the gate appearance in the mixing chamber are rotated between chamber and the mixing chamber Face is fixedly installed gate, and two gates rotate round about, to guarantee that the mixing chamber bottom is closed or beats It opens, is provided with the rotation chamber of opening to the right on the left of the fuselage in end wall, the rotation is intracavitary to be provided with material-receiving device, described to connect It is provided with rotatable rotating turret in material device, the rotating turret roof inner opening has set up symmetrical two storings Slot, the stock chest can be taken the mixture after stirring with equivalent point, be provided with switching chamber, the switching in the wall of the rotation bottom of chamber It is provided with the sliding cavity that Open Side Down in chamber roof, the driving agitating device is provided in the sliding cavity and the splicing fills The power device set, the power device include that sliding shoe is slidably provided in the sliding cavity, and the sliding shoe is adjoint The movement of the valve system moves left and right, so that the power device timesharing be driven to drive the agitating device and the splicing Device.
Valuably, the agitating device further include agitating shaft outer surface setting with the internal spline and described the The second gear of one gear engagement, the agitating shaft outer surface is fixedly installed multiple agitating paddles.
Valuably, rotation is provided with third shaft, left and right two described first between two the first belt chambers in left and right The intracavitary third shaft end of belt is equipped with the second belt wheel, by the first belt between second belt wheel and the first pulley Transmission is cooperatively connected.
Valuably, the valve system further includes the snail of the intracavitary second shaft end fixed setting of the worm gear Wheel, the worm gear is intracavitary to be rotatably provided with the worm screw engaged with the worm gear of front and back two, the worm screw and the worm gear The first motor being fixedly installed in chamber roof is connected by power.
Valuably, the material-receiving device includes the 4th shaft that setting is rotated between the rotation chamber and the switching chamber, Intracavitary the 4th shaft of the rotation is fixedly connected with the rotating turret, intracavitary the 4th shaft end of the switching It is fixedly installed first bevel gear.
Valuably, it is provided with cam chamber in the rotating turret bottom wall, is provided with material-dropping hole in the storing groove bottom wall, it is described It is provided with and communicated with the first sliding eye between two material-dropping holes of stock chest and left and right, being provided in first sliding eye can slide Dynamic sliding bar is provided between the sliding bar and the first sliding eye end wall and drives the cunning after sliding bar sliding The reset spring that lever resets, the interior rotation of the cam chamber roof is provided with and the 5th turn for rotating chamber roof and being fixedly connected Axis, the 5th shaft end in the cam chamber are fixedly installed cam.
Valuably, the power device includes that the second motor is fixedly installed in the sliding shoe bottom wall, second electricity Machine output shaft end is fixedly installed the second bevel gear with first bevel gear cooperation, sets in end wall on the left of the sliding cavity It is equipped with opening the second sliding eye to the right, is slidably provided in second sliding eye and is fixedly connected with the sliding shoe Rack gear, the worm screw bottom extends into second sliding eye and end is fixedly installed the third tooth engaged with the rack gear Wheel.
Valuably, the second belt chamber upwardly extended, the second belt chamber are provided in end wall on the left of the switching chamber Rotation is provided with the 6th shaft between the switching chamber, intracavitary the 6th shaft end of the switching be fixedly installed with The third hand tap gear of second bevel gear engagement, intracavitary the 6th shaft end of second belt are fixedly installed the Three belt wheels, wherein the first rotating shaft left distal end in left side protrudes into, second belt is intracavitary and end is fixedly installed the 4th Belt wheel is driven by the second belt between the 4th belt wheel and the third belt wheel and is cooperatively connected.
Valuably, connection is external in the mixing chamber roof is provided with symmetrical feed inlet, passes through the feed inlet What be can be convenient is added powder into the mixing chamber.
Beneficial effects of the present invention: a kind of construction of hydro project powder puddling device provided by the invention can be realized Powder is sufficiently mixed, and is driven when equipment of the invention mixes and is had enough to meet the need in mixing chamber while agitating paddle rotation, to guarantee Powder is sufficiently mixed in mixing chamber, while device bottom of the invention is provided with material-receiving device, can to mixed sub-material into Row equivalent separates, and is convenient for subsequent use.
Detailed description of the invention
It, below will be to embodiment or existing in order to illustrate more clearly of inventive embodiments or technical solution in the prior art Attached drawing needed in technical description is briefly described, it should be apparent that, the accompanying drawings in the following description is only to invent Some embodiments for those of ordinary skill in the art without creative efforts, can also basis These attached drawings obtain other attached drawings.
Present invention will be further explained below with reference to the attached drawings and examples.
Fig. 1 is a kind of construction of hydro project powder puddling device overall structure diagram of the invention.
Fig. 2 is top view in Fig. 1.
Fig. 3 is the structural schematic diagram of A-A in Fig. 1.
Fig. 4 is the structural schematic diagram of B in Fig. 1.
Fig. 5 is the structural schematic diagram of C in Fig. 1.
Specific embodiment
Below with reference to Fig. 1-5, the present invention is described in detail, wherein for sake of convenience, now to hereafter described orientation Provide as follows: hereafter described front-rear direction up and down is consistent with the front-rear direction up and down of Fig. 1 projection relation itself.
A kind of construction of hydro project powder puddling device in conjunction with described in attached drawing 1-5, including fuselage 10 and the machine The mixing chamber 11 being arranged in body 10 is provided with the agitating device 99 to misplace up and down, institute in 11 left and right sides end wall of mixing chamber State the internal spline 41 that agitating device 99 includes the connection mixing chamber 11 being arranged in 11 left and right sides end wall of mixing chamber, institute Internal spline 41 is stated far from being provided with the first belt chamber 16 in the 11 side end wall of mixing chamber, the first belt chamber 16 with it is described Rotation is provided with first rotating shaft 44 between internal spline 41, and 44 end of the first rotating shaft fixation in the first belt chamber 16 is set It is equipped with first pulley 46,44 end of the first rotating shaft in the internal spline 41 is fixedly installed first gear 43, described interior 44 outer surface of first rotating shaft rotation in tooth socket 41 is provided with planet carrier 45, and the planet carrier 45 is close to the mixing chamber 11 It is symmetrical above and below in the end wall of side to be provided with rotatable agitating shaft 13, around the first rotating shaft while 13 rotation of agitating shaft 44 turnovers, while the dislocation of agitating device 99 stirring of left and right two, so that the mixture in the mixing chamber 11 is mixed More sufficiently, it is provided with worm gear chamber 37 in the 11 left side end wall of mixing chamber, between the worm gear chamber 37 and the mixing chamber 11 It is provided with valve system 98, the valve system 98 includes rotating the two of setting between the worm gear chamber 37 and the mixing chamber 11 A symmetrical second shaft 39 in front and back, 40 outer surface of the gate in the mixing chamber 11 are fixedly installed gate 40, and two The gate 40 rotates round about, thus guarantee that 11 bottom of mixing chamber is closed or opens, 10 left side of fuselage It is provided with the rotation chamber 48 of opening to the right in end wall, is provided with material-receiving device 97, the material-receiving device 97 in the rotation chamber 48 It is inside provided with rotatable rotating turret 47, the 47 roof inner opening of rotating turret has set up symmetrical two stock chests 50, the stock chest 50 can take the mixture after stirring with equivalent point, and switching chamber 33, institute are provided in 48 bottom wall of rotation chamber It states in switching 33 roof of chamber and is provided with the sliding cavity 32 that Open Side Down, the driving agitating device is provided in the sliding cavity 32 99 with the power device 96 of the material-receiving device 97, the power device 96 include slidably being provided in the sliding cavity 32 Sliding shoe 31, the sliding shoe 31 are moved left and right with the movement of the valve system 98, to drive the power device 96 Timesharing drives the agitating device 99 and the material-receiving device 97.
Valuably, the agitating device 99 further include 13 outer surface of agitating shaft setting with the internal spline 41 and The second gear 42 that the first gear 43 engages, 13 outer surface of agitating shaft is fixedly installed multiple agitating paddles 12.
Valuably, it is rotated between two the first belt chambers 16 in left and right and is provided with third shaft 14, described in left and right two 14 end of third shaft in first belt chamber 16 is equipped with the second belt wheel 15, second belt wheel 15 and the first pulley 46 Between by the first belt 17 be driven be cooperatively connected.
Valuably, the valve system 98 further include in the worm gear chamber 37 second shaft, 39 end fixation set The worm gear 38 set rotatably is provided with the worm screw 22 engaged with the worm gear 38 of front and back two in the worm gear chamber 37, described Worm screw 22 is connected by power with the first motor 21 being fixedly installed in 37 roof of worm gear chamber.
Valuably, the material-receiving device 97 includes rotating the 4th of setting between the rotation chamber 48 and the switching chamber 33 Shaft 35, the 4th shaft 35 rotated in chamber 48 is fixedly connected with the rotating turret 47, in the switching chamber 33 4th shaft, 35 end is fixedly installed first bevel gear 34.
Valuably, it is provided with cam chamber 56 in 47 bottom wall of rotating turret, is provided with blanking in 50 bottom wall of stock chest Hole 53 is provided with and communicated with the first sliding eye 51 between two material-dropping holes 53 of the stock chest 50 and left and right, and described first is sliding It is provided with slidable sliding bar 52 in dynamic hole 51, is provided between the sliding bar 52 and 51 end wall of the first sliding eye in institute The reset spring 54 for driving the sliding bar 52 to reset after sliding bar 52 slides is stated, rotation is provided in 56 roof of cam chamber With the 5th shaft 49 that is fixedly connected of rotation 48 roof of chamber, 49 end of the 5th shaft in the cam chamber 56 is fixed It is provided with cam 57.
Valuably, the power device 96 includes being fixedly installed the second motor 30 in 31 bottom wall of sliding shoe, described Second motor 30 output shaft end is fixedly installed the second bevel gear 29 with the first bevel gear 34 cooperation, the sliding cavity It is provided with opening the second sliding eye 25 to the right in 32 left side end walls, is slidably provided in second sliding eye 25 and institute The rack gear 24 that sliding shoe 31 is fixedly connected is stated, 22 bottom of the worm screw extends into second sliding eye 25 and end fixation is set It is equipped with the third gear 23 engaged with the rack gear 24.
Valuably, the second belt chamber 19 upwardly extended, second skin are provided in the switching 33 left side end wall of chamber Rotation is provided with the 6th shaft 27,27 end of the 6th shaft in the switching chamber 33 between band chamber 19 and the switching chamber 33 It holds and is fixedly installed the third hand tap gear 28 engaged with the second bevel gear 29, the in the second belt chamber 19 the described 6th 27 end of shaft is fixedly installed third belt wheel 26, wherein 44 left distal end of the first rotating shaft in left side protrudes into second skin In band chamber 19 and end is fixedly installed the 4th belt wheel 18, by the second skin between the 4th belt wheel 18 and the third belt wheel 26 The transmission of band 20 is cooperatively connected.
Valuably, connection is external in 11 roof of mixing chamber is provided with symmetrical feed inlet 36, by it is described into What material mouth 36 can be convenient is added powder into the mixing chamber 11.
Fixed connection method described in the present embodiment includes but is not limited to that bolt the methods of is fixed, welded.
The sequence of the mechanical action of whole device:
1, when equipment work of the invention, hydraulic engineering is placed in the mixing chamber 11 with powder, starts described the at this time Two motors 30 drive the second bevel gear 29 to rotate, so that the third hand tap gear 28 be driven to rotate, to drive described the The rotation of three belt wheels 26, the rotation of third belt wheel 26 drives the 4th belt wheel 18 rotation, to drive the described of the left side First pulley 46 rotates, so that second belt wheel 15 rotation in left side is driven, to drive second belt wheel 15 on right side Rotation, so that the first pulley 46 on right side be driven to rotate, the rotation of first pulley 46 of left and right two drives described first Gear 43 rotates, and the rotation of first gear 43 drives the second gear 42 to rotate, 13 rotation of agitating shaft at this time, thus The agitating paddle 12 is driven to rotate, simultaneously because the second gear 42 is engaged with the internal spline 41, the planet carrier at this time 45 rotations, to drive the second gear 42 to have enough to meet the need around the first rotating shaft 44, to be sufficiently mixed in the mixing chamber 11 Powder;
2, after powder is sufficiently mixed, start the first motor 21 and the worm screw 22 is driven to rotate, to drive former and later two The worm gear 38 rotates backward, so that the gate 40 be driven to rotate, the powder in the mixing chamber 11 falls into left side at this time In the stock chest 50, the rotation of worm screw 22 drives the third gear 23 to rotate at the same time, to drive the rack gear 24 move to right, to drive the sliding shoe 31 to move to right, so that the second bevel gear 29 be driven to move to right and the first bevel gear 34 engagements;
3, starting second motor 30 after filling in the stock chest 50 in left side drives the second bevel gear 29 to rotate, To drive the first bevel gear 34 to rotate, to drive the 4th shaft 35 to rotate, to drive the rotating turret 47 Half cycle is rotated, at this time two 50 transpositions of stock chest in left and right, simultaneously because the cam 57 is fixed, the rotating turret 47 The abutting that the sliding bar 52 after rotation originally positioned at left side loses the cam 57 is mobile by the corresponding blanking Hole 53 is opened, and the powder being located at originally in the stock chest 50 in left side at this time slides out the storing by the material-dropping hole 53 Slot 50 facilitates carry out splicing thereunder at this time, while original the supporting in the cam 57 of the sliding bar 52 for being located at right side It connects lower movement to close the corresponding material-dropping hole 53, the powder in the mixing chamber 11 is fallen into wherein at this time, is successively followed Ring, to realize that the equivalent of mixed powder separates.
The above embodiments merely illustrate the technical concept and features of the present invention, and its object is to allow be familiar with this field technology Personage can understand the content of present invention and be implemented, and it is not intended to limit the scope of the present invention.It is all according to the present invention Equivalent change or modification made by Spirit Essence, should be covered by the scope of protection of the present invention.

Claims (9)

1. a kind of construction of hydro project powder puddling device, special including the mixing chamber being arranged in fuselage and the fuselage Sign is: being provided with the agitating device to misplace up and down at left and right sides of the mixing chamber in end wall, the agitating device includes described The internal spline for the connection mixing chamber being arranged in end wall at left and right sides of mixing chamber, the internal spline is far from the mixing chamber side The first belt chamber is provided in end wall, rotation is provided with first rotating shaft between the first belt chamber and the internal spline, described The intracavitary first rotating shaft end of first belt is fixedly installed first pulley, the first rotating shaft end in the internal spline End is fixedly installed first gear, and the first rotating shaft outer surface rotation in the internal spline is provided with planet carrier, the row Carrier is symmetrical above and below in the end wall of the mixing chamber side to be provided with rotatable agitating shaft, while the agitating shaft rotation It is had enough to meet the need around the first rotating shaft, while the agitating device dislocation stirring of left and right two, thus by the mixing in the mixing chamber Object mixes more abundant, worm gear chamber is provided in end wall on the left of the mixing chamber, between the worm gear chamber and the mixing chamber Be provided with valve system, the valve system include rotated between the worm gear chamber and the mixing chamber setting two front and backs it is right The second shaft claimed, the gate outer surface in the mixing chamber are fixedly installed gate, and two gates are to Xiang Fanfang To rotation, to guarantee that the mixing chamber bottom is closed or opens, it is provided with and is open to the right in end wall on the left of the fuselage Chamber is rotated, the rotation is intracavitary to be provided with material-receiving device, and rotatable rotating turret, the rotation are provided in the material-receiving device Frame roof inner opening has set up symmetrical two stock chests, and the stock chest can take the mixing after stirring with equivalent point Object is provided with switching chamber in the wall of the rotation bottom of chamber, is provided with the sliding cavity that Open Side Down, the cunning in the switching chamber roof The intracavitary power device for being provided with and driving the agitating device and the material-receiving device is moved, the power device includes the sliding Intracavitary to be slidably provided with sliding shoe, the sliding shoe is moved left and right with the movement of the valve system, to drive institute It states power device timesharing and drives the agitating device and the material-receiving device.
2. a kind of construction of hydro project powder puddling device as described in claim 1, it is characterised in that: the agitating device is also The second gear engaged with the internal spline and the first gear including agitating shaft outer surface setting, the stirring Axis outer surface is fixedly installed multiple agitating paddles.
3. a kind of construction of hydro project powder puddling device as claimed in claim 2, it is characterised in that: left and right two described the Rotation is provided with third shaft between one belt chamber, and the two intracavitary third shaft ends of first belt in left and right are equipped with the Two belt wheels are driven by the first belt between second belt wheel and the first pulley and are cooperatively connected.
4. a kind of construction of hydro project powder puddling device as described in claim 1, it is characterised in that: the valve system is also Worm gear including the intracavitary second shaft end fixed setting of the worm gear, the worm gear is intracavitary to be rotatably provided with The first motor being fixedly installed in the worm screw engaged with the worm gear of front and back two, the worm screw and the worm gear chamber roof It is connected by power.
5. a kind of construction of hydro project powder puddling device as described in claim 1, it is characterised in that: the material-receiving device packet Include the 4th shaft that setting is rotated between the rotation chamber and the switching chamber, the rotation intracavitary the 4th shaft and institute It states rotating turret to be fixedly connected, intracavitary the 4th shaft end of the switching is fixedly installed first bevel gear.
6. a kind of construction of hydro project powder puddling device as claimed in claim 5, it is characterised in that: the rotating turret bottom wall Inside be provided with cam chamber, be provided with material-dropping hole in the storing groove bottom wall, the stock chest and left and right two material-dropping holes it Between be provided with and communicated with the first sliding eye, be provided with slidable sliding bar in first sliding eye, the sliding bar with it is described The reset spring for driving the sliding bar to reset after sliding bar sliding, the cam are provided between first sliding eye end wall Rotation is provided with the 5th shaft being fixedly connected with the rotation chamber roof in chamber roof, and described 5th turn in the cam chamber Shaft end is fixedly installed cam.
7. a kind of construction of hydro project powder puddling device as described in claim 1, it is characterised in that: the power device packet It includes and is fixedly installed the second motor in the sliding shoe bottom wall, second motor output shaft end is fixedly installed and described The second bevel gear of one bevel gear cooperation is provided with the second sliding eye of opening to the right in end wall on the left of the sliding cavity, described The rack gear being fixedly connected with the sliding shoe is slidably provided in second sliding eye, the worm screw bottom extends into described In two sliding eyes and end is fixedly installed the third gear engaged with the rack gear.
8. a kind of construction of hydro project powder puddling device as claimed in claim 7, it is characterised in that: on the left of the switching chamber The the second belt chamber upwardly extended is provided in end wall, rotation is provided with the 6th between the second belt chamber and the switching chamber Shaft, intracavitary the 6th shaft end of the switching are fixedly installed the triconodont engaged with the second bevel gear Wheel, intracavitary the 6th shaft end of second belt are fixedly installed third belt wheel, wherein described first turn of left side Axis left distal end protrudes into that second belt is intracavitary and end is fixedly installed the 4th belt wheel, the 4th belt wheel and the third It is driven and is cooperatively connected by the second belt between belt wheel.
9. a kind of construction of hydro project powder puddling device as described in claim 1, it is characterised in that: the mixing chamber roof It is provided with symmetrical feed inlet outside interior connection, powder is added into the mixing chamber by what the feed inlet can be convenient Material.
CN201910881194.3A 2019-09-18 2019-09-18 A kind of construction of hydro project powder puddling device Withdrawn CN110496550A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910881194.3A CN110496550A (en) 2019-09-18 2019-09-18 A kind of construction of hydro project powder puddling device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910881194.3A CN110496550A (en) 2019-09-18 2019-09-18 A kind of construction of hydro project powder puddling device

Publications (1)

Publication Number Publication Date
CN110496550A true CN110496550A (en) 2019-11-26

Family

ID=68592253

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910881194.3A Withdrawn CN110496550A (en) 2019-09-18 2019-09-18 A kind of construction of hydro project powder puddling device

Country Status (1)

Country Link
CN (1) CN110496550A (en)

Similar Documents

Publication Publication Date Title
CN110215858A (en) A kind of solid-liquid mixed chemical preparation of reagents machine
CN109107490A (en) One kind can essence control fertilizer production device
CN109228091A (en) A kind of ring sealing device with sealing surfaces extension
CN110496550A (en) A kind of construction of hydro project powder puddling device
CN109363121A (en) A kind of food processing apparatus
CN108502950B (en) A kind of processing method of pharmaceuticals industry waste water
CN209317521U (en) A kind of powder premixing machine being used to prepare toothpaste
CN108176293A (en) A kind of modified form feed-processing device
CN108619974A (en) A kind of medical treatment chlorination equipment
CN109224952A (en) A kind of Water-borne modification functional paint and auxiliary agent equipment and its operating method
CN111297688A (en) Traditional chinese medicine system of enduring partial shipment equipment
CN108435042A (en) A kind of fertilizer plant
CN110385070A (en) A kind of automotive paints mixing color system containing paillette
CN213669036U (en) Taurine mixer
CN110038475A (en) A kind of Organic-inorganic composite fluorescent powder and preparation method thereof
CN109016207A (en) A kind of control system of improved plastic molding
CN109046121A (en) A kind of advanced polychrome jelly production equipment
CN109224932A (en) A kind of polychrome jelly production equipment
CN109016160A (en) A kind of novel corrosion resistant cement and its application
CN219964661U (en) Fodder stirring device
CN108554272A (en) A kind of bio-pharmaceuticals device
CN217887612U (en) Corrosion and scale inhibitor circulating stirring preparation device
CN109200917A (en) A kind of efficient organic-inorganic compound fertilizer equipment
CN109224984A (en) A kind of efficient polychrome jelly production equipment
CN109248607A (en) A kind of advanced polychrome jelly production equipment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication
WW01 Invention patent application withdrawn after publication

Application publication date: 20191126