CN110496398A - A kind of multipurpose tower having both multiple items of recreation - Google Patents
A kind of multipurpose tower having both multiple items of recreation Download PDFInfo
- Publication number
- CN110496398A CN110496398A CN201910781472.8A CN201910781472A CN110496398A CN 110496398 A CN110496398 A CN 110496398A CN 201910781472 A CN201910781472 A CN 201910781472A CN 110496398 A CN110496398 A CN 110496398A
- Authority
- CN
- China
- Prior art keywords
- group
- tower
- frame
- climbing
- central tower
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Classifications
-
- A—HUMAN NECESSITIES
- A63—SPORTS; GAMES; AMUSEMENTS
- A63B—APPARATUS FOR PHYSICAL TRAINING, GYMNASTICS, SWIMMING, CLIMBING, OR FENCING; BALL GAMES; TRAINING EQUIPMENT
- A63B9/00—Climbing poles, frames, or stages
-
- A—HUMAN NECESSITIES
- A63—SPORTS; GAMES; AMUSEMENTS
- A63G—MERRY-GO-ROUNDS; SWINGS; ROCKING-HORSES; CHUTES; SWITCHBACKS; SIMILAR DEVICES FOR PUBLIC AMUSEMENT
- A63G21/00—Chutes; Helter-skelters
-
- A—HUMAN NECESSITIES
- A63—SPORTS; GAMES; AMUSEMENTS
- A63G—MERRY-GO-ROUNDS; SWINGS; ROCKING-HORSES; CHUTES; SWITCHBACKS; SIMILAR DEVICES FOR PUBLIC AMUSEMENT
- A63G21/00—Chutes; Helter-skelters
- A63G21/04—Chutes; Helter-skelters with fixed rails
-
- A—HUMAN NECESSITIES
- A63—SPORTS; GAMES; AMUSEMENTS
- A63G—MERRY-GO-ROUNDS; SWINGS; ROCKING-HORSES; CHUTES; SWITCHBACKS; SIMILAR DEVICES FOR PUBLIC AMUSEMENT
- A63G21/00—Chutes; Helter-skelters
- A63G21/06—Chutes; Helter-skelters with passing arrangements for cars
-
- A—HUMAN NECESSITIES
- A63—SPORTS; GAMES; AMUSEMENTS
- A63G—MERRY-GO-ROUNDS; SWINGS; ROCKING-HORSES; CHUTES; SWITCHBACKS; SIMILAR DEVICES FOR PUBLIC AMUSEMENT
- A63G21/00—Chutes; Helter-skelters
- A63G21/10—Chutes; Helter-skelters with spiral tracks
-
- A—HUMAN NECESSITIES
- A63—SPORTS; GAMES; AMUSEMENTS
- A63G—MERRY-GO-ROUNDS; SWINGS; ROCKING-HORSES; CHUTES; SWITCHBACKS; SIMILAR DEVICES FOR PUBLIC AMUSEMENT
- A63G31/00—Amusement arrangements
-
- A—HUMAN NECESSITIES
- A63—SPORTS; GAMES; AMUSEMENTS
- A63B—APPARATUS FOR PHYSICAL TRAINING, GYMNASTICS, SWIMMING, CLIMBING, OR FENCING; BALL GAMES; TRAINING EQUIPMENT
- A63B9/00—Climbing poles, frames, or stages
- A63B2009/006—Playground structures
-
- A—HUMAN NECESSITIES
- A63—SPORTS; GAMES; AMUSEMENTS
- A63G—MERRY-GO-ROUNDS; SWINGS; ROCKING-HORSES; CHUTES; SWITCHBACKS; SIMILAR DEVICES FOR PUBLIC AMUSEMENT
- A63G31/00—Amusement arrangements
- A63G2031/002—Free-fall
Landscapes
- Health & Medical Sciences (AREA)
- General Health & Medical Sciences (AREA)
- Physical Education & Sports Medicine (AREA)
- Tents Or Canopies (AREA)
Abstract
A kind of multipurpose tower having both multiple items of recreation, including central tower and climbing frame, the climbing frame are connect with central tower;Wherein, the central tower includes sky gliding track, jumps tower, central tower ontology, the straight slide of central tower, central tower Revolving slide, sky gliding platform and tracks travel trolley;The climbing frame includes one layer of climbing netting structure, two layers of climbing netting structure and three layers of climbing netting structure, and the structure that one layer of climbing netting structure, two layers of climbing netting structure climb netting structure with three layers includes that one group of climbing frame connects square steel, one group of climbing frame column, one group of brilliant climbing frame and one group of ball-type climbing frame.The multipurpose tower of the present invention for having both multiple items of recreation, reasonable in design, vdiverse in function, interest is strong, and different some projects can be arranged, and increases whole interest, while tempering teenager and adult willpower, and the courage of self-challenge is turned up.
Description
Technical field
The invention belongs to amusement facility technical fields, and in particular, to a kind of multipurpose tower for having both multiple items of recreation.
Background technique
With the continuous improvement of the living standard of people, the spiritual demand of people is also continuously improved, amusement park conduct
People loosen the place of body and mind, deep always to be liked by teen-age.Currently, the entertainment selection in amusement park is varied, not only
There is the big small-sized amusement facility of many outdoors, while market is also equipped with the amusement facility much played for children, room indoors
Outer large scale equipment includes Twister, magic power bowl, wave pool, advance through the rapids, roller-coaster, sea rover, ferris wheel etc., these joys
Happy project is all fabulous, can bring people's experience of tense and stimulation.Interior is mainly air fort, slide, sea-ball pond, jumps
Bed etc..
However the above project has all had longer history, belongs to conventional items, many people have made repeated attempts
It crosses, no longer there is feeling of freshness, therefore with the continuous development of society, need to design novel amusement facility, people can be brought
More enjoyment during playing.
Summary of the invention
Goal of the invention: the object of the present invention is to provide a kind of multipurpose towers for having both multiple items of recreation, provide one kind
The strong amusement facility of diversity interest.
Technical solution: the present invention provides a kind of multipurpose towers for having both multiple items of recreation, including central tower and climbing
Frame, the climbing frame are connect with central tower;
Wherein, the central tower includes sky gliding track, jumps tower, central tower ontology, the straight slide of central tower, central tower rotation cunning
Ladder, sky gliding platform and tracks travel trolley, the sky gliding track are obliquely installed in flexure type, and the sky gliding is flat
Platform is connect with the lower end of central tower ontology, and one end of the sky gliding track is fixed on the upper end of central tower ontology,
And the other end of sky gliding track may pass through on the lower end of the sky gliding centrally disposed tower ontology of platform, the jump tower
On the upper end of centrally disposed tower ontology, the upper end of the straight slide of the central tower and central tower Revolving slide is and central tower
Ontology connection, and the other end of the straight slide of central tower and central tower Revolving slide is as on ground, the tracks travel trolley
Setting is glided on track on high, and tracks travel trolley can be along sky gliding track sliding;The climbing frame includes one layer
Netting structure, two layers of climbing netting structure and three layers of climbing netting structure are climbed, two layers of climbing netting structure setting is one
In layer climbing netting structure, three layers of climbing netting structure setting is in two layers of climbing netting structure, two layers of climbing rope
Ladder is equipped with before web frame and three layers of climbing netting structure;Wherein, one layer of climbing netting structure, two layers of climbing netting knot
The structures of structure and three layers of climbing netting structure include one group of climbing frame connection square steel, one group of climbing frame column, one group brilliant climb
Climbing frame and one group of ball-type climbing frame, under one group of climbing frame column, one group of brilliant climbing frame and one group of ball-type climbing frame
End is bolted on ground, between one group of climbing frame column and one group of brilliant climbing frame, one group of multi-panel
Connected by climbing frame between type climbing frame and one group of ball-type climbing frame, between one group of climbing frame column and one group of ball-type climbing frame
Square steel connection is connect, the ball-type climbing frame includes ball-type climbing frame column, ball-type frame and ball-type outer casing, the ball-type climbing
Erect column be it is cylindric, the ball-type frame and ball-type outer casing are spheroidal, and the ball-type frame is arranged in ball-type climbing frame
On the outer wall in column lower end portion, the ball-type outer casing is located on ball-type frame, and the ball-type outer casing is equipped with one group of circle
Shape is open, and is equipped with adapter flange, the ball-type outer casing and switching method on the ball-type frame with circular open corresponding position
Orchid connection.
Further, the above-mentioned multipurpose tower for having both multiple items of recreation, the central tower ontology include central tower frame
Frame, the first platform of central tower, the second platform of central tower and central tower third platform, first platform of central tower, central tower
Two platforms and central tower third platform are successively set on central tower frame according to sequence from top to bottom, and the sky gliding is flat
One end of platform is connect with the edge of central tower third platform, on centrally disposed first platform of tower of jump tower, the central tower
Straight slide, central tower Revolving slide are connect with central tower third platform.
Further, the above-mentioned multipurpose tower for having both multiple items of recreation, the central tower frame includes in central tower
Between pillar, one group of connecting square pipes, one group of central tower internal layer support column and one group of central tower outer layer support column, among the central tower
Between pillar and one group of central tower internal layer support column, between central tower intermediate studdle and one group of central tower outer layer support column, one group
Pass through one group of connecting square pipes connection, one group of center between central tower internal layer support column and one group of central tower outer layer support column
Tower internal layer support column is arranged on the circumference centered on central tower intermediate studdle, one group of central tower outer layer support column setting
On the circumference centered on central tower intermediate studdle, and one group of central tower internal layer support column and one group of central tower outer layer support
Column is arranged in a manner of annular array.
Further, the above-mentioned multipurpose tower for having both multiple items of recreation, the jump tower include jumping tower frame, jumping tower branch
Crossbeam and reduction of speed device are supportted, described one end for jumping tower support beam is fixed on the top for jumping tower frame, and jumps tower support beam
The other end, which stretches out, jumps outside tower frame, and the reduction of speed device is arranged on the end for jumping tower support beam stretching jump tower frame, and
Reduction of speed device is equipped with safety belt, and the jump tower frame is bolted on the table top of the first platform of central tower.
Further, the above-mentioned multipurpose tower for having both multiple items of recreation, the ball-type climbing frame column are equipped with six
Angle pinboard, the hexagonal pinboard include upper junction plate, lower connecting plate and one group of middle connecting plate, connection among described one group
Plate is arranged between upper junction plate and lower connecting plate, and the upper junction plate and lower connecting plate are equipped with one group of protrusion, and described one group
Protrusion is arranged in a manner of annular array, and groove is equipped between one group of protrusion, and the middle connecting plate is located at upper junction plate
Between lower connecting plate groove institute to position at, one end of climbing frame connection square steel, which is bolted, to be arranged in upper connection
On the protrusion of plate and the protrusion of lower connecting plate.
Further, the above-mentioned multipurpose tower for having both multiple items of recreation, the brilliant climbing frame includes brilliant
Climbing frame column, brilliant frame and fence, the brilliant climbing frame column is cylindrical, the section of the brilliant frame
It is positive polygonal, the brilliant frame is connect with the outer wall of brilliant climbing frame column, and the fence is arranged in brilliant frame
On frame.
Further, the above-mentioned multipurpose tower for having both multiple items of recreation, the tracks travel trolley includes sleigh
It frame, one group of first compression position-limited wheel, one group of second compression position-limited wheel, one group of first sliding wheel, one group of second sliding wheel and unloads
Button, the upper end for sliding frame are equipped with the first opening, one group of first compression position-limited wheel and one group of second compression limit
Position wheel is arranged in by pinboard to be slided frame and is located in the both ends of the surface of the first opening, and the first compression position-limited wheel and the
Two, which compress position-limited wheel, is symmetrical arranged, and one group of first sliding wheel, which is arranged in, slides frame on the end face of the first opening,
And one group of first sliding wheel and one group of first compression position-limited wheel are located at the same side, and one group of second sliding wheel setting is being slided
Frame is located on the end face of the first opening, and one group of second sliding wheel and one group of second compression position-limited wheel are located at the same side,
The shackle, which is arranged in, slides the other end opposite with the first opening on frame, one group of first compression position-limited wheel, one group
Second compression position-limited wheel, one group of first sliding wheel and one group of second sliding wheel can offset with track.
Further, the above-mentioned multipurpose tower for having both multiple items of recreation, the frame that slides includes first fixed
Mounting plate, the second fixed mounting plate, shackle mounting plate and one group of connecting plate, first fixed mounting plate and second are fixedly mounted
The section of plate is circular ring shape, and the first fixed mounting plate and the second fixed mounting plate are equipped with first and are open, and described one group
Connecting plate is arranged between the first fixed mounting plate and the second fixed mounting plate, and the shackle mounting plate is arranged in one group of connecting plate
On, and middle position of the shackle mounting plate between the first fixed mounting plate and the second fixed mounting plate, the shackle are set
It sets on shackle mounting plate.
Further, the above-mentioned multipurpose tower for having both multiple items of recreation, the axis of first fixed mounting plate and
The axis of second fixed mounting plate is on same axis, one group of connecting plate being arranged radially along the first fixed mounting plate.
Further, the above-mentioned multipurpose tower for having both multiple items of recreation is opened close to first in one group of connecting plate
Connecting plate at mouthful, which is equipped with, compresses position-limited wheel mounting base, and the compression position-limited wheel mounting base is horizontally disposed, and described one group first
It compresses position-limited wheel and one group of second compression position-limited wheel is separately positioned on and compresses in position-limited wheel mounting base.
Above-mentioned technical proposal, which can be seen that, has both multiple travel the invention has the following beneficial effects: of the present invention
The multipurpose tower of project, reasonable in design, vdiverse in function, interest is strong, has the advantages that
(1) central tower is to integrate climbing frame, stainless steel slide, jump tower, the entrance platform that regulation is circled in the air, can be to above
It is effectively connected between 4 projects, the queue time between saving project;
(2) jumping tower is connect by fastener with reduction of speed device after tourist fastens the safety belt, and is then rapidly decreased to ground, is increased adventurous
And irritation;
(3) climbing frame belongs to aerial adventure amusement facility, is suitble to the use of all age group crowd, and user is fastening safety
Each project is successively passed through by stair along track under the premise of band, another platform is reached from a platform, was travelling
The feeling that air walk is experienced in journey, tempers courage and insight self-challenge;
(4) climbing adds settable different software project between adjacent platform, such as walk single-plank bridge, pass through roller etc., energy
Different some projects are enough set, whole interest is increased, while tempering teenager and adult willpower, challenge is turned up certainly
My courage.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the multipurpose tower of the present invention for having both multiple items of recreation;
Fig. 2 is the structural schematic diagram one of central tower of the present invention;
Fig. 3 is the structural schematic diagram two of central tower of the present invention;
Fig. 4 is the structural schematic diagram three of central tower of the present invention;
Fig. 5 is the structural schematic diagram of the present invention for jumping tower;
Fig. 6 is the structural schematic diagram one of climbing frame of the present invention;
Fig. 7 is one layer of climbing frame of structural schematic diagram of the present invention;
Fig. 8 is two or three layers of climbing frame of structural schematic diagram of the present invention;
Fig. 9 is the structural schematic diagram one of ball-type climbing frame of the present invention;
Figure 10 is the structural schematic diagram two of ball-type climbing frame of the present invention;
Figure 11 is the structural schematic diagram one of brilliant climbing frame of the present invention;
Figure 12 is the structural schematic diagram two of brilliant climbing frame of the present invention;
Figure 13 is the structural schematic diagram of hexagonal connecting plate of the present invention;
Figure 14 is structural schematic diagram when hexagonal connecting plate of the present invention is applied;
Figure 15 is the structural schematic diagram one of tracks travel trolley of the present invention;
Figure 16 is the structural schematic diagram two of tracks travel trolley of the present invention;
Figure 17 is the structural schematic diagram of tracks travel carriage frame of the present invention;
Figure 18 is the partial enlarged view of sky of the present invention gliding track;
Figure 19 is the sectional view of lifting device of the present invention;
Figure 20 is the structural schematic diagram of lifting device of the present invention;
Figure 21 is the partial enlarged view in Figure 20 of the present invention at A;
Figure 22 is the main view that slide trolley of the present invention promotes docking orbit;
Figure 23 is the left view that slide trolley of the present invention promotes docking orbit;
Figure 24 is that lifting device of the present invention is mounted on the structural schematic diagram on frame body;
Figure 25 is that lifting device of the present invention is mounted on the sectional view on frame body;
Figure 26 is structural schematic diagram when lifting device of the present invention is applied;
Figure 27 is the structural schematic diagram of sky of the present invention gliding;
Figure 28 is the partial enlarged view of sky of the present invention gliding;
Figure 29 is the structural schematic diagram of stop assembly of the present invention;
Figure 30 is the structural schematic diagram of scotch of the present invention;
Figure 31 is the structural schematic diagram of baffle of the present invention;
Figure 32-34 is the schematic diagram of stop assembly of the present invention application;
Figure 35 is the structural schematic diagram that permanent magnetism one of the present invention and permanent magnetism two act on.
Specific embodiment
The embodiment of the present invention is described below in detail, examples of the embodiments are shown in the accompanying drawings, wherein from beginning to end
Same or similar label indicates same or similar element or element with the same or similar functions.Below with reference to attached
The embodiment of figure description is exemplary, it is intended to is used to explain the present invention, and is not considered as limiting the invention.
In the description of the present invention, it is to be understood that, term " center ", " longitudinal direction ", " transverse direction ", " length ", " width ",
" thickness ", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom" "inner", " clockwise ", " inverse
The orientation or positional relationship of the instructions such as hour hands " is to be based on the orientation or positional relationship shown in the drawings, and is merely for convenience of description originally
Invention and simplified description, rather than the device or element of indication or suggestion meaning must have a particular orientation, with specific side
Position construction and operation, therefore be not considered as limiting the invention.
In addition, term " first ", " second " are used for descriptive purposes only and cannot be understood as indicating or suggesting relative importance
Or implicitly indicate the quantity of indicated technical characteristic.Define " first " as a result, the feature of " second " can be expressed or
Implicitly include one or more of the features.In the description of the present invention, unless otherwise indicated, the meaning of " plurality " is two
It is a or more than two, unless otherwise restricted clearly.
In the present invention unless specifically defined or limited otherwise, term " installation ", " connected ", " connection ", " fixation " etc.
Term shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or be integrally connected;It can be machine
Tool connection, is also possible to be electrically connected;It can be directly connected, two members can also be can be indirectly connected through an intermediary
Connection inside part.For the ordinary skill in the art, above-mentioned term can be understood in this hair as the case may be
Concrete meaning in bright.
In the present invention unless specifically defined or limited otherwise, fisrt feature second feature "upper" or "lower"
It may include that the first and second features directly contact, also may include that the first and second features are not direct contacts but pass through it
Between other characterisation contact.Moreover, fisrt feature includes the first spy above the second feature " above ", " above " and " above "
Sign is right above second feature and oblique upper, or is merely representative of first feature horizontal height higher than second feature.Fisrt feature exists
Second feature " under ", " lower section " and " following " include that fisrt feature is directly below and diagonally below the second feature, or is merely representative of
First feature horizontal height is less than second feature.
Embodiment
The multipurpose tower for having both multiple items of recreation as shown in Figure 1, including central tower 100 and climbing frame 200, it is described to climb
Climbing frame 200 is connect with central tower 100;
Wherein, central tower 100 as shown in Figure 2-5 includes sky gliding track 201, jumps tower 202, central tower ontology 203, center
The straight slide 204 of tower, central tower Revolving slide 205, sky gliding platform 206 and tracks travel trolley 207, the sky gliding rail
Road 201 is obliquely installed in flexure type, and the sky gliding platform 206 is connect with the lower end of central tower ontology 203, the sky
One end of gliding track 201 is fixed on the upper end of central tower ontology 203, and the other end of sky gliding track 201 can
On the lower end of the sky gliding centrally disposed tower ontology 203 of platform 206, the centrally disposed tower ontology of the jump tower 202
On 203 upper end, the upper end of the straight slide 204 of the central tower and central tower Revolving slide 205 with central tower ontology 203
Connection, and the other end of the straight slide 204 of central tower and central tower Revolving slide 205, as on ground, the tracks travel is small
The setting of vehicle 207 is glided on track 201 on high, and tracks travel trolley 207 can be slided along sky gliding track 201;Sky
The track 201 that glides is supported by the support frame of steel construction, for the structure that steel pipe is built, is being not shown in the figure.Central tower ontology 203
It is described including central tower frame 208, the first platform of central tower 209, the second platform of central tower 210 and central tower third platform 211
The first platform of central tower 209, the second platform of central tower 210 and central tower third platform 211 according to sequence from top to bottom successively
On centrally disposed tower frame 208, one end of the sky gliding platform 206 is connect with the edge of central tower third platform 211,
On centrally disposed the first platform of tower 209 of the jump tower 202, the straight slide 204 of the central tower, central tower Revolving slide 205 are equal
It is connect with central tower third platform 211.Central tower frame 208 includes 212, one groups of connecting square pipes 213, one of central tower intermediate studdle
Group central tower internal layer support column 214 and one group of central tower outer layer support column 215, in the central tower intermediate studdle 212 and one group
Between heart tower internal layer support column 214, between central tower intermediate studdle 212 and one group of central tower outer layer support column 215, one group of center
It is connected by one group of connecting square pipes 213 between tower internal layer support column 214 and one group of central tower outer layer support column 215, described one
Group central tower internal layer support column 214 is arranged on the circumference centered on central tower intermediate studdle 212, outside one group of central tower
Layer support column 215 is arranged on the circumference centered on central tower intermediate studdle 212, and one group of central tower internal layer support column
214 and one group of central tower outer layer support column 215 be arranged in a manner of annular array.The first platform of central tower 209, central tower second
Platform 210 is connected including 216, one groups of supporting square tubes 217 of central tower tabletop of platform with one group of arc with central tower third platform 211
Pipe 218, the middle position of the central tower tabletop of platform 216 are equipped with first through hole 219, and the first through hole 219 is with central tower
Centered on intermediate studdle 212, connected between one group of central tower internal layer support column 214 by one group of arc connecting tube 218, institute
It states and is connected between one group of central tower outer layer support column 215 by one group of supporting square tube 217 and one group of arc connecting tube 218, it is described
Central tower tabletop of platform 216 is located on one group of supporting square tube 217 and one group of arc connecting tube 218.Sky gliding platform 206 wraps
Include sky gliding tabletop of platform 220, sky gliding platform support columns 221 and sky gliding frame 222, the sky gliding platform
The upper end of support column 221 is connect with sky gliding frame 222, one end of the sky gliding frame 222 and central tower third
Platform 211 connects, and the sky gliding tabletop of platform 220 is provide with glides on frame 222 on high.Central tower tabletop of platform 216
Interface be equilateral triangle, and the corner of central tower tabletop of platform 216 is disposed as fillet.Jumping tower 202 includes jumping tower frame
Frame 223, jump tower support beam 224 and reduction of speed device 225(reduction of speed device are also descending lifeline, for existing mature production commercially available on the market
Product), described one end for jumping tower support beam 224 is fixed on the top for jumping tower frame 223, and jumps the another of tower support beam 224
One end, which is stretched out, jumps outside tower frame 223, and the reduction of speed device 225, which is arranged in, jumps the end that tower support beam 224 stretches out jump tower frame 223
In portion, and reduction of speed device 225 is equipped with safety belt, and the jump tower frame 223 is bolted on the first platform of central tower 209
Table top on.Jumping tower frame 223 includes one group of jump tower frame support column, 226, one groups of jump tower frame connecting square pipes 227 and fence
228, the lower end of one group of jump tower frame support column 226 is fixed on the table top of the first platform of central tower 209, described
The upper end of one group of jump tower frame support column 226 is connected by one group of jump tower frame connecting square pipes 227, and the fence 228 is arranged
Between one group of jump tower frame support column 226, the fence 228 is equipped with safety door.Tower support beam 224 is jumped to set in 2 ° of inclinations
It sets, and jumps tower support beam 224 and tilted to 225 direction of reduction of speed device.It jumps tower frame connecting square pipes 227 and is equipped with anchor ear 229, institute
Anchor ear 229 is stated to be set on central tower outer layer support column 215.
The climbing frame 200 as shown in Fig. 6-14 is climbed including one layer of climbing netting structure, two layers of climbing netting structure and three layers
Rope climbing web frame, two layers of climbing netting structure setting is in one layer of climbing netting structure, three layers of climbing netting structure
It is arranged in two layers of climbing netting structure, is equipped with ladder before two layers of climbing netting structure and three layers of climbing netting structure
10;Wherein, the structure of one layer of climbing netting structure, two layers of climbing netting structure and three layers of climbing netting structure includes one group
Climbing frame connects the brilliant climbing frame 103 of 101, one groups of square steel, 102, one groups of climbing frame column and one group of ball-type climbing frame 104, institute
The lower end for stating one group of climbing frame column, 102, one groups of brilliant climbing frames 103 and one group of ball-type climbing frame 104 passes through bolt
It fixes on the ground, between one group of climbing frame column 102 and one group of brilliant climbing frame 103, one group of brilliant climbing frame
Pass through climbing between 103 and one group of ball-type climbing frame 104, between one group of climbing frame column 102 and one group of ball-type climbing frame 104
Frame connects square steel 101 and connects, and the ball-type climbing frame 104 includes outside ball-type climbing frame column 105, ball-type frame 106 and ball-type
Housing 107, the ball-type climbing frame column 105 be it is cylindric, the ball-type frame 106 and ball-type outer casing 107 are spheroidal,
The ball-type frame 106 is arranged on the outer wall of 105 lower end of ball-type climbing frame column, and the ball-type outer casing 107 is located at
On ball-type frame 106, the ball-type outer casing 107 is equipped with one group of circular open 108, on the ball-type frame 106 with circle
108 corresponding positions be open equipped with adapter flange 109, the ball-type outer casing 107 is connect with adapter flange 109.Climbing frame needle
Different layers height and project grade separation are carried out to the crowd of different age group, one layer of netting climbing carries out the forging of body intelligence for children
Refining;Two layers of climbing project temper its strength and balanced capacity for teenager with this;Three layers of climbing project are carried out for adult
Difficult Self-challenge.Ball-type climbing frame column 105 is equipped with hexagonal pinboard 110, and the hexagonal pinboard 110 includes upper
Connecting plate 111, lower connecting plate 112 and one group of middle connecting plate 113, one group of middle connecting plate 113 are arranged in upper junction plate
Between 111 and lower connecting plate 112, the upper junction plate 111 and lower connecting plate 112 are equipped with one group of protrusion 114, and described one group convex
Portion 114 is arranged in a manner of annular array, and groove 115, the middle connecting plate 113 are equipped between one group of protrusion 114
Between upper junction plate 111 and lower connecting plate 112 groove 115 to position at, one end of climbing frame connection square steel 101 is logical
Bolt is crossed to be fixed on the protrusion 114 of upper junction plate 111 and the protrusion 114 of lower connecting plate 112.Ball-type climbing frame column
105, which are equipped with one group of polygon, climbs platform 116, and the polygon climbing platform 116 is located at 106 top of ball-type frame.Ball-type
Climbing frame column 105 is equipped with one group of Succor plain stage 117, and the Succor plain stage 117 is located at 106 top of ball-type frame.It is brilliant
Climbing frame 103 includes brilliant climbing frame column 118, brilliant frame 119 and fence 120, the brilliant climbing frame column
118 is cylindrical, and the section of the brilliant frame 119 is positive polygonal, the brilliant frame 119 and brilliant climbing frame
The outer wall of column 118 connects, and the fence 120 is arranged on brilliant frame 119.Brilliant climbing frame column 118 is equipped with
Hexagonal pinboard 110.Brilliant climbing frame column 118 is equipped with one group of polygon climbing platform 116 and one group of Succor plain stage
117, the polygon climbing platform 116 and Succor plain stage 117 are located at brilliant 119 top of frame.Ball-type climbing frame column 105
Safe rescue band 121 is equipped with the upper end of brilliant climbing frame column 118.The upper end of climbing frame column 102 is equipped with hexagonal
Pinboard 110.
Tracks travel trolley 207 as shown in figures 15-19 includes sliding 401, one group of first compression position-limited wheel of frame
402, one group of second 403, one group first of compression position-limited wheel, 404, one group second of sliding wheel sliding wheel 405 and shackle 406, the cunning
The upper end of driving frame 401 is equipped with the first opening 407, one group of first compression position-limited wheel 402 and one group of second compression limit
Position wheel 403 is arranged in by pinboard slides frame 401 in the both ends of the surface at the first opening 407, and first compresses
Position-limited wheel 402 and the second compression position-limited wheel 403 are symmetrical arranged, and frame 401 is being slided in one group of first sliding wheel 404 setting
On the end face of the first opening 407, and one group of first sliding wheel 404 and one group of first compression position-limited wheel 402 are positioned at same
Side, one group of second sliding wheel 405, which is arranged in, slides frame 401 on the end face of the first opening 407, and one group the
Two sliding wheels 405 and one group of second compression position-limited wheel 403 are located at the same side, and the shackle 406 is arranged on sliding frame 401
With the first 407 opposite other ends of opening, one group of first compression position-limited wheel, 402, one group of second compression position-limited wheel 403, one
The first sliding wheel 404 of group and one group of second sliding wheel 405 can offset with track.Sliding frame 401 includes the first fixed peace
Loading board 408, the second fixed mounting plate 409, shackle mounting plate 410 and one group of connecting plate 411, first fixed mounting plate 408
Section with the second fixed mounting plate 409 is circular ring shape, and the first fixed mounting plate 408 and the second fixed mounting plate 409
It is equipped with the first opening 407, one group of connecting plate 411 is arranged in the first fixed mounting plate 408 and the second fixed mounting plate 409
Between, the shackle mounting plate 410 is arranged on one group of connecting plate 411, and shackle mounting plate 410 is located at first and is fixedly mounted
Middle position between plate 408 and the second fixed mounting plate 409, the shackle 406 are arranged on shackle mounting plate 410.First
The axis of fixed mounting plate 408 and the axis of the second fixed mounting plate 409 are on same axis, one group of connecting plate 411
Along being arranged radially for the first fixed mounting plate 408.Connecting plate 411 in one group of connecting plate 411 at the first opening 407
It is equipped with and compresses position-limited wheel mounting base 412, the compression position-limited wheel mounting base 412 is horizontally disposed.One group of first compression limit
Position wheel 402 and one group of second compression position-limited wheel 403, which are separately positioned on, to be compressed in position-limited wheel mounting base 412.One group of connecting plate
One group of first sliding wheel 404 and one group of second sliding wheel are respectively equipped on the connecting plate 411 of first 407 two sides of opening on 411
405, one group of first sliding wheel 404 sets up the two sides that position-limited wheel 402 is compressed at one group first, one group of second sliding wheel separately
405 set up the two sides that position-limited wheel 403 is compressed at one group second separately.The number of one group of connecting plate 411 is 4, described one group the
The number of one compression position-limited wheel 402 and one group of second compression position-limited wheel 403 is respectively 1, and first slides on the connecting plate 411
The number of wheel 404 is respectively 2, and the number of second sliding wheel 405 is respectively 2 on the connecting plate 411, the connecting plate
411 are equipped with the first sliding wheel 404 and the second sliding wheel 405 along axial same section, and connecting plate 411 is along the same of axial direction
The first sliding wheel 404 and the second sliding wheel 405 on one section are located on same circumference.Described first compresses 402 He of position-limited wheel
Second compresses middle position of the position-limited wheel 403 between the first fixed mounting plate 408 and the second fixed mounting plate 409.It is described
Connecting plate 411 and compression position-limited wheel mounting base 412 are equipped with hex bolts 413, one group of first compression position-limited wheel 402, one
Group second compresses 403, one group of first sliding wheel 404 of position-limited wheel and one group of second sliding wheel 405 is equipped with deep groove ball bearing 414,
Described one group of first compression position-limited wheel, 402, one group of second 403, one group of first sliding wheel 404 of compression position-limited wheel and one group of second cunning
Row wheel 405 is connect by deep groove ball bearing 414 with hex bolts 413, and the hex bolts 413 is equipped with locking nut 415.Institute
It states one group of first compression position-limited wheel, 402, one group of second 403, one group of first sliding wheel 404 of compression position-limited wheel and one group second is slided
Wheel 405 is polyester ammonia wheel.
The sky gliding track 201 applied as shown in figure 20 for the tracks travel trolley of the application, first compresses position-limited wheel
402 and one group of second compression position-limited wheel 403 be pressed on vertical plane 2011 from two sides, one group of first sliding wheel 404 and one group
Two sliding wheels 405 are pressed in cambered surface 2012, and sky glides track 201 as incline structure, and safety jaw is arranged in shackle 406
Tool after people has dressed suspender, is slided by tracks travel trolley along inclined sky gliding track 201, the sense of familiarization flight
Feel, increases interest.
The lifting device of slide trolley in the gliding amusement facility of the sky as shown in Figure 19-27, including promote main girder frame
601, one group of guide rail, 602, one groups of sliding blocks 603, installation mainboard 604, slide trolley promote docking orbit 605, promote servo motor
606, driving gear 607 and lifting rack 608 are promoted, the two sides of main girder frame 601 along its length that promoted are equipped with guide rail
602, the lifting rack 608 is fixed in promotion main girder frame 601 along its length along main girder frame 601 is promoted, the cunning
Block 603 is arranged on guide rail 602, and the installation mainboard 604 is fixedly connected in one group of sliding block 603, the slide trolley promotion pair
Integrate with 605 and promoted servo motor 606 be fixed at installation mainboard 604 on, the promotion driving gear 607 is watched with promotion
The shaft connection of motor 606 is taken, and the shaft for promoting servo motor 606 can drive and promote the rotation of driving gear 607, it is described to mention
It rises driving gear 607 to engage with lifting rack 608, the slide trolley promotes settable slide trolley on docking orbit 605.Its
In, it promotes main girder frame 601 and is arranged along the vertical direction, the lifting rack 608, which is located at, to be promoted between 601 upper rail 602 of main girder frame
Position.Promoted it is evenly spaced along its length in main girder frame 601 be equipped with one group of promotion main girder frame mounting plate 609, described one group
It promotes main girder frame mounting plate 609 to be bolted on the frame body of glide, the promotion main girder frame 601 is square steel.It is sliding
It includes docking orbit mounting plate 613 and docking orbit ontology 614, the docking orbit installation that row trolley, which promotes docking orbit 605,
Plate 613 is fixed by screws on installation mainboard 604, and one end of the docking orbit ontology 614 is welded on docking orbit installation
On plate 613, slide trolley can be arranged on the docking orbit ontology 614.Docking orbit ontology 614 includes 615 He of planar tracks
One end of circular orbit 616, the planar tracks 615 is connect with the outer wall of circular orbit 616.
On the basis of above structure, the lifting device of slide trolley is fixed on along the vertical direction as shown in figs 24-26
On the frame body of sky dragging track, after the personnel that play reach dragging track terminal, staff removes slide trolley, and places
It onto slide trolley promotion docking orbit 605, promotes servo motor 606 and starts, driving promotes driving gear 607 along promotion tooth
Item 608 moves up, and in moving process, one group of guide rail 602 can keep the stability of installation mainboard 604, and installation mainboard 604 is mobile
To dragging track initial position, slide trolley is promoted from slide trolley and is removed on docking orbit 605 by staff, and promotion is watched
It takes the driving installation mainboard 604 of motor 606 and is lowered back to original initial position, constantly circulation is gone up and down, so that continual will slide
Row trolley transports back initial position from terminal position automatically, and for travelling, personnel are used.
The sky as shown in Figure 28-35 circles in the air the security system of slide trolley, including sky gliding track 201, track are sliding
Row trolley 207 and one group of stop assembly 801, the sky gliding track 201 are erected on frame body, the tracks travel trolley
207 settings are glided on track 201 on high, and tracks travel trolley 207 can be slided along sky gliding track 201, and described one
Group stop assembly 801 is set gradually to glide on track 201 on high, and the starting point of sky gliding track 201 and end section
It is equipped with stop assembly 801;Wherein, the stop assembly 801 includes stop mounting blocks 802, brake block 803, electromagnetic module
804, shoulder bolt 805 and locking nut 1, the stop mounting blocks 802 are glided on high by screw bolt and nut fixation
On the upper surface of track 201, the electromagnetic module 804 is fixed on stop mounting blocks 802, and the shoulder bolt 805 is set
It sets on stop mounting blocks 802, and shoulder bolt 805 is located at stop mounting blocks 802 along the initial of tracks travel trolley 207
Stop mounting blocks 802, the locking nut 1 and 805 screw thread of shoulder bolt are stretched out in end, the both ends of the shoulder bolt 805
Connection, the brake block 803 is set in shoulder bolt 805 and stretches out on the both ends of stop mounting blocks 802, and brake block 803
It can be rotated around shoulder bolt 805, the upper surface of the brake block 803 is bonded with electromagnetic module 804, and electromagnetic module 804 can
Absorption or release brake block 803.In addition, the starting point of the sky gliding track 201 is equipped with traffic lights display 1.
The sky gliding track 201 slides end equipped with traffic lights display 2 817.The starting of the sky gliding track 201
End is equipped with traffic lights and incudes optocoupler 1, and the end of sliding of the sky gliding track 201 incudes optocoupler two equipped with traffic lights
819.Electromagnetic module mounting plate 807 is fixed on the upper surface of stop mounting blocks 802, the electromagnetic module 804 is fixedly installed
On electromagnetic module mounting plate 807.Brake block 803 includes electromagnetic adsorption plate 808 and stop fork 809, the electromagnetic adsorption plate 808
Stop fork 809 is set on the end face of electromagnetic module 804, the stop fork 809 is erected on shoulder bolt 805, described
Tracks travel trolley 207 can pitch 809 with stop and contact.Electromagnetic adsorption plate 808 includes electromagnetic adsorption plate ontology 810 and extension board
811, the section of the electromagnetic adsorption plate ontology 810 is sector, and the extension board 811 is symmetricly set on electromagnetic adsorption plate ontology
810 both ends, and extension board 811 sets up separately in the two sides of stop mounting blocks 802, and the extension board 811 and stop fork 809 are symmetrical
Setting, the electromagnetic adsorption plate ontology 810 are bonded with electromagnetic module 804.The upper surface of stop mounting blocks 802 is equipped with baffle 812,
The baffle 812 is located between electromagnetic module 804 and electromagnetic adsorption plate ontology 810, and the electromagnetic adsorption plate ontology 810 can be with gear
Plate 812 contacts.The upper end-face edge of sky gliding track 201 is equipped with one group of permanent magnetism and buffers mounting plate 813, the permanent magnetism buffering peace
Loading board 813 is equipped with permanent magnetism 1.Also, tracks travel trolley 207 is equipped with permanent magnetism 2 815.The principle of deceleration buffer is,
Permanent magnetism 2 815 converts kinetic energy into thermal energy, root with the mutual magnetic strength wire cutting of permanent magnetism 1 on track on tracks travel trolley 207
According to law of conservation of energy, thermal energy increases, and kinetic energy is reduced, therefore plays the role of the reduction of speed of tracks travel trolley 207.Electromagnetism stop group
Part is exactly that normal condition electromagnetic module 804 is charged, and baffle is sucked electromagnet, and trolley cannot pass through, when operator is by decentralization
After row button, electromagnet power-off, baffle without adsorption capacity, trolley normal through.
As shown in figure 28, it is equipped with several dragging track support columns 820 on the ground, passes through hoist cable 821 and sky gliding rail
Road 201 connects, thus in the sky by the suspention of sky gliding track 201, so that tracks travel trolley 207 can be along inclined day
Sky gliding 201 quick sliding of track, this part is not belonging to the main points of present patent application, and exists in the prior art a variety of more
The gliding track supporting way of sample loading mode.
The above is only a preferred embodiment of the present invention, it is noted that for the ordinary skill people of the art
For member, without departing from the principle of the present invention, several improvement can also be made, these improvement also should be regarded as of the invention
Protection scope.
Claims (10)
1. a kind of multipurpose tower for having both multiple items of recreation, it is characterised in that: including central tower (100) and climbing frame (200),
The climbing frame (200) connect with central tower (100);
Wherein, the central tower (100) includes sky gliding track (201), jumps tower (202), central tower ontology (203), center
The straight slide of tower (204), central tower Revolving slide (205), sky gliding platform (206) and tracks travel trolley (207), the day
Sky gliding track (201) is obliquely installed in flexure type, the lower end of the sky gliding platform (206) and central tower ontology (203)
One end of portion's connection, sky gliding track (201) is fixed on the upper end of central tower ontology (203), and sky is sliding
The other end of Xiang track (201) may pass through on the lower end of sky gliding platform (206) centrally disposed tower ontology (203), institute
It states on the upper end for jumping tower (202) centrally disposed tower ontology (203), the straight slide of central tower (204) and central tower rotation
The upper end of slide (205) is connect with central tower ontology (203), and the straight slide of central tower (204) and central tower rotation are slided
The other end of terraced (205) as on ground, glide on track (201) on high by tracks travel trolley (207) setting, and
Tracks travel trolley (207) can be slided along sky gliding track (201);
The climbing frame (200) includes one layer of climbing netting structure, two layers of climbing netting structure and three layers of climbing netting structure, institute
Two layers of climbing netting structure setting are stated in one layer of climbing netting structure, three layers of climbing netting structure setting is climbed at two layers
In netting structure, ladder (10) are equipped with before two layers of climbing netting structure and three layers of climbing netting structure;Wherein, described one
The structure that layer climbing netting structure, two layers of climbing netting structure climb netting structure with three layers includes that one group of climbing frame connects square steel
(101), one group of climbing frame column (102), one group of brilliant climbing frame (103) and one group of ball-type climbing frame (104), described one group
The lower end of climbing frame column (102), one group of brilliant climbing frame (103) and one group of ball-type climbing frame (104) passes through bolt
It fixes on the ground, between one group of climbing frame column (102) and one group of brilliant climbing frame (103), one group brilliant to be climbed
Between climbing frame (103) and one group of ball-type climbing frame (104), one group of climbing frame column (102) and one group of ball-type climbing frame (104) it
Between by climbing frame connection square steel (101) connection, the ball-type climbing frame (104) includes ball-type climbing frame column (105), ball
Type frame (106) and ball-type outer casing (107), the ball-type climbing frame column (105) are cylindric, the ball-type frame
(106) and ball-type outer casing (107) is spheroidal, and the ball-type frame (106) is arranged in ball-type climbing frame column (105) lower end
On the outer wall in portion, the ball-type outer casing (107) is located on ball-type frame (106), and the ball-type outer casing (107) is equipped with
One group of circular open (108) is equipped with adapter flange with circular open (108) corresponding position on the ball-type frame (106)
(109), the ball-type outer casing (107) connect with adapter flange (109).
2. the multipurpose tower according to claim 1 for having both multiple items of recreation, it is characterised in that: the central tower ontology
It (203) include central tower frame (208), the first platform of central tower (209), the second platform of central tower (210) and central tower third
Platform (211), first platform of central tower (209), the second platform of central tower (210) and central tower third platform (211) are pressed
It is successively set on central tower frame (208) according to sequence from top to bottom, one end and center of sky gliding platform (206)
The edge of tower third platform (211) connects, on centrally disposed first platform of tower (209) of jump tower (202), the central tower
Straight slide (204), central tower Revolving slide (205) are connect with central tower third platform (211).
3. the multipurpose tower according to claim 1 for having both multiple items of recreation, it is characterised in that: the central tower frame
It (208) include central tower intermediate studdle (212), one group of connecting square pipes (213), one group of central tower internal layer support column (214) and one
Group central tower outer layer support column (215), the central tower intermediate studdle (212) and one group of central tower internal layer support column (214) it
Between, between central tower intermediate studdle (212) and one group of central tower outer layer support column (215), one group of central tower internal layer support column
(214) pass through one group of connecting square pipes (213) connection, one group of center between one group of central tower outer layer support column (215)
Tower internal layer support column (214) is arranged on the circumference centered on central tower intermediate studdle (212), one group of central tower outer layer
Support column (215) is arranged on the circumference centered on central tower intermediate studdle (212), and one group of central tower internal layer support column
(214) it is arranged in a manner of annular array with one group of central tower outer layer support column (215).
4. the multipurpose tower according to claim 1 for having both multiple items of recreation, it is characterised in that: the jump tower (202)
Including jumping tower frame (223), jumping tower support beam (224) and reduction of speed device (225), described one end for jumping tower support beam (224)
The other end for being fixed on the top for jumping tower frame (223), and jumping tower support beam (224), which stretches out, jumps tower frame (223) outside,
Reduction of speed device (225) setting is on jumping the end that tower frame (223) are jumped in tower support beam (224) stretching, and reduction of speed device
(225) it is equipped with safety belt, jump tower frame (223) is bolted on the table top of the first platform of central tower (209).
5. the multipurpose tower according to claim 1 for having both multiple items of recreation, it is characterised in that: the ball-type climbing frame
Column (105) is equipped with hexagonal pinboard (110), and the hexagonal pinboard (110) includes upper junction plate (111), lower connecting plate
(112) it is arranged with one group of middle connecting plate (113), one group of middle connecting plate (113) in upper junction plate (111) and lower connection
Between plate (112), the upper junction plate (111) and lower connecting plate (112) are equipped with one group of protrusion (114), one group of protrusion
(114) it is arranged in a manner of annular array, is equipped with groove (115) between one group of protrusion (114), the middle connecting plate
(113) between upper junction plate (111) and lower connecting plate (112) groove (115) institute to position at, the climbing frame connection side
One end of steel (101), which is bolted, to be arranged in the protrusion (114) of upper junction plate (111) and the protrusion of lower connecting plate (112)
(114) on.
6. the multipurpose tower according to claim 5 for having both multiple items of recreation, it is characterised in that: the brilliant climbing
Frame (103) includes brilliant climbing frame column (118), brilliant frame (119) and fence (120), the brilliant climbing frame
Column (118) is cylindrical, and the section of the brilliant frame (119) is positive polygonal, the brilliant frame (119) and more
The outer wall of face type climbing frame column (118) connects, and the fence (120) is arranged on brilliant frame (119).
7. the multipurpose tower according to claim 1 for having both multiple items of recreation, it is characterised in that: the tracks travel is small
Vehicle (207) includes sliding frame (401), one group of first compression position-limited wheel (402), one group of second compression position-limited wheel (403), one
Group the first sliding wheel (404), one group of second sliding wheel (405) and shackle (406), the upper end for sliding frame (401)
Equipped with the first opening (407), one group of first compression position-limited wheel (402) and one group of second compression position-limited wheel (403) are by turning
Fishplate bar setting is sliding frame (401) in the both ends of the surface at the first opening (407), and first compresses position-limited wheel
(402) it is symmetrical arranged with the second compression position-limited wheel (403), frame is being slided in one group of first sliding wheel (404) setting
(401) it is located on the end face of the first opening (407), and one group of first sliding wheel (404) and one group of first compression position-limited wheel
(402) it is located at the same side, one group of second sliding wheel (405) setting is sliding frame (401) positioned at the first opening (407)
End face on, and one group of second sliding wheel (405) and one group of second compression position-limited wheel (403) are located at the same side, the shackle
(406) other end opposite with the first opening (407), one group of first compression limit are set on sliding frame (401)
Take turns (402), one group of second compression position-limited wheel (403), one group of first sliding wheel (404) and one group of second sliding wheel (405)
It offsets with track.
8. the multipurpose tower according to claim 7 for having both multiple items of recreation, it is characterised in that: described to slide frame
It (401) include the first fixed mounting plate (408), the second fixed mounting plate (409), shackle mounting plate (410) and one group of connecting plate
(411), the section of first fixed mounting plate (408) and the second fixed mounting plate (409) is circular ring shape, and first is solid
Dingan County's loading board (408) and the second fixed mounting plate (409) are equipped with the first opening (407), one group of connecting plate (411) setting
Between the first fixed mounting plate (408) and the second fixed mounting plate (409), the shackle mounting plate (410) is arranged at one group
On connecting plate (411), and shackle mounting plate (410) is located at the first fixed mounting plate (408) and the second fixed mounting plate (409)
Between middle position, the shackle (406) is arranged on shackle mounting plate (410).
9. the multipurpose tower according to claim 8 for having both multiple items of recreation, it is characterised in that: the described first fixed peace
The axis of loading board (408) and the axis of the second fixed mounting plate (409) are on same axis, one group of connecting plate (411)
Along being arranged radially for the first fixed mounting plate (408).
10. the multipurpose tower according to claim 9 for having both multiple items of recreation, it is characterised in that: one group of connection
Connecting plate (411) in plate (411) at the first opening (407), which is equipped with, compresses position-limited wheel mounting base (412), the compression
Position-limited wheel mounting base (412) is horizontally disposed, one group of first compression position-limited wheel (402) and one group of second compression position-limited wheel
(403) it is separately positioned on and compresses on position-limited wheel mounting base (412).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910781472.8A CN110496398A (en) | 2019-08-23 | 2019-08-23 | A kind of multipurpose tower having both multiple items of recreation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910781472.8A CN110496398A (en) | 2019-08-23 | 2019-08-23 | A kind of multipurpose tower having both multiple items of recreation |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110496398A true CN110496398A (en) | 2019-11-26 |
Family
ID=68589088
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910781472.8A Withdrawn CN110496398A (en) | 2019-08-23 | 2019-08-23 | A kind of multipurpose tower having both multiple items of recreation |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110496398A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111298451A (en) * | 2020-02-27 | 2020-06-19 | 北京鑫特乐教玩具有限公司 | Outdoor climbing playing facility for improving applicable crowds |
-
2019
- 2019-08-23 CN CN201910781472.8A patent/CN110496398A/en not_active Withdrawn
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111298451A (en) * | 2020-02-27 | 2020-06-19 | 北京鑫特乐教玩具有限公司 | Outdoor climbing playing facility for improving applicable crowds |
CN111298451B (en) * | 2020-02-27 | 2021-06-01 | 北京鑫特乐教玩具有限公司 | Outdoor climbing playing facility for improving applicable crowds |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US4159113A (en) | Child recreation structure | |
US9016210B2 (en) | Tower ride | |
CN110496398A (en) | A kind of multipurpose tower having both multiple items of recreation | |
JP2008188384A (en) | Tower type ferris wheel | |
CN208176948U (en) | A kind of jellyfish shape theme amusement facility | |
CN210845272U (en) | Multi-project multifunctional tower with strong interest | |
CN210751249U (en) | Climbing frame structure of multifunctional large amusement equipment | |
US20180296931A1 (en) | Adventure Park | |
CN112587937B (en) | Bungee sightseeing device | |
CN210751248U (en) | Central tower of multifunctional tower amusement equipment | |
CN108310778A (en) | A kind of amusement slide | |
CN206896801U (en) | A kind of recreation facility of advancing through the rapids just to recoil | |
CN2130103Y (en) | Multifunction playing device | |
CN208193639U (en) | A kind of amusement slide | |
CN2234802Y (en) | Ball car for amusement | |
CN207101870U (en) | A kind of safety-type slide | |
CN106669155B (en) | Spiral of travelling Durchgangshohle system | |
CN206664584U (en) | A kind of high-altitude spiral cable car sightseeing entertainment systems | |
CN108261768B (en) | amusement slide | |
CN216169885U (en) | Combined surfing type water slide | |
CN220257143U (en) | Motor train unit type mountain-climbing grass-sliding plate without damaging grasslands | |
CN218685991U (en) | Ride-through and challenge type combined amusement device | |
CN218248476U (en) | Rotatory amusement equipment based on centrifugal force | |
CN2722984Y (en) | Bungee flying car platform | |
CN208493211U (en) | A kind of rotation train recreational machine |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WW01 | Invention patent application withdrawn after publication | ||
WW01 | Invention patent application withdrawn after publication |
Application publication date: 20191126 |