CN110488217A - A kind of mutual detecting method of multilist of electric energy meter measuring accuracy - Google Patents

A kind of mutual detecting method of multilist of electric energy meter measuring accuracy Download PDF

Info

Publication number
CN110488217A
CN110488217A CN201910783624.8A CN201910783624A CN110488217A CN 110488217 A CN110488217 A CN 110488217A CN 201910783624 A CN201910783624 A CN 201910783624A CN 110488217 A CN110488217 A CN 110488217A
Authority
CN
China
Prior art keywords
electric energy
energy meter
current
current value
load
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910783624.8A
Other languages
Chinese (zh)
Other versions
CN110488217B (en
Inventor
龙翔林
陆聪沛
蒋卫平
章恩友
马益平
钟祖安
张静
姚晓峰
沈叶
寿寅生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ningbo Canaan Intelligent Electrical Ltd By Share Ltd
Original Assignee
Ningbo Canaan Intelligent Electrical Ltd By Share Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ningbo Canaan Intelligent Electrical Ltd By Share Ltd filed Critical Ningbo Canaan Intelligent Electrical Ltd By Share Ltd
Priority to CN201910783624.8A priority Critical patent/CN110488217B/en
Publication of CN110488217A publication Critical patent/CN110488217A/en
Application granted granted Critical
Publication of CN110488217B publication Critical patent/CN110488217B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R35/00Testing or calibrating of apparatus covered by the other groups of this subclass
    • G01R35/04Testing or calibrating of apparatus covered by the other groups of this subclass of instruments for measuring time integral of power or current

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Testing Relating To Insulation (AREA)
  • Locating Faults (AREA)

Abstract

A kind of mutual detecting method of multilist of electric energy meter measuring accuracy, it will be in the load current Ii feedback to the zero curve of next electric energy meter of this table, then there are increments on the zero curve of next electric energy meter, pass through the increment and feedback ratio, the load current Ij of this table can be measured by next electric energy meter, the two current values are theoretically identical, but it is constantly present deviation E, if the metering of a certain electric energy meter there is a problem, when being amplified m times of (or reducing) in sometime its measured value, it can be easy to release the average current value of its own measurement and m times of (or diminution) can be all amplified by the average current value of its upper electric energy meter monitored.The present invention is mutually monitored by electric energy meter in operating status, and real-time with higher can quickly position bug list, reduces metering loss or dispute, and only need to increase several current transformers, cost is relatively low.

Description

A kind of mutual detecting method of multilist of electric energy meter measuring accuracy
Technical field
The present invention relates to a kind of detection methods of the measuring accuracy of electric energy meter.
Background technique
Electric energy meter is a kind of metering product, although all having done sternly in the production of producer, the examination of Utilities Electric Co. etc. link The measuring accuracies of lattice is managed, still, for whether there is measuring accuracy in the process of running certain section of time over range the case where It can not judge.When user has metering misalignment query, Utilities Electric Co. needs to be detected to scene, and one side on-site test must It is detected in the case of must not powering off, because if be that electric energy meter embedded software executive problem powers on and will lead to failure reset and disappear again It loses;On the other hand there is also detection when may electrical energy meter fault it is recovered, the testing result of two kinds of situations can be all judged It is without exception for electric energy meter, truth cannot be reacted.Therefore, it if being able to achieve running measuring accuracy monitoring, is transported to improving The service of inspection is very valuable work.
Summary of the invention
In order to overcome above-mentioned deficiency in the prior art, the present invention provides a kind of one for realizing measuring accuracy in operation and monitoring The mutual detecting method of measuring accuracy multilist of kind electric energy meter.
The present invention is achieved through the following technical solutions:
A kind of mutual detecting method of multilist of electric energy meter measuring accuracy, it is characterised in that: include the following steps, (1) is arranged three or three For electric energy meter more than a as mutually inspection grouping, each electric energy meter measures the load current Ii of this table, and the load of this table is electric Stream is fed back on the zero curve of next electric energy meter, has the neutral line current of next electric energy meter proportional to the load current of this table Increment, calculate the load current Ij that next electric energy meter measures this table using the increment;
(2) the average current value Ai and next electricity that each this table of electric energy meter measures are acquired according to cycle T by acquisition terminal Energy table measures the average current value Aj of this table, and saves, and two groups of average current values of same period are obtained in acquisition terminal Set S=Ai1, Ai2 ..., Ain } and T=Aj1, Aj2 ..., and Ajn }, wherein n is the number of electric energy meter, and S is electricity The average current value set of energy Biao Benbiao measurement, T is the average current value set of this table measured by next electric energy meter;
(3) acquisition terminal can calculate each this table of electric energy meter detected current value and next electric energy according to the corresponding relationship of monitoring The monitoring deviation of table detected current value is denoted as W={ E1, E2 ..., En };
(4) assume that Aik is the average current value that electric energy meter K is measured, Ajk is being averaged by the next table K+1 table K measured Current value can determine that a certain piece of table is asked in the presence of metering in wherein table K, table K+1 if the deviation Ek of two values is more than threshold value E0 Topic;
(5) Aj(k-1) be the table K-1 that table K is measured average current value, Ai(k-1) be the average electricity that table K-1 is measured oneself Flow valuve, if the deviation E(k-1 of two values) also above threshold value E0, it can determine that wherein there are measurement problems by table K.
Preferably, in step (1), the firewire outlet of this table is parallel to by the current transformer that no-load voltage ratio is K next On the zero curve of a electric energy meter.
Preferably, the load of the last one electric energy meter is parallel to first electric energy by current transformer in step (1) On the zero curve of table, make the neutral line current of first electric energy meter that there is the increasing proportional to the load current of the last one electric energy meter Amount, the load current of last electric energy meter is calculated using the increment.
Preferably, the neutral line current increment of next electric energy meter is that its neutral line current subtracts firewire electric current in step (1), By the increment again divided by the no-load voltage ratio K of current transformer, the load current of this table measured by next electric energy meter can be calculated.
By in the load current Ii feedback to the zero curve of next electric energy meter of this table, then deposited on the zero curve of next electric energy meter The load current Ij of this table, the two electric currents can be measured by next electric energy meter by the increment and feedback ratio in increment Value is theoretically identical, but is constantly present deviation E, if the metering of a certain electric energy meter there is a problem, i.e., in certain a period of time Between its measured value when being amplified m times of (or reduce), can be easy to release the average current value of its own measurement and be monitored by it The average current value of a upper electric energy meter can all be amplified m times of (or reduce), then the electric current of itself monitoring and next electric energy meter prison The current value that deviation Ex between the electric current of survey, the upper electric energy meter current monitored by it and a upper electric energy meter oneself monitor it is inclined Poor Ey can be amplified m-1 times of (or diminution).A threshold value E0 is set, when two deviations are above threshold value, then the electric energy meter Metering there is a problem.
This kind of mode, power meter group will at least be arranged three, when only there are two when, can not judge it is specific which be to measure Show problem, only when three or three or more, when being related to the data that the table measures and all there are problems that measurement deviation, and its When his table is normal, then can be concluded that it is that the table measurement problem occurs.
The beneficial effects of the present invention are: the present invention is mutually monitored by electric energy meter in operating status, is had higher Real-time, bug list can quickly be positioned, reduce metering loss or dispute, and only need to increase several electric currents mutual Sensor, cost is relatively low.
Specific embodiment
Invention is described in further detail below by specific embodiment.
Embodiment one: a kind of mutual detecting method of multilist of electric energy meter measuring accuracy includes the following steps, (1) be arranged three or For three or more electric energy meters as mutually inspection grouping, each electric energy meter measures the load current Ii of this table, and this table firewire is gone out Line is parallel on the zero curve of next electric energy meter by the current transformer that no-load voltage ratio is K, makes the neutral line current of next electric energy meter With the increment proportional to the load current of this table, the neutral line current increment of next electric energy meter is that its neutral line current subtracts firewire Electric current can calculate the load of this table measured by next electric energy meter by the increment again divided by the no-load voltage ratio K of current transformer Circuit current Ij.
(2) average current value that each this table of electric energy meter measures is acquired according to cycle T (such as 1 minute) by acquisition terminal Ai and next electric energy meter measure the average current value Aj of this table, and save, and the same period is obtained in acquisition terminal Two groups of average current value S=Ai1, Ai2 ..., Ain } and T=Aj1, Aj2 ..., and Ajn }, wherein n is electric energy meter Number, S are the average current value sets of this table of electric energy meter measurement, and T is the average current of this table measured by next electric energy meter Value set.
(3) acquisition terminal can calculate each this table of electric energy meter detected current value Ai under according to the corresponding relationship of monitoring The detection error of one electric energy meter detected current value Aj is denoted as W={ E1, E2 ..., En }.
(4) assume that Aik is the average current value that electric energy meter K is measured, Ajk is the table K measured by next table K+1 Average current value can determine in wherein table K, table K+1 a certain piece of table presence if the deviation Ek of two values are more than threshold value E0 Measurement problem.
(5) Aj(k-1) be the table K-1 that table K is measured average current value, Ai(k-1) to be that table K-1 is measured oneself flat Equal current value, if the deviation E(k-1 of two values) also above threshold value E0, it can determine that wherein there are measurement problems by table K.
According to the above method, when the last one electric energy meter, load is parallel to first electric energy meter by current transformer On zero curve, make the neutral line current of first electric energy meter that there is the increment proportional to the load current of the last one electric energy meter, benefit The load current of last electric energy meter is calculated with the increment.Certainly, electric energy meter can also be grouped, and every group 3 or more electric energy meters are It can.
By in the load current Ii feedback to the zero curve of next electric energy meter of this table, then deposited on the zero curve of next electric energy meter The load current Ij of this table, the two electric currents can be measured by next electric energy meter by the increment and feedback ratio in increment Value is theoretically identical, but is constantly present deviation E, if the metering of a certain electric energy meter there is a problem, i.e., in certain a period of time Between its measured value when being amplified m times of (or reduce), can be easy to release the average current value of its own measurement and be monitored by it The average current value of a upper electric energy meter can all be amplified m times of (or reduce), then the electric current of itself monitoring and next electric energy meter prison The current value that deviation Ex between the electric current of survey, the upper electric energy meter current monitored by it and a upper electric energy meter oneself monitor it is inclined Poor Ey can be amplified m-1 times of (or diminution).A threshold value E0 is set, when two deviations Ex and Ey are above threshold value E0, then should The metering of electric energy meter there is a problem.
This kind of mode, power meter group will at least be arranged 3, when only 2, can not judge that specifically which is that metering occurs Problem, only when 3 or 3 or more, when being related to the data that the table measures and all there are problems that measurement deviation, and other tables When normal, then can be concluded that it is that the table measurement problem occurs.
The present invention is mutually monitored by electric energy meter in operating status, and real-time with higher can be to bug list It is quickly positioned, reduces metering loss or dispute, and only need to increase several current transformers, cost is relatively low.

Claims (4)

1. a kind of mutual detecting method of multilist of electric energy meter measuring accuracy, it is characterised in that: include the following steps, (1) be arranged three or As mutually inspection grouping, each electric energy meter measures the load current Ii of this table for three or more electric energy meters, and by the load of this table On the zero curve of the next electric energy meter of current feedback, make the neutral line current of next electric energy meter have with the load current of this table at than The increment of example, calculates the load current Ij that next electric energy meter measures this table using the increment;
(2) the average current value Ai and next electricity that each this table of electric energy meter measures are acquired according to cycle T by acquisition terminal Energy table measures the average current value Aj of this table, and saves, and two groups of average current values of same period are obtained in acquisition terminal Set S=Ai1, Ai2 ..., Ain } and T=Aj1, Aj2 ..., and Ajn }, wherein n is the number of electric energy meter, and S is electricity The average current value set of energy Biao Benbiao measurement, T is the average current value set of this table measured by next electric energy meter;
(3) acquisition terminal can calculate each this table of electric energy meter detected current value and next electric energy according to the corresponding relationship of monitoring The monitoring deviation of table detected current value is denoted as W={ E1, E2 ..., En };
(4) assume that Aik is the average current value that electric energy meter K is measured, Ajk is being averaged by the next table K+1 table K measured Current value can determine that a certain piece of table is asked in the presence of metering in wherein table K, table K+1 if the deviation Ek of two values is more than threshold value E0 Topic;
(5) Aj(k-1) be the table K-1 that table K is measured average current value, Ai(k-1) be the average electricity that table K-1 is measured oneself Flow valuve, if the deviation E(k-1 of two values) also above threshold value E0, it can determine that wherein there are measurement problems by table K.
2. a kind of mutual detecting method of multilist of electric energy meter measuring accuracy according to claim 1, it is characterised in that: step (1) In, the firewire outlet of this table is parallel on the zero curve of next electric energy meter by the current transformer that no-load voltage ratio is K.
3. a kind of mutual detecting method of multilist of electric energy meter measuring accuracy according to claim 2, it is characterised in that: step (1) In, the load of the last one electric energy meter is parallel on the zero curve of first electric energy meter by current transformer, and first electric energy is made The neutral line current of table has the increment proportional to the load current of the last one electric energy meter, calculates last electric energy using the increment The load current of table.
4. a kind of mutual detecting method of multilist of electric energy meter measuring accuracy according to claim 3, it is characterised in that: step (1) In, the neutral line current increment of next electric energy meter is that its neutral line current subtracts firewire electric current, by the increment again divided by current transformer No-load voltage ratio K, the load current of this table measured by next electric energy meter can be calculated.
CN201910783624.8A 2019-08-23 2019-08-23 Multi-meter mutual detection method for metering accuracy of electric energy meter Active CN110488217B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910783624.8A CN110488217B (en) 2019-08-23 2019-08-23 Multi-meter mutual detection method for metering accuracy of electric energy meter

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910783624.8A CN110488217B (en) 2019-08-23 2019-08-23 Multi-meter mutual detection method for metering accuracy of electric energy meter

Publications (2)

Publication Number Publication Date
CN110488217A true CN110488217A (en) 2019-11-22
CN110488217B CN110488217B (en) 2021-06-22

Family

ID=68553267

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910783624.8A Active CN110488217B (en) 2019-08-23 2019-08-23 Multi-meter mutual detection method for metering accuracy of electric energy meter

Country Status (1)

Country Link
CN (1) CN110488217B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111239673A (en) * 2020-02-07 2020-06-05 云南电网有限责任公司电力科学研究院 System and method for detecting residual current metering precision of electric energy meter

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101644753A (en) * 2009-08-20 2010-02-10 宁波三星电气股份有限公司 Debugging method of centralized meter reading system
CN201438214U (en) * 2009-07-22 2010-04-14 广州市格宁电气有限公司 Multi-meter parallel testing system for testing kilowatt-hour meters
CN102236086A (en) * 2010-04-29 2011-11-09 杭州市电力局 Method and device for inspecting electric energy meter
CN203414541U (en) * 2013-08-08 2014-01-29 杭州艾能纪企业管理咨询有限公司 Integrated electric balance testing system
CN103792420A (en) * 2014-01-26 2014-05-14 威胜集团有限公司 Electricity larceny preventing and electricity utilization monitoring method based on load curves
WO2014117985A1 (en) * 2013-01-29 2014-08-07 Itron France Method and apparatus for current correction
CN104020367A (en) * 2013-03-01 2014-09-03 北海市聚志电子科技有限公司 Transformer area user automatic identification system
CN204287470U (en) * 2014-12-22 2015-04-22 潍坊五洲浩特电气有限公司 A kind of electric energy meter current impact experiment apparatus
CN105023421A (en) * 2015-07-28 2015-11-04 夏浩嘉 Ammeter monitoring method, device and system
CN107240247A (en) * 2017-07-14 2017-10-10 杭州钛比科技有限公司 A kind of ammeter data acquisition system based on NB IoT
CN108008341A (en) * 2017-12-25 2018-05-08 黑龙江龙电电气有限公司 A kind of adjusting process of electric energy meter

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201438214U (en) * 2009-07-22 2010-04-14 广州市格宁电气有限公司 Multi-meter parallel testing system for testing kilowatt-hour meters
CN101644753A (en) * 2009-08-20 2010-02-10 宁波三星电气股份有限公司 Debugging method of centralized meter reading system
CN102236086A (en) * 2010-04-29 2011-11-09 杭州市电力局 Method and device for inspecting electric energy meter
WO2014117985A1 (en) * 2013-01-29 2014-08-07 Itron France Method and apparatus for current correction
CN104020367A (en) * 2013-03-01 2014-09-03 北海市聚志电子科技有限公司 Transformer area user automatic identification system
CN203414541U (en) * 2013-08-08 2014-01-29 杭州艾能纪企业管理咨询有限公司 Integrated electric balance testing system
CN103792420A (en) * 2014-01-26 2014-05-14 威胜集团有限公司 Electricity larceny preventing and electricity utilization monitoring method based on load curves
CN204287470U (en) * 2014-12-22 2015-04-22 潍坊五洲浩特电气有限公司 A kind of electric energy meter current impact experiment apparatus
CN105023421A (en) * 2015-07-28 2015-11-04 夏浩嘉 Ammeter monitoring method, device and system
CN107240247A (en) * 2017-07-14 2017-10-10 杭州钛比科技有限公司 A kind of ammeter data acquisition system based on NB IoT
CN108008341A (en) * 2017-12-25 2018-05-08 黑龙江龙电电气有限公司 A kind of adjusting process of electric energy meter

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
XIN LIU 等: "Life character analysis methods of storage electronic components", 《2011 INTERNATIONAL CONFERENCE ON QUALITY, RELIABILITY, RISK, MAINTENANCE, AND SAFETY ENGINEERING》 *
姜玉晗 等: "电能计量装置远程自动检测系统的设计研制", 《科技信息》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111239673A (en) * 2020-02-07 2020-06-05 云南电网有限责任公司电力科学研究院 System and method for detecting residual current metering precision of electric energy meter

Also Published As

Publication number Publication date
CN110488217B (en) 2021-06-22

Similar Documents

Publication Publication Date Title
US20100188240A1 (en) Continuous condition monitoring of transformers
CN103176142B (en) A kind of photovoltaic electric station grid connection adaptive testing method
CN102981049B (en) Frequency detection method used for microgrid system
CN107727963B (en) The electrical quantities measurement fault distinguishing method verified based on historical data sample and algorithm
CN105954632A (en) Zinc oxide lightning arrester on-line monitoring and diagnostic method
CN107359612A (en) A kind of comprehensive estimation method of quality of power supply to power distribution network energy consumption
Frankie et al. PMU data validation at ISO New England
CN109116156A (en) A kind of method and apparatus that transmission line of electricity line loss is determined based on mutual inductor output signal
CN110082700A (en) A kind of electric energy meter measurement error on-line monitoring circuit and method based on CT sampling
KR101728690B1 (en) Real-time anomaly notice system and method in solar energy generation
Silsüpür et al. Flicker source detection methods based on IEC 61000-4-15 and signal processing techniques–a review
CN109888729A (en) A kind of early warning type transformer protection method and device
Eslami et al. A probabilistic approach for the evaluation of fault detection schemes in microgrids
CN110488217A (en) A kind of mutual detecting method of multilist of electric energy meter measuring accuracy
CN113376561B (en) Electric energy metering device remote calibration system based on peer comparison mode
CN105589052B (en) A kind of CVT capacitance on-line monitoring methods based on residual voltage monitoring
CN106787896B (en) It avoids blow-out angular measurement abnormal circuit and avoids direct current transportation commutation failure circuit
CN106646007A (en) HVDC thyristor level damping loop dynamic parameter on-line monitoring method
CN106505530B (en) A kind of guard method of the low-voltage distribution cabinet based on SVG grid connection test and device
US20210396790A1 (en) Method and device for approximately determining voltages at a high-voltage side of a transformer
CN201011520Y (en) Three-phase electric energy meter
CN103606950A (en) Island detection method of distributed wind-power converter
CN106767375B (en) Three-phase transformer winding deformation on-line monitoring method based on short circuit impedance method
CN106814278A (en) Plant stand take out can it is high anti-once and secondary current loop Site Detection and determination methods
CN103245842B (en) 10 ~ 35kV new clothes electric device total system dry run detection method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant