CN110485760A - A kind of burn-in chamber convenient for Fast Installation - Google Patents

A kind of burn-in chamber convenient for Fast Installation Download PDF

Info

Publication number
CN110485760A
CN110485760A CN201910808391.2A CN201910808391A CN110485760A CN 110485760 A CN110485760 A CN 110485760A CN 201910808391 A CN201910808391 A CN 201910808391A CN 110485760 A CN110485760 A CN 110485760A
Authority
CN
China
Prior art keywords
room body
burn
aging room
chamber
aging
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910808391.2A
Other languages
Chinese (zh)
Inventor
吕东贤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GUANGZHOU CHANGQI AUTOMATION TECHNOLOGY Co Ltd
Original Assignee
GUANGZHOU CHANGQI AUTOMATION TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUANGZHOU CHANGQI AUTOMATION TECHNOLOGY Co Ltd filed Critical GUANGZHOU CHANGQI AUTOMATION TECHNOLOGY Co Ltd
Priority to CN201910808391.2A priority Critical patent/CN110485760A/en
Publication of CN110485760A publication Critical patent/CN110485760A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/343Structures characterised by movable, separable, or collapsible parts, e.g. for transport
    • E04B1/34315Structures characterised by movable, separable, or collapsible parts, e.g. for transport characterised by separable parts
    • E04B1/34321Structures characterised by movable, separable, or collapsible parts, e.g. for transport characterised by separable parts mainly constituted by panels
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/74Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls
    • E04B1/76Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls specifically with respect to heat only
    • E04B1/762Exterior insulation of exterior walls
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H1/00Buildings or groups of buildings for dwelling or office purposes; General layout, e.g. modular co-ordination or staggered storeys
    • E04H1/12Small buildings or other erections for limited occupation, erected in the open air or arranged in buildings, e.g. kiosks, waiting shelters for bus stops or for filling stations, roofs for railway platforms, watchmen's huts or dressing cubicles
    • E04H1/125Small buildings, arranged in other buildings

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Electromagnetism (AREA)
  • Acoustics & Sound (AREA)
  • Testing Resistance To Weather, Investigating Materials By Mechanical Methods (AREA)

Abstract

A kind of burn-in chamber convenient for Fast Installation, including following preparation step: prefabricated aging room body Metal plate;The prepackage of aging room body;The assembly of aging room body;Assembling aging room body is simultaneously transported;Aging room body split is assembled into burn-in chamber.Prefabrication production efficiency can be improved convenient for the burn-in chamber of Fast Installation to improve complete machine packaging efficiency in this, it decomposes prefabricated, the preparation of aging room body is completed in the factory, assembling need to be only put in the field, greatly improve the packaging efficiency at scene, reduce the production cycle, save space and material, operating expenses is effectively reduced and reduces built-up time.

Description

A kind of burn-in chamber convenient for Fast Installation
Technical field
The present invention relates to burn-in chamber preparation technical field, especially a kind of burn-in chamber convenient for Fast Installation.
Background technique
Burn-in chamber is the equipment that a kind of high temperature, adverse circumstances test are simulated for electronic product, is to improve product to stablize The experimental facilities of property, reliability.Because burn-in chamber volume is larger, if complete machine production is completed in factory, being can not complete machine transport Client's use site is transported to complete machine.So traditional burn-in chamber production procedure is generally the metal plate for the burn-in chamber that is prefabricated in the factory Material orders power supply and circuit system distribution prison etc., whole metal plate loose mails and electrical material etc. is transported curstomer's site, existing Field assembling burn-in chamber.And on-site assembly burn-in chamber can occupy erecting bed more time, circuits assembly, heating system assembly etc. Require longer set-up time and more operating expenses, and need the consumptive materials such as on-site cutting plate, need the number of constructing compared with More, working hour is longer, and integral installation efficiency is lower.
Summary of the invention
In order to overcome the disadvantages mentioned above of the prior art, the object of the present invention is to provide a kind of agings convenient for Fast Installation Room.
The technical solution adopted by the present invention to solve the technical problems is: a kind of burn-in chamber convenient for Fast Installation, special Sign is, including following preparation step:
(1) prefabricated aging room body Metal plate, comprising: the production of burn-in chamber plate, the customization of vacuum heat-insulation glass, metal plate accessory Machine tooling, dynamic aging power supply is ordered and aging trolley panel beating;
(2) aging room body pre-install, comprising: circuit system distribution supervise make, jig frame wiring assembling and aging trolley wiring Assembling;
(3) aging room body is assembled, comprising: burn-in chamber circuits assembly, heating system assembly, cooling system assembly and liquid crystal supply Power supply assembly;
(4) it assembling aging room body and transports;
(5) aging room body split is assembled, lifting gate is installed, form burn-in chamber.
As a further improvement of the present invention: the aging room body split be assembled into burn-in chamber after further include debugging step, It is self-checking step and whole checking procedure after the debugging step, it is ensured that the burn-in chamber normal operation after assembling.
As a further improvement of the present invention: aging room body split assembling uses high strength glass glue in the step (5) With metal plate connector, by burn-in chamber body gluing, sealing.
As a further improvement of the present invention: the burn-in chamber includes several aging room bodies, and the aging room body includes top Portion and side wall surround, and the top and side wall are equipped with insulating layer, connect draught fan partition plate, aging room body top above the side wall Portion is equipped with circulating fan, and the circulating fan is connect with circular centrifugal page wheel, is fixedly connected with volute outside the circular centrifugal page wheel, Heating unit is equipped at the top of the other side, the lower section of the side wall is equipped with outlet air guide plate.
As a further improvement of the present invention: the top and side wall are equipped with circulation air path, the circular centrifugal page wheel, whirlpool Shell, heating unit are located on circulation air path.
As a further improvement of the present invention: the volute is exported equipped with wind-guiding, and the wind-guiding outlet port is towards heating Unit.
As a further improvement of the present invention: the side wall, which is equipped with, visits window, and the visit window is using the double-deck glass Glass is made, and the side wall includes left side wall and right side wall, is all equipped on the left side wall and right side wall and visits window, the visit Window is made by double glazing.
As a further improvement of the present invention: the right side wall is equipped with circulation air path, and the double glazing is located at heat preservation On layer, the circulation air path of the right side wall is equipped with single-glass, and the single-glass position and insulating layer visit the window's position Unanimously, outlet air guide plate is equipped with below the single-glass.
As a further improvement of the present invention: the aging room body split that the side wall is equipped with visit window is assembled into aging Room body column, the aging room body column side are equipped with another aging room body by aging room body split and arrange, and the aging room body arranges it Between composition visit channel.
As a further improvement of the present invention: burn-in chamber column front and rear sides are equipped with lifting gate, the lifting gate It is tightly connected with aging room body.
As a further improvement of the present invention: the heating unit is popped one's head in equipped with heating unit temperature acquisition.
As a further improvement of the present invention: being provided with the program-controlled tunnel that can move ageing rack in the burn-in chamber on bottom The strip conductor of diatom, program-controlled tunnel line can provide power supply simultaneously for the product for the required aging placed on ageing rack vehicle, Condition is run at high operating temperatures for analog equipment.
As a further improvement of the present invention: when the aging room body split is assembled into burn-in chamber, the aging room body Circulating fan is located at the same side, and the outlet air guide plate of the aging room body is all located at the other side, guarantees hot blast flow direction system in burn-in chamber One.
Compared with prior art, the beneficial effects of the present invention are: improving prefabrication production efficiency to improve complete machine assembling Efficiency, decomposition is prefabricated, completes the preparation of aging room body in the factory, need to only put assembling in the field, greatly improves scene Packaging efficiency reduces the production cycle, saves space and material, and operating expenses is effectively reduced and reduces built-up time.
Detailed description of the invention
Fig. 1 is block flow diagram of the invention.
Fig. 2 is the structural schematic diagram of aging room body.
Fig. 3 is the structural schematic diagram of the side wall equipped with outlet air guide plate.
Fig. 4 is the schematic top plan view of aging room body.
Fig. 5 is the schematic top plan view of volute.
Fig. 6 is the structural schematic diagram equipped with outlet air guide plate and the side wall for visiting window.
Fig. 7 is the structural schematic diagram equipped with the side wall for visiting window.
Fig. 8 is the cross section structure schematic diagram of burn-in chamber after assembling.
Fig. 9 is the structural schematic diagram of burn-in chamber after assembling.
Specific embodiment
Now in conjunction with Detailed description of the invention, the present invention is further described with embodiment: one kind as shown in figure 1-9 is convenient for quickly peace The burn-in chamber of dress, including following preparation step:
(1) prefabricated aging room body Metal plate, comprising: the production of burn-in chamber plate, the customization of vacuum heat-insulation glass, metal plate accessory Machine tooling, dynamic aging power supply is ordered and aging trolley panel beating;
(2) aging room body pre-install, comprising: circuit system distribution supervise make, jig frame wiring assembling and aging trolley wiring Assembling;
(3) aging room body is assembled, comprising: burn-in chamber circuits assembly, heating system assembly, cooling system assembly and liquid crystal supply Power supply assembly;
(4) it assembling aging room body and transports;
(5) aging room body split is assembled, lifting gate is installed, form burn-in chamber.
The burn-in chamber includes several aging room bodies, and the aging room body includes that top 1 and side wall 2 surround, the top 1 It is equipped with insulating layer with side wall 2, draught fan partition plate is connected above the side wall 2,1 is equipped with circulating fan 3, institute at the top of the aging room body State circulating fan 3 to connect with circular centrifugal page wheel 6, be fixedly connected with volute 5 outside the circular centrifugal page wheel 6,1 at the top of the other side in Equipped with heating unit 4, the lower section of the side wall 2 is equipped with outlet air guide plate 22.
The top 1 and side wall 2 are equipped with circulation air path 7, and the circular centrifugal page wheel 6, volute 5, heating unit 4 are located at and follow On ring air duct 7, the side wall 2, which is equipped with, visits window 21, and the visit window 21 is made using double glazing, the side wall 2 Including left side wall and right side wall, all it is equipped on the left side wall and right side wall and visits window 21, the circulating fan as shown in Figure 2 3 are set to left side, then left side wall is set as shown in Figure 6 visits window 21, and right side wall visits window 21 as shown in Figure 5 and is located at insulating layer On, the circulation air path of right side wall is equipped with single-glass 23, and 23 position of single-glass and insulating layer visit window 21 It sets unanimously, it is outlet air guide plate 22 below window 21 that right side wall, which is visited, and the volute 5 is equipped with wind-guiding outlet 51, and the wind-guiding exports 7 Position is towards heating unit 4.
Visit window can not also be set on the side wall 2 as shown in Figure 3, it is another that the outlet air guide plate 22 is located at circulating fan 3 On the side wall 2 of side.
The heating unit is popped one's head in equipped with heating unit temperature acquisition, and the side wall 2 is equipped with power supply base, the confession Electrical socket is connect by electric wire with aging unwheeling 102, provides power supply for equipment operation in aging unwheeling 102.
When the aging room body split is assembled into burn-in chamber, the circulating fan of the aging room body is located at the same side, described The outlet air guide plate of aging room body is all located at the other side.
The aging room body split that the side wall is equipped with visit window 21 is assembled into aging room body column, the aging room body column Side is equipped with another aging room body by aging room body split and arranges, and composition visits channel 101 such as Fig. 8 between the aging room body column Shown in~9, aging room body column front and rear sides are equipped with gate 8, and personnel enter from channel 101 is visited, by visiting in aging room body Product testing situation in aging unwheeling 102 in the observation burn-in chamber of window 21.
In order to which burn-in chamber facilitates the different warm areas of setting, the aging room body is equipped with heating unit, circulating fan, circular centrifugal Page wheel and volute, each aging room body individually heat, and conveniently set up different warm area detections.
In order to facilitate equipment connects power supply in aging unwheeling in burn-in chamber, the side wall is equipped with power supply base, the confession Electrical socket is connect by electric wire with aging unwheeling.
Case study on implementation one: client needs in workshop, on the basis of having numerous other function devices, cooks up the confined space Place increases one large-scale burn-in chamber newly, and the scale lengths of this burn-in chamber are more than 15 meters, and 2 meters are highly above with width, if Complete machine production is completed in factory, the live work of 15 meters of complete machine either complete machine entrucking transport or curstomer's site transportation route Condition, be all can not complete machine transport and complete machine be transported to client's use site, while curstomer's site is dust-free workshop, does not allow to advise greatly The site welding of mould does not allow in the prolonged sheet metal component assembly polishing of plant site yet, in case the dust generated influences and dirt Contaminate the dustless degree in workshop.Therefore the method for the method assembling equipment assembled at the scene according to conventional loose mail pattern is unworkable, and client does not connect By.It now is prefabricated into several segments molding metal plate burn-in chamber structures alone using whole set equipment, and assembly in advance completes heating system The function component of the related systems such as system, the circulatory system.Then the burn-in chamber structures alone assembled is transported to curstomer's site After carry out to burn-in chamber structure dock reinforce sealing, so that it may carry out field adjustable and operation.Steps are as follows:
(1) prefabricated aging room body Metal plate in factory carries out the production of burn-in chamber plate, the customization of vacuum heat-insulation glass, metal plate Golden accessory machine tooling, dynamic aging power supply is ordered and aging trolley panel beating;
(2) carry out the prepackage of aging room body in the factory, carry out circuit system distribution supervise make, jig frame wiring assembling and old Change the assembling of trolley wiring;
(3) aging room body is assembled in the factory, carries out the burn-in chamber circuits assembly of aging room body, heating system assembles, is cold But system assembly and the assembly of liquid crystal power supply;
(4) assembling of aging room body is completed;
(5) client erecting bed is transported;
(6) by the split at same direction of aging room body, the circulating fan locality of each aging room body is opposite;
(7) glass glue connection will be used between aging room body, be assembled into aging room body column;
(8) lifting gate is installed in aging room body column front and rear sides, completes burn-in chamber assembling;
(9) it is debugged and is examined after completing assembling.
Case study on implementation two:
(1) prefabricated aging room body Metal plate in factory carries out the production of burn-in chamber plate, the customization of vacuum heat-insulation glass, metal plate Golden accessory machine tooling, dynamic aging power supply is ordered and aging trolley panel beating;
(2) carry out the prepackage of aging room body in the factory, carry out circuit system distribution supervise make, jig frame wiring assembling and old Change the assembling of trolley wiring;
(3) aging room body is assembled in the factory, carries out the burn-in chamber circuits assembly of aging room body, heating system assembles, is cold But system assembly and the assembly of liquid crystal power supply;
(4) assembling of aging room body is completed;
(5) client erecting bed is transported;
(6) by the split at same direction of aging room body, the circulating fan locality of each aging room body is opposite;
(7) aging room body two sides side wall, which is equipped with, visits window, aging room body is arranged as a column, the other side is put another Column aging room body, there are walking positions between two column aging room bodies;
(8) high strength glass glue and metal plate connector will be used between aging room body, by burn-in chamber body gluing, sealing.
, aging room body column are assembled into, composition visits channel between two column aging room bodies column;
(9) lifting gate is installed in aging room body column front and rear sides, completes burn-in chamber assembling;
(10) it is debugged and is examined after completing assembling.
Case study on implementation three:
(1) prefabricated aging room body Metal plate in factory carries out the production of burn-in chamber plate, the customization of vacuum heat-insulation glass, metal plate Golden accessory machine tooling, dynamic aging power supply is ordered and aging trolley panel beating;
(2) carry out the prepackage of aging room body in the factory, carry out circuit system distribution supervise make, jig frame wiring assembling and old Change the assembling of trolley wiring;
(3) aging room body is assembled in the factory, carries out the burn-in chamber circuits assembly of aging room body, heating system assembles, is cold But system assembly and the assembly of liquid crystal power supply;
(4) assembling of aging room body is completed;
(5) client erecting bed is transported;
(6) by the split at same direction of aging room body, the circulating fan locality of each aging room body is opposite;
(7) left column aging room body right side wall, which is equipped with, visits window, and right column aging room body left side wall, which is equipped with, visits window, There are walking positions between two column aging room bodies;
(8) glass glue connection will be used between aging room body, be assembled into aging room body column, form between two column aging room bodies column Visit channel;
(9) lifting gate is installed in aging room body column front and rear sides, completes burn-in chamber assembling;
(10) it is debugged and is examined after completing assembling.
Major function of the invention: prefabrication production efficiency is improved to improve complete machine packaging efficiency, decomposition is prefabricated, in work The preparation that aging room body is completed in factory, need to only put assembling in the field, greatly improve the packaging efficiency at scene, reduce production week Phase saves space and material, and operating expenses is effectively reduced and reduces built-up time.
In conclusion after those skilled in the art read file of the present invention, according to the technique and scheme of the present invention with Technical concept is not necessarily to creative mental labour and makes other various corresponding conversion schemes, belongs to the model that the present invention is protected It encloses.

Claims (6)

1. a kind of burn-in chamber convenient for Fast Installation, which is characterized in that including following preparation step:
(1) prefabricated aging room body Metal plate, comprising: the production of burn-in chamber plate, the customization of vacuum heat-insulation glass, metal plate accessory lathe Processing, dynamic aging power supply is ordered and aging trolley panel beating;
(2) aging room body pre-install, comprising: circuit system distribution supervise make, jig frame wiring assembling and aging trolley wiring assembling;
(3) aging room body is assembled, comprising: burn-in chamber circuits assembly, heating system assembly, cooling system assembly and liquid crystal power supply electricity Source assembly;
(4) it assembling aging room body and transports;
(5) aging room body split is assembled, lifting gate is installed, form burn-in chamber.
2. a kind of burn-in chamber convenient for Fast Installation according to claim 1, which is characterized in that the aging room body split Being assembled into after burn-in chamber further includes debugging step.
3. a kind of burn-in chamber convenient for Fast Installation according to claim 1, which is characterized in that if the burn-in chamber includes Dry ageing room body, the aging room body include that top and side wall surround, and the top and side wall are equipped with insulating layer, on the side wall Side's connection draught fan partition plate, the aging room body top are equipped with circulating fan, and the circulating fan is connect with circular centrifugal page wheel, institute It states and is fixedly connected with volute outside circular centrifugal page wheel, interior at the top of the other side to be equipped with heating unit, the lower section of the side wall is equipped with outlet air Guide plate.
4. a kind of burn-in chamber convenient for Fast Installation according to claim 3, which is characterized in that the side wall is equipped with ginseng Viewing window mouth, the visit window are made using double glazing.
5. a kind of burn-in chamber convenient for Fast Installation according to claim 4, which is characterized in that the side wall is equipped with ginseng The aging room body split of viewing window mouth is assembled into aging room body column, and the aging room body column side is equipped with another by aging room body split Aging room body column, composition visits channel between aging room body column.
6. a kind of burn-in chamber convenient for Fast Installation according to claim 3, which is characterized in that set on the heating unit There is heating unit temperature acquisition probe.
CN201910808391.2A 2019-08-29 2019-08-29 A kind of burn-in chamber convenient for Fast Installation Pending CN110485760A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910808391.2A CN110485760A (en) 2019-08-29 2019-08-29 A kind of burn-in chamber convenient for Fast Installation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910808391.2A CN110485760A (en) 2019-08-29 2019-08-29 A kind of burn-in chamber convenient for Fast Installation

Publications (1)

Publication Number Publication Date
CN110485760A true CN110485760A (en) 2019-11-22

Family

ID=68555063

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910808391.2A Pending CN110485760A (en) 2019-08-29 2019-08-29 A kind of burn-in chamber convenient for Fast Installation

Country Status (1)

Country Link
CN (1) CN110485760A (en)

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202176123U (en) * 2010-09-06 2012-03-28 徐智伟 Assembled box-type integrated house with industrial production
KR20120040328A (en) * 2010-10-19 2012-04-27 (주)엔시스 Aging system for flat pannel display module
JP3181452U (en) * 2012-11-28 2013-02-07 榮 長岡 New construction
CN103216115A (en) * 2012-12-20 2013-07-24 沈阳瑞福工业住宅有限公司 Modular integrally-movable house
CN204595125U (en) * 2015-05-07 2015-08-26 广州市长崎自动化科技有限公司 A kind of energy-saving dynamic test burn-in chamber
CN106193679A (en) * 2016-06-23 2016-12-07 广州市长崎自动化科技有限公司 A kind of energy-saving burn-in chamber
CN206091379U (en) * 2016-08-23 2017-04-12 广州市长崎自动化科技有限公司 Portable and fixed ageing room structure
KR20170091537A (en) * 2017-06-12 2017-08-09 임춘만 A building robot located in decrepit vessel; a public rental apartment up the muddy coast
CN209167437U (en) * 2018-11-14 2019-07-26 广州市长崎自动化科技有限公司 A kind of band visits the novel burn-in chamber in channel
CN110145033A (en) * 2019-05-04 2019-08-20 广东铝遊家科技有限公司 Assembled assembled house structure
CN210858129U (en) * 2019-08-29 2020-06-26 广州市长崎自动化科技有限公司 Ageing room convenient to install fast

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202176123U (en) * 2010-09-06 2012-03-28 徐智伟 Assembled box-type integrated house with industrial production
KR20120040328A (en) * 2010-10-19 2012-04-27 (주)엔시스 Aging system for flat pannel display module
JP3181452U (en) * 2012-11-28 2013-02-07 榮 長岡 New construction
CN103216115A (en) * 2012-12-20 2013-07-24 沈阳瑞福工业住宅有限公司 Modular integrally-movable house
CN204595125U (en) * 2015-05-07 2015-08-26 广州市长崎自动化科技有限公司 A kind of energy-saving dynamic test burn-in chamber
CN106193679A (en) * 2016-06-23 2016-12-07 广州市长崎自动化科技有限公司 A kind of energy-saving burn-in chamber
CN206091379U (en) * 2016-08-23 2017-04-12 广州市长崎自动化科技有限公司 Portable and fixed ageing room structure
KR20170091537A (en) * 2017-06-12 2017-08-09 임춘만 A building robot located in decrepit vessel; a public rental apartment up the muddy coast
CN209167437U (en) * 2018-11-14 2019-07-26 广州市长崎自动化科技有限公司 A kind of band visits the novel burn-in chamber in channel
CN110145033A (en) * 2019-05-04 2019-08-20 广东铝遊家科技有限公司 Assembled assembled house structure
CN210858129U (en) * 2019-08-29 2020-06-26 广州市长崎自动化科技有限公司 Ageing room convenient to install fast

Similar Documents

Publication Publication Date Title
CN212758650U (en) High-temperature box
CN110485760A (en) A kind of burn-in chamber convenient for Fast Installation
CN104465861A (en) Silica gel type solar cell assembly full-automatic flow production line
CN208477085U (en) A kind of motor mechanical back to back test rack having both environment temperature simulation
CN211014091U (en) Building curtain wall thermal cycle performance detection equipment
CN105910978A (en) A platform for testing accelerated ageing in liquid oxidizing medium environments
CN210858129U (en) Ageing room convenient to install fast
CN103861790B (en) A kind of infrared high-temperature high humidity liquid silica gel rapid solidification device
CN205843940U (en) A kind of automobile spherojoint assembly high/low temperature durability test machine
CN207742139U (en) A kind of small-sized condensation test case
CN206096262U (en) Constant temperature DC resistance measuring device
CN105006200B (en) A kind of small multi-functional actual training device of floor space
CN206431222U (en) Aging test control equipment of low-voltage apparatus
CN210442469U (en) Aging device of power transistor
CN209896544U (en) Heat dissipation device for reactive compensation cabinet
CN208320850U (en) A kind of Novel bunk temperature wet heating testing case
CN203690327U (en) Whole course automatic flow production line for silica solar battery assembly
CN106626199A (en) Efficient cooling equipment
CN211403691U (en) Real standard platform of new energy automobile air conditioner
CN201616977U (en) Intelligent radiating protection device for water-supply control system
CN211988681U (en) Constant temperature and humidity control device
CN206536394U (en) A kind of tail-gate tool pedestal
CN109991278A (en) A kind of small-sized condensation test case
CN218854322U (en) Split type high-low temperature alternating test box
CN216847395U (en) Energy-saving cold and hot impact test box

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination