CN110485558A - A kind of connection structure and method of rope bar collaboration hanging weight - Google Patents

A kind of connection structure and method of rope bar collaboration hanging weight Download PDF

Info

Publication number
CN110485558A
CN110485558A CN201910865844.5A CN201910865844A CN110485558A CN 110485558 A CN110485558 A CN 110485558A CN 201910865844 A CN201910865844 A CN 201910865844A CN 110485558 A CN110485558 A CN 110485558A
Authority
CN
China
Prior art keywords
connecting plate
round steel
preformed hole
ornament
steel pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910865844.5A
Other languages
Chinese (zh)
Inventor
高红伟
张虎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
IT Electronics Eleventh Design and Research Institute Scientific and Technological Engineering Corp
Original Assignee
IT Electronics Eleventh Design and Research Institute Scientific and Technological Engineering Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by IT Electronics Eleventh Design and Research Institute Scientific and Technological Engineering Corp filed Critical IT Electronics Eleventh Design and Research Institute Scientific and Technological Engineering Corp
Priority to CN201910865844.5A priority Critical patent/CN110485558A/en
Publication of CN110485558A publication Critical patent/CN110485558A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/92Protection against other undesired influences or dangers
    • E04B1/98Protection against other undesired influences or dangers against vibrations or shocks; against mechanical destruction, e.g. by air-raids
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H9/00Buildings, groups of buildings or shelters adapted to withstand or provide protection against abnormal external influences, e.g. war-like action, earthquake or extreme climate
    • E04H9/02Buildings, groups of buildings or shelters adapted to withstand or provide protection against abnormal external influences, e.g. war-like action, earthquake or extreme climate withstanding earthquake or sinking of ground

Abstract

The connection structure and method of a kind of rope bar collaboration hanging weight is disclosed in the present invention;Zhong Ge branch of the present invention gusset plate has enough intensity and rigidity, and end plate and connecting plate need to carry out force analysis, and strict control maximum stress, to prevent gusset plate stress deficiency from causing security risk.The selection of cable wire and round steel pipe model should be determined by stress analysis, avoid rule of thumb chosen material as far as possible.The present invention provides a kind of novel connection thinkings, very good solution flexible hanging is the problem of ambient windstream acts on lower swing to a certain extent, and rigid rod can provide two defence lines, flexible link and rigid rod cooperate under geological process, to guarantee to hang the firm of weight.

Description

A kind of connection structure and method of rope bar collaboration hanging weight
Technical field
It is specifically connection structure and the side of a kind of rope bar collaboration hanging weight the present invention relates to rope bar connection area Method.
Background technique
Market or enterprise entrance hall, can be in Zhongting or the hanger (weights of entrance hall position decoration more style due to decoration needs Amount is likely to be breached 10t), Normal practice is weight to be hung by cable wire, but (cable wire is rigid there are certain drawback for this connection type Degree is smaller, and the swing for decorating hanger can not be stopped under quality event).
Summary of the invention
Therefore, in order to solve above-mentioned deficiency, the purpose of the present invention is not can effectively prevent weight in cable wire hanging weight to exist On the basis of swing under ambient windstream effect, the connection structure and method of a kind of rope bar collaboration hanging weight are provided herein;I.e. A kind of suspending method of cable wire and round steel pipe collaboration hanging weight.
The invention is realized in this way constructing a kind of connection structure of rope bar collaboration hanging weight, it is characterised in that: the knot Structure have main structure supporting member, chemical anchor bolts expansion bolt or built-in fitting, connection board, connecting plate, connecting plate preformed hole, Cable wire, round steel pipe, round steel tube end sheet, round steel tube end sheet preformed hole, round steel pipe connecting plate, round steel pipe connecting plate preformed hole, decoration Object, ornament end plate, ornament end plate preformed hole, ornament connecting plate, ornament connecting plate preformed hole, cable wire fixture, connection End plate preformed hole, embedded board;Wherein, the H-shaped gusset plate being made of connection board, connecting plate and connecting plate preformed hole;Round steel pipe End plate is two groups, corresponds respectively to main structure supporting member and this side of ornament;Wherein, one end of cable wire passes through connecting pin It is fixed after plate preformed hole with cable wire fixture, is connect connecting plate with embedded board by welding;By rivet by connecting plate and round steel The connection of pipe connecting plate, forms the connection of round steel tube portion and main structure supporting member part;Round steel pipe and round steel tube end sheet connect It connects;After cable wire passes through the round steel tube end sheet preformed hole in the round steel tube end sheet of two sides, the ornament that is then passed through on ornament end plate End plate preformed hole;By the ornament connecting plate on the round steel pipe connecting plate preformed hole and ornament connecting plate on round steel pipe connecting plate Preformed hole alignment, round steel pipe connecting plate is by rivet connect with ornament connecting plate, formation round steel tube portion and ornament Connection.
A kind of connection structure of rope bar collaboration hanging weight according to this patent, it is characterised in that: passing through of embedded board It learns anchor bolt expansion bolt or built-in fitting is fixed with main structure supporting member.
A kind of method of rope bar collaboration hanging weight, it is characterised in that: this method successively carries out according to the following steps:
A, the whether reserved pre-buried end plate of ornament suspension centre of main structure supporting member is verified, if nothing, special design is carried out and determines The quantity and specification of chemical anchor bolts, expansion bolt or built-in fitting;
B, prepare the H-shaped gusset plate that multiple groups are made of connection board, connecting plate and connecting plate preformed hole;
C, cable wire is fixed after connection board preformed hole with cable wire fixture, is then connected connecting plate and embedded board by welding It connects;
D, cable wire passes through round steel tube end sheet preformed hole in round steel tube end sheet, and the round steel pipe connecting plate on round steel pipe connecting plate is reserved Hole is aligned with connecting plate preformed hole, is connect connecting plate with round steel pipe connecting plate by rivet, forms round steel tube portion and main body The connection of structural bearing component part;
E, cable wire is passed through to the round steel tube end sheet preformed hole in the round steel tube end sheet of the other end again, is then then passed through ornament end plate On ornament end plate preformed hole;
F, the round steel pipe connecting plate preformed hole on round steel pipe connecting plate is reserved with the ornament connecting plate on ornament connecting plate Hole alignment, is connected round steel pipe connecting plate with ornament connecting plate by rivet, forms the connection of round steel pipe and ornament;
G, it is fixed after so that cable wire is born ornament hoisting point position load tensioning cable with cable wire fixture;
H, other suspension centre installations are carried out according to the above method with this.
The present invention has the advantage that the purpose of the present invention is not can effectively prevent weight in environment in cable wire hanging weight On the basis of swing under airflow function, the suspending method of a kind of cable wire and round steel pipe collaboration hanging weight is provided herein;This hair Ming Zhongge branch gusset plate has enough intensity and rigidity, and end plate and connecting plate need to carry out force analysis, and strict control is most Big stress, to prevent gusset plate stress deficiency from causing security risk.The selection of cable wire and round steel pipe model should pass through stress analysis It determines, avoids rule of thumb chosen material as far as possible.The present invention provides a kind of novel connection thinkings, solve well to a certain extent Flexible hanging determined the problem of ambient windstream acts on lower swing, and rigid rod can provide two defence lines, it is soft under geological process Property bar and rigid rod cooperate, to guarantee to hang the firm of weight.
Detailed description of the invention
Fig. 1 is main structure position node connection schematic diagram in the present invention;
Fig. 2 is ornament suspension centre position node connection schematic diagram in the present invention;
Fig. 3 is H-shaped node schematic diagram in the present invention.
In figure: 1- main structure supporting member, 2- chemical anchor bolts expansion bolt or built-in fitting 3- connection board, 4- connecting plate, 5- Connecting plate preformed hole, 6- cable wire, 7- round steel pipe, 8- round steel tube end sheet, 9- round steel tube end sheet preformed hole, 10- round steel pipe connecting plate, 11- round steel pipe connecting plate preformed hole, 12- ornament, 13- ornament end plate, 14- ornament end plate preformed hole, 15- ornament connect Fishplate bar, 16- ornament connecting plate preformed hole, 17- cable wire fixture, 18- connection board preformed hole, 19- embedded board, 20- rivet.
Specific embodiment
Below in conjunction with attached drawing 1- Fig. 3, the present invention is described in detail, technical solution in the embodiment of the present invention into Row clearly and completely describes, it is clear that described embodiments are only a part of the embodiments of the present invention, rather than whole realities Apply example.Based on the embodiments of the present invention, those of ordinary skill in the art are obtained without making creative work Every other embodiment, shall fall within the protection scope of the present invention.
The present invention provides a kind of connection structure of rope bar collaboration hanging weight by improving herein, can be as follows It is practiced;The structure has main structure supporting member 1, chemical anchor bolts expansion bolt or built-in fitting 2, connection board 3, connection Plate 4, connecting plate preformed hole 5, cable wire 6, round steel pipe 7, round steel tube end sheet 8, round steel tube end sheet preformed hole 9, round steel pipe connecting plate 10, Round steel pipe connecting plate preformed hole 11, ornament 12, ornament end plate 13, ornament end plate preformed hole 14, ornament connecting plate 15, Ornament connecting plate preformed hole 16, cable wire fixture 17, connection board preformed hole 18, embedded board 19;Wherein, by connection board 3, company The H-shaped gusset plate that fishplate bar 4 and connecting plate preformed hole 5 form;Round steel tube end sheet 8 is two groups, corresponds respectively to main structure load-bearing Component 1 and this side of ornament 12;Wherein, one end of cable wire 6 is fixed after passing through connection board preformed hole 18 with cable wire fixture 17, Connecting plate 4 is connect with embedded board 19 by welding;Connecting plate 4 is connect with round steel pipe connecting plate 10 by rivet 20, is formed The connection of 7 part of round steel pipe and 1 part of main structure supporting member;Round steel pipe 7 is connect with round steel tube end sheet 8;Cable wire 6 passes through two After round steel tube end sheet preformed hole 9 in the round steel tube end sheet 8 of side, the ornament end plate preformed hole that is then passed through on ornament end plate 13 14;Round steel pipe connecting plate preformed hole 11 on round steel pipe connecting plate 10 and the ornament connecting plate on ornament connecting plate 15 is pre- It boxes out 16 alignment, is connected round steel pipe connecting plate 10 and ornament connecting plate 15 by rivet 20, form 7 part of round steel pipe and dress The connection of jewelry 12.
Wherein;Embedded board 19 is fixed by chemical anchor bolts expansion bolt or built-in fitting 2 and main structure supporting member 1;
A kind of method of rope bar collaboration hanging weight, this method successively carry out according to the following steps:
A, it verifies the whether reserved pre-buried end plate 3 of ornament suspension centre of main structure supporting member 1 and it is true to carry out special design if nothing Determine the quantity and specification of chemical anchor bolts, expansion bolt or built-in fitting 2;
B, prepare the H-shaped gusset plate that multiple groups are made of connection board 3, connecting plate 4 and connecting plate preformed hole 5;
C, use cable wire fixture 17 fixed after cable wire 6 being passed through connection board preformed hole 18, then by welding connecting plate 4 and in advance Buried plate 19 connects;
D, cable wire 6 passes through round steel tube end sheet preformed hole 9 in round steel tube end sheet 8, and the round steel pipe on round steel pipe connecting plate 10 is connected Plate preformed hole 11 is aligned with connecting plate preformed hole 5, is connect connecting plate 4 with round steel pipe connecting plate 10 by rivet 20, forms circle The connection of 7 part of steel pipe and 1 part of main structure supporting member;
E, cable wire 6 is passed through to the round steel tube end sheet preformed hole 9 in the round steel tube end sheet 8 of the other end again, is then then passed through ornament Ornament end plate preformed hole 14 on end plate 13;
F, the round steel pipe connecting plate preformed hole 11 on round steel pipe connecting plate 10 is connect with the ornament on ornament connecting plate 15 Plate preformed hole 16 is aligned, and is connected round steel pipe connecting plate 10 and ornament connecting plate 15 by rivet 20, forms round steel pipe 7 and dress The connection of jewelry 12;
G, fixed with cable wire fixture 17 after so that cable wire 6 is born ornament hoisting point position load 6 tensioning of cable wire;
H, other suspension centre installations are carried out according to the above method with this.
Advantages of the present invention: Zhong Ge branch of the present invention gusset plate has enough intensity and rigidity, and end plate and connecting plate need Force analysis, and strict control maximum stress are carried out, to prevent gusset plate stress deficiency from causing security risk.Cable wire and round steel pipe The selection of model should be determined by stress analysis, avoid rule of thumb chosen material as far as possible.The present invention provides a kind of Novel connections Connect thinking, very good solution flexible hanging is the problem of ambient windstream acts on lower swing to a certain extent, and rigid rod can be with Two defence lines are provided, flexible link and rigid rod cooperate under geological process, to guarantee to hang the firm of weight.
The foregoing description of the disclosed embodiments enables those skilled in the art to implement or use the present invention. Various modifications to these embodiments will be readily apparent to those skilled in the art, as defined herein General Principle can be realized in other embodiments without departing from the spirit or scope of the present invention.Therefore, of the invention It is not intended to be limited to the embodiments shown herein, and is to fit to and the principles and novel features disclosed herein phase one The widest scope of cause.

Claims (3)

1. a kind of connection structure of rope bar collaboration hanging weight, it is characterised in that: the structure has main structure supporting member (1), chemical anchor bolts expansion bolt or built-in fitting (2), connection board (3), connecting plate (4), connecting plate preformed hole (5), cable wire (6), round steel pipe (7), round steel tube end sheet (8), round steel tube end sheet preformed hole (9), round steel pipe connecting plate (10), round steel pipe connecting plate Preformed hole (11), ornament (12), ornament end plate (13), ornament end plate preformed hole (14), ornament connecting plate (15), dress Jewelry connecting plate preformed hole (16), cable wire fixture (17), connection board preformed hole (18), embedded board (19);Wherein, by connecting pin The H-shaped gusset plate of plate (3), connecting plate (4) and connecting plate preformed hole (5) composition;Round steel tube end sheet (8) is two groups, is respectively corresponded In main structure supporting member (1) and ornament (12) this side;Wherein, one end of cable wire (6) passes through connection board preformed hole (18) fixed with cable wire fixture (17) afterwards, connecting plate (4) is connect with embedded board (19) by welding;It will be even by rivet (20) Fishplate bar (4) is connect with round steel pipe connecting plate (10), forms round steel pipe (7) partially company with main structure supporting member (1) part It connects;Round steel pipe (7) is connect with round steel tube end sheet (8);Cable wire (6) passes through the round steel tube end sheet in the round steel tube end sheet (8) of two sides After preformed hole (9), the ornament end plate preformed hole (14) that is then passed through on ornament end plate (13);It will be on round steel pipe connecting plate (10) Round steel pipe connecting plate preformed hole (11) be aligned with the ornament connecting plate preformed hole (16) on ornament connecting plate (15), pass through Rivet (20) connects round steel pipe connecting plate (10) and ornament connecting plate (15), forms round steel pipe (7) part and ornament (12) connection.
2. a kind of connection structure of rope bar collaboration hanging weight according to claim 1, it is characterised in that: embedded board (19) is logical It crosses chemical anchor bolts expansion bolt or built-in fitting (2) and main structure supporting member (1) is fixed.
3. a kind of method of rope bar collaboration hanging weight, it is characterised in that: this method successively carries out according to the following steps:
A, main structure supporting member (1) whether reserved pre-buried end plate of ornament suspension centre (3) is verified to carry out special project if nothing and set Count the quantity and specification for determining chemical anchor bolts, expansion bolt or built-in fitting (2);
B, prepare the H-shaped gusset plate that multiple groups are made of connection board (3), connecting plate (4) and connecting plate preformed hole (5);
C, cable wire (6) connection board preformed hole (18) are passed through to be fixed with cable wire fixture (17) afterwards, it then will connection by welding (19 connect plate (4) with embedded board;
D, cable wire (6) passes through round steel tube end sheet preformed hole (9) on round steel tube end sheet (8), by the circle on round steel pipe connecting plate (10) Steel pipe connecting plate preformed hole (11) is aligned with connecting plate preformed hole (5), is connect connecting plate (4) with round steel pipe by rivet (20) Plate (10) connection, forms round steel pipe (7) partially connection with main structure supporting member (1) part;
E, cable wire (6) are passed through to the round steel tube end sheet preformed hole (9) in the round steel tube end sheet (8) of the other end again, are then then passed through Ornament end plate preformed hole (14) on ornament end plate (13);
F, by the round steel pipe connecting plate preformed hole (11) on round steel pipe connecting plate (10) and the decoration on ornament connecting plate (15) Object connecting plate preformed hole (16) alignment is connected round steel pipe connecting plate (10) and ornament connecting plate (15) by rivet (20), Form the connection of round steel pipe (7) and ornament (12);
G, fixed with cable wire fixture (17) after so that cable wire (6) is born ornament hoisting point position load cable wire (6) tensioning;
H, other suspension centre installations are carried out according to the above method with this.
CN201910865844.5A 2019-09-09 2019-09-09 A kind of connection structure and method of rope bar collaboration hanging weight Pending CN110485558A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910865844.5A CN110485558A (en) 2019-09-09 2019-09-09 A kind of connection structure and method of rope bar collaboration hanging weight

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910865844.5A CN110485558A (en) 2019-09-09 2019-09-09 A kind of connection structure and method of rope bar collaboration hanging weight

Publications (1)

Publication Number Publication Date
CN110485558A true CN110485558A (en) 2019-11-22

Family

ID=68557974

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910865844.5A Pending CN110485558A (en) 2019-09-09 2019-09-09 A kind of connection structure and method of rope bar collaboration hanging weight

Country Status (1)

Country Link
CN (1) CN110485558A (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104843557A (en) * 2014-02-13 2015-08-19 株式会社日立制作所 Elevator main suspension line shake preventing apparatus
CN204662842U (en) * 2015-05-25 2015-09-23 苏州金螳螂建筑装饰股份有限公司 A kind of steelframe adjustable connection structure
CN105507148A (en) * 2014-09-26 2016-04-20 上海建科预应力技术工程有限公司 Connecting structure for cable clamp and suspender of suspension bridge
EP3029220A1 (en) * 2014-12-02 2016-06-08 Ikona AG Transport anchor for prefabricated reinforced concrete double walls
CN208154280U (en) * 2018-04-16 2018-11-27 中山市卡骐灯饰照明有限公司 A kind of multilayer pendent lamp
CN109707037A (en) * 2018-12-28 2019-05-03 长安大学 A kind of assembling frame structure Self-resetting dissipative devices and its construction method
CN208964366U (en) * 2018-09-28 2019-06-11 成都飞机工业(集团)有限责任公司 A kind of truss Current Collector Sleave
CN210767201U (en) * 2019-09-09 2020-06-16 信息产业电子第十一设计研究院科技工程股份有限公司 Connecting structure for cable-pole cooperated hanging heavy object

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104843557A (en) * 2014-02-13 2015-08-19 株式会社日立制作所 Elevator main suspension line shake preventing apparatus
CN105507148A (en) * 2014-09-26 2016-04-20 上海建科预应力技术工程有限公司 Connecting structure for cable clamp and suspender of suspension bridge
EP3029220A1 (en) * 2014-12-02 2016-06-08 Ikona AG Transport anchor for prefabricated reinforced concrete double walls
CN204662842U (en) * 2015-05-25 2015-09-23 苏州金螳螂建筑装饰股份有限公司 A kind of steelframe adjustable connection structure
CN208154280U (en) * 2018-04-16 2018-11-27 中山市卡骐灯饰照明有限公司 A kind of multilayer pendent lamp
CN208964366U (en) * 2018-09-28 2019-06-11 成都飞机工业(集团)有限责任公司 A kind of truss Current Collector Sleave
CN109707037A (en) * 2018-12-28 2019-05-03 长安大学 A kind of assembling frame structure Self-resetting dissipative devices and its construction method
CN210767201U (en) * 2019-09-09 2020-06-16 信息产业电子第十一设计研究院科技工程股份有限公司 Connecting structure for cable-pole cooperated hanging heavy object

Similar Documents

Publication Publication Date Title
US5871193A (en) Flame resistant, non-conductive hanger
US10295087B2 (en) Multi-connection truss pick
CN200992763Y (en) Ceiling unit structure hanging aluminium slat under hyperboloid grid third quavter
US9663947B2 (en) Hanging load support
US9121437B1 (en) Resilient S-hook shaped construction site tool
US7090173B2 (en) Para-seismic support for pipes
CN105905781A (en) Hanger used for hoisting large-section steel truss girders and hoisting method
CN110485558A (en) A kind of connection structure and method of rope bar collaboration hanging weight
CN210767201U (en) Connecting structure for cable-pole cooperated hanging heavy object
CN208899928U (en) Stage building structure
CN204624959U (en) Building berth main frame installation hoisting structure
CN209114016U (en) Bumper cathode electro-coating hanger
CN209114718U (en) A kind of building-supporting steel beam structure
CN205616430U (en) Railway T beam mold board dismouting hoist and hang and move device
CN102506233A (en) Combined hook
CN202280946U (en) Combined hook
KR20020082713A (en) Balanceable wire sling
CN204060013U (en) To encorbelment outward protective frame
CN209583372U (en) A kind of Double-directional rotary shackle structure
JP2019181084A (en) Net for indoor space part and method for forming the same
CN201312704Y (en) Coat hanger with locking function
CN218305868U (en) Suspension assembly and suspension device
CN208782444U (en) A kind of cable clip
CN208980172U (en) Hanger is used in a kind of lifting of seamless steel pipe
CN208364955U (en) Pipeline insulating support

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination