CN110485479A - Composite water-proof structure and its construction method at deep basal pit anti-float anchor rod node - Google Patents

Composite water-proof structure and its construction method at deep basal pit anti-float anchor rod node Download PDF

Info

Publication number
CN110485479A
CN110485479A CN201910671477.5A CN201910671477A CN110485479A CN 110485479 A CN110485479 A CN 110485479A CN 201910671477 A CN201910671477 A CN 201910671477A CN 110485479 A CN110485479 A CN 110485479A
Authority
CN
China
Prior art keywords
hole
waterproof
reinforcing bar
anchor
water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910671477.5A
Other languages
Chinese (zh)
Other versions
CN110485479B (en
Inventor
陈建平
黄言君
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Zhengfei Construction Co.,Ltd.
Original Assignee
Jiangsu Maosheng Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Maosheng Construction Group Co Ltd filed Critical Jiangsu Maosheng Construction Group Co Ltd
Priority to CN201910671477.5A priority Critical patent/CN110485479B/en
Publication of CN110485479A publication Critical patent/CN110485479A/en
Application granted granted Critical
Publication of CN110485479B publication Critical patent/CN110485479B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/02Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against ground humidity or ground water
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/10Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against soil pressure or hydraulic pressure
    • E02D31/12Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against soil pressure or hydraulic pressure against upward hydraulic pressure
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/74Means for anchoring structural elements or bulkheads

Abstract

The invention discloses composite water-proof structure and its construction method at a kind of deep basal pit anti-float anchor rod node, the sub-surface set gradually including anchor pole, from top to bottom, concrete cushion, waterproof protective layer, bottom plate are extended in bottom plate from sub-surface on anchor pole;The junction of anchor pole and waterproof protective layer opens up a through-hole, and setting one penetrates through concrete cushion and protrudes into the anchor hole of sub-surface below through-hole, and anchor hole cross section is less than the cross section of through-hole;Slurries are poured into anchor hole and form injecting cement paste, and a supplement waterproof layer is formed in through-hole;The anchor pole includes anchoring body and the reinforcing bar that is fixed on anchoring body; the anchoring body soil layer located underground; reinforcing bar extends in bottom plate from sub-surface; a connector is socketed on the reinforcing bar; the connector includes the steel loop covered on reinforcing bar, the water-swellable ring being bonded in below steel loop; gap weldig between the steel loop and reinforcing bar seals to form a weld part, and the upper surface of the steel loop and the lower surface of waterproof protective layer are concordant.

Description

Composite water-proof structure and its construction method at deep basal pit anti-float anchor rod node
Technical field
The present invention relates to waterproofs at anti-float anchor rod node, in particular to composite water-proof structure at deep basal pit anti-float anchor rod node And its construction method.
Background technique
Anti-float anchor rod is one kind of architectural engineering underground structure measure of anti float.Anti-float anchor rod tensional element, one end are anchored at Building bottom plate, the other end are anchored in the supporting course of ground, loading process be first by anchoring body reinforcing bar and injecting cement paste it Between effect uplift force is reached on injecting cement paste;It then will be suffered by injecting cement paste by the frictional force between injecting cement paste and periphery soil layer To power reach in the stable soil body around, thus formed have certain breakout capacity anti-float anchor rod, play anti-float anchor rod Anti-floating effect.
Since anchor bar steel influential point of tendons passes through waterproof outside bottom plate, corresponding supplement waterproof measure will do it.Existing waterproof construction As the anti-float anchor rod waterproofing node for the patent disclosure that notification number is CN206986886U, including reinforced concrete floor and anti- The main stress muscle of drogue bar, the anti-float anchor rod protrudes into the reinforced concrete floor, the reinforced concrete floor and institute The junction for stating anti-float anchor rod is equipped with a funnel-shaped recesses makes, and the reinforced concrete floor lower section is described in addition to being equipped with waterproof layer Groove is also successively arranged waterproof mortar course and waterproofing unction filled layer, anchor pole pile crown waterproof reinforced layer, mortar levelling from top to down Layer;The waterproofing node of the anti-float anchor rod of the utility model is additionally arranged funnel-shaped recesses makes on anti-float anchor rod top, has performed waterproof roll After material, the waterproofing unction of certain altitude is first filled out, then with waterproof mortar filling and levelling.
This mode is irregular due to rebar surface, and capillary water, which easily rises along the gap of body of rod outer wall, to be caused to seep water.
Summary of the invention
In view of the deficienciess of the prior art, the first object of the present invention is to answer at a kind of deep basal pit anti-float anchor rod node Waterproof construction is closed, waterproof effect is promoted.
Above-mentioned technical purpose of the invention has the technical scheme that a kind of deep basal pit anti-float anchor rod section Composite water-proof structure at point, the sub-surface set gradually including anchor pole, from top to bottom, concrete cushion, waterproof protective layer, bottom Plate is extended in bottom plate from sub-surface on anchor pole;The junction of anchor pole and waterproof protective layer opens up a through-hole, sets below through-hole It sets a perforation concrete cushion and protrudes into the anchor hole of sub-surface, anchor hole cross section is less than the cross section of through-hole;It is poured into anchor hole Slurries form injecting cement paste, and a supplement waterproof layer is formed in through-hole;The anchor pole includes anchoring body and the steel that is fixed on anchoring body Muscle, the anchoring body soil layer located underground, reinforcing bar extend in bottom plate from sub-surface, and a connector is socketed on the reinforcing bar, The connector includes the steel loop covered on reinforcing bar, the water-swellable ring being bonded in below steel loop, between the steel loop and reinforcing bar Gap weldig seal to form a weld part, the upper surface of the steel loop and the lower surface of waterproof protective layer are concordant.
This programme positions steel loop by water-swellable ring, later by steel loop and reinforcement welding, due to steel loop and steel Muscle welding, therefore capillary water will not up be flowed along reinforcing bar;And it is upper due to waterproof layer lower surface and steel loop and injecting cement paste Face seal connection, therefore capillary water can not be between anchor hole inner wall be between waterproof layer lower surface and injecting cement paste upper surface Clearance flow goes out, therefore ensure that its whole waterproof effect (water cannot from from anchor hole overflow).
Further, the upper surface of the steel loop opens up a holding tank, the connection for accommodating trench bottom and opening up a perforation Hole, the connecting hole are connected to water-swellable ring.
It can so be filled the water out of steel loop holding tank, so that water-swellable ring water swelling abuts reinforcing bar outer wall, from outer Portion's end-on water expansion loop water spray is easy to cause water to enter in anchor hole, influences to construct.
Further, the weld part and water-swellable central spacer are arranged.
High temperature can be generated when welding, and end-on water expansion loop is avoided to impact.
Further, the supplement waterproof layer includes waterproof coating, waterproof roll and waterproofing unction filled layer from bottom to top.
By three layers of waterproof of waterproof coating, waterproof roll and waterproofing unction filled layer, it is further ensured that its waterproof performance.
Further, form the waterproof jacket that passes through for reinforcing bar on the waterproof roll, after the waterproof jacket hot melt with reinforcing bar Bonding.
Waterproof roll is heated so that its is in a molten state Nian Jie with reinforcing bar cooling.
Further, it is arranged a steel bushing outside the waterproof jacket, the bottom of the steel bushing is abutted with the upper surface of waterproof roll.
The setting of steel bushing after waterproof jacket hot melt by steel bushing so that be limited between reinforcing bar and reinforcing bar.
Further, the opening of the steel bushing is gradually reduced from top to bottom.
In this way, entering in steel bushing convenient for heat-fused portion.
The second object of the present invention is to provide composite water-proof construction method at a kind of deep basal pit anti-float anchor rod node, Good water-proof effect.
Composite water-proof construction method at deep basal pit anti-float anchor rod node, includes the following steps: 1) self waterproofing protective layer Punching downwards protrudes into sub-surface across concrete cushion and forms anchor hole, forms through-hole to reaming is carried out at waterproof protective layer;
2) recrement in anchor hole and through-hole is removed using pressure-air until feel is without dust, to avoid until the wind that aperture is returned out Sediment in anchor hole and through-hole exists;
3) anchor pole is put into anchor hole and anchor pole will be kept vertical in anchoring body partial insertion sub-surface;
4) connector is inserted on reinforcing bar, mobile connection body makes steel loop upper surface concordant with anchor hole upper surface, in holding tank Water filling is so that steel loop positions, and by steel ring welding on reinforcing bar, later by connecting hole and holding tank welded seal;
5) carry out slip casing by pressure, by the way of the reversed slip casting of bottom hole, Grouting Pipe insertion away from anchor hole bottom 30cm at, slurries are from slip casting Pipe inwardly pours into, and gas is expelled directly out;
6) coating waterproof coating, laying water-proof coiled material process are successively carried out after injecting cement paste solidification;
7) steel bushing is covered outside waterproof jacket, waterproof jacket is heated so that being bonded after waterproof jacket hot melt with reinforcing bar;
8) waterproofing unction is injected above the waterproof roll in through-hole form waterproofing unction filled layer;
9) reinforcing bar upper end is bent;
10) bottom plate is poured.
Reinforcing bar is fixed in water-swellable ring, and when to steel ring welding, heat can make in water-swellable ring Part water evaporation;Later again in anchor hole inject slurries when, water-swellable ring expands herein, can effectively prevent water from Steel loop side wall flows up.
In conclusion the invention has the following advantages: this programme is effectively promoted at deep basal pit anti-float anchor rod node Waterproof effect.
Detailed description of the invention
Fig. 1 is the schematic diagram of embodiment;
Fig. 2 is the portion the A enlarged drawing of Fig. 1.
Appended drawing reference: 1, sub-surface;2, concrete cushion;31, waterproof coating;32, waterproof roll;33, waterproof jacket; 34, waterproof protective layer;35, steel bushing;36, waterproofing unction filled layer;4, bottom plate;5, anchor pole;51, anchoring body;52, reinforcing bar;6, steel Ring;61, holding tank;62, connecting hole;7, water-swellable ring;8, weld part;91, through-hole;92, anchor hole.
Specific embodiment
This specific embodiment is only explanation of the invention, is not limitation of the present invention, those skilled in the art Member can according to need the modification that not creative contribution is made to the present embodiment after reading this specification, but as long as at this All by the protection of Patent Law in the scope of the claims of invention.
Composite water-proof structure, such as Fig. 1-2 at a kind of deep basal pit anti-float anchor rod node, including anchor pole 5, successively set from top to bottom Sub-surface 1, concrete cushion 2, waterproof protective layer 34, the bottom plate 4 set are extended in bottom plate 4 from sub-surface 1 on anchor pole 5.
Anchor pole 5 includes anchoring body 51 and the reinforcing bar 52 being welded on anchoring body 51, and reinforcing bar 52 is arranged three, and anchoring body 51 is in Cone shape soil layer 1 located underground, reinforcing bar 52 extend in bottom plate 4 from sub-surface 1.
The junction of anchor pole 5 and waterproof protective layer 34 opens up a through-hole 91, one perforation concrete mats of setting below through-hole 91 Layer 2 and the anchor hole 92 for protruding into sub-surface 1,92 cross section of anchor hole are less than the cross section of through-hole 91, pour into slurries shape in anchor hole 92 At injecting cement paste.A supplement waterproof layer is formed in through-hole 91, supplement waterproof layer includes waterproof coating 31, waterproof roll 32 from bottom to top With waterproofing unction filled layer 36.31 lower surface of waterproof coating is concordant with 91 lower end surface of through-hole, 36 upper surface of waterproofing unction filled layer It is concordant with 91 upper surface of through-hole.The waterproof jacket 33 passed through integrally formed with formation for reinforcing bar 52 on waterproof roll 32, waterproof jacket 33 It is arranged a steel bushing 35 outside, the bottom of steel bushing 35 is abutted with the upper surface of waterproof roll 32, and steel bushing 35 is in shaped hollow round table, steel bushing 35 Opening be gradually reduced from top to bottom;35 height of steel bushing is lower than the height of waterproof jacket 33, and waterproof jacket 33 is viscous with reinforcing bar 52 after heating 33 height of waterproof jacket is lower than 35 height of steel bushing after knot and hot melt.
A connector is socketed on reinforcing bar 52, connector includes the steel loop 6 covered on reinforcing bar 52, is bonded in below steel loop 6 Water-swellable ring 7, the gap weldig between steel loop 6 and reinforcing bar 52 seal to form a weld part 8, weld part 8 and water-swellable ring 7 In vertical direction, there are differences in height.The upper surface of steel loop 6 is concordant with the lower surface of waterproof protective layer 34.It opens the upper surface of steel loop 6 If a holding tank 61,61 bottom of holding tank opens up the connecting hole 62 of a perforation, and connecting hole 62 is connected to water-swellable ring 7.
Waterproof protective layer 34 can be water-proof concrete.Water-swellable ring 7 is identical as water expandable waterstop material.
Above structure constructs to be formed using following methods: composite water-proof structure construction side at deep basal pit anti-float anchor rod node Method includes the following steps: that the 1) punching downwards of self waterproofing protective layer 34 protrudes into the formation anchor hole of sub-surface 1 across concrete cushion 2 92, through-hole 91 is formed to reaming is carried out at waterproof protective layer 34;
2) recrement in anchor hole 92 and through-hole 91 is removed using pressure-air, until the wind that aperture is returned out, until feel is without dust, The sediment in anchor hole 92 and through-hole 91 is avoided to exist;
3) anchor pole 5 is put into anchor hole 92 and will keeps anchor pole 5 vertical in 51 partial insertion sub-surface 1 of anchoring body;
4) connector is inserted on reinforcing bar 52, mobile connection body makes 6 upper surface of steel loop concordant with 92 upper surface of anchor hole, accommodating Water filling in slot 61 later welds connecting hole 62 and holding tank 61 so that steel loop 6 positions, and steel loop 6 is welded on reinforcing bar 52 Sealing;
5) carry out slip casing by pressure, by the way of the reversed slip casting of bottom hole, Grouting Pipe insertion away from 92 bottom 30cm of anchor hole at, slurries are from note Slurry pipe inwardly pours into, and gas is expelled directly out;
6) coating waterproof coating 31,32 process of laying water-proof coiled material are successively carried out after injecting cement paste solidification;
7) by 35 sets of steel bushing outside waterproof jacket 33, waterproof jacket 33 is heated so that waterproof jacket 33 bonds after heating with reinforcing bar 52;
8) waterproofing unction is injected above the waterproof roll 32 in through-hole 91 form waterproofing unction filled layer 36;
9) 52 upper end of reinforcing bar is bent;
10) bottom plate 4 is poured.

Claims (8)

1. composite water-proof structure at a kind of deep basal pit anti-float anchor rod node, the underground set gradually including anchor pole (5), from top to bottom Soil layer (1), concrete cushion (2), waterproof protective layer (34), bottom plate (4) extend to bottom plate from sub-surface (1) on anchor pole (5) (4) in;The junction of anchor pole (5) and waterproof protective layer (34) opens up a through-hole (91), and one perforation of setting is mixed below through-hole (91) Solidifying soil padding (2) and the anchor hole (92) for protruding into sub-surface (1), anchor hole (92) cross section are less than the cross section of through-hole (91);Anchor Slurries are poured into hole (92) and form injecting cement paste, a supplement waterproof layer are formed in through-hole (91), it is characterized in that: the anchor pole (5) wraps The reinforcing bar (52) for including anchoring body (51) and being fixed on anchoring body (51), the anchoring body (51) soil layer located underground (1), reinforcing bar (52) it is extended in bottom plate (4) from sub-surface (1), a connector is socketed on the reinforcing bar (52), the connector includes set In the steel loop (6) on reinforcing bar (52), the water-swellable ring (7) that is bonded in below steel loop (6), the steel loop (6) and reinforcing bar (52) Between gap weldig seal to be formed a weld part (8), the lower surface of the upper surface of the steel loop (6) and waterproof protective layer (34) Concordantly.
2. composite water-proof structure at deep basal pit anti-float anchor rod node according to claim 1, it is characterized in that: the steel loop (6) upper surface opens up a holding tank (61), and holding tank (61) bottom opens up the connecting hole (62) of a perforation, the connection Hole (62) is connected to water-swellable ring (7).
3. composite water-proof structure at deep basal pit anti-float anchor rod node according to claim 1, it is characterized in that: the weld part (8) it is arranged with water-swellable ring (7) interval.
4. composite water-proof structure at deep basal pit anti-float anchor rod node according to claim 1, it is characterized in that: the supplement is anti- Water layer includes waterproof coating (31), waterproof roll (32) and waterproofing unction filled layer (36) from bottom to top.
5. composite water-proof structure at deep basal pit anti-float anchor rod node according to claim 4, it is characterized in that: the waterproof roll The waterproof jacket (33) passed through for reinforcing bar (52) is formed on material (32), is bonded after waterproof jacket (33) hot melt with reinforcing bar (52).
6. composite water-proof structure at deep basal pit anti-float anchor rod node according to claim 5, it is characterized in that: the waterproof jacket (33) it is arranged a steel bushing (35) outside, the bottom of the steel bushing (35) is abutted with the upper surface of waterproof roll (32).
7. composite water-proof structure at deep basal pit anti-float anchor rod node according to claim 6, it is characterized in that: the steel bushing (35) opening is gradually reduced from top to bottom.
8. composite water-proof construction method at deep basal pit anti-float anchor rod node, characterized in that include the following steps: 1) self waterproofing Protective layer (34) punching downwards protrudes into sub-surface (1) across concrete cushion (2) and forms anchor hole (92), to waterproof protective layer (34) reaming is carried out at forms through-hole (91);
2) recrement in anchor hole (92) and through-hole (91) is removed using pressure-air, until the wind that aperture is returned out, feel is without dust Until, avoid the sediment in anchor hole (92) and through-hole (91) from existing;
3) anchor pole (5) is put into anchor hole (92) and will keeps anchor pole (5) perpendicular in anchoring body (51) partial insertion sub-surface (1) Directly;
4) connector is inserted on reinforcing bar (52), mobile connection body makes steel loop (6) upper surface concordant with anchor hole (92) upper surface, The water filling in holding tank (61) is so that steel loop (6) positions, and steel loop (6) is welded on reinforcing bar (52), later by connecting hole (62) and holding tank (61) welded seal;
5) carry out slip casing by pressure, by the way of the reversed slip casting of bottom hole, Grouting Pipe insertion away from anchor hole (92) bottom 30cm at, slurries from Grouting Pipe inwardly pours into, and gas is expelled directly out;
6) coating waterproof coating (31), laying water-proof coiled material (32) process are successively carried out after injecting cement paste solidification;
7) by steel bushing (35) cover waterproof jacket (33) outside, to waterproof jacket (33) heat so that waterproof jacket (33) hot melt after with reinforcing bar (52) it bonds;
8) injection waterproofing unction forms waterproofing unction filled layer (36) above the waterproof roll (32) in through-hole (91);
9) reinforcing bar (52) upper end is bent;
10) bottom plate (4) are poured.
CN201910671477.5A 2019-07-24 2019-07-24 Deep foundation pit anti-floating anchor rod node composite waterproof structure and construction method thereof Active CN110485479B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910671477.5A CN110485479B (en) 2019-07-24 2019-07-24 Deep foundation pit anti-floating anchor rod node composite waterproof structure and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910671477.5A CN110485479B (en) 2019-07-24 2019-07-24 Deep foundation pit anti-floating anchor rod node composite waterproof structure and construction method thereof

Publications (2)

Publication Number Publication Date
CN110485479A true CN110485479A (en) 2019-11-22
CN110485479B CN110485479B (en) 2021-05-07

Family

ID=68548127

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910671477.5A Active CN110485479B (en) 2019-07-24 2019-07-24 Deep foundation pit anti-floating anchor rod node composite waterproof structure and construction method thereof

Country Status (1)

Country Link
CN (1) CN110485479B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115142479A (en) * 2022-08-03 2022-10-04 深圳市宏源建设工程有限公司 Pressure type prestressing force anti-floating anchor rod waterproof construction

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100879803B1 (en) * 2007-12-13 2009-01-22 주식회사 젠트로 Waterproof structure and constructing method of the same
CN202809659U (en) * 2012-03-20 2013-03-20 苏州市能工基础工程有限责任公司 Waterproof joint for steel strand
CN204112349U (en) * 2014-08-12 2015-01-21 中国十七冶集团有限公司 Dewatering well water-tight device
CN205653784U (en) * 2016-03-23 2016-10-19 中建一局集团第二建筑有限公司 Novel anti -floating anchor rod node waterproofing structure
CN205822273U (en) * 2016-06-28 2016-12-21 中铁二院重庆勘察设计研究院有限责任公司 External labeling type Water stop structure for the active-passive integrated sealing of construction joint
CN205954622U (en) * 2016-08-27 2017-02-15 中国二十冶集团有限公司 A sealing device for post stretching anti -floating anchor rod
CN207727600U (en) * 2017-12-13 2018-08-14 中国一冶集团有限公司 Plugging dewatering well device

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100879803B1 (en) * 2007-12-13 2009-01-22 주식회사 젠트로 Waterproof structure and constructing method of the same
CN202809659U (en) * 2012-03-20 2013-03-20 苏州市能工基础工程有限责任公司 Waterproof joint for steel strand
CN204112349U (en) * 2014-08-12 2015-01-21 中国十七冶集团有限公司 Dewatering well water-tight device
CN205653784U (en) * 2016-03-23 2016-10-19 中建一局集团第二建筑有限公司 Novel anti -floating anchor rod node waterproofing structure
CN205822273U (en) * 2016-06-28 2016-12-21 中铁二院重庆勘察设计研究院有限责任公司 External labeling type Water stop structure for the active-passive integrated sealing of construction joint
CN205954622U (en) * 2016-08-27 2017-02-15 中国二十冶集团有限公司 A sealing device for post stretching anti -floating anchor rod
CN207727600U (en) * 2017-12-13 2018-08-14 中国一冶集团有限公司 Plugging dewatering well device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115142479A (en) * 2022-08-03 2022-10-04 深圳市宏源建设工程有限公司 Pressure type prestressing force anti-floating anchor rod waterproof construction

Also Published As

Publication number Publication date
CN110485479B (en) 2021-05-07

Similar Documents

Publication Publication Date Title
CN109403371A (en) A kind of Steep Slope Embankment retaining structure and construction method
CN105926617B (en) A kind of structure and its construction method that protection can be provided anti-float anchor rod
CN110359957B (en) Dam body connecting structure and construction method thereof
CN105604100B (en) A kind of outer anchoring process of nonmetallic anti-float anchor rod
CN105625421B (en) A kind of outer anchor of nonmetallic anti-float anchor rod
CN209368867U (en) A kind of Steep Slope Embankment retaining structure
CN107988895B (en) Bridge and construction method thereof
CN106988328A (en) A kind of C c-types opening locked steel tube pilecofferdam and construction method
CN106522959B (en) A kind of borehole wall steel construction waterproof connecting plate and its construction technology
CN111894045A (en) Anti-floating anchoring structure and anti-floating anchoring construction method for basement bottom plate
CN110485479A (en) Composite water-proof structure and its construction method at deep basal pit anti-float anchor rod node
KR101038945B1 (en) A filling structure of upper part of a tunnel and its procedure
CN109736156A (en) A kind of highway barrier and sound barrier share integrated steel anchor tube foundation structure and construction method
CN212582757U (en) Anti-floating anchoring structure for basement bottom plate
CN205712098U (en) A kind of structure that anti-float anchor rod can be provided protection
CN108193706A (en) A kind of downward construction concrete pouring procedure of part contrary sequence method vertical structure
CN214272102U (en) Waterproof construction of underground foundation ditch precipitation well
CN205591210U (en) Formula cast member and construction assembly are spliced to underground
KR101234270B1 (en) Method for non excavated excavating construction using steel pipe and steel pipe with hole
CN211395734U (en) Straight anchor and group anchor composite rock anchoring foundation for power transmission tower
CN204163076U (en) The wadding weft variation device for casting at prestressed concrete pipe pile pile extension place
CN209144837U (en) The pattern foundation pit supporting structure of waterproof tensile
CN114525781A (en) Prestressed rod core bag grouting combined anti-floating component and construction method
CN206143725U (en) Novel dam of steel clad concrete that highly resistance washes away
CN103277102B (en) Slope toe reinforcement method for artificial boundary pillars during transition from open-pit mining to underground mining

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20210414

Address after: 225300 Suchen Town, Hailing District, Taizhou City, Jiangsu Province (Suchen)

Applicant after: Jiangsu Zhengfei Construction Co.,Ltd.

Address before: 213000 65 Yanshan Road, Licheng Town, Liyang City, Changzhou City, Jiangsu Province

Applicant before: Jiangsu Maosheng Construction Group Co.,Ltd.

GR01 Patent grant
GR01 Patent grant