CN110485215A - A kind of novel pretensioned prestressing steel-continuous-fiber muscle enhancing is without tiny fragments of stone, coal, etc. Reactive Powder Concrete track plates and preparation method thereof - Google Patents

A kind of novel pretensioned prestressing steel-continuous-fiber muscle enhancing is without tiny fragments of stone, coal, etc. Reactive Powder Concrete track plates and preparation method thereof Download PDF

Info

Publication number
CN110485215A
CN110485215A CN201910860022.8A CN201910860022A CN110485215A CN 110485215 A CN110485215 A CN 110485215A CN 201910860022 A CN201910860022 A CN 201910860022A CN 110485215 A CN110485215 A CN 110485215A
Authority
CN
China
Prior art keywords
sfcb
track plates
continuous
steel
reactive powder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910860022.8A
Other languages
Chinese (zh)
Inventor
杨洋
张志勤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yangzhou University
Original Assignee
Yangzhou University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yangzhou University filed Critical Yangzhou University
Priority to CN201910860022.8A priority Critical patent/CN110485215A/en
Publication of CN110485215A publication Critical patent/CN110485215A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B23/00Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects
    • B28B23/02Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects wherein the elements are reinforcing members
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B23/00Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects
    • B28B23/02Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects wherein the elements are reinforcing members
    • B28B23/04Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects wherein the elements are reinforcing members the elements being stressed
    • B28B23/043Wire anchoring or tensioning means for the reinforcements
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B1/00Ballastway; Other means for supporting the sleepers or the track; Drainage of the ballastway
    • E01B1/002Ballastless track, e.g. concrete slab trackway, or with asphalt layers
    • E01B1/004Ballastless track, e.g. concrete slab trackway, or with asphalt layers with prefabricated elements embedded in fresh concrete or asphalt

Landscapes

  • Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Chemical & Material Sciences (AREA)
  • Ceramic Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Manufacturing Of Tubular Articles Or Embedded Moulded Articles (AREA)

Abstract

The invention discloses a kind of novel pretensioned prestressing steel-continuous-fiber muscle (SFCB) enhancings without tiny fragments of stone, coal, etc. Reactive Powder Concrete track plates and preparation method thereof, belong to the rail plate technique field of non-fragment orbit, including track plates plate body, SFCB mesh sheet and presstressed reinforcing steel.Track plates plate body is poured using Reactive Powder Concrete, is provided with multiple groups concrete bearing platform and shoulder block, fill orifice, inspection hole and pre-buried insulating sleeve;SFCB mesh sheet is combined closely with track plates, arranges four layer arrangement of time-division, respectively transverse direction SFCB, longitudinal SFCB, lateral SFCB and longitudinal direction SFCB;Presstressed reinforcing steel is reinforcing bar, using bidirectional arrangements in length and breadth.The present invention substantially improves the insulation performance of track plates, improves the bearing capacity of rail plate, reduces the use of cumbersome insulated working and material.

Description

A kind of novel pretensioned prestressing steel-continuous-fiber muscle enhancing is mixed without tiny fragments of stone, coal, etc. reactive powder Solidifying soil track plates and preparation method thereof
Technical field
The present invention relates to high speed railway track technical fields, further, belong to the rail plate technique of non-fragment orbit Field specifically proposes that a kind of novel pretensioned prestressing steel-continuous-fiber muscle (SFCB) enhances without tiny fragments of stone, coal, etc. Reactive Powder Concrete (RPC) track plates and preparation method thereof.
Background technique
High-speed railway with increasingly automated, high security, high reliability, it is high-comfort the features such as, just by many countries With the attention in area, and huge Social benefit and economic benefit is achieved.Non-fragment orbit because its high reliability, high ride, The features such as high-durability and intimate rail-free are safeguarded gradually is adopted in the construction of high-speed railway, however, in China's high speed In the railway system, there are still incompatibility problem, main cause is steel in track plates for fragment-free track slab and ZPW-2000A track circuit The high frequency signal current mutual inductance of muscle closed circuit and track circuit is degrading the primary parameter of rail, i.e. rail equivalent resistance increases Greatly, inductance reduces, and railway ballast leak resistance reduces, serious curtailment track circuit transmission distance, and reduces train operating safety Property.
Summary of the invention
The object of the present invention is to provide a kind of novel pretensioned prestressing steel-continuous-fiber muscle (SFCB) enhancings without tiny fragments of stone, coal, etc. activity Powder concrete (RPC) track plates, the fragment-free track slab are closed back due to avoiding structure using steel-continuous-fiber muscle (SFCB) The formation on road, thus solve the problems, such as proposed in above-mentioned background, and due to using Reactive Powder Concrete (RPC), The bearing capacity of track plates can also be improved, and reduces the use of material.
Technical scheme is as follows:
A kind of novel pretensioned prestressing steel-continuous-fiber muscle enhancing is without tiny fragments of stone, coal, etc. Reactive Powder Concrete track plates, characterized in that packet Track plates plate body, SFCB mesh sheet and presstressed reinforcing steel are included, the track plates plate body is provided with multiple groups concrete bearing platform, fill orifice, inspection Look into hole and pre-buried insulating sleeve;The concrete bearing platform both ends are respectively symmetrically equipped with shoulder block, and multiple groups concrete bearing platform is in track plates Longitudinal centre line two sides are arranged symmetrically at the top of plate body, and the fill orifice and inspection hole setting are on the longitudinal, described pre-buried Insulating sleeve is built in concrete bearing platform;SFCB mesh sheet is equipped in the track plate body, SFCB mesh sheet is by between vertical, horizontal SFCB It is constituted every arrangement, lateral SFCB extends along track plates plate body width direction, and longitudinal SFCB extends along track plate body length direction; The presstressed reinforcing steel is bidirectional pre-tensioned along track plates length and width direction, and interts arrangement in SFCB mesh sheet.
Preferably, SFCB mesh sheet through-thickness point four layers of arranged for interval in track plates plate body, from top to bottom according to Minor tick is provided with lateral SFCB, longitudinal direction SFCB, transverse direction SFCB and longitudinal direction SFCB.
Preferably, the presstressed reinforcing steel is reinforcing bar, and arrangement is interted in SFCB mesh sheet.
Preferably, the track plates plate body is cuboid, is poured with Reactive Powder Concrete.
Preferably, the longitudinally, laterally SFCB in the SFCB mesh sheet includes in fibrous composite clad and reinforcing bar Core, the reinforcing bar inner core be Ribbed Bar, fibrous composite clad along Ribbed Bar rib tooth spiral wrap in steel Outside muscle inner core.
Preferably, the SFCB mesh sheet, wherein transverse direction SFCB extends in the width direction, the cloth below each pair of concrete bearing platform It sets, longitudinal SFCB extends along track plate body length direction, is arranged symmetrically in longitudinal centre line two sides.
A kind of preparation side of the novel pretensioned prestressing steel-continuous-fiber muscle enhancing without tiny fragments of stone, coal, etc. Reactive Powder Concrete track plates Method, characterized in that include the following steps:
(1) pre-manufactured steel-Continuous glassfibre reinforced plastics (SFCB)
1) using Ribbed Bar as reinforcing bar inner core, reinforcing bar inner core of polishing removes the longitudinal rib of Ribbed Bar;
2) epoxy resin is sufficiently impregnated using FRP roving;
3) spiral wrap is carried out to reinforcing bar inner core along the rib tooth of Ribbed Bar with the FRP roving after dipping, obtains steel-company Continuous fibre composite reinforcement;
(2) SFCB mesh sheet is made
Four layers of arranged for interval of SFCB mesh sheet point, are respectively arranged from top to bottom as lateral SFCB, longitudinal direction SFCB, transverse direction SFCB and longitudinal direction SFCB;
(3) arrangement prestress muscle
Presstressed reinforcing steel uses reinforcing bar, interspersed to be arranged in SFCB mesh sheet;
(4) each presstressed reinforcing steel is connected to tensioning equipment, tensioning is carried out to rod piece after the completion;
(5) after the completion of tension of prestressed tendon in template casting concrete;
(6) after concrete reaches required intensity, presstressed reinforcing steel is put and opens and removes connection, to demolding of track slab;
(7) concrete railway board is conserved.
Preferably, in the step (4), it should check and clear up before tension rod and the connector assembling of tensioning equipment, and is pre- Stress, which applies, should use automatic Tensioning equipment, and the tensioning muscle tensioning is divided into initial tensioning and whole two stages of tensioning.
Preferably, in the step (5), pouring with concrete is Reactive Powder Concrete, according to specification by cement, silicon Ash, 0-6mm aggregate, fiber, high efficiency water reducing agent and water are prepared.
Preferably, in the step (6), presstressed reinforcing steel puts Zhang Caiyong Integral tension mode, and it is preferably two-way same for putting Zhang Shunxu Step, which is put, opens, and forbids ultra stretching, and presstressed reinforcing steel, which is put to open, successively removes connecting rod after the completion, and to demolding of track slab.
Preferably, in the step (7), track plates maintenance preferably uses steam curing, is divided into standing, heating, constant temperature and drop Warm four-stage, and the thermostatic curing time should be according to the requirement of component demoulding strength, concrete mix situation and environmental condition It is determined Deng by test.
Beneficial effects of the present invention are as follows:
The present invention avoids the formation of structure closed circuit since it is with excellent insulation performance, to solve nothing There are still incompatibility problems with ZPW-2000A track circuit for tiny fragments of stone, coal, etc. track plates, increase track circuit transmission distance, improve train Safety in operation reduces cumbersome insulated working;Since track plates use Reactive Powder Concrete (RPC), component is improved Bearing capacity, saved material.
Detailed description of the invention
Fig. 1 is that novel pretensioned prestressing steel-continuous-fiber muscle (SFCB) enhances without tiny fragments of stone, coal, etc. Reactive Powder Concrete (RPC) rail Guidance tape side view;
Fig. 2 is that novel pretensioned prestressing steel-continuous-fiber muscle (SFCB) enhances without tiny fragments of stone, coal, etc. Reactive Powder Concrete (RPC) track plates Top view;
Fig. 3 is that novel pretensioned prestressing steel-continuous-fiber muscle (SFCB) enhances without tiny fragments of stone, coal, etc. Reactive Powder Concrete (RPC) track plates Overall situation figure;
Fig. 4 is steel-continuous-fiber muscle (SFCB) mesh sheet and presstressed reinforcing steel figure;
Fig. 5 is steel-continuous-fiber muscle (SFCB) cross-sectional view.
Specific embodiment
The present invention is described in further details with reference to the accompanying drawing.
A kind of novel pretensioned prestressing steel-continuous-fiber muscle (SFCB) enhancing is without tiny fragments of stone, coal, etc. Reactive Powder Concrete (RPC) rail Guidance tape, including track plates plate body 1, vertically and horizontally steel-continuous-fiber muscle (SFCB) constitute SFCB mesh sheet 2 and presstressed reinforcing steel 3.
As shown in Figs. 1-5, track plates plate body 1 is provided with multiple groups concrete bearing platform 4 and shoulder block 5, fill orifice 6,7 He of inspection hole Pre-buried insulating sleeve 8;The SFCB mesh sheet 2 that vertically and horizontally steel-continuous-fiber muscle (SFCB) is constituted is combined closely with track plates, when arrangement Divide four layer arrangements, be respectively as follows: the through-thickness in track plates plate body and be sequentially arranged at intervals with lateral SFCB(9 from top to bottom), Longitudinal SFCB(10), transverse direction SFCB(9) and longitudinal direction SFCB(10), lateral SFCB(9) extend in the width direction, longitudinal SFCB(10) Extend along track plate body length direction;Presstressed reinforcing steel 3 is reinforcing bar, using bidirectional arrangements in length and breadth, along track plates length and width Direction is bidirectional pre-tensioned.
Track plates plate body 1 be cuboid, poured with Reactive Powder Concrete (RPC), be provided with multiple groups concrete bearing platform 4 and Shoulder block 5, fill orifice 6, inspection hole 7 and pre-buried insulating sleeve 8.Multiple groups concrete bearing platform 4 and shoulder block 5 are indulged above track plates plate body It is arranged symmetrically to center line two sides, on the longitudinal, the pre-buried setting of insulating sleeve 8 is mixed for fill orifice 6 and the setting of inspection hole 7 On solidifying cushion cap.
SFCB in steel-continuous-fiber muscle (SFCB) mesh sheet 2 includes in fibrous composite (FRP) clad 91 and reinforcing bar Core 92, reinforcing bar inner core 92 be Ribbed Bar, FRP clad 91 along Ribbed Bar rib tooth spiral wrap in reinforcing bar inner core 92 It is external.The interval vertical, horizontal SFCB of SFCB mesh sheet 2 is arranged, lateral SFCB(9) extend in the width direction, it is held in each pair of concrete Platform arranged beneath, longitudinal SFCB(10) extend along track plate body length direction, it is arranged symmetrically in longitudinal centre line two sides.
Presstressed reinforcing steel 3 uses reinforcing bar, bidirectional pre-tensioned along track plates length and width direction, and cloth is interted in SFCB mesh sheet 2 It sets.
Above-mentioned novel pretensioned prestressing steel-continuous-fiber muscle (SFCB) enhancing is prepared without tiny fragments of stone, coal, etc. activity powder using following methods Last concrete (RPC) track plates:
(1) pre-manufactured steel-Continuous glassfibre reinforced plastics (SFCB)
Using Ribbed Bar as reinforcing bar inner core 92, the longitudinal rib of polishing removal Ribbed Bar, using fibrous composite (FRP) Roving is sufficiently impregnated epoxy resin, and the FRP roving after using dipping is as FRP clad 91 along the rib of Ribbed Bar Tooth carries out spiral wrap to reinforcing bar inner core 92, obtains steel-continuous-fiber composite-rib, and wherein FRP can choose basalt fibre, virtue Synthetic fibre fiber, glass fibre, pbo fiber, Dyneema fiber.
(2) SFCB mesh sheet layer 2 is made
Four layers of arranged for interval of SFCB mesh sheet point are respectively arranged for lateral SFCB(9), longitudinal direction SFCB(10), laterally from top to bottom SFCB(9) and longitudinal direction SFCB(10), lateral SFCB(9) extend in the width direction, it is longitudinal in each pair of concrete bearing platform arranged beneath SFCB(10) extend along track plate body length direction, be arranged symmetrically in longitudinal centre line two sides.
(3) arrangement prestress muscle 3
Presstressed reinforcing steel 3 uses reinforcing bar, bidirectional pre-tensioned along track plates length and width direction, interspersed to be arranged in SFCB mesh sheet 2.
(4) each presstressed reinforcing steel 3 is connected to tensioning equipment, tensioning is carried out to rod piece after the completion.
It should check and clear up before tension rod and connector assembling, and prestress application should use automatic Tensioning equipment, tensioning The tensioning of muscle is divided into initial tensioning and whole two stages of tensioning.
(5) after the completion of 3 tensioning of presstressed reinforcing steel in template casting concrete
Pouring with concrete is Reactive Powder Concrete (RPC), according to specification by cement, silicon ash, and 0-6mm aggregate, fiber, efficiently Water-reducing agent and water are prepared.
(6) after concrete reaches some strength, presstressed reinforcing steel 3 is put and opens and remove connection, it is de- to track plates plate body 1 Mould.
Presstressed reinforcing steel 3 puts Zhang Caiyong Integral tension mode, and putting Zhang Shunxu is preferably that bi-directional synchronization is put, forbids ultra stretching, in advance Stress rib 3 is put to open successively removes connecting rod after the completion, and demoulds to track plates 1.
(7) concrete railway board 1 is conserved.
Track plates maintenance preferably uses steam curing, is divided into standing, heating, constant temperature and cooling four-stage, and thermostatic curing Time should be determined according to the requirement of component demoulding strength, concrete mix situation and environmental condition etc. by test.

Claims (10)

1. a kind of novel pretensioned prestressing steel-continuous-fiber muscle enhancing is without tiny fragments of stone, coal, etc. Reactive Powder Concrete track plates, characterized in that Including track plates plate body, SFCB mesh sheet and presstressed reinforcing steel, the track plates plate body be provided with multiple groups concrete bearing platform, fill orifice, Inspection hole and pre-buried insulating sleeve;The concrete bearing platform both ends are respectively symmetrically equipped with shoulder block, and multiple groups concrete bearing platform is in track Longitudinal centre line two sides are arranged symmetrically at the top of plate plate body, and the fill orifice and inspection hole setting are on the longitudinal, described pre- It buries insulating sleeve and is built in concrete bearing platform;SFCB mesh sheet is equipped in the track plate body, SFCB mesh sheet is by vertical, horizontal SFCB Arranged for interval is constituted, and lateral SFCB extends along track plates plate body width direction, and longitudinal SFCB prolongs along track plate body length direction It stretches;The presstressed reinforcing steel is bidirectional pre-tensioned along track plates length and width direction, and interts arrangement in SFCB mesh sheet.
2. a kind of novel pretensioned prestressing steel-continuous-fiber muscle enhancing according to claim 1 is mixed without tiny fragments of stone, coal, etc. reactive powder Solidifying soil track plates, characterized in that the SFCB mesh sheet four layers of arranged for interval of through-thickness point in track plates plate body, from up to Under be sequentially arranged at intervals with lateral SFCB, longitudinal direction SFCB, transverse direction SFCB and longitudinal direction SFCB.
3. a kind of novel pretensioned prestressing steel-continuous-fiber muscle enhancing according to claim 1 is mixed without tiny fragments of stone, coal, etc. reactive powder Solidifying soil track plates, characterized in that the presstressed reinforcing steel is reinforcing bar.
4. a kind of novel pretensioned prestressing steel-continuous-fiber muscle enhancing according to claim 1 is mixed without tiny fragments of stone, coal, etc. reactive powder Solidifying soil track plates, characterized in that the track plates plate body is cuboid, is poured with Reactive Powder Concrete.
5. a kind of novel pretensioned prestressing steel-continuous-fiber muscle enhancing according to claim 1 is mixed without tiny fragments of stone, coal, etc. reactive powder Solidifying soil track plates, characterized in that the longitudinally, laterally SFCB in the SFCB mesh sheet includes fibrous composite clad and steel Muscle inner core, the reinforcing bar inner core are Ribbed Bar, rib tooth spiral wrap of the fibrous composite clad along Ribbed Bar Outside reinforcing bar inner core.
6. a kind of novel pretensioned prestressing steel-continuous-fiber muscle enhancing according to claim 1 is mixed without tiny fragments of stone, coal, etc. reactive powder Solidifying soil track plates, characterized in that the SFCB mesh sheet, wherein transverse direction SFCB extends in the width direction, in each pair of concrete bearing platform Arranged beneath, longitudinal SFCB extend along track plate body length direction, are arranged symmetrically in longitudinal centre line two sides.
7. a kind of novel pretensioned prestressing steel-continuous-fiber muscle enhancing according to claim 1 to 6 is without the tiny fragments of stone, coal, etc. The preparation method of Reactive Powder Concrete track plates, characterized in that include the following steps:
(1) pre-manufactured steel-Continuous glassfibre reinforced plastics (SFCB)
1) using Ribbed Bar as reinforcing bar inner core, reinforcing bar inner core of polishing removes the longitudinal rib of Ribbed Bar;
2) epoxy resin is sufficiently impregnated using FRP roving;
3) spiral wrap is carried out to reinforcing bar inner core along the rib tooth of Ribbed Bar with the FRP roving after dipping, obtains steel-company Continuous fibre composite reinforcement;
(2) SFCB mesh sheet is made
Four layers of arranged for interval of SFCB mesh sheet point, are respectively arranged from top to bottom as lateral SFCB, longitudinal direction SFCB, transverse direction SFCB and longitudinal direction SFCB;
(3) arrangement prestress muscle
Presstressed reinforcing steel uses reinforcing bar, interspersed to be arranged in SFCB mesh sheet;
(4) each presstressed reinforcing steel is connected to tensioning equipment, tensioning is carried out to rod piece after the completion;
(5) after the completion of tension of prestressed tendon in template casting concrete;
(6) after concrete reaches required intensity, presstressed reinforcing steel is put and opens and removes connection, to demolding of track slab;
(7) concrete railway board is conserved.
8. a kind of novel pretensioned prestressing steel-continuous-fiber muscle enhancing according to claim 7 is mixed without tiny fragments of stone, coal, etc. reactive powder The preparation method of solidifying soil track plates, characterized in that in the step (4), answered before tension rod and the connector assembling of tensioning equipment It checks and clears up, and prestress application should use automatic Tensioning equipment, the tensioning muscle tensioning be divided into initial tensioning and whole tensioning two A stage.
9. a kind of novel pretensioned prestressing steel-continuous-fiber muscle enhancing according to claim 7 is mixed without tiny fragments of stone, coal, etc. reactive powder The preparation method of solidifying soil track plates, characterized in that in the step (5), pouring with concrete is Reactive Powder Concrete, according to Specification is prepared by cement, silicon ash, 0-6mm aggregate, fiber, high efficiency water reducing agent and water.
10. a kind of novel pretensioned prestressing steel-continuous-fiber muscle enhancing according to claim 7 is mixed without tiny fragments of stone, coal, etc. reactive powder The preparation method of solidifying soil track plates, characterized in that in the step (6), presstressed reinforcing steel puts Zhang Caiyong Integral tension mode, puts and opens Sequence preferably bi-directional synchronization, which is put, opens, and forbids ultra stretching, and presstressed reinforcing steel is put to open successively removes connecting rod after the completion, and de- to track plates Mould.
CN201910860022.8A 2019-09-11 2019-09-11 A kind of novel pretensioned prestressing steel-continuous-fiber muscle enhancing is without tiny fragments of stone, coal, etc. Reactive Powder Concrete track plates and preparation method thereof Pending CN110485215A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910860022.8A CN110485215A (en) 2019-09-11 2019-09-11 A kind of novel pretensioned prestressing steel-continuous-fiber muscle enhancing is without tiny fragments of stone, coal, etc. Reactive Powder Concrete track plates and preparation method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910860022.8A CN110485215A (en) 2019-09-11 2019-09-11 A kind of novel pretensioned prestressing steel-continuous-fiber muscle enhancing is without tiny fragments of stone, coal, etc. Reactive Powder Concrete track plates and preparation method thereof

Publications (1)

Publication Number Publication Date
CN110485215A true CN110485215A (en) 2019-11-22

Family

ID=68557673

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910860022.8A Pending CN110485215A (en) 2019-09-11 2019-09-11 A kind of novel pretensioned prestressing steel-continuous-fiber muscle enhancing is without tiny fragments of stone, coal, etc. Reactive Powder Concrete track plates and preparation method thereof

Country Status (1)

Country Link
CN (1) CN110485215A (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101823860A (en) * 2010-05-25 2010-09-08 陈耀强 High-strength active powder fiber concrete slab and manufacturing method thereof
CN201915299U (en) * 2010-12-31 2011-08-03 中国铁道科学研究院铁道建筑研究所 Pretensioned prestressed concrete track slab of slab ballastless track
CN102628242A (en) * 2012-04-28 2012-08-08 中铁二十三局集团有限公司 Plate-type ballastless track concrete track plate, manufacturing method thereof, and stretching device thereof
CN104264533A (en) * 2014-08-07 2015-01-07 中铁二十三局集团轨道交通工程有限公司 Two-way pre-tensioned prestressed concrete track plate and production method thereof
JP2015203228A (en) * 2014-04-14 2015-11-16 公益財団法人鉄道総合技術研究所 Railway sleeper direct-coupled track structure
CN107443542A (en) * 2017-08-04 2017-12-08 东南大学 A kind of FRP presstressed reinforcing steels fragment-free track slab and preparation method thereof
EP3263766A1 (en) * 2016-06-27 2018-01-03 Antoine Marot Concrete slab for a railway vehicle and/or guided tyre vehicle
CN208685352U (en) * 2018-05-31 2019-04-02 中国铁道科学研究院铁道建筑研究所 A kind of fiber reinforcement prestressed reinforced concrete sleeper

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101823860A (en) * 2010-05-25 2010-09-08 陈耀强 High-strength active powder fiber concrete slab and manufacturing method thereof
CN201915299U (en) * 2010-12-31 2011-08-03 中国铁道科学研究院铁道建筑研究所 Pretensioned prestressed concrete track slab of slab ballastless track
CN102628242A (en) * 2012-04-28 2012-08-08 中铁二十三局集团有限公司 Plate-type ballastless track concrete track plate, manufacturing method thereof, and stretching device thereof
JP2015203228A (en) * 2014-04-14 2015-11-16 公益財団法人鉄道総合技術研究所 Railway sleeper direct-coupled track structure
CN104264533A (en) * 2014-08-07 2015-01-07 中铁二十三局集团轨道交通工程有限公司 Two-way pre-tensioned prestressed concrete track plate and production method thereof
EP3263766A1 (en) * 2016-06-27 2018-01-03 Antoine Marot Concrete slab for a railway vehicle and/or guided tyre vehicle
CN107443542A (en) * 2017-08-04 2017-12-08 东南大学 A kind of FRP presstressed reinforcing steels fragment-free track slab and preparation method thereof
CN208685352U (en) * 2018-05-31 2019-04-02 中国铁道科学研究院铁道建筑研究所 A kind of fiber reinforcement prestressed reinforced concrete sleeper

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
刘志文等: "《第五届全国土木工程研究生学术论坛论文集》", 31 July 2007 *
薛伟辰: "《现代预应力结构设计》", 31 March 2003, 中国建筑工业出版社 *

Similar Documents

Publication Publication Date Title
CN103497503A (en) Light composite sleeper as well as preparation method thereof
US20130264394A1 (en) Pre-stressed concrete track slab of slab-type ballast-less track
CN107443542B (en) A kind of FRP presstressed reinforcing steel fragment-free track slab and preparation method thereof
CN202718022U (en) Fabricated type prestressed concrete pavement
CN108589436B (en) Fiber reinforced prestressed reinforced concrete sleeper
CN107190585A (en) A kind of cast-in-place sleeper plate-type ballastless track and its construction method
CN107190583A (en) Urethane cures railway roadbed and preparation method thereof
CN104131498A (en) Lifting repair method for ballastless track with settled curved section
CN106012694A (en) Prestressed concrete track slab and manufacturing method thereof
CN201883346U (en) Prestressed concrete track slab of slab-type ballastless track
CN105153674A (en) Railway gage apron, production method therefor and application thereof in rail fastening system
CN207091835U (en) A kind of cast-in-place sleeper plate-type ballastless track
CN201915299U (en) Pretensioned prestressed concrete track slab of slab ballastless track
CN113547633B (en) Production process of prestressed nonmetal sound barrier unit plate
CN110485215A (en) A kind of novel pretensioned prestressing steel-continuous-fiber muscle enhancing is without tiny fragments of stone, coal, etc. Reactive Powder Concrete track plates and preparation method thereof
CN103374865A (en) Construction method for longitudinally connecting and laying ballastless track slabs
CN204703013U (en) A kind of heavy haul railway abrasion-proof concrete sleeper
CN206844444U (en) A kind of steel bar girder concrete hollow building roof based on non-dismantling formwork
CN103758040B (en) Frange plate construction special hoisting bar and using method is watered after sound barrier T beam
CN107574725A (en) A kind of double-block type ballastless track plate and preparation method thereof
CN105178165A (en) Tension face layer compound-reinforced reinforced concrete continuous rigid frame bridge and construction method thereof
CN106988183A (en) A kind of concrete road of High anti bending strength
CN102587223A (en) Composite precast concrete rail plate
CN207091831U (en) A kind of track plates
CN113845639A (en) Integral polyurethane foaming synthetic sleeper and preparation method thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20191122

RJ01 Rejection of invention patent application after publication