CN110472298A - Construction method, device, equipment and the storage medium of electricity market model - Google Patents
Construction method, device, equipment and the storage medium of electricity market model Download PDFInfo
- Publication number
- CN110472298A CN110472298A CN201910666615.0A CN201910666615A CN110472298A CN 110472298 A CN110472298 A CN 110472298A CN 201910666615 A CN201910666615 A CN 201910666615A CN 110472298 A CN110472298 A CN 110472298A
- Authority
- CN
- China
- Prior art keywords
- component
- electricity market
- data
- model
- power grid
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 230000005611 electricity Effects 0.000 title claims abstract description 147
- 238000010276 construction Methods 0.000 title claims abstract description 31
- 230000004044 response Effects 0.000 claims abstract description 14
- 239000000284 extract Substances 0.000 claims abstract description 9
- 238000004590 computer program Methods 0.000 claims description 20
- 238000004088 simulation Methods 0.000 claims description 13
- 238000000034 method Methods 0.000 claims description 11
- 230000008901 benefit Effects 0.000 claims description 2
- 238000000605 extraction Methods 0.000 claims 1
- 230000006872 improvement Effects 0.000 description 13
- 238000010586 diagram Methods 0.000 description 8
- 230000006870 function Effects 0.000 description 7
- 239000000446 fuel Substances 0.000 description 3
- 238000012423 maintenance Methods 0.000 description 3
- 230000004048 modification Effects 0.000 description 3
- 238000012986 modification Methods 0.000 description 3
- 230000015572 biosynthetic process Effects 0.000 description 2
- 238000004891 communication Methods 0.000 description 2
- 238000012545 processing Methods 0.000 description 2
- 238000000926 separation method Methods 0.000 description 2
- 241001269238 Data Species 0.000 description 1
- 230000004913 activation Effects 0.000 description 1
- 238000004458 analytical method Methods 0.000 description 1
- 230000006399 behavior Effects 0.000 description 1
- 238000004364 calculation method Methods 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 230000009194 climbing Effects 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000003780 insertion Methods 0.000 description 1
- 230000037431 insertion Effects 0.000 description 1
- 230000010354 integration Effects 0.000 description 1
- 230000003993 interaction Effects 0.000 description 1
- 230000002452 interceptive effect Effects 0.000 description 1
- 230000007774 longterm Effects 0.000 description 1
- 230000008520 organization Effects 0.000 description 1
- 238000002360 preparation method Methods 0.000 description 1
- 230000008569 process Effects 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 230000003068 static effect Effects 0.000 description 1
- 238000012360 testing method Methods 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/50—Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
Landscapes
- Business, Economics & Management (AREA)
- Health & Medical Sciences (AREA)
- Engineering & Computer Science (AREA)
- Economics (AREA)
- Public Health (AREA)
- Water Supply & Treatment (AREA)
- General Health & Medical Sciences (AREA)
- Human Resources & Organizations (AREA)
- Marketing (AREA)
- Primary Health Care (AREA)
- Strategic Management (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Supply And Distribution Of Alternating Current (AREA)
Abstract
The invention discloses construction method, device, equipment and the storage mediums of a kind of electricity market model, comprising: judges whether the power grid physical model is known forming types according to the mode of writing of power grid physical model;It is known forming types in response to the power grid physical model, then extracts the master data of component according to the known forming types;Electricity market data relevant to the component title are obtained from electricity market database, and the electricity market data are divided into electricity market component attribute data and electricity market component connection relationship data;The master data of the electricity market component attribute data, the electricity market component connection relationship data and the component forms electric power system data table according to preset format;Electricity market model is configured to according to the data in the electric power system data table.It solves the problems, such as building electricity market model inaccuracy in the prior art using multiple embodiments and modeling efficiency is low.
Description
Technical field
The present invention relates to technical field of power systems more particularly to a kind of construction method of electricity market model, device, set
Standby and storage medium.
Background technique
Electricity market model construction depends on two methods at present, first is that power application Market Simulation software support is certainly
The dynamic format imported is automatically imported power system network topology by power grid physical model, fills in relevant information manually, parameter is set
Set and simulate setting;Second is that manual construction electricity market model and its data, emulation are set according to the grid condition that laboratory technician grasps
It sets.When needing to carry out power market simulation, technical staff needs to construct the model for being used for power market simulation first.Model
Building needs to consider real power system network topology, equipment operating maintenance or fault condition, power parameter, power supply operating maintenance
Situation, power supply economy parameter, fuel conditions, weather condition, load condition, hydrologic regime, emulation the period in festivals or holidays situation,
Economic development situation, user behavior, Electric Power Network Planning.According to the difference of emulation purpose and demand, above-mentioned parameter is intended to carry out on demand
Modification and combination, current existing technology are to be judged by technical staff, analyze and are automatically imported as required by software one by one
Function fills in generation simulation model manually.Since often element is numerous for large-scale power grid, connection relationship is complicated, and parameter is numerous and jumbled, hand
It is dynamic to fill in not only time and effort consuming, and manual operation easily causes carelessness to be omitted, to influence the accuracy of electricity market model.
Summary of the invention
The embodiment of the present invention provides construction method, device, equipment and the storage medium of a kind of electricity market model, can be effective
It solves the problems, such as building electricity market model inaccuracy in the prior art and modeling efficiency is low.
One embodiment of the invention provides a kind of construction method of electricity market model, comprising:
Judge whether the power grid physical model is known forming types according to the mode of writing of power grid physical model;
It is known forming types in response to the power grid physical model, then extracts first device according to the known forming types
The master data of part;Wherein, the master data of the component includes: the title of component, the property parameters of component, first device
Connection relationship between part;
Obtain relevant to component title electricity market data from electricity market database, and by the electric power
Marketing data is divided into electricity market component attribute data and electricity market component connection relationship data;
The electricity market component attribute data, the electricity market component connection relationship data and first device
The master data of part forms electric power system data table according to preset format;Wherein, the electric power system data table, packet
It includes: component attribute table, component connection relationship and parameter table;
Electricity market model is configured to according to the data in the electric power system data table.
As an improvement of the above scheme, the method, further includes:
It is not known forming types in response to the power grid physical model, then will be extracted according to user's self-defined pattern
The master data of the component.
As an improvement of the above scheme, the mode of writing according to power grid physical model judges the power grid physical model
It whether is known forming types, specifically:
The Electricity Market Simulation for judging that the power grid physical model uses according to the extension name of the power grid physical model is soft
Part.
As an improvement of the above scheme, the master data of the component includes: the attribute of the title of component, component
Connection relationship between parameter, component.
As an improvement of the above scheme, to the master data of the component to carry out classification and according to preset format shape
At electric power system data table, wherein the electric power system data table, comprising: component and attribute table, component connection
Relationship and parameter table, specifically:
The component and attribute list are constructed according to the property parameters of the corresponding component of the title of the component
Lattice;
According to the corresponding component connection relationship of the title of the component construct the component connection relationship and
Parameter table.
It as an improvement of the above scheme, is known forming types in response to the power grid physical model described, then basis
The known forming types extract after the master data of component, further includes:
Scene configuration parameter is obtained according to the master data of component;
Classification is carried out to scene configuration parameter and forms analog simulation allocation list according to preset format.
As an improvement of the above scheme, the known forming types include: the .raw format of PSS/E, the .dat lattice of BPA
Formula, the .pwd format of PowerWorld, the .dat format of DSP and the .slx format of matlab.
Another embodiment of the present invention correspondence provides a kind of construction device of electricity market model, comprising:
Judgment module, for judging whether the power grid physical model is known according to the mode of writing of power grid physical model
Forming types;
First respond module, for being known forming types in response to the power grid physical model, then according to described known
Forming types extract component master data;Wherein, the master data of the component includes: title, the member of component
Connection relationship between the property parameters of device, component;
Module is obtained, for obtaining electricity market number relevant to the component title from electricity market database
According to, and the electricity market data are divided into electricity market component attribute data and electricity market component connection relationship number
According to;
Control module is used for the electricity market component attribute data, the electricity market component connection relationship number
Accordingly and the master data of the component is according to preset format formation electric power system data table;Wherein, the power train
System data form, comprising: component attribute table, component connection relationship and parameter table;
Module is constructed, for being configured to electricity market model according to the data in the electric power system data table.
Another embodiment of the present invention is corresponding to provide a kind of building equipment of electricity market model, including processor, storage
Device and storage in the memory and are configured as the computer program executed by the processor, and the processor executes
The construction method of the electricity market model is realized when the computer program.
Another embodiment of the present invention correspondence provides a kind of computer readable storage medium, the computer-readable storage medium
Matter includes the computer program of storage, wherein controls the computer readable storage medium in computer program operation
Place equipment executes the construction method of the electricity market model.
Compared with prior art, construction method, the device, equipment of a kind of electricity market model disclosed by the embodiments of the present invention
And storage medium, by constructing software used in power grid physical model to identification, and then carry out parsing power grid physical model
In component master data, then relevant to component title electricity market number is obtained from electricity market database
According to according to electricity market data and the master data of component generation electric power system data table, further according to electric power system data
Table constructs electricity market model, intelligent to parse to power grid physical model, avoids that table is filled in manually, so that component
Master data it is more accurate, modified on a large scale so as to avoid the electricity market model of building.Again due to table kind
Electricity market data and component master data are merged simultaneously, so that the electricity market model of building is more accurate.
Detailed description of the invention
Fig. 1 is a kind of flow diagram of the construction method for electricity market model that one embodiment of the invention provides;
Fig. 2 is a kind of structural schematic diagram of the construction device for electricity market model that one embodiment of the invention provides;
Fig. 3 is a kind of structural schematic diagram of the building equipment for electricity market model that one embodiment of the invention provides.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete
Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on
Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other
Embodiment shall fall within the protection scope of the present invention.
It is a kind of flow diagram of the construction method for electricity market model that one embodiment of the invention provides referring to Fig. 1.
A kind of construction method of electricity market model, comprising:
S10, judge whether the power grid physical model is known forming types according to the mode of writing of power grid physical model;
Wherein, the known forming types include: the .raw format of PSS/E, the .dat format of BPA, the .pwd format of PowerWorld,
The .dat format of DSP and the .slx format of matlab.
Specifically, since there are the network topology knots of complete electric system in the simulation software of building power grid physical model
Structure, only compiling form and organizational form difference, analyze the data format of power grid physical model, more quickly parsing
Power grid physical model.
Obtain relevant to component title electricity market data from electricity market database, and by the electric power
Marketing data is divided into electricity market component attribute data and electricity market component connection relationship data.According to the electric power
The master data of market component attribute data, the electricity market component connection relationship data and the component according to
Preset format forms electric power system data table;Wherein, the electric power system data table, comprising: component attribute table,
Component connection relationship and parameter table.
For example, the first row must store version information etc. with 0 beginning in the .raw format of PSSE, then followed by
It must be node data, have apparent separation and mark between every one kind data.The for another example .dat of BPA, although without PSSE that
Stringent puts in order, but every row first character characterizes the type of card, is also assured that the assorted identical element part of data
Data, therefore by read following extension name can several rows in front format, which kind of format can judge automatically out is, it is known that is
It, can be according to reading data after which kind of format.
S20, in response to the power grid physical model it is known forming types, then is extracted according to the known forming types
The master data of component;Wherein, the master data of the component includes: the title of component, component property parameters,
Connection relationship between component.
In the present embodiment, component title can be generator, transformer, route, node, meet, section, region
Deng, the property parameters of component can constrain for maximum power, maximum capacity, route, meet data, section value etc., component
Between connection relationship can be connected to some component, route beginning, line end, belonging to region.
Specifically, since each data format has certain compiling form and organizational form, when determination is known
Forming types after, power grid physical model is parsed using the corresponding software data format prestored, member can be parsed
The master data of device.It avoids and manually the component of power grid physical model is analyzed.
S30, electricity market data relevant to the component title are obtained from electricity market database, and will be described
Electricity market data are divided into electricity market component attribute data and electricity market component connection relationship data.Wherein, institute
Electricity market data are stated including at least following any one: quotation information, Weather information, cost information, section information, scene letter
Breath, hydrologic regime, the plan of A class unit, the electric plan in west, maintenance plan, section relaxation facilities, load prediction information.
Illustratively, during extracting data from electricity market database, by the electricity market with connection relationship
Data regard as electricity market component connection relationship data, remaining electricity market data regards as electricity market member device
Part attribute data.
S40, the electricity market component attribute data, electricity market component connection relationship data and described
The master data of component forms electric power system data table according to preset format;;Wherein, the electric power system data table
Lattice, comprising: component attribute table, component connection relationship and parameter table.
Specifically, preset format is to establish two tables respectively according to effect, by electricity market data and component
Component attribute table, component connection relationship and parameter table are respectively formed among master data filling table.The life of intelligence
It at table, avoids and table is filled in manually, so that data are more accurate.Again since table kind has merged electricity market data simultaneously
And component master data, so that the electricity market model of building is more accurate.
S50, electricity market model is configured to according to the data in the electric power system data table.
Specifically, it is applied by electricity market according to component attribute table, component connection relationship and parameter table
The simulation software known is modeled, so that electricity market model is more accurate.
Compared with prior art, the construction method of a kind of electricity market model disclosed by the embodiments of the present invention, by knowledge
Not Gou Jian software used in power grid physical model, and then parse the basic number of the component in power grid physical model
According to, then electricity market data relevant to the component title are obtained from electricity market database, according to electricity market number
Electric power system data table is generated according to the master data of component, constructs electricity market mould further according to electric power system data table
Type, it is intelligent that power grid physical model is parsed, it avoids that table is filled in manually, so that the master data of component is more quasi-
Really, it is modified on a large scale so as to avoid the electricity market model of building.Again since table kind has merged electric power city simultaneously
Field data and component master data, so that the electricity market model of building is more accurate.
As an improvement of the above scheme, the method, further includes: in response to the power grid physical model be not known building
Mode will then extract the master data of the component according to user's self-defined pattern.
In the present embodiment, power grid physical model is first determined whether from which kind of power system simulation software, so that it is determined that being
No is known forming types, and analysis model fills in format and organizational form, helps to identify the hair in electric power system model
Motor, transformer, route, electric net device (string benefit, reactor, breaker, static passive compensation device etc.), node, switch etc..
If cannot parse according to known forming types, the power grid physical model is judged as unknown building model
(i.e. the customized model of user), and parsed according to user's self-defined pattern.Initially allow for the structure of user-defined model
The data organization rule of modeling formula, usual power grid simulation softwares can be found in the specification or service manual of the software,
If failing to find, user can also rule of thumb define and fill in data format.According to newly-built forming types by power grid physics mould
Type is parsed.The unknown forming types of known forming types and user's self-defined pattern are stored in storage and interaction again
In device.
As an improvement of the above scheme, the mode of writing according to power grid physical model judges the power grid physical model
It whether is known forming types, specifically:
According to the extension name of the power grid physical model, the Electricity Market Simulation that the power grid physical model uses is judged
Software.
Specifically, judgment method is to be judged according to data extension, is divided into physical model according to judging result
Know two class of format model and unknown format model.It can also be judged according to user, judge whether to belong to known building mould manually
Formula.
As an improvement of the above scheme, to the master data of the component to carry out classification and according to preset format shape
At electric power system data table, wherein the electric power system data table, comprising: component and attribute table, component connection
Relationship and parameter table, specifically:
The component and attribute list are constructed according to the property parameters of the corresponding component of the title of the component
Lattice.
Referring to table 1, in the present embodiment, first row lists the title of all components, is not strict with the sequence of arrangement,
But title does not allow to repeat.Begin from secondary series, list all properties and property parameters of component, as route maximum transmitted is held
Load name that amount, generator climbing rate, fuel efficiency, node voltage grade, node are connected, load numerical value etc. at times.
All component parameters can be read from storing and interacting in device, and the customized component property parameters of user can be stored in storage
It deposits and is constructed in module with the unknown format for interacting device, and is called in this step, no data situation retains space.This table is supported
The value of component property parameters is read from the file in a certain path, or from data base querying, for example, load data is at any time
Between change, user can establish the tables of data that a load changes over time, and path is filled in the load value frame of supreme table
In, load data tableau format is first row fill in the time (being necessary for the arithmetic progression that minimum unit is one minute), from second
Column begin, and each column the first row fills in nodename, and subsequent each row fills in data.
Table 1 is as follows:
According to the corresponding component connection relationship of the title of the component construct the component connection relationship and
Parameter table.
Specifically, referring to table 2, in the present embodiment, connection relationship and parameter table are to show owning in component table
The connection relationship of component, the connection relationship is either the connection in component table between listed all components of component is closed
System, connection relationship, the fuel transport relationship etc. being also possible between hydroelectric power plant or more library.Connectionless relation retains space.Even
The relationship of connecing can be cut-off with the variation of simulated scenario or time, can also be cut-off according to the definition of random fault, also
External connection relation table can be applicable in define the time or cut-off, when the format of external table is classified as standard time format for first
Between, begin from secondary series, respectively connection relationship, if empty, then it represents that element, in state is cut-off, is somebody's turn to do within the period up to next time
There is connection relationship in position.This can be given birth to when the emulation of failure automatically and cut-offs table, and is closed to Auto-writing to connecting to outbound path
It is table.
Table 2 is as follows:
It as an improvement of the above scheme, is known forming types in response to the power grid physical model described, then basis
The known forming types extract after the master data of component, further includes:
Scene configuration parameter is obtained according to the master data of component;Scene configuration parameter can be configuration name and value
Name, configuration name include: time type, GAP, price format, activation failure etc., value name include: beginning, ends, in short term, in
Phase, long-term, random fault etc..Cost information etc. can also be artificially added,
Classification is carried out to scene configuration parameter and forms analog simulation allocation list according to preset format.
Specifically, referring to table 3, the work configured in Electricity Market Simulation software is simplified by building analog simulation allocation list
It measures.
Table 3, as follows:
The present invention can be modeled according to different data, to realize the configuration of more simulating scenes.For example, In
When carrying out the emulation of high, normal, basic three kinds of load scenarios, high, normal, basic three kinds of load datas are added and fill in three according to regulation format respectively
In a table, when configuring high scheme, then the load data that high scheme table walk fills in Electricity Market Simulation software is chosen
In, if simulation softward support path is filled in, directly reference table is temporally filled according to table reading to phase if not supporting
The node answered.
The electricity market model of generation can make a preliminary test in target simulation software and (simulation softward be needed to support), survey
Record file can be read after examination automatically to judge whether there is model errors and correct automatically.Electric system mould used in model construction
Type and the target market model of generation can be stored in and be stored in interactive device, for calling later.When constructing model, also support
Relevant parameter is read for modeling from oracle, and can be obtained section from the actual operation system of support automatically and be filled in
Into simulation softward.
Referring to fig. 2, be one embodiment of the invention provide a kind of electricity market model construction device structural schematic diagram.
Correspondence of the embodiment of the present invention provides a kind of construction device of electricity market model, comprising:
Judgment module 10, for judging whether the power grid physical model is according to the mode of writing of power grid physical model
Know forming types;
First respond module 20, for being known forming types in response to the power grid physical model, then according to
The forming types known extract the master data of component;Wherein, the master data of the component includes: the title of component,
Connection relationship between the property parameters of component, component;
Module 30 is obtained, for obtaining electricity market number relevant to the component title from electricity market database
According to, and the electricity market data are divided into electricity market component attribute data and electricity market component connection relationship number
According to;
Control module 40 is used for the electricity market component attribute data, the electricity market component connection relationship
Data and the master data of the component are according to preset format formation electric power system data table;Wherein, the electric power
System data table, comprising: component attribute table, component connection relationship and parameter table;
Module 50 is constructed, for being configured to electricity market model according to the data in the electric power system data table.
As an improvement of the above scheme.Described device further include:
Second respond module then will be according to user for not being known forming types in response to the power grid physical model
Self-defined pattern extracts the master data of the component.
Compared with prior art, the construction device of a kind of electricity market model disclosed by the embodiments of the present invention, by knowledge
Not Gou Jian software used in power grid physical model, and then parse the basic number of the component in power grid physical model
According to, then electricity market data relevant to the component title are obtained from electricity market database, according to electricity market number
Electric power system data table is generated according to the master data of component, constructs electricity market mould further according to electric power system data table
Type, it is intelligent that power grid physical model is parsed, it avoids that table is filled in manually, so that the master data of component is more quasi-
Really, it is modified on a large scale so as to avoid the electricity market model of building.Again since table kind has merged electric power city simultaneously
Field data and component master data, so that the electricity market model of building is more accurate.
It is the schematic diagram of the building equipment for the electricity market model that one embodiment of the invention provides referring to Fig. 3.The embodiment
Electricity market model building equipment include: processor, memory and storage in the memory and can be at the place
The computer program run on reason device, the processor realize above-mentioned each electricity market model when executing the computer program
Construction method embodiment in step.Alternatively, the processor realizes that above-mentioned each device is real when executing the computer program
Apply the function of each module/unit in example.
Illustratively, the computer program can be divided into one or more module/units, one or more
A module/unit is stored in the memory, and is executed by the processor, to complete the present invention.It is one or more
A module/unit can be the series of computation machine program instruction section that can complete specific function, and the instruction segment is for describing institute
State implementation procedure of the computer program in the building equipment of the electricity market model.
The building equipment of the electricity market model can be desktop PC, notebook, palm PC and cloud clothes
Business device etc. calculates equipment.The building equipment of the electricity market model may include, but be not limited only to, processor, memory.Ability
Field technique personnel are appreciated that the schematic diagram is only the example of the building equipment of electricity market model, do not constitute to electricity
The restriction of the building equipment of power market model may include components more more or fewer than diagram, or combine certain components, or
The different component of person, such as the building equipment of the electricity market model can also be set including input-output equipment, network insertion
Standby, bus etc..
Alleged processor 11 can be central processing unit (Central Processing Unit, CPU), can also be
Other general processors, digital signal processor (Digital Signal Processor, DSP), specific integrated circuit
(Application Specific Integrated Circuit, ASIC), ready-made programmable gate array (Field-
Programmable Gate Array, FPGA) either other programmable logic device, discrete gate or transistor logic,
Discrete hardware components etc..General processor can be microprocessor or the processor is also possible to any conventional processor
Deng the processor is the control centre of the building equipment of the electricity market model, whole using various interfaces and connection
The various pieces of the building equipment of a electricity market model.
The memory 12 can be used for storing the computer program and/or module, and the processor is by operation or holds
Row stores computer program and/or module in the memory, and calls the data being stored in memory, realizes institute
State the various functions of the building equipment of electricity market model.The memory can mainly include storing program area and storing data
Area, wherein storing program area can application program needed for storage program area, at least one function (such as sound-playing function,
Image player function etc.) etc.;Storage data area, which can be stored, uses created data (such as audio data, electricity according to mobile phone
Script for story-telling etc.) etc..In addition, memory may include high-speed random access memory, it can also include nonvolatile memory, such as
Hard disk, memory, plug-in type hard disk, intelligent memory card (Smart Media Card, SMC), secure digital (Secure
Digital, SD) card, flash card (Flash Card), at least one disk memory, flush memory device or other volatibility are solid
State memory device.
Wherein, if module/unit of the building integration of equipments of the electricity market model is with the shape of SFU software functional unit
Formula realize and when sold or used as an independent product, can store in a computer readable storage medium.It is based on
Such understanding, the present invention realize above-described embodiment method in all or part of the process, can also by computer program come
Relevant hardware is instructed to complete, the computer program can be stored in a computer readable storage medium, the computer
Program is when being executed by processor, it can be achieved that the step of above-mentioned each embodiment of the method.Wherein, the computer program includes meter
Calculation machine program code, the computer program code can be source code form, object identification code form, executable file or certain
Intermediate form etc..The computer-readable medium may include: can carry the computer program code any entity or
Device, recording medium, USB flash disk, mobile hard disk, magnetic disk, CD, computer storage, read-only memory (ROM, Read-Only
Memory), random access memory (RAM, Random Access Memory), electric carrier signal, telecommunication signal and software
Distribution medium etc..
It should be noted that the apparatus embodiments described above are merely exemplary, wherein described be used as separation unit
The unit of explanation may or may not be physically separated, and component shown as a unit can be or can also be with
It is not physical unit, it can it is in one place, or may be distributed over multiple network units.It can be according to actual
It needs that some or all of the modules therein is selected to achieve the purpose of the solution of this embodiment.In addition, device provided by the invention
In embodiment attached drawing, the connection relationship between module indicate between them have communication connection, specifically can be implemented as one or
A plurality of communication bus or signal wire.Those of ordinary skill in the art are without creative efforts, it can understand
And implement.
The above is a preferred embodiment of the present invention, it is noted that for those skilled in the art
For, various improvements and modifications may be made without departing from the principle of the present invention, these improvements and modifications are also considered as
Protection scope of the present invention.
Claims (10)
1. a kind of construction method of electricity market model characterized by comprising
Judge whether the power grid physical model is known forming types according to the mode of writing of power grid physical model;
It is known forming types in response to the power grid physical model, then extracts component according to the known forming types
Master data;Wherein, the master data of the component includes: the title of component, the property parameters of component, component it
Between connection relationship;
Obtain relevant to component title electricity market data from electricity market database, and by the electricity market
Data are divided into electricity market component attribute data and electricity market component connection relationship data;
The electricity market component attribute data, the electricity market component connection relationship data and the component
Master data forms electric power system data table according to preset format;Wherein, the electric power system data table, comprising: member
Device attribute table, component connection relationship and parameter table;
Electricity market model is configured to according to the data in the electric power system data table.
2. the construction method of electricity market model as described in claim 1, which is characterized in that the method, further includes:
It is not known forming types in response to the power grid physical model, then will be extracted according to user's self-defined pattern described
The master data of component.
3. the construction method of electricity market model as described in claim 1, which is characterized in that described according to power grid physical model
The mode of writing judge whether the power grid physical model is known forming types, specifically:
The Electricity Market Simulation software that the power grid physical model uses is judged according to the extension name of the power grid physical model.
4. the construction method of electricity market model as described in claim 1, which is characterized in that
The electricity market data include at least following any one: quotation information, Weather information, cost information, section information,
Honourable information, hydrologic regime.
5. the construction method of electricity market model as described in claim 1, which is characterized in that the basic number of the component
Classification is carried out accordingly and forms electric power system data table according to preset format, wherein the electric power system data table, packet
It includes: component and attribute table, component connection relationship and parameter table, specifically:
The component and attribute table are constructed according to the property parameters of the corresponding component of the title of the component;
The component connection relationship and parameter are constructed according to the corresponding component connection relationship of the title of the component
Table.
6. the construction method of electricity market model as described in claim 1, which is characterized in that described in response to the power grid
Physical model is known forming types, then after the master data for extracting component according to the known forming types, also wraps
It includes:
Scene configuration parameter is obtained according to the master data of component;
Classification is carried out to scene configuration parameter and forms analog simulation allocation list according to preset format.
7. the construction method of electricity market model as claimed in claim 2, which is characterized in that the known forming types packet
Include: the .raw format of PSS/E, the .dat format of BPA, the .pwd format of PowerWorld, DSP .dat format and matlab
.slx format.
8. a kind of construction device of electricity market model characterized by comprising
Judgment module, for judging whether the power grid physical model is known building according to the mode of writing of power grid physical model
Mode;
First respond module, for being known forming types in response to the power grid physical model, then according to the known structure
Build the master data of schema extraction component;Wherein, the master data of the component includes: the title of component, component
Property parameters, the connection relationship between component;
Module is obtained, for obtaining electricity market data relevant to the component title from electricity market database, and
The electricity market data are divided into electricity market component attribute data and electricity market component connection relationship data;
Control module, for the electricity market component attribute data, the electricity market component connection relationship data with
And the master data of the component forms electric power system data table according to preset format;Wherein, the electric system number
According to table, comprising: component attribute table, component connection relationship and parameter table;
Module is constructed, for being configured to electricity market model according to the data in the electric power system data table.
9. a kind of building equipment of electricity market model, which is characterized in that including processor, memory and be stored in described deposit
In reservoir and it is configured as the computer program executed by the processor, the processor executes real when the computer program
The now construction method of electricity market model as claimed in any of claims 1 to 7 in one of claims.
10. a kind of computer readable storage medium, which is characterized in that the computer readable storage medium includes the calculating of storage
Machine program, wherein equipment where controlling the computer readable storage medium in computer program operation is executed as weighed
Benefit require any one of 1 to 7 described in electricity market model construction method.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910666615.0A CN110472298B (en) | 2019-07-23 | 2019-07-23 | Method, device, equipment and storage medium for constructing electric power market model |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910666615.0A CN110472298B (en) | 2019-07-23 | 2019-07-23 | Method, device, equipment and storage medium for constructing electric power market model |
Publications (2)
Publication Number | Publication Date |
---|---|
CN110472298A true CN110472298A (en) | 2019-11-19 |
CN110472298B CN110472298B (en) | 2023-07-25 |
Family
ID=68509767
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910666615.0A Active CN110472298B (en) | 2019-07-23 | 2019-07-23 | Method, device, equipment and storage medium for constructing electric power market model |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110472298B (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111951121A (en) * | 2020-07-20 | 2020-11-17 | 广东电力交易中心有限责任公司 | Electric power spot market quotation mode classification method, device and storage medium |
CN113592667A (en) * | 2020-04-30 | 2021-11-02 | 南京南瑞继保电气有限公司 | Method for generating market model of electric power spot market from EMS |
CN113805876A (en) * | 2021-09-22 | 2021-12-17 | 重庆标能瑞源储能技术研究院有限公司 | App implementation method and device for generating bms model variable |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103116823A (en) * | 2013-01-25 | 2013-05-22 | 中国电力科学研究院 | Market structure public information model building method used for multistage power market |
US20160203569A1 (en) * | 2015-01-13 | 2016-07-14 | Causam Energy, Inc. | Systems and methods for advanced energy settlements, network-based messaging, and software applications for electric power grids, microgrids, grid elements, and/or electric power networks |
US20170092055A1 (en) * | 2015-09-24 | 2017-03-30 | Causam Energy, Inc. | Systems and methods for aggregation and integration of distributed grid elements inputs for providing an interactive electric power grid geographic visualization |
CN109493118A (en) * | 2018-10-17 | 2019-03-19 | 国家电网有限公司 | A kind of power grid enterprises' market competitiveness Visual evaluation model building method and system |
CN109948209A (en) * | 2019-03-07 | 2019-06-28 | 广东电力交易中心有限责任公司 | Operation simulation method, device and equipment suitable for power spot market |
-
2019
- 2019-07-23 CN CN201910666615.0A patent/CN110472298B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103116823A (en) * | 2013-01-25 | 2013-05-22 | 中国电力科学研究院 | Market structure public information model building method used for multistage power market |
US20160203569A1 (en) * | 2015-01-13 | 2016-07-14 | Causam Energy, Inc. | Systems and methods for advanced energy settlements, network-based messaging, and software applications for electric power grids, microgrids, grid elements, and/or electric power networks |
US20170092055A1 (en) * | 2015-09-24 | 2017-03-30 | Causam Energy, Inc. | Systems and methods for aggregation and integration of distributed grid elements inputs for providing an interactive electric power grid geographic visualization |
CN109493118A (en) * | 2018-10-17 | 2019-03-19 | 国家电网有限公司 | A kind of power grid enterprises' market competitiveness Visual evaluation model building method and system |
CN109948209A (en) * | 2019-03-07 | 2019-06-28 | 广东电力交易中心有限责任公司 | Operation simulation method, device and equipment suitable for power spot market |
Non-Patent Citations (6)
Title |
---|
杨波: "发电侧电力市场交易决策系统的分析与设计", 《华中电力》 * |
杨波: "发电侧电力市场交易决策系统的分析与设计", 《华中电力》, no. 01, 20 February 2003 (2003-02-20), pages 22 - 26 * |
石俊杰;李昊;路轶;翟明玉;向博;季学纯;: "基于应用与时间维度的电网模型多版本构建与管理技术", 电力系统自动化, no. 10, pages 111 - 116 * |
董炜;潘秋萍;雷金勇;谢欢;辛焕海;吴浩;: "BPA与DIgSILENT动态模型的比较与数据转换", 电力系统自动化, no. 08, pages 145 - 151 * |
陈玲等: "电力市场条件下省级电网公司售电优化策略模型研究", 《陕西电力》 * |
陈玲等: "电力市场条件下省级电网公司售电优化策略模型研究", 《陕西电力》, no. 11, 25 October 2010 (2010-10-25), pages 10 - 13 * |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113592667A (en) * | 2020-04-30 | 2021-11-02 | 南京南瑞继保电气有限公司 | Method for generating market model of electric power spot market from EMS |
CN111951121A (en) * | 2020-07-20 | 2020-11-17 | 广东电力交易中心有限责任公司 | Electric power spot market quotation mode classification method, device and storage medium |
CN113805876A (en) * | 2021-09-22 | 2021-12-17 | 重庆标能瑞源储能技术研究院有限公司 | App implementation method and device for generating bms model variable |
Also Published As
Publication number | Publication date |
---|---|
CN110472298B (en) | 2023-07-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106940428B (en) | Chip verification method, device and system | |
CN110472298A (en) | Construction method, device, equipment and the storage medium of electricity market model | |
CN108022039B (en) | Transformer substation simulation training system based on augmented reality | |
CN106372044B (en) | A method of based on the typing dimension XBRL report of report generation | |
CN105471647B (en) | A kind of power communication network fault positioning method | |
CN102768641B (en) | Webpage testing factor selecting device and webpage testing factor selecting method | |
CN108255707A (en) | Development roles creation method, device, equipment and the storage medium of test case | |
CN109583002A (en) | Aviation electronics integral design method | |
CN109960826A (en) | Supply chain simulation method and apparatus | |
CN107451112A (en) | Form tool data inspection method, device, terminal device and storage medium | |
US20120259611A1 (en) | System and method for generation of cim-based power system circuit models | |
CN109828750A (en) | Auto-configuration data buries method, apparatus, electronic equipment and storage medium a little | |
CN112380803A (en) | Distribution network single line diagram artificial intelligence layout method, system and medium | |
CN113705143A (en) | Automatic simulation system and automatic simulation method | |
CN110262961A (en) | Test method, device, storage medium and the terminal device of Workflow Management System | |
CN112580178B (en) | Graph-model bidirectional verification method and device for energy management system | |
CN107977201A (en) | A kind of comprehensively monitoring HMI automatic generation methods | |
CN109446642A (en) | A kind of grid equipment starting scheme intelligence write method and device | |
CN116646891A (en) | Relay protection fixed value checking method, device and equipment | |
López et al. | Co-simulation of intelligent power systems | |
CN107451188A (en) | A kind of dissemination method and system of power grid regulation model data multistage combination of nodes | |
CN109522210A (en) | Interface testing parameters analysis method, device, electronic device and storage medium | |
CN109521300A (en) | A kind of test method of multifunctional digital tester | |
CN109117469A (en) | Excel report file generation method, device, computer equipment and storage medium | |
CN104881455B (en) | A kind of architectural difference processing method and system based on MYSQL |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |