CN110471754A - Method for exhibiting data, device, equipment and storage medium in job scheduling - Google Patents

Method for exhibiting data, device, equipment and storage medium in job scheduling Download PDF

Info

Publication number
CN110471754A
CN110471754A CN201910776943.6A CN201910776943A CN110471754A CN 110471754 A CN110471754 A CN 110471754A CN 201910776943 A CN201910776943 A CN 201910776943A CN 110471754 A CN110471754 A CN 110471754A
Authority
CN
China
Prior art keywords
subtask
job
dependence
data
relational graph
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910776943.6A
Other languages
Chinese (zh)
Other versions
CN110471754B (en
Inventor
夏添
曹辉健
何旭敏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Industrial and Commercial Bank of China Ltd ICBC
Original Assignee
Industrial and Commercial Bank of China Ltd ICBC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Industrial and Commercial Bank of China Ltd ICBC filed Critical Industrial and Commercial Bank of China Ltd ICBC
Priority to CN201910776943.6A priority Critical patent/CN110471754B/en
Publication of CN110471754A publication Critical patent/CN110471754A/en
Application granted granted Critical
Publication of CN110471754B publication Critical patent/CN110471754B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F9/00Arrangements for program control, e.g. control units
    • G06F9/06Arrangements for program control, e.g. control units using stored programs, i.e. using an internal store of processing equipment to receive or retain programs
    • G06F9/46Multiprogramming arrangements
    • G06F9/48Program initiating; Program switching, e.g. by interrupt
    • G06F9/4806Task transfer initiation or dispatching

Landscapes

  • Engineering & Computer Science (AREA)
  • Software Systems (AREA)
  • Theoretical Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • General Engineering & Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Information Retrieval, Db Structures And Fs Structures Therefor (AREA)
  • User Interface Of Digital Computer (AREA)

Abstract

This specification embodiment provides method for exhibiting data, device, equipment and the storage medium in a kind of job scheduling, this method comprises: providing operable graphic assembly set;The graphic assembly set includes the node for indicating subtask, and the directed connection for indicating dependence accords with;Graphic operation is built for what the node and the directed connection accorded with based on user, the job dependence relational graph of subtask set is generated and shows;The execution state of subtask in the set of subtask described in timing acquisition, and the execution state is shown in the job dependence relational graph.This specification embodiment can intuitively show the job dependence relationship and executive condition of subtask in system call operation.

Description

Method for exhibiting data, device, equipment and storage medium in job scheduling
Technical field
This specification is related to distributed batch jobs dispatching technique field, more particularly, to the data in a kind of job scheduling Methods of exhibiting, device, equipment and storage medium.
Background technique
Distributed batch jobs scheduling refers to that, based on given time point, time interval and execution number automatically execute and appoint Business.Wherein, task can be split as multiple independent subtasks, then execute therein one respectively by distributed server A or multiple subtasks.Job dependence refers to the execution of the lot size scheduling operation of subtask, dependent on preposition one or more The completion of subtask.
It is general for the treatment process of existing dependence currently, in existing distributed task dispatching technology are as follows: 1, press The sequential logic of business generates job dependence relation table;2, job relations table is resolved into specific data structure, such as xml configuration File;3, system reads relevant configuration and parses job dependence relationship, judges whether that operation can have been adjusted.
However, in the prior art, when system call job run, job dependence relationship for each subtask and hold Market condition lacks intuitive show.
Summary of the invention
A kind of method for exhibiting data being designed to provide in job scheduling of this specification embodiment, device, equipment and Storage medium, intuitively to show the job dependence relationship and executive condition of subtask in system call operation.
In order to achieve the above objectives, on the one hand, this specification embodiment provides the data displaying side in a kind of job scheduling Method, comprising:
Operable graphic assembly set is provided;The graphic assembly set includes the node for indicating subtask, and For indicating that the directed connection of dependence accords with;
Build graphic operation for what the node and the directed connection accorded with based on user, generate the operation of subtask set according to Rely relational graph and shows;
The execution state of subtask in the set of subtask described in timing acquisition, and shown in the job dependence relational graph The execution state.
Method for exhibiting data in the job scheduling of this specification embodiment, further includes:
The modification that user is received for the job dependence relational graph operates, and modifies the work according to modification operation Industry dependence graph.
Method for exhibiting data in the job scheduling of this specification embodiment, the modification operation includes any in following It is one or more:
Increase subtask and its dependence with other subtasks in the set of the subtask;
Delete subtask and its dependence with other subtasks in the set of the subtask;
Modify the dependence of other subtasks in subtask and subtask set.
Method for exhibiting data in the job scheduling of this specification embodiment, in the set of subtask described in the timing acquisition The execution state of subtask, comprising:
From the job instances table of local cache, the execution state of the subtask in the subtask set is read.
Method for exhibiting data in the job scheduling of this specification embodiment, it is described to be opened up in the job dependence relational graph Show the execution state, comprising:
On the corresponding node in subtask, the execution performance of the preposition subtask of the subtask is shown.
Method for exhibiting data in the job scheduling of this specification embodiment, it is described to be opened up in the job dependence relational graph Show the execution state, further includes:
On the corresponding node in subtask, show that the plan of the subtask executes the time.
Method for exhibiting data in the job scheduling of this specification embodiment, further includes:
From the job dependence relationship and plan for extracting subtask in the subtask set in the job dependence relational graph Execute the time;
In the job instances table that the job dependence relationship and plan are executed to time write-in local cache.
On the other hand, this specification embodiment additionally provides the data in a kind of job scheduling and shows device, comprising:
Component provides module, for providing operable graphic assembly set;The graphic assembly set includes being used for table Show the node of subtask, and the directed connection for indicating dependence accords with;
Graph generation module is generated for building graphic operation for what the node and the directed connection accorded with based on user The job dependence relational graph of subtask set is simultaneously shown;
Figure display module, for the execution state of subtask in the set of subtask described in timing acquisition, and in the work The execution state is shown on industry dependence graph.
Data in the job scheduling of this specification embodiment show device, further includes:
Figure modified module is operated for receiving user for the modification of the job dependence relational graph, and according to described The job dependence relational graph is modified in modification operation.
Data in the job scheduling of this specification embodiment show device, and the modification operation includes any in following It is one or more:
Increase subtask and its dependence with other subtasks in the set of the subtask;
Delete subtask and its dependence with other subtasks in the set of the subtask;
Modify the dependence of other subtasks in subtask and subtask set.
Data in the job scheduling of this specification embodiment show device, in the set of subtask described in the timing acquisition The execution state of subtask, comprising:
From the job instances table of local cache, the execution state of the subtask in the subtask set is read.
Data in the job scheduling of this specification embodiment show device, described to open up in the job dependence relational graph Show the execution state, comprising:
On the corresponding node in subtask, the execution performance of the preposition subtask of the subtask is shown.
Data in the job scheduling of this specification embodiment show device, described to open up in the job dependence relational graph Show the execution state, further includes:
On the corresponding node in subtask, show that the plan of the subtask executes the time.
Data in the job scheduling of this specification embodiment show device, further includes:
Data write. module, for from the work for extracting subtask in the set of the subtask in the job dependence relational graph Industry dependence and plan execute the time, and the job dependence relationship and plan are executed to the operation of time write-in local cache In example table.
On the other hand, this specification embodiment additionally provides a kind of computer equipment, including memory, processor and The computer program being stored on the memory, the computer program execute above-mentioned data when being run by the processor Methods of exhibiting.
On the other hand, this specification embodiment additionally provides a kind of computer storage medium, is stored thereon with computer journey Sequence, the computer program realize above-mentioned method for exhibiting data when being executed by processor.
The technical solution provided by above this specification embodiment is providing a user as it can be seen that in this specification embodiment After operable graphic assembly set, graphic operation can be built for what node and directed connection accorded with based on user, generate subtask collection The job dependence relational graph of conjunction simultaneously shows user;Hereafter the execution shape of subtask in being gathered with timing acquisition subtask State, and execution state is shown in job dependence relational graph, subtask is intuitively shown in system call operation to realize Job dependence relationship and executive condition.
Detailed description of the invention
In order to illustrate more clearly of this specification embodiment or technical solution in the prior art, below will to embodiment or Attached drawing needed to be used in the description of the prior art is briefly described, it should be apparent that, the accompanying drawings in the following description is only The some embodiments recorded in this specification, for those of ordinary skill in the art, in not making the creative labor property Under the premise of, it is also possible to obtain other drawings based on these drawings.In the accompanying drawings:
Fig. 1 is the flow chart of the method for exhibiting data in some embodiments of this specification in job scheduling;
Fig. 2 is the schematic diagram of the job dependence relational graph in one embodiment of this specification;
Fig. 3 is the flow chart of the method for exhibiting data in other embodiments of this specification in job scheduling;
Fig. 4 is the structural block diagram of the data displaying device in some embodiments of this specification in job scheduling;
Fig. 5 is the structural block diagram of computer equipment in some embodiments of this specification.
Specific embodiment
In order to make those skilled in the art more fully understand the technical solution in this specification, below in conjunction with this explanation Attached drawing in book embodiment is clearly and completely described the technical solution in this specification embodiment, it is clear that described Embodiment be only this specification a part of the embodiment, instead of all the embodiments.The embodiment of base in this manual, Every other embodiment obtained by those of ordinary skill in the art without making creative efforts, all should belong to The range of this specification protection.
Method for exhibiting data in the job scheduling of this specification embodiment can be applied in distributed job system.Example Such as, in some embodiments of this specification, the data that can be applied in distributed job system show device.Wherein, described Data show that device can be the server in distributed job system.In one embodiment of this specification, the server can Think the electronic equipment with operation and network interaction function;Or run in the electronic equipment, be data processing and The software of network interaction offer service logic.
Refering to what is shown in Fig. 1, the method for exhibiting data in the job scheduling of some embodiments of this specification may include as follows Step:
S101, operable graphic assembly set is provided;The graphic assembly set includes the section for indicating subtask Point, and the directed connection symbol for indicating dependence;
S102, graphic operation is built for what the node and the directed connection accorded with based on user, generates subtask set Job dependence relational graph is simultaneously shown;
The execution state of subtask in the set of subtask described in S103, timing acquisition, and in the job dependence relational graph It is upper to show the execution state.
It can be seen that after providing a user operable graphic assembly set, can be based in this specification embodiment User builds graphic operation for what node and directed connection accorded with, generates the job dependence relational graph of subtask set and shows use Family;Hereafter the execution state of subtask in being gathered with timing acquisition subtask, and show and hold in job dependence relational graph Row state, to realize the job dependence relationship and executive condition for intuitively showing subtask in system call operation.
In some embodiments of this specification, provide in operable graphic assembly set in addition to node and directed connection accord with It outside, can also include some other graphic assembly (such as groups such as " addition ", " deletion ", " modification ", " confirmation ", " return " Part), to facilitate user's dynamic to draw job dependence relational graph.Wherein, node can have any shape, such as shown in Fig. 2 In exemplary embodiment, the shape of node can be rectangle frame, in order to which information is shown.When between two nodes pass through oriented company When connecing symbol connection, indicate that there is dependence between the two nodes.For example, in the exemplary embodiment illustrated in fig. 2, node By directed connection symbol (here by taking directed connection symbol is line segment with the arrow as an example) between M2 and node M 1, arrow is directed toward node M2, arrow tail are directed toward node M 1, show that the execution of node M 2 depends on the completion of node M 1.
Under distributed task scheduling scene, since a task can be split into as multiple independent subtasks, this is a little Task may be constructed subtask set.Therefore, graphic operation is built for what node and directed connection accorded with based on user, son can be generated The job dependence relational graph of set of tasks, and show user.It should be noted that here to build graphic operation generally a series of Operation needs to carry out multiple operations in order to draw the corresponding job dependence relational graph of a sub- set of tasks.
Refering to what is shown in Fig. 3, in some embodiments of this specification, when the device that executes in batches of distributed job system is executing Behind complete subtask, execution state can be returned to the batch controller of distributed job system, in order to which batch controller can be with It is written into job instances table and caches.Wherein, execution state for example may include: execute completion, execute failure, be not carried out, In execution etc..The data of distributed job system show that device can execution shape to store in timing scan job instances table State, and execution state is shown in the corresponding node of job dependence relational graph, such as shown in Fig. 2.Wherein, in job instances table not The execution state that each subtask in the set of subtask can only be saved, the plan that can also save each subtask execute the time Etc. information.
In some embodiments of this specification, the method for exhibiting data can also include: from job dependence relational graph It extracts the job dependence relationship of subtask and plan in the set of subtask and executes the time;And by the job dependence relationship and plan In the job instances table for executing time write-in local cache.In this way, allow the batch controller of distributed job system from The plan of each subtask of regular check executes the time in job instances table, and tune (is meeting when meeting execution condition When execution condition, the device that executes in batches of instruction distributed job system starts subtasking).
In one embodiment of this specification, the extraction may include: reading operation dependence graph;Parse operation according to Rely relational graph, it is hereby achieved that the job dependence relationship and plan in figure execute the time.
Correspondingly, in some embodiments of this specification, it is described that the execution state is shown in job dependence relational graph It may include the execution performance that the preposition subtask of the subtask is shown on the corresponding node in subtask, Yi Jisuo The plan for stating subtask itself executes the time.For example, node M 1 is the preposition son of node M 2 in the exemplary embodiment of Fig. 2 Therefore task can show the executive plan of the execution performance and node M 2 itself of node M 1 in node M 2.At this In other embodiments of specification, the preposition subtask of subtask can also be counted on the corresponding node in subtask. For example, can show the counting of the unfinished quantity of the preposition subtask of subtask on node and/or the meter of quantity is completed Number etc..It is corresponding, it, can be by the complete of the preposition subtask of correspondence after the completion of a preposition subtask for having subtask is performed Add one at the counting of quantity, while the counting that can also correspond to the unfinished quantity of preposition subtask subtracts one.
In some embodiments of this specification, when needing to modify operation dependence graph, user can be to job dependence Relational graph carries out dynamic modification.The data of distributed job system show that device is receiving user for job dependence pass It is that after the modification of figure operates, can be operated according to the modification and modify the job dependence relational graph, and show modified work Industry dependence graph.In this way, compared with the prior art needs to read data from database when modifying operation dependence, due to This specification embodiment can read data from caching when modifying operation dependence, to improve modification operation dependence Efficiency.
In one exemplary embodiment, the modification operation includes that for example can be to increase subtask and its appoint with the son The dependence of other subtasks in business set.In a further exemplary embodiment, the modification operation, which for example can also be, deletes Dependence except subtask and its with other subtasks in the set of the subtask.In a further exemplary embodiment, described Modification operation for example can also be the dependence of other subtasks in modification subtask and subtask set.
Although procedures described above process includes the multiple operations occurred with particular order, it should however be appreciated that understand, These processes may include more or fewer operations, these operations can be executed sequentially or be executed parallel (such as using parallel Processor or multi-thread environment).
Refering to what is shown in Fig. 4, the data in job scheduling in some embodiments of this specification show device, may include:
Component provides module 41, may be used to provide operable graphic assembly set;The graphic assembly set includes For indicating the node of subtask, and the directed connection for indicating dependence accords with;
Graph generation module 42 can be used for building figure behaviour for what the node and the directed connection accorded with based on user Make, generate the job dependence relational graph of subtask set and shows;
Figure display module 43, can be used for subtask described in timing acquisition set in subtask execution state, and The execution state is shown in the job dependence relational graph.
In other embodiments of this specification, the data show that device can further include figure modified module;The figure Shape modified module can be used for receiving user and operate for the modification of the job dependence relational graph, and be operated according to the modification Modify the job dependence relational graph.
In other embodiments of this specification, the data show device, can also include Data write. module, the number It can be used for according to writing module from the job dependence for extracting subtask in the subtask set in the job dependence relational graph Relationship and plan execute the time, and the job dependence relationship and plan are executed to the job instances table of time write-in local cache In.
For convenience of description, it is divided into various units when description apparatus above with function to describe respectively.Certainly, implementing this The function of each unit can be realized in the same or multiple software and or hardware when specification.
Refering to what is shown in Fig. 5, the computer equipment of some embodiments of this specification may include memory, processor and The computer program being stored on the memory, the computer program execute following steps when being run by the processor:
Operable graphic assembly set is provided;The graphic assembly set includes the node for indicating subtask, and For indicating that the directed connection of dependence accords with;
Build graphic operation for what the node and the directed connection accorded with based on user, generate the operation of subtask set according to Rely relational graph and shows;
The execution state of subtask in the set of subtask described in timing acquisition, and shown in the job dependence relational graph The execution state.
The present invention be referring to according to the method for the embodiment of the present invention, the process of equipment (system) and computer program product Figure and/or block diagram describe.It should be understood that every one stream in flowchart and/or the block diagram can be realized by computer program instructions The combination of process and/or box in journey and/or box and flowchart and/or the block diagram.It can provide these computer programs Instruct the processor of general purpose computer, special purpose computer, Embedded Processor or other programmable data processing devices to produce A raw machine, so that being generated by the instruction that computer or the processor of other programmable data processing devices execute for real The device for the function of being specified in present one or more flows of the flowchart and/or one or more blocks of the block diagram.
These computer program instructions, which may also be stored in, is able to guide computer or other programmable data processing devices with spy Determine in the computer-readable memory that mode works, so that it includes referring to that instruction stored in the computer readable memory, which generates, Enable the manufacture of device, the command device realize in one box of one or more flows of the flowchart and/or block diagram or The function of being specified in multiple boxes.
These computer program instructions also can be loaded onto a computer or other programmable data processing device, so that counting Series of operation steps are executed on calculation machine or other programmable devices to generate computer implemented processing, thus in computer or The instruction executed on other programmable devices is provided for realizing in one or more flows of the flowchart and/or block diagram one The step of function of being specified in a box or multiple boxes.
In a typical configuration, calculating equipment includes one or more processors (CPU), input/output interface, net Network interface and memory.
Memory may include the non-volatile memory in computer-readable medium, random access memory (RAM) and/or The forms such as Nonvolatile memory, such as read-only memory (ROM) or flash memory (flash RAM).Memory is computer-readable medium Example.
Computer-readable medium includes permanent and non-permanent, removable and non-removable media can be by any method Or technology come realize information store.Information can be computer readable instructions, data structure, the module of program or other data. The example of the storage medium of computer includes, but are not limited to phase change memory (PRAM), static random access memory (SRAM), moves State random access memory (DRAM), other kinds of random access memory (RAM), read-only memory (ROM), electric erasable Programmable read only memory (EEPROM), flash memory or other memory techniques, read-only disc read only memory (CD-ROM) (CD-ROM), Digital versatile disc (DVD) or other optical storage, magnetic cassettes, magnetic disc type storage or other magnetic storage devices are appointed What his non-transmission medium, can be used for storing and can be accessed by a computing device information.As defined in this article, computer can Reading medium not includes temporary computer readable media (transitory media), such as data-signal and carrier wave of modulation.
It should also be noted that, the terms "include", "comprise" or its any other variant are intended to nonexcludability Include, so that process, method or equipment including a series of elements not only include those elements, but also including not having There is the other element being expressly recited, or further includes for this process, method or the intrinsic element of equipment.Do not having more In the case where more limitations, the element that is limited by sentence "including a ...", it is not excluded that including process, the side of the element There is also other identical elements in method or equipment.
It will be understood by those skilled in the art that the embodiment of this specification can provide as the production of method, system or computer program Product.Therefore, complete hardware embodiment, complete software embodiment or implementation combining software and hardware aspects can be used in this specification The form of example.Moreover, it wherein includes the computer of computer usable program code that this specification, which can be used in one or more, The computer program implemented in usable storage medium (including but not limited to magnetic disk storage, CD-ROM, optical memory etc.) produces The form of product.
This specification can describe in the general context of computer-executable instructions executed by a computer, such as journey Sequence module.Generally, program module include routines performing specific tasks or implementing specific abstract data types, programs, objects, Component, data structure etc..This specification can also be practiced in a distributed computing environment, in these distributed computing environment In, by executing task by the connected remote processing devices of communication network.In a distributed computing environment, program module It can be located in the local and remote computer storage media including storage equipment.
All the embodiments in this specification are described in a progressive manner, same and similar portion between each embodiment Dividing may refer to each other, and each embodiment focuses on the differences from other embodiments.Especially for system reality For applying example, since it is substantially similar to the method embodiment, so being described relatively simple, related place is referring to embodiment of the method Part explanation.
The foregoing is merely the embodiments of this specification, are not limited to this specification.For art technology For personnel, this specification can have various modifications and variations.It is all made any within the spirit and principle of this specification Modification, equivalent replacement, improvement etc., should be included within the scope of the claims of this specification.

Claims (16)

1. the method for exhibiting data in a kind of job scheduling characterized by comprising
Operable graphic assembly set is provided;The graphic assembly set includes the node for indicating subtask, and is used for Indicate the directed connection symbol of dependence;
Graphic operation is built for what the node and the directed connection accorded with based on user, the job dependence for generating subtask set closes System schemes and shows;
The execution state of subtask in the set of subtask described in timing acquisition, and in the job dependence relational graph described in displaying Execution state.
2. the method for exhibiting data in job scheduling as described in claim 1, which is characterized in that further include:
The modification that user is received for the job dependence relational graph operates, and according to the modification operation modification operation according to Rely relational graph.
3. the method for exhibiting data in job scheduling as claimed in claim 2, which is characterized in that modification operation include with Any one or more in lower:
Increase subtask and its dependence with other subtasks in the set of the subtask;
Delete subtask and its dependence with other subtasks in the set of the subtask;
Modify the dependence of other subtasks in subtask and subtask set.
4. the method for exhibiting data in job scheduling as described in claim 1, which is characterized in that son described in the timing acquisition The execution state of subtask in set of tasks, comprising:
From the job instances table of local cache, the execution state of the subtask in the subtask set is read.
5. the method for exhibiting data in job scheduling as described in claim 1, which is characterized in that described in the job dependence The execution state is shown in relational graph, comprising:
On the corresponding node in subtask, the execution performance of the preposition subtask of the subtask is shown.
6. the method for exhibiting data in job scheduling as described in claim 1, which is characterized in that described in the job dependence The execution state is shown in relational graph, further includes:
On the corresponding node in subtask, show that the plan of the subtask executes the time.
7. the method for exhibiting data in job scheduling as described in claim 1, which is characterized in that further include:
It is executed from the job dependence relationship of subtask and plan in the subtask set is extracted in the job dependence relational graph Time;
In the job instances table that the job dependence relationship and plan are executed to time write-in local cache.
8. the data in a kind of job scheduling show device characterized by comprising
Component provides module, for providing operable graphic assembly set;The graphic assembly set includes for indicating son The node of task, and the directed connection symbol for indicating dependence;
Graph generation module generates son and appoints for building graphic operation for what the node and the directed connection accorded with based on user The job dependence relational graph for set of being engaged in simultaneously is shown;
Figure display module, for subtask described in timing acquisition set in subtask execution state, and the operation according to Rely and shows the execution state in relational graph.
9. the data in job scheduling as claimed in claim 8 show device, which is characterized in that further include:
Figure modified module is operated for receiving user for the modification of the job dependence relational graph, and according to the modification The job dependence relational graph is modified in operation.
10. the data in job scheduling as claimed in claim 9 show device, which is characterized in that the modification, which operates, includes Any one or more in below:
Increase subtask and its dependence with other subtasks in the set of the subtask;
Delete subtask and its dependence with other subtasks in the set of the subtask;
Modify the dependence of other subtasks in subtask and subtask set.
11. the data in job scheduling as claimed in claim 8 show device, which is characterized in that described in the timing acquisition The execution state of subtask in the set of subtask, comprising:
From the job instances table of local cache, the execution state of the subtask in the subtask set is read.
12. data in job scheduling as claimed in claim 8 show device, which is characterized in that it is described the operation according to Rely and show the execution state in relational graph, comprising:
On the corresponding node in subtask, the execution performance of the preposition subtask of the subtask is shown.
13. data in job scheduling as claimed in claim 8 show device, which is characterized in that it is described the operation according to Rely and show the execution state in relational graph, further includes:
On the corresponding node in subtask, show that the plan of the subtask executes the time.
14. the data in job scheduling as claimed in claim 8 show device, which is characterized in that further include:
Data write. module, for from extracted in the job dependence relational graph operation of subtask in the set of the subtask according to The relationship of relying and plan execute the time, and the job dependence relationship and plan are executed to the job instances of time write-in local cache In table.
15. a kind of computer equipment, including memory, processor and the computer program being stored on the memory, It is characterized in that, perform claim requires data exhibition described in 1-7 any one when the computer program is run by the processor Show method.
16. a kind of computer storage medium, is stored thereon with computer program, which is characterized in that the computer program is located It manages when device executes and realizes method for exhibiting data described in claim 1-7 any one.
CN201910776943.6A 2019-08-22 2019-08-22 Data display method, device, equipment and storage medium in job scheduling Active CN110471754B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910776943.6A CN110471754B (en) 2019-08-22 2019-08-22 Data display method, device, equipment and storage medium in job scheduling

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910776943.6A CN110471754B (en) 2019-08-22 2019-08-22 Data display method, device, equipment and storage medium in job scheduling

Publications (2)

Publication Number Publication Date
CN110471754A true CN110471754A (en) 2019-11-19
CN110471754B CN110471754B (en) 2022-04-05

Family

ID=68513642

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910776943.6A Active CN110471754B (en) 2019-08-22 2019-08-22 Data display method, device, equipment and storage medium in job scheduling

Country Status (1)

Country Link
CN (1) CN110471754B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111539185A (en) * 2020-04-14 2020-08-14 北京宝兰德软件股份有限公司 Job processing method, job processing apparatus, electronic device, and storage medium
CN113127175A (en) * 2021-05-18 2021-07-16 中国银行股份有限公司 Host job scheduling operation method and device
CN113239028A (en) * 2021-05-10 2021-08-10 成都新潮传媒集团有限公司 Data restoration method and device for data warehouse scheduling and readable storage medium
CN113534750A (en) * 2020-04-15 2021-10-22 北京旷视机器人技术有限公司 Job scheduling method, device, system, equipment and medium under intensive storage
CN113821326A (en) * 2021-09-24 2021-12-21 北京天融信网络安全技术有限公司 Job scheduling method and device, electronic equipment and storage medium
CN117170889A (en) * 2023-11-01 2023-12-05 沐曦集成电路(上海)有限公司 Heterogeneous non-blocking data packet synchronous processing system

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7594227B2 (en) * 2004-03-08 2009-09-22 Ab Initio Technology Llc Dependency graph parameter scoping
CN107315581A (en) * 2017-05-23 2017-11-03 努比亚技术有限公司 Mission script generating means and method, task scheduling system and method
CN108845798A (en) * 2018-05-30 2018-11-20 安徽四创电子股份有限公司 A kind of visualization big data task cradle and processing method
CN109508413A (en) * 2018-10-22 2019-03-22 中国银行股份有限公司 Job scheduling methods of exhibiting and device, storage medium and electronic equipment

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7594227B2 (en) * 2004-03-08 2009-09-22 Ab Initio Technology Llc Dependency graph parameter scoping
CN107315581A (en) * 2017-05-23 2017-11-03 努比亚技术有限公司 Mission script generating means and method, task scheduling system and method
CN108845798A (en) * 2018-05-30 2018-11-20 安徽四创电子股份有限公司 A kind of visualization big data task cradle and processing method
CN109508413A (en) * 2018-10-22 2019-03-22 中国银行股份有限公司 Job scheduling methods of exhibiting and device, storage medium and electronic equipment

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111539185A (en) * 2020-04-14 2020-08-14 北京宝兰德软件股份有限公司 Job processing method, job processing apparatus, electronic device, and storage medium
CN111539185B (en) * 2020-04-14 2023-04-14 北京宝兰德软件股份有限公司 Job processing method, job processing apparatus, electronic device, and storage medium
CN113534750A (en) * 2020-04-15 2021-10-22 北京旷视机器人技术有限公司 Job scheduling method, device, system, equipment and medium under intensive storage
CN113239028A (en) * 2021-05-10 2021-08-10 成都新潮传媒集团有限公司 Data restoration method and device for data warehouse scheduling and readable storage medium
CN113127175A (en) * 2021-05-18 2021-07-16 中国银行股份有限公司 Host job scheduling operation method and device
CN113821326A (en) * 2021-09-24 2021-12-21 北京天融信网络安全技术有限公司 Job scheduling method and device, electronic equipment and storage medium
CN117170889A (en) * 2023-11-01 2023-12-05 沐曦集成电路(上海)有限公司 Heterogeneous non-blocking data packet synchronous processing system
CN117170889B (en) * 2023-11-01 2024-01-23 沐曦集成电路(上海)有限公司 Heterogeneous non-blocking data packet synchronous processing system

Also Published As

Publication number Publication date
CN110471754B (en) 2022-04-05

Similar Documents

Publication Publication Date Title
CN110471754A (en) Method for exhibiting data, device, equipment and storage medium in job scheduling
CN110058856A (en) Page configuration method and device
CN105335412B (en) For data conversion, the method and apparatus of Data Migration
CN108984652B (en) Configurable data cleaning system and method
CN103309904A (en) Method and device for generating data warehouse ETL (Extraction, Transformation and Loading) codes
CN105389402A (en) Big-data-oriented ETL (Extraction-Transformation-Loading) method and device
CN109144699A (en) Distributed task dispatching method, apparatus and system
CN107103064B (en) Data statistical method and device
CN104298496B (en) data analysis type software development framework system
CN109144511B (en) Method and system for automatically generating numerical simulation graphical user interface
CN104317928A (en) Service ETL (extraction-transformation-loading) method and service ETL system both based on distributed database
CN104298588A (en) Continuous integration implementation method and device
CN105354376B (en) The exchange method and system of multi-dimensional data and OA databases based on BIM
CN107798120B (en) Data conversion method and device
CN110515795A (en) A kind of monitoring method of big data component, device, electronic equipment
CN109145055A (en) A kind of method of data synchronization and system based on Flink
CN111966760B (en) Test data generation method and device based on Hive data warehouse
CN109190025A (en) information monitoring method, device, system and computer readable storage medium
CN108427709B (en) Multi-source mass data processing system and method
CN105279138A (en) Automatic generation system of message research report
CN111190814A (en) Software test case generation method and device, storage medium and terminal
CN104182295A (en) Data backup method and data backup device
CN111435329A (en) Automatic testing method and device
CN112860412A (en) Service data processing method and device, electronic equipment and storage medium
CN103809947A (en) Automatic release method and system for development requirement

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant