CN110471754A - Method for exhibiting data, device, equipment and storage medium in job scheduling - Google Patents
Method for exhibiting data, device, equipment and storage medium in job scheduling Download PDFInfo
- Publication number
- CN110471754A CN110471754A CN201910776943.6A CN201910776943A CN110471754A CN 110471754 A CN110471754 A CN 110471754A CN 201910776943 A CN201910776943 A CN 201910776943A CN 110471754 A CN110471754 A CN 110471754A
- Authority
- CN
- China
- Prior art keywords
- subtask
- job
- dependence
- data
- relational graph
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F9/00—Arrangements for program control, e.g. control units
- G06F9/06—Arrangements for program control, e.g. control units using stored programs, i.e. using an internal store of processing equipment to receive or retain programs
- G06F9/46—Multiprogramming arrangements
- G06F9/48—Program initiating; Program switching, e.g. by interrupt
- G06F9/4806—Task transfer initiation or dispatching
Landscapes
- Engineering & Computer Science (AREA)
- Software Systems (AREA)
- Theoretical Computer Science (AREA)
- Physics & Mathematics (AREA)
- General Engineering & Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Information Retrieval, Db Structures And Fs Structures Therefor (AREA)
- User Interface Of Digital Computer (AREA)
Abstract
This specification embodiment provides method for exhibiting data, device, equipment and the storage medium in a kind of job scheduling, this method comprises: providing operable graphic assembly set;The graphic assembly set includes the node for indicating subtask, and the directed connection for indicating dependence accords with;Graphic operation is built for what the node and the directed connection accorded with based on user, the job dependence relational graph of subtask set is generated and shows;The execution state of subtask in the set of subtask described in timing acquisition, and the execution state is shown in the job dependence relational graph.This specification embodiment can intuitively show the job dependence relationship and executive condition of subtask in system call operation.
Description
Technical field
This specification is related to distributed batch jobs dispatching technique field, more particularly, to the data in a kind of job scheduling
Methods of exhibiting, device, equipment and storage medium.
Background technique
Distributed batch jobs scheduling refers to that, based on given time point, time interval and execution number automatically execute and appoint
Business.Wherein, task can be split as multiple independent subtasks, then execute therein one respectively by distributed server
A or multiple subtasks.Job dependence refers to the execution of the lot size scheduling operation of subtask, dependent on preposition one or more
The completion of subtask.
It is general for the treatment process of existing dependence currently, in existing distributed task dispatching technology are as follows: 1, press
The sequential logic of business generates job dependence relation table;2, job relations table is resolved into specific data structure, such as xml configuration
File;3, system reads relevant configuration and parses job dependence relationship, judges whether that operation can have been adjusted.
However, in the prior art, when system call job run, job dependence relationship for each subtask and hold
Market condition lacks intuitive show.
Summary of the invention
A kind of method for exhibiting data being designed to provide in job scheduling of this specification embodiment, device, equipment and
Storage medium, intuitively to show the job dependence relationship and executive condition of subtask in system call operation.
In order to achieve the above objectives, on the one hand, this specification embodiment provides the data displaying side in a kind of job scheduling
Method, comprising:
Operable graphic assembly set is provided;The graphic assembly set includes the node for indicating subtask, and
For indicating that the directed connection of dependence accords with;
Build graphic operation for what the node and the directed connection accorded with based on user, generate the operation of subtask set according to
Rely relational graph and shows;
The execution state of subtask in the set of subtask described in timing acquisition, and shown in the job dependence relational graph
The execution state.
Method for exhibiting data in the job scheduling of this specification embodiment, further includes:
The modification that user is received for the job dependence relational graph operates, and modifies the work according to modification operation
Industry dependence graph.
Method for exhibiting data in the job scheduling of this specification embodiment, the modification operation includes any in following
It is one or more:
Increase subtask and its dependence with other subtasks in the set of the subtask;
Delete subtask and its dependence with other subtasks in the set of the subtask;
Modify the dependence of other subtasks in subtask and subtask set.
Method for exhibiting data in the job scheduling of this specification embodiment, in the set of subtask described in the timing acquisition
The execution state of subtask, comprising:
From the job instances table of local cache, the execution state of the subtask in the subtask set is read.
Method for exhibiting data in the job scheduling of this specification embodiment, it is described to be opened up in the job dependence relational graph
Show the execution state, comprising:
On the corresponding node in subtask, the execution performance of the preposition subtask of the subtask is shown.
Method for exhibiting data in the job scheduling of this specification embodiment, it is described to be opened up in the job dependence relational graph
Show the execution state, further includes:
On the corresponding node in subtask, show that the plan of the subtask executes the time.
Method for exhibiting data in the job scheduling of this specification embodiment, further includes:
From the job dependence relationship and plan for extracting subtask in the subtask set in the job dependence relational graph
Execute the time;
In the job instances table that the job dependence relationship and plan are executed to time write-in local cache.
On the other hand, this specification embodiment additionally provides the data in a kind of job scheduling and shows device, comprising:
Component provides module, for providing operable graphic assembly set;The graphic assembly set includes being used for table
Show the node of subtask, and the directed connection for indicating dependence accords with;
Graph generation module is generated for building graphic operation for what the node and the directed connection accorded with based on user
The job dependence relational graph of subtask set is simultaneously shown;
Figure display module, for the execution state of subtask in the set of subtask described in timing acquisition, and in the work
The execution state is shown on industry dependence graph.
Data in the job scheduling of this specification embodiment show device, further includes:
Figure modified module is operated for receiving user for the modification of the job dependence relational graph, and according to described
The job dependence relational graph is modified in modification operation.
Data in the job scheduling of this specification embodiment show device, and the modification operation includes any in following
It is one or more:
Increase subtask and its dependence with other subtasks in the set of the subtask;
Delete subtask and its dependence with other subtasks in the set of the subtask;
Modify the dependence of other subtasks in subtask and subtask set.
Data in the job scheduling of this specification embodiment show device, in the set of subtask described in the timing acquisition
The execution state of subtask, comprising:
From the job instances table of local cache, the execution state of the subtask in the subtask set is read.
Data in the job scheduling of this specification embodiment show device, described to open up in the job dependence relational graph
Show the execution state, comprising:
On the corresponding node in subtask, the execution performance of the preposition subtask of the subtask is shown.
Data in the job scheduling of this specification embodiment show device, described to open up in the job dependence relational graph
Show the execution state, further includes:
On the corresponding node in subtask, show that the plan of the subtask executes the time.
Data in the job scheduling of this specification embodiment show device, further includes:
Data write. module, for from the work for extracting subtask in the set of the subtask in the job dependence relational graph
Industry dependence and plan execute the time, and the job dependence relationship and plan are executed to the operation of time write-in local cache
In example table.
On the other hand, this specification embodiment additionally provides a kind of computer equipment, including memory, processor and
The computer program being stored on the memory, the computer program execute above-mentioned data when being run by the processor
Methods of exhibiting.
On the other hand, this specification embodiment additionally provides a kind of computer storage medium, is stored thereon with computer journey
Sequence, the computer program realize above-mentioned method for exhibiting data when being executed by processor.
The technical solution provided by above this specification embodiment is providing a user as it can be seen that in this specification embodiment
After operable graphic assembly set, graphic operation can be built for what node and directed connection accorded with based on user, generate subtask collection
The job dependence relational graph of conjunction simultaneously shows user;Hereafter the execution shape of subtask in being gathered with timing acquisition subtask
State, and execution state is shown in job dependence relational graph, subtask is intuitively shown in system call operation to realize
Job dependence relationship and executive condition.
Detailed description of the invention
In order to illustrate more clearly of this specification embodiment or technical solution in the prior art, below will to embodiment or
Attached drawing needed to be used in the description of the prior art is briefly described, it should be apparent that, the accompanying drawings in the following description is only
The some embodiments recorded in this specification, for those of ordinary skill in the art, in not making the creative labor property
Under the premise of, it is also possible to obtain other drawings based on these drawings.In the accompanying drawings:
Fig. 1 is the flow chart of the method for exhibiting data in some embodiments of this specification in job scheduling;
Fig. 2 is the schematic diagram of the job dependence relational graph in one embodiment of this specification;
Fig. 3 is the flow chart of the method for exhibiting data in other embodiments of this specification in job scheduling;
Fig. 4 is the structural block diagram of the data displaying device in some embodiments of this specification in job scheduling;
Fig. 5 is the structural block diagram of computer equipment in some embodiments of this specification.
Specific embodiment
In order to make those skilled in the art more fully understand the technical solution in this specification, below in conjunction with this explanation
Attached drawing in book embodiment is clearly and completely described the technical solution in this specification embodiment, it is clear that described
Embodiment be only this specification a part of the embodiment, instead of all the embodiments.The embodiment of base in this manual,
Every other embodiment obtained by those of ordinary skill in the art without making creative efforts, all should belong to
The range of this specification protection.
Method for exhibiting data in the job scheduling of this specification embodiment can be applied in distributed job system.Example
Such as, in some embodiments of this specification, the data that can be applied in distributed job system show device.Wherein, described
Data show that device can be the server in distributed job system.In one embodiment of this specification, the server can
Think the electronic equipment with operation and network interaction function;Or run in the electronic equipment, be data processing and
The software of network interaction offer service logic.
Refering to what is shown in Fig. 1, the method for exhibiting data in the job scheduling of some embodiments of this specification may include as follows
Step:
S101, operable graphic assembly set is provided;The graphic assembly set includes the section for indicating subtask
Point, and the directed connection symbol for indicating dependence;
S102, graphic operation is built for what the node and the directed connection accorded with based on user, generates subtask set
Job dependence relational graph is simultaneously shown;
The execution state of subtask in the set of subtask described in S103, timing acquisition, and in the job dependence relational graph
It is upper to show the execution state.
It can be seen that after providing a user operable graphic assembly set, can be based in this specification embodiment
User builds graphic operation for what node and directed connection accorded with, generates the job dependence relational graph of subtask set and shows use
Family;Hereafter the execution state of subtask in being gathered with timing acquisition subtask, and show and hold in job dependence relational graph
Row state, to realize the job dependence relationship and executive condition for intuitively showing subtask in system call operation.
In some embodiments of this specification, provide in operable graphic assembly set in addition to node and directed connection accord with
It outside, can also include some other graphic assembly (such as groups such as " addition ", " deletion ", " modification ", " confirmation ", " return "
Part), to facilitate user's dynamic to draw job dependence relational graph.Wherein, node can have any shape, such as shown in Fig. 2
In exemplary embodiment, the shape of node can be rectangle frame, in order to which information is shown.When between two nodes pass through oriented company
When connecing symbol connection, indicate that there is dependence between the two nodes.For example, in the exemplary embodiment illustrated in fig. 2, node
By directed connection symbol (here by taking directed connection symbol is line segment with the arrow as an example) between M2 and node M 1, arrow is directed toward node
M2, arrow tail are directed toward node M 1, show that the execution of node M 2 depends on the completion of node M 1.
Under distributed task scheduling scene, since a task can be split into as multiple independent subtasks, this is a little
Task may be constructed subtask set.Therefore, graphic operation is built for what node and directed connection accorded with based on user, son can be generated
The job dependence relational graph of set of tasks, and show user.It should be noted that here to build graphic operation generally a series of
Operation needs to carry out multiple operations in order to draw the corresponding job dependence relational graph of a sub- set of tasks.
Refering to what is shown in Fig. 3, in some embodiments of this specification, when the device that executes in batches of distributed job system is executing
Behind complete subtask, execution state can be returned to the batch controller of distributed job system, in order to which batch controller can be with
It is written into job instances table and caches.Wherein, execution state for example may include: execute completion, execute failure, be not carried out,
In execution etc..The data of distributed job system show that device can execution shape to store in timing scan job instances table
State, and execution state is shown in the corresponding node of job dependence relational graph, such as shown in Fig. 2.Wherein, in job instances table not
The execution state that each subtask in the set of subtask can only be saved, the plan that can also save each subtask execute the time
Etc. information.
In some embodiments of this specification, the method for exhibiting data can also include: from job dependence relational graph
It extracts the job dependence relationship of subtask and plan in the set of subtask and executes the time;And by the job dependence relationship and plan
In the job instances table for executing time write-in local cache.In this way, allow the batch controller of distributed job system from
The plan of each subtask of regular check executes the time in job instances table, and tune (is meeting when meeting execution condition
When execution condition, the device that executes in batches of instruction distributed job system starts subtasking).
In one embodiment of this specification, the extraction may include: reading operation dependence graph;Parse operation according to
Rely relational graph, it is hereby achieved that the job dependence relationship and plan in figure execute the time.
Correspondingly, in some embodiments of this specification, it is described that the execution state is shown in job dependence relational graph
It may include the execution performance that the preposition subtask of the subtask is shown on the corresponding node in subtask, Yi Jisuo
The plan for stating subtask itself executes the time.For example, node M 1 is the preposition son of node M 2 in the exemplary embodiment of Fig. 2
Therefore task can show the executive plan of the execution performance and node M 2 itself of node M 1 in node M 2.At this
In other embodiments of specification, the preposition subtask of subtask can also be counted on the corresponding node in subtask.
For example, can show the counting of the unfinished quantity of the preposition subtask of subtask on node and/or the meter of quantity is completed
Number etc..It is corresponding, it, can be by the complete of the preposition subtask of correspondence after the completion of a preposition subtask for having subtask is performed
Add one at the counting of quantity, while the counting that can also correspond to the unfinished quantity of preposition subtask subtracts one.
In some embodiments of this specification, when needing to modify operation dependence graph, user can be to job dependence
Relational graph carries out dynamic modification.The data of distributed job system show that device is receiving user for job dependence pass
It is that after the modification of figure operates, can be operated according to the modification and modify the job dependence relational graph, and show modified work
Industry dependence graph.In this way, compared with the prior art needs to read data from database when modifying operation dependence, due to
This specification embodiment can read data from caching when modifying operation dependence, to improve modification operation dependence
Efficiency.
In one exemplary embodiment, the modification operation includes that for example can be to increase subtask and its appoint with the son
The dependence of other subtasks in business set.In a further exemplary embodiment, the modification operation, which for example can also be, deletes
Dependence except subtask and its with other subtasks in the set of the subtask.In a further exemplary embodiment, described
Modification operation for example can also be the dependence of other subtasks in modification subtask and subtask set.
Although procedures described above process includes the multiple operations occurred with particular order, it should however be appreciated that understand,
These processes may include more or fewer operations, these operations can be executed sequentially or be executed parallel (such as using parallel
Processor or multi-thread environment).
Refering to what is shown in Fig. 4, the data in job scheduling in some embodiments of this specification show device, may include:
Component provides module 41, may be used to provide operable graphic assembly set;The graphic assembly set includes
For indicating the node of subtask, and the directed connection for indicating dependence accords with;
Graph generation module 42 can be used for building figure behaviour for what the node and the directed connection accorded with based on user
Make, generate the job dependence relational graph of subtask set and shows;
Figure display module 43, can be used for subtask described in timing acquisition set in subtask execution state, and
The execution state is shown in the job dependence relational graph.
In other embodiments of this specification, the data show that device can further include figure modified module;The figure
Shape modified module can be used for receiving user and operate for the modification of the job dependence relational graph, and be operated according to the modification
Modify the job dependence relational graph.
In other embodiments of this specification, the data show device, can also include Data write. module, the number
It can be used for according to writing module from the job dependence for extracting subtask in the subtask set in the job dependence relational graph
Relationship and plan execute the time, and the job dependence relationship and plan are executed to the job instances table of time write-in local cache
In.
For convenience of description, it is divided into various units when description apparatus above with function to describe respectively.Certainly, implementing this
The function of each unit can be realized in the same or multiple software and or hardware when specification.
Refering to what is shown in Fig. 5, the computer equipment of some embodiments of this specification may include memory, processor and
The computer program being stored on the memory, the computer program execute following steps when being run by the processor:
Operable graphic assembly set is provided;The graphic assembly set includes the node for indicating subtask, and
For indicating that the directed connection of dependence accords with;
Build graphic operation for what the node and the directed connection accorded with based on user, generate the operation of subtask set according to
Rely relational graph and shows;
The execution state of subtask in the set of subtask described in timing acquisition, and shown in the job dependence relational graph
The execution state.
The present invention be referring to according to the method for the embodiment of the present invention, the process of equipment (system) and computer program product
Figure and/or block diagram describe.It should be understood that every one stream in flowchart and/or the block diagram can be realized by computer program instructions
The combination of process and/or box in journey and/or box and flowchart and/or the block diagram.It can provide these computer programs
Instruct the processor of general purpose computer, special purpose computer, Embedded Processor or other programmable data processing devices to produce
A raw machine, so that being generated by the instruction that computer or the processor of other programmable data processing devices execute for real
The device for the function of being specified in present one or more flows of the flowchart and/or one or more blocks of the block diagram.
These computer program instructions, which may also be stored in, is able to guide computer or other programmable data processing devices with spy
Determine in the computer-readable memory that mode works, so that it includes referring to that instruction stored in the computer readable memory, which generates,
Enable the manufacture of device, the command device realize in one box of one or more flows of the flowchart and/or block diagram or
The function of being specified in multiple boxes.
These computer program instructions also can be loaded onto a computer or other programmable data processing device, so that counting
Series of operation steps are executed on calculation machine or other programmable devices to generate computer implemented processing, thus in computer or
The instruction executed on other programmable devices is provided for realizing in one or more flows of the flowchart and/or block diagram one
The step of function of being specified in a box or multiple boxes.
In a typical configuration, calculating equipment includes one or more processors (CPU), input/output interface, net
Network interface and memory.
Memory may include the non-volatile memory in computer-readable medium, random access memory (RAM) and/or
The forms such as Nonvolatile memory, such as read-only memory (ROM) or flash memory (flash RAM).Memory is computer-readable medium
Example.
Computer-readable medium includes permanent and non-permanent, removable and non-removable media can be by any method
Or technology come realize information store.Information can be computer readable instructions, data structure, the module of program or other data.
The example of the storage medium of computer includes, but are not limited to phase change memory (PRAM), static random access memory (SRAM), moves
State random access memory (DRAM), other kinds of random access memory (RAM), read-only memory (ROM), electric erasable
Programmable read only memory (EEPROM), flash memory or other memory techniques, read-only disc read only memory (CD-ROM) (CD-ROM),
Digital versatile disc (DVD) or other optical storage, magnetic cassettes, magnetic disc type storage or other magnetic storage devices are appointed
What his non-transmission medium, can be used for storing and can be accessed by a computing device information.As defined in this article, computer can
Reading medium not includes temporary computer readable media (transitory media), such as data-signal and carrier wave of modulation.
It should also be noted that, the terms "include", "comprise" or its any other variant are intended to nonexcludability
Include, so that process, method or equipment including a series of elements not only include those elements, but also including not having
There is the other element being expressly recited, or further includes for this process, method or the intrinsic element of equipment.Do not having more
In the case where more limitations, the element that is limited by sentence "including a ...", it is not excluded that including process, the side of the element
There is also other identical elements in method or equipment.
It will be understood by those skilled in the art that the embodiment of this specification can provide as the production of method, system or computer program
Product.Therefore, complete hardware embodiment, complete software embodiment or implementation combining software and hardware aspects can be used in this specification
The form of example.Moreover, it wherein includes the computer of computer usable program code that this specification, which can be used in one or more,
The computer program implemented in usable storage medium (including but not limited to magnetic disk storage, CD-ROM, optical memory etc.) produces
The form of product.
This specification can describe in the general context of computer-executable instructions executed by a computer, such as journey
Sequence module.Generally, program module include routines performing specific tasks or implementing specific abstract data types, programs, objects,
Component, data structure etc..This specification can also be practiced in a distributed computing environment, in these distributed computing environment
In, by executing task by the connected remote processing devices of communication network.In a distributed computing environment, program module
It can be located in the local and remote computer storage media including storage equipment.
All the embodiments in this specification are described in a progressive manner, same and similar portion between each embodiment
Dividing may refer to each other, and each embodiment focuses on the differences from other embodiments.Especially for system reality
For applying example, since it is substantially similar to the method embodiment, so being described relatively simple, related place is referring to embodiment of the method
Part explanation.
The foregoing is merely the embodiments of this specification, are not limited to this specification.For art technology
For personnel, this specification can have various modifications and variations.It is all made any within the spirit and principle of this specification
Modification, equivalent replacement, improvement etc., should be included within the scope of the claims of this specification.
Claims (16)
1. the method for exhibiting data in a kind of job scheduling characterized by comprising
Operable graphic assembly set is provided;The graphic assembly set includes the node for indicating subtask, and is used for
Indicate the directed connection symbol of dependence;
Graphic operation is built for what the node and the directed connection accorded with based on user, the job dependence for generating subtask set closes
System schemes and shows;
The execution state of subtask in the set of subtask described in timing acquisition, and in the job dependence relational graph described in displaying
Execution state.
2. the method for exhibiting data in job scheduling as described in claim 1, which is characterized in that further include:
The modification that user is received for the job dependence relational graph operates, and according to the modification operation modification operation according to
Rely relational graph.
3. the method for exhibiting data in job scheduling as claimed in claim 2, which is characterized in that modification operation include with
Any one or more in lower:
Increase subtask and its dependence with other subtasks in the set of the subtask;
Delete subtask and its dependence with other subtasks in the set of the subtask;
Modify the dependence of other subtasks in subtask and subtask set.
4. the method for exhibiting data in job scheduling as described in claim 1, which is characterized in that son described in the timing acquisition
The execution state of subtask in set of tasks, comprising:
From the job instances table of local cache, the execution state of the subtask in the subtask set is read.
5. the method for exhibiting data in job scheduling as described in claim 1, which is characterized in that described in the job dependence
The execution state is shown in relational graph, comprising:
On the corresponding node in subtask, the execution performance of the preposition subtask of the subtask is shown.
6. the method for exhibiting data in job scheduling as described in claim 1, which is characterized in that described in the job dependence
The execution state is shown in relational graph, further includes:
On the corresponding node in subtask, show that the plan of the subtask executes the time.
7. the method for exhibiting data in job scheduling as described in claim 1, which is characterized in that further include:
It is executed from the job dependence relationship of subtask and plan in the subtask set is extracted in the job dependence relational graph
Time;
In the job instances table that the job dependence relationship and plan are executed to time write-in local cache.
8. the data in a kind of job scheduling show device characterized by comprising
Component provides module, for providing operable graphic assembly set;The graphic assembly set includes for indicating son
The node of task, and the directed connection symbol for indicating dependence;
Graph generation module generates son and appoints for building graphic operation for what the node and the directed connection accorded with based on user
The job dependence relational graph for set of being engaged in simultaneously is shown;
Figure display module, for subtask described in timing acquisition set in subtask execution state, and the operation according to
Rely and shows the execution state in relational graph.
9. the data in job scheduling as claimed in claim 8 show device, which is characterized in that further include:
Figure modified module is operated for receiving user for the modification of the job dependence relational graph, and according to the modification
The job dependence relational graph is modified in operation.
10. the data in job scheduling as claimed in claim 9 show device, which is characterized in that the modification, which operates, includes
Any one or more in below:
Increase subtask and its dependence with other subtasks in the set of the subtask;
Delete subtask and its dependence with other subtasks in the set of the subtask;
Modify the dependence of other subtasks in subtask and subtask set.
11. the data in job scheduling as claimed in claim 8 show device, which is characterized in that described in the timing acquisition
The execution state of subtask in the set of subtask, comprising:
From the job instances table of local cache, the execution state of the subtask in the subtask set is read.
12. data in job scheduling as claimed in claim 8 show device, which is characterized in that it is described the operation according to
Rely and show the execution state in relational graph, comprising:
On the corresponding node in subtask, the execution performance of the preposition subtask of the subtask is shown.
13. data in job scheduling as claimed in claim 8 show device, which is characterized in that it is described the operation according to
Rely and show the execution state in relational graph, further includes:
On the corresponding node in subtask, show that the plan of the subtask executes the time.
14. the data in job scheduling as claimed in claim 8 show device, which is characterized in that further include:
Data write. module, for from extracted in the job dependence relational graph operation of subtask in the set of the subtask according to
The relationship of relying and plan execute the time, and the job dependence relationship and plan are executed to the job instances of time write-in local cache
In table.
15. a kind of computer equipment, including memory, processor and the computer program being stored on the memory,
It is characterized in that, perform claim requires data exhibition described in 1-7 any one when the computer program is run by the processor
Show method.
16. a kind of computer storage medium, is stored thereon with computer program, which is characterized in that the computer program is located
It manages when device executes and realizes method for exhibiting data described in claim 1-7 any one.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910776943.6A CN110471754B (en) | 2019-08-22 | 2019-08-22 | Data display method, device, equipment and storage medium in job scheduling |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910776943.6A CN110471754B (en) | 2019-08-22 | 2019-08-22 | Data display method, device, equipment and storage medium in job scheduling |
Publications (2)
Publication Number | Publication Date |
---|---|
CN110471754A true CN110471754A (en) | 2019-11-19 |
CN110471754B CN110471754B (en) | 2022-04-05 |
Family
ID=68513642
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910776943.6A Active CN110471754B (en) | 2019-08-22 | 2019-08-22 | Data display method, device, equipment and storage medium in job scheduling |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110471754B (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111539185A (en) * | 2020-04-14 | 2020-08-14 | 北京宝兰德软件股份有限公司 | Job processing method, job processing apparatus, electronic device, and storage medium |
CN113127175A (en) * | 2021-05-18 | 2021-07-16 | 中国银行股份有限公司 | Host job scheduling operation method and device |
CN113239028A (en) * | 2021-05-10 | 2021-08-10 | 成都新潮传媒集团有限公司 | Data restoration method and device for data warehouse scheduling and readable storage medium |
CN113534750A (en) * | 2020-04-15 | 2021-10-22 | 北京旷视机器人技术有限公司 | Job scheduling method, device, system, equipment and medium under intensive storage |
CN113821326A (en) * | 2021-09-24 | 2021-12-21 | 北京天融信网络安全技术有限公司 | Job scheduling method and device, electronic equipment and storage medium |
CN117170889A (en) * | 2023-11-01 | 2023-12-05 | 沐曦集成电路(上海)有限公司 | Heterogeneous non-blocking data packet synchronous processing system |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US7594227B2 (en) * | 2004-03-08 | 2009-09-22 | Ab Initio Technology Llc | Dependency graph parameter scoping |
CN107315581A (en) * | 2017-05-23 | 2017-11-03 | 努比亚技术有限公司 | Mission script generating means and method, task scheduling system and method |
CN108845798A (en) * | 2018-05-30 | 2018-11-20 | 安徽四创电子股份有限公司 | A kind of visualization big data task cradle and processing method |
CN109508413A (en) * | 2018-10-22 | 2019-03-22 | 中国银行股份有限公司 | Job scheduling methods of exhibiting and device, storage medium and electronic equipment |
-
2019
- 2019-08-22 CN CN201910776943.6A patent/CN110471754B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US7594227B2 (en) * | 2004-03-08 | 2009-09-22 | Ab Initio Technology Llc | Dependency graph parameter scoping |
CN107315581A (en) * | 2017-05-23 | 2017-11-03 | 努比亚技术有限公司 | Mission script generating means and method, task scheduling system and method |
CN108845798A (en) * | 2018-05-30 | 2018-11-20 | 安徽四创电子股份有限公司 | A kind of visualization big data task cradle and processing method |
CN109508413A (en) * | 2018-10-22 | 2019-03-22 | 中国银行股份有限公司 | Job scheduling methods of exhibiting and device, storage medium and electronic equipment |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111539185A (en) * | 2020-04-14 | 2020-08-14 | 北京宝兰德软件股份有限公司 | Job processing method, job processing apparatus, electronic device, and storage medium |
CN111539185B (en) * | 2020-04-14 | 2023-04-14 | 北京宝兰德软件股份有限公司 | Job processing method, job processing apparatus, electronic device, and storage medium |
CN113534750A (en) * | 2020-04-15 | 2021-10-22 | 北京旷视机器人技术有限公司 | Job scheduling method, device, system, equipment and medium under intensive storage |
CN113239028A (en) * | 2021-05-10 | 2021-08-10 | 成都新潮传媒集团有限公司 | Data restoration method and device for data warehouse scheduling and readable storage medium |
CN113127175A (en) * | 2021-05-18 | 2021-07-16 | 中国银行股份有限公司 | Host job scheduling operation method and device |
CN113821326A (en) * | 2021-09-24 | 2021-12-21 | 北京天融信网络安全技术有限公司 | Job scheduling method and device, electronic equipment and storage medium |
CN117170889A (en) * | 2023-11-01 | 2023-12-05 | 沐曦集成电路(上海)有限公司 | Heterogeneous non-blocking data packet synchronous processing system |
CN117170889B (en) * | 2023-11-01 | 2024-01-23 | 沐曦集成电路(上海)有限公司 | Heterogeneous non-blocking data packet synchronous processing system |
Also Published As
Publication number | Publication date |
---|---|
CN110471754B (en) | 2022-04-05 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110471754A (en) | Method for exhibiting data, device, equipment and storage medium in job scheduling | |
CN110058856A (en) | Page configuration method and device | |
CN105335412B (en) | For data conversion, the method and apparatus of Data Migration | |
CN108984652B (en) | Configurable data cleaning system and method | |
CN103309904A (en) | Method and device for generating data warehouse ETL (Extraction, Transformation and Loading) codes | |
CN105389402A (en) | Big-data-oriented ETL (Extraction-Transformation-Loading) method and device | |
CN109144699A (en) | Distributed task dispatching method, apparatus and system | |
CN107103064B (en) | Data statistical method and device | |
CN104298496B (en) | data analysis type software development framework system | |
CN109144511B (en) | Method and system for automatically generating numerical simulation graphical user interface | |
CN104317928A (en) | Service ETL (extraction-transformation-loading) method and service ETL system both based on distributed database | |
CN104298588A (en) | Continuous integration implementation method and device | |
CN105354376B (en) | The exchange method and system of multi-dimensional data and OA databases based on BIM | |
CN107798120B (en) | Data conversion method and device | |
CN110515795A (en) | A kind of monitoring method of big data component, device, electronic equipment | |
CN109145055A (en) | A kind of method of data synchronization and system based on Flink | |
CN111966760B (en) | Test data generation method and device based on Hive data warehouse | |
CN109190025A (en) | information monitoring method, device, system and computer readable storage medium | |
CN108427709B (en) | Multi-source mass data processing system and method | |
CN105279138A (en) | Automatic generation system of message research report | |
CN111190814A (en) | Software test case generation method and device, storage medium and terminal | |
CN104182295A (en) | Data backup method and data backup device | |
CN111435329A (en) | Automatic testing method and device | |
CN112860412A (en) | Service data processing method and device, electronic equipment and storage medium | |
CN103809947A (en) | Automatic release method and system for development requirement |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |