CN105354376B - The exchange method and system of multi-dimensional data and OA databases based on BIM - Google Patents
The exchange method and system of multi-dimensional data and OA databases based on BIM Download PDFInfo
- Publication number
- CN105354376B CN105354376B CN201510714111.3A CN201510714111A CN105354376B CN 105354376 B CN105354376 B CN 105354376B CN 201510714111 A CN201510714111 A CN 201510714111A CN 105354376 B CN105354376 B CN 105354376B
- Authority
- CN
- China
- Prior art keywords
- bim
- data
- databases
- models
- light
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/10—Geometric CAD
- G06F30/13—Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F16/00—Information retrieval; Database structures therefor; File system structures therefor
- G06F16/20—Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
- G06F16/28—Databases characterised by their database models, e.g. relational or object models
- G06F16/283—Multi-dimensional databases or data warehouses, e.g. MOLAP or ROLAP
Abstract
The present invention provides the exchange methods and system of a kind of multi-dimensional data based on BIM and OA databases, including:BIM model foundations step, interaction docking step, data call step, data edition step, data return to step.What the present invention realized the numerous and jumbled database of the information in three-dimensional building information model (BIM models) and OA system database interacts docking, so that traditional architectural engineering BIM models have OA data and its function needed for enterprise internal management, but also traditional OA system has the intuitive displaying of BIM model three-dimensional visualizations.
Description
Technical field
The present invention relates to architectural engineering and Building Information Model fields, and in particular, to the multidimensional number of degrees based on BIM technology
According to OA databases exchange method more particularly to Building Engineering Design, construction, the Life cycle such as O&M engineering project pipe
The integrated utilization of the technologies such as reason and big data, cloud platform, informationization.
Background technology
BIM (Building Information Modeling, i.e. Building Information Model) is that (area of computer aided is set after CAD
Meter) appear in the another important Computer Applied Technology of engineering construction industry after technology, causing history of building trade without
The thorough revolution of precedent.The technology utilizes digital modeling software, improves Project design, the efficiency of construction and management, and to use
The building enterprise of the technology brings great newly-increased value.
Through retrieval, following Patents documents are found.
Coordinate indexing result 1:
Application number:201310610159.0
Publication number:CN104680355A
Title:The company information mobile management system of the cloud computing of new technology.
This publication disclose a kind of company information mobile management systems of the cloud computing of new technology.Done existing
Common information system is such as:The business systems tool such as OA systems, ERP system, e-mail system, crm system utilizes cloud computing
Mode uses support mobile office in the intelligent movables equipment such as smart mobile phone, tablet computer by high-speed mobile network.
Technology compares:
Although technical solution disclosed in the patent document complicated a variety of office automation systems by express network with
The mode of mobile interchange realizes the mobile office on basis on intelligent devices, but is lacked under information age background instantly
The bandwagon effect of weary visual pattern.Especially in building engineering field, if around the office management software of building itself
Vivid three-dimensional expression mode is not difficult more intuitively to express clearly in the orientation that architectural engineering event itself is occurred.And such as
All office system softwares of fruit, such as:The business systems such as OA systems, ERP system, e-mail system, crm system can be intuitive
Reaction in three-dimensional buildings model, then there be clearly expression and a transmission in the institute address that event occurs.It is so right
It will be more readily understood in receiving information side.
Invention content
For the defects in the prior art, the object of the present invention is to provide a kind of multi-dimensional datas based on BIM and OA numbers
According to the exchange method and system in library.
According to the exchange method of a kind of multi-dimensional data based on BIM provided by the invention and OA databases, including it is as follows
Step:
BIM model foundation steps:Establish BIM models;
Interaction docking step:Establish the friendship between the open interface of BIM databases and the open interface of OA system databases
Mutually docking;
Data call step:BIM models are docked by the interaction, will call the engineering information number from OA system databases
In BIM databases according to write-in BIM models;
Data edition step:The engineering information data are shown in BIM models, and in BIM databases described in editor
Engineering information data;
Data return to step:It will pass through in the engineering information data cover OA system databases of editor in BIM databases
Accordingly called engineering information data.
Preferably, further include following steps:
Database strip step:BIM databases are separated from BIM models, BIM databases, which are uploaded to private clound, holds level with both hands
The BIM models for having separated BIM databases are carried out lightweight, obtain light-weighted BIM models by platform;
Associated steps:Light-weighted BIM models are uploaded to private clound end platform, and establish BIM databases and lightweight
BIM models association, light-weighted BIM models are then pushed to multiple Intelligent mobile equipments;
The data call step, includes the following steps:
Mobile end data write step:The lightweight in an Intelligent mobile equipment in the multiple Intelligent mobile equipment
BIM models, the BIM databases that the light-weighted BIM models are written from the engineering information data of OA system databases will be called
In;
Data edition step, includes the following steps:
Mobile terminal data modification step:The engineering information data are shown in the light-weighted BIM models, and light at this
The engineering information data are edited in the BIM databases of quantization;
Data return to step, includes the following steps:
Mobile end data refilling step:It will be covered by the engineering information data of editor in the light-weighted BIM databases
Cover engineering information data accordingly called in OA system databases;
Further, the exchange method of the multi-dimensional data based on BIM and OA databases, further includes following steps:
Push step:OA system databases are docked by the interaction, will be in the light-weighted BIM databases by compiling
The light-weighted BIM moulds of other Intelligent mobile equipments in the engineering information data-pushing to the multiple Intelligent mobile equipment collected
The BIM databases of type.
Preferably, the interaction docking step, includes the following steps:
First data determination:BIM models determine the data for needing interaction;
Step is added in first data:The Post functions that BIM models pass through http agreements, it would be desirable to which interactive data are added to
In the WebService of OA system databases publication;
First data processing step:The WebService of OA system databases publication is to needing the data of interaction to handle
After be written in OA system databases, and by write-in result BIM is returned to by the WebService that OA system databases are issued
Model;
Second data determination:OA systems determine the data for needing interaction;
Step is added in second data:The Post functions that OA systems pass through http agreements, it would be desirable to which interactive data are added to
In the WebService of BIM Database Publishings;
Second data processing step:After the WebService of BIM Database Publishings is to needing the data of interaction to handle
It is written in BIM databases, and write-in result is returned into OA systems by the WebService of BIM Database Publishings;
Preferably, the BIM model foundations step, includes the following steps:
Dimension supports information generation step:The dimension of built-in corresponding actual components is supported inside the plan in the model component of BIM models, by
BIM models, which support to plan to generate to tie up according to the corresponding dimension of each model component, supports plan list;Wherein, the dimension of the actual components supports plan
It calls from OA system databases;
The interaction docking step, includes the following steps:
Dimension supports information exchange step:The single corresponding dimension of plan will be supported with dimension support record and upload to BIM databases, then by
The dimension is supported record push write-in OA system databases by BIM databases.
According to the interactive system of a kind of multi-dimensional data based on BIM provided by the invention and OA databases, including it is as follows
Device:
BIM model foundation devices:For establishing BIM models;
Interaction docking facilities:Between open interface for establishing BIM databases and the open interface of OA system databases
Interaction docking;
Data call device:It is docked by the interaction for BIM models, the engineering from OA system databases will be called to believe
In the BIM databases for ceasing data write-in BIM models;
Data editor:For showing the engineering information data in BIM models, and edited in BIM databases
The engineering information data;
Data return mechanism:For the engineering information data cover OA system datas of editor will to be passed through in BIM databases
Engineering information data accordingly called in library.
Preferably, further include following device:
Database stripping off device:For separating BIM databases from BIM models, BIM databases are uploaded to private clound
Platform is held, the BIM models for having separated BIM databases are subjected to lightweight, obtain light-weighted BIM models;
Associated apparatus:For light-weighted BIM models to be uploaded to private clound end platform, and establish BIM databases with it is light
Then light-weighted BIM models are pushed to multiple Intelligent mobile equipments by the association of the BIM models of quantization;
The data call device, including following device:
Mobile terminal data transfer apparatus:For making in an Intelligent mobile equipment in the multiple Intelligent mobile equipment
Light-weighted BIM models will call the BIM that the light-weighted BIM models are written from the engineering information data of OA system databases
In database;
Data editor, including following device:
Mobile terminal data modifying apparatus:For showing the engineering information data in the light-weighted BIM models, and
The engineering information data are edited in the light-weighted BIM databases;
Data return mechanism, including following device:
Mobile end data backfilling apparatus:For the engineering information number of editor will to be passed through in the light-weighted BIM databases
According to engineering information data accordingly called in covering OA system databases;
Further, the interactive system of the multi-dimensional data based on BIM and OA databases further includes following device:
Pusher:It, will be in the light-weighted BIM databases for making OA system databases pass through the interaction docking
By the lightweight of other Intelligent mobile equipments in the engineering information data-pushing to the multiple Intelligent mobile equipment of editor
BIM models BIM databases.
Preferably, the interactive docking facilities, including following device:
First data determining device:Interactive data are needed for making BIM models determine;
First data adding apparatus:For making BIM models pass through the Post functions of http agreements, it would be desirable to interactive data
It is added in the WebService of OA system databases publication;
First data processing equipment:For make OA system databases issue WebService to need interaction data into
It is written in OA system databases after row processing, and returned result is written by the WebService that OA system databases are issued
Give BIM models;
Second data determining device:Interactive data are needed for making OA systems determine;
Second data adding apparatus:For making OA systems pass through the Post functions of http agreements, it would be desirable to interactive data
It is added in the WebService of BIM Database Publishings;
Second data processing equipment:For making the WebService of BIM Database Publishings to needing the data of interaction to carry out
It is written to after processing in BIM databases, and write-in result is returned into OA systems by the WebService of BIM Database Publishings
System;
Preferably, the BIM model foundations device, including following device:
Dimension supports information generation device:The dimension of built-in corresponding actual components supports plan in model component for making BIM models
It is interior, it supports to plan to generate to tie up according to the corresponding dimension of each model component by BIM models and supports plan list;Wherein, the dimension of the actual components
The plan of supporting is called from OA system databases;
The interactive docking facilities, including following device:
Dimension supports information interactive device:BIM databases are uploaded to for that will support to record with the single corresponding dimension of the foster plan of dimension, then
The dimension is supported into record push write-in OA system databases by BIM databases.
Compared with prior art, the present invention has following advantageous effect:
1, the present invention realizes the numerous and jumbled database of the information in three-dimensional building information model (BIM models) and office OA systems
The interactive of database of uniting is docked, so that traditional architectural engineering BIM models have the OA numbers needed for enterprise internal management
According to and its function, but also traditional OA system has the intuitive displaying of BIM model three-dimensional visualizations.
2, the present invention realizes the multi-dimensional data from three-dimensional building information model (BIM models) (such as in addition to length
Time schedule dimension except three dimensions, the cost information dimension in addition to above-mentioned four kinds of dimensions) database in read, repair
Change, store OA system data, and in OA systems reverse operating three-dimensional building information model (BIM models) data it is double
To interaction.
3, the numerous and jumbled three-dimensional building information model rendered by effect is used after scale of construction data light-weight technologg
The technology of cloud computing is presented on the smart machines such as tablet, smart mobile phone, and utilizes the technology of big data so that architectural engineering is complete
The engineering management of life cycle is achieved more accurate, finer, more scientific effect.
Description of the drawings
Upon reading the detailed description of non-limiting embodiments with reference to the following drawings, other feature of the invention,
Objects and advantages will become more apparent upon:
Fig. 1 is the step flow chart of the multi-dimensional data provided by the invention based on BIM and the exchange method of OA databases.
Fig. 2 is the structural schematic diagram of the multi-dimensional data provided by the invention based on BIM and the interactive system of OA databases.
Specific implementation mode
With reference to specific embodiment, the present invention is described in detail.Following embodiment will be helpful to the technology of this field
Personnel further understand the present invention, but the invention is not limited in any way.It should be pointed out that the ordinary skill of this field
For personnel, without departing from the inventive concept of the premise, several changes and improvements can also be made.These belong to the present invention
Protection domain.
According to the interactive system of a kind of multi-dimensional data based on BIM provided by the invention and OA databases, including it is as follows
Device:
BIM model foundation devices:For establishing BIM models;
Interaction docking facilities:Between open interface for establishing BIM databases and the open interface of OA system databases
Interaction docking;
Data call device:It is docked by the interaction for BIM models, the engineering from OA system databases will be called to believe
In the BIM databases for ceasing data write-in BIM models;
Data editor:For showing the engineering information data in BIM models, and edited in BIM databases
The engineering information data;
Data return mechanism:For the engineering information data cover OA system datas of editor will to be passed through in BIM databases
Engineering information data accordingly called in library.
Database stripping off device:For separating BIM databases from BIM models, BIM databases are uploaded to private clound
Platform is held, the BIM models for having separated BIM databases are subjected to lightweight, obtain light-weighted BIM models;The lightweight
BIM models can refer to simplified BIM models, can also be using application No. is CN201510080604.6, Publication No.
It is a kind of disclosed in the patent document of CN104679954A that the light-weighted method and system of BIM models is achieved.
Associated apparatus:For light-weighted BIM models to be uploaded to private clound end platform, and establish BIM databases with it is light
Then light-weighted BIM models are pushed to multiple Intelligent mobile equipments by the association of the BIM models of quantization;
Pusher:It, will be in the light-weighted BIM databases for making OA system databases pass through the interaction docking
By the lightweight of other Intelligent mobile equipments in the engineering information data-pushing to the multiple Intelligent mobile equipment of editor
BIM models BIM databases.
The data call device, including following device:
Mobile terminal data transfer apparatus:For making in an Intelligent mobile equipment in the multiple Intelligent mobile equipment
Light-weighted BIM models will call the BIM that the light-weighted BIM models are written from the engineering information data of OA system databases
In database;
Data editor, including following device:
Mobile terminal data modifying apparatus:For showing the engineering information data in the light-weighted BIM models, and
The engineering information data are edited in the light-weighted BIM databases;
Data return mechanism, including following device:
Mobile end data backfilling apparatus:For the engineering information number of editor will to be passed through in the light-weighted BIM databases
According to engineering information data accordingly called in covering OA system databases;
The interactive docking facilities, including following device:
First data determining device:Interactive data are needed for making BIM models determine;
First data adding apparatus:For making BIM models pass through the Post functions of http agreements, it would be desirable to interactive data
It is added in the WebService of OA system databases publication;
First data processing equipment:For make OA system databases issue WebService to need interaction data into
It is written in OA system databases after row processing, and returned result is written by the WebService that OA system databases are issued
Give BIM models;
Second data determining device:Interactive data are needed for making OA systems determine;
Second data adding apparatus:For making OA systems pass through the Post functions of http agreements, it would be desirable to interactive data
It is added in the WebService of BIM Database Publishings;
Second data processing equipment:For making the WebService of BIM Database Publishings to needing the data of interaction to carry out
It is written to after processing in BIM databases, and write-in result is returned into OA systems by the WebService of BIM Database Publishings
System;
The BIM model foundations device, including following device:
Dimension supports information generation device:The dimension of built-in corresponding actual components supports plan in model component for making BIM models
It is interior, it supports to plan to generate to tie up according to the corresponding dimension of each model component by BIM models and supports plan list;Wherein, the dimension of the actual components
The plan of supporting is called from OA system databases;
The interactive docking facilities, including following device:
Dimension supports information interactive device:BIM databases are uploaded to for that will support to record with the single corresponding dimension of the foster plan of dimension, then
The dimension is supported into record push write-in OA system databases by BIM databases.
The multi-dimensional data based on BIM and the interactive system of OA databases can be according to a kind of bases provided by the invention
It is realized in the multi-dimensional data of BIM and the step flow of the exchange method of OA databases, those skilled in the art can incite somebody to action
The exchange method of the multi-dimensional data based on BIM and OA databases is interpreted as the multi-dimensional data and OA based on BIM
One preference of the interactive system of database.Specifically, the side of interaction based on the multi-dimensional data of BIM with OA databases
Method includes the following steps:
BIM model foundation steps:Establish BIM models;Cover contract management, progress control and building work in BIM models
The personnel of journey, material, machinery, quality, safety, environment etc. necessary factor, BIM models may include architectural discipline BIM models, knot
Structure professional BIM models, the electric profession BIM models in geomantic omen;
Interaction docking step:Establish the friendship between the open interface of BIM databases and the open interface of OA system databases
Mutually docking, so as to two-way reading, modification, storage data in BIM systems and OA systems.Specifically, pass through WebService
Technology carries out data interaction, wherein the ends Client prepare to need the data of interaction, are converted into Json, pass through Http agreements Post
To the Webservice interfaces at the ends Server, Server receives data, is handled, and decides whether that database is written, and return
Return the information needed for Client.
Data call step:BIM models are docked by the interaction, will call the engineering information number from OA system databases
In BIM databases according to write-in BIM models;OA systems contain enterprises examine flow, enterprises flow of work function,
Enterprises outcome-success check function, internal task distribution function etc.;
Data edition step:The engineering information data are shown in BIM models, and in BIM databases described in editor
Engineering information data;
Data return to step:It will pass through in the engineering information data cover OA system databases of editor in BIM databases
Accordingly called engineering information data;
Database strip step:BIM databases are separated from BIM models, BIM databases, which are uploaded to private clound, holds level with both hands
The BIM models for having separated BIM databases are carried out lightweight, obtain light-weighted BIM models by platform;
Associated steps:Light-weighted BIM models are uploaded to private clound end platform, and establish BIM databases and lightweight
BIM models association, light-weighted BIM models are then pushed to multiple Intelligent mobile equipments;Intelligent mobile equipment is such as:It is flat
The terminal devices such as plate computer, smart mobile phone, web browser;
Push step:OA system databases are docked by the interaction, will be in the light-weighted BIM databases by compiling
The light-weighted BIM moulds of other Intelligent mobile equipments in the engineering information data-pushing to the multiple Intelligent mobile equipment collected
The BIM databases of type.
The data call step, includes the following steps:
Mobile end data write step:The lightweight in an Intelligent mobile equipment in the multiple Intelligent mobile equipment
BIM models, the BIM databases that the light-weighted BIM models are written from the engineering information data of OA system databases will be called
In;
Data edition step, includes the following steps:
Mobile terminal data modification step:The engineering information data are shown in the light-weighted BIM models, and light at this
The engineering information data are edited in the BIM databases of quantization;
Data return to step, includes the following steps:
Mobile end data refilling step:It will be covered by the engineering information data of editor in the light-weighted BIM databases
Cover engineering information data accordingly called in OA system databases;
The interaction docking step, includes the following steps:
First data determination:BIM models determine the data for needing interaction;
Step is added in first data:The Post functions that BIM models pass through http agreements, it would be desirable to which interactive data are added to
In the WebService of OA system databases publication;
First data processing step:The WebService of OA system databases publication is to needing the data of interaction to handle
After be written in OA system databases, and by write-in result BIM is returned to by the WebService that OA system databases are issued
Model;
Second data determination:OA systems determine the data for needing interaction;
Step is added in second data:The Post functions that OA systems pass through http agreements, it would be desirable to which interactive data are added to
In the WebService of BIM Database Publishings;
Second data processing step:After the WebService of BIM Database Publishings is to needing the data of interaction to handle
It is written in BIM databases, and write-in result is returned into OA systems by the WebService of BIM Database Publishings;
Data edition, operation are carried out to OA by BIM to realize, the ends BIM prepare data to be treated, assisted by http
View, to Data Analysis Services, database is arrived in storage by the WebService of the ends Post to OA publication, the Webservice at the ends OA, and
Result is returned into the ends BIM by WebService;
Data edition, operation are carried out to BIM by OA in order to realize, the ends OA prepare data to be treated, pass through http
Agreement, to Data Analysis Services, data are arrived in storage by the WebService of the ends Post to BIM publication, the Webservice at the ends BIM
Library, and result is returned into the ends OA by WebService.
The BIM model foundations step, includes the following steps:
Dimension supports information generation step:The dimension of built-in corresponding actual components is supported inside the plan in the model component of BIM models, by
BIM models, which support to plan to generate to tie up according to the corresponding dimension of each model component, supports plan list;Wherein, the dimension of the actual components supports plan
It calls from OA system databases;
The interaction docking step, includes the following steps:
Dimension supports information exchange step:The single corresponding dimension of plan will be supported with dimension support record and upload to BIM databases, then by
The dimension is supported record push write-in OA system databases by BIM databases.
The information exchange that equipment dimension supports information and BIM threedimensional models may be implemented in the present invention, specifically, dimension is supported inside the plan
It is placed in the corresponding model component of relevant device, and dimension can be automatically generated and support plan list;Dimension is supported into record by WebService
Information model is uploaded to, the ends Server generate case record, realize that information model and daily dimension support the information exchange of work, leave dimension
Foster electronical record (word, picture, sound) generates subway Life cycle electronics dimension and supports archives.Further, base of the present invention
In BIM models, the maintenance platform built based on maintenance demand can be searched for generally by keyword, realize in entire line
Lu Zhong finds rapidly certain a kind of equipment containing search " keyword ", and list, clicks the equipment in list, realize equipment
Search, which positions, simultaneously focuses amplification, pointing device, can the letters such as query facility as-built information, the description of product, operation manual, case record
Breath.Meanwhile the maintenance of product record, maintenance, replacement can be recorded, it is saved in corresponding case record, record one is set
The state and process in standby whole service period.To reduce the difficulty and risk of operation maintenance.
Function may be implemented by interacting docking between BIM and OA in the present invention:OA systems have BIM model three-dimensionals can
The Get3D interfaces in WebService depending on changing function, the ends OA calling BIM, get all data of 3D model displays needs,
By processing, 3D models are converted into, imitates and writes.
One skilled in the art will appreciate that in addition to realizing system provided by the invention in a manner of pure computer readable program code
And its other than each device, completely can by by method and step carry out programming in logic come so that system provided by the invention and its
Each device is in the form of logic gate, switch, application-specific integrated circuit, programmable logic controller (PLC) and embedded microcontroller etc.
To realize identical function.So system provided by the invention and its every device are considered a kind of hardware component, and it is right
The device for realizing various functions for including in it can also be considered as the structure in hardware component;It can also will be for realizing each
The device of kind function is considered as either the software module of implementation method can be the structure in hardware component again.
Specific embodiments of the present invention are described above.It is to be appreciated that the invention is not limited in above-mentioned
Particular implementation, those skilled in the art can make a variety of changes or change within the scope of the claims, this not shadow
Ring the substantive content of the present invention.In the absence of conflict, the feature in embodiments herein and embodiment can arbitrary phase
Mutually combination.
Claims (6)
1. the exchange method of a kind of multi-dimensional data based on BIM and OA databases, which is characterized in that include the following steps:
BIM model foundation steps:Establish BIM models;
Interaction docking step:Establish the interaction pair between the open interface of BIM databases and the open interface of OA system databases
It connects;
Data call step:BIM models are docked by the interaction, are write calling from the engineering information data of OA system databases
In the BIM databases for entering BIM models;
Data edition step:The engineering information data are shown in BIM models, and the engineering is edited in BIM databases
Information data;
Data return to step:It will be corresponding in the engineering information data cover OA system databases for passing through editor in BIM databases
Called engineering information data;
The interaction docking step, includes the following steps:
First data determination:BIM models determine the data for needing interaction;
Step is added in first data:The Post functions that BIM models pass through http agreements, it would be desirable to which interactive data are added to OA systems
In the WebService of system Database Publishing;
First data processing step:The WebService of OA system databases publication after needing the data of interaction to handle to writing
Enter into OA system databases, and write-in result is returned into BIM models by the WebService that OA system databases are issued;
Second data determination:OA systems determine the data for needing interaction;
Step is added in second data:The Post functions that OA systems pass through http agreements, it would be desirable to which interactive data are added to BIM numbers
In WebService according to library publication;
Second data processing step:The WebService of BIM Database Publishings after needing the data of interaction to handle to being written
OA systems are returned to by the WebService of BIM Database Publishings into BIM databases, and by write-in result.
2. the exchange method of the multi-dimensional data according to claim 1 based on BIM and OA databases, which is characterized in that
Further include following steps:
Database strip step:BIM databases are separated from BIM models, and BIM databases are uploaded to private clound end platform,
The BIM models for having separated BIM databases are subjected to lightweight, obtain light-weighted BIM models;
Associated steps:Light-weighted BIM models are uploaded to private clound end platform, and establish BIM databases and light-weighted BIM
Then light-weighted BIM models are pushed to multiple Intelligent mobile equipments by the association of model;
The data call step, includes the following steps:
Mobile end data write step:It is light-weighted in an Intelligent mobile equipment in the multiple Intelligent mobile equipment
BIM models are written calling from the engineering information data of OA system databases in the BIM databases of the light-weighted BIM models;
Data edition step, includes the following steps:
Mobile terminal data modification step:The engineering information data are shown in the light-weighted BIM models, and in the lightweight
BIM databases in edit the engineering information data;
Data return to step, includes the following steps:
Mobile end data refilling step:By the engineering information data cover OA by editing in the light-weighted BIM databases
Engineering information data accordingly called in system database;
Further, the exchange method of the multi-dimensional data based on BIM and OA databases, further includes following steps:
Push step:OA system databases are docked by the interaction, will pass through editor's in the light-weighted BIM databases
The light-weighted BIM models of other Intelligent mobile equipments in engineering information data-pushing to the multiple Intelligent mobile equipment
BIM databases.
3. the exchange method of the multi-dimensional data according to claim 1 based on BIM and OA databases, which is characterized in that
The BIM model foundations step, includes the following steps:
Dimension supports information generation step:The dimension of built-in corresponding actual components is supported inside the plan in the model component of BIM models, by BIM moulds
Type, which supports to plan to generate to tie up according to the corresponding dimension of each model component, supports plan list;Wherein, the dimension of the actual components plan of supporting is called
From OA system databases;
The interaction docking step, includes the following steps:
Dimension supports information exchange step:It will support to record with the single corresponding dimension of the foster plan of dimension and upload to BIM databases, then by BIM numbers
The dimension is supported into record push write-in OA system databases according to library.
4. the interactive system of a kind of multi-dimensional data based on BIM and OA databases, which is characterized in that including following device:
BIM model foundation devices:For establishing BIM models;
Interaction docking facilities:Friendship between open interface for establishing BIM databases and the open interface of OA system databases
Mutually docking;
Data call device:It is docked by the interaction for BIM models, the engineering information number from OA system databases will be called
In BIM databases according to write-in BIM models;
Data editor:For showing the engineering information data in BIM models, and in BIM databases described in editor
Engineering information data;
Data return mechanism:For will pass through in the engineering information data cover OA system databases of editor in BIM databases
Accordingly called engineering information data;
The interactive docking facilities, including following device:
First data determining device:Interactive data are needed for making BIM models determine;
First data adding apparatus:For making BIM models pass through the Post functions of http agreements, it would be desirable to which interactive data are added
In the WebService issued to OA system databases;
First data processing equipment:For making at data of the WebService that OA system databases are issued to needing interaction
It is written to after reason in OA system databases, and write-in result is returned to by the WebService that OA system databases are issued
BIM models;
Second data determining device:Interactive data are needed for making OA systems determine;
Second data adding apparatus:For making OA systems pass through the Post functions of http agreements, it would be desirable to which interactive data are added
Into the WebService of BIM Database Publishings;
Second data processing equipment:For making the WebService of BIM Database Publishings to needing the data of interaction to handle
After be written in BIM databases, and by write-in result OA systems are returned to by the WebService of BIM Database Publishings.
5. the interactive system of the multi-dimensional data according to claim 4 based on BIM and OA databases, which is characterized in that
It further include following device:
Database stripping off device:For separating BIM databases from BIM models, BIM databases are uploaded to private clound and are held level with both hands
The BIM models for having separated BIM databases are carried out lightweight, obtain light-weighted BIM models by platform;
Associated apparatus:For light-weighted BIM models to be uploaded to private clound end platform, and establish BIM databases and lightweight
BIM models association, light-weighted BIM models are then pushed to multiple Intelligent mobile equipments;
The data call device, including following device:
Mobile terminal data transfer apparatus:For making the light weight in an Intelligent mobile equipment in the multiple Intelligent mobile equipment
The BIM models of change will call the BIM data that the light-weighted BIM models are written from the engineering information data of OA system databases
In library;
Data editor, including following device:
Mobile terminal data modifying apparatus:For showing the engineering information data in the light-weighted BIM models, and it is light at this
The engineering information data are edited in the BIM databases of quantization;
Data return mechanism, including following device:
Mobile end data backfilling apparatus:For will be covered by the engineering information data of editor in the light-weighted BIM databases
Cover engineering information data accordingly called in OA system databases;
Further, the interactive system of the multi-dimensional data based on BIM and OA databases further includes following device:
Pusher:For making OA system databases pass through the interaction docking, will pass through in the light-weighted BIM databases
The light-weighted BIM of other Intelligent mobile equipments in the engineering information data-pushing to the multiple Intelligent mobile equipment of editor
The BIM databases of model.
6. the interactive system of the multi-dimensional data according to claim 4 based on BIM and OA databases, which is characterized in that
The BIM model foundations device, including following device:
Dimension supports information generation device:The dimension of built-in corresponding actual components is supported inside the plan in model component for making BIM models, by
BIM models, which support to plan to generate to tie up according to the corresponding dimension of each model component, supports plan list;Wherein, the dimension of the actual components supports plan
It calls from OA system databases;
The interactive docking facilities, including following device:
Dimension supports information interactive device:Record is supported for the single corresponding dimension of plan will to be supported with dimension and uploads to BIM databases, then by
The dimension is supported record push write-in OA system databases by BIM databases.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510714111.3A CN105354376B (en) | 2015-10-28 | 2015-10-28 | The exchange method and system of multi-dimensional data and OA databases based on BIM |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510714111.3A CN105354376B (en) | 2015-10-28 | 2015-10-28 | The exchange method and system of multi-dimensional data and OA databases based on BIM |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105354376A CN105354376A (en) | 2016-02-24 |
CN105354376B true CN105354376B (en) | 2018-09-11 |
Family
ID=55330348
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510714111.3A Active CN105354376B (en) | 2015-10-28 | 2015-10-28 | The exchange method and system of multi-dimensional data and OA databases based on BIM |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105354376B (en) |
Families Citing this family (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105639816A (en) * | 2016-03-21 | 2016-06-08 | 中国十七冶集团有限公司 | Safety helmet with attendance check and positioning functions |
CN105912655A (en) * | 2016-04-11 | 2016-08-31 | 东南大学 | WebGL-based three-dimensional model display method and corresponding Web-BIM engineering information integration management system |
CN106844490B (en) * | 2016-12-26 | 2020-08-28 | 江苏龙腾工程设计股份有限公司 | Method and system for structuring and interacting BIM non-geometric information database |
CN107436785B (en) * | 2017-07-21 | 2020-09-01 | 东风设计研究院有限公司 | Revit software information interaction system and interaction method based on information system |
CN110598346B (en) * | 2019-09-20 | 2022-11-11 | 国网江苏省电力工程咨询有限公司 | Interaction method of construction management system and GIM (graphic information management) model |
CN111190964B (en) * | 2019-12-31 | 2022-11-08 | 中国平安财产保险股份有限公司 | Data docking method, device, equipment and storage medium |
CN112907390A (en) * | 2021-04-22 | 2021-06-04 | 中交第四公路工程局有限公司 | Building full life cycle dynamic intelligent management system and method based on BIM |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102884532A (en) * | 2010-03-09 | 2013-01-16 | 欧特克公司 | Systems and methods for construction field management and operations with building information modeling |
CN104573231A (en) * | 2015-01-06 | 2015-04-29 | 上海同筑信息科技有限公司 | BIM based smart building system and method |
CN104614126A (en) * | 2015-02-13 | 2015-05-13 | 郑州能通网络技术有限公司 | Leakage monitoring method for building in steel-frame structure based on BIM (Building Information Modeling) technology |
CN104680355A (en) * | 2013-11-27 | 2015-06-03 | 上海墨芋电子科技有限公司 | Novel-technology cloud computing enterprise information movement management system |
CN104732034A (en) * | 2015-04-01 | 2015-06-24 | 中铁隆工程集团有限公司 | Constructional engineering budgeting system and working mechanism thereof |
Family Cites Families (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20100106654A1 (en) * | 2008-10-16 | 2010-04-29 | Hntb Holdings Ltd | Managing and memorializing design requirements of a building project |
WO2015095141A1 (en) * | 2013-12-16 | 2015-06-25 | Latista Technologies, Inc. | Project management system providing optimized interaction with digital models |
-
2015
- 2015-10-28 CN CN201510714111.3A patent/CN105354376B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102884532A (en) * | 2010-03-09 | 2013-01-16 | 欧特克公司 | Systems and methods for construction field management and operations with building information modeling |
CN104680355A (en) * | 2013-11-27 | 2015-06-03 | 上海墨芋电子科技有限公司 | Novel-technology cloud computing enterprise information movement management system |
CN104573231A (en) * | 2015-01-06 | 2015-04-29 | 上海同筑信息科技有限公司 | BIM based smart building system and method |
CN104614126A (en) * | 2015-02-13 | 2015-05-13 | 郑州能通网络技术有限公司 | Leakage monitoring method for building in steel-frame structure based on BIM (Building Information Modeling) technology |
CN104732034A (en) * | 2015-04-01 | 2015-06-24 | 中铁隆工程集团有限公司 | Constructional engineering budgeting system and working mechanism thereof |
Non-Patent Citations (2)
Title |
---|
BIM技术在工程全过程精细化项目管理中的应用;潘多忠;《土木建筑工程信息技术》;20140831;第6卷(第4期);第49-54页 * |
基于Cloud-BIM的工程项目数据管理研究;乐云等;《工程管理学报》;20150228;第29卷(第1期);第91-96页 * |
Also Published As
Publication number | Publication date |
---|---|
CN105354376A (en) | 2016-02-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105354376B (en) | The exchange method and system of multi-dimensional data and OA databases based on BIM | |
CN105426572B (en) | The exchange method and system of multi-dimensional data and P6 databases based on BIM | |
CN107622355B (en) | Digital management system and method for project group construction process | |
US10127507B2 (en) | Project management system providing interactive issue creation and management | |
Rehg | Computer-integrated manufacturing | |
CN106250987B (en) | A kind of machine learning method, device and big data platform | |
US10510044B2 (en) | Project management system providing digital form-based inspections in the field | |
CN105528418B (en) | A kind of design documentation generation method and device | |
Zhu et al. | A framework-based approach to utility big data analytics | |
Bontcheva et al. | Web-based collaborative corpus annotation: Requirements and a framework implementation | |
Lee et al. | NESIS: a neutral schema for a web-based simulation model exchange service across heterogeneous simulation software | |
CN108427693B (en) | Method for storing BIM model to third-party software system in datamation mode | |
KR20140141313A (en) | System for automatically generating virtual factory model, method for automatically generating virtual factory model, system for automatically simulating virtual factory model and method for automatically simulating virtual factory model | |
CN107436785B (en) | Revit software information interaction system and interaction method based on information system | |
CN112567476A (en) | Device for representing and utilizing the overall layout of a nuclear power plant | |
Barbini et al. | BIM objects library for information exchange in public works: The use of proprietary and open formats | |
Yuan et al. | Collaborative construction industry integrated management service system framework based on big data | |
US20150154567A1 (en) | Facility management system using perspective definition metadata and method therefor | |
CN110598346B (en) | Interaction method of construction management system and GIM (graphic information management) model | |
Eriksson et al. | Assessing digital information management between design and production in industrialised house-building–a case study | |
CN112506900A (en) | Method, device and equipment for checking three-dimensional data of ventilation pipe of nuclear power plant and storage medium | |
CN110096773A (en) | Threedimensional model batch processing method and system for the exploitation of nuclear power station virtual emulation | |
Diez | qd-Build your own LS-DYNA Tool Quickly in Python | |
CN114201855A (en) | Power station unit installation auxiliary information reorganization method based on three-dimensional model | |
Yangxuan et al. | Influence of virtual reality and 3D printing on architectural innovation evaluation based on quality of experience evaluation using fuzzy logic |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |