CN110469112A - A kind of concreting method - Google Patents
A kind of concreting method Download PDFInfo
- Publication number
- CN110469112A CN110469112A CN201910641041.1A CN201910641041A CN110469112A CN 110469112 A CN110469112 A CN 110469112A CN 201910641041 A CN201910641041 A CN 201910641041A CN 110469112 A CN110469112 A CN 110469112A
- Authority
- CN
- China
- Prior art keywords
- concrete
- vibrating
- concreting
- layer
- exposure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/02—Conveying or working-up concrete or similar masses able to be heaped or cast
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
The invention discloses a kind of concreting methods, the following steps are included: (1) concreting: concrete uses placement layer by layer, every layer pours thickness control in (30~50) cm, concreting from surrounding toward center cloth, and remains that cushion cap periphery concrete height is slightly higher;(2) concrete vibrating: vibrating head is inserted perpendicularly into when vibrating, it is fast insert it is slow dial, depth of vibrating is more than every layer of exposure (5~10) cm, and while vibrating inserts point uniformly;(3) concrete receives slurry plastering: every layer concrete exposure should carry out second plastering in time and at least after vibrating and receive slurry, to eliminate Plastic settlement cracks and because of plastic shrinkage cracks caused by the quick dehydration in surface;(4) concrete curing: curing agent is sprayed in the exposure for the concrete structure for completing to pour and is laid with curing film and maintenance plate.The invention has the advantages that can effectively enhance placing intensity, it is effectively prevent the generation of distress in concrete, and elastic modulus of concrete can be improved.
Description
Technical field
The present invention relates to concreting technical fields, and in particular to a kind of concreting method.
Background technique
Concreting refers to entering concreting into mould the process until plasticizing, coagulation in civil construction project
It is made predetermined body in the materials to mould such as soil, that there are intensity is inadequate for existing concreting, and there are a large amount of gas for solidification process
Bubble cannot exclude, and because internal-external temperature difference will cause internal and surface, dilatancy cracks concrete everywhere, and shock resistance is poor, pours strong
Spend the problems such as low.Thus need a kind of to enhance placing intensity, concrete cracking can be prevented and the coagulation of impact resistance can be improved
Native casting method.
Summary of the invention
The object of the present invention is to provide the enabled enhancing placing intensity of one kind, concrete cracking can be prevented and coagulation can be improved
The concreting method of native impact resistance.
To achieve the above object, present invention employs following technical solutions: a kind of concreting method, including following step
It is rapid:
(1) concreting: concrete uses placement layer by layer, and every layer pours thickness control in (30~50) cm, concreting
When from surrounding toward center cloth, and remain that concrete height in cushion cap periphery is slightly higher;
(2) concrete vibrating: every layer pour after vibrated using vibrating head, vibrating head is inserted perpendicularly into when vibrating, fast to insert
Slow to dial, depth of vibrating is more than every layer of exposure (5~10) cm, and while vibrating inserts point uniformly;
(3) concrete receives slurry plastering: every layer concrete exposure should carry out second plastering receipts in time and at least after vibrating
Slurry, to eliminate Plastic settlement cracks and because of plastic shrinkage cracks caused by the quick dehydration in surface;
(4) concrete curing: curing agent is sprayed in the exposure for the concrete structure for completing to pour and is laid with curing film and maintenance
Plate realizes that the heat preservation to concrete structure is retained double effects, effectively reduces crack generation.
Further, a kind of concreting method above-mentioned, in which: in concreting process, control concrete
Laitance and plastic cracking, it may be assumed that reduce concrete slump as far as possible under the premise of guaranteeing pumpable, especially pour to last
When (30~50) cm concrete, concrete slump should be lower than 20mm.
Further, a kind of concreting method above-mentioned, in which: in concreting process, control concrete
Pour the intermittent phase, it may be assumed that casting of concrete in mass intermittent phase general control is being less than or equal to 7 days, and longest was no more than 10 days, always
Less than 20 DEG C, the intensity of old concrete is more than the 50% of design strength for concrete maximum temperature and surface temperature difference.
Through the implementation of the above technical solution, it the beneficial effects of the present invention are: can effectively enhance placing intensity, effectively prevent
The generation of distress in concrete, and elastic modulus of concrete can be improved.
Specific embodiment
The present invention is further explained in the light of specific embodiments.
A kind of concreting method, comprising the following steps:
(1) concreting: concrete uses placement layer by layer, and every layer pours thickness control in (30~50) cm, concreting
When from surrounding toward center cloth, and remain that concrete height in cushion cap periphery is slightly higher;
In concreting process, concrete laitance and plastic cracking are controlled, it may be assumed that drop as far as possible under the premise of guaranteeing pumpable
The low concrete slump, when especially pouring to last (30~50) cm concrete, concrete slump should be lower than 20mm;
In concreting process, the concreting intermittent phase is controlled, it may be assumed that casting of concrete in mass intermittent phase general control
It is being less than or equal to 7 days, longest was no more than 10 days, and old concrete maximum temperature and surface temperature difference are less than 20 DEG C, old concrete
Intensity be more than design strength 50%;
(2) concrete vibrating: every layer pour after vibrated using vibrating head, vibrating head is inserted perpendicularly into when vibrating, fast to insert
Slow to dial, depth of vibrating is more than every layer of exposure (5~10) cm, and while vibrating inserts point uniformly;
(3) concrete receives slurry plastering: every layer concrete exposure should carry out second plastering receipts in time and at least after vibrating
Slurry, to eliminate Plastic settlement cracks and because of plastic shrinkage cracks caused by the quick dehydration in surface;
(4) concrete curing: curing agent is sprayed in the exposure for the concrete structure for completing to pour and is laid with curing film and maintenance
Plate realizes that the heat preservation to concrete structure is retained double effects, effectively reduces crack generation.
The invention has the advantages that can effectively enhance placing intensity, it is effectively prevent the generation of distress in concrete, and can be improved mixed
Solidifying soil impact resistance.
Claims (3)
1. a kind of concreting method, it is characterised in that: the following steps are included:
(1) concreting: concrete uses placement layer by layer, and every layer pours thickness control in (30~50) cm, concreting
When from surrounding toward center cloth, and remain that concrete height in cushion cap periphery is slightly higher;
(2) concrete vibrating: every layer pour after vibrated using vibrating head, vibrating head is inserted perpendicularly into when vibrating, fast to insert
Slow to dial, depth of vibrating is more than every layer of exposure (5~10) cm, and while vibrating inserts point uniformly;
(3) concrete receives slurry plastering: every layer concrete exposure should carry out second plastering receipts in time and at least after vibrating
Slurry, to eliminate Plastic settlement cracks and because of plastic shrinkage cracks caused by the quick dehydration in surface;
(4) concrete curing: curing agent is sprayed in the exposure for the concrete structure for completing to pour and is laid with curing film and maintenance
Plate realizes that the heat preservation to concrete structure is retained double effects, effectively reduces crack generation.
2. a kind of concreting method according to claim 1, it is characterised in that: in concreting process, control
Concrete laitance and plastic cracking processed, it may be assumed that reduce concrete slump as far as possible under the premise of guaranteeing pumpable, especially pour
When to last (30~50) cm concrete, concrete slump should be lower than 20mm.
3. a kind of concreting method according to claim 1 or 2, it is characterised in that: in concreting process,
Control the concreting intermittent phase, it may be assumed that casting of concrete in mass intermittent phase general control is being less than or equal to 7 days, and longest is unsuitable
More than 10 days, less than 20 DEG C, the intensity of old concrete was more than design strength for old concrete maximum temperature and surface temperature difference
50%。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910641041.1A CN110469112A (en) | 2019-07-16 | 2019-07-16 | A kind of concreting method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910641041.1A CN110469112A (en) | 2019-07-16 | 2019-07-16 | A kind of concreting method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110469112A true CN110469112A (en) | 2019-11-19 |
Family
ID=68508772
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910641041.1A Pending CN110469112A (en) | 2019-07-16 | 2019-07-16 | A kind of concreting method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110469112A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110820465A (en) * | 2019-11-22 | 2020-02-21 | 湖南华意项目管理有限公司 | Old concrete pavement pouring process |
CN112343344A (en) * | 2020-09-16 | 2021-02-09 | 上海宝冶冶金工程有限公司 | Construction method of low-hydration-heat concrete |
CN115467525A (en) * | 2022-08-25 | 2022-12-13 | 昆山市交通工程集团有限公司 | Method for pouring prestressed concrete box girder large-volume concrete |
USD1000927S1 (en) | 2021-04-22 | 2023-10-10 | Milwaukee Electric Tool Corporation | Concrete vibrator |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH06212799A (en) * | 1992-11-09 | 1994-08-02 | Kanebo Ltd | Curing method for concrete and curing sheet used therefor |
JPH11117530A (en) * | 1997-10-13 | 1999-04-27 | Takeshi Yamaguchi | Finishing method of concrete |
CN102296819A (en) * | 2011-06-15 | 2011-12-28 | 四川路桥建设股份有限公司 | Construction method for mass pipe concrete without temperature reduction |
CN102758436A (en) * | 2011-04-27 | 2012-10-31 | 五冶集团上海有限公司 | Benzene hydrogenation engineering concrete pouring method |
-
2019
- 2019-07-16 CN CN201910641041.1A patent/CN110469112A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH06212799A (en) * | 1992-11-09 | 1994-08-02 | Kanebo Ltd | Curing method for concrete and curing sheet used therefor |
JPH11117530A (en) * | 1997-10-13 | 1999-04-27 | Takeshi Yamaguchi | Finishing method of concrete |
CN102758436A (en) * | 2011-04-27 | 2012-10-31 | 五冶集团上海有限公司 | Benzene hydrogenation engineering concrete pouring method |
CN102296819A (en) * | 2011-06-15 | 2011-12-28 | 四川路桥建设股份有限公司 | Construction method for mass pipe concrete without temperature reduction |
Non-Patent Citations (2)
Title |
---|
林波: "《大体积砼裂缝控制及成因探析》", 《中国科技信息》 * |
王德川: "《大体积承台混凝土施工及裂缝控制技术》", 《中小企业管理与科技》 * |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110820465A (en) * | 2019-11-22 | 2020-02-21 | 湖南华意项目管理有限公司 | Old concrete pavement pouring process |
CN112343344A (en) * | 2020-09-16 | 2021-02-09 | 上海宝冶冶金工程有限公司 | Construction method of low-hydration-heat concrete |
USD1000927S1 (en) | 2021-04-22 | 2023-10-10 | Milwaukee Electric Tool Corporation | Concrete vibrator |
CN115467525A (en) * | 2022-08-25 | 2022-12-13 | 昆山市交通工程集团有限公司 | Method for pouring prestressed concrete box girder large-volume concrete |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110469112A (en) | A kind of concreting method | |
CN106517934A (en) | Alkali-activating-agent-doped early strength super-high performance concrete and preparation method thereof | |
CN110423074B (en) | High-thixotropy quick-hardening self-compacting concrete for construction of CRTS III plate type track skylight and preparation method | |
CN106869503A (en) | A kind of concreting method of concrete heat-insulating curtain wall | |
CN109809743A (en) | High tenacity avalanche prevention PHC concrete tubular pile and its manufacturing process | |
CN104847114A (en) | Construction method for preventing concrete cracks | |
WO2020015508A1 (en) | Method for treating concrete hole or rebar exposure | |
CN110615654A (en) | Curing material for reinforcing soft soil foundation in low-temperature construction and application method thereof | |
CN109095850A (en) | A kind of concrete mix and its Winter Construction Methods of high early strength | |
CN108178586A (en) | The pervious concrete prepared using discarded clay brick | |
CN105926656B (en) | The construction method of volume of concrete foundation | |
CN112341140A (en) | Assembled building wet joint concrete interface agent and preparation method thereof | |
CN107035149A (en) | Without mould 3D printing casting concrete technique and application | |
CN110421683A (en) | A kind of production technology of building structure integration heat-insulation wall plate | |
CN108947583B (en) | Concrete exposed stone agent and preparation method thereof | |
CN108145832B (en) | A kind of forming method of high-strength, high pervious concrete | |
CN109440771A (en) | A kind of solution large volume mixed mud temperature difference leads to the construction technology in crack | |
CN109281473A (en) | A kind of concreting method | |
CN109702888A (en) | Board production technology is overlapped under a kind of cryogenic conditions | |
CN103882836A (en) | Method and filling device for controlling sluice pier cracks | |
RU2245784C2 (en) | Method of production of decorative facade made out of architectural concrete and a form for its realization | |
KR101590124B1 (en) | Pc box culvert concrete composition unnecessary for steam aging and manufacturing method for pc box culvert using the same | |
CN114247849A (en) | Lattice mechanism gypsum forming process | |
CN207775732U (en) | A kind of large volume heat insulation formwork | |
CN106699080A (en) | Method for making mortar block body model with internal hidden cracks |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20191119 |
|
RJ01 | Rejection of invention patent application after publication |