CN103882836A CN201410071347.5A CN201410071347A CN103882836A CN 103882836 A CN103882836 A CN 103882836A CN 201410071347 A CN201410071347 A CN 201410071347A CN 103882836 A CN103882836 A CN 103882836A
Authority
CN
China
Prior art keywords
mortar
pier
embedded groove
stress
gate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410071347.5A
Other languages
Chinese (zh)
Other versions
CN103882836B (en
Inventor
王可良
郑茂海
徐运海
刘玲
许尚杰
宋芳芳
胡廷正
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Jiaotong University
Original Assignee
Shandong Jiaotong University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Jiaotong University filed Critical Shandong Jiaotong University
Priority to CN201410071347.5A priority Critical patent/CN103882836B/en
Publication of CN103882836A publication Critical patent/CN103882836A/en
Application granted granted Critical
Publication of CN103882836B publication Critical patent/CN103882836B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention relates to a method and a filling device for controlling sluice pier cracks. The method includes: arranging an embedded groove (3) at the position, corresponding to a pier (2), in a sluice bottom board (1), arranging steel bars (6) on the sluice bottom board (1) at the bottom of the embedded groove (3) vertically, filling the embedded groove (3) with acrylic emulsion mortar, crumb rubber mortar or crumb rubber and acrylic emulsion mixed mortar serving as a stress absorbing material (5), and then pouring pier concrete on the embedded groove (3). The filling device is provided with a tank (7) made of rubber, the tank (7) is filled with the acrylic emulsion mortar, crumb rubber mortar or crumb rubber and acrylic emulsion mixed mortar serving as the stress absorbing material (5), and prepared holes (8) for penetration of the steel bars (6) on the sluice bottom board (1) are formed at the bottom of the tank (7) and in the stress absorbing material (5). By the method and the filling device, stress constraint of the bottom board on the pier concrete is overcome, and the technical problem that a pier is prone to cracking is solved.

Description

A kind of method and filling device of controlling Sluice Pier crack
Technical field
The invention belongs to water conservancy projects technical field, relate in particular to a kind of method and filling device of controlling Sluice Pier crack.
Background technology
Sluice Pier crack is a universal phenomenon, built or almost " do not split without pier " building sluice, and crack affects durability and the safe operation of sluice.Gate pier crack has certain feature and regularity.Gate pier on batholith easily ftractures than the gate pier on soft base; When construction, base plate and gate pier are built more long more easily cracking interval time; First gate pier crack results from gate pier bottom, and along with time lengthening, crack is upwards development gradually.The main cause that gate pier produces crack is that the tensile stress that the variations in temperature after concrete setting produces is greater than concrete ultimate tensile strength.When the necessary condition of pier concrete generation thermal stresses is gradient of temperature, concrete is by Complete Bind build-in.
Summary of the invention
The object of this invention is to provide a kind of method and filling device of controlling Sluice Pier crack.The present invention is based on the basic theories of stress absorbing layer in structural mechanics, one deck stress absorbing layer is set between gate pier and base plate, effectively absorbs the temperature deformation energy that pier concrete aquation produces, release temperature stress, reduce the stress constraint of base plate to gate pier, control gate pier crack.Based on above-mentioned analysis, the object of the present invention is achieved like this: a kind of method of controlling Sluice Pier crack, in gate floor, the position of corresponding gate pier arranges embedded groove, the embedded groove degree of depth is 20-50cm, the notch area of embedded groove is identical with gate pier floor space or slightly large, on the gate floor of embedded groove bottom, reinforcing bar is vertically set, the one of mixing the third newborn mortar with the third newborn mortar or rubber aggregate mortar or rubber aggregate is filled in embedded groove as stress-absorbed material, then on embedded groove, builds pier concrete.Stress-absorbed material should have good mechanics and deformation performance, and the compressive strength in the 28 day length of time is 15-30Mpa, and the modulus of elasticity in the 28d days length of time is 3000Mpa-30000Mpa.For convenient construction, improve construction speed, stress-absorbed material can be made to filling device, its concrete scheme is: a kind of filling device of controlling Sluice Pier crack, it is characterized in that: this device is provided with the casing made from rubber, the one that in casing, filling the third newborn mortar or rubber aggregate mortar or rubber aggregate mix the third newborn mortar, as stress-absorbed material, is provided with the preformed hole that installs reinforcing bar on gate floor in bottom half and stress-absorbed material.When use, first in gate floor, embedded groove is outputed in the position of corresponding gate pier, the notch area of embedded groove is identical with gate pier floor space or slightly larger, on the gate floor of embedded groove bottom, reinforcing bar is vertically set, by be filled with the third newborn mortar or rubber aggregate mortar or rubber aggregate mix the third newborn mortar casing be set on the reinforcing bar on gate floor and be placed in embedded groove along preformed hole, then on embedded groove, build pier concrete.Stress absorption layer material has larger deformability and good mechanical property, and modulus of elasticity is almost the 1/10-1/100 of gate pier and gate floor, and compressive strength equates substantially with gate pier and gate floor.Be embedded in stress absorption layer material at gate floor, overcome the stress constraint of base plate to top gate pier, absorbed by the thermogenetic temperature deformation energy of pier concrete aquation, avoid causing thermal stresses, effectively control Sluice Pier crack.
The present invention by arranging one deck stress absorbing layer between base plate and gate pier, stress-absorbed material embeds in gate floor, has overcome the stress constraint of base plate to pier concrete, has solved the easily technical barrier of cracking of gate pier, improve the durability of gate pier, be conducive to the safe operation of sluice.
Brief description of the drawings
Fig. 1 is the structural representation of gate pier and gate floor in the present invention;
Fig. 2 is the structural representation of filling device in the present invention.
In figure, 1, gate floor, 2, gate pier, 3, embedded groove, 4, notch, 5, stress absorption layer material, 6, reinforcing bar, 7, casing, 8, preformed hole.
detailed description of the invention
With reference to accompanying drawing, a kind of method of controlling Sluice Pier crack, position at the interior corresponding gate pier 2 of gate floor 1 arranges embedded groove 3, embedded groove 3 degree of depth are 20-50cm, notch 4 areas of embedded groove 3 are identical with gate pier 2 floor spaces or slightly large, on the gate floor 1 of embedded groove 3 bottoms, reinforcing bar 6 is vertically set, the one of mixing the third newborn mortar with the third newborn mortar or rubber aggregate mortar or rubber aggregate is filled in embedded groove as stress-absorbed material 5, then on embedded groove 3, builds pier concrete.Stress-absorbed material 5 should have good mechanics and deformation performance, and the compressive strength in the 28 day length of time is 15-30Mpa, and the modulus of elasticity in the 28d days length of time is 3000Mpa-30000Mpa.The portland cement of the third described newborn mortar 20.0-45.0% by weight percentage; The third breast of 20-40.0%; The sand of 20.0-60.0%; The water reducing agent of 0-1.2%; The water proportioning of 5.0-15.0% forms, each component be combined into 100%; The portland cement of described rubber aggregate mortar 30.0-60.0% by weight percentage; The rubber powder of 30.0-45.0%; The sand of 0-10.0%; The water reducing agent of 0-1.2%; The water proportioning of 10.0-15.0% forms, each component be combined into 100%; Described rubber aggregate mixes the portland cement of the third newborn mortar 40.0-60.0% by weight percentage; The third breast of 20.0-30.0%; The rubber powder of 20.0-40.0%; The sand of 0-20.0%; The water reducing agent of 0.3-1.2%; The water proportioning of 5.0-10.0% forms, each component be combined into 100%.While building gate floor, at corresponding gate pier place, the groove that the reserved degree of depth is 20-50cm, bottom land area is identical with gate pier floor space or slightly larger; With masterplate supporting preformed groove, avoid concreting in groove, treat that gate floor built, remove masterplate in groove; Stress-absorbed material selects the third newborn mortar or rubber aggregate mortar or rubber aggregate to mix the one in the third newborn mortar; After mixing in mixer, in groove, build; Then build in the above pier concrete.For convenient construction, improve construction speed, stress-absorbed material can be made to filling device, its concrete scheme is: a kind of filling device of controlling Sluice Pier crack, it is characterized in that: this device is provided with the casing 7 made from rubber, the one that the casing 7 newborn mortar of interior filling third or rubber aggregate mortar or rubber aggregate mix the third newborn mortar, as stress-absorbed material 5, is provided with the preformed hole 8 that installs reinforcing bar 6 on gate floor 1 in casing 7 bottoms and stress-absorbed material 5.When use, first in gate floor, embedded groove 3 is outputed in the position of corresponding gate pier, the notch area of embedded groove 3 is identical or slightly larger with gate pier 2 floor spaces, on the gate floor 1 of embedded groove 3 bottoms, reinforcing bar 6 is vertically set, by be filled with the third newborn mortar or rubber aggregate mortar or rubber aggregate mix the third newborn mortar casing 7 be set on the reinforcing bar 6 on gate floor 1 and be placed in embedded groove 3 along preformed hole 8, then on embedded groove 3, build pier concrete.
  

Claims (3)

1. control the method in Sluice Pier crack for one kind, it is characterized in that: in gate floor (1), the position of corresponding gate pier (2) arranges embedded groove (3), embedded groove (3) degree of depth is 20-50cm, notch (4) area of embedded groove (3) is identical or slightly large with gate pier (2) floor space, on the gate floor (1) of embedded groove (3) bottom, reinforcing bar (6) is vertically set, the one of mixing the third newborn mortar with the third newborn mortar or rubber aggregate mortar or rubber aggregate is filled in embedded groove (3) as stress-absorbed material (5), then on embedded groove (3), build pier concrete, described stress-absorbed material (5) should have good mechanics and deformation performance, the compressive strength in the 28 day length of time is 15-30Mpa, the modulus of elasticity in the 28d days length of time is 3000Mpa-30000Mpa.
2. according to the method in control Sluice Pier claimed in claim 1 crack, it is characterized in that: the portland cement of the third described newborn mortar 20.0-45.0% by weight percentage; The third breast of 20-40.0%; The sand of 20.0-60.0%; The water reducing agent of 0-1.2%; The water proportioning of 5.0-15.0% forms, each component be combined into 100%; The portland cement of described rubber aggregate mortar 30.0-60.0% by weight percentage; The rubber powder of 30.0-45.0%; The sand of 0-10.0%; The water reducing agent of 0-1.2%; The water proportioning of 10.0-15.0% forms, each component be combined into 100%; Described rubber aggregate mixes the portland cement of the third newborn mortar 40.0-60.0% by weight percentage; The third breast of 20.0-30.0%; The rubber powder of 20.0-40.0%; The sand of 0-20.0%; The water reducing agent of 0.3-1.2%; The water proportioning of 5.0-10.0% forms, each component be combined into 100%.
3. control the filling device in Sluice Pier crack for one kind, it is characterized in that: this device is provided with the casing (7) made from rubber, the one that in casing (7), filling the third newborn mortar or rubber aggregate mortar or rubber aggregate mix the third newborn mortar is as stress-absorbed material (5), and in casing (7) bottom and stress-absorbed material, (5) are provided with the preformed hole (8) that installs the upper reinforcing bar (6) of gate floor (1).
?
CN201410071347.5A 2014-03-02 2014-03-02 A kind of method and filling device controlling Sluice Pier crack Expired - Fee Related CN103882836B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410071347.5A CN103882836B (en) 2014-03-02 2014-03-02 A kind of method and filling device controlling Sluice Pier crack

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410071347.5A CN103882836B (en) 2014-03-02 2014-03-02 A kind of method and filling device controlling Sluice Pier crack

Publications (2)

Publication Number Publication Date
CN103882836A true CN103882836A (en) 2014-06-25
CN103882836B CN103882836B (en) 2016-02-10

Family

ID=50951939

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410071347.5A Expired - Fee Related CN103882836B (en) 2014-03-02 2014-03-02 A kind of method and filling device controlling Sluice Pier crack

Country Status (1)

Country Link
CN (1) CN103882836B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106087881A (en) * 2016-02-19 2016-11-09 河海大学 A kind of precast concrete box-structure and cast-in-place concrete convolution Sluice Pier structure and construction technology thereof
CN106480859B (en) * 2016-09-27 2018-08-17 四川大学 Parting formula gate pier and parting formula bridge pier
CN114250750A (en) * 2021-12-31 2022-03-29 山东省水利科学研究院 Can subdue assembled sluice structure in concrete crack

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1044067A (en) * 1989-01-13 1990-07-25 勒孔特·米歇尔 Sealing facing and implementation method thereof that masonry structure is used
JPH06286688A (en) * 1993-03-31 1994-10-11 Nissan Kensetsu Kk Method for building dock submerged for ship entering moat
CN101148856A (en) * 2007-11-12 2008-03-26 徐培华 Asphalt macadam stress absorption layer and construction method thereof
CN202466534U (en) * 2012-03-15 2012-10-03 衡水橡胶股份有限公司 Water-proof telescopic device

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1044067A (en) * 1989-01-13 1990-07-25 勒孔特·米歇尔 Sealing facing and implementation method thereof that masonry structure is used
JPH06286688A (en) * 1993-03-31 1994-10-11 Nissan Kensetsu Kk Method for building dock submerged for ship entering moat
CN101148856A (en) * 2007-11-12 2008-03-26 徐培华 Asphalt macadam stress absorption layer and construction method thereof
CN202466534U (en) * 2012-03-15 2012-10-03 衡水橡胶股份有限公司 Water-proof telescopic device

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106087881A (en) * 2016-02-19 2016-11-09 河海大学 A kind of precast concrete box-structure and cast-in-place concrete convolution Sluice Pier structure and construction technology thereof
CN106087881B (en) * 2016-02-19 2018-04-03 河海大学 A kind of precast concrete box-structure and cast-in-place concrete convolution Sluice Pier structure and its construction technology
CN106480859B (en) * 2016-09-27 2018-08-17 四川大学 Parting formula gate pier and parting formula bridge pier
CN114250750A (en) * 2021-12-31 2022-03-29 山东省水利科学研究院 Can subdue assembled sluice structure in concrete crack

Also Published As

Publication number Publication date
CN103882836B (en) 2016-02-10

Similar Documents

Publication Publication Date Title
Nogueira et al. Design and behavior of traditional lime-based plasters and renders. Review and critical appraisal of strengths and weaknesses
CN104860714B (en) One-component tolerant noise-insulating warm-keeping light mortar material and its construction method
CN106522440A (en) Composite floor slab based on polyphenyl granule fiber concrete sandwich insulation and construction method
CN102108787A (en) Construction method of ultra-high strength steel fiber concrete
CN105619596A (en) Preparation method of foam concrete composite board
CN102503307A (en) Novel high-strength expansive concrete
CN103835523A (en) Ultra-long extra-large reinforced concrete structure engineering crack prevention process
CN104831862B (en) Fiber-reinforced concrete composite thermal insulation permanent template
CN110078453A (en) A kind of lightweight concrete and its preparation method and application
CN103882836A (en) Method and filling device for controlling sluice pier cracks
CN104499498A (en) Construction method of mass concrete construction
CN104499611A (en) Novel plastering rapid construction wall after grouting and construction method thereof
CN102674759A (en) EPS (Expandable Polystyrene) light aggregate concrete thermal insulation hollow block and construction method thereof
CN204266529U (en) Assembly type building wall pasting board component
CN102661154A (en) Double-layer structural concrete for lining tunnel under condition of terrestrial heat erosion and construction method of double-layer structural concrete
CN108675708A (en) A kind of concrete link plate and preparation method thereof
CN107795071A (en) A kind of non-adhesive superhigh tenacity cement-base composite material functionally gradient beam and method
CN207405875U (en) A kind of non-adhesive superhigh tenacity cement-base composite material functionally gradient beam
CN108118712A (en) The construction method on large-sized concrete basis
CN108585673A (en) A kind of deep foundation pit support steel fibre haydite light aggregate concrete and preparation method thereof
JP2016044393A (en) Manufacturing method for reinforcement structure
Pulyaev et al. Research of hydration heat of Portland cement used in bridge construction of Kerch Strait
RU174634U1 (en) INSULATING FACING PLATE
CN107246106A (en) A kind of surface cuts shaping haydite concrete prefabricated panel
CN106587820A (en) Hand throwing type early-strength impermeable concrete and preparation method thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CB03 Change of inventor or designer information

Inventor after: Wang Keliang

Inventor after: Liu Gang

Inventor after: Zheng Maohai

Inventor after: Xu Yunhai

Inventor after: Liu Ling

Inventor after: Xu Shangjie

Inventor after: Song Fangfang

Inventor after: Hu Tingzheng

Inventor before: Wang Keliang

Inventor before: Zheng Maohai

Inventor before: Xu Yunhai

Inventor before: Liu Ling

Inventor before: Xu Shangjie

Inventor before: Song Fangfang

Inventor before: Hu Tingzheng

CB03 Change of inventor or designer information
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160210

Termination date: 20190302

CF01 Termination of patent right due to non-payment of annual fee