CN110468829A - End board assembly, concrete-pile, end board assembly processing method, stake production method and pile extension method - Google Patents

End board assembly, concrete-pile, end board assembly processing method, stake production method and pile extension method Download PDF

Info

Publication number
CN110468829A
CN110468829A CN201910682005.XA CN201910682005A CN110468829A CN 110468829 A CN110468829 A CN 110468829A CN 201910682005 A CN201910682005 A CN 201910682005A CN 110468829 A CN110468829 A CN 110468829A
Authority
CN
China
Prior art keywords
end plate
polygon
workpiece
pile
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910682005.XA
Other languages
Chinese (zh)
Inventor
俞向阳
干钢
曾凯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201910682005.XA priority Critical patent/CN110468829A/en
Publication of CN110468829A publication Critical patent/CN110468829A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B21/00Methods or machines specially adapted for the production of tubular articles
    • B28B21/56Methods or machines specially adapted for the production of tubular articles incorporating reinforcements or inserts
    • B28B21/60Methods or machines specially adapted for the production of tubular articles incorporating reinforcements or inserts prestressed reinforcements
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/24Prefabricated piles
    • E02D5/30Prefabricated piles made of concrete or reinforced concrete or made of steel and concrete
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/52Piles composed of separable parts, e.g. telescopic tubes ; Piles composed of segments
    • E02D5/523Piles composed of separable parts, e.g. telescopic tubes ; Piles composed of segments composed of segments
    • E02D5/526Connection means between pile segments

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Chemical & Material Sciences (AREA)
  • Ceramic Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The present invention relates to a kind of end board assemblies, the first cutting groove of workpiece, second workpiece slot and polygon perforation are molded by the extended segment of longitudinally cutting each workpiece jack in the middle part of first end plate ontology, and using the complete block part cut down as polygon connecting plate;In the state that first end plate and the second end plate are spliced and polygon connecting plate is inserted into the polygon perforation, the first cutting groove of workpiece and second workpiece slot dock the extended segment to form complete workpiece jack.The end board assembly have the advantages that it is easy to process it is high-efficient, at low cost, greatly save material, while also mitigating the weight of processing plate, make it possible industrial volume production.The invention further relates to concrete-pile, end board assembly processing method, stake production method and pile extension methods.

Description

End board assembly, concrete-pile, end board assembly processing method, stake production method and pile extension Method
Technical field
The invention belongs to the technical field of the pile foundation engineering of all kinds of architectural structure systems more particularly to a kind of end plate, The processing method of concrete-pile, end plate, the production method of stake and pile extension method with the end plate.
Background technique
The pile body both ends of concrete-pile are generally provided with end plate, can be divided into according to the difference of the pile body cross section of concrete-pile Tubular pole, square pile, the stake of T shape, I-shaped stake etc., end plate are mainly used for pile extension, carry out anchoring to prestressing force main reinforcement and to make Tensioning is carried out to the presstressed reinforcing steel of steel reinforcement cage during making concrete-pile.
The pile extension pile extension mode of existing concrete stake mostly uses greatly manual welding end plate to realize, when pile extension, by adjacent two The end plate of concrete-pile is bonded, then is welded together the end plate being bonded to each other by welding.Welding manner pile extension is maximum excellent Point is that cost is lower, but influence of the manual welding vulnerable to human factor and weather, welding quality are not sufficiently stable, and it is hidden to there is safety Suffer from, after in addition stake and stake are welded, needs to can continue within natural cooling 8~10 minutes pile sinking, waste the plenty of time, influence the effect of construction Rate.
Someone has invented the mechanical pile splicing structure using buckplate thus, and such as one application No. is CN201210418614.2 Chinese invention patent " a kind of square concave-convex trigger tool pile extension side for precast square pile of (Publication No. CN103790156A) Method " and the Chinese invention patent of a Patent No. CN201210419254.8 (Publication No. CN103790157A) " one kind is used for The round buckplate machinery pile extension method of prefabricated tubular pile ", they disclose a kind of similar pile splicing structure, the above pile extension method institute The buckplate of use is structure as a whole with end plate, and buckplate component not only acts as the connection rod iron effect of end plate, also acts as pile extension Effect.
End plate will not be made of casting material, because casting material intensity is not easily rupturable enough, therefore end plate is generally used and rolled System is just made, and above-mentioned T font end plate can only be processed using the processing method of milling, therefore processing initial stage need to be using the steel of high thickness Plate processing, and in the middle part of concave character type end plate it is not perforation, cavity can only also be processed using the processing method of milling, by the material of mill off Material waste completely, processing time consuming, consumptive material are serious.And two end plates processing is complicated, T font end plate needs first to mill out boss, then Boss periphery mills out the first groove to pile extension, and concave character type end plate will first mill out cavity, then cut out and perforate in cavity bottom surface, also The second groove to pile extension is milled out on the internal perisporium of cavity, finally drill out shearing resistance hole.Process is extremely complex, low efficiency Under, lead to all high enterprise of processing cost and material cost, does not have the feasibility of present commercial application substantially in reality, and carry out Commercial applications, therefore background patents are not applied so far.
Summary of the invention
It is a kind of for concrete-pile the technical problem to be solved by the present invention is to be provided for above-mentioned state of the art End board assembly, the end board assembly have the advantages that it is easy to process it is high-efficient, at low cost, greatly save material, while also mitigating The weight for processing plate, makes it possible industrial volume production.
The technical scheme of the invention to solve the technical problem is: a kind of end board assembly, it is characterised in that including First end plate: the first end plate includes first end plate ontology, and it is perforative that multiple longitudinal directions are provided on the end face of first end plate ontology To the first lock muscle hole being connect with main reinforcement;The middle part of first end plate ontology has longitudinal perforative polygon perforation, polygon The first cutting groove of workpiece being laterally extended is separately formed on each side inner hole wall of shape perforation, every first cutting groove of workpiece and one is laterally It is arranged in end plate body and is pierced by the workpiece jack straight line perforation of first end plate outer body wall;Second end plate: described second End plate includes the second end plate body, and perforative the second lock muscle to connect main reinforcement in multiple longitudinal directions is provided on the second end plate body Hole is fixed with polygon connecting plate on the end face of the second end plate body to form boss, each side periphery of polygon connecting plate The second workpiece slot being laterally extended is formed on wall;Pass through longitudinally cutting each workpiece jack in the middle part of first end plate ontology Extended segment and mold first cutting groove of workpiece, second workpiece slot and polygon perforation, and will cut down Complete block part is as the polygon connecting plate;In the first end plate and the second end plate splices and the polygon connecting plate In the state of being inserted into polygon perforation, first cutting groove of workpiece and second workpiece slot dock to be formed it is complete described The extended segment of workpiece jack.
Alternatively, above-mentioned first lock muscle hole and the second lock muscle hole are the bellmouth that aperture is gradually expanded from the inside to the outside. The lock muscle pore structure is suitble to carry out locking connection to steel strand wires.
It is connect for convenience of two end plate bodies with stretch board or anchor plate, is provided with multiple longitudinal directions on above-mentioned first end plate ontology Perforative the first threaded hole to be connect with stretch board, be provided on second end plate body multiple longitudinal directions it is perforative to Second threaded hole of anchor plate connection.Certainly it can also be connected using existing other way, such as be blocked by the way of clip Button connection.
Alternatively, above-mentioned first lock muscle hole is the 8-shaped hole with the first big hole portion and the first small hole portion, wherein first Big hole portion is threaded hole to constitute first threaded hole;Second lock muscle hole is with the second largest hole portion and second orifice The 8-shaped hole in portion, wherein the second largest hole portion is threaded hole to constitute second threaded hole.Suitable pair of aforementioned lock muscle pore structure Rod iron is attached, and the part in 8-shaped hole is threaded hole, is suitble to be attached with stretch board or anchor plate.
Preferably, above-mentioned first end plate ontology and the second end plate body are in rectangle, polygon perforation is rectangular opening;Or, The first end plate ontology and the second end plate body are hexagonal, and the polygon perforation is hexagonal hole.Aforementioned tip plate configurations For rectangular pile, naturally it is also possible to other polygons, such as pentagon or hexagon.
Preferably, being provided with multiple threaded connection holes on above-mentioned polygon connecting plate, it is provided on second end plate body It is multiple with the matched perforation of the threaded connection hole, after thering is bolt to pass through the perforation from the second end plate body back side with it is described more Side shape connecting plate is threadedly coupled.The mode that threaded connection can be used in polygon connecting plate in this way is fixed on end plate, easy to process. It can certainly be welded and fixed.
Second technical problem to be solved by this invention is to provide a kind of concrete-pile for facilitating pile extension.
To solve technical solution used by aforementioned second technical problem are as follows: a kind of concrete-pile, including concrete-pile Body and the intracorporal steel reinforcement cage of stake, it is characterised in that: an end of the concrete pile body is equipped with foregoing first end plate Or second end plate;Another end of the concrete pile body is equipped with foregoing first end plate or the second end plate.The stake is Polygonal pile solid can be also possible to hollow.
Third technical problem to be solved by this invention is to provide a kind of easy to process reasonable, high-efficient, at low cost End board assembly processing method.
To solve technical solution used by aforementioned third technical problem are as follows: a kind of end board assembly processing method, it is described End board assembly includes first end plate and the second end plate, and first end plate includes first end plate ontology, and second end plate includes second End plate body and the polygon connecting plate being fixed on the end face of the second end plate body, it is characterised in that;Include the following steps,
1) steel, is taken to produce the first end plate ontology of polygon;
2) multiple workpiece jacks, are drilled out in first end plate ontology, each workpiece jack at least one end is pierced by first end plate sheet External side wall, and each workpiece jack intersects and surrounds a polygon in the middle part of first end plate ontology;
3), the phase along the polygon described in step 2) to each workpiece jack being located in the middle part of first end plate ontology It answers section progress is longitudinally cutting to be cut away half, is worn to form longitudinal perforative polygon at the middle part of first end plate ontology Hole is separately formed out the first cutting groove of workpiece being laterally extended on each side inner hole wall of polygon perforation, is cutting down Each side periphery wall of the complete block part of polygon on mold the second workpiece slot being laterally extended;First cutting groove of workpiece and The correspondent section of the complete workpiece jack is formed after the docking of two cutting groove of workpiece;
4) steel, is taken to produce the second end plate body of polygon;
5), using abovementioned steps 3) in the complete block part of polygon that cuts down as the polygon connecting plate be fixed to institute It states on the end face on the second end plate body.
It is few that this processing method is related to manufacturing procedure, is formed and is perforated using cutting mode, processing convenience;And the workpiece drilled out is inserted Hole automatically forms the cutting groove of workpiece to pile extension, polygon perforation after cutting, without additionally milling out groove, cuts down Plate as polygon connecting plate, form the boss portion on the second end plate body, make full use of material, consumptive material is few, high-efficient, Because the boss portion on the second end plate body is additionally to fix up, without milling out boss on the second end plate body, therefore process Plate used in second end plate body is lighter, easy to process, more material-saving.This processing method not only ensures processing efficiency, but also will The connecting plate that the block part cut down by the polygon perforation processed on first end plate ontology turns waste into wealth as the second end plate, It also ensures the polygon connecting plate in pile extension more to match, coincide with polygon perforation, improves pile extension quality and safety.
Above-mentioned steps 5) in polygon connecting plate fix in the following ways, multiple spiral shells are processed on polygon connecting plate Line connecting hole processes the perforation being correspondingly arranged with threaded connection hole on the second plate body, with bolt pass through perforation after with it is polygon Threaded connection hole on shape connecting plate is threadedly coupled.Polygon connecting plate is fixed on end plate by the way of being threadedly coupled, and is added Work is convenient, naturally it is also possible to be welded and fixed;The perforative first lock muscle hole in multiple longitudinal directions and the are processed on first end plate ontology One threaded hole;The perforative second lock muscle hole in multiple longitudinal directions and the second threaded hole are processed on the second end plate body, it is each to lock muscle hole For locking and being connected to end plate main reinforcement, and each threaded hole is then used to for end plate connecting with stretch board or anchor plate.
In the method, step 1) and step 4) dividing without strict sequence, that is to say, that can also first make Second end plate body, then make first end plate ontology and its corresponding construction;In fact, in large-scale industrial production, first The production of end plate body and the second end plate body often intersects, synchronous progress, therefore, to the suitable of each step of this method Sequence understands the sequence that should not stick to above-mentioned serial number.
4th technical problem to be solved by this invention is to provide a kind of conjunction easy to process using aforementioned end board assembly Reason, the production method of concrete-pile high-efficient, at low cost.
One end of a kind of production method of concrete-pile, the concrete pile body is equipped with first end plate;The coagulation Another end of native pile body is equipped with the second end plate;The first end plate includes first end plate ontology, the end of first end plate ontology Be provided on face multiple longitudinal directions it is perforative to connect with main reinforcement first lock muscle hole and multiple longitudinal directions it is perforative to stretch board First threaded hole of connection;The middle part of first end plate ontology has longitudinal perforative polygon perforation, in each of polygon perforation The first cutting groove of workpiece being laterally extended is separately formed on the inner hole wall of side, every first cutting groove of workpiece and a lateral arrangement are in end plate Ontology is interior and is pierced by the perforation of the workpiece jack straight line of first end plate outer body wall;Second end plate includes the second end plate sheet Body, perforative the second lock muscle hole to connect main reinforcement in multiple longitudinal directions is provided on the second end plate body and multiple longitudinal directions are perforative To the second threaded hole connecting with anchor plate, it is convex to be formed that polygon connecting plate is fixed on the end face of the second end plate body Platform forms the second workpiece slot being laterally extended on each side periphery wall of the polygon connecting plate;
It is characterized by: the manufacturing method comprises the steps of
1) steel reinforcement cage: main reinforcement customized cut-off, is made, one end of every main reinforcement on steel reinforcement cage is allowed to be fixed on the first lock muscle hole Interior, the other end of main reinforcement is fixed in the second lock muscle hole;
2), stretch board is bolted on first end plate ontology, the inner face of stretch board is polygon equipped with being filled in The first filling block in shape perforation, tensioning screw rod is fixedly connected with stretch board;
3), anchor plate is bolted on the second end plate body;
4), the steel reinforcement cage with stretch board and anchor plate is placed in the die cavity of mold, wherein stretch board is located at die cavity In, anchor plate is bonded with the outer end face of mold side;
5), the feeding into mold carries out tensioning to the steel reinforcement cage by tensioning equipment, main reinforcement is stretched to defined number Steel reinforcement cage is locked after value;
6) it, is vibrated by centrifuge centrifugation or shaking device so that concrete-pile forms;
7) mold after maintenance, is subjected to demoulding and takes out concrete-pile.
Abovementioned steps are not necessarily to numeric order arrangement, and the sequence of some steps can be interchanged.
As an improvement, above-mentioned steps 3) in anchor plate inner face have to accommodate the first of polygon connecting plate it is recessed Chamber.It is bonded anchor plate more preferably with end plate.
It may also is that a kind of production method of concrete-pile, two ends of the concrete pile body are equipped with first End plate;The first end plate includes first end plate ontology, be provided on the end face of first end plate ontology multiple longitudinal directions it is perforative to The first lock muscle hole being connect with main reinforcement and perforative first threaded hole in multiple longitudinal directions;The middle part of first end plate ontology has longitudinal Perforative polygon perforation, is separately formed the first cutting groove of workpiece being laterally extended on each side inner hole wall of polygon perforation, Every first cutting groove of workpiece and a lateral arrangement in end plate body and be pierced by first end plate outer body wall workpiece jack it is straight Line perforation;It is characterized by: comprising the steps of
1) steel reinforcement cage: main reinforcement customized cut-off, is made, one end of every main reinforcement on steel reinforcement cage is allowed to be fixed on the first lock muscle hole Interior, the other end of main reinforcement is fixed in the first lock muscle hole of another piece of first end plate;
2), stretch board is bolted on first end plate ontology, the inner face of stretch board is polygon equipped with being filled in The first filling block in shape perforation, tensioning screw rod is fixedly connected with stretch board;
3), anchor plate is bolted on another piece of first end plate ontology, the inner face of anchor plate is equipped with filling The second filling block in polygon perforation;
4), the steel reinforcement cage with stretch board and anchor plate is placed in the die cavity of mold, wherein stretch board is located at die cavity In, anchor plate is bonded with the outer end face of mold side;
5), the feeding into mold carries out tensioning to the steel reinforcement cage by tensioning equipment, main reinforcement is stretched to defined number Steel reinforcement cage is locked after value;
6) it, is vibrated by centrifuge centrifugation or shaking device so that concrete-pile forms;
7) mold after maintenance, is subjected to demoulding and takes out concrete-pile.
Second end can be equipped with the production method of such a concrete-pile, two ends of the concrete pile body Plate;Second end plate includes the second end plate body, and it is perforative to connect main reinforcement to be provided with multiple longitudinal directions on the second end plate body The second lock muscle hole and perforative second threaded hole in multiple longitudinal directions, be fixed with polygon on the end face of second end plate body Connecting plate forms the second workpiece being laterally extended and inserts to form boss on each side periphery wall of the polygon connecting plate Slot;
It is characterized by: the manufacturing method comprises the steps of
1) steel reinforcement cage: main reinforcement customized cut-off, is made, one end of every main reinforcement on steel reinforcement cage is allowed to be fixed on the of the second end plate In two lock muscle holes, the other end of main reinforcement is fixed in the second lock muscle hole of another piece of the second end plate;
2), stretch board is bolted on the second end plate body;
3), anchor plate is bolted on another piece of the second end plate body;
4), the steel reinforcement cage with stretch board and anchor plate is placed in the die cavity of mold, wherein stretch board is located at die cavity In, anchor plate is bonded with the outer end face of mold side;
5), the feeding into mold carries out tensioning to the steel reinforcement cage by tensioning equipment, main reinforcement is stretched to defined number Steel reinforcement cage is locked after value;
6) it, is vibrated by centrifuge centrifugation or shaking device so that concrete-pile forms;
7) mold after maintenance, is subjected to demoulding and takes out concrete-pile.
Above-mentioned steps 2) in the inner face of stretch board have to the second cavity for accommodating polygon connecting plate;The step It is rapid 3) in the inner face of anchor plate have to the first cavity for accommodating polygon connecting plate.
5th technical problem to be solved by this invention is to provide that a kind of pile extension is firm and convenient pile extension method.
A kind of pile extension method, it is characterised in that: to by the first end plate as described above in a concrete-pile and separately The second end plate as described above in a piece concrete-pile links together;The polygon being fixed on the second end plate body is connected Fishplate bar is inserted into the polygon perforation of first end plate ontology, and first cutting groove of workpiece and the docking of second workpiece slot have re-formed The extended segment of the whole workpiece jack;Bolt is inserted into each workpiece jack, bolt is located at the first cutting groove of workpiece and simultaneously In two cutting groove of workpiece and then complete being connected and fixed for first end plate and the second end plate.
When pile extension, first end plate and the second end plate pairing are spliced, the polygon connection being fixed on the second end plate body Plate is inserted into the polygon perforation of first end plate ontology, is finally inserted into bolt from workpiece jack, while entering the first cutting groove of workpiece In second workpiece slot, pile extension is completed, pile extension is safer firm and pile extension operation is more simple and fast.
Compared with the prior art, the advantages of the present invention are as follows: the middle part of first end plate ontology is longitudinal perforative polygon Perforation, in this way setting are conducive to by the way of cutting form polygon perforation, complete by what is cut down from first end plate ontology Boss of the whole block part (polygon connecting plate) as the second end plate body, had both made the block cut down on first end plate ontology Part can turn waste into wealth, and not need to mill out the boss on the second end plate body using very thick steel plate, therefore life is greatly saved Produce raw material and manufacturing cost;By the extended segment of longitudinally cutting each workpiece jack in the middle part of the first end plate ontology, The extended segment of each workpiece jack is split into two halves, so as to mold the first cutting groove of workpiece, second workpiece slot, polygon simultaneously Shape perforation and the connecting plate as the second end plate body boss, process cutting groove of workpiece and the second end plate without additional process The boss of ontology, therefore production efficiency is greatly improved, and large-scale industry volume production may be implemented;Because of the extension of workpiece jack Section is divided into two after longitudinally cutting and generates the first cutting groove of workpiece and second workpiece slot, thus in the insertion of polygon connecting plate In the state of in polygon perforation, just coincideing after the first cutting groove of workpiece and the docking of second workpiece slot, it is slotting to form complete workpiece The extended segment in hole, matching is more accurate, is conducive to pile extension.
Detailed description of the invention
Fig. 1 is the schematic perspective view of end board assembly embodiment of the present invention;
Fig. 2 is the three-dimensional knot that end board assembly embodiment of the present invention is cut into formation first end plate ontology after polygon connecting plate Structure schematic diagram;
Fig. 3 is the front view of first end plate in end board assembly embodiment of the present invention;
Fig. 4 is the side view of first end plate in end board assembly embodiment of the present invention;
Fig. 5 is the front view of polygon connecting plate in end board assembly embodiment of the present invention;
Fig. 6 is the side view of polygon connecting plate in end board assembly embodiment of the present invention;
Fig. 7 is the schematic perspective view of the second end plate of end board assembly embodiment of the present invention;
Fig. 8 is the front view of the second end plate in end board assembly embodiment of the present invention;
Fig. 9 is the side view of the second end plate in end board assembly embodiment of the present invention;
Figure 10 is front view of the end board assembly embodiment of the present invention using the first end plate in 8-shaped hole;
Figure 11 is front view of the end board assembly embodiment of the present invention using second end plate in 8-shaped hole;
Figure 12 is the schematic perspective view one of concrete-pile preferred embodiment of the present invention;
Figure 13 is the schematic perspective view two of concrete-pile preferred embodiment of the present invention;
Figure 14 is the schematic perspective view of second embodiment of concrete-pile of the present invention;
Figure 15 is the schematic perspective view of concrete-pile third embodiment of the present invention;
Figure 16 is the schematic diagram of concrete pile production method preferred embodiment of the present invention;
Figure 17 is the schematic diagram of second embodiment of concrete pile production method of the present invention;
Figure 18 is the schematic diagram of concrete pile production method third embodiment of the present invention;
Figure 19 is the schematic diagram of concrete-pile pile extension method embodiment of the present invention.
Specific embodiment
The present invention will be described in further detail below with reference to the embodiments of the drawings.
It as shown in figure 1-9, is the preferred embodiment of end board assembly of the present invention.
A kind of end board assembly, including first end plate: first end plate includes first end plate ontology 1, the end of first end plate ontology 1 Perforative the first lock muscle hole 11 to connect with main reinforcement 4 in multiple longitudinal directions is provided on face;The middle part of first end plate ontology 1 has vertical To perforative polygon perforation 13, the first workpiece being laterally extended is separately formed on each side inner hole wall of polygon perforation 13 Slot 131, every first cutting groove of workpiece 131 and a lateral arrangement are in end plate body 1 and being pierced by outside first end plate ontology 1 12 straight line of workpiece jack of side wall penetrates through.Workpiece jack 12 is that the inside with certain depth drilled out in end plate body leads to Hole.
Second end plate: second end plate includes the second end plate body 2, is provided with multiple longitudinal directions on the second end plate body 2 and passes through The the second lock muscle hole 21 to connect main reinforcement 4 worn, be fixed on the end face of the second end plate body 2 polygon connecting plate 5 to Boss is formed, forms the second workpiece slot 51 being laterally extended on each side periphery wall of polygon connecting plate 5.
The first work is molded by the extended segment of longitudinally cutting each workpiece jack 12 positioned at 1 middle part of first end plate ontology Part slot 131, second workpiece slot 51 and polygon perforation 13, and connect the complete block part cut down as polygon Fishplate bar 5;In the state that first end plate and the second end plate are spliced and polygon connecting plate 5 is inserted into polygon perforation 13, first Cutting groove of workpiece 131 and the docking of second workpiece slot 51 form the extended segment of the complete workpiece jack 12.Workpiece jack 12 Extended segment and correspondent section it is practical be workpiece jack 12 a part, be merely for convenience of distinguishing workpiece jack by before cutting and Structure after cutting and the different expression made.
First end plate ontology 1 and the second end plate body 2 in the present embodiment are in rectangle, and the polygon perforation 13 is rectangle Hole;It can certainly be that first end plate ontology 1 and the second end plate body 2 are hexagonal, the polygon perforation 13 is hexagon Hole.
Multiple the second lock muscle holes 21 to connect with main reinforcement 4 are provided on second end plate body 2;First lock muscle hole 11 and the Two lock muscle holes 21 are the bellmouth that aperture is gradually expanded from the inside to the outside.Polygon connecting plate 5 is fixed on the second end plate body 2 Boss is formed on end face, in the state that polygon connecting plate 5 is inserted into polygon perforation 13, the first cutting groove of workpiece 131 and the The docking of two cutting groove of workpiece 51 forms the extended segment of the complete workpiece jack 12.
Certainly, as shown in Figure 10,11, the first lock muscle hole 11 can also be small with the first interconnected big hole portion and first The 8-shaped hole of hole portion, wherein the first big hole portion is threaded hole to constitute first threaded hole 14;Second lock muscle hole 21 is tool There is the 8-shaped hole of the interconnected second largest hole portion and second orifice portion, wherein the second largest hole portion is threaded hole to constitute the Two threaded holes 22.
Multiple threaded connection holes 52 are provided on polygon connecting plate 5, be provided on second end plate body 2 it is multiple with it is described The matched perforation of threaded connection hole 52 connects after having bolt to pass through the perforation from 2 back side of the second end plate body with the polygon Fishplate bar 5 is threadedly coupled.
Perforative the first threaded hole 14 to connect with stretch board 6 in multiple longitudinal directions is provided on first end plate ontology 1, it is described
Perforative the second threaded hole 22 to connect with anchor plate 7 in multiple longitudinal directions is provided on second end plate body 2.
The middle part of first end plate ontology 1 is longitudinal perforative polygon perforation 13, and setting in this way is conducive to the side using cutting Formula forms polygon perforation 13, and cutting down complete block part (polygon connecting plate 5) can be used as the convex of the second end plate body 2 Platform;The workpiece jack 12 of multiple lateral arrangements is equipped in first end plate ontology 1, the extended segment of each workpiece jack 12, which is cut, to be divided into Two halves, so that the first cutting groove of workpiece 131 is directly formed on each side inner hole wall of polygon perforation 13, in polygon connecting plate 5 Each side periphery wall on directly form second workpiece slot 51, process cutting groove of workpiece without additional process;Local terminal board group Part have the advantages that it is easy to process it is high-efficient, at low cost, greatly save material, while also mitigating weight, the thickness of processing plate, Make it possible industrial volume production.And polygon connecting plate insertion polygon perforation in the state of, the first cutting groove of workpiece and Second workpiece slot docks to form complete workpiece jack, is conducive to pile extension.
Longitudinal direction described in the present embodiment is the thickness direction Y of figure end plate body, as shown in Figure 1.
The preferred embodiment of end board assembly processing method of the present invention.
A kind of end board assembly processing method, the end board assembly include first end plate and the second end plate, the first end plate Including first end plate ontology 1, the second end plate includes more on the second end plate body 2 and the end face for being fixed on the second end plate body 2 Side shape connecting plate 5, includes the following steps,
1) steel, are taken to produce the first end plate ontology 1 of polygon, in addition, also processing on first end plate ontology 1 more Lock muscle hole 11 and the first threaded hole 14 in a longitudinal direction perforative first;
2) multiple workpiece jacks 12, are drilled out in first end plate ontology 1, each at least one end of workpiece jack 12 is pierced by first end 1 lateral wall of plate ontology, and each workpiece jack 12 intersects and surrounds a polygon at the middle part of first end plate ontology 12;Intersect Polygon is formed, refers to hint obliquely in the longitudinal direction of end plate and intersects to form polygon on face, each workpiece jack can be located at a plane It goes up and intersects, can also be located in Different Plane.
3), along the polygon described in step 2) to each workpiece jack 12 for being located at 1 middle part of first end plate ontology Correspondent section carry out it is longitudinally cutting cut away half, to be formed at the middle part of first end plate ontology 1 longitudinal perforative polygon Shape perforation 13 is separately formed out the first cutting groove of workpiece 131 being laterally extended on each side inner hole wall of polygon perforation 13, is cutting The second workpiece slot 51 being laterally extended is molded on each side periphery wall of the complete block part of the polygon cut off;First workpiece Slot 131 and second workpiece slot 51 form the correspondent section of the complete workpiece jack 12 after docking;
4) steel, are taken to produce the second end plate body 2 of polygon, in addition, also processing on the second end plate body 2 more Lock muscle hole 21 and the second threaded hole 22 in a longitudinal direction perforative second;
5), using abovementioned steps 3) in the complete block part of polygon that cuts down be fixed to as the polygon connecting plate 5 On the second end plate body 2 after step 4 processing.
Polygon connecting plate 5 in step 5) is fixed in the following ways, and multiple screw threads are processed on polygon connecting plate 5 Connecting hole 52 processes the perforation being correspondingly arranged with threaded connection hole 52 on the second plate body after step 4 processing, uses bolt It is threadedly coupled after perforation with the threaded connection hole 52 on polygon connecting plate 5.
It is the preferred embodiment of concrete-pile of the present invention as shown in Figure 12~13.
A kind of concrete-pile, including concrete pile body 10 and the intracorporal steel reinforcement cage of stake, an end of concrete pile body 10 Equipped with the first end plate in previous embodiment;Another end of concrete pile body 10 is equipped with the second end such as previous embodiment Plate.
It as shown in figure 14, is second embodiment of concrete-pile of the present invention.
A kind of concrete-pile, including concrete pile body 10 and the intracorporal steel reinforcement cage of stake, two ends of concrete pile body 10 The first end plate being equipped in previous embodiment.
It as shown in figure 15, is the third embodiment of concrete-pile of the present invention.
A kind of concrete-pile, including concrete pile body 10 and the intracorporal steel reinforcement cage of stake, two ends of concrete pile body 10 The second end plate being equipped in previous embodiment.
It as shown in figure 16, is the preferred embodiment of concrete pile production method of the present invention.
One end of a kind of production method of concrete-pile, the concrete pile body 10 is equipped with first end plate;It is described mixed Another end of solidifying soil pile body 10 is equipped with the second end plate;
First end plate includes first end plate ontology 1, be provided on the end face of first end plate ontology 1 multiple longitudinal directions it is perforative to The first lock muscle hole 11 being connect with main reinforcement 4 and perforative the first threaded hole 14 to be connect with stretch board 6 in multiple longitudinal directions;The The middle part of end plate ontology 1 has longitudinal perforative polygon perforation 13, on each side inner hole wall of polygon perforation 13 respectively The first cutting groove of workpiece 131 being laterally extended is formed, every first cutting groove of workpiece 131 and a lateral arrangement are in end plate body 1 And it is penetrated through through 12 straight line of workpiece jack of 1 lateral wall 1 of first end plate ontology;
Second end plate includes the second end plate body 2, and it is perforative to even that multiple longitudinal directions are provided on the second end plate body 2 Connect the second lock muscle hole 21 and perforative the second threaded hole 22 to connect with anchor plate 7 in multiple longitudinal directions of main reinforcement 4, described the Polygon connecting plate 5 is fixed on the end face of two end plate bodies 2 to form boss, outside each side of the polygon connecting plate 5 The second workpiece slot 51 being laterally extended is formed on peripheral wall.
It comprises the steps of
1) steel reinforcement cage: 4 customized cut-off of main reinforcement, is made, one end of every main reinforcement 4 on steel reinforcement cage 9 is allowed to consolidate by locking member 41 It is scheduled in the first lock muscle hole 11, the other end of main reinforcement 4 is fixed in the second lock muscle hole 21;
2), stretch board 6 is bolted on first end plate ontology 1, the inner face of stretch board 6 is more equipped with being filled in The first filling block 61 in side shape perforation 13, tensioning screw rod 30 is fixedly connected with stretch board 6;
3), anchor plate 7 is fixed on the second end plate body 2 by bolt 8;
4), the steel reinforcement cage 3 with stretch board 6 and anchor plate 7 is placed in the die cavity of mold 20, wherein stretch board 6 is located at In die cavity, anchor plate 7 is bonded with the outer end face of 20 side of mold, and simultaneous tension screw rod 30 passes through the outer end with 20 other side of mold It is locked after the mold baffle 40 that face paste is closed by nut 60;
5), the feeding into mold carries out tensioning to the steel reinforcement cage 9 by tensioning equipment, main reinforcement 4 is stretched to defined Steel reinforcement cage 9 is locked after numerical value;
6) it, is vibrated by centrifuge centrifugation or shaking device so that concrete-pile forms;
7) mold 20 after maintenance, is subjected to demoulding, then takes out concrete-pile.
The inner face of anchor plate 7 in step 3) has the first cavity 71 to accommodate polygon connecting plate 5.
It as shown in figure 17, is second embodiment of concrete pile production method of the present invention.
Two ends of a kind of production method of concrete-pile, the concrete pile body 10 are equipped with first end plate;
The first end plate includes first end plate ontology 1, and it is perforative that multiple longitudinal directions are provided on the end face of first end plate ontology 1 To the first lock muscle hole 11 being connect with main reinforcement 4 and perforative first threaded hole 14 in multiple longitudinal directions;In first end plate ontology 1 Portion has longitudinal perforative polygon perforation 13, is separately formed and is laterally extended on each side inner hole wall of polygon perforation 13 First cutting groove of workpiece 131, every first cutting groove of workpiece 131 and a lateral arrangement are in end plate body 1 and being pierced by first end plate sheet 12 straight line of workpiece jack of 1 lateral wall of body penetrates through;
It comprises the steps of
1) steel reinforcement cage: 4 customized cut-off of main reinforcement, is made, one end of every main reinforcement 4 on steel reinforcement cage 9 is allowed to be fixed on the first lock muscle In hole 11, the other end of main reinforcement 4 is fixed in the first lock muscle hole 11 of another piece of first end plate;
2), stretch board 6 is fixed on first end plate ontology 1 by bolt 8 and the first threaded hole 14, stretch board 6 it is interior End face is equipped with the first filling block 61 being filled in polygon perforation 13, and tensioning screw rod 30 is fixedly connected with stretch board 6;
3), anchor plate 7 is fixed on first end plate ontology 1 by bolt 8 and the first threaded hole 14, anchor plate 7 it is interior End face is equipped with the second filling block 72 being filled in polygon perforation 13;
4), the steel reinforcement cage 3 with stretch board 6 and anchor plate 7 is placed in the die cavity of mold 20, wherein stretch board 6 is located at In die cavity, anchor plate 7 is bonded with the outer end face of 20 side of mold, and simultaneous tension screw rod 30 passes through the outer end with 20 other side of mold It is locked after the mold baffle 40 that face paste is closed by nut 60;
5), the feeding into mold carries out tensioning to the steel reinforcement cage 9 by tensioning equipment, main reinforcement 4 is stretched to defined Steel reinforcement cage 9 is locked after numerical value;
6) it, is vibrated by centrifuge centrifugation or shaking device so that concrete-pile forms;
7) mold 20 after maintenance, is subjected to demoulding and takes out concrete-pile.
It as shown in figure 18, is the third embodiment of concrete pile production method of the present invention.
Two ends of a kind of production method of concrete-pile, concrete pile body 10 are equipped with the second end plate;
Second end plate includes the second end plate body 2, and it is perforative to even that multiple longitudinal directions are provided on the second end plate body 2 The second lock muscle hole 21 and perforative second threaded hole 22 in multiple longitudinal directions of main reinforcement 4 are connect, is fixed on the end face of the second end plate body 2 There is polygon connecting plate 5 to forming boss, the be laterally extended is formed on each side periphery wall of the polygon connecting plate 5 Two cutting groove of workpiece 51;
Manufacturing method comprises the steps of
1) steel reinforcement cage: 4 customized cut-off of main reinforcement, is made, one end of every main reinforcement 4 on steel reinforcement cage 9 is allowed to be fixed on the second end plate Second lock muscle hole 21 in, the other end of main reinforcement 4 be fixed on another piece of the second end plate second lock muscle hole 21 in;
2), stretch board 6 is fixed on the second end plate body 2 by bolt 8 and the second threaded hole 22;
3), anchor plate 7 is fixed on another piece of the second end plate body 2 by bolt 8 and the second threaded hole 22;
4), the steel reinforcement cage 3 with stretch board 6 and anchor plate 7 is placed in the die cavity of mold 20, wherein stretch board 6 is located at In die cavity, anchor plate 7 is bonded with the outer end face of 20 side of mold, and simultaneous tension screw rod 30 passes through the outer end with 20 other side of mold It is locked after the mold baffle 40 that face paste is closed by nut 60;
5), the feeding into mold carries out tensioning to the steel reinforcement cage 9 by tensioning equipment, main reinforcement 4 is stretched to defined Steel reinforcement cage 9 is locked after numerical value;
6) it, is vibrated by centrifuge centrifugation or shaking device so that concrete-pile forms;
7) mold 20 after maintenance, is subjected to demoulding and takes out concrete-pile.
Abovementioned steps 2) in the inner face of stretch board 6 have to the second cavity 62 for accommodating polygon connecting plate 5;Institute The inner face of the anchor plate 7 in step 3) is stated with the first cavity 71 to accommodate polygon connecting plate 5.
It as shown in figure 19, is the preferred embodiment of concrete-pile pile extension method of the present invention.
A kind of pile extension method, it is characterised in that: to by the first end plate as described above in a concrete-pile and separately The second end plate as described above in a piece concrete-pile links together;The polygon on the second end plate body 2 will be fixed on Connecting plate 5 is inserted into the polygon perforation 13 of first end plate ontology 1, and first cutting groove of workpiece 131 and second workpiece slot 51 are right Connect the extended segment for re-forming the complete workpiece jack 12;Bolt 50 is inserted into each workpiece jack 12, bolt 50 is simultaneously Complete the company of first end plate ontology 1 and the second end plate body 2 in turn in the first cutting groove of workpiece 131 and second workpiece slot 51 Connect fixation.
It should be noted that " extended segment of workpiece jack " described in technical solution of the present invention, " workpiece jack it is corresponding Section ", in a part for actually being belonged to a complete workpiece jack before cutting, to avoid ambiguity, convenient for distinguishing workpiece Jack is cut forward and backward structure and state and introduces " extended segment ", " correspondent section " this concept, is cut also for explanation " extended segment ", " correspondent section " original inherently workpiece jack a part.

Claims (15)

1. a kind of end board assembly, it is characterised in that including
First end plate: the first end plate includes first end plate ontology (1), is provided on the end face of first end plate ontology (1) multiple Longitudinal perforative the first lock muscle hole (11) to be connect with main reinforcement (4);The middle part of first end plate ontology (1) has longitudinal run through Polygon perforate (13), the first workpiece for being laterally extended is separately formed on each side inner hole wall of polygon perforation (13) and is inserted Slot (131), every first cutting groove of workpiece (131) and a lateral arrangement in end plate body (1) and are pierced by first end plate sheet Workpiece jack (12) straight line of body (1) lateral wall penetrates through;
Second end plate: second end plate includes the second end plate body (2), is provided with multiple longitudinal directions on the second end plate body (2) and passes through Second to connect main reinforcement (4) worn locks muscle hole (21), and polygon company is fixed on the end face of second end plate body (2) Fishplate bar (5) forms the second workpiece being laterally extended on each side periphery wall of the polygon connecting plate (5) to form boss Slot (51);
Described the is molded by the extended segment of longitudinally cutting each workpiece jack (12) in the middle part of first end plate ontology (1) One cutting groove of workpiece (131), second workpiece slot (51) and polygon perforation (13), and the complete block part cut down is made For the polygon connecting plate (5);Splice in the first end plate and the second end plate and the polygon connecting plate (5) is inserted into In the state of in the polygon perforation (13), first cutting groove of workpiece (131) and second workpiece slot (51) docking are formed The extended segment of the complete workpiece jack (12).
2. end board assembly according to claim 1, it is characterised in that: first lock muscle hole (11) and the second lock muscle hole (21) it is aperture is gradually expanded from the inside to the outside bellmouth.
3. end board assembly according to claim 1, it is characterised in that: be provided on the first end plate ontology (1) multiple vertical To perforative the first threaded hole (14) to connect with stretch board (6), multiple longitudinal directions are provided on second end plate body (2) Perforative the second threaded hole (22) to be connect with anchor plate (7).
4. end board assembly according to claim 3, it is characterised in that: first lock muscle hole (11) is with the first macropore The 8-shaped hole in portion and the first small hole portion, wherein the first big hole portion is threaded hole to constitute first threaded hole (14);It is described Second lock muscle hole (21) be the 8-shaped hole with the second largest hole portion and second orifice portion, wherein the second largest hole portion be threaded hole from And constitute second threaded hole (22).
5. end board assembly according to claim 1, it is characterised in that: the first end plate ontology (1) and the second end plate sheet Body (2) is in rectangle, and the polygon perforation (13) is rectangular opening;Or, the first end plate ontology (1) and the second end plate body (2) hexagonal, the polygon perforation (13) is hexagonal hole.
6. end board assembly according to claim 1, it is characterised in that: be provided with multiple spiral shells on the polygon connecting plate (5) Line connecting hole (52), is provided on second end plate body (2) multiple with the threaded connection hole (52) matched perforation, there is spiral shell Bolt (8) is threadedly coupled after passing through the perforation from the second end plate body (2) back side with the polygon connecting plate (5).
7. a kind of concrete-pile, including concrete pile body (10) and the intracorporal steel reinforcement cage of stake, it is characterised in that: the concrete-pile One end of body is equipped with first end plate or the second end plate as described in preceding claims 1~6 are any;The concrete pile body (10) another end is equipped with first end plate or the second end plate as described in preceding claims 1~6 are any.
8. a kind of end board assembly processing method, the end board assembly includes first end plate and the second end plate, the first end plate packet It includes first end plate ontology (1), second end plate includes the second end plate body (2) and the end for being fixed on the second end plate body (2) Polygon connecting plate (5) on face, it is characterised in that;Include the following steps,
1) steel, is taken to produce the first end plate ontology (1) of polygon;
2) multiple workpiece jacks (12), are drilled out in first end plate ontology (1), each workpiece jack (12) at least one end is pierced by first End plate body (1) lateral wall, and each workpiece jack (12) intersects and surrounds more than one in the middle part of first end plate ontology (12) Side shape;
3), along the polygon described in step 2) to each workpiece jack (12) being located in the middle part of first end plate ontology (1) Correspondent section carry out it is longitudinally cutting cut away half, to be formed at the middle part of first end plate ontology (1) longitudinal perforative more Side shape is perforated (13), and the first workpiece being laterally extended is separately formed out on each side inner hole wall of polygon perforation (13) and is inserted Slot (131) molds the second workpiece slot being laterally extended on each side periphery wall of the complete block part of polygon cut down (51);The complete workpiece jack (12) is formed after first cutting groove of workpiece (131) and second workpiece slot (51) docking Correspondent section;
4) steel, is taken to produce the second end plate body (2) of polygon;
5), using abovementioned steps 3) in the complete block part of polygon that cuts down as the polygon connecting plate (5) be fixed to institute On the end face for stating the second end plate body (2).
9. end board assembly processing method according to claim 8, it is characterised in that: the polygon connection in the step 5) Plate (5) is fixed in the following ways, and multiple threaded connection holes (52) are processed on polygon connecting plate (5), in the second end plate sheet The perforation being correspondingly arranged with threaded connection hole (52) is processed on body (2), with bolt (8) pass through after perforation with polygon connecting plate (5) threaded connection hole (52) on is threadedly coupled;The perforative first lock muscle in multiple longitudinal directions is processed on first end plate ontology (1) Hole (11) and the first threaded hole (14);Perforative second lock muscle hole (21) in multiple longitudinal directions is processed on the second end plate body (2) With the second threaded hole (22).
10. an end of a kind of production method of concrete-pile, the concrete pile body (10) is equipped with first end plate;It is described mixed Another end of solidifying soil pile body (10) is equipped with the second end plate;
The first end plate includes first end plate ontology (1), and it is perforative to be provided with multiple longitudinal directions on the end face of first end plate ontology (1) To the first lock muscle hole (11) and perforative the first spiral shell to be connect with stretch board (6) in multiple longitudinal directions being connect with main reinforcement (4) Pit (14);The middle part of first end plate ontology (1) has longitudinal perforative polygon perforation (13), in polygon perforation (13) The first cutting groove of workpiece (131) being laterally extended is separately formed on each side inner hole wall, every first cutting groove of workpiece (131) is horizontal with one To workpiece jack (12) the straight line perforation for being arranged in end plate body (1) and being pierced by first end plate ontology (1) lateral wall (1);
Second end plate includes the second end plate body (2), and it is perforative to even that multiple longitudinal directions are provided on the second end plate body (2) Connect the second lock muscle hole (21) and perforative the second threaded hole to connect with anchor plate (7) in multiple longitudinal directions of main reinforcement (4) (22), polygon connecting plate (5) are fixed on the end face of second end plate body (2) to form boss, the polygon The second workpiece slot (51) being laterally extended is formed on each side periphery wall of connecting plate (5);
It is characterized by: the manufacturing method comprises the steps of
1), make steel reinforcement cage: main reinforcement (4) customized cut-off allows one end of the upper every main reinforcement (4) of steel reinforcement cage (9) to be fixed on the first lock In muscle hole (11), the other end of main reinforcement (4) is fixed in the second lock muscle hole (21);
2), stretch board (6) is bolted on first end plate ontology (1), the inner face of stretch board (6), which is equipped with, to be filled in The first filling block (61) that polygon is perforated in (13), tensioning screw rod (30) is fixedly connected with stretch board (6);
3), anchor plate (7) are fixed on the second end plate body (2) by bolt (8);
4), the steel reinforcement cage (3) with stretch board (6) and anchor plate (7) is placed in the die cavity of mold (20), wherein stretch board (6) it is located in die cavity, anchor plate (7) is bonded with the outer end face of mold (20) side;
5), the feeding into mold carries out tensioning to the steel reinforcement cage (9) by tensioning equipment, main reinforcement (4) is stretched to defined Steel reinforcement cage (9) are locked after numerical value;
6) it, is vibrated by centrifuge centrifugation or shaking device so that concrete-pile forms;
7) mold (20) after maintenance, is subjected to demoulding and takes out concrete-pile.
11. the production method of concrete-pile according to claim 10, it is characterised in that: the anchor plate in the step 3) (7) inner face has the first cavity (71) to accommodate polygon connecting plate (5).
12. two ends of a kind of production method of concrete-pile, the concrete pile body (10) are equipped with first end plate;
The first end plate includes first end plate ontology (1), and it is perforative to be provided with multiple longitudinal directions on the end face of first end plate ontology (1) To the first lock muscle hole (11) being connect with main reinforcement (4) and perforative first threaded hole (14) in multiple longitudinal directions;First end plate ontology (1) middle part has longitudinal perforative polygon perforation (13), is separately formed on each side inner hole wall of polygon perforation (13) There is the first cutting groove of workpiece (131) being laterally extended, every first cutting groove of workpiece (131) and a lateral arrangement are in end plate body (1) Workpiece jack (12) straight line perforation that is interior and being pierced by first end plate ontology (1) lateral wall;
It is characterized by: comprising the steps of
1), make steel reinforcement cage: main reinforcement (4) customized cut-off allows one end of the upper every main reinforcement (4) of steel reinforcement cage (9) to be fixed on the first lock In muscle hole (11), the other end of main reinforcement (4) is fixed in first lock muscle hole (11) of another piece of first end plate;
2), stretch board (6) is bolted on first end plate ontology (1), the inner face of stretch board (6), which is equipped with, to be filled in The first filling block (61) that polygon is perforated in (13), tensioning screw rod (30) is fixedly connected with stretch board (6);
3), anchor plate (7) are fixed on another piece of first end plate ontology (1) by bolt (8), the inner face of anchor plate (7) Equipped with the second filling block (72) being filled in polygon perforation (13);
4), the steel reinforcement cage (3) with stretch board (6) and anchor plate (7) is placed in the die cavity of mold (20), wherein stretch board (6) it is located in die cavity, anchor plate (7) is bonded with the outer end face of mold (20) side;
5), the feeding into mold carries out tensioning to the steel reinforcement cage (9) by tensioning equipment, main reinforcement (4) is stretched to defined Steel reinforcement cage (9) are locked after numerical value;
6) it, is vibrated by centrifuge centrifugation or shaking device so that concrete-pile forms;
7) mold (20) after maintenance, is subjected to demoulding and takes out concrete-pile.
13. two ends of a kind of production method of concrete-pile, the concrete pile body (10) are equipped with the second end plate;
Second end plate includes the second end plate body (2), and it is perforative to even that multiple longitudinal directions are provided on the second end plate body (2) Connect the second lock muscle hole (21) and perforative second threaded hole (22) in multiple longitudinal directions of main reinforcement (4), second end plate body (2) End face on be fixed with polygon connecting plate (5) to form boss, on each side periphery wall of the polygon connecting plate (5) at Type has the second workpiece slot (51) being laterally extended;
It is characterized by: the manufacturing method comprises the steps of
1), make steel reinforcement cage: main reinforcement (4) customized cut-off allows one end of the upper every main reinforcement (4) of steel reinforcement cage (9) to be fixed on second end In second lock muscle hole (21) of plate, the other end of main reinforcement (4) is fixed in second lock muscle hole (21) of another piece of the second end plate;
2), stretch board (6) is bolted on the second end plate body (2);
3), anchor plate (7) are fixed on another piece of the second end plate body (2) by bolt (8);
4), the steel reinforcement cage (3) with stretch board (6) and anchor plate (7) is placed in the die cavity of mold (20), wherein stretch board (6) it is located in die cavity, anchor plate (7) is bonded with the outer end face of mold (20) side;
5), the feeding into mold carries out tensioning to the steel reinforcement cage (9) by tensioning equipment, main reinforcement (4) is stretched to defined Steel reinforcement cage (9) are locked after numerical value;
6) it, is vibrated by centrifuge centrifugation or shaking device so that concrete-pile forms;
7) mold (20) after maintenance, is subjected to demoulding.
14. the production method of concrete-pile according to claim 13, it is characterised in that: the stretch board in the step 2) (6) inner face has the second cavity (62) to accommodate polygon connecting plate (5);Anchor plate (7) in the step 3) Inner face have to the first cavity (71) for accommodating polygon connecting plate (5).
15. a kind of pile extension method, it is characterised in that: to by the first end as described in claim 1 in a concrete-pile Plate links together with the second end plate as described in claim 1 in another concrete-pile;The second end plate sheet will be fixed on The polygon of polygon connecting plate (5) insertion first end plate ontology (1) on body (2) is perforated (13), first cutting groove of workpiece (131) and second workpiece slot (51) docks the extended segment for re-forming the complete workpiece jack (12);It is inserted in each workpiece Bolt (50) are inserted into hole (12), bolt (50) be located at simultaneously the first cutting groove of workpiece (131) and second workpiece slot (51) it is interior into And complete being connected and fixed for first end plate and the second end plate.
CN201910682005.XA 2019-07-26 2019-07-26 End board assembly, concrete-pile, end board assembly processing method, stake production method and pile extension method Pending CN110468829A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910682005.XA CN110468829A (en) 2019-07-26 2019-07-26 End board assembly, concrete-pile, end board assembly processing method, stake production method and pile extension method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910682005.XA CN110468829A (en) 2019-07-26 2019-07-26 End board assembly, concrete-pile, end board assembly processing method, stake production method and pile extension method

Publications (1)

Publication Number Publication Date
CN110468829A true CN110468829A (en) 2019-11-19

Family

ID=68509918

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910682005.XA Pending CN110468829A (en) 2019-07-26 2019-07-26 End board assembly, concrete-pile, end board assembly processing method, stake production method and pile extension method

Country Status (1)

Country Link
CN (1) CN110468829A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111231100A (en) * 2020-01-20 2020-06-05 江苏博森建筑设计有限公司 Grouting groove type connecting structure for prefabricated column and grouting groove forming die

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006207117A (en) * 2005-01-25 2006-08-10 Orimoto Takumi Kozo Sekkei Kenkyusho:Kk Joining structure of steel pipe pile
CN103790156A (en) * 2012-10-26 2014-05-14 上海中技桩业股份有限公司 Square buckle plate mechanical pile splicing method for precast square piles
CN104818715A (en) * 2015-03-24 2015-08-05 俞向阳 End plate, pile connecting mechanism, connecting mechanism for tensioning reinforcement cage, concrete pile and manufacturing method
CN204626393U (en) * 2015-03-24 2015-09-09 俞向阳 For the pile extension assembly of concrete pile
US20150345096A1 (en) * 2013-08-21 2015-12-03 Chin Chai Ong End plate for concrete piles
CN210766742U (en) * 2019-07-26 2020-06-16 俞向阳 End plate assembly and concrete pile
CN211340762U (en) * 2019-07-26 2020-08-25 俞向阳 End plate and concrete pile with same

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006207117A (en) * 2005-01-25 2006-08-10 Orimoto Takumi Kozo Sekkei Kenkyusho:Kk Joining structure of steel pipe pile
CN103790156A (en) * 2012-10-26 2014-05-14 上海中技桩业股份有限公司 Square buckle plate mechanical pile splicing method for precast square piles
US20150345096A1 (en) * 2013-08-21 2015-12-03 Chin Chai Ong End plate for concrete piles
CN104818715A (en) * 2015-03-24 2015-08-05 俞向阳 End plate, pile connecting mechanism, connecting mechanism for tensioning reinforcement cage, concrete pile and manufacturing method
CN204626393U (en) * 2015-03-24 2015-09-09 俞向阳 For the pile extension assembly of concrete pile
CN210766742U (en) * 2019-07-26 2020-06-16 俞向阳 End plate assembly and concrete pile
CN211340762U (en) * 2019-07-26 2020-08-25 俞向阳 End plate and concrete pile with same

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111231100A (en) * 2020-01-20 2020-06-05 江苏博森建筑设计有限公司 Grouting groove type connecting structure for prefabricated column and grouting groove forming die
CN111231100B (en) * 2020-01-20 2022-05-20 江苏博森建筑设计有限公司 Grouting groove type connecting structure for prefabricated column and grouting groove forming die

Similar Documents

Publication Publication Date Title
CN104818715B (en) End plate, pile extension mechanism, the bindiny mechanism of tension reinforcing steel bar cage, concrete-pile and manufacture method
CN103741672B (en) A kind of pre-tensioning system centrifugal concrete pile and manufacture method with steel strand
CN103556624B (en) Adapter sleeve, to produce and method of attachment containing the prefabricated units of this adapter sleeve and prefabricated units
CN103866761B (en) The mechanical connection pile crown of end plate recycling precast concrete pile and manufacture method thereof
CN107989029B (en) Pile-to-pile connection system and construction method thereof
CN207376618U (en) A kind of split type anchorage
CN110468829A (en) End board assembly, concrete-pile, end board assembly processing method, stake production method and pile extension method
CN204645030U (en) End plate, pile extension mechanism, for the bindiny mechanism of tension reinforcing steel bar cage and concrete pile
CN104972550B (en) The polygonal mould and preparation method of a kind of in-situ precast concrete-pile
CN207277847U (en) A kind of assembled overlapped shear wall fixing templates
CN204626393U (en) For the pile extension assembly of concrete pile
CN205100438U (en) Concrete cushion forming device and concrete cushion forming mechanism
CN108797797A (en) The installation method of foundation bolt group
CN204753575U (en) A pile extension mechanism for concrete pile
CN211340762U (en) End plate and concrete pile with same
CN210359067U (en) Sleeve cold heading mould
CN210766742U (en) End plate assembly and concrete pile
CN102383425A (en) Integrated concrete pile tip and manufacturing method thereof
CN209942727U (en) Impact hammer head for cast-in-place pile
CN206769106U (en) A kind of assembled steel fiber high strength concrete steel plate combination Antiknock wall body
CN106759855A (en) The connecting node and its construction method of prefabricated concrete hollow slab
CN202280057U (en) Integrated concrete pile tip
CN102490266B (en) Method for preparing pre-tensioned prestressing concrete pile connected with basic bearing platform in non-welding mode
CN211899268U (en) Precast concrete post and pre-buried anchor slab connection structure
CN210880197U (en) Pile head tensioning assembly

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination