CN110460096A - A kind of fault traversing control method and device of the soft straight transmitting system of new energy isolated island - Google Patents

A kind of fault traversing control method and device of the soft straight transmitting system of new energy isolated island Download PDF

Info

Publication number
CN110460096A
CN110460096A CN201910727173.6A CN201910727173A CN110460096A CN 110460096 A CN110460096 A CN 110460096A CN 201910727173 A CN201910727173 A CN 201910727173A CN 110460096 A CN110460096 A CN 110460096A
Authority
CN
China
Prior art keywords
power
control
energy
grid
new energy
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910727173.6A
Other languages
Chinese (zh)
Other versions
CN110460096B (en
Inventor
李广磊
李琰
迟永宁
孙树敏
苏建军
程艳
于芃
张兴友
张用
汤海雁
曲立楠
刘超
陈宁
田新首
苏媛媛
张小瑜
王志冰
刘宏志
魏春霞
胡健祖
唐冰婕
雷雨
肖宇
樊肖杰
徐鹏超
郑广范
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
China Electric Power Research Institute Co Ltd CEPRI
Electric Power Research Institute of State Grid Shandong Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
China Electric Power Research Institute Co Ltd CEPRI
Electric Power Research Institute of State Grid Shandong Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, China Electric Power Research Institute Co Ltd CEPRI, Electric Power Research Institute of State Grid Shandong Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201910727173.6A priority Critical patent/CN110460096B/en
Publication of CN110460096A publication Critical patent/CN110460096A/en
Application granted granted Critical
Publication of CN110460096B publication Critical patent/CN110460096B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/28Arrangements for balancing of the load in a network by storage of energy
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/36Arrangements for transfer of electric power between ac networks via a high-tension dc link
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02E60/60Arrangements for transfer of electric power between AC networks or generators via a high voltage DC link [HVCD]

Abstract

The invention proposes a kind of energy storage devices and flexible direct current converter station to control mutually coordinated lower realization new energy fault traversing control method and device.For the soft straight power grid of the access new energy containing isolated island, cause transimission power limited when DC grid breaks down, signal (the voltage change on ac bus is controlled by previously given DC converter station, frequency variation etc.), energy storage device carries out quick real power control reduction to the impact of isolated island access new energy power station to ensure DC converter station nonoverload, then ability is sent out according to the given power of the DC grid after fault recovery, the power control system and energy storage device for starting new energy power station carry out power control together and reach balance with converter station capacity, realize fault traversing.The impact that new energy power station is accessed to isolated island can be reduced by quickly active adjust, while the control system of the converter station of DC grid is also very flexible, the two carries out cooperation and adjusts the effect that can effectively weaken failure.

Description

A kind of fault traversing control method and device of the soft straight transmitting system of new energy isolated island
Technical field
The present invention relates to technical field of electric power system control, more particularly, to one kind based on flexible direct current converter station with The fault traversing control method of the soft straight transmitting system of the new energy isolated island that energy storage device is mutually coordinated.
Background technique
Chinese energy resource and energy-consuming are very unbalanced, and energy abundance area is far from developed area, non-renewable energy The few pattern of Xi Duodong is presented in Regional Distribution, China's overwhelming majority new energy concentrates on three backlands of northeast, North China, northwest Area, and load center, in the southeastern coast in Zhejiang, Jiangsu, the new energy of enrichment largely needs to send outside.With Jiuquan 10,000,000 thousand For watt wind power base, base is objectively required through UHV transmission apart from more than 800~3000 kilometers of Middle Eastern come real Existing large capacity long distance power transmission, but as the ratio of synchronous Power Support gradually declines, or even stop exploitation, it studies flexible straight Technology of transmission of electricity is flowed, and propose that power grid application flexible DC transmission technology solution large-scale wind power is sent outside to become following trend.
New energy does not need synchro source support, and isolated island accesses soft straight power grid, and control mode and fault traversing will face Huge challenge, the grid-connected new energy unit of isolated island collects by exchange, accesses soft straight power grid after DC converting, so that new energy Unit and flexible direct current power grid are asynchronous to the perception and response of failure, and after soft straight grid collapses, thousands of new Energy unit is difficult to accurately the generation of perception failure in time and is quickly controlled accordingly, but still according to normal condition Lower operation, issues power as usual, and at this time DC grid due to failure cause submitting ability reduce so that injection DC grid in Power surplus, so as to cause DC converter station overload, DC grid collapse.
The extensive new energy development region in China is often in the end of power grid, and synchro source support is weak, it is difficult to realize big The remote submitting of scale, and decoupled active and reactive is not needed the support of synchro source by flexible DC transmission when sending power outside, One of the major way that future will be sent outside as extensive new energy.Especially due to the operation characteristic of DC grid and AC network It is that fault response characteristics difference is very big, therefore no longer connects with AC network and be directly accessed its event of the new energy unit of soft straight power grid Hinder the requirement passed through for fault traversing different with the fault traversing demand that is directly incorporated into AC network, under DC grid, closes The problem of key is whether new energy unit can experience failure and limit power output in time, is rushed to reduce to DC converter station It hits, saves DC grid from damage.
Extensive new energy accesses flexible direct current power grid using isolated island mode, and new energy unit is difficult to perceive soft straight electricity in time The generation of net failure still issues power according to normal condition, will lead to DC converter station overload locking.In addition, current soft straight electricity The protection of net is ms grades, and new energy unit is difficult to realize the emergent control to power within ms grades of time.
Summary of the invention
After the soft straight system jam of the access new energy power station containing isolated island, causes grid power superfluous, compel to be essential The reactive power consumption that new energy injects is fallen, the invention proposes a kind of wind power plants in the case where isolated island accesses soft straight operation of power networks, storage It can equipment and the mutually coordinated lower realization new energy fault traversing control method and device of flexible direct current converter station control.I.e. in the change of current The exchange side stood configures certain energy storage device, after DC grid breaks down, issues signal, energy storage dress by DC converter station It sets and quickly stores remaining power, and control the active of entire new energy power station simultaneously, then according to straight after fault recovery The given power of galvanic electricity net sends out ability, together with new energy power station, active, the realization fault traversing of slow release storage.
Specifically, the present invention proposes that a kind of new energy isolated island mutually coordinated based on flexible direct current converter station and energy storage device is soft The fault traversing control method of straight transmitting system is adjusted by DC converter station and energy storage device cooperation to realize new energy power station The fault traversing of access, the described method comprises the following steps:
S1: the power that energy storage device needs to absorb is adjusted according to Parameters variation;
S2: failure occurs, and DC grid issues control signal;
S3: energy storage device carries out power control according to control signal during failure;
S4: after fault recovery, DC grid issues control target, and new energy power station carries out the Precise control of power, complete At passing through.
Further,
In the step S1, adjusting the power that energy storage device needs absorb according to Parameters variation includes,
Frequency variation, the voltage change of exchange side are adjusted to determine the power for needing to absorb by direct current, provide letter Number-Policy Table of power control.
Further,
The step S2 includes:
After direct current breaks down, DC converter station changes to start storage by voltage change, the frequency of control exchange side It can device realization control.
Further,
In step S3,
Energy storage device is grid-connected under normal circumstances, but does not absorb power, after receiving the signal of DC converter station sending, Startup power controls energy storage device immediately.
Further,
The power control is that power absorption value is determined according to the control scheme list pre-established.
Further,
In the step S3,
If line failure needs to cut off in DC grid, then the power of DC converter station is reduced, at this time DC converter The voltage change stood through control ac bus, energy storage device then absorb power as requested.
Further,
The step S4 includes:
After DC grid fault recovery, DC grid passes through having to new energy power station according to itself concrete condition Function control system issues instruction, and the Precise control of power is realized by the real power control system of new energy power station, reaches new energy The matching of power and DC grid converter station capacity is issued, realizes that the failure of the new energy unit of isolated island access DC grid is worn More.
The step S4 further comprises:
The real power control system of energy storage device and new energy power station is cooperated, and in time discharges the power of storage, Energy storage is in light condition in time, is ready for next fault traversing.
The present invention also proposes a kind of soft direct sending of new energy isolated island mutually coordinated based on flexible direct current converter station with energy storage device The fault traversing control device of system out characterized by comprising fault detection module, power adjusting module, control module and Energy-storage module;
Fault detection module, for when DC grid breaks down, issuing control signal;
Power adjusts module, for adjusting the power that energy-storage module needs to absorb according to Parameters variation;
Control module receives the control signal when an error occurs, and according to the control signal, whole according to power The setting valve that cover half block provides carries out power control to energy-storage module;After fault recovery, sent according to the power that DC grid gives Output capacity, control energy-storage module complete fault traversing together with new energy power station;
Energy-storage module, configuration cooperate with DC converter station and adjust to realize that new energy power station connects in the exchange side of converter station The fault traversing entered.
Further,
The power adjusts module and adjusts frequency variation, the voltage change of exchange side by direct current to determine the energy storage mould Block needs the power absorbed, and provides signal-power control Policy Table.
Further,
After direct current breaks down, fault detection module issues control by the voltage change of control exchange side, frequency variation Signal processed, and then start energy-storage module and realize control.
Further,
The energy-storage module is grid-connected under normal circumstances, but does not absorb power, former when being received by the control module After hindering the signal that detection module issues, energy-storage module startup power is controlled immediately.
Further,
The power control is to adjust the control scheme list that module pre-establishes according to power to determine power absorption value.
Further,
If line failure needs to cut off in DC grid, then the power of DC converter station is reduced, at this time DC converter The voltage change stood through control ac bus, energy storage device then absorb power as requested.
Further,
After DC grid fault recovery, DC grid passes through having to new energy power station according to itself concrete condition Function control system issues instruction, and the Precise control of power is realized by the real power control system of new energy power station, reaches new energy The matching of power and DC grid converter station capacity is issued, realizes that the failure of the new energy unit of isolated island access DC grid is worn More.
Further,
The real power control system of the control device and new energy power station is cooperated, the function in time storing energy-storage module Rate discharges, and energy-storage module is made to be in light condition, is ready for next fault traversing.
Method of the present invention is directed to the soft straight power grid of the access new energy containing isolated island, causes when DC grid breaks down Transimission power is limited, and controlling the signal on ac bus by previously given DC converter station, (voltage change, frequency change Deng), energy storage device carries out quick real power control reduction to the impact of isolated island access new energy power station to ensure DC converter station Then nonoverload sends out ability according to the given power of the DC grid after fault recovery, starts the power control of new energy power station System processed and energy storage device carry out power control together and reach balance with converter station capacity, realize fault traversing.
When DC Line Fault occurs for DC grid, energy storage device can be reduced by quickly active adjusting and access new energy to isolated island The impact in source power station, while the control system of the converter station of DC grid is also very flexible, the two carries out cooperation adjusting can be effective Weaken the effect of failure, realizes the fault traversing of new energy power station access.
Detailed description of the invention
Fig. 1 is fault ride-through method control flow chart of the present invention.
Fig. 2 is fault traversing schematic device of the present invention.
Specific embodiment
In order to make the object, technical scheme and advantages of the embodiment of the invention clearer, below in conjunction with the embodiment of the present invention Attached drawing, the technical solution of the embodiment of the present invention is clearly and completely described.Obviously, described embodiment is this hair Bright a part of the embodiment, instead of all the embodiments.Based on described the embodiment of the present invention, ordinary skill Personnel's every other embodiment obtained, shall fall within the protection scope of the present invention.
To achieve the above object, concrete scheme of the invention is as follows:
A kind of soft direct sending of new energy isolated island mutually coordinated based on flexible direct current converter station with energy storage device proposed by the present invention The fault traversing control method of system, process are as shown in Figure 1 out.
It the described method comprises the following steps:
I, the power for needing to absorb according to control signal adjusting energy storage;
II, failure occur, and DC grid issues control signal;
Energy storage carries out power control according to control signal during III, failure;
After IV, fault recovery, direct current issues control target, and new energy power station carries out the Precise control of power, completes to wear More.
Further, in the step I, the power that energy storage needs to absorb is adjusted according to control signal.
It needs energy storage device to make to timely feedback in view of DC grid breaks down, the interval of time may need to reach Ms grades, thus the frequency variation of exchange side can be adjusted by direct current, voltage change determines the power to be absorbed, provide letter Number-Policy Table of power control.
By taking voltage change as an example, draft the value of voltage change, after energy storage device experiences voltage change, directly initiate by Power is absorbed according to corresponding Policy Table.It should be noted that the variation of associated voltage, cannot influence the normal fortune of new energy unit Row.
Further, in the step II, failure occurs, and DC grid issues control signal.
After direct current breaks down, converter station can be changed by voltage change, the frequency of control exchange side come real at this time Now achieve the purpose that starting energy storage device realizes control.
Further, in the step III, energy storage carries out power control according to control signal during failure.
Energy storage device is grid-connected under normal circumstances, but does not absorb power, after receiving the signal of DC converter station sending, Startup power controls energy storage device immediately, and corresponding control is the absorption value according to the control scheme list and power pre-established.
If line failure needs to cut off in DC grid, then need to reduce the power of converter station, converter station is logical at this time The voltage change of control ac bus is crossed, energy storage device then absorbs power as requested.
Further, in the step IV, after fault recovery, direct current issues control target, and new energy power station carries out power Precise control, complete to pass through.
After DC grid fault recovery, DC grid is by according to the concrete condition of itself at this time, by giving new energy electricity The real power control system stood issues instruction, and the Precise control of power is realized by the real power control system requirements of new energy power station, Reach the matching that new energy issues power and DC grid converter station capacity, realizes the new energy unit of isolated island access DC grid Fault traversing.
The real power control system of subsequent energy storage needs and new energy power station is cooperated, and in time releases the power of storage It goes, energy storage is in light condition in time, is ready for fault traversing.
As shown in Fig. 2, a kind of fault traversing control device for realizing the above method that the present invention also proposes.Include: Fault detection module, power adjusting module, control module and energy-storage module.
Fault detection module, for when DC grid breaks down, issuing control signal.
Power adjusts module, for adjusting the power that energy-storage module needs to absorb according to Parameters variation.
Control module receives the control signal when an error occurs, and according to the control signal, whole according to power The setting valve that cover half block provides carries out power control to energy-storage module;After fault recovery, sent according to the power that DC grid gives Output capacity, control energy-storage module complete fault traversing together with new energy power station.
Energy-storage module, configuration cooperate with DC converter station and adjust to realize that new energy power station connects in the exchange side of converter station The fault traversing entered.
The power adjusts module and adjusts frequency variation, the voltage change of exchange side by direct current to determine the energy storage mould Block needs the power absorbed, and provides signal-power control Policy Table.
After direct current breaks down, fault detection module issues control by the voltage change of control exchange side, frequency variation Signal processed, and then start energy-storage module and realize control.
The energy-storage module is grid-connected under normal circumstances, but does not absorb power, former when being received by the control module After hindering the signal that detection module issues, energy-storage module startup power is controlled immediately.
The power control is to adjust the control scheme list that module pre-establishes according to power to determine power absorption value.
If line failure needs to cut off in DC grid, then the power of DC converter station is reduced, at this time DC converter The voltage change stood through control ac bus, energy storage device then absorb power as requested.
After DC grid fault recovery, DC grid passes through having to new energy power station according to itself concrete condition Function control system issues instruction, and the Precise control of power is realized by the real power control system of new energy power station, reaches new energy The matching of power and DC grid converter station capacity is issued, realizes that the failure of the new energy unit of isolated island access DC grid is worn More.
The real power control system of the control device and new energy power station is cooperated, the function in time storing energy-storage module Rate discharges, and energy-storage module is made to be in light condition, is ready for next fault traversing.
Applicant combines Figure of description to be described in detail and describe the embodiment of the present invention, but this field skill Art personnel are it should be understood that above embodiments are only the preferred embodiments of the invention, and explanation is intended merely to help reader in detail More fully understand spirit of that invention, and it is not intended to limit the protection scope of the present invention, on the contrary, any based on invention essence of the invention Any improvement or modification made by mind should all be fallen within the scope and spirit of the invention.

Claims (16)

1. a kind of failure for the soft straight transmitting system of new energy isolated island mutually coordinated based on flexible direct current converter station with energy storage device is worn More control method, which is characterized in that DC converter station and energy storage device cooperation adjust the failure to realize new energy power station access It passes through, the described method comprises the following steps:
S1: the power that energy storage device needs to absorb is adjusted according to Parameters variation;
S2: failure occurs, and DC grid issues control signal;
S3: energy storage device carries out power control according to control signal during failure;
S4: after fault recovery, DC grid issues control target, and new energy power station carries out the Precise control of power, completes to wear More.
2. the method as described in claim 1, which is characterized in that
In the step S1, adjusting the power that energy storage device needs absorb according to Parameters variation includes,
Frequency variation, the voltage change of exchange side are adjusted to determine the power for needing to absorb by direct current, provide signal-function The Policy Table of rate control.
3. the method as described in claim 1, which is characterized in that
The step S2 includes:
After direct current breaks down, DC converter station changes to start energy storage and fill by voltage change, the frequency of control exchange side Set realization control.
4. the method as described in claim 1, which is characterized in that
In step S3,
Energy storage device is grid-connected under normal circumstances, but does not absorb power, after receiving the signal of DC converter station sending, energy storage Startup power controls device immediately.
5. method as claimed in claim 4, which is characterized in that
The power control is that power absorption value is determined according to the control scheme list pre-established.
6. method as claimed in claim 5, which is characterized in that
In the step S3,
If line failure needs to cut off in DC grid, then the power of DC converter station is reduced, DC converter station is logical at this time The voltage change of control ac bus is crossed, energy storage device then absorbs power as requested.
7. method as claimed in claim 6, which is characterized in that
The step S4 includes:
After DC grid fault recovery, DC grid is according to itself concrete condition, by having power control to new energy power station System processed issues instruction, and the Precise control of power is realized by the real power control system of new energy power station, reaches new energy sending The fault traversing of the new energy unit of isolated island access DC grid is realized in the matching of power and DC grid converter station capacity.
8. the method for claim 7, which is characterized in that
The step S4 further comprises:
The real power control system of energy storage device and new energy power station is cooperated, and is in time discharged the power of storage, in time Energy storage is in light condition, is ready for next fault traversing.
9. a kind of failure for the soft straight transmitting system of new energy isolated island mutually coordinated based on flexible direct current converter station with energy storage device is worn More control device characterized by comprising fault detection module, power adjusting module, control module and energy-storage module;
Fault detection module, for when DC grid breaks down, issuing control signal;
Power adjusts module, for adjusting the power that energy-storage module needs to absorb according to Parameters variation;
Control module receives the control signal, and adjust mould according to the control signal, according to power when an error occurs The setting valve that block provides carries out power control to energy-storage module;After fault recovery, energy is sent out according to the power that DC grid gives Power, control energy-storage module complete fault traversing together with new energy power station;
Energy-storage module, configuration cooperate with DC converter station and adjust to realize new energy power station access in the exchange side of converter station Fault traversing.
10. device as claimed in claim 9, which is characterized in that
The power adjusts module and adjusts frequency variation, the voltage change of exchange side by direct current to determine that the energy-storage module needs The power to be absorbed, and provide signal-power control Policy Table.
11. device as claimed in claim 10, which is characterized in that
After direct current breaks down, fault detection module issues control letter by the voltage change of control exchange side, frequency variation Number, and then start energy-storage module and realize control.
12. device as claimed in claim 11, which is characterized in that
The energy-storage module is grid-connected under normal circumstances, but does not absorb power, examines when receiving failure by the control module After surveying the signal that module issues, energy-storage module startup power is controlled immediately.
13. device as claimed in claim 12, which is characterized in that
The power control is to adjust the control scheme list that module pre-establishes according to power to determine power absorption value.
14. device as claimed in claim 13, which is characterized in that
If line failure needs to cut off in DC grid, then the power of DC converter station is reduced, DC converter station is logical at this time The voltage change of control ac bus is crossed, energy storage device then absorbs power as requested.
15. device as claimed in claim 14, which is characterized in that
After DC grid fault recovery, DC grid is according to itself concrete condition, by having power control to new energy power station System processed issues instruction, and the Precise control of power is realized by the real power control system of new energy power station, reaches new energy sending The fault traversing of the new energy unit of isolated island access DC grid is realized in the matching of power and DC grid converter station capacity.
16. device as claimed in claim 15, which is characterized in that
The real power control system of the control device and new energy power station is cooperated, and in time releases the power that energy-storage module stores It runs out, energy-storage module is made to be in light condition, be ready for next fault traversing.
CN201910727173.6A 2019-08-07 2019-08-07 Fault ride-through control method and device for new energy island flexible direct-sending system Active CN110460096B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910727173.6A CN110460096B (en) 2019-08-07 2019-08-07 Fault ride-through control method and device for new energy island flexible direct-sending system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910727173.6A CN110460096B (en) 2019-08-07 2019-08-07 Fault ride-through control method and device for new energy island flexible direct-sending system

Publications (2)

Publication Number Publication Date
CN110460096A true CN110460096A (en) 2019-11-15
CN110460096B CN110460096B (en) 2021-12-03

Family

ID=68485319

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910727173.6A Active CN110460096B (en) 2019-08-07 2019-08-07 Fault ride-through control method and device for new energy island flexible direct-sending system

Country Status (1)

Country Link
CN (1) CN110460096B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111864783A (en) * 2020-07-28 2020-10-30 浙江华云清洁能源有限公司 Direct-current short-circuit fault ride-through control method and related device
CN113098063A (en) * 2021-04-13 2021-07-09 东南大学 New energy island sending alternating current fault ride-through control method and device
CN113394780A (en) * 2021-07-21 2021-09-14 国网江苏省电力有限公司南通供电分公司 Power control method and system for automatic port fault ride-through
CN114336723A (en) * 2020-09-29 2022-04-12 南京南瑞继保电气有限公司 Island fault ride-through control method and device for converter of flexible direct current transmission system

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20120062205A1 (en) * 2010-04-20 2012-03-15 Rf Micro Devices, Inc. Voltage compatible charge pump buck and buck power supplies
CN105391050A (en) * 2015-10-28 2016-03-09 南方电网科学研究院有限责任公司 Checking method and system of high-cycle cutting machine configuration scheme
CN106532745A (en) * 2016-12-15 2017-03-22 中国南方电网有限责任公司电网技术研究中心 Frequency coordination control method specific to send-out islands of multiple direct current circuits
CN108233409A (en) * 2017-12-21 2018-06-29 中国电力科学研究院有限公司 A kind of the fault traversing control method and system of the soft straight transmitting system of new energy isolated island
CN108736511A (en) * 2018-04-18 2018-11-02 中国电力科学研究院有限公司 It is a kind of through the soft wind-powered electricity generation transmitting system fault traversing control method and system directly collected
CN109193766A (en) * 2018-09-18 2019-01-11 南京理工大学 A kind of grid-connected fault traversing control method of MMC-HVDC based on DC energy storage device

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20120062205A1 (en) * 2010-04-20 2012-03-15 Rf Micro Devices, Inc. Voltage compatible charge pump buck and buck power supplies
CN105391050A (en) * 2015-10-28 2016-03-09 南方电网科学研究院有限责任公司 Checking method and system of high-cycle cutting machine configuration scheme
CN106532745A (en) * 2016-12-15 2017-03-22 中国南方电网有限责任公司电网技术研究中心 Frequency coordination control method specific to send-out islands of multiple direct current circuits
CN108233409A (en) * 2017-12-21 2018-06-29 中国电力科学研究院有限公司 A kind of the fault traversing control method and system of the soft straight transmitting system of new energy isolated island
CN108736511A (en) * 2018-04-18 2018-11-02 中国电力科学研究院有限公司 It is a kind of through the soft wind-powered electricity generation transmitting system fault traversing control method and system directly collected
CN109193766A (en) * 2018-09-18 2019-01-11 南京理工大学 A kind of grid-connected fault traversing control method of MMC-HVDC based on DC energy storage device

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111864783A (en) * 2020-07-28 2020-10-30 浙江华云清洁能源有限公司 Direct-current short-circuit fault ride-through control method and related device
CN114336723A (en) * 2020-09-29 2022-04-12 南京南瑞继保电气有限公司 Island fault ride-through control method and device for converter of flexible direct current transmission system
CN114336723B (en) * 2020-09-29 2024-02-02 南京南瑞继保电气有限公司 Island fault ride-through control method and device for converter of flexible direct current transmission system
CN113098063A (en) * 2021-04-13 2021-07-09 东南大学 New energy island sending alternating current fault ride-through control method and device
CN113098063B (en) * 2021-04-13 2022-07-05 东南大学 New energy island sending alternating current fault ride-through control method and device
CN113394780A (en) * 2021-07-21 2021-09-14 国网江苏省电力有限公司南通供电分公司 Power control method and system for automatic port fault ride-through
CN113394780B (en) * 2021-07-21 2022-08-19 国网江苏省电力有限公司南通供电分公司 Power control method and system for automatic port fault ride-through

Also Published As

Publication number Publication date
CN110460096B (en) 2021-12-03

Similar Documents

Publication Publication Date Title
CN110460096A (en) A kind of fault traversing control method and device of the soft straight transmitting system of new energy isolated island
CN102882229B (en) Automatic control system for dynamic voltage of wind power plant
CN105826936B (en) A kind of fired power generating unit intelligence primary frequency modulation control method for power grid large frequency-difference
CN102496948B (en) Central-control-system-based energy storage type wind power plant
CN106842946B (en) Load emergency adjusting method and device under AGC mode of thermal power generating unit
CN102709946A (en) Method for realizing seamless switching of micro-grid from grid-connection operation to isolated network operation
CN108599379B (en) Power monitoring system for micro-grid group
CN103595052B (en) Method for stably controlling switchover from micro-grid connection into island state
CN107346893A (en) A kind of wind power station active power control method and system
CN218482665U (en) Redundancy coordination control device for high-capacity energy storage system
CN107465198B (en) A kind of wind power field automatic voltage control and system
CN102868178B (en) Method for improving grid-connected transient stability in wind power plant voltage automatic control system
CN105162171B (en) For how wind farm grid-connected dispatching patcher
CN108206525A (en) Photo-voltaic power generation station reactive compensation system and method based on inverter and the private network that communicates
CN103812133B (en) Grid-connected photovoltaic power station power control system and remote control method thereof
CN104319779B (en) Regional power grid reactive voltage control method
CN102946097A (en) Method for controlling thermal stability in real time by combining automatic gain control (AGC) system and manual scheduling
CN114069701B (en) Multi-time-scale power control system suitable for new energy station
CN210517808U (en) Little water and electricity little grid system that can intelligent regulation
CN103701154A (en) Automatic power generating control target command receiving system of grid combined power generator set
CN107508325A (en) For multiple distributed power sources and off-grid synchronisation control means
CN202550689U (en) Intelligent management control system for enhancing stability of small power grid
CN108832720B (en) Communication control system, method and device for photovoltaic station
KR101610699B1 (en) Power management system for frequency regulation based on energy storage sytem and method thereof
CN110336315A (en) A kind of receiving end city partial electric grid isolated power grid control system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant