CN104319779B - Regional power grid reactive voltage control method - Google Patents

Regional power grid reactive voltage control method Download PDF

Info

Publication number
CN104319779B
CN104319779B CN201410553543.6A CN201410553543A CN104319779B CN 104319779 B CN104319779 B CN 104319779B CN 201410553543 A CN201410553543 A CN 201410553543A CN 104319779 B CN104319779 B CN 104319779B
Authority
CN
China
Prior art keywords
power grid
network
reactive
time data
voltage control
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410553543.6A
Other languages
Chinese (zh)
Other versions
CN104319779A (en
Inventor
李端超
黄太贵
马金辉
王松
张�浩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ANHUI LEADZONE INTELLIGENT GRID TECHNOLOGY Co Ltd
State Grid Corp of China SGCC
State Grid Anhui Electric Power Co Ltd
Original Assignee
ANHUI LEADZONE INTELLIGENT GRID TECHNOLOGY Co Ltd
State Grid Corp of China SGCC
State Grid Anhui Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ANHUI LEADZONE INTELLIGENT GRID TECHNOLOGY Co Ltd, State Grid Corp of China SGCC, State Grid Anhui Electric Power Co Ltd filed Critical ANHUI LEADZONE INTELLIGENT GRID TECHNOLOGY Co Ltd
Priority to CN201410553543.6A priority Critical patent/CN104319779B/en
Publication of CN104319779A publication Critical patent/CN104319779A/en
Application granted granted Critical
Publication of CN104319779B publication Critical patent/CN104319779B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/12Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/18Arrangements for adjusting, eliminating or compensating reactive power in networks
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E40/00Technologies for an efficient electrical power generation, transmission or distribution
    • Y02E40/30Reactive power compensation

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention discloses a regional power grid reactive voltage control method, and the method comprises the steps as follows: S1, building the power grid topology network covering all power substations in the whole network; S2, real time collecting power grid real time data in regional power grid and extracting effective real time data; S3, calculating and analyzing the effective real time data, obtaining more than one control strategy for realizing reserve area power grid reactive voltage control target by capacitor switching or transformer gear adjusting operation, generating the control strategy set; S4, combining the power grid topology network, selecting optimum control strategy with least operation step to the capacitor or transformer; S5, judging the optimum control strategy; when the optimum control strategy is right, generating power grid remote control command, when the optimum control strategy is wrong, returning to the step S3; S6, realizing reactive voltage control target according to the power grid remote control command and returning to the step S2. The regional power grid reactive voltage control method can have reactive control for regional power grid and have smallest power loss.

Description

A kind of area power grid reactive voltage control method
Technical field
The present invention relates to technical field of electric power automation, more particularly, to a kind of area power grid reactive voltage control method.
Background technology
Stablizing of voltage may insure normally running and extending its service life, with user to confession of various electrical equipments The increasingly raising that electricity quality requires, rate of qualified voltage becomes a subject matter of their unusual care.Examining for economy Consider, be unable to long-distance sand transport reactive power in electrical network, to avoid the energy loss caused by long-distance transmissions reactive power as far as possible. Meanwhile, voltage and Reactive Power Control are one and are related to guarantee power supply quality, meet user's reactive power demand and system electricity The problem of pressing lattice, is also to reduce network loss, the effective measures of raising operation of power networks economy, is constantly subject to Operation of Electric Systems people The close attention of member.In power system, therefore realize voltage & reactive power-control there is extensive and important economic benefit and society Can benefit.
Part electric substation has had VQC (VQC) putting into operation at present.This device is usually basis The position on administrative division map that this electric substation is run, to provide control measure, meets the builtin voltage requirement of this electric substation and idle work( The reasonable layout of rate.This electric substation step voltage is idle local optimum Comprehensive Control Technology comparative maturity, but still have following not Foot:First, the optimization of local can only be realized it is impossible to realize system-wide optimum control, and only can guarantee that controlled busbar voltage is closed Lattice are it is impossible to reach the minimum purpose of the whole network power attenuation;2nd, occur that voltage frequently adjusts in two grades of on-load voltage regulation electrical networks, hold Easily cause voltage-regulation un-reasonable phenomenon, not enough to the regulating power of the middle terminal voltage of three-winding transformer;3rd, VQC device Adjusting control is based on given voltage power-less upper lower limit value, and the determination of voltage power-less upper lower limit value will rely on the warp of attendant Test, lack a set of effective computational methods, if upper lower limit value gives unreasonable, no matter how perfect regulation measure is, all can not Can reasonably be controlled;4th, each electric substation is both needed to put into VQC device, also can increase the equipment investment of power supply enterprise.
Content of the invention
The technical problem being existed based on background technology, the present invention proposes a kind of area power grid reactive voltage control method, The whole network power attenuation minimum purpose can be reached while realizing the reactive power/voltage control target of area power grid.
A kind of area power grid reactive voltage control method proposed by the present invention, sets up covering the whole network using electric network model and respectively becomes Electricity topological network, by Real-time Collection real-time data of power grid, the whole network is monitored, and according to reactive power/voltage control target Adjusted by capacitor switching and transformer gear and ensureing to be optimized control to area power grid on the premise of the whole network voltage is qualified System;The method comprising the steps of:
S1, foundation cover the power network topology network of each electric substation of the whole network;
S2, the real-time data of power grid of Real-time Collection area power grid are simultaneously detected, will detect qualified real-time data of power grid It is analyzed processing and extract effective real time data;
S3, effective real time data is carried out calculate analysis, obtain can pass through capacitor switching or transformer no less than one Gear adjusts the control strategy realizing predetermined area power grid reactive power/voltage control target, and generates control strategy set;
S4, combine power network topology network, each control strategy of analysis implement after the whole network running status, ensureing that the whole network voltage closes The optimal control policy minimum to capacitor or transformer operating step is selected on the premise of lattice;
S5, optimal control policy is judged;When optimal control policy is correct, generate electrical network telecommand, when When excellent control strategy is incorrect, return to step S3;
S6, the capacitor switching state specified or transformer gear are adjusted according to electrical network telecommand, realize reactive voltage Return to step S2 after control targe.
Preferably, step S1 is specially:Done root node built for child node with secondary substation with local one time power transformation Stand and be no less than a trunk net, generate power network topology network in conjunction with the whole network all trunks net.
Preferably, step S2 is specially:Travel through each child node collection electrical network real-time in area power grid corresponding trunk net Data is simultaneously detected, extracts effective real time data by detecting that qualified real-time data of power grid is averaging processing, and will be effectively Real time data backup storage.
Preferably, in step S2, the detection of real-time data of power grid is included with message correctness verification data validity school Test.
Preferably, in step S2, the real-time data of power grid of collection includes:The switch shape of electric substations at different levels main transformer and capacitor State, disconnecting link state;The current gear of electric substations at different levels transformer;Active, the idle, voltage of electric substations at different levels;Relay protection is believed Number.
Preferably, relay protection signal includes:Capacitor faults signal and main transformer fault-signal.
Preferably, step S3 is specially:Effective real time data is analyzed, calculates power factor of electric network, one time power transformation Reactive-load compensation redundancy K of capacitor of idle, each substation busbars voltage and each electric substation and capacitor switching coefficient M, and the M value of each capacitor is ranked with clear and definite switching order, analysis obtains can pass through capacitor switching no less than one Or transformer gear is adjusted to realize the control strategy of area power grid reactive power/voltage control target, and generate control strategy set.
Preferably, in step S3, area power grid reactive power/voltage control target is obtained by communication or arranges manually.
Preferably, in step S5, the standard of optimal control policy correctness is:Grid equipment whether can be led to abnormal, be No beyond number of operations restriction, if beyond the operating time interval, if be capable of electric network reactive-load voltage control targe.
Preferably it is characterised in that in step S5, when optimal control policy is correct, being backed up storage, and generate electricity Net telecommand.
Present invention achieves the local optimum of the online optimal reactive power dispatch of electrical network the whole network and idle control targe automatically controls Coordinate, improve the quality of voltage of whole electrical network, reduce electric network active and be lost it is ensured that the voltage of each transformer station is qualified, adjust Section action promptly and accurately, meets actual motion demand.
The present invention combines power network topology network, can either realize the optimization of partial electric grid, enables the optimum control of the whole network again System, can also reach the whole network power attenuation minimum purpose while ensureing that controlled busbar voltage is qualified.
The present invention is preferentially chosen to the multiple embodiments of achievable network optimization target with reference to the whole network situation, and right Telecommand is judged, realizes network optimization target in the way of guarantee is minimum by advantages of simple, step.
The present invention, according to each electric substation building topology network, enters line number to each electric substation in the way of will pass through traverse node Adjust with monitoring according to collection, be conducive to improving the preciseness of the whole network inspection, it is to avoid omit.
The present invention can realize the voltage & var control of the whole network according to the operation information of the whole network system, thus ensureing network-wide basis The qualified reasonable layout with reactive power of interior quality of voltage.
Brief description
Fig. 1 is a kind of area power grid reactive voltage control method flow chart proposed by the present invention.
Fig. 2 is a kind of area power grid reactive voltage control system structural representation.
Specific embodiment
With reference to Fig. 1, a kind of area power grid reactive voltage control method proposed by the present invention, set up using electric network model and cover The locally topological network of each electric substation, is monitored to the whole network by Real-time Collection real-time data of power grid, and according to reactive voltage Control targe is adjusted by capacitor switching and transformer gear and is ensureing on the premise of the whole network voltage is qualified, regional the whole network to be entered Row optimal control.
This area's electric network reactive-load voltage control method comprises the following steps:
S1, done with local one time power transformation root node and with secondary substation for child node set up be no less than a trunk Net, generates power network topology network in conjunction with the whole network all trunks net.
In this step topological network should cover locally all electric substation and meet local power grid model actual conditions.
S2, area power grid corresponding trunk net travels through each child node collection real-time data of power grid and is detected, will Detect that qualified real-time data of power grid is averaging processing the effective real time data of extraction, and effective real time data is backed up storage.
In this step, real-time data of power grid includes:The on off state of electric substations at different levels main transformer and capacitor, disconnecting link state;Respectively The current gear of level electric substation transformer;Active, the idle, voltage of electric substations at different levels;Relay protection signal etc..Wherein, at different levels The on off state of electric substation's main transformer and capacitor, disconnecting link state, that the current gear of electric substations at different levels transformer belongs to electrical network is distant Letter data, active, idle, the voltage of electric substations at different levels belong to electrical network telemetry.Relay protection signal includes:Capacitor event Barrier signal and main transformer fault-signal etc..
In this step, the real-time data of power grid of collection is more comprehensive, is more conducive to the accurate judgement to electrical network real-time status.
The detection that real-time data of power grid is carried out includes message correctness verification data validity check, is conducive to deleting Invalid real-time data of power grid, improves the correctness of subsequent treatment.
In this step, extract effective real time data to detecting that qualified real-time data of power grid is averaging processing, specifically, N group data is carried out with the average computation effective real time data of extraction and as the whole network calculating and controls the data source analyzed, do so, Can ensure that the foundation of calculating is relatively steady, prevented the impact of accidental data.The value of N can be determined on a case-by-case basis, such as electricity The frequency acquisition of net real time data, the whole network cover quantity of electric substation etc..In present embodiment, go out for the effective real time data of guarantee Existing frequency, arranges 3≤N≤10.
S3, effective real time data is carried out calculate analysis, obtain can pass through capacitor switching or transformer no less than one Gear adjusts the control strategy realizing regional pre-determined network reactive power/voltage control target, and generates control strategy set.
Area power grid reactive power/voltage control target can be obtained by communication, and for example superior system is assigned to lower system, Can be arranged manually according to actual conditions by staff.
In this step, to needing to realize effectively counting in real time of the area power grid corresponding trunk net of reactive power/voltage control target According to being analyzed, calculate power factor of electric network, primary substation is idle, the electric capacity of each substation busbars voltage and each electric substation Reactive-load compensation redundancy K of device and capacitor switching coefficient M, and the M value of each capacitor is ranked with clear and definite switching order, Judge the whole network each electric substation state.Then, the control strategy of all achievable reactive power/voltage control targets is formulated for trunk net, The content of control strategy is to carry out switching operation to capacitor or transformer carries out gear regulation, and all control strategies are formed Control strategy set.So, using trunk net as process object, carried out by way of traveling through each of trunk net node point Analysis, level is strong, can avoid omission or the repetition of Data processing, improves accuracy.
S4, combine power network topology network, each control strategy of analysis implement after the whole network running status, ensureing that the whole network voltage closes The optimal control policy minimum to capacitor or transformer operating step is selected on the premise of lattice.
Specifically, after to the enforcement of each control strategy, the whole network running status is analyzed, thus ensureing the whole network voltage Select on the premise of qualified to capacitor or the minimum control strategy of transformer operating step as optimal control policy.
S5, optimal control policy is judged;When optimal control policy is correct, carry out storage backup, and according to Excellent control strategy generates electrical network telecommand, when optimal control policy is incorrect, return to step S3.
In this step, judge that the standard of optimal control policy correctness is:Grid equipment whether can be led to abnormal, if Limit beyond number of operations, if beyond operating time interval, if be capable of electric network reactive-load voltage control targe.
S6, the capacitor switching state specified or transformer gear are adjusted according to electrical network telecommand, to realize area electricity Return to step S2 after net reactive power/voltage control target.
The area power grid reactive voltage present invention being provided below in conjunction with specific area power grid reactive voltage control system Control method is further explained.
With reference to Fig. 2, a kind of area power grid reactive voltage control system proposed by the present invention, electrical network can be directly connected to existing SCADA system (Supervisory Control And Data Acquisition, data acquisition and supervisor control), and Realize the data acquisition and control to electrical network using SCADA system, make full use of existing grid equipment, the system that saves is set up Cost, reduces difficulty of construction.
This area's electric network reactive-load voltage control system includes topological network and sets up module, data collection and analysis module, idle Instruction input module, reactive voltage analysis module, control output module and memory module.Wherein, topological network is set up module and is divided Not Lian Jie data collection and analysis module and reactive voltage analysis module, data collection and analysis module and reactive voltage analysis module equal Connect memory module, idle instruction input module connects reactive voltage analysis module, and it is defeated that reactive voltage analysis module connects control Go out module.
Idle instruction input module connects reactive voltage analysis module, sends as saved tune etc. for receiving higher level's scheduling system Reactive power/voltage control target instruction target word, or staff input reactive power/voltage control target instruction target word so that reactive voltage analysis Module obtains area power grid reactive power/voltage control target.
Realize the area power grid reactive voltage control method of present invention offer using this system, step is as follows:
S1, topological network set up module according to regional electric network model to be once changed into root node and with two in area power grid The secondary child node that is changed into sets up trunk net, and generates power network topology network according to multiple trunk nets.So, power network topology network be with The one-to-one topological structure of area power grid.
S2, data collection and analysis module travel through each child node in area power grid corresponding trunk net and adopt from SCADA system Collection real-time data of power grid, and real-time data of power grid is carried out with the detection qualified data of acquisition, asked for averagely by data qualified to N group Value to obtain effective real time data, and by effective real-time data memory to memory module.
Real-time data of power grid includes:The on off state of electric substations at different levels main transformer and capacitor, disconnecting link state;Electric substations at different levels The current gear of transformer;Active, the idle, voltage of electric substations at different levels;Relay protection signal.Relay protection signal includes:Electricity Reservoir failure signal and main transformer fault-signal.Real-time data of power grid is the foundation that electric network state is judged.
It is effective that the detection that data collection and analysis module is carried out to real-time data of power grid includes message correctness verification data Property verification.
The verification of message correctness includes:Whether synchronization character is complete, frame length whether correct, CRC (Cyclic Redundancy Check, CRC) verify and whether pass through.
Data validation includes:The judgement of correct data scope, the judgement of comprehensive remote signalling amount state.For in voltage Hold, often sometimes because the reason such as have a power failure, overhaul, cause the telemetry value sending abnormal, and now, belong to for capture program Normal condition, when this happens, locking relevant device or the corresponding power transformation of setting are done and are exited state, no longer it are entered Row calculates and analyzes;And the whole network other parts, still normally run, unaffected.So it may be determined that transmitting terminal sent interior Appearance is genuine and believable and can adopt, to ensure that system will not do sentencing of making mistake because real-time data of power grid gathers mistake Disconnected.
Data collection and analysis module does not directly adopt to the qualified data in the real-time data of power grid receiving, but to N Group data carries out the average computation effective real time data of extraction and as the whole network calculating and controls the data source analyzed, and do so can Relatively steady to ensure the data participating in calculating, prevent the impact of accidental data.The value of N can be determined on a case-by-case basis, such as The frequency acquisition of real-time data of power grid, the whole network cover quantity of electric substation etc..The value of N is bigger, effective real time data of acquisition Representativeness is higher, it is contemplated that amount of calculation, with effective real-time data acquisition frequency, the span of N be preferably 3≤N≤ 10.
Data collection and analysis module combines network topology structure, by way of traverse node, the whole network is detected and controls System, beneficial to the preciseness improving the whole network control, it is to avoid error.
S3-S5, reactive voltage analysis module are analyzed to effective real time data, calculate the whole network power factor, once become Electricity reactive-load compensation redundancy K of capacitor of idle, each substation busbars voltage and each electric substation and capacitor switching system Number M, ranks to M value with clear and definite switching order, and selects optimal control policy to generate electrical network with reference to power network topology network Telecommand, and electrical network telecommand is stored memory module.Electrical network telecommand includes:The switching operation of capacitor and/ Or the upshift of ULTC gear or downshift are adjusted.
Specifically, reactive voltage analysis module travels through child node in trunk net and calculates area electricity according to effective real time data The power factor of net, primary substation is idle, the reactive-load compensation of the capacitor of each substation busbars voltage and each electric substation remains The service data such as remaining K and capacitor switching coefficient M, the M value of each capacitor is ranked with clear and definite switching order.Idle electricity Pressure analysis module combines regional operation of power networks data and area power grid reactive power/voltage control target, and analysis obtains and can achieve this mesh The all control strategies of target, the measure of control strategy includes capacitor is carried out with switching operation and/or has load transformer to carry out shelves Position pressure regulation.All control strategies of the corresponding same trunk net of reactive voltage analysis module set generate control strategy set, then By carrying out area power grid comprehensive analysis with reference to power network topology network, that is, according to the effective real time data of the whole network calculate the whole network power because Number, primary substation is idle, reactive-load compensation redundancy K of capacitor of each substation busbars voltage and each electric substation etc., Ensure that selecting the minimum control strategy of operating procedure on the premise of the whole network voltage is qualified is carried out as optimal control policy and to it Correction judgement.When optimal control policy is correct, reactive voltage analysis module generates electrical network remote control according to optimal control policy Instruction.
Optimal control policy refers to be capable of the minimum plan of the advantages of simple of electric network reactive-load voltage control targe, step Slightly, its perfect condition is, only carrying out a secondary control to a capacitor or transformer just realizes area power grid reactive power/voltage control Target.
Reactive voltage analysis module judges that the standard of optimal control policy correctness is:Grid equipment whether can be led to different Often, if limit beyond number of operations, if beyond operating time interval, if be capable of the voltage-controlled mesh of electric network reactive-load Mark.
The calculating of M value has considered energy-saving effect, the compensation effect of capacitor switching and the impact to busbar voltage.M Value is bigger, and the energy-conservation of input and voltage effect are better;M value is less, and the energy-conservation of input and voltage effect are poorer.M by capacitor Value is ranked, and specifies the switching order of each capacitor, very intuitively, is conducive to the analysis of reactive voltage analysis module to judge.
Electrical network telecommand is transported to SCADA system to throw by adjusting the capacitor specified by S6, control output module Cut state or transformer gear realizes area power grid reactive power/voltage control target..
After electrical network telecommand is performed, data collection and analysis module the whole network real time data is carried out the collection of a new round with Analyzing and processing, reactive voltage analysis module is monitored to the whole network running status according to effective real time data, can according to default when Between section primary substation, secondary substation and the whole network network loss situation are inquired about and are counted.
The above, the only present invention preferably specific embodiment, but protection scope of the present invention is not limited thereto, Any those familiar with the art the invention discloses technical scope in, technology according to the present invention scheme and its Inventive concept equivalent or change in addition, all should be included within the scope of the present invention.

Claims (7)

1. a kind of area power grid reactive voltage control method covers each power transformation of the whole network it is characterised in that setting up using electric network model Topological network, by Real-time Collection real-time data of power grid, the whole network is monitored, and according to reactive power/voltage control target lead to Cross capacitor switching and transformer gear adjusts and ensureing to be optimized control to area power grid on the premise of the whole network voltage is qualified; The method comprising the steps of:
S1, foundation cover the power network topology network of each electric substation of the whole network;
S2, the real-time data of power grid of Real-time Collection area power grid are simultaneously detected, the real-time data of power grid detecting qualified is carried out Analyzing and processing extracts effective real time data;
S3, effective real time data is carried out calculate analysis, obtain can pass through capacitor switching or transformer gear no less than one Adjust the control strategy realizing predetermined area power grid reactive power/voltage control target, and generate control strategy set;
S4, combine power network topology network, each control strategy of analysis implement after the whole network running status, ensureing that the whole network voltage is qualified Under the premise of select the optimal control policy minimum to capacitor or transformer operating step;
S5, optimal control policy is judged;When optimal control policy is correct, generate electrical network telecommand, when optimum control When making tactful incorrect, return to step S3;
S6, the capacitor switching state specified or transformer gear are adjusted according to electrical network telecommand, realize reactive power/voltage control Return to step S2 after target;
Step S1 is specially:With local one time power transformation do root node and with secondary substation for child node set up be no less than one Trunk net, generates power network topology network in conjunction with the whole network all trunks net;
In step S5, the standard of optimal control policy correctness is:Grid equipment whether can be led to abnormal, if beyond operation Number of times limits, if beyond operating time interval, if be capable of electric network reactive-load voltage control targe;
In step S5, when optimal control policy is correct, backed up storage, and generated electrical network telecommand.
2. area power grid reactive voltage control method as claimed in claim 1 is it is characterised in that step S2 is specially:On ground Travel through each child node collection real-time data of power grid in area's electrical network corresponding trunk net and detected, will detect that qualified electrical network is real When data be averaging processing extraction effective real time data, and by effective real time data back up storage.
3. area power grid reactive voltage control method as claimed in claim 2 is it is characterised in that real-time to electrical network in step S2 The detection of data includes message correctness verification data validity check.
4. area power grid reactive voltage control method as claimed in claim 2 it is characterised in that in step S2 collection electrical network Real time data includes:The on off state of electric substations at different levels main transformer and capacitor, disconnecting link state;Electric substations at different levels transformer current Gear;Active, the idle, voltage of electric substations at different levels;Relay protection signal.
5. area power grid reactive voltage control method as claimed in claim 4 is it is characterised in that relay protection signal includes: Capacitor faults signal and main transformer fault-signal.
6. area power grid reactive voltage control method as claimed in claim 1 is it is characterised in that step S3 is specially:To having Effect real time data is analyzed, and calculates power factor of electric network, primary substation is idle, each substation busbars voltage and each power transformation Reactive-load compensation redundancy K of capacitor and capacitor switching coefficient M, and the M value of each capacitor is ranked with clear and definite Sequentially, it is idle that analysis acquisition can realize area power grid by capacitor switching or transformer gear regulation no less than one to switching The control strategy of voltage control targe, and generate control strategy set.
7. area power grid reactive voltage control method as claimed in claim 1 is it is characterised in that in step S3, area power grid Reactive power/voltage control target is obtained by communication or arranges manually.
CN201410553543.6A 2014-10-17 2014-10-17 Regional power grid reactive voltage control method Active CN104319779B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410553543.6A CN104319779B (en) 2014-10-17 2014-10-17 Regional power grid reactive voltage control method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410553543.6A CN104319779B (en) 2014-10-17 2014-10-17 Regional power grid reactive voltage control method

Publications (2)

Publication Number Publication Date
CN104319779A CN104319779A (en) 2015-01-28
CN104319779B true CN104319779B (en) 2017-02-15

Family

ID=52374978

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410553543.6A Active CN104319779B (en) 2014-10-17 2014-10-17 Regional power grid reactive voltage control method

Country Status (1)

Country Link
CN (1) CN104319779B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106329540A (en) * 2016-10-09 2017-01-11 国网上海市电力公司 Reactive voltage control system for light-load period of power grid
CN110808634A (en) * 2019-11-06 2020-02-18 国网安徽省电力有限公司安庆供电公司 Reactive numerical value abnormity detection system
CN113162056B (en) * 2021-03-22 2023-01-06 华北电力科学研究院有限责任公司 Automatic voltage control method and device for extra-high voltage power grid

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1851997A (en) * 2006-04-29 2006-10-25 枣庄供电公司 Distribution-type real-time voltage power-less optimized controlling method
CN103475003A (en) * 2013-09-16 2013-12-25 国电南瑞科技股份有限公司 Automatic regional power grid voltage reactive power control method based on regional strategy optimization

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0638379A (en) * 1992-07-17 1994-02-10 Mitsubishi Electric Corp Voltage/reactive power control system

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1851997A (en) * 2006-04-29 2006-10-25 枣庄供电公司 Distribution-type real-time voltage power-less optimized controlling method
CN103475003A (en) * 2013-09-16 2013-12-25 国电南瑞科技股份有限公司 Automatic regional power grid voltage reactive power control method based on regional strategy optimization

Also Published As

Publication number Publication date
CN104319779A (en) 2015-01-28

Similar Documents

Publication Publication Date Title
Farag et al. A two ways communication-based distributed control for voltage regulation in smart distribution feeders
US11616390B2 (en) Micro-grid reconstruction method and device, micro-grid protection control center, and storage medium
CN103812131B (en) A kind of urban distribution network isolated island black starting-up system and method based on multiple agent
CN104283222B (en) A kind of area power grid reactive voltage control system
CN103248056B (en) Reactive voltage emergency control method in concentrated grid connecting area of wind power plant
CN105281344B (en) A kind of intelligent distribution network self-healing recovery optimization method considering power quality and uncertainty constraint
CN108879706A (en) A kind of automatic voltage control system
CN110429714B (en) Cloud platform intelligent power distribution system based on big data
CN103701212B (en) A kind of method for monitoring and analyzing for safety and stability control device of electric network and system
CN106154084A (en) Network load exception and operation risk real-time monitoring and early warning method
CN108847660A (en) The prevention and control Study on Decision-making Method for Optimization checked online based on Safety system off-line strategy
CN105553103B (en) A kind of region active distribution network Energy Management System and method
CN103312040A (en) Control method for improving reliability of AVC (Automatic Voltage Control) system of electric power monitoring center
CN103545921B (en) City power distribution platform area autonomy management and control optimization electric power system and its monitoring system
CN103746368A (en) Method of optimizing static safe and stable operation limit of electric power system
CN107516903B (en) Accurate load control method considering economy and safety and stability of multiple time scales
CN108649575B (en) Alternating current-direct current hybrid micro-grid and protection control center and protection control method thereof
CN105893714B (en) Based on the detection of automatic voltage control system closed loop and appraisal procedure under Bulk power system simulation system
CN104810840A (en) Full-network voltage and reactive power optimization control system and control method thereof
CN108321819A (en) The dc power prompt drop method and its system accurately perceived based on new energy station power loss amount
CN105119267A (en) Static voltage stable level analyzing method for power grid
CN104319779B (en) Regional power grid reactive voltage control method
CN104158199A (en) System and method for reactive voltage optimal control of real-time status of power system
CN103606931B (en) A kind of AVC system definite value method of adjustment based on probability statistics feature
CN105226666B (en) To the check method of reactive apparatus running status in transformer station's automatism voltage control

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant