CN110460076A - The automatic checkout system and method for grid side energy storage Monitor Process control system - Google Patents

The automatic checkout system and method for grid side energy storage Monitor Process control system Download PDF

Info

Publication number
CN110460076A
CN110460076A CN201910788519.3A CN201910788519A CN110460076A CN 110460076 A CN110460076 A CN 110460076A CN 201910788519 A CN201910788519 A CN 201910788519A CN 110460076 A CN110460076 A CN 110460076A
Authority
CN
China
Prior art keywords
test
analog end
value
parameter
energy storage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910788519.3A
Other languages
Chinese (zh)
Inventor
钟昀
王丽莉
高翔
朱杰媛
陈旺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing SAC Automation Co Ltd
Original Assignee
Nanjing SAC Automation Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing SAC Automation Co Ltd filed Critical Nanjing SAC Automation Co Ltd
Priority to CN201910788519.3A priority Critical patent/CN110460076A/en
Publication of CN110460076A publication Critical patent/CN110460076A/en
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/28Arrangements for balancing of the load in a network by storage of energy
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E40/00Technologies for an efficient electrical power generation, transmission or distribution
    • Y02E40/70Smart grids as climate change mitigation technology in the energy generation sector
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/12Monitoring or controlling equipment for energy generation units, e.g. distributed energy generation [DER] or load-side generation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/14Energy storage units

Abstract

The invention discloses the automatic checkout systems and method of a kind of grid side energy storage Monitor Process control system, comprising: automatic test lead, main website analog end, BMS system analog end, PCS device analog end;PC machine where PC machine and tested energy storage Monitor Process system where automatic test lead, main website analog end, PCS device analog end, BMS system analog end is connected on same interchanger, and configures IEC-104 communications parameter, establishes communication connection.The present invention solves existing method to the higher cost of grid side energy storage Monitor Process System Functional Test, pressure test and stability test environment, it builds period length and simulator quantity is few, and the difficult problem that cooperates between the device and device of a large amount of device abnormal behaviour of simulation, special state.

Description

The automatic checkout system and method for grid side energy storage Monitor Process control system
Technical field
The present invention relates to the automatic checkout systems and method of a kind of grid side energy storage Monitor Process control system, belong to intelligence The operation and maintenance technical field of power grid.
Background technique
Energy storage refers to through medium or equipment the process that energy stores are released again when needed.Energy storage skill Art is to solve renewable energy to access the key technology for abandonment, abandoning optical issue on a large scale;Be distributed energy, smart grid, The indispensable technology of energy internet development;Be also solve conventional electric power peak load shifting, improve conventional energy resource power generation with power transmission efficiency, The important support technology of safety and economy.Renewable energy is grid-connected, power grid ancillary service, power grid transmission & distribution, distribution and The fields such as microgrid and user side, the application scenarios of energy storage are very extensive.In current electric system both domestic and external, send out, is defeated, Match, use, energy storage almost covers the industry of entire electric power, and state's net, southern net, energy storage device manufacturing enterprise, numerous state-owned enterprises, private enterprise are confused The energy storage business of oneself is confusingly started.
The booming of grid side energy storing and electricity generating brings unprecedented opportunity to develop, however as centralization and distribution Formula energy-accumulating power station largely accesses power grid, and the also certain influence of bring of the stable operation and power quality to power grid is given birth to therefrom Grid side energy storage Monitor Process Control management system it is also more and more, many electric power producers all develop the control system of oneself. Accordingly, the power supply company of the provinces and cities such as Jiangsu, Zhejiang, Shandong and Guangzhou proposes to grid side energy storage Monitor Process control system Networking testing requirements, and DianKeYuan is organized to carry out entry test, with canonical system function and performance indicator.
Currently, being difficult to build the practical fortune of simulation energy-accumulating power station in laboratory because of the limitation of place, expense and scale Capable environment meets the test of grid side energy storage Monitor Process system.Conventional test has following two methods: using RTDS (real-time digital simulator) analogue simulation and specific specification message is simulated with specific program to realize communication simulation.
It is tested using RTDS analogue system, it is at high cost, build that the period is long and simulator although simulation precision is high Quantity is few, the testing requirement for not being able to satisfy the multiple generating equipments of energy-accumulating power station while adjusting;It is simulated using specific program specific The mode of specification message, although simple interactive operation can be carried out, for simulating a large amount of device abnormal behaviour, special shape Cooperating between number, device is set in the transmitting of state, and there are certain difficulties.
Demand of the power consumer to grid side energy storage Monitor Process system is different, and the power generation of grid side energy-accumulating power station is set Standby quantity is more, then being just badly in need of a set of flexibly configurable, complete function, being supported using the testing tool being simple and convenient to operate The test of grid side energy storage Monitor Process control system.
Summary of the invention
Purpose: in order to overcome the deficiencies in the prior art, the present invention provides a kind of grid side energy storage Monitor Process control The automatic checkout system and method for system.
Technical solution: in order to solve the above technical problems, the technical solution adopted by the present invention are as follows:
A kind of automatic checkout system of grid side energy storage Monitor Process control system, including following module: automatic test lead, Main website analog end, BMS system analog end, PCS device analog end;
The automatic test lead, for the production of test case, data processing comparison, the generation of test report, to main website Analog end issues test case, issues preset equipment initial state value and distant to BMS system analog end and PCS device analog end The target component and target value that the remote control that reconciles needs to detect;
The main website analog end, for being used according to test after receiving the test case instruction that automatic test lead issues The function of the operation simulation set in example issues the control mesh of AGC specified in test case to tested energy storage Monitor Process system Mark instruction;To main website analog end execution result back after tested energy storage Monitor Process system operation, main website analog end is surveyed to automatic Try the feedback information that end sends implementing result;
The BMS system analog end, one or more BMS systems for simulating and emulating different type energy-accumulating power station exist Measurement change information in AGC control process, and it is sent to tested energy storage Monitor Process system and PCS device analog end;Start Before test, the initial state information of each equipment in the power station being arranged in test case is sent to BMS system and simulated by automatic test lead End;In test process, BMS system analog end includes: to the BMS emulation mode information sent in tested energy storage Monitor Process system Real-time charge-discharge electric power, maximum charge-discharge electric power, soc real time information, battery cell voltage and temperature, charge and discharge control parameter, Warning information;BMS system analog end includes: real-time charge and discharge electric work to the BMS emulation mode information that PCS device analog end is sent Rate, maximum charge-discharge electric power, soc real time information;
The PCS device analog end is opened for simulating and emulating one or more PCS devices of different type energy-accumulating power station Begin before test, the initial state information of each equipment in the power station being arranged in test case is sent to PCS device mould by automatic test lead Quasi- end;After test starting, after tested energy storage Monitor Process system receives the AGC control instruction of main website analog end, according to predetermined plan Control target is slightly decomposed, and issues remote regulating or remote control command to all PCS device analog ends of grid side energy-accumulating power station;PCS After equipment simulating end receives instruction, executed according to the emulation mode information sent in the original state of itself and BMS system analog end AGC control instruction, and the status information after analog regulation is fed back into tested energy storage Monitor Process with telemetering or remote signalling message System, and then automatic test lead is fed back to, the result of adjusting is compared automatic test lead with the target value that expectation reaches, such as Fruit then thinks test item qualification in error range, on the contrary then unqualified.
Preferably, a communication point table is established for each energy-accumulating power station equipment, content includes in communication point table table Each equipment remote regulating, remote control, remote signalling, the parameter name of telemetering, parameter coding, the information body address of parameter, parameter value, parameter number According to type, Parameter units, parameter minimum value and maximum value, the content of parameter of communication point table meets IEC-104 specification, communicates point Table is file storage in xml format, and BMS system analog end, PCS device analog end are written and read communication point table, and in real time Presentation device status information.
Preferably, test case includes the file of multiple XML formats, and file content includes test item to be tested And the test data that each test item is related to, test data include the instruction set that automatic test lead is issued by main website analog end And original state and target component is arranged to all devices of BMS system analog end, PCS device analog end in automatic test lead And target value, test item and data parameters are all stored with the format set into XML file, automatic test lead to this document into Row read-write, and be shown on interface for checking and modifying, if testing unacceptable project, can be filled in not in test report Qualification, can also be red by test item title mark underproof on interface.
Preferably, test report, for recording test item to be tested, testing procedure, each test item End value, target value and qualification, underproof test result, target value is before program operation, and automatic load test is used The value that sets in example, and end value is value of the Auto-writing into report at the end of each test item in actual operation.
It preferably, will be where automatic test lead, main website analog end, PCS device analog end, BMS system analog end PC machine and tested energy storage Monitor Process system where PC machine be connected on same interchanger, and configure IEC-104 communication ginseng Number, establishes communication connection.
A kind of automatic testing method of grid side energy storage Monitor Process control system, characterized by the following steps:
For the device model modeling in grid side energy-accumulating power station, comprising: PCS device, BMS system business mould in energy-accumulating power station Type modeling, for each equipment create communication point table, on the interface at analogue simulation end each equipment remote regulating of typing, remote control, remote signalling, The parameter name of telemetering, parameter coding ID, the information body address of parameter, parameter value, parameter data type, Parameter units, parameter Minimum value and maximum value;
Main website analog end issues active and idle target instruction target word to tested energy storage Monitor Process system, and new energy is arranged The parameter initial state value of BMS system, PCS device business model in power station, while target component is set and fills in target value;
Tested energy storage Monitor Process system, which receives, instructs all devices to PCS device analog end to issue remote regulating or distant Control order, according to etc. nargin distribution the strategy active target value of giving every PCS device to distribute, system under test (SUT) receives reactive command Target of Reactive Power value is calculated according to current voltage-target and random impedance coefficient bound in voltage-target;
PCS device analog end is arranged according to the remote control, remote regulating instruction and automatic test lead that receive according to all devices Original state come adjust every equipment in requisition for according to instruction come the value of the parameter adjusted, and by result pass through remote signalling, telemetering Message feeds back to system under test (SUT), while the status information of all devices after adjusting is sent automatic test lead by com interface, and Value after sending every inverter practical adjustments by telemetering message, while real-time update respectively has work value in communication point table, And will actually there be work value to send automatic test lead;PCS analog machine adjusting without work value by oneself according to the remote regulating instruction received To be worth specified in remote regulating order, and the value after every inverter practical adjustments is sent by telemetering message, while real-time update is each From in communication point table, without work value, and actually automatic test lead will be sent without work value;
Automatic test lead receives the result data of PCS device analog end and BMS system analog end feedback, writes into test report End value item, and do error op with target value, in error range belong to that detection is qualified, and test result filling " is closed Lattice " otherwise fill out " unqualified ".
Preferably, the test report is saved in local.
The utility model has the advantages that the automatic checkout system and method for grid side energy storage Monitor Process control system provided by the invention, solution Existing method of having determined to the cost of grid side energy storage Monitor Process System Functional Test, pressure test and stability test environment compared with Height, builds period length and simulator quantity is few, and the device and device of a large amount of device abnormal behaviour of simulation, special state Between cooperate difficult problem.
Its advantages are as follows:
1, it only needs to dispose test macro in laboratory environment, greatly reduces difficulty, the cost of test environmental structure And the period;
2, analogue simulation can be carried out to multiple pc S equipment in energy storage station and BMS system, considerably increases analog device Quantity can be flexibly applied to the analogue simulation of different scales energy-accumulating power station, improve the adaptivity of system;
3, can in real-time monitoring energy-accumulating power station various equipment such as high-tension apparatus, PCS device and BMS system status information, With readable and real-time;
4, the various actions of main website and substation can be simulated simultaneously, realize the closed cycle simulation test to system under test (SUT), and there is pole High real value;
5, the test report of customizable improves the utilization rate and flexibility of test macro;
6, one-touch starting test is realized, user experience is improved;
7, it is realized by random proportionality coefficient come the method for computing system impedance value unstable to energy-accumulating power station true environment The simulation of factor is determined, so as to obtain test data and test result more true to nature;
8, it automatically generates test report and saves, substantially reduce the time to grid side energy storage Monitor Process system testing, Test complexity is reduced, labour cost is greatly saved, improves testing efficiency.
Detailed description of the invention
Fig. 1 is automatic checkout system structural schematic diagram of the present invention;
Fig. 2 is automatic test lead overhaul flow chart provided by the invention.
Specific embodiment
The present invention will be further explained with reference to the accompanying drawing.
As shown in Figure 1, a kind of automatic checkout system of grid side energy storage Monitor Process system, comprising: automatic test lead, master It stands analog end, BMS (battery management system) system analog end, PCS (energy accumulation current converter) equipment simulating end;
The automatic test lead, for the production of test case, data processing comparison, the generation of test report, to main website Analog end issues test case, issues preset equipment initial state value and distant to BMS system analog end and PCS device analog end The target component and target value that the remote control that reconciles needs to detect.
The main website analog end is the TCP Client based on IEC-104, for receiving automatic test lead sending Test case instruction after, issue in test case and advise to system under test (SUT) according to the function of the operation simulation set in test case Fixed AGC controls target instruction target word;To main website analog end execution result back after system under test (SUT) operation, main website analog end is surveyed to automatic Try the feedback information that end sends implementing result;Automatic test lead and main website analog end can be deployed in on 1 PC host, also may be used It is deployed on different PC hosts respectively.
The BMS system analog end is the TCP server-side based on IEC-104, for simulating and emulating different type Measurement change information of one or more BMS systems of energy-accumulating power station in AGC control process, and it is sent to tested energy storage prison Control AGC system and PCS device analog end.Start the preceding automatic test lead of test for the first of each equipment in the power station being arranged in test case Beginning status information is sent to BMS system analog end.BMS system analog end is to tested energy storage Monitor Process system in test process On the BMS emulation mode information sent include: real-time charge-discharge electric power, maximum charge-discharge electric power, soc real time information, battery cell Voltage and temperature, charge and discharge control parameter, warning information;BMS system analog end is simulated to the BMS that PCS device analog end is sent Status information includes: real-time charge-discharge electric power, maximum charge-discharge electric power, soc real time information.
The PCS device analog end is the TCP server-side based on IEC-104, for simulating and emulating different type One or more PCS devices of energy-accumulating power station start the preceding automatic test lead of test for each equipment in the power station being arranged in test case Initial state information is sent to PCS device analog end.The energy storage Monitor Process system being tested after test starting receives main website analog end AGC control instruction after, according to predetermined policy decompose control target, and to grid side energy-accumulating power station all PCS devices simulate End issues remote regulating or remote control command.After PCS device analog end receives instruction, according to the original state of itself and BMS system mould The emulation mode information sent on quasi- end executes AGC control instruction, and by the status information after analog regulation with telemetering or remote signalling Message feeds back to tested energy storage Monitor Process system, and then feeds back to automatic test lead, automatic test lead by the result of adjusting with It is expected that the target value reached is compared, test item qualification is thought if in error range, it is on the contrary then unqualified.This survey Method for testing realizes the closed-loop communications between main website, substation and system under test (SUT) by the network environment of pure software, to realize The closed cycle simulation test to system under test (SUT) is completed in laboratory environments, reduces difficulty, cost and the week of test environmental structure Phase shortens the time of test, improves testing efficiency.
BMS system analog end and PCS device analog end can be deployed in on 1 PC host, can be also deployed in respectively not On same PC host.
The grid side energy-accumulating power station of simulation and simulating realistic is that each energy-accumulating power station equipment establishes a communication point table, is led to News point table table in content include each equipment remote regulating, remote control, remote signalling, the parameter name of telemetering, parameter coding, parameter imformosome Address, parameter value, parameter data type, Parameter units, parameter minimum value and maximum value, the content of parameter of communication point table exists Have in IEC-104 specification and clearly standardize, communication point table is file in xml format to store, and BMS system analog end, PCS are set Standby analog end can be written and read communication point table, and the status information of presentation device in real time, improve readable and data Real-time, while the energy-accumulating power station of different scales can be emulated and be simulated, there is very strong flexibility ratio and adaptivity.
Test case is the file of multiple XML formats, and file content includes needing test item to be tested and each test The test data that item is related to, test data include the instruction set and automatic test that automatic test lead is issued by main website analog end It holds and original state and target component and target value is arranged to all devices of BMS system analog end, PCS device analog end, this A little test items and data parameters are all stored with the format set into XML file, and automatic test lead can carry out this document Read-write, and be shown on interface for checking and modifying, if testing unacceptable project, can not only be filled in test report It is unqualified, can also be red by test item title mark underproof on interface, it can allow tester is open-and-shut which is known in this way A test item is problematic, facilitates investigation problem, substantially reduces the time of malfunction elimination;
Test report is the word document of a programming automatic generation, for recording need test item to be tested, test Step, the end value of each test item, target value and qualified or not test result, target value are preceding certainly in program operation The value set in dynamic load test use-case, and end value be in actual operation at the end of each test item Auto-writing to reporting In value, automatic test has been achieved, has been greatly saved the testing time, and the format reported can be according to different users Producer's customization, test method is readily applicable to the system under test (SUT) of different manufacturers, improves the utilization rate and flexibly of test macro Property;
Communication between main website analog end and system under test (SUT) and system under test (SUT) and BMS system analog end, PCS device analog end It is all by -104 specification of IEC (International Electrotechnical Commission);
As shown in Fig. 2, a kind of automatic testing method of grid side energy-accumulating power station AGC system, includes the following steps:
(1) for the device model modeling in grid side energy-accumulating power station, PCS device, BMS system industry for example, in energy-accumulating power station It is engaged in model modeling, as each equipment creates communication point table, each equipment remote regulating of typing, distant on the interface at analogue simulation end Control, remote signalling, the parameter name of telemetering, parameter coding ID, the information body address of parameter, parameter value, parameter data type, parameter list Position, parameter minimum value and maximum value.
For example, an energy-accumulating power station includes 10 PCS devices, 10 sets of BMS systems, then need in analogue simulation end typing 10 The communication point table and communications parameter of platform PCS device and 10 sets of BMS systems, i.e., IP address and end based on the communication of IEC-104 specification Slogan shows that relevant parameter, table 1 are remote regulating parameter exhibition in PCS device communication point table by taking the communication point table that PCS is related to as an example below Show, table 2 is that telemetry parameter shows that wherein ID refers to parameter coding, it is ensured that the uniqueness of parameter, item in PCS device communication point table Mesh number refers to information body address specified in IEC-104 specification;
Remote regulating parameter display in 1 PCS device communication point table of table
Number Title ID Entry number Numerical value
1 Idle operating point setting YT001 25089 0
2 System voltage setting YT002 25090 0
3 It is spare YT003 25091 0
4 Voltage upper control limit YT004 25092 0
5 Voltage lower control limit YT005 25093 0
6 The idle adjustable upper limit YT006 25094 0
7 Idle adjustable lower limit YT007 25095 0
Telemetry parameter is shown in 2 PCS device communication point table of table
The test case for making main website analog end, issues active and idle target to system under test (SUT) for main website analog end Instruction, such as total active target value are set as 5MW, and total idle target instruction target word is set as varying DC link voltage to 230KV;Make power grid BMS system, PCS device business mould in new energy power station is arranged in side BMS system analog end, the test case of PCS device analog end The parameter initial state value of type, while target component is set and fills in target value, 10 PCS devices and 10 sets for example in energy-accumulating power station BMS system typing original state, such as every PCS device initially to have work value to be all provided be 0, while the target value of test item is set, Such as 0.05MW is set as to each device active target value for adjusting test item active for the first time;
Test environment is built, it will be where automatic test lead, main website analog end, PCS device analog end, BMS system analog end PC machine and system under test (SUT) where PC machine be connected on same interchanger, and configure IEC-104 communications parameter, establish communication and connect It connects, this is built the production that the period includes test case, test report and an engineer is only needed to spend 3 hours, compared to biography The period of building of the RTDS analogue system of system is greatly improved, and substantially reduces the period of environmental structure, is greatly reduced Build cost.
(2) it is clicked in automatic test lead and starts testing button, automatic load test use-case, starting test realizes a key Formula operation, improves the Experience Degree of user, and main website analog end is sent out according to automatic test lead by com (The Component Object Model) interface The target value information sent issues active or idle target value to system under test (SUT), and always having work value as defined in test case is 5MW, It is 5MW that then main website analog end, which issues total active target value to system under test (SUT) by IEC-104 specification message, as test case provides Target bus voltage is adjusted to 230KV, then it is 230KV that main website analog end, which issues busbar voltage target value to system under test (SUT),;
(3) system under test (SUT) receives instruction and issues remote regulating or remote control command to all devices of PCS device analog end, such as quilt When examining system receives total active target value and needs to adjust the order for arriving 5MW, according to etc. the strategy of nargin distribution give every PCS device The active target value of distribution should be 0.05MW, and system under test (SUT) receives reactive command voltage-target when being 230KV, can be according to working as Target of Reactive Power value is calculated in preceding voltage-target 225KV and random impedance coefficient bound, and calculation method is as follows:
Original busbar voltage target value: U0=225KV;
It is expected that busbar voltage target value: U1=230KV;
Target voltage difference: Δ U=U1-U0=5KV;
System impedance coefficient is R;
The random impedance coefficient upper limit: R1;
Random impedance lower coefficient limit: R0;
Idle difference DELTA Q=Δ U*R;
And system impedance coefficients R is obtained by random impedance coefficient bound:
Random proportionality coefficient rate;
Rate=random number %20000/20000.0
R=R0+ (R1-R0) * rate;
Assuming that the calculated result of R is 10, then idle difference DELTA Q=Δ U*R=50MVar (megavar), and initially idle Target value is 0, then expected Target of Reactive Power value Q1=0+ Δ Q=50MVar, according to etc. nargin distribution strategy it is inverse to every The Target of Reactive Power value for becoming device distribution should be Q1/100=0.05MVar;
Due to various uncertain factors such as plant load rate etc. in energy-accumulating power station, actual system impedance value is also certain It can impacted be in fluctuation tendency, be realized by random proportionality coefficient come the method for computing system impedance value true to energy-accumulating power station The simulation of environment unstable factor, so as to obtain test data and test result more true to nature;
(4) PCS device analog end is arranged according to the remote control, remote regulating instruction and automatic test lead that receive according to all devices Original state come adjust every equipment in requisition for according to instruction come the value of the parameter adjusted, such as the work value that has of PCS device, and Result is fed back into system under test (SUT) by remote signalling, telemetering message, simultaneously also by com interface the state of all devices after adjusting Information sends automatic test lead, such as active adjusting: 10 PCS analog machines are instructed according to the remote regulating received has work value for oneself It is adjusted to 0.05MW specified in remote regulating order, and sends the value after every inverter practical adjustments by telemetering message, while Can real-time update respectively have work value in communication point table, and will actually there is work value to send automatic test lead, in addition, Reactive-power control: Oneself is adjusted to 0.05MVar specified in remote regulating order without work value according to the remote regulating instruction received by 10 PCS analog machines, And the value after every inverter practical adjustments is sent by telemetering message, while also can the respective nothing in communication point table of real-time update Work value, and will automatic test lead actually be sent without work value;
(5) automatic test lead receives the result data of PCS device analog end and BMS system analog end feedback, writes into test The end value item of report, and error op is done with target value, belonging in error range detects qualified, test result filling " qualification " is otherwise filled out " unqualified ", and report, which fills in finish, can be reserved for local, is had access to for tester.So as to greatly simplify The test process of grid side energy storage Monitor Process system, shortens the testing time, improves testing efficiency, has extremely strong reality Value.
The above is only a preferred embodiment of the present invention, it should be pointed out that: for the ordinary skill people of the art For member, various improvements and modifications may be made without departing from the principle of the present invention, these improvements and modifications are also answered It is considered as protection scope of the present invention.

Claims (7)

1. a kind of automatic checkout system of grid side energy storage Monitor Process control system, it is characterised in that: including following module: from Dynamic test lead, main website analog end, BMS system analog end, PCS device analog end;
The automatic test lead, for the production of test case, data processing comparison, the generation of test report, to main website simulate End issues test case, to BMS system analog end and PCS device analog end issue preset equipment initial state value and remote regulating and Remote control needs the target component and target value detected;
The main website analog end, after being instructed in the test case for receiving automatic test lead sending, according in test case The function of the operation simulation of setting issues the control of AGC specified in test case target to tested energy storage Monitor Process system and refers to It enables;To main website analog end execution result back after tested energy storage Monitor Process system operation, main website analog end is to automatic test lead Send the feedback information of implementing result;
The BMS system analog end, one or more BMS systems for simulating and emulating different type energy-accumulating power station are controlled in AGC Measurement change information during system, and it is sent to tested energy storage Monitor Process system and PCS device analog end;Start to test Before, the initial state information of each equipment in the power station being arranged in test case is sent to BMS system analog end by automatic test lead;It surveys During examination, BMS system analog end includes: to fill in real time to the BMS emulation mode information sent in tested energy storage Monitor Process system Discharge power, maximum charge-discharge electric power, soc real time information, battery cell voltage and temperature, charge and discharge control parameter, alarm letter Breath;The BMS emulation mode information that BMS system analog end is sent to PCS device analog end includes: real-time charge-discharge electric power, maximum Charge-discharge electric power, soc real time information;
The PCS device analog end starts to survey for simulating and emulating one or more PCS devices of different type energy-accumulating power station Before examination, the initial state information of each equipment in the power station being arranged in test case is sent to PCS device analog end by automatic test lead; After test starting, after tested energy storage Monitor Process system receives the AGC control instruction of main website analog end, according to predetermined policy point Solution control target, and remote regulating or remote control command are issued to all PCS device analog ends of grid side energy-accumulating power station;PCS device After analog end receives instruction, AGC control is executed according to the emulation mode information sent in the original state of itself and BMS system analog end System instruction, and the status information after analog regulation is fed back into tested energy storage Monitor Process system with telemetering or remote signalling message, And then automatic test lead is fed back to, the result of adjusting is compared automatic test lead with the target value that expectation reaches, if Test item qualification is then thought in error range, it is on the contrary then unqualified.
2. the automatic checkout system of grid side energy storage Monitor Process control system according to claim 1, it is characterised in that: Establish a communication point table for each energy-accumulating power station equipment, in communication point table table content include each equipment remote regulating, it is remote control, distant Letter, the parameter name of telemetering, parameter coding, the information body address of parameter, parameter value, parameter data type, Parameter units, parameter Minimum value and maximum value, the content of parameter of communication point table meets IEC-104 specification, and communication point table is file in xml format Storage, BMS system analog end, PCS device analog end are written and read communication point table, and the state letter of presentation device in real time Breath.
3. the automatic checkout system of grid side energy storage Monitor Process control system according to claim 1, it is characterised in that: Test case includes the file of multiple XML formats, and file content includes that test item to be tested and each test item are related to Test data, test data includes the instruction set that automatic test lead is issued by main website analog end and automatic test lead to BMS System analog end, all devices setting original state of PCS device analog end and target component and target value, test item sum number It is all stored with the format set into XML file according to parameter, automatic test lead is written and read this document, and is shown to boundary For checking and modify on face, if testing unacceptable project, can be filled in test report it is unqualified, can also by interface not Qualified test item title mark is red.
4. the automatic checkout system of grid side energy storage Monitor Process control system according to claim 1, it is characterised in that: Test report, for recording test item to be tested, testing procedure, the end value of each test item, target value and conjunction Lattice, underproof test result, target value is the value set in automatic load test use-case before program operation, and end value It is value of the Auto-writing into report at the end of each test item in actual operation.
5. the automatic checkout system of grid side energy storage Monitor Process control system according to claim 1, it is characterised in that: By the PC machine and tested energy storage monitoring where automatic test lead, main website analog end, PCS device analog end, BMS system analog end PC machine where AGC system is connected on same interchanger, and configures IEC-104 communications parameter, establishes communication connection.
6. a kind of automatic testing method of grid side energy storage Monitor Process control system, characterized by the following steps:
For the device model modeling in grid side energy-accumulating power station, comprising: PCS device, BMS system business model are built in energy-accumulating power station Mould creates communication point table, each equipment remote regulating of typing, remote control, remote signalling, telemetering on the interface at analogue simulation end for each equipment Parameter name, parameter coding ID, the information body address of parameter, parameter value, parameter data type, Parameter units, parameter most Small value and maximum value;
Main website analog end issues active and idle target instruction target word to tested energy storage Monitor Process system, and new energy power station is arranged The parameter initial state value of middle BMS system, PCS device business model, while target component is set and fills in target value;
Tested energy storage Monitor Process system receives instruction and issues remote regulating or remote control life to all devices of PCS device analog end Enable, according to etc. nargin distribution the strategy active target value of giving every PCS device to distribute, system under test (SUT) receives reactive command voltage Target of Reactive Power value is calculated according to current voltage-target and random impedance coefficient bound in target value;
PCS device analog end is arranged according to the remote control, remote regulating instruction and automatic test lead received according to all devices initial State come adjust every equipment in requisition for according to instruction come the value of the parameter adjusted, and by result pass through remote signalling, telemetering message System under test (SUT) is fed back to, while the status information of all devices after adjusting is sent by com interface by automatic test lead, and pass through Telemetering message sends the value after every inverter practical adjustments, while real-time update respectively has work value in communication point table, and will Actually there is work value to send automatic test lead;PCS analog machine according to receive remote regulating instruction by oneself be adjusted to without work value it is distant It is worth specified in transfer order, and sends the value after every inverter practical adjustments by telemetering message, while real-time update is respectively led to In news point table without work value, and actually will send automatic test lead without work value;
Automatic test lead receives the result data of PCS device analog end and BMS system analog end feedback, writes into the knot of test report Fruit value item, and error op is done with target value, belonging in error range detects qualified, test result filling " qualification ", no Then fill out " unqualified ".
7. the automatic checkout system and method for grid side energy storage Monitor Process control system according to claim 6, feature Be: the test report is saved in local.
CN201910788519.3A 2019-08-23 2019-08-23 The automatic checkout system and method for grid side energy storage Monitor Process control system Pending CN110460076A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910788519.3A CN110460076A (en) 2019-08-23 2019-08-23 The automatic checkout system and method for grid side energy storage Monitor Process control system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910788519.3A CN110460076A (en) 2019-08-23 2019-08-23 The automatic checkout system and method for grid side energy storage Monitor Process control system

Publications (1)

Publication Number Publication Date
CN110460076A true CN110460076A (en) 2019-11-15

Family

ID=68488977

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910788519.3A Pending CN110460076A (en) 2019-08-23 2019-08-23 The automatic checkout system and method for grid side energy storage Monitor Process control system

Country Status (1)

Country Link
CN (1) CN110460076A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111488687A (en) * 2020-04-14 2020-08-04 南方电网科学研究院有限责任公司 AGC test method based on RTDS real-time simulation and related device
CN112181726A (en) * 2020-09-28 2021-01-05 南京国电南自电网自动化有限公司 System and method for verifying consistency of redundant backup measurement and control and four-unified measurement and control
CN112463396A (en) * 2021-02-03 2021-03-09 树根互联技术有限公司 Parallel transmission method of pressure test data, pressure test tool and electronic equipment
CN112670986A (en) * 2020-12-23 2021-04-16 杭州意能电力技术有限公司 Energy storage station PCS simulation operation method
CN112737120A (en) * 2020-12-26 2021-04-30 中国南方电网有限责任公司 Generation method and device of regional power grid control report and computer equipment
CN113568307A (en) * 2021-07-02 2021-10-29 福建时代星云科技有限公司 Control strategy optimization method for storage and charging station and terminal
CN114185280A (en) * 2021-12-06 2022-03-15 国网湖南省电力有限公司 Energy storage power station semi-physical real-time simulation architecture building method based on embedded system

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1999031956A2 (en) * 1997-12-19 1999-07-01 Lsi Logic Corporation Automated servo gain adjustment using fourier transform
CN105207242A (en) * 2015-09-17 2015-12-30 山东大学 Optimizing control and capacity planning system and method for involving energy storage device into machine set frequency modulation
CN206559058U (en) * 2017-02-14 2017-10-13 北京清能世福科技有限公司 A kind of grid-connected Large Copacity energy-accumulating power station of synchronized motor
CN108958216A (en) * 2018-06-06 2018-12-07 南京国电南自电网自动化有限公司 The automatic checkout system and method for new energy AGC or AVC control system
CN109066810A (en) * 2018-09-12 2018-12-21 南京国电南自电网自动化有限公司 A kind of battery energy storage participates in the optimal control method and system of fired power generating unit frequency modulation
CN109066894A (en) * 2018-09-11 2018-12-21 深圳市科陆电子科技股份有限公司 Multistage SOC balance control method based on AGC frequency modulation energy-storage system

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1999031956A2 (en) * 1997-12-19 1999-07-01 Lsi Logic Corporation Automated servo gain adjustment using fourier transform
CN105207242A (en) * 2015-09-17 2015-12-30 山东大学 Optimizing control and capacity planning system and method for involving energy storage device into machine set frequency modulation
CN206559058U (en) * 2017-02-14 2017-10-13 北京清能世福科技有限公司 A kind of grid-connected Large Copacity energy-accumulating power station of synchronized motor
CN108958216A (en) * 2018-06-06 2018-12-07 南京国电南自电网自动化有限公司 The automatic checkout system and method for new energy AGC or AVC control system
CN109066894A (en) * 2018-09-11 2018-12-21 深圳市科陆电子科技股份有限公司 Multistage SOC balance control method based on AGC frequency modulation energy-storage system
CN109066810A (en) * 2018-09-12 2018-12-21 南京国电南自电网自动化有限公司 A kind of battery energy storage participates in the optimal control method and system of fired power generating unit frequency modulation

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111488687A (en) * 2020-04-14 2020-08-04 南方电网科学研究院有限责任公司 AGC test method based on RTDS real-time simulation and related device
CN111488687B (en) * 2020-04-14 2023-02-28 南方电网科学研究院有限责任公司 AGC test method based on RTDS real-time simulation and related device
CN112181726A (en) * 2020-09-28 2021-01-05 南京国电南自电网自动化有限公司 System and method for verifying consistency of redundant backup measurement and control and four-unified measurement and control
CN112181726B (en) * 2020-09-28 2023-12-19 南京国电南自电网自动化有限公司 Redundant backup measurement and control and four-unified measurement and control consistency verification test system and method
CN112670986A (en) * 2020-12-23 2021-04-16 杭州意能电力技术有限公司 Energy storage station PCS simulation operation method
CN112737120A (en) * 2020-12-26 2021-04-30 中国南方电网有限责任公司 Generation method and device of regional power grid control report and computer equipment
CN112737120B (en) * 2020-12-26 2024-03-22 中国南方电网有限责任公司 Regional power grid control report generation method and device and computer equipment
CN112463396A (en) * 2021-02-03 2021-03-09 树根互联技术有限公司 Parallel transmission method of pressure test data, pressure test tool and electronic equipment
CN112463396B (en) * 2021-02-03 2021-05-07 树根互联技术有限公司 Parallel transmission method of pressure test data, pressure test tool and electronic equipment
CN113568307A (en) * 2021-07-02 2021-10-29 福建时代星云科技有限公司 Control strategy optimization method for storage and charging station and terminal
CN114185280A (en) * 2021-12-06 2022-03-15 国网湖南省电力有限公司 Energy storage power station semi-physical real-time simulation architecture building method based on embedded system
CN114185280B (en) * 2021-12-06 2023-11-21 国网湖南省电力有限公司 Energy storage power station semi-physical real-time simulation architecture construction method based on embedded system

Similar Documents

Publication Publication Date Title
CN110460076A (en) The automatic checkout system and method for grid side energy storage Monitor Process control system
CN108958216A (en) The automatic checkout system and method for new energy AGC or AVC control system
CN101272051B (en) Information system integration method of electric network production control region and management information region
CN104239059B (en) Intelligence based on full model matches somebody with somebody the construction method of electricity consumption unified information support platform
CN101873008B (en) Method for converting SCD (Substation Configuration Description) model into dispatching center CIM (Common Information Model)
Maitra et al. Microgrid controllers: expanding their role and evaluating their performance
CN103488835B (en) The emulation platform of a kind of dispatch automated system and emulation mode thereof
CN101771581B (en) Server-side simulating system based on IEC61850 and method thereof
CN202159106U (en) Intelligent tester with intelligent power grid self-healing control technology
CN104217127B (en) A kind of PMU dynamic datas simulation-generation method
Li et al. A large-scale testbed as a virtual power grid: For closed-loop controls in research and testing
CN102209108A (en) Method and system for realizing seamless communication between master scheduling station and substation of power grid
CN107390547B (en) Active power distribution network performance test method containing micro-grid group
CN103353857B (en) The communication test method of a kind of transformer station comprehensive monitoring unit
CN112505451A (en) Mobile AGC (automatic gain control) and AVC (automatic Voltage control) function test system for offshore wind farm
CN104779658A (en) Communication management and power control simulation system of multi-type battery energy storage system
CN112799373A (en) New energy power station power control system test platform and method
CN102638101B (en) Method and device for scheduling fault recovery resource of power distribution network
Bai et al. Automatic modeling and optimization for the digital twin of a regional multi-energy system
Pratt et al. Using an advanced distribution management system test bed to evaluate the impact of model quality on volt/var optimization
Lightner Evolution of distribution: impacts on grid planning and operations [in my view]
CN116206499A (en) Power equipment scene simulation method and device for power grid maintenance training
CN208092126U (en) Energy-storage system signal acquisition device
CN112711841A (en) Micro-grid intelligent substation is innovation platform device in coordination
CN107039968B (en) A kind of distributed distribution automation hybrid simulation system based on RTDS

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20191115