CN110453784A - A kind of method of construction carrying out movable tree room suitable for the mankind - Google Patents

A kind of method of construction carrying out movable tree room suitable for the mankind Download PDF

Info

Publication number
CN110453784A
CN110453784A CN201910788953.1A CN201910788953A CN110453784A CN 110453784 A CN110453784 A CN 110453784A CN 201910788953 A CN201910788953 A CN 201910788953A CN 110453784 A CN110453784 A CN 110453784A
Authority
CN
China
Prior art keywords
plates
plate
sapling
branch
tree room
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910788953.1A
Other languages
Chinese (zh)
Inventor
储裕龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201910788953.1A priority Critical patent/CN110453784A/en
Publication of CN110453784A publication Critical patent/CN110453784A/en
Pending legal-status Critical Current

Links

Classifications

    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G17/00Cultivation of hops, vines, fruit trees, or like trees
    • A01G17/005Cultivation methods
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G7/00Botany in general
    • A01G7/06Treatment of growing trees or plants, e.g. for preventing decay of wood, for tingeing flowers or wood, for prolonging the life of plants
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/34Extraordinary structures, e.g. with suspended or cantilever parts supported by masts or tower-like structures enclosing elevators or stairs; Features relating to the elastic stability
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H3/00Buildings or groups of buildings for public or similar purposes; Institutions, e.g. infirmaries or prisons
    • E04H3/02Hotels; Motels; Coffee-houses; Restaurants; Shops; Department stores

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Biodiversity & Conservation Biology (AREA)
  • Ecology (AREA)
  • Forests & Forestry (AREA)
  • Botany (AREA)
  • Environmental Sciences (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Wood Science & Technology (AREA)
  • Cultivation Receptacles Or Flower-Pots, Or Pots For Seedlings (AREA)

Abstract

The invention discloses a kind of methods of construction that movable tree room is carried out suitable for the mankind, including the design of tree room bottom, sapling sizing, tree room bottom modeling process, it is combined especially by several saplings, the fixation form for carrying out transverse direction and longitudinal direction to sapling branch in sapling growth is grown, branch is woven into the bottom with enough bearing capacities afterwards to a certain extent to branch growth, the basic structure in tree room is formed with this.The shape for no longer relying on trees when present invention tree room is built simply, can first carry out trees large area plantation, carry out braiding production as needed after waiting branches to form, and can produce and use to heavy industrialization again while energy conservation and environmental protection.

Description

A kind of method of construction carrying out movable tree room suitable for the mankind
Technical field
The invention belongs to treescape cultivation fields, and in particular to a kind of construction side that movable tree room is carried out suitable for the mankind Method.
Background technique
Using being built based on trees, the place for being suitable for mankind's activity is formed, such design concept not only can be with It solves the problems, such as that many tourist attraction tourist season houses are difficult, can also further beautify tourist attraction, formed together New landscape.In ethnic group accumulation regions, tree room can be often seen, the construction in these tree rooms must rely on the shape of trees strut Shape is all much one shape of a room, is widely applied relatively difficult.Existing some tree rooms are all " the vacation trees combined with tree Room ", such as by the toughness of tree, built in the enterprising having sexual intercourse room of tree crown, such tree room is other than bottom is contacted with tree, remaining knot Structure is all that separately processing is built, and really tree room can not be calculated on stricti jurise, moreover, such structure is not by trees It is utilized, material is centainly handled when building in order to adapt to the shape of tree crown instead, most probably cause original Expect the waste of timber.
Summary of the invention
Goal of the invention: in view of the above-mentioned deficiencies in the prior art, it is an object of the present invention to provide a kind of suitable for mankind's carry out activity Tree room method of construction.
Technical solution: in order to achieve the above object of the invention, the present invention is specifically achieved like this: one kind be suitable for the mankind into The method of construction in the movable tree room of row, comprising the following steps:
(1) tree room bottom design: the bottom area and shape in default tree room take several points to carry out sapling on the periphery of its bottom Plantation is cultivated;
(2) sapling is formed: board group is fixed when growing to 8 ~ 10cm of diameter to sapling trunk and builds, fixed board group includes No.1 Plate, No. two plates and No. three plates, the No.1 plate are straight panel shape, the side for being fixed on sapling trunk, and No. two plates at least have One planar structure and the plate are fixed on the other side of sapling trunk, are located at sapling trunk between No.1 plate and No. two plates; No. three plates are at least to have 2 folding faces, and one of folding face and No.1 plate are parallel to each other or angle is no more than ± 10 °, separately One folding face and No. two plates are parallel to each other or angle is no more than ± 10 °, and No. three plates folding face corresponding with No.1 plate passes through Fixing bolt and No.1 plate are relatively fixed, and No. three plates folding face corresponding with No. two plates passes through fixing bolt and No. two plate phases To fixation, gap of the branch between gap, No. two plates and No. three plates between No.1 plate and No. three plates on sapling trunk into 7 fonts are integrally formed in row growth, branch;
(3) it sets the moulding of room bottom: removing fixed board group after branch is produced into required length, it will be between No. two plates and No. three plates The branch of gap cross growth is made in order, and by the way of being cross-woven, the branch of all sapling cross growths is become Arachnoid, and to a section bar is carried out at the top of sapling trunk, make to flush at the top of sapling trunk with arachnoid branch, the arachnoid being woven into Branch is the bottom for setting room, the branch of gap longitudinal growth forms the side wall in tree room between No.1 plate and No. three plates, and by side Wall trims out the channel passed through for people.
Wherein, after the completion of above-mentioned steps (3), inflation account is laid in the hemi-closure space that branch forms side wall and bottom Paulin can solve the problem of scraping of branch bring, out-of-flatness of ecosystem etc. influence human comfort.
Wherein, the fixed board group is clear sheet, and transparent resin plate or transparent Asia is selected to make every effort to overcome plate, it is ensured that The photosynthesis of branch is not interfered while carrying out shaping to branch.
The construction process in another kind tree room, above-mentioned steps (1) and step (2) process can be exchanged, after sapling sizing Bottom design is carried out again, and sapling is planted to preset by the method for turning to plant by sapling root system, sapling can in this way carried out Large area sizing plantation after again according to require relocated, on the one hand can effectively improve sapling initial stage cultivation density, The utilization rate in soil is improved, tree room is on the other hand carried out again after sapling sizing and builds the bottom area that can guarantee to set room more Precisely, the variation of tree room bottom area will not be brought by the force majeure factor that sapling generates in process of production.
Wherein, above-mentioned No.1 plate, No. two plates are plate, and No. three plates are preferably 90 ° of dog-ear of 7 font plates, institute State No.1 plate, No. two plates are fixed by the bracket respectively in the two sides of sapling trunk, No. three plates are then by fixing piece directly with one Number plate, No. two plates carry out relatively fixed.
A kind of preferred fixed form between plate: No.1 plate and No. three plates are correspondingly provided with several through-holes, run through in through-hole Equipped with threaded screw rod, the threaded screw rod between 2 plates is equipped with a pair of of location nut, and each location nut is corresponding on the outside of plate Equipped with fixture nut;Or No. two plates and No. three plates are correspondingly provided with several through-holes, run through in through-hole and are equipped with threaded screw rod, 2 plates Between threaded screw rod be equipped with a pair of of location nut, each location nut is corresponding to be equipped with fixture nut on the outside of plate.In this way After securing plate, branch is grown along fixed channel, so that its shape meets the requirement that the present invention designs, and due to Branch production has certain gap, thus while threaded screw rod is applied between 2 blocks of plates, it will not influence branch just It is frequently grown.
Further, the spacing between 2 location nuts is not less than 5cm.
Wherein, above-mentioned branch, which is woven into behind spider web bottom, is laid with the clear sheet of one layer of 3 ~ 8cm as substrate on its surface, People can be improved and carry out movable stability above.
Wherein, sapling trunk height is controlled in 1.8 ~ 2.0m in the step (3);If tree seedling excessive height can interfere to set The sight of crowd within doors, influences use feeling.
The utility model has the advantages that the present invention, compared with traditional technology, there are following advantages:
(1) present invention carries out artificial model, so that branch is grown into satisfactory 7 font, and to lateral life in arboreal growth Long branch carries out weaving to make it have certain bearing capacity, and overall procedure does not need exterior material and built, i.e., It is environmentally friendly and ecological, meet the requirement of national energy conservation and emission reduction;
(2) shape for no longer relying on trees when present invention tree room is built simply, can first carry out trees large area plantation, wait branches Braiding production is carried out after molding as needed, can be produced and used to heavy industrialization again while energy conservation and environmental protection;
(3) in overall procedure of the present invention by be all nature growth trees, do not need in addition to use material especially timber And chemical binder, entire room of setting is the ecological woodlot completely lived, and not only beauty can also persistently play Greening functions;
(4) tree room provided by the invention usable floor area is big, and can according to need and be combined more saplings, compared to general Traditional tree room manufacturing method (such as anchoring base around trunk), the mankind in active procedure by place limiting factor more It is small.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of sapling branch of the present invention sizing;
Fig. 2 is the cross-sectional view of compoboard of the present invention;
Fig. 3 builds mode for the specific tree room of one kind of the invention.
Specific embodiment
Embodiment 1:
The method of construction in movable tree room is carried out suitable for the mankind, comprising the following steps:
(1) tree room bottom design: the bottom area and shape in default tree room take several points to carry out sapling on the periphery of its bottom Plantation is cultivated;
(2) sapling is formed: board group is fixed when growing to 8 ~ 10cm of diameter to sapling trunk and builds, fixed board group is transparent Plate selects transparent resin plate or transparent Asia to make every effort to overcome plate, and fixed board group includes No.1 plate, No. two plates and No. three plates, the No.1 Plate is straight panel shape, the side for being fixed on sapling trunk, and No. two plates at least have a planar structure and the plate is fixed on The other side of sapling trunk is located at sapling trunk between No.1 plate and No. two plates;No. three plates are at least to have 2 foldings Face, one of folding face and No.1 plate are parallel to each other or angle is no more than ± 10 °, another folding face and No. two plates be parallel to each other or Angle is not more than ± 10 °, and No. three plates folding face corresponding with No.1 plate passes through fixing bolt and No.1 plate is relatively fixed, institute It is relatively fixed by fixing bolt and No. two plates to state No. three plates folding face corresponding with No. two plates, the branch on sapling trunk is along one The gap between gap, No. two plates and No. three plates number between plate and No. three plates is grown, and 7 fonts are integrally formed in branch;
(3) it sets the moulding of room bottom: removing fixed board group, the branch of the gap cross growth between No. two plates and No. three plates is carried out It makes in order, and by the way of being cross-woven, the branch of all sapling cross growths is become into arachnoid, and to sapling trunk top It carries out cutting bar, makes to flush at the top of sapling trunk with arachnoid branch, the arachnoid branch being woven into is the bottom for setting room, along No.1 The branch of gap longitudinal growth between plate and No. three plates forms the side wall in tree room, and side wall is trimmed out and is led to for what people passed through Road, the control of sapling trunk height are advisable in 1.8 ~ 2.0m.
After the completion of setting the moulding of room bottom, it can come in the clear sheet that bottom surface is laid with one layer of 3 ~ 8cm as substrate Bottom surface flatness is improved, air dome can also be laid in the hemi-closure space that branch forms side wall and bottom.
Embodiment 2:
Reference implementation example 1 can also exchange step (1) and step (2) process, carry out bottom design again after sapling sizing, Sapling is planted to preset by the method for turning to plant by sapling root system, can make sapling after carrying out large area sizing plantation in this way Again according to requiring to be relocated, it on the one hand can effectively improve the cultivation density at sapling initial stage, improve the utilization rate in soil, On the other hand carrying out the construction of tree room again after sapling sizing can guarantee that the bottom area for setting room is more accurate, will not be existed by sapling The force majeure factor generated in production process brings the variation of tree room bottom area.
Embodiment 3:
As shown in Figure 1, 2, in sapling type-approval process, sapling trunk side is fixed with No.1 plate 1, and the sapling trunk other side is fixed with No. two plates 2,1, No. two plate 2 of the No.1 plate is straight panel, and the corresponding top of No. two plates 2 is equipped with 7 fonts have folding face three Number plate 3,3 one faces of No. three plates are parallel with No.1 plate 1, another face is parallel with No. two plates 2;No.1 plate 1 is corresponding with No. three plates 3 to be set There are several through-holes, the threaded screw rod 4 being equipped between 4,2 plate of threaded screw rod is run through in through-hole and is equipped with a pair of of location nut 5, often The corresponding combination equipped with No. bis- plates of fixture nut 6(and No. three plates on the outside of plate of a location nut 5 is same), into one Preferably, the spacing between 2 location nuts is not less than 5cm to step.On the one hand location nut effect is to fix adjacent 2 pieces Plate, on the other hand to control the spacing between adjacent 2 blocks of plate, to meet the requirement of branch growth;The effect of location nut It is more the fixation to plate.
Embodiment 5:
As shown in figure 3, a kind of method of construction for carrying out movable tree room suitable for the mankind disclosed by the invention, 12 saplings are divided into 3 rows, every row 4, spacing is equal between every row and the adjacent sapling of each column, when sapling trunk grows to diameter 8cm or more, tree Branch is provided with certain bearing capacity, carries out fixed board group as described in Example 1 at this time and is built, to branch along fixed board group It grows to (1/2 or more of adjacent 2 sapling spacing) after required length, removes fixed board group, it will by the way of interlacing Adjacent sapling branch is woven, and an arachnoid bottom with receiving human weight and life activity article is eventually formed Portion.

Claims (10)

1. a kind of method of construction for carrying out movable tree room suitable for the mankind, which comprises the following steps:
(1) tree room bottom design: the bottom area and shape in default tree room take several points to carry out sapling on the periphery of its bottom Plantation is cultivated;
(2) sapling is formed: board group is fixed when growing to 8 ~ 10cm to sapling trunk and builds, fixed board group include No.1 plate, No. two plates and No. three plates, the No.1 plate are straight panel shape, the side for being fixed on sapling trunk, and No. two plates at least have one Planar structure and the plate are fixed on the other side of sapling trunk, are located at sapling trunk between No.1 plate and No. two plates;It is described No. three plates are at least to have 2 folding faces, and one of folding face and No.1 plate are parallel to each other or angle is no more than ± 10 °, another Folding face and No. two plates are parallel to each other or angle is no more than ± 10 °, and No. three plates folding face corresponding with No.1 plate passes through fixation Bolt and No.1 plate are relatively fixed, and No. three plates folding face corresponding with No. two plates is relatively solid by fixing bolt and No. two plates Fixed, gap of the branch between gap, No. two plates and No. three plates between No.1 plate and No. three plates on sapling trunk is given birth to Long, 7 fonts are integrally formed in branch;
(3) it sets the moulding of room bottom: removing fixed board group, the branch of the gap cross growth between No. two plates and No. three plates is carried out It makes in order, and by the way of being cross-woven, the branch of all sapling cross growths is become into arachnoid, and to sapling trunk top It carries out cutting bar, makes to flush at the top of sapling trunk with arachnoid branch, the arachnoid branch that bottom is woven into is bottom, the edge for setting room The branch of gap longitudinal growth between No.1 plate and No. three plates forms the side wall in tree room, and side wall is trimmed out and is passed through for people Channel.
2. the method for construction according to claim 1 for carrying out movable tree room suitable for the mankind, which is characterized in that the step (3) after the completion of, air dome is laid in the hemi-closure space that branch forms side wall and bottom.
3. the method for construction according to claim 1 for carrying out movable tree room suitable for the mankind, which is characterized in that the fixation Board group is clear sheet, and transparent resin plate or transparent Asia is selected to make every effort to overcome plate.
4. the method for construction according to claim 1 for carrying out movable tree room suitable for the mankind, which is characterized in that the step (1) it is exchanged with step (2) process, carries out bottom design again after sapling sizing, will set by the way that sapling root system is turned the method planted Seedling is planted to preset.
5. the method for construction according to claim 1 for carrying out movable tree room suitable for the mankind, which is characterized in that the No.1 Plate, No. two plates are plate, and the 7 font plates that No. three plates are 90 ° of dog-ear, the No.1 plate, No. two plates pass through branch respectively Frame is fixed on the two sides of sapling trunk.
6. the method for construction according to claim 1 for carrying out movable tree room suitable for the mankind, which is characterized in that the No.1 Plate and No. three plates are correspondingly provided with several through-holes, run through in through-hole and are equipped with threaded screw rod, and the threaded screw rod between 2 plates is equipped with one To location nut, each location nut is corresponding to be equipped with fixture nut on the outside of plate.
7. the method for construction according to claim 1 for carrying out movable tree room suitable for the mankind, which is characterized in that described No. two Plate and No. three plates are correspondingly provided with several through-holes, run through in through-hole and are equipped with threaded screw rod, and the threaded screw rod between 2 plates is equipped with one To location nut, each location nut is corresponding to be equipped with fixture nut on the outside of plate.
8. the method for construction according to claim 6 or 7 for carrying out movable tree room suitable for the mankind, which is characterized in that described 2 Spacing between a location nut is not less than 5cm.
9. the method for construction according to claim 1 or 2 for carrying out movable tree room suitable for the mankind, which is characterized in that described Branch is woven into behind spider web bottom and is laid with the clear sheet of one layer of 3 ~ 8cm as substrate on its surface.
10. the method for construction according to claim 1 for carrying out movable tree room suitable for the mankind, which is characterized in that the step Suddenly sapling trunk height is controlled in 1.8 ~ 2.0m in (3).
CN201910788953.1A 2019-08-26 2019-08-26 A kind of method of construction carrying out movable tree room suitable for the mankind Pending CN110453784A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910788953.1A CN110453784A (en) 2019-08-26 2019-08-26 A kind of method of construction carrying out movable tree room suitable for the mankind

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910788953.1A CN110453784A (en) 2019-08-26 2019-08-26 A kind of method of construction carrying out movable tree room suitable for the mankind

Publications (1)

Publication Number Publication Date
CN110453784A true CN110453784A (en) 2019-11-15

Family

ID=68489075

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910788953.1A Pending CN110453784A (en) 2019-08-26 2019-08-26 A kind of method of construction carrying out movable tree room suitable for the mankind

Country Status (1)

Country Link
CN (1) CN110453784A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114051876A (en) * 2020-07-29 2022-02-18 杨怀胜 Tree house structure and construction method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200186540Y1 (en) * 2000-02-02 2000-06-15 허만철 Weaving silver foil using for fruit precociousness
CN101457547A (en) * 2009-01-06 2009-06-17 张木金 Artificial cultivated ecological house and method for manufacturing same
CN102823448B (en) * 2012-08-20 2014-10-29 蒋兴志 Fixing forming device for making live tree plates
CN105475075A (en) * 2015-12-15 2016-04-13 河北省林业科学研究院 Living plant house modeling method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200186540Y1 (en) * 2000-02-02 2000-06-15 허만철 Weaving silver foil using for fruit precociousness
CN101457547A (en) * 2009-01-06 2009-06-17 张木金 Artificial cultivated ecological house and method for manufacturing same
CN102823448B (en) * 2012-08-20 2014-10-29 蒋兴志 Fixing forming device for making live tree plates
CN105475075A (en) * 2015-12-15 2016-04-13 河北省林业科学研究院 Living plant house modeling method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114051876A (en) * 2020-07-29 2022-02-18 杨怀胜 Tree house structure and construction method

Similar Documents

Publication Publication Date Title
CN100526234C (en) Method for treating eutrophication water body by waterborne cultivated plant
CN201928763U (en) Intergrowth culturing column for rubber tree and dendrobe
CN1952324A (en) Ecological farmyard with room and sunlight greenhouse
CN202153896U (en) Three-dimensional green plant wall culture medium box
CN110453784A (en) A kind of method of construction carrying out movable tree room suitable for the mankind
CN204225375U (en) A kind of roof garden structure
CN2515312Y (en) Three-dimensional planting wall
CN204968759U (en) Iris stereoscopic cultivate frame
CN104585008B (en) The planting unit of a kind of water plant and method
CN206413466U (en) A kind of three-dimensional greening plant wall
CN207854566U (en) A kind of anti-miscellany plant protection layer structure of lake bank green vegetation
CN102113444A (en) Method for manufacturing plant polymer
CN204392951U (en) The planting unit of a kind of water plants
CN204929778U (en) Free modular flowerpot
CN211580818U (en) Special-shaped tree pit based on regional wind rose diagram
CN204070036U (en) A kind of water surface soilless culture flotation gear adopting ceiling
CN207075285U (en) A kind of multifunctional basin device available for office partition
CN101828513B (en) Indoor large-tree-shaped air flower water culture machine
CN206744030U (en) It is a kind of can gravity-flow ventilation and the good vegetable cultivation seedling rearing room of daylighting
CN206547431U (en) A kind of urban architecture landscape ecology afforestation equipment
CN204743478U (en) Wood pergola
CN201634984U (en) Access road brick
CN212138658U (en) Nursery stock cultivation is cultivated and is used fixing device
CN211185988U (en) Artificial landscape tree
CN210137698U (en) Moss wall greening module and modular moss wall

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20191115