CN110453726A - A kind of constructing device that overlength reinforced concrete floor is levelling and method - Google Patents

A kind of constructing device that overlength reinforced concrete floor is levelling and method Download PDF

Info

Publication number
CN110453726A
CN110453726A CN201910663094.3A CN201910663094A CN110453726A CN 110453726 A CN110453726 A CN 110453726A CN 201910663094 A CN201910663094 A CN 201910663094A CN 110453726 A CN110453726 A CN 110453726A
Authority
CN
China
Prior art keywords
bottom plate
support
track
angle bar
levelling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910663094.3A
Other languages
Chinese (zh)
Other versions
CN110453726B (en
Inventor
冯丽花
赵宪永
秦建涛
张彦芳
张国芳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HEBEI NO2 BUILDING ENGINEERING Co Ltd
Original Assignee
HEBEI NO2 BUILDING ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HEBEI NO2 BUILDING ENGINEERING Co Ltd filed Critical HEBEI NO2 BUILDING ENGINEERING Co Ltd
Priority to CN201910663094.3A priority Critical patent/CN110453726B/en
Publication of CN110453726A publication Critical patent/CN110453726A/en
Application granted granted Critical
Publication of CN110453726B publication Critical patent/CN110453726B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D21/00Separation of suspended solid particles from liquids by sedimentation
    • B01D21/02Settling tanks with single outlets for the separated liquid
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D15/00Handling building or like materials for hydraulic engineering or foundations
    • E02D15/02Handling of bulk concrete specially for foundation or hydraulic engineering purposes
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/045Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/02Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against ground humidity or ground water

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Mining & Mineral Resources (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Civil Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Hydrology & Water Resources (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The invention discloses a kind of constructing device that overlength reinforced concrete floor is levelling and methods, it is related to technical field of building construction, including bottom plate top bars multiple groups horizontally disposed bottom plate lower layer reinforcing bar and be arranged in right above bottom plate lower layer reinforcing bar, vertical support, support upper end is higher by bottom plate top bars, the vertical bar dowel of one be fixed with by support and support form a mounting groove, and the top angle bar track concordant with the backplate surface poured in advance is fixed in mounting groove;The bottom plate surrounding poured in advance is provided with a circle guide wall form board and the positioning device for fixing guide wall form board, the darby with the cooperation of angle bar track.It is laid with bottom plate lower layer reinforcing bar and bottom plate top bars first and leads wall reinforcing bar and supporting guide wall form board, it is levelling along the progress of inbuilt angle bar track using darby.The invention enables bottom plate one-pass molding, prevents and lead wall bottom without concrete accumulation and the generation of unevenness phenomenon, avoid later period repairing, increase mud scraper service life.

Description

A kind of constructing device that overlength reinforced concrete floor is levelling and method
Technical field
The present invention relates to technical field of building construction, reinforced concrete floor is levelling in especially a kind of building construction process Construction method.
Background technique
With the progress of project of South-to-North water diversion, to protect groundwater resources, the construction of earth's surface water factory is more and more, after building up Requirement it is more and more.Main units of the horizontal sedimentation tank as earth's surface water factory, because its bottom need to install mud scraper, the bottom of to The far super general norm requirement of the absolute altitude and flatness requirement of plate, and mud scraper installation is wanted close to wall is led to wall bottom flatness is led Sample of seeking common ground is higher.Traditional levelling mode is upper flat absolute altitude control line to be popped up on surrounding wall, column, then draw horizontal line to smear by line and look for Flat pier after determining levelness, then is poured concrete and is struck off using level.But the levelling mode work progress is cumbersome, causes to construct Low efficiency.Survey crew's whole process is relied only in construction using instrument controlling, enchancement factor is larger, and encounters concreting night Between construct etc. unfavorable conditions, it is even more impossible to guarantee for construction quality.Existing levelling technology not can guarantee bottom plate one-pass molding, will cause and leads Wall bottom is accumulated without concrete and unevenness phenomenon, needs the later period to repair, reduces the service life of equipment, increases phase maintenance Expense.
Summary of the invention
The technical problem to be solved by the invention is to provide a kind of constructing device that overlength reinforced concrete floor is levelling and Method, so that bottom plate one-pass molding, prevention leads wall bottom without concrete accumulation and the generation of unevenness phenomenon, and the later period is avoided to repair It mends, increases mud scraper service life, reduce late maintenance cost.
In order to solve the above technical problems, the technical scheme adopted by the invention is that:
A kind of constructing device that overlength reinforced concrete floor is levelling, including the horizontally disposed bottom plate lower layer reinforcing bar of multiple groups and setting Bottom plate top bars right above bottom plate lower layer reinforcing bar, support are welded on bottom plate lower layer reinforcing bar and bottom plate top bars, are erected Straight support upper end is higher by bottom plate top bars, and a vertical bar dowel and support is fixed with by support and bar dowel forms one A mounting groove is fixed with the top angle bar track concordant with the backplate surface poured in advance in mounting groove;The bottom plate surrounding poured in advance It is provided with a circle guide wall form board and the positioning device for fixing guide wall form board, further includes the darby with the cooperation of angle bar track.
Technical solution of the present invention further improvement lies in that: positioning device includes outer flitch on the outside of guide wall form board and leads Interior flitch on the inside of wall form, the interior flitch bottom are higher than the backplate surface 30mm poured in advance.
Technical solution of the present invention further improvement lies in that: the angle bar track is having a size of 25 × 25 × 3 × 4000mm, angle Rail road is horizontal positioned, and one of right-angle side is vertically upward.
A kind of construction method that overlength reinforced concrete floor is levelling, first laying bottom plate lower layer reinforcing bar and bottom plate upper layer steel Muscle and wall reinforcing bar and supporting guide wall form board are led, is carried out using darby along inbuilt angle bar track levelling.
Construction method technical solution of the present invention further improvement lies in that: specifically includes the following steps:
A, guide wall form board installs
Bottom plate and after the completion of leading wall reinforcement installation, installs guide wall form board in the bottom plate surrounding poured in advance, guide wall form board includes outside Long guide wall form board and one, interval being arranged in long guide wall form board lead the short-range missile wall form of wall thickness, long guide wall form board with It is contour at the top of short-range missile wall form;
B, support is welded
It is laid with bottom plate lower layer reinforcing bar and bottom plate top bars and support is welded on bottom plate lower layer reinforcing bar and bottom plate top bars, The top of support is higher than bottom plate top bars;
C, welding short steel rod
Bar dowel is welded on to support top half vertically, bond pad locations are set on the bottom plate at layer reinforcing bar height, support and short steel The distance between muscle is matched with the one-sided thickness of angle bar track;
D, levelling track is installed
By in the gap between one of angle bar track unilateral insertion support and bar dowel, contact angle rail road at the top of bar dowel The unilateral plane in inside is fixed at every angle bar track both ends with bottom plate top bars by tying up silk;
E, casting concrete and levelling
Along angle bar parallel track direction casting concrete, darby is placed on angle bar track and along angle bar track after the completion of pouring It pushes darby to strike off concrete, is smeared after striking off using wood levelling;After underplate concrete pours 2~3h hours, carry out leading wall portion Position concrete pours;
F, track is taken out
The silk of tying up that angle bar track both ends are cut off before concrete initial set, takes out angle bar track;
G, secondary levelling press polish
Catch up with optical pressure real with plasterer's trowel or electronic calender, and implement before concrete final set it is secondary catch up with optical pressure real, it is secondary to catch up with optical pressure Undesirable place is carried out to smear pressure during real.
Construction method of the present invention further improvement lies in that: in the step c before welding short steel rod determine bar dowel at the top of Absolute altitude at the top of absolute altitude and the bottom plate poured in advance, it is unilateral according to the absolute altitude at the top of bar dowel elevation of top=bottom plate-angle bar track Thickness.
Construction method of the present invention further improvement lies in that: in the step c before welding short steel rod determine bar dowel at the top of Absolute altitude at the top of absolute altitude and the bottom plate poured in advance, it is unilateral according to the absolute altitude at the top of bar dowel elevation of top=bottom plate-angle bar track Thickness.
Construction method of the present invention further improvement lies in that: to every angle bar track before step e casting concrete Top mark height re-starts measurement, is adjusted to undesirable angle bar track.
Construction method of the present invention further improvement lies in that: worn in guide wall form board and connect steel plate for sealing water, steel plate for sealing water setting Above the bottom plate bottom surface at 500mm.
Construction method of the present invention further improvement lies in that: the spacing in adjacent angular rail road be 1900mm, the length of darby For 2000mm.
Construction method of the present invention further improvement lies in that: the support elongation rail road both ends at single angle bar track both ends Distance is 500mm, sets 1500mm for spacing between remaining support.
By adopting the above-described technical solution, the technological progress achieved by the present invention is:
The invention enables bottom plate one-pass moldings, reduce backplate surface elevation and flatness deviation, prevent and lead wall bottom without coagulation The generation of mound product and unevenness phenomenon avoids later period repairing, increases mud scraper service life, reduce later maintenance expense With.
To lead wall hang mould position template bottom it is fixed in flitch or steel pipe be improved upwards 30mm, ensure that bottom it is fixed in wood Side or the iron pipe as frame pipe in turn ensure that trowel is able to enter interior flitch or iron pipe bottom to the reinforcement effect for hanging mould position template Portion, it is ensured that the deviation of this position cast-in-place structural size is met the requirements.
The size of track is 25 × 25 × 3 × 4000mm, provides the unilateral of enough width, can both be inserted into and stitch in track Enough supports are provided for track when in gap, avoid waste material.Interorbital is slightly less than common 2000mm and scrapes away from for 1900mm The length of thick stick, in order to darby leveling operations.
Support bottom end is welded on bottom plate lower layer reinforcing bar, and top is welded on bottom plate top bars, and the top of support is higher than Bottom plate top bars prevent from causing leakage passage.Rationally provided with the spacing between support, guarantee the same of the support effect of support When reduce support number, reduce the waste of material, so that the support at track both ends is more, compensate for track both ends coagulation The less disadvantage of constraint of the soil for support.
Repetition measurement is carried out with 800mm distance measurement point in step e, length direction respectively measures point height difference and guarantees in 8mm range It is interior, guarantee each size in error range, track level measuring need to be adjusted, it is therefore prevented that track in height unstable avoids Track inclination is uneven.
The spacing of the support at the bottom plate lower layer reinforcing bar both ends support nearest with it is set as 500mm, by remaining support it Between spacing be set as 1500mm, ensure that the rigidity of the support at bottom plate lower layer reinforcing bar both ends, prevent its unstability or bending, reduce The density of the support in middle position reduces the waste of material.
Detailed description of the invention
Fig. 1 is guide wall form board structural schematic diagram of the invention;
Fig. 2 is support structural schematic diagram of the invention;
Fig. 3 is rail support structures schematic diagram of the invention;
Fig. 4 is that track of the invention lays floor map;
Wherein, 1, outer flitch, 1a, long guide wall form board, 1b, short-range missile wall form, 2, interior flitch, 3, steel pipe, 4, bottom plate, 5, lead wall, 6, steel plate for sealing water, 7, water stopping type split bolt, 8, angle bar track, 9, support, 10, bar dowel, 11, bottom plate lower layer reinforcing bar, 12, bottom Plate top bars, 13, solder joint, 14, at base top absolute altitude, 15, darby.
Specific embodiment
The present invention is described in further details below with reference to embodiment:
As shown in Figure 1, Figure 2, Figure 3, Figure 4, a kind of constructing device that overlength reinforced concrete floor is levelling, including multiple groups level are set The bottom plate lower layer reinforcing bar 11 set and the bottom plate top bars 12 being arranged in right above bottom plate lower layer reinforcing bar 11, bottom plate lower layer reinforcing bar 11 It being connected with bottom plate top bars 12 by vertical support 9, vertical 9 bottom of support is welded on bottom plate lower layer reinforcing bar 11, on Portion is welded to bottom plate top bars 12, it is characterised in that: vertical 9 upper end of support is higher by bottom plate top bars 12, consolidates by support 9 There is a vertical bar dowel 10 and support 9 and bar dowel 10 to form a mounting groove surely, be fixed in mounting groove top with it is pre- The concordant angle bar track 8 of the backplate surface poured;The bottom plate surrounding poured in advance is provided with a circle guide wall form board and for fixing The positioning device of guide wall form board, guide wall form board include that the short-range missile wall of wall thickness is led at one, the interval of long guide wall form board 1a and inside It is provided with outer flitch 1 on the outside of template 1b, long guide wall form board 1a, is provided with interior flitch 2 and steel pipe 3 on the outside of short-range missile wall form 1b;Also Including the darby 15 cooperated with angle bar track 8.
2 bottom of interior flitch is higher than the backplate surface 30mm poured in advance.The angle bar track 8 is having a size of 25 × 25 × 3 × 4000mm, angle bar track 8 is horizontal positioned, and one of right-angle side is upward.
As shown in Figure 1, Figure 2, Figure 3, Figure 4, a kind of construction method digital power amplifier that overlength reinforced concrete floor is levelling, it is first It is first laid with bottom plate lower layer reinforcing bar 11 and bottom plate top bars 12 and leads wall reinforcing bar, and supporting guide wall form board, established angle rail road 8 After-pouring bottom plate and wall is led, is carried out using darby 15 along inbuilt angle bar track 8 levelling.It is by the way that angle bar track 8 is rationally arranged Darby 15 is oriented to, and is that one kind requires floor level in installation device procedures and flatness is more than specification to reduce levelling difficulty It is required that the levelling construction method of reinforced concrete floor, comprising the following steps:
A, guide wall form board installs
Guide wall form board is installed in the bottom plate surrounding poured in advance, guide wall form board includes the long guide wall form board 1a in outside and is arranged in length Lead top short-range missile wall form 1b, long guide wall form board 1a and short-range missile wall form 1b of wall thickness etc. in one, interval in guide wall form board 1a It is high.The place 500mm above 4 bottom surface of bottom plate of the construction joint setting between wall and bottom plate, the setting steel plate for sealing water at construction joint will be led 6, it leads construction joint is below 5 part of wall and is poured together with bottom plate 4, the guide wall form board of this part uses hoisting die construction, before construction It is by water stopping type split bolt 7 that interior flitch 2 and steel pipe 3 is fixed using interior flitch 2 and the fixed template hung at mould of steel pipe 3, it is interior Minimum distance between the bottom and bottom plate 4 of flitch 2 is 30mm, and minimum distance is between the bottom and bottom plate 4 of interior flitch 2 at this time Vertical range.
B, support is welded
It is horizontally disposed with the multipair bottom plate lower layer reinforcing bar 11 being parallel to each other and the multipair bottom plate top bars 12 being parallel to each other;By more Vertical 9 bottom end of support is welded on bottom plate lower layer reinforcing bar 11, and support 9 uses reinforcing bar clout, diameter 12mm or so, top welding On bottom plate top bars 12, the top of support 9 is higher than bottom plate top bars 12, and 9 lower end of support is no more than bottom plate lower layer at this time The upper end of the bottom of reinforcing bar 11, support 9 must not be higher than base top absolute altitude 14, prevent from causing leakage passage;Single angle bar track two The distance at the support elongation rail road both ends at end is 500mm, sets 1500mm for spacing between remaining support.
C, welding short steel rod
10 elevation of top of bar dowel is measured, One-sided Widths of the measurement as the equal angle iron of angle bar track 8 measure base top absolute altitude The absolute altitude at place 14;The size of the angle bar track 8 is 25 × 25 × 3 × 4000mm, and the spacing in pair of horns rail road 8 is 1900mm adjusts the top mark of bar dowel 10 according to 10 elevation of top of bar dowel=base top absolute altitude -8 One-sided Widths of angle bar track Height, the length for choosing bar dowel 10 is 100mm, bar dowel 10 is welded on 9 top half of support vertically, by 10 spot welding of bar dowel In in support 9, the position of solder joint 13 is also convenient for established angle rail road 8, solder joint 13 near bottom plate top bars 12, convenient for operation Lower than the top at 9 top and bar dowel 10 of support, the one-sided thickness of the distance between support 9 and bar dowel 10 and angle bar track 8 It matches, forms gap between support 9 and bar dowel 10, the trend or extending direction in this gap can be with bottom plate top bars 12 is parallel, can also be perpendicular with bottom plate top bars 12;Because angle bar track 8 is 4000mm long, every 8 bottom of angle bar track is set Three supports 9 are set, away from a support 9 is set at every 8 both ends 500mm of angle bar track, middle position is arranged a support, such as holds Angle bar track 8 length in portion's is less than or equal to 2500mm, and support 9 only is arranged at 8 both ends of angle bar track.
D, levelling track is installed
By in the gap between one of angle bar track 8 unilateral insertion support 9 and bar dowel 10, angle bar is contacted at the top of bar dowel 10 The unilateral plane in the inside of track 8, is influenced by the gap between support 9 and bar dowel 10, angle bar track 8 can on bottom plate Layer reinforcing bar 12 is parallel, can also be perpendicular with bottom plate top bars 12, just when track 1 is parallel with bottom plate top bars 12 In gap between the unilateral insertion support 9 and bar dowel 10 by track 1, when track 1 is vertical with bottom plate top bars 12, Need to adjust the position of each solder joint 13, so that the solder joint on different bottom plate top bars 12 is located on the same line, and this Straight line is parallel with track 1, need to guarantee the straightness of solder joint 13;By tying up silk for every 8 both ends of angle bar track and bottom plate upper layer Reinforcing bar 12 is fixed.
E, casting concrete and levelling
Measurement is re-started to the top mark height of every angle bar track 8, undesirable angle bar track 8 is adjusted;At angle Measurement point is divided on rail road 8, measurement point is divided with every 800mm spacing, and diagonal rail road 8 carries out repetition measurement, length direction is each The limits of error for measuring point height are 8mm, and the limits of error that point height is respectively measured in width direction are 3mm, measurement Such as measured value is more than error afterwards, then 8 absolute altitude of adjusting angle rail road;Survey crew when repetition measurement personnel must not be to lay track.
Along 8 parallel direction casting concrete of angle bar track, it is concordant with the top edge of angle bar track 8 to pour height, selection The length of darby 15 is 2000mm, and 15 material of darby is aluminium alloy, and darby 15 is placed on angle bar track 8 and along angle bar track 8 promotion darbys 15 strike off concrete, are smeared after striking off using wood levelling;After when 4 2~3h of concreting of bottom plate is small at the beginning of concrete Before solidifying, carry out leading pouring for 5 position concrete of wall.
F, track is taken out
The silk of tying up that 8 both ends of angle bar track are cut off before concrete initial set, takes out angle bar track 8, and taking advantage of concrete, initial set is not filled out at this time Lift the gap between support 9 and bar dowel 10;It is Ke Xunhuanliyong to tie up silk, at most uses 3 times, as found angle bar angle bar rail in use Road 8, which deforms, to be replaced, and forbid to trample on the angle bar angle bar track 8 arranged.
G, secondary levelling press polish
Catch up with optical pressure real with plasterer's trowel or electronic calender, and implement before concrete final set it is secondary catch up with optical pressure real, it is secondary to catch up with optical pressure It requires to measure surface smoothness and absolute altitude in press polish during real, it is secondary to catch up with optical pressure is real to carry out in the process to undesirable place Pressure is smeared, to reduce flatness and vertical error.

Claims (10)

1. a kind of constructing device that overlength reinforced concrete floor is levelling, including the horizontally disposed bottom plate lower layer reinforcing bar (11) of multiple groups With the bottom plate top bars (12) being arranged right above bottom plate lower layer reinforcing bar (11), vertical support (9) is welded to bottom plate lower layer On reinforcing bar (11) and bottom plate top bars (12), it is characterised in that: support (9) upper end is higher by bottom plate top bars (12), support (9) it is fixed with a vertical bar dowel (10) and support (9) by and bar dowel (10) form a mounting groove, consolidates in mounting groove Surely the angle bar track (8) for having top concordant with the backplate surface poured in advance;The bottom plate surrounding poured in advance is provided with a circle and leads wall mould Plate and positioning device for fixing guide wall form board further include the darby (15) with angle bar track (8) cooperation.
2. a kind of construction method that overlength reinforced concrete floor is levelling according to claim 1, it is characterised in that: positioning Device includes the outer flitch (1) on the outside of guide wall form board and the interior flitch (2) on the inside of guide wall form board, interior flitch (2) bottom Higher than the backplate surface 30mm poured in advance.
3. a kind of construction method that overlength reinforced concrete floor is levelling according to claim 1, it is characterised in that: described Angle bar track (8) is having a size of 25 × 25 × 3 × 4000mm, and angle bar track (8) is horizontal positioned, one of vertical court of right-angle side On.
4. a kind of construction method that overlength reinforced concrete floor is levelling according to claim 1, it is characterised in that: first It is laid with bottom plate lower layer reinforcing bar (11) and bottom plate top bars (12) and leads wall reinforcing bar and supporting guide wall form board, use darby (15) It is carried out along inbuilt angle bar track (8) levelling.
5. a kind of construction method that overlength reinforced concrete floor is levelling according to claim 4, it is characterised in that:
Specifically includes the following steps:
A, guide wall form board installs
Bottom plate and after the completion of leading wall reinforcement installation, installs guide wall form board in the bottom plate surrounding poured in advance, guide wall form board includes outside Long guide wall form board (1a) and the short-range missile wall form (1b) that wall thickness is led at one, interval in long guide wall form board (1a) is set, Long guide wall form board (1a) and short-range missile wall form (1b) top are contour;
B, support is welded
Be laid with bottom plate lower layer reinforcing bar (11) and bottom plate top bars (12) and by support (9) be welded to bottom plate lower layer reinforcing bar (11) and On bottom plate top bars (12), the top of support (9) is higher than bottom plate top bars (12);
C, welding short steel rod
Bar dowel (10) is welded on support (9) top half vertically, bond pad locations are set on the bottom plate at a layer reinforcing bar (12) height, The distance between support (9) and bar dowel (10) are matched with the one-sided thickness of angle bar track (8);
D, levelling track is installed
By in the gap between one of angle bar track (8) unilateral insertion support (9) and bar dowel (10), at the top of bar dowel (10) The unilateral plane in inside in contact angle rail road (8), by tying up silk for every angle bar track (8) both ends and bottom plate top bars (12) It is fixed;
E, casting concrete and levelling
Along angle bar track (8) parallel direction casting concrete, darby (15) is placed on angle bar track (8) simultaneously after the completion of pouring It pushes darby (15) to strike off concrete along angle bar track (8), is smeared after striking off using wood levelling;Bottom plate (4) concreting 2~ After 3h hours, carry out leading pouring for wall (5) position concrete;
F, track is taken out
The silk of tying up that angle bar track (8) both ends are cut off before concrete initial set, takes out angle bar track (8);
G, secondary levelling press polish
Catch up with optical pressure real with plasterer's trowel or electronic calender, and implement before concrete final set it is secondary catch up with optical pressure real, it is secondary to catch up with optical pressure Undesirable place is carried out to smear pressure during real.
6. a kind of construction method that overlength reinforced concrete floor is levelling according to claim 5, it is characterised in that: described The absolute altitude of (14) at the top of bar dowel (10) elevation of top and the bottom plate poured in advance is determined in step c before welding short steel rod (10), According to the absolute altitude at the top of bar dowel (10) elevation of top=bottom plate-angle bar track (8) one-sided thickness.
7. a kind of construction method that overlength reinforced concrete floor is levelling according to claim 6, it is characterised in that: in step Measurement is re-started to the top mark height of every angle bar track (8) before rapid e casting concrete, to undesirable angle bar track (8) it is adjusted.
8. a kind of construction method that overlength reinforced concrete floor is levelling according to claim 5, it is characterised in that: leading It wears and connects steel plate for sealing water (6) in wall form, steel plate for sealing water (6) setting is above bottom plate (4) bottom surface at 500mm.
9. a kind of construction method that overlength reinforced concrete floor is levelling according to claim 6, it is characterised in that: adjacent The spacing of angle bar track (8) is 1900mm, and the length of darby (15) is 2000mm.
10. a kind of construction method that overlength reinforced concrete floor is levelling according to claim 6, it is characterised in that: single The distance at support (9) elongation rail road (8) both ends at root angle bar track (8) both ends is 500mm, will be between remaining support (9) Spacing is set as 1500mm.
CN201910663094.3A 2019-07-22 2019-07-22 Construction device and method for leveling overlong reinforced concrete bottom plate Active CN110453726B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910663094.3A CN110453726B (en) 2019-07-22 2019-07-22 Construction device and method for leveling overlong reinforced concrete bottom plate

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910663094.3A CN110453726B (en) 2019-07-22 2019-07-22 Construction device and method for leveling overlong reinforced concrete bottom plate

Publications (2)

Publication Number Publication Date
CN110453726A true CN110453726A (en) 2019-11-15
CN110453726B CN110453726B (en) 2021-09-14

Family

ID=68482975

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910663094.3A Active CN110453726B (en) 2019-07-22 2019-07-22 Construction device and method for leveling overlong reinforced concrete bottom plate

Country Status (1)

Country Link
CN (1) CN110453726B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112814369A (en) * 2020-12-30 2021-05-18 中国建筑第八工程局有限公司 Horizontal construction joint formwork device for cast-in-place reinforced concrete wall and construction method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001059343A (en) * 1999-08-25 2001-03-06 Honma Kogyo Kk Concrete placement method for forming slab, and support tool for guide rail used therefor
US6412185B1 (en) * 2000-07-07 2002-07-02 Oscar Mills Tile laying gauge and leveling assembly
CN103161298A (en) * 2011-12-14 2013-06-19 五冶集团上海有限公司 Production method of large area concrete terrace
CN203462765U (en) * 2013-09-24 2014-03-05 中建三局建设工程股份有限公司 Floor flatness control system of large-area concrete building
CN105421776A (en) * 2015-11-09 2016-03-23 中冶天工集团有限公司 Device for leveling super-flat floor and method for conducting super-flat floor construction through device
CN208310244U (en) * 2018-05-04 2019-01-01 远洋国际建设有限公司 A kind of device for control panel surface evenness

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001059343A (en) * 1999-08-25 2001-03-06 Honma Kogyo Kk Concrete placement method for forming slab, and support tool for guide rail used therefor
US6412185B1 (en) * 2000-07-07 2002-07-02 Oscar Mills Tile laying gauge and leveling assembly
CN103161298A (en) * 2011-12-14 2013-06-19 五冶集团上海有限公司 Production method of large area concrete terrace
CN203462765U (en) * 2013-09-24 2014-03-05 中建三局建设工程股份有限公司 Floor flatness control system of large-area concrete building
CN105421776A (en) * 2015-11-09 2016-03-23 中冶天工集团有限公司 Device for leveling super-flat floor and method for conducting super-flat floor construction through device
CN208310244U (en) * 2018-05-04 2019-01-01 远洋国际建设有限公司 A kind of device for control panel surface evenness

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112814369A (en) * 2020-12-30 2021-05-18 中国建筑第八工程局有限公司 Horizontal construction joint formwork device for cast-in-place reinforced concrete wall and construction method

Also Published As

Publication number Publication date
CN110453726B (en) 2021-09-14

Similar Documents

Publication Publication Date Title
CN111206698B (en) Construction method of assembled wallboard
CN102127968B (en) Method for grouting floor slab bushing hole reservation preembedding die and grouting die
CN107313314B (en) Subway vehicle section reserved stand column inspection pit track construction method
CN104100092B (en) The track-type facilities of a kind of pitched roof pouring construction and method
CN108330980A (en) The hidden rail sliding-mode structure of large area slope concrete and construction method
CN102937027A (en) Construction method of edge top arch and bottom arch of concrete pouring tunnel
CN108331348A (en) The construction method of assembled wall
CN101906768A (en) Panel construction method of concrete faced rock-fill dam
CN109454746B (en) Concrete pouring device for building construction and construction method thereof
CN106120835B (en) A kind of circle concrete structures toe board panel guide rail and its levelling construction
CN103387836A (en) Method for mounting coke oven roof buried pipe
CN111608041B (en) Concrete pavement paving method
CN110453726A (en) A kind of constructing device that overlength reinforced concrete floor is levelling and method
CN109057189B (en) Flashing construction method and carrying device
CN108677722A (en) Hollow High Pier with Thin Wall stub top section construction technology
CN205955223U (en) Guide tracked flattening system is once only pour to cast in situ concrete floor
CN109610354B (en) Cast-in-situ slab culvert template system and construction method applying same
CN218149821U (en) Aluminum alloy combined template supporting structure
CN113585317B (en) Construction method for mucky soil support beam cushion layer
CN115749290A (en) Construction method and device for controlling flatness of concrete surface at root of column wall
CN206844389U (en) Building blocks wall structure
CN205046842U (en) Cast -in -place stair assembled typical forms
CN210117921U (en) Shear wall structure tunnel formwork
CN114134927A (en) Device and method for embedding large power equipment foundation embedded pipe
CN208039839U (en) Steel construction main building construction bracket

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant