CN110453274A - Cleaning treatment system and method - Google Patents
Cleaning treatment system and method Download PDFInfo
- Publication number
- CN110453274A CN110453274A CN201910884642.5A CN201910884642A CN110453274A CN 110453274 A CN110453274 A CN 110453274A CN 201910884642 A CN201910884642 A CN 201910884642A CN 110453274 A CN110453274 A CN 110453274A
- Authority
- CN
- China
- Prior art keywords
- anode
- earth
- pumping components
- positive pole
- cleaning treatment
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- C—CHEMISTRY; METALLURGY
- C25—ELECTROLYTIC OR ELECTROPHORETIC PROCESSES; APPARATUS THEREFOR
- C25D—PROCESSES FOR THE ELECTROLYTIC OR ELECTROPHORETIC PRODUCTION OF COATINGS; ELECTROFORMING; APPARATUS THEREFOR
- C25D21/00—Processes for servicing or operating cells for electrolytic coating
- C25D21/08—Rinsing
Abstract
The present invention relates to a kind of cleaning treatment system and method, cleaning treatment system includes: anode, titanium basket and the first pumping components.When in use, the anode being located in the plating process in titanium basket first constantly reacts above-mentioned cleaning treatment system, to generate the earth of positive pole.The earth of positive pole can be fallen in the anode being set in outside titanium basket, to realize collection of the anode to the earth of positive pole.After the earth of positive pole be stacked into anode it is a certain amount of after (the pre- storage in anode is determined according to the actual conditions that the accommodating space of different anodes or anode generate the earth of positive pole), run the first pumping components, at this time, the earth of positive pole inside anode can be extracted out under suction by the first pumping components, to realize the cleaning to the earth of positive pole.Above-mentioned cleaning treatment system is compared to traditionally cleaning way, without taking out titanium basket and metalwork, so as to avoid damage to the anode film that titanium basket is formed at anode.
Description
Technical field
The present invention relates to the technical fields of plating, more particularly to a kind of cleaning treatment system and method.
Background technique
Traditionally, using plating mode to metal carry out coating, i.e., the metal after coating can be improved corrosion resistance,
Increase hardness, prevent abrasion etc..But electroplanting device itself in the plating process, anode part can generate the earth of positive pole, that is, need
Periodically the earth of positive pole is cleared up.Currently, by the way that manually the anode equipped with titanium basket is taken out, then again by the sun in titanium basket
Pole metalwork (such as copper ball) takes out, and is cleaned, can be realized to the sun in anode with a large amount of pure water and chemical reagent
Pole mud is cleaned.After the cleaned processing completely of anode, also need to put into anode by the way that anode is manually reentered into titanium indigo plant,
Again electrolytically generated new anode film.Above-mentioned this cleaning way can destroy anode (metalwork) in titanium basket after metalwork taking-up
The anode film that surface is formed.
Summary of the invention
Based on this, it is necessary to provide a kind of cleaning treatment system and method, can be avoided and destroy the sun that anode surface is formed
Pole film.
Its technical solution is as follows:
A kind of cleaning treatment system, comprising: anode, titanium basket and the first pumping components are installed with metal in the titanium basket
Part, and the titanium basket, for installing anode core, the anode is set in outside the titanium basket, the anode is for receiving sun
The aspiration end of pole mud, first pumping components is connected with the anode.
When in use, the anode being located in the plating process in titanium basket first constantly reacts above-mentioned cleaning treatment system, from
And generate the earth of positive pole.The earth of positive pole can be fallen in the anode being set in outside titanium basket, to realize anode to the earth of positive pole
It collects.After the earth of positive pole be stacked into anode it is a certain amount of after (anode is generated according to the accommodating space of different anodes or anode
The actual conditions of mud determine the pre- storage in anode), the first pumping components are run, at this point, being located at the anode inside anode
Mud can be extracted out under suction by the first pumping components, to realize the cleaning to the earth of positive pole.Above-mentioned cleaning treatment system
Compared to traditionally cleaning way, without taking out titanium basket and metalwork, so as to avoid damage to the sun of anode surface formation
Pole film.
A kind of cleaning treatment method, includes the following steps:
The titanium basket for being installed with anode core in the plating process generates the earth of positive pole and collects in anode;
Suction recycling is carried out to the earth of positive pole in anode by the first pumping components;
After collecting in the earth of positive pole in anode and detaching anode by the first pumping components, the first pumping components are closed.
When in use, the titanium basket for being installed with anode core in the plating process first generates the earth of positive pole to above-mentioned cleaning treatment method
And collect in anode, i.e., the earth of positive pole is carried out by anode collecting processing, convenient for handling the earth of positive pole.Pass through
One pumping components carry out suction recycling to the earth of positive pole in anode;Wait collect in the earth of positive pole in anode by the first suction group
After part detaches anode, the first pumping components are closed.Above-mentioned cleaning treatment method is when clearing up the earth of positive pole, without stopping
Electroplating operations, i.e. electroplating operations synchronous can be carried out with the scale removal process of the earth of positive pole.Meanwhile above-mentioned cleaning treatment method compared to
Traditional cleaning way, without taking out titanium basket and metalwork, so as to avoid damage to the anode that titanium basket is formed at anode
Film.
Technical solution is illustrated further below:
Cleaning treatment system further includes electroplating bath and filter press, and the electroplating bath is marked with electroplate liquid, the filter press and institute
The first pumping components are stated to be connected.
First pumping components include the first infusion part, the first self priming pump, the first control valve and first flowmeter, described
Anode is connected by the first infusion part with first self priming pump, first control valve and the first flowmeter
It is installed on the first infusion part.
Cleaning treatment system further includes pars infundibularis, and the bottom of the anode offers opening, and the pars infundibularis is installed in
The opening, the wide mouth part of the pars infundibularis is corresponding with the opening, the slot end of the pars infundibularis and described first defeated
Liquid part is connected.
Cleaning treatment system further includes filter mechanism and the second pumping components, the filter mechanism and the filter press phase
Even, second pumping components are installed between the filter mechanism and the filter press.
Second pumping components include the second infusion part, the second self priming pump, the second control valve and second flowmeter, described
Filter mechanism is connected with the filter press by the second infusion part, second self priming pump, second control valve, institute
Second flowmeter is stated to be installed on the second infusion part.
Cleaning treatment system further includes third pumping components, and the outlet end of the filter mechanism and the electroplating bath pass through institute
Third pumping components are stated to be connected.
Cleaning treatment system further includes flushing machine, third control valve and the 4th control valve, is also opened on the filter mechanism
Equipped with air inlet, the liquid feeding end of the filter mechanism is connected with second pumping components, and the third control valve is installed
In the liquid feeding end of the filter mechanism, the flushing machine is connected with the air inlet, and the 4th control valve is installed in
At the air inlet.
The filter mechanism includes the first filtration members and the second filtration members, first filtration members and second suction pieces
It is connected, and the liquid feeding end of first filtration members is connected with second pumping components, second filtration members go out liquid
End is connected with the third pumping components.
Detailed description of the invention
Fig. 1 is the local structural graph of cleaning treatment system described in one embodiment of the invention;
Fig. 2 is the work structuring figure of cleaning treatment system described in one embodiment of the invention;
Fig. 3 is the structural schematic diagram of titanium basket described in one embodiment of the invention;
Fig. 4 is the flow chart of cleaning treatment method described in one embodiment of the invention.
Description of symbols:
10, anode, 11, pars infundibularis, 20, titanium basket, 30, metalwork, 40, anode film, the 100, first pumping components, 110,
First infusion part, 111, bend pipe, 112, straight tube, the 120, first self priming pump, the 130, first control valve, 140, first flowmeter,
200, electroplating bath, 300, filter press, 400, filter mechanism, 410, third control valve, 420, air inlet, the 430, first filtration members,
440, the second filtration members, the 500, second pumping components, the 510, second infusion part, the 520, second self priming pump, the 530, second control valve,
540, second flowmeter, 550, first pressure gauge, 600, third pumping components, 610, third infusion part, 620, third suction pump,
630, recycle control valve, 640, second pressure gauge, 700, flushing machine, 810, connect liquid bath, the 820, the 4th control valve, 900, PLC
Electric cabinet.
Specific embodiment
To make the objectives, technical solutions, and advantages of the present invention more comprehensible, below in conjunction with attached drawing and specific embodiment party
Formula, the present invention is further described in detail.It should be understood that the specific embodiments described herein are only to solve
The present invention is released, and the scope of protection of the present invention is not limited.
It should be noted that it can directly on the other element when element is referred to as " being fixed on " another element
Or there may also be elements placed in the middle.When an element is considered as " connection " another element, it, which can be, is directly connected to
To another element or it may be simultaneously present centering elements.Term as used herein " vertical ", " horizontal ", " left side ",
" right side " and similar statement for illustrative purposes only, are not meant to be the only embodiment.
Unless otherwise defined, all technical and scientific terms used herein and belong to technical field of the invention
The normally understood meaning of technical staff is identical.Term as used herein in the specification of the present invention is intended merely to description tool
The purpose of the embodiment of body, it is not intended that in the limitation present invention.Term " and or " used herein includes one or more
Any and all combinations of relevant listed item.
Heretofore described " first ", " second " do not represent specific quantity and sequence, are only used for the differentiation of title.
As shown in Figure 1 to Figure 3, in one embodiment, a kind of cleaning treatment system, comprising: anode 10, titanium basket 20 with
First pumping components 100 are installed with metalwork 30 in the titanium basket 20, and the titanium basket 20 is for installing anode core, the sun
Pole bag 10 is set in outside the titanium basket 20, and the anode 10 is for receiving the earth of positive pole, the pumping of first pumping components 100
End is inhaled to be connected with the anode 10.
When in use, the anode being located in the plating process in titanium basket 20 first constantly reacts above-mentioned cleaning treatment system,
To generate the earth of positive pole.The earth of positive pole can be fallen in the anode 10 being set in outside titanium basket 20, to realize that anode 10 is right
The collection of the earth of positive pole.After the earth of positive pole be stacked into anode 10 it is a certain amount of after (according to the accommodating space of different anodes 10 or
The actual conditions that anode generates the earth of positive pole determine the pre- storage in anode 10), the first pumping components 100 are run, at this point, being located at
The earth of positive pole inside anode 10 can be extracted out under suction by the first pumping components 100, to realize to the earth of positive pole
Cleaning.Above-mentioned cleaning treatment system is compared to traditional cleaning way, without taking out titanium basket 20 and metalwork 30, so as to
Avoid damage to the anode film 40 that titanium basket 20 is formed at anode.
In one embodiment, compared to traditional artificial treatment mode (by manually taking the anode equipped with titanium basket
Out, then the anode metal part (such as copper ball) in titanium basket is taken out again, is cleaned with a large amount of pure water and chemical reagent, ability
Enough realize cleans the earth of positive pole in anode.After the cleaned processing completely of anode, also need by manually by anode again
It is put into titanium indigo plant, puts into anode, again electrolytically generated new anode film), above-mentioned cleaning treatment system is not necessarily to titanium basket from anode
It is taken out in bag, that is, reduces cleaning step, shortens cleaning duration and reduce labor intensity.
In one embodiment, specifically, the metalwork 30 includes copper piece or nickel part etc..It is described in actual installation
Titanium basket 20 is hung at anode, i.e. a kind of hanger of the titanium basket 20 really as anode.By installing metalwork additional inside titanium basket 20
30 so that realize the in electrical contact of titanium basket 20 and anode core.Stacking of the metalwork 30 in titanium basket 20 is considered in the present embodiment
Density can use ball-type metal part 30.
In one embodiment, specifically, in the plating process, the anode of electroplating device is placed by titanium basket 20 for electricity
The metalwork 30 of dissolution is plated, the cathode of electroplating device is for connecting plating piece, the metalwork 30 in energization, at anode
Can occur dissolution and be located at cathode at plating piece on formed the corresponding coat of metal (such as: when needing to carry out copper facing operation,
Copper piece is installed additional in titanium basket 20.When needing to carry out nickel plating operation, nickel part is installed additional in titanium basket 20).Since titanium material itself has
There is stronger stability, therefore, in energization, the titanium basket 20 at anode will not dissolve.
In one embodiment, specifically, the titanium basket 20 be equipped with hook, i.e., titanium basket 20 by hook realize relative to
The suspension of anode core is fixed.This is only in one embodiment, it is contemplated that in plating, the capacity of electroplate liquid sometimes can not
Realization effectively submerges titanium basket 20.Therefore, two can be arranged along the short transverse interval of the titanium basket 20 on the titanium basket 20
A above hook, so as to select the hook of different height on titanium basket 20 according to the actual capacity of electroplate liquid, to realize
Titanium basket 20 is suspended vacantly different height.Meanwhile titanium basket 20 also can be realized in electroplate liquid by the variation of oneself height
Effective immersion.
In one embodiment, the side of the titanium basket 20 reticulates structure, and the opening size of each network interface is less than throwing
It is placed on the overall dimensions of 20 inside single metal part 30 of titanium basket.Surprisingly fall after avoiding metalwork 30 from launching titanium basket 20 from network interface
Out.Specifically, the shape of the network interface can be diamond shape or circle etc..
In one embodiment, when clearing up the earth of positive pole, traditionally by taking out metalwork 30, then to sun
The earth of positive pole in pole bag 10 is cleared up.Sometimes the surface of titanium basket 20 and metalwork 30 can also be cleaned.In titanium basket 20
After filling metalwork 30, the overall weight of titanium basket 20 is heavier, and therefore, operator is dismantled very expense to titanium basket 20 every time
Power.Compared to this traditional cleaning method, the cleaning treatment system in the present embodiment is without taking metalwork 30 and titanium basket 20
It can be realized out and the earth of positive pole in anode 10 cleaned.Meanwhile without wasting too many manpower.
In one embodiment, cleaning treatment system further includes electroplating bath 200 and filter press 300,200 note of electroplating bath
There is electroplate liquid, the filter press 300 is connected with first pumping components 100.It specifically, can be same in the electroplating bath 200
When be inserted into more anode cores, i.e. more anode core intervals settings.At this point, the titanium basket 20 with the anode 10 be it is multiple,
Guarantee that each anode core can correspond to installing titanium basket 20 and anode 10.Above-mentioned this embodiment can effectively improve electricity
The utilization rate of coating bath 200, while also saving the required use space of plating.
In one embodiment, when being placed with multiple anodes 10 inside electroplating bath 200, multiple anodes after powered up
The earth of positive pole can be collected inside 10.Therefore, collecting pipe can be added in cleaning treatment system, the collecting pipe is equipped with multiple
Shunt pipe passes through shunt pipe connection corresponding with anode 10, the then remittance of the first pumping components 100 and collecting pipe
It flows end to be connected, the earth of positive pole in multiple anodes 10 is carried out clearly simultaneously by first pumping components 100 to realize
Reason.This is only one of embodiment, such as: according to the actual situation, when first pumping components 100 can not meet simultaneously
When carrying out the cleaning of the earth of positive pole to multiple anodes 10, more than one first pumping components 100 can be added, can be incited somebody to action at this time
Collecting pipe is changed to the pipe conveying fluid with multiple branch pipes.I.e. a part of branch pipe connection corresponding with anode 10, another part branch pipe
Connection corresponding with more than two first pumping components 100.
In one embodiment, specifically, first pumping components 100 are located at the anode 10 and the filter press
Between 300.Such as: when carrying out copper facing operation, rich in there is a large amount of phosphor-coppers in the generated earth of positive pole, phosphor-copper has in the industry
High recovery value, directly discharging the earth of positive pole will cause the wasting of resources.Therefore, pass through when handling the earth of positive pole
Filter press 300 is added in the first suction pieces, so that the earth of positive pole can enter at filter press 300 under suction
Reason.In the present embodiment, the filter press 300 is plate and frame filter press 300 or chamber-type press filter 300.I.e. earth of positive pole solution enters
After filter press 300, phosphor-copper can be trapped in filter press 300 by the particular filter medium inside filter press 300, and will be isolated
Solution discharge.
In one embodiment, first pumping components 100 include the first infusion part 110, the first self priming pump 120, the
One control valve 130 and first flowmeter 140.The anode 10 passes through the first infusion part 110 and first self priming pump
120 are connected, and first control valve 130 is installed on the first infusion part 110 with the first flowmeter 140.Tool
Body, the first infusion part 110 is hard water pipe or hose.In the present embodiment, the first infusion part 110 includes bend pipe
111 with straight tube 112, i.e., the bend pipe 111 of the described first infusion part 110 is connected with the bottom of the anode 10, at this point, described the
The other end direction of one infusion part 110 is consistent with the short transverse of anode 10 or approximate consistent.Above-mentioned this arrangement energy
The earth of positive pole is enough avoided to flow out when collecting in anode 10 along the first infusion part 110.I.e. above-mentioned arrangement utilizes the earth of positive pole certainly
The gravity of body avoids the earth of positive pole with the unexpected outflow of the first infusion part 110.Further, when needing to export the sun in anode 10
Control valve is opened when the mud of pole, and (when the first self priming pump 120 is in off working state, control valve is in close state.I.e. on the one hand
It prevents from generating reflux inside the first infusion part 110, the earth of positive pole or electroplate liquid in anode 10 is on the other hand avoided to cover first
112 part of straight tube of infusion part 110.), and open self priming pump.The earth of positive pole is discharged under suction from the bottom of anode 10,
Then in turn through the bend pipe 111 and straight tube 112 (in the present embodiment, 112 part of straight tube and anode of the first infusion part 110
10 is parallel, i.e., the earth of positive pole is in the gravity by needing to overcome the earth of positive pole itself when 112 part of straight tube).Further, first
It is also equipped with flowmeter on infusion part 110, at this point, just can be infused inside part 110 first by flowmeter the earth of positive pole
Mobility status is detected.
In one embodiment, cleaning treatment system further includes pars infundibularis 11.The bottom of the anode 10 offers out
Mouthful, the pars infundibularis 11 is installed in the opening, the wide mouth part and the opening in communication of the pars infundibularis 11, the funnel
The slot end in portion 11 is connected with the first infusion part 110.Specifically, the pars infundibularis 11 can with the one of anode 10 at
Type or the pars infundibularis 11 and the detachably installation of the anode 10.In the present embodiment, the wide mouth part of the pars infundibularis 11
Opening size it is identical as the opening size of the anode 10.Further, the funnel from wide-mouth transition be slot so that
The earth of positive pole is able to carry out after falling into pars infundibularis 11 effectively to be collected.
In one embodiment, cleaning treatment system further includes filter mechanism 400 and the second pumping components 500, the mistake
Filter structure 400 is connected with the filter press 300, and second pumping components 500 are installed in the filter mechanism 400 and the pressure
Between filter 300.Specifically, it is contemplated that the particular medium in filter press 300 can only often filter out specific materials (such as phosphor-copper),
And passes through and also contain other impurities or metallic particles in the solution that filter press 300 is discharged.Therefore, pass through the second pumping components 500
Realization filter mechanism 400 is interconnected with filter press 300.In addition, the earth of positive pole enters the solution meeting given off after filter press 300
It is for re-filtering to enter filter mechanism 400 under the action of the second pumping components 500.
In one embodiment, second pumping components 500 include the second infusion part 510, the second self priming pump 520, the
Two control valves 530 and second flowmeter 540.The filter mechanism 400 passes through the second infusion part with the filter press 300
510 are connected, and second self priming pump 520, second control valve 530, the second flowmeter 540 are installed in described
On two infusion parts 510.Specifically, the second infusion part 510 is hard water pipe or hose.Second self priming pump 520 is molten
Liquid provides power in the second infusion 510 internal flow of part, and second control valve 530 is installed on the second infusion part 510
It can be avoided solution surprisingly to flow backwards.The second flowmeter 540 is used to detect flowing feelings of the solution inside the second infusion part 510
Condition.
In one embodiment, cleaning treatment system further includes third pumping components 600.The filter mechanism 400 goes out
Liquid end is connected with the electroplating bath 200 by the third pumping components 600.It specifically, will by third pumping components 600
It is imported inside electroplating bath 200 again by the solution of filter mechanism 400, to realize the recycling for solution.More specifically
Ground, the third pumping components 600 include third infusion part 610, third suction pump 620 and recycle control valve 630.The third
Part 610 of being infused is hard water pipe or hose.The third suction pump 620 is installed on the third infusion part 610, as third
Liquid inside infusion part 610 provides mobilization dynamic.The recycle control valve 630 is installed on the third infusion part 610, is kept away
Exempt from the solution in electroplating bath 200 to flow back in third infusion part 610.
In one embodiment, cleaning treatment system further includes flushing machine 700, third control valve 410 and the 4th control
Valve 820, air inlet 420 is also provided on the filter mechanism 400, and the liquid feeding end of the filter mechanism 400 and described second are taken out
It inhales component 500 to be connected, and the third control valve 410 is installed in the liquid feeding end of the filter mechanism 500, the flushing machine
700 are connected with the air inlet 420, and the 4th control valve 820 is installed at the air inlet.Specifically, the punching
Washing machine structure 700 is air compressor machine or pulser.When occur blocking or circulating in the filter mechanism 400 unsmooth situation when, first
Close the second control valve 530 inside the second pumping components 500, the third control valve 410 at 400 liquid feeding end of filter mechanism and
Recycle control valve 630 inside third pumping components 600, thus guarantee filter mechanism 400 in cleaning treatment system in every
From state.Then drive flushing machine 700, flushing machine 700 can generate blowback air-flow, blowback air stream by air inlet 420 into
Enter filter mechanism 400, the residue inside filter mechanism 400 can be under the action of blowback air-flow from filter mechanism 400 at this time
It is detached from.Finally, can by inside filter mechanism 400 residue and filtrate in the sundries that filters out recycled together.
Realize the cleaning to filter mechanism 400.More specifically, the second control valve 530 and filtering on the second pumping components 500
First pressure gauge 550 is equipped between mechanism 400, recycle control valve 630 and filter mechanism on third pumping components 600
Second pressure gauge 640 is equipped between 400.I.e. after blowback air stream enters filter mechanism 400, by first pressure gauge 550 with
Second pressure gauge 640 can be monitored the air pressure inside filter mechanism 400, on the one hand avoid air pressure excessive to cleaning treatment
System damages, and too small cannot achieve of air pressure is on the other hand avoided effectively to clean filter mechanism 400.
In one embodiment, the filter mechanism 400 includes the first filtration members 430 and the second filtration members 440.Described
The liquid feeding end of one filtration members 430 is connected with second pumping components 500, the outlet end of second filtration members 440 and institute
Third pumping components 600 are stated to be connected.Specifically, first filtration members 430 for press type filter or are equipped with filter core or filter
The filter of net.That is the first filtration members 430 carry out first time filtering (thick mistake to the solution being discharged by filter press 300 first
Filter).Second filtration members 440 are semi-permeable membrane or dialysis membrane filter.That is 440 pairs of the second filtration members are passed through the first filtration members
430 filtered solution carry out secondary filter (essence filtering).Above-mentioned filter type is effectively guaranteed the filter effect to solution.
Further, when needing to clean the first filtration members 430 and the second filtration members 440, the second pumping components are first shut off
The third control valve 410 and third pumping components at the second control valve 530,430 liquid feeding end of the first filtration members inside 500
Recycle control valve 630 inside 600, to guarantee the first filtration members 430 with the second filtration members 440 in cleaning treatment system
In isolation.Blowback air-flow is generated by flushing machine 700, blowback air stream enters the second filtration members by air inlet 420
440, the first filtration members 430 are then flowed to again, at this point, the first filtration members 430 and the sundries inside the second filtration members 440 are (or miscellaneous
Matter) can be converged inside the first filtration members 430, it can by during being filtered to filtrate together to retentate
(including the sundries collected in the first filtration members 430 after the flushing of flushing machine 700 and filtrate by the first filtration members
Generated impurity after 430) it is recycled.
In one embodiment, cleaning treatment system further includes PLC (programmable logic controller) electricity
Case is controlled, i.e., by PLC electric cabinet 900 to the first pumping components 100, filter press 300, the second pumping components 500, filter mechanism
400, third pumping components 600, third control valve 410, the 4th control valve 820 and multiple components such as flushing machine 700 are united
One Electric control.
As shown in figure 4, in one embodiment, a kind of cleaning treatment method includes the following steps:
S100, the titanium basket 20 for being installed with anode core in the plating process generate the earth of positive pole and collect in anode 10;
S200, suction recycling is carried out to the earth of positive pole in anode 10 by the first pumping components 100;
After S300, the earth of positive pole wait collect in anode 10 detach anode 10 by the first pumping components 100, the is closed
One pumping components 100.
When in use, the titanium basket 20 for being installed with anode core in the plating process first generates anode to above-mentioned cleaning treatment method
Mud simultaneously collects in anode 10, i.e., carries out collecting processing to the earth of positive pole by anode 10, convenient for handling the earth of positive pole.
Suction recycling is carried out to the earth of positive pole in anode 10 by the first pumping components 100;Anode in anode 10 to be collected in
After mud detaches anode 10 by the first pumping components 100, the first pumping components 100 are closed.Above-mentioned cleaning treatment method is to sun
When pole mud is cleared up, without stopping electroplating operations, i.e. electroplating operations synchronous can be carried out with the scale removal process of the earth of positive pole.Together
When, above-mentioned cleaning treatment method is compared to traditional cleaning way, without taking out titanium basket 20 and metalwork 30, so as to keep away
Exempt to destroy the anode film 40 formed in anode surface.
Further, first pumping components 100 include the first infusion part 110, the control of the first self priming pump 120, first
Valve 130 and first flowmeter 140.The anode 10 is connected by the first infusion part 110 with first self priming pump 120
Logical, first control valve 130 is installed on the first infusion part 110 with the first flowmeter 140.Specifically, institute
Stating the first infusion part 110 is hard water pipe or hose.It is generated inside the first infusion part 110 by the first self priming pump 120 first
Power, at this point, the earth of positive pole inside anode 10 can flow out under the action of the first self priming pump 120 by the first infusion part 110
Anode 10.Meanwhile first control valve 130 can be avoided the earth of positive pole first infusion part 110 inside flow backwards, first flow
That counts the earth of positive pole solution inside 140 pair of first infusion part 110 stays speed to detect, and allows staff according to flowmeter
Numerical value shown by 140 carries out power adjustment to the first self priming pump 120, ensure that the cleaning effect to the earth of positive pole.
Further, often rich precious metal element rich in the generated earth of positive pole in electroplating process, such as:
Phosphor-copper.Therefore, passing through the first pumping components 100 by the earth of positive pole after taking out in anode 10, it can be right by filter press 300
The earth of positive pole is separated, i.e., filters out a part of phosphor-copper in the earth of positive pole, and filter press 300 is discharged in remaining solution.At this point, remaining is molten
Liquid still may be used as electroplate liquid and carry out using and hence it is also possible to filter mechanism 400 be added, to after the separation of filter 300
Solution is for re-filtering, so that presence of the solution after returning to electroplating bath 200 due to impurity be avoided to cause shadow to electroplating effect
It rings.Finally, by electroplating bath 200 is imported again by the solution of filter mechanism 400.On the one hand above-mentioned cleaning treatment method realizes
On the other hand cleaning for the earth of positive pole is also achieved for the separation and recovery of the earth of positive pole and is carried out again to the solution isolated
Secondary utilization.Each technical characteristic of embodiment described above can be combined arbitrarily, for simplicity of description, not to above-mentioned implementation
The all possible combination of each technical characteristic in example is all described, as long as however, the combination of these technical characteristics is not present
Contradiction all should be considered as described in this specification.
The embodiments described above only express several embodiments of the present invention, and the description thereof is more specific and detailed, but simultaneously
It cannot therefore be construed as limiting the scope of the patent.It should be pointed out that coming for those of ordinary skill in the art
It says, without departing from the inventive concept of the premise, various modifications and improvements can be made, these belong to protection of the invention
Range.Therefore, the scope of protection of the patent of the invention shall be subject to the appended claims.
Claims (10)
1. a kind of cleaning treatment system characterized by comprising anode, titanium basket and the first pumping components, the titanium basket are built-in
Equipped with metalwork, and the titanium basket, for installing anode core, the anode is set in outside the titanium basket, and the anode is used
In receiving the earth of positive pole, the aspiration end of first pumping components is connected with the anode.
2. cleaning treatment system according to claim 1, which is characterized in that first pumping components include the first infusion
Part, the first self priming pump, the first control valve and first flowmeter, the anode are infused part and described first certainly by described first
Sucking pump is connected, and first control valve and the first flowmeter are installed on the first infusion part.
3. cleaning treatment system according to claim 2, which is characterized in that it further include pars infundibularis, the bottom of the anode
Portion offers opening, and the pars infundibularis is installed in the opening, and the wide mouth part of the pars infundibularis is corresponding with the opening, institute
The slot end for stating pars infundibularis is connected with the first infusion part.
4. cleaning treatment system according to claim 1, which is characterized in that further include electroplating bath and filter press, the electricity
Coating bath is marked with electroplate liquid, and the filter press is connected with first pumping components.
5. cleaning treatment system according to claim 4, which is characterized in that further include filter mechanism and the second suction group
Part, the filter mechanism are connected with the filter press, and second pumping components are installed in the filter mechanism and the filters pressing
Between machine.
6. cleaning treatment system according to claim 5, which is characterized in that second pumping components include the second infusion
Part, the second self priming pump, the second control valve and second flowmeter, the filter mechanism are infused with the filter press by described second
Part is connected, and second self priming pump, second control valve, the second flowmeter are installed in the second infusion part
On.
7. cleaning treatment system according to claim 5, which is characterized in that further include third pumping components, the filtering
The outlet end of mechanism is connected with the electroplating bath by the third pumping components.
8. cleaning treatment system according to claim 7, which is characterized in that further include flushing machine, third control valve with
4th control valve is also provided with air inlet, the liquid feeding end of the filter mechanism and the second suction group on the filter mechanism
Part is connected, and the third control valve is installed in the liquid feeding end of the filter mechanism, the flushing machine and the air inlet
It is connected, and the 4th control valve is installed at the air inlet.
9. cleaning treatment system according to claim 8, which is characterized in that the filter mechanism include the first filtration members with
Second filtration members, the liquid feeding end of first filtration members are connected with second pumping components, and second filtration members go out
Liquid end is connected with the third pumping components.
10. a kind of cleaning treatment method, which comprises the steps of:
The titanium basket for being installed with anode core in the plating process generates the earth of positive pole and collects in anode;
Suction recycling is carried out to the earth of positive pole in anode by the first pumping components;
After collecting in the earth of positive pole in anode and detaching anode by the first pumping components, the first pumping components are closed.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910884642.5A CN110453274A (en) | 2019-09-19 | 2019-09-19 | Cleaning treatment system and method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910884642.5A CN110453274A (en) | 2019-09-19 | 2019-09-19 | Cleaning treatment system and method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110453274A true CN110453274A (en) | 2019-11-15 |
Family
ID=68492454
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910884642.5A Pending CN110453274A (en) | 2019-09-19 | 2019-09-19 | Cleaning treatment system and method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110453274A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113005500A (en) * | 2021-02-17 | 2021-06-22 | 曾鹏 | High-bonding-force electroplating equipment and using method thereof |
Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN203613292U (en) * | 2013-11-26 | 2014-05-28 | 广州兴森快捷电路科技有限公司 | Anode titanium basket sleeve |
CN204058639U (en) * | 2014-07-01 | 2014-12-31 | 昆山市华新电路板有限公司 | The anti-titanium basket on fire of plating |
CN205903687U (en) * | 2016-07-18 | 2017-01-25 | 江门市河正环保设备有限公司 | Electrolysis filter |
CN107254695A (en) * | 2017-06-23 | 2017-10-17 | 湖北共铭电路有限公司 | Pcb board copper plating process |
CN107460530A (en) * | 2017-09-14 | 2017-12-12 | 苏州吴江春宇电子股份有限公司 | A kind of nickel plating apparatus of electronics hardware products |
CN107937970A (en) * | 2017-11-21 | 2018-04-20 | 鹤山安栢电路版厂有限公司 | New VCP lines copper-plated anode bag |
CN207418900U (en) * | 2017-11-02 | 2018-05-29 | 惠州市特创电子科技有限公司 | Electro-coppering cylinder ANODE SLIME TREATMENT system |
CN207582000U (en) * | 2017-10-31 | 2018-07-06 | 广德东威电镀设备技术有限公司 | A kind of novel ladder type formula available on plating line erects net titanium basket |
CN208055494U (en) * | 2018-04-12 | 2018-11-06 | 河南理工大学 | A kind of electro-deposition anode basket |
CN208167139U (en) * | 2018-04-09 | 2018-11-30 | 杨坤辉 | Earth of positive pole cleaning mechanism |
CN209128288U (en) * | 2018-10-30 | 2019-07-19 | 广州新灿环保科技有限公司 | Continous way galvanic anode mud purification device |
-
2019
- 2019-09-19 CN CN201910884642.5A patent/CN110453274A/en active Pending
Patent Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN203613292U (en) * | 2013-11-26 | 2014-05-28 | 广州兴森快捷电路科技有限公司 | Anode titanium basket sleeve |
CN204058639U (en) * | 2014-07-01 | 2014-12-31 | 昆山市华新电路板有限公司 | The anti-titanium basket on fire of plating |
CN205903687U (en) * | 2016-07-18 | 2017-01-25 | 江门市河正环保设备有限公司 | Electrolysis filter |
CN107254695A (en) * | 2017-06-23 | 2017-10-17 | 湖北共铭电路有限公司 | Pcb board copper plating process |
CN107460530A (en) * | 2017-09-14 | 2017-12-12 | 苏州吴江春宇电子股份有限公司 | A kind of nickel plating apparatus of electronics hardware products |
CN207582000U (en) * | 2017-10-31 | 2018-07-06 | 广德东威电镀设备技术有限公司 | A kind of novel ladder type formula available on plating line erects net titanium basket |
CN207418900U (en) * | 2017-11-02 | 2018-05-29 | 惠州市特创电子科技有限公司 | Electro-coppering cylinder ANODE SLIME TREATMENT system |
CN107937970A (en) * | 2017-11-21 | 2018-04-20 | 鹤山安栢电路版厂有限公司 | New VCP lines copper-plated anode bag |
CN208167139U (en) * | 2018-04-09 | 2018-11-30 | 杨坤辉 | Earth of positive pole cleaning mechanism |
CN208055494U (en) * | 2018-04-12 | 2018-11-06 | 河南理工大学 | A kind of electro-deposition anode basket |
CN209128288U (en) * | 2018-10-30 | 2019-07-19 | 广州新灿环保科技有限公司 | Continous way galvanic anode mud purification device |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113005500A (en) * | 2021-02-17 | 2021-06-22 | 曾鹏 | High-bonding-force electroplating equipment and using method thereof |
CN113005500B (en) * | 2021-02-17 | 2022-01-07 | 江苏良友钢绳有限公司 | High-bonding-force electroplating equipment and using method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP2010274231A (en) | Apparatus and method of cleaning drainage | |
CN110453274A (en) | Cleaning treatment system and method | |
CN106513173B (en) | The separator of working fluid containing ferromagnetic particle that a kind of liquid phase circulation solid phase is collected | |
CN211799355U (en) | Circulating water filter device with self-cleaning function | |
CN105056600A (en) | Device and method for removing floating objects in sewage through spiral-flow type automatic cleaning and filtration | |
CN218687136U (en) | Water-soluble cutting fluid filtration system | |
CN217939347U (en) | Continuous filtering device capable of realizing uninterrupted filtering during cleaning | |
CN206089848U (en) | Convenient and fast's earth of positive pole processing apparatus | |
CN215692381U (en) | Sewage precipitation circulating device | |
CN213680070U (en) | Ultrafiltration and reverse osmosis combined water purification equipment | |
CN114849314A (en) | Continuous filtering method capable of realizing uninterrupted filtering during cleaning | |
CN114045472A (en) | Novel chemical nickel plating equipment | |
CN105002551B (en) | A kind of plating tank liquid medicine filtering devices and methods therefor | |
CN114345007A (en) | Waste water circulating system for hard alloy recycling production line | |
CN209575880U (en) | A kind of automatic filtering system of ammonium nitrate solution | |
CN204246920U (en) | The cyclic processing device of metallurgical furnace casting cooling water | |
CN204319875U (en) | Circulating water filter of electric equipment | |
CN114227355A (en) | Scrap recovery equipment for steel cutting | |
CN208639357U (en) | A kind of fish jar water treatment facilities | |
CN206604633U (en) | The separator of working fluid containing ferromagnetic particle that a kind of liquid phase circulation solid phase is collected | |
CN219157018U (en) | Electroplating equipment for flange machining | |
CN109569046A (en) | A kind of automatic filtering system of ammonium nitrate solution | |
CN110699712A (en) | Silver electrolysis process and apparatus | |
CN104324540A (en) | Circulating water filter of electric equipment | |
CN205649928U (en) | Get ready oil field with polymer filter online cleaning device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20191115 |