CN110443508A - A kind of Electric Power Project Management system - Google Patents

A kind of Electric Power Project Management system Download PDF

Info

Publication number
CN110443508A
CN110443508A CN201910725875.0A CN201910725875A CN110443508A CN 110443508 A CN110443508 A CN 110443508A CN 201910725875 A CN201910725875 A CN 201910725875A CN 110443508 A CN110443508 A CN 110443508A
Authority
CN
China
Prior art keywords
data
module
unit
result
feasibility
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910725875.0A
Other languages
Chinese (zh)
Inventor
荣卫方
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Guiwang Electronic Technology Co Ltd
Original Assignee
Shandong Guiwang Electronic Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Guiwang Electronic Technology Co Ltd filed Critical Shandong Guiwang Electronic Technology Co Ltd
Priority to CN201910725875.0A priority Critical patent/CN110443508A/en
Publication of CN110443508A publication Critical patent/CN110443508A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Human Resources & Organizations (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Health & Medical Sciences (AREA)
  • Marketing (AREA)
  • General Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Tourism & Hospitality (AREA)
  • Educational Administration (AREA)
  • Quality & Reliability (AREA)
  • Operations Research (AREA)
  • Game Theory and Decision Science (AREA)
  • Development Economics (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a kind of Electric Power Project Management systems, including information acquisition unit, data analysis unit, engineer's analytical unit, pre-feasibility judging unit and stage feasibility judging unit;Corresponding to proposed power engineering by information acquisition unit, all data information carries out acquisition and respective material amount on the spot and is estimated;The data obtained by data analysis unit according to information acquisition unit are compared and analyzed with industry standard standard, are obtained a result;The data that information acquisition unit obtains are transferred in engineer's analysis system by engineer's analytical unit, are analyzed and determined by expert engineer, are obtained a result;Pre-feasibility judging unit show that proposed preceding feasibility judges according to the analysis result of data analysis unit and engineer's analytical unit;Next step stage feasibility judging unit is carried out the information collection of next step, is analyzed stage by stage, obtained a result according to the judging result of pre-feasibility judging unit after feasibility analysis.

Description

A kind of Electric Power Project Management system
Technical field
The present invention relates to Electric Power Project Management technical field, specially a kind of Electric Power Project Management system.
Background technique
Power engineering broadly further includes using electricity as power that is, with the production of electric energy, conveying, the related engineering of distribution The engineering applied in multiple fields with the energy.It is understood that simultaneously and power transformation industry is sent to expand engineering.After 20th century, the life of electric energy It produces mainly by thermal power plant, power station and nuclear power station.Conditional place is also generated electricity using tide, underground heat and wind energy.Electric energy Conveying and distribution are mainly realized by high and low pressure AC power network.As the direction of power transmission engineering technology development, emphasis It is research extra-high voltage (1,000,000 volts or more) ac transmission and HVDC Transmission Technology, forms bigger electric power networks;It also to grind simultaneously The technical issues of studying carefully superconductor electrical energy transportation.The large-scale power system that 20th century occurred is by power generation, transmission of electricity, power transformation, distribution, electricity consumption Comprehensive all link is an organic whole, becomes in social materialss production division that spatial extent is most wide, time coordination is stringent, level The extremely complicated entity project system of the division of labor.
The development for seriously hampering national economy that electric power is insufficient, in recent years, governments at all levels, China generally increase to electric power The dynamics of investment of engineering project, power engineering project play increasingly important role in Chinese society, economic development.Just It increases sharply in power engineering project investment, while effectively spurring economic growth, also occurs some cannot be neglected successively Problem, as portfolio performance is undesirable, low-level duplicate construction is serious, ignores the problems such as environmental pollution monitoring.It is limited in order to make Power engineering project investment plays bigger benefit, and before capital construction, management and planning feasibility to entire engineering are ground for power engineering Study carefully particularly significant.
Summary of the invention
The purpose of the present invention is to provide a kind of Electric Power Project Management systems, to solve mentioned above in the background art ask Topic.
To achieve the above object, the invention provides the following technical scheme: a kind of Electric Power Project Management system, including information obtain Take unit, data analysis unit, engineer's analytical unit, pre-feasibility judging unit and stage feasibility judging unit;Its In:
Information acquisition unit, corresponding to proposed power engineering, all data information is acquired and is corresponded on the spot material Doses is estimated;
Data analysis unit is compared and analyzed with industry standard standard according to the data that information acquisition unit obtains, is obtained Result out;
The data that information acquisition unit obtains are transferred in engineer's analysis system, by special by engineer's analytical unit Industrial engineering (IE) Shi Jinhang is analyzed and determined, is obtained a result;
Pre-feasibility judging unit obtains proposed according to the analysis result of data analysis unit and engineer's analytical unit Preceding feasibility judgement;
Stage feasibility judging unit, according to the judging result of pre-feasibility judging unit, after feasibility analysis, The information collection for carrying out next step, is analyzed stage by stage, is obtained a result.
Preferably, the information acquisition unit is connected to data analysis unit and engineer's analytical unit, and data analysis is single Member and engineer's analytical unit are connected to pre-feasibility judging unit, and pre-feasibility judging unit is connected to stage feasibility Judging unit.
Preferably, the information acquisition unit includes installed capacity data acquisition module, plant site selection measurement module, raw material Dosage calculates module and geological condition estimation block;Wherein:
Installed capacity data acquisition module, capacity motor data needed for treating proposed power engineering are acquired;
Plant site selection measurement module, selects suitable construction address, and according to proposed power engineering scale to factory site The data such as area are acquired;
Raw material dosage calculates module, calculates according to proposed power engineering scale to required raw material dosage, obtains Specific data area;
Geological condition estimation block searches the geology in factory site location according to the results of measuring of plant site selection measurement module Data.
Preferably, according to raw material dosage calculate module results of measuring, search factory site near material supplier's quantity and The specific number of supply, if meet raw material institute expense.
Preferably, the geological condition estimation block need to obtain the underground in 10 kilometer range of factory site location and its periphery Water distribution data, tectonic plates mobile data and earthquake occurrence frequency data over the years.
Preferably, the data analysis unit includes model building module, standardization comparison module and analytical judgment module; Wherein:
Model building module establishes analysis model according to the information data that information acquisition unit acquires;
Comparison module is standardized, analysis model data and codes and standards data in industry are compared.
It analyzes and determines module, comparing result is subjected to discriminatory analysis, it was therefore concluded that, it is single to be sent to pre-feasibility judgement Member.
Preferably, engineer's analytical unit includes same type comparison module, supply and demand comparison module and empirical judgement Module;Wherein:
Same type comparison module, engineer obtain information by data system, the electric power of measurement data and same type are set It is standby to be compared;
Supply and demand comparison module calculates the results of measuring of module according to raw material dosage, estimates the pre-output amount of power equipment, than More whether supply-demand relationship is met;
Empirical judgment module, expert engineer is according to the comparison result and supply-demand relationship number with same type power equipment According to obtaining feasibility judging result.
Preferably, the pre-feasibility judging unit includes data collection module, Comparative result module and data output Module;Wherein:
Data analysis unit and engineer analytical unit Alto are washed result and summarized by data collection module;
Comparative result module, the information after summarizing carry out Comprehensive Comparison, obtain a result;
Data outputting module shows the structure output that Comparative result module obtains.
Preferably, the stage feasibility judging unit include interim data acquisition module, by different level computing module and As a result output module;Wherein:
Interim data acquisition module obtains the interim data in power equipment process of construction;
Computing module by different level, the data that will acquire are analyzed by different level, obtain the data result in each stage;
Result is carried out output and shown by as a result output module, and record management.
Compared with prior art, the beneficial effects of the present invention are: the present invention can be to the proposed preparation of power equipment and project Data in process of construction carry out analysis test, to carry out energy-saving management to power equipment;Pass through information acquisition unit pair Acquisition and respective material amount on the spot should be carried out to proposed power engineering, all data information to be estimated;Pass through data point The data that analysis unit is obtained according to information acquisition unit are compared and analyzed with industry standard standard, are obtained a result;Engineer point The data that information acquisition unit obtains are transferred in engineer's analysis system by analysis unit, are carried out analysis by expert engineer and are sentenced It is disconnected, it obtains a result;Pre-feasibility judging unit is obtained according to the analysis result of data analysis unit and engineer's analytical unit Feasibility judgement before proposed;Next step stage feasibility judging unit according to the judging result of pre-feasibility judging unit, After feasibility analysis, the information collection of next step is carried out, is analyzed stage by stage, is obtained a result.
Detailed description of the invention
Fig. 1 is workflow schematic diagram of the invention.
In figure: 1, information acquisition unit;11, installed capacity data acquisition module;12, plant site selection measurement module;13, former Expect that dosage calculates module;14, geological condition estimation block;2, data analysis unit;21, model building module;22, it standardizes Comparison module;23, module is analyzed and determined;3, engineer's analytical unit;31, same type comparison module;32, supply and demand comparison module; 33, empirical judgment module;4, pre-feasibility judging unit;41, data collection module;42, Comparative result module;43, number According to output module;5, stage feasibility judging unit;51, interim data acquisition module;52, computing module by different level;53, it ties Fruit output module.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
In the description of the present invention, it should be noted that the orientation of the instructions such as term "vertical", "upper", "lower", "horizontal" Or positional relationship is to be based on the orientation or positional relationship shown in the drawings, and is merely for convenience of description of the present invention and simplification of the description, and It is not that the device of indication or suggestion meaning or element must have a particular orientation, be constructed and operated in a specific orientation, therefore It is not considered as limiting the invention.
In the description of the present invention, it is also necessary to which explanation is unless specifically defined or limited otherwise, term " setting ", " installation ", " connected ", " connection " shall be understood in a broad sense, for example, it may be fixedly connected, may be a detachable connection or one Connect to body;It can be mechanical connection, be also possible to be electrically connected;It can be directly connected, it can also be indirect by intermediary It is connected, can be the connection inside two elements.For the ordinary skill in the art, it can manage as the case may be Solve the concrete meaning of above-mentioned term in the present invention.
Referring to Fig. 1, the present invention provides a kind of technical solution: a kind of Electric Power Project Management system, including acquisition of information list Member 1, data analysis unit 2, engineer's analytical unit 3, pre-feasibility judging unit 4 and stage feasibility judging unit 5; Wherein:
Information acquisition unit 1, corresponding to proposed power engineering, all data information is acquired and is corresponded on the spot material Doses is estimated;
Data analysis unit 2 is compared and analyzed according to the data that information acquisition unit 1 obtains with industry standard standard, It obtains a result;
The data that information acquisition unit 1 obtains are transferred in engineer's analysis system, pass through by engineer's analytical unit 3 Expert engineer analyzes and determines, obtains a result;
Pre-feasibility judging unit 4 is obtained according to the analysis result of data analysis unit 2 and engineer's analytical unit 3 Feasibility judgement before proposed;
Stage feasibility judging unit 5, according to the judging result of pre-feasibility judging unit 4, passes through feasibility analysis Afterwards, the information collection for carrying out next step, is analyzed stage by stage, is obtained a result.
Further, the information acquisition unit 1 is connected to data analysis unit 2 and engineer's analytical unit 3, data point Analysis unit 2 and engineer's analytical unit 3 are connected to pre-feasibility judging unit 4, and pre-feasibility judging unit 4 is connected to rank Section feasibility judging unit 5.
Further, the information acquisition unit 1 includes installed capacity data acquisition module 11, plant site selection measurement module 12, raw material dosage measuring and calculating module 13 and geological condition estimation block 14;Wherein:
Installed capacity data acquisition module 11, capacity motor data needed for treating proposed power engineering are acquired;
Plant site selection measurement module 12, selects suitable construction address, and according to proposed power engineering scale to factory The data such as location area are acquired;
Raw material dosage calculates module 13, calculates according to proposed power engineering scale to required raw material dosage, obtains Provide volume data range;
Geological condition estimation block 14 searches factory site location according to the results of measuring of plant site selection measurement module 12 Geologic data.
Further, the results of measuring of module 13 is calculated according to raw material dosage, searches the raw material supply quotient near factory site Amount and the specific number of supply, if meet raw material institute expense.
Further, the geological condition estimation block 14 need to obtain in 10 kilometer range of factory site location and its periphery Groundwater occurrence data, tectonic plates mobile data and earthquake occurrence frequency data over the years.
Further, the data analysis unit 2 includes model building module 21, standardization comparison module 22 and analysis Judgment module 23;Wherein:
Model building module 21 establishes analysis model according to the information data that information acquisition unit 1 acquires;
Comparison module 22 is standardized, analysis model data and codes and standards data in industry are compared.
It analyzes and determines module 23, comparing result is subjected to discriminatory analysis, it was therefore concluded that, it is single to be sent to pre-feasibility judgement Member 4.
Further, engineer's analytical unit 3 includes same type comparison module 31, supply and demand comparison module 32 and experience Property judgment module 33;Wherein:
Same type comparison module 31, engineer obtains information by data system, by the electric power of measurement data and same type Equipment is compared;
Supply and demand comparison module 32 calculates the results of measuring of module 13 according to raw material dosage, estimates the pre-output of power equipment More whether amount, meet supply-demand relationship;
Empirical judgment module 33, expert engineer is according to the comparison result and supply-demand relationship number with same type power equipment According to obtaining feasibility judging result.
Further, the pre-feasibility judging unit 4 includes data collection module 41,42 sum number of Comparative result module According to output module 43;Wherein:
Data analysis unit 2 and 3 Alto of engineer's analytical unit are washed result and summarized by data collection module 41;
Comparative result module 42, the information after summarizing carry out Comprehensive Comparison, obtain a result;
Data outputting module 43 shows the structure output that Comparative result module 42 obtains.
Further, the stage feasibility judging unit 5 includes interim data acquisition module 51, calculates mould by different level Block 52 and result output module 53;Wherein:
Interim data acquisition module 51 obtains the interim data in power equipment process of construction;
Computing module 52 by different level, the data that will acquire are analyzed by different level, obtain the data result in each stage;
Result is carried out output and shown by as a result output module 53, and record management.
Working principle: corresponding to proposed power engineering by information acquisition unit 1, all data information carries out on the spot Acquisition and respective material amount are estimated;The data and industry obtained by data analysis unit 2 according to information acquisition unit 1 are advised Model standard compares and analyzes, and obtains a result;The data that information acquisition unit 1 obtains are transferred to work by engineer's analytical unit 3 It in Cheng Shi analysis system, is analyzed and determined, is obtained a result by expert engineer;
Pre-feasibility judging unit 4 is obtained according to the analysis result of data analysis unit 2 and engineer's analytical unit 3 Feasibility judgement before proposed;In next step, stage feasibility judging unit 5 is according to the judgement knot of pre-feasibility judging unit 4 Fruit is carried out the information collection of next step, is analyzed stage by stage, obtained a result after feasibility analysis.
It although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with A variety of variations, modification, replacement can be carried out to these embodiments without departing from the principles and spirit of the present invention by understanding And modification, the scope of the present invention is defined by the appended.

Claims (9)

1. a kind of Electric Power Project Management system, it is characterised in that: including information acquisition unit (1), data analysis unit (2), work Cheng Shi analytical unit (3), pre-feasibility judging unit (4) and stage feasibility judging unit (5);Wherein:
Information acquisition unit (1), corresponding to proposed power engineering, all data information is acquired on the spot and respective material Amount is estimated;
Data analysis unit (2) is compared and analyzed according to the data that information acquisition unit (1) obtains with industry standard standard, It obtains a result;
The data that information acquisition unit (1) obtains are transferred in engineer's analysis system, pass through by engineer's analytical unit (3) Expert engineer analyzes and determines, obtains a result;
Pre-feasibility judging unit (4) is obtained according to the analysis result of data analysis unit (2) and engineer's analytical unit (3) Proposed preceding feasibility judgement out;
Stage feasibility judging unit (5) passes through feasibility analysis according to the judging result of pre-feasibility judging unit (4) Afterwards, the information collection for carrying out next step, is analyzed stage by stage, is obtained a result.
2. a kind of Electric Power Project Management system according to claim 1, it is characterised in that: the information acquisition unit (1) It is connected to data analysis unit (2) and engineer's analytical unit (3), data analysis unit (2) and engineer's analytical unit (3) are even It is connected to pre-feasibility judging unit (4), pre-feasibility judging unit (4) is connected to stage feasibility judging unit (5).
3. a kind of Electric Power Project Management system according to claim 1, it is characterised in that: the information acquisition unit (1) Including installed capacity data acquisition module (11), plant site selection measurement module (12), raw material dosage measuring and calculating module (13) and geology Situation estimation block (14);Wherein:
Installed capacity data acquisition module (11), capacity motor data needed for treating proposed power engineering are acquired;
Plant site selection measurement module (12), selects suitable construction address, and according to proposed power engineering scale to factory site The data such as area are acquired;
Raw material dosage calculates module (13), calculates according to proposed power engineering scale to required raw material dosage, obtains Specific data area;
Geological condition estimation block (14) searches factory site location according to the results of measuring of plant site selection measurement module (12) Geologic data.
4. a kind of Electric Power Project Management system according to claim 3, it is characterised in that: calculate module according to raw material dosage (13) results of measuring searches material supplier's quantity and the specific number of supply near factory site, if meet needed for raw material Dosage.
5. a kind of Electric Power Project Management system according to claim 3, it is characterised in that: the geological condition estimation block (14) need to obtain groundwater occurrence data in 10 kilometer range of factory site location and its periphery, tectonic plates mobile data and Earthquake occurrence frequency data over the years.
6. a kind of Electric Power Project Management system according to claim 1, it is characterised in that: the data analysis unit (2) Including model building module (21), standardization comparison module (22) and analyze and determine module (23);Wherein:
Model building module (21) establishes analysis model according to the information data that information acquisition unit (1) acquires;
It standardizes comparison module (22), analysis model data and codes and standards data in industry is compared.
It analyzes and determines module (23), comparing result is subjected to discriminatory analysis, it was therefore concluded that, it is sent to pre-feasibility judging unit (4)。
7. a kind of Electric Power Project Management system according to claim 1, it is characterised in that: engineer's analytical unit It (3) include same type comparison module (31), supply and demand comparison module (32) and empirical judgment module (33);Wherein:
Same type comparison module (31), engineer obtain information by data system, the electric power of measurement data and same type are set It is standby to be compared;
Supply and demand comparison module (32) calculates the results of measuring of module (13) according to raw material dosage, estimates the pre-output of power equipment More whether amount, meet supply-demand relationship;
Empirical judgment module (33), expert engineer is according to the comparison result and supply-demand relationship number with same type power equipment According to obtaining feasibility judging result.
8. a kind of Electric Power Project Management system according to claim 1, it is characterised in that: the pre-feasibility judgement is single First (4) include data collection module (41), Comparative result module (42) and data outputting module (43);Wherein:
Data collection module (41), by data analysis unit (2) and engineer's analytical unit, (3) Alto wash result and summarize;
Comparative result module (42), the information after summarizing carry out Comprehensive Comparison, obtain a result;
Data outputting module (43) shows the structure output that Comparative result module (42) obtains.
9. a kind of Electric Power Project Management system according to claim 1, it is characterised in that: the stage feasibility judgement is single First (5) include interim data acquisition module (51), by different level computing module (52) and result output module (53);Wherein:
Interim data acquisition module (51), obtains the interim data in power equipment process of construction;
Computing module (52) by different level, the data that will acquire are analyzed by different level, obtain the data result in each stage;
Result is carried out output and shown by as a result output module (53), and record management.
CN201910725875.0A 2019-08-07 2019-08-07 A kind of Electric Power Project Management system Pending CN110443508A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910725875.0A CN110443508A (en) 2019-08-07 2019-08-07 A kind of Electric Power Project Management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910725875.0A CN110443508A (en) 2019-08-07 2019-08-07 A kind of Electric Power Project Management system

Publications (1)

Publication Number Publication Date
CN110443508A true CN110443508A (en) 2019-11-12

Family

ID=68433803

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910725875.0A Pending CN110443508A (en) 2019-08-07 2019-08-07 A kind of Electric Power Project Management system

Country Status (1)

Country Link
CN (1) CN110443508A (en)

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1741046A (en) * 2004-08-27 2006-03-01 鸿富锦精密工业(深圳)有限公司 Sheet metal component Engineering Design Management System and method
CN101789628A (en) * 2010-01-08 2010-07-28 江苏大学 Enterprise electrical energy-saving management system
CN103903094A (en) * 2014-03-28 2014-07-02 国家电网公司 System and method for bearing capacity evaluation of power grid enterprise
CN104408549A (en) * 2014-10-31 2015-03-11 国家电网公司 Running state evaluation method of urban distribution network
US20170308934A1 (en) * 2016-04-22 2017-10-26 Economy Research Institute of State Grid Zhejiang Electric Power Management method of power engineering cost
CN108416531A (en) * 2018-03-19 2018-08-17 国网安徽省电力有限公司经济技术研究院 A kind of automatic evaluation method of distribution automation planning design effect
CN108428071A (en) * 2018-05-18 2018-08-21 河南尚和中知数据科技有限公司 A kind of industry assessment monitoring system and its appraisal procedure
CN108921412A (en) * 2018-06-22 2018-11-30 中船第九设计研究院工程有限公司 A kind of project feasibility assessment system based on simulation intelligence
CN109685558A (en) * 2018-12-14 2019-04-26 国网辽宁省电力有限公司经济技术研究院 A kind of Cost for Electric Power Engineering evaluation system based on BIM technology

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1741046A (en) * 2004-08-27 2006-03-01 鸿富锦精密工业(深圳)有限公司 Sheet metal component Engineering Design Management System and method
CN101789628A (en) * 2010-01-08 2010-07-28 江苏大学 Enterprise electrical energy-saving management system
CN103903094A (en) * 2014-03-28 2014-07-02 国家电网公司 System and method for bearing capacity evaluation of power grid enterprise
CN104408549A (en) * 2014-10-31 2015-03-11 国家电网公司 Running state evaluation method of urban distribution network
US20170308934A1 (en) * 2016-04-22 2017-10-26 Economy Research Institute of State Grid Zhejiang Electric Power Management method of power engineering cost
CN108416531A (en) * 2018-03-19 2018-08-17 国网安徽省电力有限公司经济技术研究院 A kind of automatic evaluation method of distribution automation planning design effect
CN108428071A (en) * 2018-05-18 2018-08-21 河南尚和中知数据科技有限公司 A kind of industry assessment monitoring system and its appraisal procedure
CN108921412A (en) * 2018-06-22 2018-11-30 中船第九设计研究院工程有限公司 A kind of project feasibility assessment system based on simulation intelligence
CN109685558A (en) * 2018-12-14 2019-04-26 国网辽宁省电力有限公司经济技术研究院 A kind of Cost for Electric Power Engineering evaluation system based on BIM technology

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
张晖: "浅析风电项目前期工作的相关环节", 《中国农业机械工业协会风能设备分会2011年度论文集(上)》 *

Similar Documents

Publication Publication Date Title
CN104504607A (en) Method for diagnosing photovoltaic power station faults on the basis of fuzzy clustering algorithm
CN103955777A (en) Photovoltaic power generation access power distribution network scheme design and analysis assessment auxiliary system
CN103235981A (en) Wind power quality trend predicting method
CN103279639A (en) Receiving-end network voltage stabilization overall process situation assessment and prevention and control method based on responses
CN102819813B (en) A kind of safety risk estimating method of automatic system of intelligent transformer station
CN104809665B (en) A kind of power distribution network method for early warning based on improvement Apriori algorithm
CN103489035A (en) Power grid electric energy quality comprehensive evaluation method based on gray weighting correlation analysis algorithm
CN105117532A (en) Modeling method for intelligent substation secondary equipment interval information model
CN110263391A (en) A kind of active power distribution network intelligence Sofe Switch planing method based on chance constraint
CN104506137A (en) Equipment fault diagnosis method and apparatus
CN106651658A (en) Non-intruding type dwelling electrical load decomposition method based on finite-state machine
Amini et al. Electrical energy systems resilience: A comprehensive review on definitions, challenges, enhancements and future proceedings
CN104834305A (en) Distribution network automated terminal telemetering abnormity analyzing system and method based on DMS system
Bo et al. Substation cloud computing for secondary auxiliary equipment
Cao et al. A Coordinated Emergency Response Scheme for Electricity and Watershed Networks Considering Spatio-Temporal Heterogeneity and Volatility of Rainstorm Disasters
CN102855394B (en) A kind of abnormal method of detection energy for building based on probability distribution
CN110443508A (en) A kind of Electric Power Project Management system
CN115983548A (en) Power distribution network intelligent planning method based on artificial intelligence technology
Ge et al. Improved harris hawks optimization for configuration of PV intelligent edge terminals
Zhu et al. On-site energy consumption technologies and prosumer marketing for distributed poverty alleviation photovoltaic linked to agricultural loads in china
Han et al. An online calculation method of theoretical power losses for high-voltage distribution system based on rapid modeling and data quality analysis
LU505190B1 (en) Method, Device and Equipment for Monitoring the Operation State of Photovoltaic Power Station
Feng Development status and development trend of smart grid
Yun et al. Study on the Index System of Windproof Safety Evaluation for Coastal Power Grids
Zeng et al. Research on area comprehensive utilization rate based on entropy weight and gray comprehensive relational analysis method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20191112

RJ01 Rejection of invention patent application after publication