CN110442103A - A kind of operation regulation method, apparatus, equipment and the storage medium of production equipment - Google Patents

A kind of operation regulation method, apparatus, equipment and the storage medium of production equipment Download PDF

Info

Publication number
CN110442103A
CN110442103A CN201910744789.4A CN201910744789A CN110442103A CN 110442103 A CN110442103 A CN 110442103A CN 201910744789 A CN201910744789 A CN 201910744789A CN 110442103 A CN110442103 A CN 110442103A
Authority
CN
China
Prior art keywords
production
equipment
amount
power
moment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910744789.4A
Other languages
Chinese (zh)
Other versions
CN110442103B (en
Inventor
肖勇
裴丛仙子
王岩
李秋硕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Southern Power Grid Co Ltd
Research Institute of Southern Power Grid Co Ltd
Original Assignee
China Southern Power Grid Co Ltd
Research Institute of Southern Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Southern Power Grid Co Ltd, Research Institute of Southern Power Grid Co Ltd filed Critical China Southern Power Grid Co Ltd
Priority to CN201910744789.4A priority Critical patent/CN110442103B/en
Publication of CN110442103A publication Critical patent/CN110442103A/en
Application granted granted Critical
Publication of CN110442103B publication Critical patent/CN110442103B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/418Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM]
    • G05B19/41865Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM] characterised by job scheduling, process planning, material flow
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B2219/00Program-control systems
    • G05B2219/30Nc systems
    • G05B2219/32Operator till task planning
    • G05B2219/32252Scheduling production, machining, job shop
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Quality & Reliability (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Automation & Control Theory (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • General Factory Administration (AREA)

Abstract

This application discloses a kind of operations of production equipment to regulate and control method, comprising: after receiving demand response period, demand response parameter and actual production demand, calculates corresponding planned production amount of each production cycle;The object run power at each moment of each production equipment in each production cycle is calculated according to planned production amount and actual production scale;Each production equipment is controlled at each moment according to each corresponding object run Power operation, enable production equipment in peak of power consumption period and low power consumption period corresponding adjustment object run power, so as in industrial processes, on the basis of can satisfy actual production demand, the pressure of network system when peak of power consumption can be avoided, the security and stability of network system in industrial processes is promoted.Disclosed herein as well is operation regulation device, equipment and the computer readable storage mediums of a kind of production equipment, all have above-mentioned beneficial effect.

Description

A kind of operation regulation method, apparatus, equipment and the storage medium of production equipment
Technical field
The present invention relates to Electric control field, in particular to the operation of a kind of production equipment regulation method, apparatus, equipment and Computer readable storage medium.
Background technique
In recent years, industrial production technology is fast-developing, and industrial scale is increasing, so that in industrial processes Electricity consumption it is also growing.Currently, being usually production equipment each when carrying out industrial production according to actual production demand Maximum operation power is set in the production cycle, so that production equipment can must complete production task most fast, still, due in work In industry production, the operation power of equipment is larger, especially when a large amount of equipment is run simultaneously, the control methods of this production equipment The electricity consumption that will lead in the production cycle is very big, all brings huge pressure to power plant and electric power transport, or even influence whole The safety and stability of a network system;Alternatively, by each production equipment of setting according to preset operation Power operation, e.g., Each production equipment is arranged to run according to lowest power, but so, it is low to will lead to industrial production efficiency, is unable to satisfy reality Border production requirement.
Therefore, how in guarantee industrial processes on the basis of actual production demand, power grid pressure is reduced, work is promoted The security and stability of network system, is a technical problem that technical personnel in the field need to solve at present in industry production process.
Summary of the invention
In view of this, the purpose of the present invention is to provide a kind of operations of production equipment to regulate and control method, work can be being ensured In industry production process on the basis of actual production demand, power grid pressure is reduced, promotes the peace of network system in industrial processes Total stability;It is a further object of the present invention to provide a kind of operation regulation device of production equipment, equipment and computer-readable deposit Storage media all has above-mentioned beneficial effect.
In order to solve the above technical problems, the present invention provides a kind of operation regulation method of production equipment, comprising:
After receiving demand response period, demand response parameter and actual production demand, each production week is calculated Phase corresponding planned production amount;
Each production equipment is calculated in each production cycle according to the planned production amount and actual production scale The object run power at each moment;
Each production equipment is controlled at each moment according to each corresponding object run Power operation.
Preferably, the production equipment includes intermediate equipment and off-the-shelf hardware;It is corresponding, it is described according to the planned production Amount and actual production scale calculate the mistake of the object run power at each moment of each production equipment in each production cycle Journey specifically includes:
Each intermediate equipment is calculated in the production cycle according to the amount of storage of actual production scale and raw material The output at each moment and the amount of storage of semi-finished product;Wherein, the amount of storage of the semi-finished product of current intermediate equipment is next The amount of storage of the raw material of grade intermediate equipment;
According to the storage of the semi-finished product of the planned production amount and upper level intermediate equipment corresponding with the off-the-shelf hardware Meter calculates the off-the-shelf hardware in the object run power at each moment.
Preferably, described that each intermediate equipment is calculated in the life according to actual production scale and the amount of storage of raw material The output at each moment and the amount of storage of semi-finished product produced in the period specifically includes:
It is currently run under power rating when the amount of storage of the raw material of the intermediate equipment is greater than the intermediate equipment Raw material demand when, the output at the intermediate equipment current time are as follows:
Wherein,Indicate intermediate equipment l in the output of d days t moments;αlIndicate that the intermediate equipment l unit is raw Produce the quantity of consumption unit energy semi-finished product produced in the time;Pl d,tIndicate the intermediate equipment l in the d days t moments Operation power;L indicates next stage intermediate equipment corresponding with the intermediate equipment l;IlIndicate intermediate equipment equipment l production one The quantity of the raw material of a semi-finished product consumption;
Wherein,
Wherein,Indicate the amount of storage of the semi-finished product of d days t moments of intermediate equipment l;Indicate that the centre is set Amount of storage of the standby l in the semi-finished product of last moment;ILIndicate next stage intermediate equipment L production corresponding with the intermediate equipment l The quantity of the raw material of one semi-finished product consumption;Indicate the output of semi-finished product of the intermediate equipment l in last moment; OL d,tIndicate the output of the next stage intermediate equipment of intermediate equipment l described in the d days t moments;
It is currently run under power rating when the amount of storage of the raw material of the intermediate equipment is less than the intermediate equipment Raw material demand when, the output at the intermediate equipment current time are as follows:
Preferably, described according to the half of the planned production amount and upper level intermediate equipment corresponding with the off-the-shelf hardware The amount of storage of finished product calculates the off-the-shelf hardware in the process of the object run power at each moment, specifically includes:
According toThe off-the-shelf hardware is calculated to exist The object run power at each moment;
Wherein, NweekIndicate the planned production amount;Indicate off-the-shelf hardware E in the output of d days t moments;D Indicate that total number of days of each production cycle, T indicate to plan working hour number in one day;Expression and institute State the corresponding upper level intermediate equipment E of off-the-shelf hardware E1,E2,…EnIn the amount of storage of the semi-finished product of d days t moments.
Preferably, the actual production scale includes:
Semi-finished product memory capacity and/or finished product memory capacity.
Preferably, each production equipment of control is at each moment according to each corresponding object run Power operation It specifically includes:
When the production equipment is the production equipment that power is continuously adjusted, by the operation for adjusting each production equipment Power, to control each production equipment at each moment according to each corresponding object run Power operation;
Wherein, adjustable range is It is production equipment M in the d days t The object run power at moment;The production equipment M includes intermediate equipment and off-the-shelf hardware;WithRespectively production is set The minimum operation power of standby M and maximum operation power, k indicate the quantity of the production equipment M;
When the production equipment is the nonadjustable more production equipments of power for producing same workpiece, foundationControl the quantity of the production equipment run in multiple production equipments Obtain object run power;
Wherein, k is the quantity of the production equipment M of operation;K is the total quantity of production equipment M;Indicate that the production is set The rated power of standby M.
Preferably, it is transported at each moment according to each corresponding object run power in each production equipment of control After row, further comprise:
Each production equipment is recorded in corresponding object run power of each moment.
In order to solve the above technical problems, the present invention also provides a kind of operation regulation devices of production equipment, comprising:
First computing module, for after receiving demand response period, demand response parameter and actual production demand, Calculate corresponding planned production amount of each production cycle;
Second computing module, for calculating each production equipment each according to the planned production amount and actual production scale The object run power at each moment in the production cycle;
Power control module, for controlling each production equipment at each moment according to each corresponding object run function Rate operation.
In order to solve the above technical problems, the present invention also provides a kind of operation adjusting devices of production equipment, comprising:
Memory, for storing computer program;
Processor realizes the operation regulation method of any of the above-described kind of production equipment when for executing the computer program Step.
In order to solve the above technical problems, the present invention also provides a kind of computer readable storage medium, it is described computer-readable Computer program is stored on storage medium, the computer program realizes any of the above-described kind of production equipment when being executed by processor Operation regulate and control method the step of.
The operation of production equipment provided by the invention regulates and controls method, by receiving demand response period, demand response After parameter and actual production demand, corresponding planned production amount of each production cycle is calculated;Then according to planned production amount The object run power at each moment of each production equipment in each production cycle is calculated with actual production scale;Control each production Equipment, according to each corresponding object run Power operation, enables production equipment in peak of power consumption period and electricity consumption at each moment The corresponding adjustment object run power of low-valley interval, so as to can satisfy actual production demand in industrial processes On the basis of, the pressure of network system when peak of power consumption can be avoided, the safety for promoting network system in industrial processes is steady It is qualitative.
In order to solve the above technical problems, the present invention also provides operation regulation device, equipment and the meters of a kind of production equipment Calculation machine readable storage medium storing program for executing, all has above-mentioned beneficial effect.
Detailed description of the invention
It in order to illustrate the embodiments of the present invention more clearly or the technical solution of the prior art, below will be to embodiment or existing Attached drawing needed in technical description is briefly described, it should be apparent that, the accompanying drawings in the following description is only this hair Bright some embodiments for those of ordinary skill in the art without creative efforts, can be with root Other attached drawings are obtained according to the attached drawing of offer.
Fig. 1 is a kind of flow chart of the operation regulation method of production equipment provided in an embodiment of the present invention;
Fig. 2 is a kind of present invention schematic diagram for producing link provided in this embodiment;
Fig. 3 is a kind of structure chart of the operation regulation device of production equipment provided in an embodiment of the present invention;
Fig. 4 is a kind of structure chart of the operation adjusting device of production equipment provided in an embodiment of the present invention.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
The core of the embodiment of the present invention is to provide a kind of operation regulation method of production equipment, can ensure industrial production In the process on the basis of actual production demand, power grid pressure is reduced, promotes the safety and stability of network system in industrial processes Property;Another core of the invention is to provide operation regulation device, equipment and the computer readable storage medium of a kind of production equipment, All have above-mentioned beneficial effect.
It is right with reference to the accompanying drawings and detailed description in order to make those skilled in the art more fully understand the present invention program The present invention is described in further detail.
Fig. 1 is a kind of flow chart of the operation regulation method of production equipment provided in an embodiment of the present invention.As shown in Figure 1, A kind of operation regulation method of production equipment includes:
S10: after receiving demand response period, demand response parameter and actual production demand, each life is calculated Produce period corresponding planned production amount.
It should be noted that needing to preset the demand response period in actual production process, that is, need to carry out The period of electricity consumption regulation, if 8 a.m. is to 10 points;Demand response parameter, that is, the parameters such as electric power for needing to regulate and control, such as exists 10M W is reduced on the basis of originally, and corresponding planned production amount of each production cycle is calculated according to actual production demand.Production Period can be either one month one week and wait the time cycles, be arranged according to actual needs, herein without limitation.
S20: when calculating each in each production cycle of each production equipment according to planned production amount and actual production scale The object run power at quarter.
It should be noted that this step mainly calculates each production equipment according to planned production amount and actual production scale Object run power at the time of in each production cycle.It is understood that in the actual production process, it is real needing to reach It under the premise of the production requirement of border, is limited by actual production scale, it is therefore desirable to according to actual production scale and demand response Period and demand response parameter corresponding object run power at the time of calculating variant in the production cycle.
S30: each production equipment is controlled at each moment according to each corresponding object run Power operation.
Specifically, controlling each production equipment after calculating production equipment each moment corresponding object run power and existing Each moment is according to corresponding object run Power operation.In the present embodiment, to the object run power that each production equipment is arranged Concrete mode without limitation, needs to ensure that each production equipment can be in time according to the object run Power operation of each setting.
The operation of production equipment provided in this embodiment regulates and controls method, by receiving demand response period, demand sound After answering parameter and actual production demand, corresponding planned production amount of each production cycle is calculated;Then according to planned production Amount and actual production scale calculate the object run power at each moment of each production equipment in each production cycle;Control each life Equipment is produced at each moment according to each corresponding object run Power operation, enables production equipment in peak of power consumption period and use The corresponding adjustment object run power of electric low-valley interval, so as to be needed can satisfy actual production in industrial processes On the basis of asking, the pressure of network system when peak of power consumption can be avoided, promotes the safety of network system in industrial processes Stability.
On the basis of the above embodiments, the present embodiment has made further instruction and optimization to technical solution, specifically, Production equipment includes intermediate equipment and off-the-shelf hardware;It is corresponding, each life is calculated according to planned production amount and actual production scale The process for producing the object run power at each moment of the equipment in each production cycle, specifically includes:
Each moment of each intermediate equipment in the production cycle is calculated according to the amount of storage of actual production scale and raw material The amount of storage of output and semi-finished product;Wherein, the amount of storage of the semi-finished product of current intermediate equipment is next stage intermediate equipment The amount of storage of raw material;
It is calculated according to the amount of storage of the semi-finished product of planned production amount and upper level intermediate equipment corresponding with off-the-shelf hardware Object run power of the off-the-shelf hardware at each moment.
In the present embodiment, production equipment includes intermediate equipment and off-the-shelf hardware;Off-the-shelf hardware refers to obtaining the life of finished product Equipment is produced, intermediate equipment refers to other production equipments in the production link other than off-the-shelf hardware.Due to producing chain There are continuous relationships for each production equipment in road, therefore current intermediate equipment is next stage using the semi-finished product that raw material are produced The raw material of intermediate equipment, the semi-finished product that the upper level intermediate equipment of off-the-shelf hardware is produced are the raw material of the off-the-shelf hardware; That is, the amount of storage of the semi-finished product of current intermediate equipment is the amount of storage of the raw material of next stage intermediate equipment.
Specifically, calculating the object run power at each moment of each production equipment in each production cycle in the present embodiment Process, be that each moment of each intermediate equipment in the production cycle first calculated according to the amount of storage of actual production scale and raw material Output and semi-finished product amount of storage, further according to planned production amount and upper level intermediate equipment corresponding with off-the-shelf hardware The amount of storage of semi-finished product calculates off-the-shelf hardware in the object run power at each moment.
It is understood that in actual operation, being worked as according to the amount of storage of the raw material of intermediate equipment and the intermediate equipment The size relation of the demand of raw material under preceding operation power rating, the output of intermediate equipment also will be corresponding different.As It is each in the production cycle to calculate each intermediate equipment according to the amount of storage of actual production scale and raw material for preferred embodiment The output at moment and the amount of storage of semi-finished product specifically include:
When the amount of storage of the raw material of intermediate equipment is greater than the need that intermediate equipment currently runs the raw material under power rating When the amount of asking, the output at intermediate equipment current time are as follows:
Wherein,Indicate intermediate equipment l in the output of d days t moments;αlWhen indicating intermediate equipment l production of units The quantity of interior consumption unit energy semi-finished product produced;Pl d,tIndicate intermediate equipment l in the operation function of the d days t moments Rate;L indicates next stage intermediate equipment corresponding with intermediate equipment l;IlIndicate that intermediate equipment equipment l produces a semi-finished product consumption Raw material quantity;
Wherein,
Wherein,Indicate the amount of storage of the semi-finished product of d days t moments of intermediate equipment l;Indicate that intermediate equipment l exists The amount of storage of the semi-finished product of last moment;ILIndicate that next stage intermediate equipment L corresponding with intermediate equipment l produces a semi-finished product The quantity of the raw material of consumption;Indicate intermediate equipment l in the output of the semi-finished product of last moment;OL d,tIt indicates the d days The output of the next stage intermediate equipment of t moment intermediate equipment l;
When the amount of storage of the raw material of intermediate equipment is less than the need that intermediate equipment currently runs the raw material under power rating When the amount of asking, the output at intermediate equipment current time are as follows:
It should be noted that actual production scale includes: semi-finished product memory capacity and/or finished product memory capacity.
Specifically, due to the limitation of the factors such as production site and equipment scale, it will be so that storing semi-finished product in production link Quantity be restricted, specific restraint condition is as follows:
Wherein, Cl maxFor semi-finished product production link in storable maximum capacity.
In addition, due to the uncertainty of order closing time and quantity on order, traffic conditions and limitation of transport capacity etc. Situation, off-the-shelf hardware finished product produced can not transport factory immediately, but store into warehouse.And due in the short time Warehouse can not be extended, therefore, the quantity of off-the-shelf hardware production finished product is limited by the finished product memory capacity in warehouse, that is, is stored Finished product quantity should be less than or equal to warehouse finished product memory capacity maximum value, specific restraint condition is as follows:
Wherein,For the quantity of the off-the-shelf hardware E finished product produced in the d days t moments, CE maxIt is finished product in warehouse In storable maximum capacity.
As it can be seen that the present embodiment is premised on meeting actual production demand, it is contemplated that the operation power and production performance of equipment Between relationship, and influence of the actual production scale to production plan is combined, to the target of each production equipment in production link Operation power is configured, so that can be realized when each production equipment is according to object run Power operation in demand response Period is adjusted productive power according to electricity consumption adjustment requirement.
On the basis of the above embodiments, the present embodiment has made further instruction and optimization to technical solution, specifically, Off-the-shelf hardware is calculated according to the amount of storage of the semi-finished product of planned production amount and upper level intermediate equipment corresponding with off-the-shelf hardware In the process of the object run power at each moment, specifically include:
According toOff-the-shelf hardware is calculated when each The object run power at quarter;
Wherein, NweekIndicate planned production amount;Indicate off-the-shelf hardware E in the output of d days t moments;D is indicated Total number of days of each production cycle, T indicate to plan working hour number in one day;It indicates and E pairs of off-the-shelf hardware The upper level intermediate equipment E answered1,E2,…EnIn the amount of storage of the semi-finished product of d days t moments.
Specifically, as shown in Fig. 2, being a kind of schematic diagram for producing link provided in this embodiment, wherein off-the-shelf hardware E In the output of d days t momentsDepend not only on off-the-shelf hardware E in the object run power of the d days t moments, also Amount of storage depending on raw material (semi-finished product) needed for off-the-shelf hardware E production at the corresponding moment in currently production queue, That is the upper level intermediate equipment E of off-the-shelf hardware E1,E2,…EnIn the amount of storage of the semi-finished product of d days t moments.
As it can be seen that the process provided in this embodiment for obtaining off-the-shelf hardware object run power, has fully considered off-the-shelf hardware The condition of production in production link, thus when ensureing off-the-shelf hardware according to calculated object run Power operation, Neng Gouman Full border production requirement.
As preferred embodiment, each production equipment is controlled at each moment according to each corresponding object run Power operation It specifically includes:
When production equipment is the production equipment that power is continuously adjusted, by adjusting the operation power of each production equipment, with Each production equipment is controlled at each moment according to each corresponding object run Power operation;
Wherein, adjustable range is It is production equipment M in the d days t The object run power at moment;Production equipment M includes intermediate equipment and off-the-shelf hardware;WithRespectively production equipment M's Minimum operation power and maximum operation power, k indicate the quantity of production equipment M;
When production equipment is the nonadjustable more production equipments of power for producing same workpiece, foundationThe quantity for controlling the production equipment run in multiple production equipments obtains Object run power;
Wherein, k is the quantity of the production equipment M of operation;K is the total quantity of production equipment M;Indicate production equipment M Rated power.
It should be noted that when production equipment separate unit production equipment uncontrollable for power, the mesh of the production equipment Mark operation power is rated power, that is,
The method for present embodiments providing a variety of adjusting production equipment operation power, can be applicable in a plurality of types of productions and set It is standby, it is executed convenient for practical operation.
On the basis of the above embodiments, the present embodiment has made further instruction and optimization to technical solution, specifically, Each production equipment is being controlled after each moment is according to each corresponding object run Power operation, is further comprising:
Each production equipment is recorded in corresponding object run power of each moment.
Specifically, further being recorded in calculated each production equipment after corresponding object run power of each moment Each production equipment is in corresponding object run power of each moment.It should be noted that specific recording mode can be with text Or record in table form, the present embodiment does not limit this.More specifically, it can be with memory bar, hard disk, TF The modes such as (Trans-flash Card) card and SD (Secure Digital Memory Card) card carry out record storage, specifically It is selected according to actual needs, the present embodiment does not limit this.
In the present embodiment, by recording each production equipment in corresponding object run power of each moment, it can be convenient for subsequent It further checks the history working condition of each production equipment, and analyzes the follow-up work of each production equipment according to the data of record Situation further promotes the usage experience of user.
It should be noted that according to the electricity consumption policy that the excitation requirement in China responds, in the electricity price phase of demand response period Electricity price compared with the non-demand response period is more cheap.It therefore, in actual operation, can be by the way that each of each production equipment be arranged The operation power at moment so that each production equipment output at different times is different so that meet planned production amount and Under the premise of actual production demand, demands reduction and respond the output of period and the operation power of production equipment, increase non-demand The output of period and the operation power of production equipment are responded, industrial electricity consumers response demand response is realized, obtains demand sound Economic compensation is answered, achievees the effect that power cost saving.Specifically, completing actual production demand in the case where considering demand response When, the objective function of the required electricity charge is as follows:
Wherein, number of segment and production equipment number when D, T and M respectively indicate total number of days of production cycle, plan in one day;TcTable Show at the beginning of being connected to the excitation requirement response period that demand response publisher is issued, TcompExpression is connected to demand response hair The finish time for the excitation requirement response period that cloth person is issued;ptThe unit price of power of t moment in the case of expression tou power price; Pi d,tIndicate the object run power of the d days t moment production equipment i;pcompIndicate stimulable type demand response unit response load The price compensated;Pbaseline d,tIndicate the baseline load of the d days t moment demand responses, that is, the operation of reward can be obtained Power, to P under different electric power structuresbaseline d,tValue is arranged according to actual needs there are different regulations.
As it can be seen that corresponding by respectively producing the moment in response period according to demand and demand response parameter setting production cycle Object run power can adjust the object run power of production equipment in peak of power consumption period and low power consumption period correspondence, It, can be further there are timesharing on the basis of can satisfy actual production demand so as in industrial processes It is opposite to reduce the electricity charge in the case where electricity price, reduce electric cost.
Detailed retouch has been carried out for a kind of embodiment of the operation regulation method of production equipment provided by the invention above It states, the present invention also provides a kind of operation regulation device of production equipment corresponding with this method, equipment and computer-readable deposits Storage media, due to device, equipment and computer readable storage medium part embodiment and method part embodiment mutually according to It answers, therefore the embodiment of device, equipment and computer readable storage medium part refers to the description of the embodiment of method part, Here it wouldn't repeat.
Fig. 3 is a kind of structure chart of the operation regulation device of production equipment provided in an embodiment of the present invention, as shown in figure 3, A kind of operation regulation device of production equipment includes:
First computing module 31, for receiving demand response period, demand response parameter and actual production demand Afterwards, corresponding planned production amount of each production cycle is calculated;
Second computing module 32, for calculating each production equipment in each life according to planned production amount and actual production scale Produce the object run power at each moment in the period;
Power control module 33 is transported at each moment according to each corresponding object run power for controlling each production equipment Row.
The operation regulation device of production equipment provided in an embodiment of the present invention, the operation regulation side with above-mentioned production equipment The beneficial effect of method.
Fig. 4 is a kind of structure chart of the operation adjusting device of production equipment provided in an embodiment of the present invention, as shown in figure 4, A kind of operation adjusting device of production equipment includes:
Memory 41, for storing computer program;
Processor 42 realizes the step of operation such as above-mentioned production equipment regulates and controls method when for executing computer program.
The operation adjusting device of production equipment provided in an embodiment of the present invention, the operation regulation side with above-mentioned production equipment The beneficial effect of method.
In order to solve the above technical problems, the present invention also provides a kind of computer readable storage medium, computer-readable storage It is stored with computer program on medium, the operation regulation side such as above-mentioned production equipment is realized when computer program is executed by processor The step of method.
Computer readable storage medium provided in an embodiment of the present invention, the operation regulation method with above-mentioned production equipment Beneficial effect.
Above to operation regulation method, apparatus, equipment and the computer-readable storage of production equipment provided by the present invention Medium is described in detail.Principle and implementation of the present invention are described for specific embodiment used herein, The above description of the embodiment is only used to help understand the method for the present invention and its core ideas.It should be pointed out that for this technology For the those of ordinary skill in field, without departing from the principle of the present invention, several improvement can also be carried out to the present invention And modification, these improvements and modifications also fall within the scope of protection of the claims of the present invention.
Each embodiment is described in a progressive manner in specification, the highlights of each of the examples are with other realities The difference of example is applied, the same or similar parts in each embodiment may refer to each other.For device disclosed in embodiment Speech, since it is corresponded to the methods disclosed in the examples, so being described relatively simple, related place is referring to method part illustration .
Professional further appreciates that, unit described in conjunction with the examples disclosed in the embodiments of the present disclosure And algorithm steps, can be realized with electronic hardware, computer software, or a combination of the two, in order to clearly demonstrate hardware and The interchangeability of software generally describes each exemplary composition and step according to function in the above description.These Function is implemented in hardware or software actually, the specific application and design constraint depending on technical solution.Profession Technical staff can use different methods to achieve the described function each specific application, but this realization is not answered Think beyond the scope of this invention.

Claims (10)

1. a kind of operation of production equipment regulates and controls method characterized by comprising
After receiving demand response period, demand response parameter and actual production demand, each production cycle pair is calculated The planned production amount answered;
When calculating each in each production cycle of each production equipment according to the planned production amount and actual production scale The object run power at quarter;
Each production equipment is controlled at each moment according to each corresponding object run Power operation.
2. the method according to claim 1, wherein the production equipment includes intermediate equipment and off-the-shelf hardware; It is corresponding, it is described that each production equipment is calculated in each production cycle according to the planned production amount and actual production scale Each moment object run power process, specifically include:
Each institute of each intermediate equipment in the production cycle is calculated according to the amount of storage of actual production scale and raw material State the output at moment and the amount of storage of semi-finished product;Wherein, the amount of storage of the semi-finished product of current intermediate equipment is in next stage Between equipment raw material amount of storage;
According to the storage meter of the semi-finished product of the planned production amount and upper level intermediate equipment corresponding with the off-the-shelf hardware The off-the-shelf hardware is calculated in the object run power at each moment.
3. according to the method described in claim 2, it is characterized in that, the amount of storage according to actual production scale and raw material The amount of storage of the output and semi-finished product that calculate each moment of each intermediate equipment in the production cycle is specific Include:
The original under power rating is currently run when the amount of storage of the raw material of the intermediate equipment is greater than the intermediate equipment When the demand of material, the output at the intermediate equipment current time are as follows:
Wherein,Indicate intermediate equipment l in the output of d days t moments;αlWhen indicating the intermediate equipment l production of units The quantity of interior consumption unit energy semi-finished product produced;Pl d,tIndicate the intermediate equipment l in the fortune of d days t moments Row power;L indicates next stage intermediate equipment corresponding with the intermediate equipment l;IlIndicate intermediate equipment equipment l production one and half The quantity of the raw material of finished product consumption;
Wherein,
Wherein,Indicate the amount of storage of the semi-finished product of d days t moments of intermediate equipment l;Indicate that the intermediate equipment l exists The amount of storage of the semi-finished product of last moment;ILIndicate next stage intermediate equipment L production one and half corresponding with the intermediate equipment l The quantity of the raw material of finished product consumption;Indicate the output of semi-finished product of the intermediate equipment l in last moment;OL d,tTable Show the output of the next stage intermediate equipment of intermediate equipment l described in the d days t moments;
The original under power rating is currently run when the amount of storage of the raw material of the intermediate equipment is less than the intermediate equipment When the demand of material, the output at the intermediate equipment current time are as follows:
4. according to the method described in claim 3, it is characterized in that, described set according to the planned production amount and with the finished product The amount of storage of the semi-finished product of standby corresponding upper level intermediate equipment calculates target of the off-the-shelf hardware at each moment and transports The process of row power, specifically includes:
According toThe off-the-shelf hardware is calculated in each institute State the object run power at moment;
Wherein, NweekIndicate the planned production amount;Indicate off-the-shelf hardware E in the output of d days t moments;D is indicated Total number of days of each production cycle, T indicate to plan working hour number in one day;Indicate with it is described at The corresponding upper level intermediate equipment E of product equipment E1,E2,…EnIn the amount of storage of the semi-finished product of d days t moments.
5. method according to any one of claims 1 to 4, which is characterized in that the actual production scale includes:
Semi-finished product memory capacity and/or finished product memory capacity.
6. according to the method described in claim 5, it is characterized in that, each production equipment of control is pressed at each moment It is specifically included according to each corresponding object run Power operation:
When the production equipment is the production equipment that power is continuously adjusted, by the operation function for adjusting each production equipment Rate, to control each production equipment at each moment according to each corresponding object run Power operation;
Wherein, adjustable range is It is production equipment M in the d days t moments Object run power;The production equipment M includes intermediate equipment and off-the-shelf hardware;WithRespectively production equipment M Minimum operation power and maximum operation power, k indicate the quantity of the production equipment M;
When the production equipment is the nonadjustable more production equipments of power for producing same workpiece, foundationControl the quantity of the production equipment run in multiple production equipments Obtain object run power;
Wherein, k is the quantity of the production equipment M of operation;K is the total quantity of production equipment M;Indicate the production equipment M Rated power.
7. according to the method described in claim 6, it is characterized in that, in each production equipment of control at each moment After each corresponding object run Power operation, further comprise:
Each production equipment is recorded in corresponding object run power of each moment.
8. a kind of operation regulation device of production equipment characterized by comprising
First computing module, for calculating after receiving demand response period, demand response parameter and actual production demand Corresponding planned production amount of each production cycle out;
Second computing module, for calculating each production equipment each described according to the planned production amount and actual production scale The object run power at each moment in the production cycle;
Power control module is transported at each moment according to each corresponding object run power for controlling each production equipment Row.
9. a kind of operation adjusting device of production equipment characterized by comprising
Memory, for storing computer program;
Processor realizes the fortune of production equipment as described in any one of claim 1 to 7 when for executing the computer program The step of row regulation method.
10. a kind of computer readable storage medium, which is characterized in that be stored with computer on the computer readable storage medium Program, the computer program realize the operation of production equipment as described in any one of claim 1 to 7 when being executed by processor The step of regulation method.
CN201910744789.4A 2019-08-13 2019-08-13 Operation regulation and control method, device, equipment and storage medium of production equipment Active CN110442103B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910744789.4A CN110442103B (en) 2019-08-13 2019-08-13 Operation regulation and control method, device, equipment and storage medium of production equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910744789.4A CN110442103B (en) 2019-08-13 2019-08-13 Operation regulation and control method, device, equipment and storage medium of production equipment

Publications (2)

Publication Number Publication Date
CN110442103A true CN110442103A (en) 2019-11-12
CN110442103B CN110442103B (en) 2021-09-17

Family

ID=68435129

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910744789.4A Active CN110442103B (en) 2019-08-13 2019-08-13 Operation regulation and control method, device, equipment and storage medium of production equipment

Country Status (1)

Country Link
CN (1) CN110442103B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111146788A (en) * 2020-01-21 2020-05-12 南方电网科学研究院有限责任公司 Automatic power generation control method
CN113221527A (en) * 2021-05-10 2021-08-06 首钢京唐钢铁联合有限责任公司 Production form generation method, device, equipment and medium

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20070061049A1 (en) * 2005-09-12 2007-03-15 Toshikatsu Masuda System, method and program for designing a utility facility and method for manufacturing a product by the utility facility
CN103280893A (en) * 2013-05-30 2013-09-04 东南大学 Industrial user energy management device and control method thereof
CN104200389A (en) * 2014-02-21 2014-12-10 东华大学 Product power consumption allocation method based on production process time and equipment working time
CN104917298A (en) * 2015-07-16 2015-09-16 湘潭大学 Automatic demand response based load control device and method for high energy consumption type enterprise
CN108803524A (en) * 2018-06-28 2018-11-13 烟台东方能源科技有限公司 A kind of industrial equipment control strategy based on Production Scheduling orderly function
CN109063925A (en) * 2018-08-16 2018-12-21 合肥工业大学 It is a kind of meter and Load aggregation quotient regional complex energy resource system optimizing operation method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20070061049A1 (en) * 2005-09-12 2007-03-15 Toshikatsu Masuda System, method and program for designing a utility facility and method for manufacturing a product by the utility facility
CN103280893A (en) * 2013-05-30 2013-09-04 东南大学 Industrial user energy management device and control method thereof
CN104200389A (en) * 2014-02-21 2014-12-10 东华大学 Product power consumption allocation method based on production process time and equipment working time
CN104917298A (en) * 2015-07-16 2015-09-16 湘潭大学 Automatic demand response based load control device and method for high energy consumption type enterprise
CN108803524A (en) * 2018-06-28 2018-11-13 烟台东方能源科技有限公司 A kind of industrial equipment control strategy based on Production Scheduling orderly function
CN109063925A (en) * 2018-08-16 2018-12-21 合肥工业大学 It is a kind of meter and Load aggregation quotient regional complex energy resource system optimizing operation method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
张勇 等: "制丝线生产设备节能运行模式的优化设计", 《烟草科技》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111146788A (en) * 2020-01-21 2020-05-12 南方电网科学研究院有限责任公司 Automatic power generation control method
CN111146788B (en) * 2020-01-21 2021-09-10 南方电网科学研究院有限责任公司 Automatic power generation control method
CN113221527A (en) * 2021-05-10 2021-08-06 首钢京唐钢铁联合有限责任公司 Production form generation method, device, equipment and medium

Also Published As

Publication number Publication date
CN110442103B (en) 2021-09-17

Similar Documents

Publication Publication Date Title
CN104616069A (en) Annual power generation plan rolled decomposition optimization method taking balance between plan finishing rate and load rate into consideration
CN104158231B (en) A kind of unit allocation pattern dynamic converting method based on real-time generation schedule
CN106844916A (en) A kind of generating and electricity consumption method for organizing and device based on peak regulation assisted hatching
CN110034587B (en) Optimized scheduling method
CN104537428B (en) One kind meter and the probabilistic economical operation appraisal procedure of wind power integration
CN108092322B (en) AGC control method based on frequency modulation market environment
CN110442103A (en) A kind of operation regulation method, apparatus, equipment and the storage medium of production equipment
CN109447379A (en) The step-by-step optimization method and system of long-term power secure correction in a kind of
CN104376165A (en) Auxiliary service policy simulation model for user to participate in new energy power generation peak shaving
CN112632842A (en) Trading harmony based power grid and building energy consumption trading matching method and system
CN105939017B (en) The practical application method for solving of the idle work optimization of intersegmental coupling during consideration
CN111130149B (en) Power grid power generation active control method and system considering performance distribution characteristics
CN106887858A (en) A kind of energy-storage system tracking plan for accessing generation of electricity by new energy is exerted oneself method and device
DE212017000235U1 (en) Control unit for controlling energy content and power flow in a local power grid
CN111723980A (en) Power distribution network transformer substation capacity optimization method for large-scale load regulation
CN108365637A (en) A kind of power transmission plan and draw water energy storing and electricity generating plan optimization method and system
CN115481856A (en) Comprehensive energy system multi-scale scheduling method and system considering comprehensive demand response
CN103051001A (en) Minor-cycle real-time generation schedule
CN105186506A (en) Regional power grid real-time scheduling plan adjustment method
CN106953338A (en) A kind of var Optimization Method in Network Distribution and device
CN111027860A (en) Day-interior tie line plan adjusting method and system considering new energy volatility
CN109658077A (en) A kind of excitation regulation method based on the block chain network for calculating power common recognition
CN109658076A (en) A kind of excitation regulator control system based on the block chain network for calculating power common recognition
Radaideh et al. Demand response planning in day-ahead market for improving power system flexibility with high wind penetration levels
CN109167350A (en) A kind of construction method of industrial load response model

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant