CN110440610A - A kind of depositing dust high efficiency metallurgy electric arc furnaces - Google Patents

A kind of depositing dust high efficiency metallurgy electric arc furnaces Download PDF

Info

Publication number
CN110440610A
CN110440610A CN201910754201.3A CN201910754201A CN110440610A CN 110440610 A CN110440610 A CN 110440610A CN 201910754201 A CN201910754201 A CN 201910754201A CN 110440610 A CN110440610 A CN 110440610A
Authority
CN
China
Prior art keywords
furnace body
support column
adjusting rod
electric arc
high efficiency
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910754201.3A
Other languages
Chinese (zh)
Inventor
夏颖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201910754201.3A priority Critical patent/CN110440610A/en
Publication of CN110440610A publication Critical patent/CN110440610A/en
Pending legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F27FURNACES; KILNS; OVENS; RETORTS
    • F27DDETAILS OR ACCESSORIES OF FURNACES, KILNS, OVENS, OR RETORTS, IN SO FAR AS THEY ARE OF KINDS OCCURRING IN MORE THAN ONE KIND OF FURNACE
    • F27D11/00Arrangement of elements for electric heating in or on furnaces
    • F27D11/08Heating by electric discharge, e.g. arc discharge
    • F27D11/10Disposition of electrodes
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F27FURNACES; KILNS; OVENS; RETORTS
    • F27DDETAILS OR ACCESSORIES OF FURNACES, KILNS, OVENS, OR RETORTS, IN SO FAR AS THEY ARE OF KINDS OCCURRING IN MORE THAN ONE KIND OF FURNACE
    • F27D17/00Arrangements for using waste heat; Arrangements for using, or disposing of, waste gases
    • F27D17/001Extraction of waste gases, collection of fumes and hoods used therefor
    • F27D17/003Extraction of waste gases, collection of fumes and hoods used therefor of waste gases emanating from an electric arc furnace
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F27FURNACES; KILNS; OVENS; RETORTS
    • F27DDETAILS OR ACCESSORIES OF FURNACES, KILNS, OVENS, OR RETORTS, IN SO FAR AS THEY ARE OF KINDS OCCURRING IN MORE THAN ONE KIND OF FURNACE
    • F27D21/00Arrangements of monitoring devices; Arrangements of safety devices
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F27FURNACES; KILNS; OVENS; RETORTS
    • F27DDETAILS OR ACCESSORIES OF FURNACES, KILNS, OVENS, OR RETORTS, IN SO FAR AS THEY ARE OF KINDS OCCURRING IN MORE THAN ONE KIND OF FURNACE
    • F27D21/00Arrangements of monitoring devices; Arrangements of safety devices
    • F27D21/02Observation or illuminating devices
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F27FURNACES; KILNS; OVENS; RETORTS
    • F27DDETAILS OR ACCESSORIES OF FURNACES, KILNS, OVENS, OR RETORTS, IN SO FAR AS THEY ARE OF KINDS OCCURRING IN MORE THAN ONE KIND OF FURNACE
    • F27D21/00Arrangements of monitoring devices; Arrangements of safety devices
    • F27D2021/0007Monitoring the pressure

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Vertical, Hearth, Or Arc Furnaces (AREA)
  • Waste-Gas Treatment And Other Accessory Devices For Furnaces (AREA)

Abstract

The invention discloses a kind of depositing dust high efficiency metallurgy electric arc furnaces, including furnace body, support column and cyclone dust removal case, the bottom of furnace body is equipped with pedestal, furnace body is mounted on the top of pedestal, pedestal, support column and cyclone dust removal case are arranged in parallel, the side of furnace body is equipped with observation window, the other side of furnace body is equipped with heat-insulated fixed block, observation window is fixedly welded with furnace body respectively with heat-insulated fixed block, the inside of heat-insulated fixed block is fixedly installed with hydraulic cylinder, hydraulic stem is installed above hydraulic cylinder, it is flexibly connected between hydraulic stem and hydraulic cylinder, the top of hydraulic stem is equipped with connecting plate, it is fixedly welded between connecting plate and hydraulic stem, connecting plate is set to the top of furnace body, connecting plate is equipped with an elongated through-hole, the inside of through-hole is separately installed with adjusting rod one and adjusting rod two, two electrode tips of the utility model setting can work at the same time, it can satisfy different smeltings Gold bar part, and flue dust can be made sufficiently to be handled by cyclone dust removal case.

Description

A kind of depositing dust high efficiency metallurgy electric arc furnaces
Technical field
The present invention relates to smelting equipment technical field, specially a kind of depositing dust high efficiency metallurgy electric arc furnaces.
Background technique
Metal smelt technology is widely used in China, and especially steel-smelting technology is the project that China endeavours research, at present state Sparetime university, state-owned enterprise mostly uses electric-arc furnace steelmaking mode, and electric arc furnaces (abbreviation EAF) steel-making is the method for making steel using electric energy as heat source, It is so that electric energy is changed into thermal energy in arc light, and by arc radiation and electricity by the electric arc for generation of discharging between electrode and furnace charge The direct effect of arc heats and melts metal charge and clinker, smelts a kind of steel-making side of the steel and alloy of various composition qualification out Method, electric arc furnaces are bigger than other converter technological flexibilities, can be effectively removed the impurity such as sulphur, phosphorus, furnace temperature is easy to control, equipment Occupied area is small, and suitable for the melting of superior alloy steel, electric arc furnaces can generate a large amount of dust, endanger operating personnel when smelting Health, dusty gas discharge after also pollute the environment, and the electrode of existing electric arc furnaces be it is relatively-stationary, for difference Raw material cannot change interelectrode distance adjustment relevant parameter, and existing electric arc furnaces is after the completion of metallurgy, it is necessary to topple over All molten steel can all be poured out, there are certain security risk, electricity when electrode residual temperature when promoting electrode is injured and jacked All there is insecurity factor in the rollover etc. of arc furnace.
Summary of the invention
The purpose of the present invention is to provide a kind of depositing dust high efficiency metallurgy electric arc furnaces, to solve to propose in above-mentioned background technique The problem of.
To achieve the above object, the invention provides the following technical scheme: a kind of depositing dust high efficiency metallurgy electric arc furnaces, including furnace Body, support column and cyclone dust removal case, the bottom of the furnace body are equipped with pedestal, and the furnace body is installed on the top of the base, institute Pedestal, support column and the cyclone dust removal case is stated to be arranged in parallel, the side of the furnace body is equipped with observation window, the furnace body it is another Side is equipped with heat-insulated fixed block, and the observation window is fixedly welded with the furnace body respectively with the heat-insulated fixed block, described heat-insulated solid The inside for determining block is fixedly installed with hydraulic cylinder, is equipped with hydraulic stem above the hydraulic cylinder, the hydraulic stem with it is described hydraulic It being flexibly connected between cylinder, the top of the hydraulic stem is equipped with connecting plate, it is fixedly welded between the connecting plate and the hydraulic stem, The connecting plate is set to the top of the furnace body, and the connecting plate is equipped with an elongated through-hole, and the inside of the through-hole is distinguished Adjusting rod one and adjusting rod two are installed.
Preferably, guide holder one, guide holder two and guide holder three, the adjusting rod one are respectively equipped with above the furnace body It is connected to the inner wall of the furnace body, the guiding by the guide holder one and the guide holder two respectively with the adjusting rod two The inner wall of seat three is equipped with connecting tube, and the both ends of the connecting tube are respectively equipped with water inlet pipe and outlet pipe, the water inlet pipe and institute Outlet pipe is stated respectively with the inner wall for being connected to the connecting tube and through the connecting tube.
Preferably, the inner wall of the adjusting rod one and the adjusting rod two is respectively equipped with electrode connection bar, and the electrode connects The bottom of line bar is equipped with electrode tip, and the bottom of the adjusting rod one and the adjusting rod two is respectively equipped with reducing sleeve, the electricity Pole junction pole passes through the reducing sleeve respectively and connect with the electrode tip.
Preferably, the outer wall of the furnace body is respectively equipped with exhaust outlet, pressure sensor, liquid outlet, exhaust tube and air inlet pipe, The exhaust outlet and the liquid outlet are respectively arranged at the lower section of the hydraulic cylinder and communicate with the furnace body, the pressure sensing Device is set to the side of the guide holder three.
Preferably, the support column is set to the side of the furnace body, and the top of the support column is close to the furnace body Side is equipped with mounting rack, and the bottom of the mounting rack is equipped with mounting blocks, solid between the support column, mounting rack and the mounting blocks Fixed welding, the bottom of the mounting blocks are equipped with dust gathering arrester, and the inner wall of the dust gathering arrester is equipped with measured oxygen concentration instrument, described The bottom of support column is equipped with driving device close to the side of the furnace body, and the driving device and the measured oxygen concentration instrument connect It connects.
Preferably, the top of the mounting blocks connects bellows, by described between the bellows and the dust gathering arrester Mounting blocks connection, the other end of the bellows are equipped with connection air hose, fixed between the connection air hose and the bellows to connect It connects, the bottom of the connection air hose is connected to the cyclone dust removal case.
Preferably, the cyclone dust removal case is set to side of the support column far from the furnace body, the cyclone dust removal Case far from the support column one end be equipped with blower, the avris of the assembling and the cyclone dust removal case, the blower The other end is equipped with air-exhausting duct.
Compared with prior art, the beneficial effects of the present invention are:
(1) hydraulic cylinder of the present invention is arranged in the heat-insulated fixed block, effectively increases making for the hydraulic cylinder in this way Use the service life.
(2) adjusting rod one and the adjusting rod two that the present invention is arranged can slide in the through-hole, realize institute The change for stating distance between electrode tip can satisfy different metallurgy conditions, ensures in electric arc furnaces and most preferably smelts operating condition.
(3) present invention carries out out liquid by the liquid outlet of bottom opening, avoids heat injury when promoting electrode tip With the security risk when inclination furnace body, it is more abundant that such mode goes out liquid.
(4) present invention drives the dust gathering arrester that the dust in metallurgical process is drawn into the whirlwind by the blower It is then exhausted from after being handled in dust cleaning case, not only will not influence being normally carried out for metallurgy, and air in effective cleaning shop, Ensure the safety of operator, and avoids the pollution of environment.
(5) operation of the present invention personnel can observe the case where position and melting of electrode by the observation window.
(6) the measured oxygen concentration instrument that the present invention is arranged in the dust gathering arrester, can be used for measuring metallurgical process In oxygen concentration so that metallurgy it is more efficient.
Detailed description of the invention
Fig. 1 is entirety perspective view of the present invention;
Fig. 2 is furnace interior structure chart of the present invention;
Fig. 3 is two internal structure chart of adjusting rod one of the present invention and adjusting rod;
Fig. 4 is connecting tube solid anatomical structure figure of the present invention;
Fig. 5 is integrated cover internal structure chart of the present invention;
In figure: 1. furnace bodies, 2. support columns, 3. cyclone dust removal casees, 4. pedestals, 5. observation windows, 6. heat-insulated fixed blocks, 7. hydraulic cylinders, 8. hydraulic stem, 9. connecting plates, 10. through-holes, 11. adjusting rods one, 12. adjusting rods two, 13. guide holders one, 14. guide holders two, 15. Guide holder three, 16. connecting tubes, 17. water inlet pipes, 18. outlet pipes, 19. electrode connection bars, 20. electrode tips, 21. reducing sleeves, 22. Exhaust outlet, 23. pressure sensors, 24. liquid outlets, 25. exhaust tubes, 26. air inlet pipe, 27. mounting racks, 28. mounting blocks, 29. collection Dust hood, 30. measured oxygen concentration instrument, 31. driving devices, 32. bellowss, 33. connection air hoses, 34. blowers, 35. air-exhausting ducts.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
Fig. 1-5 is please referred to, the present invention provides a kind of technical solution: a kind of depositing dust high efficiency metallurgy electric arc furnaces, including furnace body 1, the bottom of support column 2 and cyclone dust removal case 3, the furnace body 1 is equipped with pedestal 4, and the furnace body 1 is mounted on the upper of the pedestal 4 Side, the pedestal 4, support column 2 and the cyclone dust removal case 3 are arranged in parallel, and the side of the furnace body 1 is equipped with observation window 5, operation Personnel can observe the case where position and melting of electrode by the observation window 5, and the other side of the furnace body 1 is equipped with heat-insulated Fixed block 6, the observation window 5 are fixedly welded with the furnace body 1 respectively with the heat-insulated fixed block 6, the heat-insulated fixed block 6 Inside is fixedly installed with hydraulic cylinder 7, and the hydraulic cylinder 7 is arranged in the heat-insulated fixed block 6, effectively increases so described The service life of hydraulic cylinder 7, the top of the hydraulic cylinder 7 is equipped with hydraulic stem 8, between the hydraulic stem 8 and the hydraulic cylinder 7 It is flexibly connected, the top of the hydraulic stem 8 is equipped with connecting plate 9, is fixedly welded between the connecting plate 9 and the hydraulic stem 8, institute The top that connecting plate 9 is set to the furnace body 1 is stated, the connecting plate 9 is equipped with an elongated through-hole 10, the inside of the through-hole 10 It is separately installed with adjusting rod 1 and adjusting rod 2 12.
In the present embodiment, the top of the furnace body 1 is respectively equipped with guide holder 1, guide holder 2 14 and guide holder 3 15, The adjusting rod 1 and the adjusting rod 2 12 are connected to institute by the guide holder 1 and the guide holder 2 14 respectively State the inner wall of furnace body 1, the inner wall of the guide holder 3 15 is equipped with connecting tube 16, the both ends of the connecting tube 16 be respectively equipped with into Water pipe 17 and outlet pipe 18, the water inlet pipe 17 and the outlet pipe 18 respectively with the inner wall for being connected to the connecting tube 16 and pass through It is through at the connecting tube 16.
In the present embodiment, the inner wall of the adjusting rod 1 and the adjusting rod 2 12 is respectively equipped with electrode connection bar 19, The bottom of the electrode connection bar 19 is equipped with electrode tip 20, the bottom difference of the adjusting rod 1 and the adjusting rod 2 12 Equipped with reducing sleeve 21, the electrode connection bar 19 is connect by the reducing sleeve 21 with the electrode tip 20 respectively, the institute of setting Stating adjusting rod 1 and the adjusting rod 2 12 can slide in the through-hole 10, realize distance between the electrode tip 20 Change, can satisfy different metallurgy conditions, ensures in electric arc furnaces and most preferably smelt operating condition.
In the present embodiment, the outer wall of the furnace body 1 is respectively equipped with exhaust outlet 22, pressure sensor 23, liquid outlet 24, pumping Pipe 25 and air inlet pipe 26, the exhaust outlet 22 and the liquid outlet 24 be respectively arranged at the lower section of the hydraulic cylinder 7 and with it is described Furnace body 1 communicates, and carries out out liquid by the liquid outlet 24 of bottom opening, avoids heat injury when promoting electrode tip and inclination The security risk when furnace body 1, such mode go out that liquid is more abundant, and the pressure sensor 23 is set to the guide holder 3 15 Side.
In the present embodiment, the support column 2 is set to the side of the furnace body 1, and the top of the support column 2 is close to described The side of furnace body 1 is equipped with mounting rack 27, and the bottom of the mounting rack 27 is equipped with mounting blocks 28, the support column 2,27 and of mounting rack It is fixedly welded between the mounting blocks 28, the bottom of the mounting blocks 28 is equipped with dust gathering arrester 29, the inner wall of the dust gathering arrester 29 Measured oxygen concentration instrument 30 is installed, the bottom of the support column 2 is equipped with driving device 31, institute close to the side of the furnace body 1 It states driving device 31 to connect with the measured oxygen concentration instrument 30, the measured oxygen concentration being arranged in the dust gathering arrester 29 Instrument 30 can be used for measuring the oxygen concentration in metallurgical process, so that metallurgy is more efficient.
In the present embodiment, the top of the mounting blocks 28 connects bellows 32, the bellows 32 and the dust gathering arrester 29 Between connected by the mounting blocks 28, the other end of the bellows 32 is equipped with connection air hose 33, the connection air hose 33 and It is fixedly connected between the bellows 32, the bottom of the connection air hose 33 is connected to the cyclone dust removal case 3.
In the present embodiment, the cyclone dust removal case 3 is set to side of the support column 2 far from the furnace body 1, the rotation Wind dust cleaning case 3 is equipped with blower 34, the side of blower 34 installation and the cyclone dust removal case 3 far from one end of the support column 2 The other end of side, the blower 34 is equipped with air-exhausting duct 35, drives the dust gathering arrester 29 by metallurgical process by the blower 34 In dust be drawn into handled in the cyclone dust removal case 3 after be then exhausted from, not only will not influence metallurgy be normally carried out, and And air in effective cleaning shop, it is ensured that the safety of operator, and avoid the pollution of environment.
Working principle: hydraulic cylinder is arranged in heat-insulated fixed block, effectively increases the service life of hydraulic cylinder in this way, even Fishplate bar is set to the top of furnace body, and connecting plate is equipped with an elongated through-hole, and the inside of through-hole is separately installed with adjusting rod one and adjusts The inner wall of pole two, adjusting rod one and adjusting rod two is respectively equipped with electrode connection bar, and the bottom of electrode connection bar is equipped with electrode Head, the adjusting rod one and adjusting rod two of setting can slide in through-hole, realize the change of distance between electrode, can satisfy not Same metallurgy condition ensures and most preferably smelts operating condition in electric arc furnaces, and the outer wall of furnace body is respectively equipped with exhaust outlet, pressure sensor, goes out Liquid mouth, exhaust tube and air inlet pipe, exhaust outlet and liquid outlet are respectively arranged at the lower section of hydraulic cylinder and communicate with furnace body, pass through bottom The liquid outlet of opening carries out out liquid, security risk when avoiding heat injury when promoting electrode and rolling furnace body, such mode Liquid is more abundant out, and cyclone dust removal case is set to side of the support column far from furnace body, and cyclone dust removal case is set far from one end of support column There is blower, the other end of blower is equipped with air-exhausting duct, drives dust gathering arrester that the dust in work is drawn into whirlwind by blower and removes It is then exhausted from after being handled in dirt case, not only will not influence being normally carried out for metallurgy, and air in effective cleaning shop, really Protect the safety of operator, and avoid the pollution of environment, operator can be observed by observation window electrode position and The case where melting, the inner wall of the dust gathering arrester are equipped with measured oxygen concentration instrument, and the bottom of the support column is close to the furnace body Side be equipped with driving device, the driving device connect with the measured oxygen concentration instrument, the oxygen being arranged in dust gathering arrester Concentration measuring apparatus can be used for measuring the oxygen concentration in metallurgical process, so that metallurgy is more efficient.
It although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with A variety of variations, modification, replacement can be carried out to these embodiments without departing from the principles and spirit of the present invention by understanding And modification, the scope of the present invention is defined by the appended.

Claims (7)

1. a kind of depositing dust high efficiency metallurgy electric arc furnaces, including furnace body (1), support column (2) and cyclone dust removal case (3), feature exists In: the bottom of the furnace body (1) is equipped with pedestal (4), and the furnace body (1) is mounted on the top of the pedestal (4), the pedestal (4), support column (2) and the cyclone dust removal case (3) are arranged in parallel, and the side of the furnace body (1) is equipped with observation window (5), described The other side of furnace body (1) is equipped with heat-insulated fixed block (6), the observation window (5) and the heat-insulated fixed block (6) respectively with the furnace Body (1) is fixedly welded, and the inside of the heat-insulated fixed block (6) is fixedly installed with hydraulic cylinder (7), the top of the hydraulic cylinder (7) It is equipped with hydraulic stem (8), is flexibly connected between the hydraulic stem (8) and the hydraulic cylinder (7), the top of the hydraulic stem (8) It equipped with connecting plate (9), is fixedly welded between the connecting plate (9) and the hydraulic stem (8), the connecting plate (9) is set to institute The top of furnace body (1) is stated, the connecting plate (9) is equipped with an elongated through-hole (10), and the inside of the through-hole (10) is installed respectively There are adjusting rod one (11) and adjusting rod two (12).
2. a kind of depositing dust high efficiency metallurgy electric arc furnaces according to claim 1, it is characterised in that: the furnace body (1) it is upper Side is respectively equipped with guide holder one (13), guide holder two (14) and guide holder three (15), the adjusting rod one (11) and the adjusting Bar two (12) is connected to the inner wall of the furnace body (1), institute by the guide holder one (13) and the guide holder two (14) respectively The inner wall for stating guide holder three (15) is equipped with connecting tube (16), the both ends of the connecting tube (16) be respectively equipped with water inlet pipe (17) and Outlet pipe (18), the water inlet pipe (17) and the outlet pipe (18) respectively with the inner wall for being connected to the connecting tube (16) and pass through It is through at the connecting tube (16).
3. a kind of depositing dust high efficiency metallurgy electric arc furnaces according to claim 1, it is characterised in that: the adjusting rod one (11) It is respectively equipped with electrode connection bar (19) with the inner wall of the adjusting rod two (12), the bottom of the electrode connection bar (19) is equipped with The bottom of electrode tip (20), the adjusting rod one (11) and the adjusting rod two (12) is respectively equipped with reducing sleeve (21), the electricity Pole junction pole (19) is connect by the reducing sleeve (21) with the electrode tip (20) respectively.
4. a kind of depositing dust high efficiency metallurgy electric arc furnaces according to claim 1, it is characterised in that: outside the furnace body (1) Wall is respectively equipped with exhaust outlet (22), pressure sensor (23), liquid outlet (24), exhaust tube (25) and air inlet pipe (26), the row Port (22) and the liquid outlet (24) are respectively arranged at the lower section of the hydraulic cylinder (7) and communicate with the furnace body (1), described Pressure sensor (23) is set to the side of the guide holder three (15).
5. a kind of depositing dust high efficiency metallurgy electric arc furnaces according to claim 1, it is characterised in that: the support column (2) sets It is placed in the side of the furnace body (1), the top of the support column (2) is equipped with mounting rack (27) close to the side of the furnace body (1), The bottom of the mounting rack (27) be equipped with mounting blocks (28), the support column (2), mounting rack (27) and the mounting blocks (28) it Between be fixedly welded, the bottom of the mounting blocks (28) is equipped with dust gathering arrester (29), and the installation of the inner wall of the dust gathering arrester (29) is aerobic The bottom of gas concentration measuring instrument (30), the support column (2) is equipped with driving device (31) close to the side of the furnace body (1), institute Driving device (31) is stated to connect with the measured oxygen concentration instrument (30).
6. a kind of depositing dust high efficiency metallurgy electric arc furnaces according to claim 1, it is characterised in that: the mounting blocks (28) Top connects bellows (32), is connect between the bellows (32) and the dust gathering arrester (29) by the mounting blocks (28), The other end of the bellows (32) is equipped with connection air hose (33), solid between the connection air hose (33) and the bellows (32) The bottom of fixed connection, connection air hose (33) is connected to the cyclone dust removal case (3).
7. a kind of depositing dust high efficiency metallurgy electric arc furnaces according to claim 1, it is characterised in that: the cyclone dust removal case (3) it is set to the side of the support column (2) far from the furnace body (1), the cyclone dust removal case (3) is far from the support column (2) one end is equipped with blower (34), the avris of blower (34) installation and the cyclone dust removal case (3), the blower (34) The other end air-exhausting duct (35) are installed.
CN201910754201.3A 2019-08-15 2019-08-15 A kind of depositing dust high efficiency metallurgy electric arc furnaces Pending CN110440610A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910754201.3A CN110440610A (en) 2019-08-15 2019-08-15 A kind of depositing dust high efficiency metallurgy electric arc furnaces

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910754201.3A CN110440610A (en) 2019-08-15 2019-08-15 A kind of depositing dust high efficiency metallurgy electric arc furnaces

Publications (1)

Publication Number Publication Date
CN110440610A true CN110440610A (en) 2019-11-12

Family

ID=68435884

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910754201.3A Pending CN110440610A (en) 2019-08-15 2019-08-15 A kind of depositing dust high efficiency metallurgy electric arc furnaces

Country Status (1)

Country Link
CN (1) CN110440610A (en)

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2005085735A1 (en) * 2004-03-03 2005-09-15 Srecko Prislan Device for intake, processing and offtake of gases in an arc furnance
CN201463505U (en) * 2009-07-14 2010-05-12 永州市兴发电熔科技有限公司 DC arc furnace
JP2012031470A (en) * 2010-07-30 2012-02-16 Jfe Steel Corp Method of reforming exhaust gas generated from arc furnace, reforming device, and method of manufacturing reformed gas
CN102878097A (en) * 2012-09-21 2013-01-16 常州安控电器成套设备有限公司 Control system of dust removal fan of steel mill
CN105806088A (en) * 2016-05-09 2016-07-27 尼欧迪克(青岛)除尘设备有限公司 Smoke gathering device used for electric arc furnace and refining furnace and smoke gathering method
CN205747929U (en) * 2016-06-15 2016-11-30 安徽省含山县林头振皖铸造厂 A kind of cleaning cleaner of electric arc furnace
CN107560444A (en) * 2017-09-20 2018-01-09 辽宁东和新材料股份有限公司 A kind of collection device and method of electric-melting magnesium shelling exhaust gas dust
CN108507346A (en) * 2018-03-06 2018-09-07 苏天平 A kind of depositing dust metallurgy electric arc furnaces
CN109612263A (en) * 2019-01-28 2019-04-12 徐州金虹钢铁集团有限公司 A kind of electric arc furnaces

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2005085735A1 (en) * 2004-03-03 2005-09-15 Srecko Prislan Device for intake, processing and offtake of gases in an arc furnance
CN201463505U (en) * 2009-07-14 2010-05-12 永州市兴发电熔科技有限公司 DC arc furnace
JP2012031470A (en) * 2010-07-30 2012-02-16 Jfe Steel Corp Method of reforming exhaust gas generated from arc furnace, reforming device, and method of manufacturing reformed gas
CN102878097A (en) * 2012-09-21 2013-01-16 常州安控电器成套设备有限公司 Control system of dust removal fan of steel mill
CN105806088A (en) * 2016-05-09 2016-07-27 尼欧迪克(青岛)除尘设备有限公司 Smoke gathering device used for electric arc furnace and refining furnace and smoke gathering method
CN205747929U (en) * 2016-06-15 2016-11-30 安徽省含山县林头振皖铸造厂 A kind of cleaning cleaner of electric arc furnace
CN107560444A (en) * 2017-09-20 2018-01-09 辽宁东和新材料股份有限公司 A kind of collection device and method of electric-melting magnesium shelling exhaust gas dust
CN108507346A (en) * 2018-03-06 2018-09-07 苏天平 A kind of depositing dust metallurgy electric arc furnaces
CN109612263A (en) * 2019-01-28 2019-04-12 徐州金虹钢铁集团有限公司 A kind of electric arc furnaces

Similar Documents

Publication Publication Date Title
CN102228895B (en) Movable type multistation suction hood
RU2114923C1 (en) Method for melting-down of scrap in closed-top pit-type dc heating furnace and closed-top pit-type electric-arc heating furnace for embodiment of the method
CN208527654U (en) A kind of dust-extraction unit for electrode rotary double-station LF furnace
CN110440610A (en) A kind of depositing dust high efficiency metallurgy electric arc furnaces
CN219507954U (en) Rotary natural gasification iron furnace
CN104713349A (en) Airtight negative pressure electric arc smelting furnace
CN205067396U (en) Hot modified test device of refining slag
CN211199272U (en) Water-cooled furnace cover of ladle refining furnace
CN211386886U (en) Online hot patching device of ladle external mounted air brick cup
US4000886A (en) Furnace exhaust duct
CN216790862U (en) Heat accumulating type walking beam type heating furnace
CN108507346A (en) A kind of depositing dust metallurgy electric arc furnaces
CN218002231U (en) Energy-saving ore-smelting electric furnace in novel metal silicon processing technology
CN216107052U (en) Quick automatic positioning installation tapping equipment of converter
CN207316973U (en) The clean-out door of burner hearth high-temperature region
CN213977911U (en) Aluminum electrolysis residual anode flue gas collecting device
CN208170994U (en) A kind of depositing dust metallurgy electric arc furnaces
CN109595936A (en) A kind of aluminum alloy melting tilting furnace
CN213335476U (en) Vertical reduction melting furnace
CN212404150U (en) Repairing tool for corroded part of converter steel tapping hole
KR20050019461A (en) Device for cleaning elbow of electro furnace
CN211814548U (en) Converter fettling device
CN210765399U (en) Continuous annealing furnace
CN210356378U (en) Secondary recovery workshop for smelting electric furnace
CN214078383U (en) Smoke dust collecting device for horizontal molten steel tank

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20191112

RJ01 Rejection of invention patent application after publication