A kind of existing building, which is inversely removed, uses vertical conversion Download PDFInfo
- Publication number
- CN110439318A CN110439318A CN201910777462.7A CN201910777462A CN110439318A CN 110439318 A CN110439318 A CN 110439318A CN 201910777462 A CN201910777462 A CN 201910777462A CN 110439318 A CN110439318 A CN 110439318A
- Authority
- CN
- China
- Prior art keywords
- bearing
- girder steel
- existing building
- frame column
- girder
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G23/00—Working measures on existing buildings
- E04G23/08—Wrecking of buildings
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Chemical & Material Sciences (AREA)
- Chemical Kinetics & Catalysis (AREA)
- Electrochemistry (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Working Measures On Existing Buildindgs (AREA)
Abstract
A kind of existing building is inversely removed with vertical conversion, and the present invention relates to building demolition fields, and in particular to a kind of to utilize the reverse construction method for removing existing building of vertical conversion.The present invention is to solve the vertical supporting members that can not be truncated simultaneously in existing reverse demolishing process, remove duration longer problem.Method: the characteristics of Vierendeel girder beam-ends normal section shear-carrying capacity is much higher than Beams Oblique Section Carrying Capacity is fully considered, the vertical load for undertaking the column by the girder steel of screw support by being arranged on the downside of column side frame is set a roof beam in place, undertakes the vertical load that pillar undertakes during inversely removing vertical member by screw rod.The present invention can replace building original vertical supporting member load-bearing in reverse demolishing process, guarantee the safety in demolishing process.
Description
Technical field
The present invention relates to building demolition fields, and in particular to a kind of to utilize the reverse construction for removing existing building of vertical conversion
Method.
Background technique
It is known as reverse demolition technique by the technology for completing building demolition at one layer with jacking system is lifted, inversely removes skill
Art is suitable for the dismounting that cities and towns are intensively built.It needs to replace building using vertical conversion equipment appropriate in reverse demolishing process
Original vertical supporting member, to guarantee the safety in demolishing process.Currently, mainly using being supported on column in reverse demolishing process
The jack of lower section replaces former column load-bearing, to ensure that vertical load still can be transmitted effectively when the vertical member built is truncated, and torn open
Except when can not simultaneously columns all in same layer are truncated, only can gradually truncation part column and increase its correspond to jack propped up
It holds, it is longer to remove the duration.
Summary of the invention
The vertical supporting member that the invention aims to solve not being truncated simultaneously in existing reverse demolishing process is removed
Duration longer problem, and a kind of existing building inversely dismounting vertical conversion is provided.
Inversely dismounting is specifically sequentially included the following steps: with vertical conversion for a kind of existing building
One, determine vertical load that single frame column is undertaken by several layers of Vierendeel girders by existing building structure to be removed
Beam-ends normal section shear-carrying capacity undertakes;Choose frame column opposite two sides big with every layer of Vierendeel girder staight scissors bearing capacity
Support Position as setting screw rod and bearing girder steel;The length of the screw rod is not less than the corresponding story height;The branch
The bearing capacity of girder steel is held not less than Vierendeel girder beam-ends normal section bearing capacity;
Two, four circular holes are made a call in the superstructure region of frame column position, four screw rods is passed through into circle from top to bottom respectively
Locking nut below hole, the bearing girder steel that every layer of Vierendeel girder lower surface is set and setting bearing girder steel, and pass through large size
Nut anchoring is supported on Ji Ding;
Three, the locking nut below synchronous rotary bearing girder steel, keeps the frame soffit for supporting girder steel with being supported tight
Contiguity touching;
Four, frame column is rejected into certain length, which is greater than very heavy heights of roofs, but is not more than very heavy heights of roofs oiling cylinder
Range;
Five, jack is placed in frame column and removes section, jack send oil, the oil cylinder support top frame column of partial dismantling
Lower end surface separates bearing girder steel with the frame soffit that it is supported, and downward synchronous rotary whole locking nut to oil cylinder is leant out
Length, bearing girder steel decline with locking nut;
Six, the oil cylinder leant out is bounced back, is moved away from jack by jack oil return, continues a section for rejecting frame column, should
Section length is the length that oil cylinder is leant out;
Seven, step 5 and step 6 are repeated in until place layer frame column is all removed;
Eight, the superstructure for removing layer where all removing frame column and Vierendeel girder, is successively removed by above-mentioned steps, final complete
At the reverse dismounting of existing building.
Beneficial effects of the present invention:
The present invention also utilizes screw rod and bearing girder steel in addition to replacing former column load-bearing using the jack being supported below column
Load-bearing can be truncated and be removed to columns all in same layer simultaneously, can effectively save the duration, guarantee that reverse safety of removing carries out.
Detailed description of the invention
Fig. 1 is the relative position schematic diagram of screw rod, bearing girder steel, frame column and Vierendeel girder;
Fig. 2 is Fig. 1 side view;
Fig. 3 is that frame column is rejected the structural schematic diagram after certain length by step 4;
Fig. 4 is that jack is placed in the structural schematic diagram after frame column removes section in step 5;
Fig. 5 is the structural schematic diagram for the length that synchronous rotary whole locking nut to oil cylinder is leant out downwards in step 5;
Fig. 6 is the structural schematic diagram in step 6 after jack oil return;
Fig. 7 is the structural schematic diagram for continuing to reject in step 6 after a section of frame column;
Fig. 8 vertical converting system schematic diagram when being removal lowermost layer locking nut and support steel beam;
Each layer of screw tip vertical converting system schematic diagram when Fig. 9 is removal lowermost layer locking nut and support steel beam.
Specific embodiment
Specific embodiment 1: illustrating present embodiment in conjunction with Fig. 1~9, a kind of existing building of present embodiment is inversely torn open
Except specifically being sequentially included the following steps: with vertical conversion
One, determine vertical load that single frame column 2 is undertaken by several layers of frames by existing building structure to be removed
Beam 3 beam-ends normal section shear-carrying capacity undertakes;Choose opposite two big with every layer of 3 staight scissors bearing capacity of Vierendeel girder of frame column 2
Support Position of a side as setting screw rod 1 and bearing girder steel 4;The length of the screw rod 1 is not less than the corresponding story height
Degree;The bearing capacity of the bearing girder steel 4 is not less than Vierendeel girder beam-ends normal section bearing capacity;
Two, four circular holes are made a call in the superstructure region of 2 position of frame column, four screw rods 1 is passed through from top to bottom respectively
Locking nut 5 below circular hole, the bearing girder steel 4 that 3 lower surface of every layer of Vierendeel girder is set and setting bearing girder steel 4, and lead to
It crosses the anchoring of large-scale nut 6 and is supported on Ji Ding;
Three, the locking nut 5 below synchronous rotary bearing girder steel 4, makes 3 bottom surface of Vierendeel girder for supporting girder steel 4 with being supported
It is in close contact;
Four, frame column 2 is rejected into certain length, which is greater than 7 height of jack, but highly adds no more than jack 7
The range of oil cylinder 8;
Five, jack 7 is placed in frame column 2 and removes section, jack 7 send oil, the frame of oil cylinder support top partial dismantling
The lower end surface of column 2, make support girder steel 4 separated with 3 bottom surface of Vierendeel girder that it is supported, downward synchronous rotary whole locking nut 5 to
The length that oil cylinder 8 is leant out, bearing girder steel 4 decline with locking nut 5;
Six, the oil cylinder 8 leant out is bounced back, is moved away from jack 7 by 7 oil return of jack, continues an area for rejecting frame column 2
Section, the section length are the length that oil cylinder 8 is leant out;
Seven, step 5 and step 6 are repeated in until place layer frame column 2 is all removed;
Eight, the superstructure for all having removed frame column 2 and 3 place layer of Vierendeel girder is removed, is successively removed by above-mentioned steps, finally
Complete the reverse dismounting of existing building.
Specific embodiment 2: the present embodiment is different from the first embodiment in that: girder steel 4 is supported described in step 1
The selection of material, section and size set a roof beam in place 3 beam-ends normal section bearing capacities according to bearing 4 bearing capacity of girder steel not less than institute's supporting frame
Principle.Other are same as the specific embodiment one.
Specific embodiment 3: the present embodiment is different from the first and the second embodiment in that: layer is determined in step 1
The sum of beam-ends normal section shear-carrying capacity of several Vierendeel girders 3 is greater than the vertical load of frame column 2.Other and specific embodiment
One or two is identical.
Specific embodiment 4: unlike one of present embodiment and specific embodiment one to three: when frame is arrived in construction
Set a roof beam in place 3 when directly remove without specially treated.Other are identical as one of specific embodiment one to three.
Specific embodiment 5: unlike one of present embodiment and specific embodiment one to four: when removal to certain
When one layer of 3 basal surface position of Vierendeel girder, the bearing girder steel 4 on this layer of 3 top of Vierendeel girder is moved to this layer of Vierendeel girder 3 by lifting handle 1
Top surface, it is fixed to hang screw rod 1, the lock of 3 lower part of this layer of Vierendeel girder of removal using locking nut 5 in the top surface of the bearing girder steel 4
Tight nut 5 and bearing girder steel 4, then screw rod 1 is supported on Ji Ding, and the bearing girder steel 4 on top is resetted.Other and specific implementation
One of mode one to four is identical.
Beneficial effects of the present invention are verified using following embodiment:
Embodiment one: inversely dismounting is specifically sequentially included the following steps: with vertical conversion for a kind of existing building
One, determine vertical load that single frame column 2 is undertaken by several layers of frames by existing building structure to be removed
Beam 3 beam-ends normal section shear-carrying capacity undertakes;Choose opposite two big with every layer of 3 staight scissors bearing capacity of Vierendeel girder of frame column 2
Support Position of a side as setting screw rod 1 and bearing girder steel 4;The length of the screw rod 1 is not less than the corresponding story height
Degree;The bearing capacity of the bearing girder steel 4 is not less than Vierendeel girder beam-ends normal section bearing capacity;
Two, four circular holes are made a call in the superstructure region of 2 position of frame column, four screw rods 1 is passed through from top to bottom respectively
Locking nut 5 below circular hole, the bearing girder steel 4 that 3 lower surface of every layer of Vierendeel girder is set and setting bearing girder steel 4, and lead to
It crosses the anchoring of large-scale nut 6 and is supported on Ji Ding;
Three, the locking nut 5 below synchronous rotary bearing girder steel 4, makes 3 bottom surface of Vierendeel girder for supporting girder steel 4 with being supported
It is in close contact;
Four, frame column 2 is rejected into certain length, which is greater than 7 height of jack, but highly adds no more than jack 7
The range of oil cylinder 8;
Five, jack 7 is placed in frame column 2 and removes section, jack 7 send oil, the frame of oil cylinder support top partial dismantling
The lower end surface of column 2, make support girder steel 4 separated with 3 bottom surface of Vierendeel girder that it is supported, downward synchronous rotary whole locking nut 5 to
The length that oil cylinder 8 is leant out, bearing girder steel 4 decline with locking nut 5;
Six, the oil cylinder 8 leant out is bounced back, is moved away from jack 7 by 7 oil return of jack, continues an area for rejecting frame column 2
Section, the section length are the length that oil cylinder 8 is leant out;
Seven, step 5 and step 6 are repeated in until place layer frame column 2 is all removed;
Eight, the superstructure for all having removed frame column 2 and 3 place layer of Vierendeel girder is removed, is successively removed by above-mentioned steps, finally
Complete the reverse dismounting of existing building.
The present invention also utilizes screw rod and bearing girder steel in addition to replacing former column load-bearing using the jack being supported below column
Load-bearing can be truncated and be removed to columns all in same layer simultaneously, can effectively save the duration, guarantee that reverse safety of removing carries out.
Claims (5)
1. a kind of existing building is inversely removed with vertical conversion, it is characterised in that existing building is inversely removed with vertical conversion
Method specifically sequentially includes the following steps:
One, determine vertical load that single frame column (2) is undertaken by several layers of Vierendeel girders by existing building structure to be removed
(3) beam-ends normal section shear-carrying capacity undertakes;Choose frame column (2) and every layer of Vierendeel girder (3) staight scissors bearing capacity greatly opposite
Two sides as setting screw rod (1) and support girder steel (4) Support Position;The length of the screw rod (1) is not less than correspondence
The story height;The bearing capacity of bearing girder steel (4) is not less than Vierendeel girder beam-ends normal section bearing capacity;
Two, four circular holes are made a call in the superstructure region of frame column (2) position, four screw rods (1) is passed through from top to bottom respectively
Circular hole, setting support the locking nut of girder steel (4) below in the bearing girder steel (4) of every layer of Vierendeel girder (3) lower surface and setting
(5), and by large-scale nut (6) anchoring it is supported on Ji Ding;
Three, the locking nut (5) of synchronous rotary bearing girder steel (4) below makes the Vierendeel girder (3) for supporting girder steel (4) with being supported
Bottom surface is in close contact;
Four, frame column (2) are rejected into certain length, which is greater than jack (7) height, but no more than jack (7) height
The range of oiling cylinder (8);
Five, jack (7) is placed in frame column (2) and removes section, jack (7) send oil, the frame of oil cylinder support top partial dismantling
The lower end surface of trestle (2), Vierendeel girder (3) bottom surface for supporting bearing girder steel (4) with it separate, and downward synchronous rotary is all locked
The length that nut (5) is leant out to oil cylinder (8), bearing girder steel (4) decline with locking nut (5);
Six, the oil cylinder leant out (8) are bounced back, are moved away from jack (7) by jack (7) oil return, continue reject frame column (2) one
A section, the section length are the length that oil cylinder (8) are leant out;
Seven, step 5 and step 6 are repeated in until place layer frame column (2) is all removed;
Eight, the superstructure for removing layer where all removing frame column (2) and Vierendeel girder (3), is successively removed, finally by above-mentioned steps
Complete the reverse dismounting of existing building.
2. a kind of existing building according to claim 1 is inversely removed with vertical conversion, it is characterised in that step 1
The selection of the material, section and size of bearing girder steel (4) is set a roof beam in place according to bearing girder steel (4) bearing capacity not less than institute's supporting frame
(3) principle of beam-ends normal section bearing capacity.
3. a kind of existing building according to claim 1 is inversely removed with vertical conversion, it is characterised in that step 1
The sum of beam-ends normal section shear-carrying capacity of Vierendeel girder (3) of the middle determining number of plies is greater than the vertical load of frame column (2).
4. a kind of existing building according to claim 1 is inversely removed with vertical conversion, it is characterised in that work as construction
It is directly removed to Vierendeel girder (3) Shi Wuxu specially treated.
5. a kind of existing building according to claim 1 is inversely removed with vertical conversion, it is characterised in that work as removal
When to a certain layer Vierendeel girder (3) basal surface position, lifting handle (1) moves to the bearing girder steel (4) on this layer of Vierendeel girder (3) top
The top surface of this layer of Vierendeel girder (3), it is fixed to hang screw rod (1) using locking nut (5) in the top surface of the bearing girder steel (4), it unloads
Locking nut (5) and bearing girder steel (4) except this layer of Vierendeel girder (3) lower part, then screw rod (1) is supported on Ji Ding, and by top
Bearing girder steel (4) reset.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910777462.7A CN110439318B (en) | 2019-08-22 | 2019-08-22 | Vertical conversion method for reverse demolition of existing building |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910777462.7A CN110439318B (en) | 2019-08-22 | 2019-08-22 | Vertical conversion method for reverse demolition of existing building |
Publications (2)
Publication Number | Publication Date |
---|---|
CN110439318A true CN110439318A (en) | 2019-11-12 |
CN110439318B CN110439318B (en) | 2021-07-13 |
Family
ID=68437056
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910777462.7A Active CN110439318B (en) | 2019-08-22 | 2019-08-22 | Vertical conversion method for reverse demolition of existing building |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110439318B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111794134A (en) * | 2020-07-29 | 2020-10-20 | 建研科技股份有限公司 | Reverse dismantling and core-pulling conversion device for reinforced concrete structure and construction method |
CN113863715A (en) * | 2021-10-13 | 2021-12-31 | 中国建筑第八工程局有限公司 | Building structure reverse-operation demolition method and building structure reverse-operation demolition auxiliary equipment |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2608614Y (en) * | 2003-03-21 | 2004-03-31 | 成志全 | Early disassembling fully suspended supporting bracket |
JP2016079759A (en) * | 2014-10-22 | 2016-05-16 | 前田建設工業株式会社 | Method and device for demolishing high-rise building |
CN207260635U (en) * | 2017-09-30 | 2018-04-20 | 江苏速捷模架科技有限公司 | Separate type adjustable supports structure |
CN108049656A (en) * | 2017-12-27 | 2018-05-18 | 山东省建筑科学研究院 | A kind of the reverse of chimney removes device and method for dismounting |
CN108868193A (en) * | 2018-07-27 | 2018-11-23 | 建研科技股份有限公司 | Construction method for reversely dismantling steel structure building |
CN208578354U (en) * | 2018-06-07 | 2019-03-05 | 国网冀北电力有限公司张家口供电公司 | Remove wall height-adjustable support device |
CN109838114A (en) * | 2019-04-01 | 2019-06-04 | 吉林建筑大学 | Reinforced concrete structure inversely removes temporary support conversion equipment and its operating method |
-
2019
- 2019-08-22 CN CN201910777462.7A patent/CN110439318B/en active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2608614Y (en) * | 2003-03-21 | 2004-03-31 | 成志全 | Early disassembling fully suspended supporting bracket |
JP2016079759A (en) * | 2014-10-22 | 2016-05-16 | 前田建設工業株式会社 | Method and device for demolishing high-rise building |
CN207260635U (en) * | 2017-09-30 | 2018-04-20 | 江苏速捷模架科技有限公司 | Separate type adjustable supports structure |
CN108049656A (en) * | 2017-12-27 | 2018-05-18 | 山东省建筑科学研究院 | A kind of the reverse of chimney removes device and method for dismounting |
CN208578354U (en) * | 2018-06-07 | 2019-03-05 | 国网冀北电力有限公司张家口供电公司 | Remove wall height-adjustable support device |
CN108868193A (en) * | 2018-07-27 | 2018-11-23 | 建研科技股份有限公司 | Construction method for reversely dismantling steel structure building |
CN109838114A (en) * | 2019-04-01 | 2019-06-04 | 吉林建筑大学 | Reinforced concrete structure inversely removes temporary support conversion equipment and its operating method |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111794134A (en) * | 2020-07-29 | 2020-10-20 | 建研科技股份有限公司 | Reverse dismantling and core-pulling conversion device for reinforced concrete structure and construction method |
CN113863715A (en) * | 2021-10-13 | 2021-12-31 | 中国建筑第八工程局有限公司 | Building structure reverse-operation demolition method and building structure reverse-operation demolition auxiliary equipment |
Also Published As
Publication number | Publication date |
---|---|
CN110439318B (en) | 2021-07-13 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2020238984A1 (en) | Vehicle-group-based apparatus for large-height lifting and shifting of bridge, and implementation method therefor | |
CN102661054B (en) | Lateral reinforcing structure in whole lifting of plane steel truss and whole lifting method | |
CN211818248U (en) | Auxiliary supporting mechanism | |
CN104863362B (en) | The arch barrel lattice shell construction technology that the sliding of arch steel lattice moulding bed is installed is set | |
CN110439318A (en) | A kind of existing building, which is inversely removed, uses vertical conversion | |
CN111254840B (en) | Integral girder falling structure and girder falling method for steel box girder bridge | |
CN106592826A (en) | Construction method for cylindrical frame supporting type hydraulic-climbing integral steel platform formwork shear steel plate layer | |
CN107119904A (en) | A kind of cantilevered structure truss combined support system | |
CN111734166A (en) | Detachable conversion device and reverse dismantling construction method using same | |
CN105952129B (en) | Elevator shaft combined type integral lifting operation platform and construction method thereof | |
CN107034790B (en) | Method for reducing support internal force during steel beam symmetrical double-cantilever assembly | |
CN105421741A (en) | Self-standing tower crane and formwork integrated construction platform system | |
CN103276894A (en) | Support system of large-cross-section girder transfer floor of hollow floor system and construction technology | |
CN107119920A (en) | The reverse dismounting device and its application method of a kind of intensive high-rise | |
CN114673196A (en) | Zero-contact construction process for isolation layer of underground water plant | |
CN100489256C (en) | Construction method and construction technique for wide cross section beam formwork supporting system | |
CN210134357U (en) | Pi-shaped bracket for construction of upper cross beam of H-shaped cable tower | |
CN114941433B (en) | Construction method of high-weight ship type daylighting roof steel structure | |
CN219175013U (en) | Whole support that moves down of double-deck overhead bridge | |
CN202882374U (en) | Novel elevator shaft lifting type diagonal bracing operation steel platform | |
CN207988457U (en) | It is protected outside skyscraper staggered floor balcony and operating platform sets up structure | |
CN108547458B (en) | Construction method of high-altitude special-shaped steel structure | |
CN216587785U (en) | Device suitable for bulky concrete floor goes up and down | |
CN206034874U (en) | Elevator shaft combined type integral lifting operation platform | |
CN114737790B (en) | Reverse dismantling method for high-rise frame structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |