CN110439243A - A kind of Fast Installation formula metal scaffolding - Google Patents
A kind of Fast Installation formula metal scaffolding Download PDFInfo
- Publication number
- CN110439243A CN110439243A CN201910594577.2A CN201910594577A CN110439243A CN 110439243 A CN110439243 A CN 110439243A CN 201910594577 A CN201910594577 A CN 201910594577A CN 110439243 A CN110439243 A CN 110439243A
- Authority
- CN
- China
- Prior art keywords
- scaffold
- ontology
- connection ring
- connection
- scaffold ontology
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G1/00—Scaffolds primarily resting on the ground
- E04G1/02—Scaffolds primarily resting on the ground composed essentially of members elongated in one dimension only, e.g. poles, lattice masts, with or without end portions of special form, connected together by any means
- E04G1/04—Scaffolds primarily resting on the ground composed essentially of members elongated in one dimension only, e.g. poles, lattice masts, with or without end portions of special form, connected together by any means the members being exclusively poles, rods, beams, or other members of similar form and simple cross-section
- E04G1/06—Scaffolds primarily resting on the ground composed essentially of members elongated in one dimension only, e.g. poles, lattice masts, with or without end portions of special form, connected together by any means the members being exclusively poles, rods, beams, or other members of similar form and simple cross-section comprising members with rod-like or tubular portions fitting together end to end, with or without separate connecting pieces
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G7/00—Connections between parts of the scaffold
- E04G7/02—Connections between parts of the scaffold with separate coupling elements
- E04G7/06—Stiff scaffolding clamps for connecting scaffold members of common shape
- E04G7/20—Stiff scaffolding clamps for connecting scaffold members of common shape for ends of members only, e.g. for connecting members in end-to-end relation
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Mutual Connection Of Rods And Tubes (AREA)
Abstract
The invention discloses a kind of Fast Installation formula metal scaffoldings, are related to Construction Formwork & Scaffold Technology field.Including scaffold ontology, the connection sleeve for connecting two scaffold ontologies, the connection sleeve the outer peripheral sidewall socket of the scaffold ontology be arranged the connection sleeve include for connecting the first part of the scaffold ontology, the second part for connecting another scaffold ontology.The present invention be able to solve the dismounting of existing scaffold need to consume a large amount of time, dismounting large labor intensity the problem of.
Description
Technical field
The present invention relates to Construction Formwork & Scaffold Technology fields, and in particular to a kind of Fast Installation formula metal scaffolding.
Background technique
In municipal field, municipal bridge is common one of urban operating mechanism, in municipal bridge construction and the mistake of maintenance
Cheng Zhong, steel structure scaffold are essential auxiliary equipment.
Steel structure scaffold in the prior art needs to install a large amount of screw completion and is fastenedly connected when building, therefore every
Secondary dismounting requires to consume a large amount of time and removes dismounting screw, and screw quantity is more, it is easy to lose, increase worker to zero
Management intensity on part increases the labor intensity dismounted every time.
Moreover, in use, screw is easy to produce loosening, therefore current steel structure scaffold is there are more deficiency,
There is also very big security risks, while can reduce the construction efficiency to municipal bridge.
Summary of the invention
In view of the deficiencies of the prior art, the present invention discloses a kind of Fast Installation formula metal scaffolding, is able to solve existing foot
Hand cradle dismounting need to consume a large amount of time, dismounting large labor intensity the problem of.
In order to achieve the above object, the present invention is achieved by the following technical programs:
A kind of Fast Installation formula metal scaffolding,
Including scaffold ontology, the connection sleeve for connecting two scaffold ontologies, the connection sleeve is in institute
The outer peripheral sidewall socket setting of scaffold ontology is stated,
The connection sleeve includes for connecting the first part of the scaffold ontology, for connecting another foot hand
The second part of frame ontology, the first part and the scaffold ontology are slidably connected, the first part and described second
Partial turn connection,
It is equipped with the first connection ring towards one end of the second part in the first part, first connection ring is along institute
The circumferentially extending for stating first part is equipped with the second connection ring towards one end of the first part in the second part, described
Along the circumferentially extending of the second part, first connection ring and second connection ring are slidably connected, use second connection ring
In guiding second part the circumferentially rotating along the scaffold ontology,
It is equipped with external screw thread in outer peripheral sidewall of the first part away from one end of the second part, at described second
The inner circumferential side wall away from one end of the first part is divided to be equipped with internal screw thread, the external screw thread and internal screw thread engagement are to connect
Two scaffold ontologies.
Preferably, the section of first connection ring is set as L-shaped, and the section of second connection ring is set as and institute
State the L-shaped of the first connection ring cooperation, first connection ring and second connection ring link closely setting.
Preferably, it is equipped with sliding slot in the outer peripheral sidewall of the scaffold ontology, the sliding slot is along the scaffold ontology
It is axially extending, to guide connection sleeve the sliding axially along the scaffold ontology,
It is equipped with sliding block in the inner circumferential side wall of the first part, the sliding block and the sliding slot are slidably connected, to guide
Connection sleeve is stated to slide along the sliding slot.
Preferably, stop collar, the relatively described scaffold body peripheral of the stop collar are equipped in the end of the scaffold
The height of side wall is set greater than the height of the relatively described scaffold body peripheral side wall of the sliding block, to prevent the connector sleeve
Cylinder skids off the end of the scaffold ontology.
Preferably, it is equipped with first through hole in the first part, the first through hole is prolonged along the axial direction of the first part
It stretches, the first through hole is passed through through the first part for the scaffold ontology.
Preferably, it is equipped with the second through-hole in the second part, second through-hole prolongs along the axial direction of the second part
It stretches, second through-hole is connected to the first through hole through the second part and passes through for the scaffold ontology.
The present invention discloses a kind of Fast Installation formula metal scaffolding, has the advantage that
The connection sleeve of setting can be in the axial easy slide of scaffold ontology, convenient for changing the scaffold of connection sleeve
The position of ontology, so that position, which is adjusted flexibly, connects another scaffold ontology at the both ends of scaffold ontology according to actual needs.
Connection sleeve is set as including first part and second part, and first part is slided with respect to scaffold ontology, and second
Part is rotated relative to scaffold ontology, the internal screw thread engagement of the external screw thread and second part of first part, thus two feet of connection
Hand cradle ontology, connection speed is fast, good connecting effect.
Detailed description of the invention
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below
There is attached drawing needed in technical description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this
Some embodiments of invention for those of ordinary skill in the art without creative efforts, can be with
It obtains other drawings based on these drawings.
Fig. 1 is the installation diagram of the embodiment of the present invention;
Fig. 2 is the main view of the embodiment of the present invention;
Fig. 3 is the partial sectional view of the embodiment of the present invention;
Fig. 4 is the main view that sleeve is connected in the embodiment of the present invention;
Fig. 5 is the cross-sectional view that sleeve is connected in the embodiment of the present invention.
Specific embodiment
In order to make the object, technical scheme and advantages of the embodiment of the invention clearer, below in conjunction with the embodiment of the present invention
In attached drawing, technical scheme in the embodiment of the invention is clearly and completely described, it is clear that described embodiment is
A part of the embodiment of the present invention, instead of all the embodiments.Based on the embodiments of the present invention, those of ordinary skill in the art
Every other embodiment obtained without making creative work, shall fall within the protection scope of the present invention.
As shown in Figures 1 to 5, a kind of Fast Installation formula metal scaffolding described in the embodiment of the present invention,
Including scaffold ontology 1, the connection sleeve 2 for connecting two scaffold ontologies 1, the connection sleeve 2
Be socketed setting in the outer peripheral sidewall of the scaffold ontology 1, connection sleeve A2 on scaffold ontology A1 as shown in Figure 1 and
Connection sleeve B2 connection on another scaffold ontology B2, to quickly fix scaffold ontology A1 and connection sleeve A2.
The connection sleeve 2 include for connecting the first part 21 of the scaffold ontology 1, it is another described for connecting
The second part 22 of scaffold ontology 1, the first part 21 and the scaffold ontology 1 are slidably connected, the first part
21 and the second part 22 be rotatablely connected.
It is equipped with the first connection ring 212 towards one end of the second part 22 in the first part 21, described first connects
Ring 212 is connect along the circumferentially extending of the first part 21, is set in one end of the second part 22 towards the first part 21
There are the second connection ring 222, circumferentially extending of second connection ring 222 along the second part 22, first connection ring 212
It is slidably connected with second connection ring 222, for guiding the second part 22 to turn along the circumferential direction of the scaffold ontology 1
It is dynamic.
The section of first connection ring 212 is set as L-shaped, and the section of second connection ring 222 is set as and institute
State the L-shaped of the first connection ring 212 cooperation, first connection ring 212 and second connection ring 222 link closely setting, thus
Guarantee that first part 21 and second part 22 will not fall off while guiding first part 21 and second part 22 relatively rotates,
In order to reduce the friction between first part 21 and second part 22, it is equipped with oilhole 223 on second part 22, is used for first
The contact surface of part 21 and second part 22 provides lubricating oil to reduce friction.
It is equipped with external screw thread 213 in outer peripheral sidewall of the first part 21 away from one end of the second part 22, in institute
It states inner circumferential side wall of the second part 22 away from one end of the first part 21 and is equipped with internal screw thread 221, the external screw thread 213 and institute
The engagement of internal screw thread 221 is stated to connect two scaffold ontologies 1.
Sliding slot 11, axis of the sliding slot 11 along the scaffold ontology 1 are equipped in the outer peripheral sidewall of the scaffold ontology 1
To extension, to guide connection the sliding axially in the inner circumferential side of the first part 21 along the scaffold ontology 1 of sleeve 2
Wall is equipped with sliding block 211, and the sliding block 211 and the sliding slot 11 are slidably connected, to guide the connection sleeve 2 along the sliding slot 11
Sliding.
Stop collar 12, relatively described 1 peripheral side of scaffold ontology of the stop collar 12 are equipped in the end of the scaffold
The height of wall is set greater than the height of relatively described 1 outer peripheral sidewall of scaffold ontology of the sliding block 211, to prevent the connection
Sleeve 2 skids off the end of the scaffold ontology 1.
First through hole 210, axial direction of the first through hole 210 along the first part 21 are equipped in the first part 21
Extend, the first through hole 210 is passed through through the first part 21 for the scaffold ontology 1.
The second through-hole 220, axial direction of second through-hole 220 along the second part 22 are equipped in the second part 22
Extend, second through-hole 220 is connected to the first through hole 210 through the second part 22 for the scaffold ontology
1 passes through.
It should be noted that, in this document, relational terms such as first and second and the like are used merely to a reality
Body or operation are distinguished with another entity or operation, are deposited without necessarily requiring or implying between these entities or operation
In any actual relationship or order or sequence.
Moreover, the terms "include", "comprise" or any other variant thereof is intended to cover non-exclusive inclusion, to make
Obtaining the process, method, article or equipment including a series of elements not only includes those elements, but also including not arranging clearly
Other element out, or further include for elements inherent to such a process, method, article, or device.Not more
In the case where limitation, the element that is limited by sentence "including a ...", it is not excluded that including process, the side of the element
There is also other identical elements in method, article or equipment.
The above embodiments are merely illustrative of the technical solutions of the present invention, rather than its limitations;Although with reference to the foregoing embodiments
Invention is explained in detail, those skilled in the art should understand that: it still can be to aforementioned each implementation
Technical solution documented by example is modified or equivalent replacement of some of the technical features;And these modification or
Replacement, the spirit and scope for technical solution of various embodiments of the present invention that it does not separate the essence of the corresponding technical solution.
Claims (6)
1. a kind of Fast Installation formula metal scaffolding, it is characterised in that:
Including scaffold ontology, the connection sleeve for connecting two scaffold ontologies, the connection sleeve is in the foot
The outer peripheral sidewall of hand cradle ontology is socketed setting,
The connection sleeve includes for connecting the first part of the scaffold ontology, for connecting another scaffold sheet
The second part of body, the first part and the scaffold ontology are slidably connected, the first part and the second part
Rotation connection,
It is equipped with the first connection ring towards one end of the second part in the first part, first connection ring is along described the
A part circumferentially extending, the second part towards one end of the first part be equipped with the second connection ring, described second
Connection ring is along the circumferentially extending of the second part, and first connection ring and second connection ring are slidably connected, for drawing
The second part circumferentially rotating along the scaffold ontology is led,
It is equipped with external screw thread in outer peripheral sidewall of the first part away from one end of the second part, is carried on the back in the second part
The inner circumferential side wall of one end from the first part is equipped with internal screw thread, and the external screw thread and internal screw thread engagement are to connect two
The scaffold ontology.
2. Fast Installation formula metal scaffolding as described in claim 1, it is characterised in that: the section of first connection ring is arranged
For L-shaped, the section of second connection ring is set as the L-shaped cooperated with first connection ring, first connection ring
It links closely setting with second connection ring.
3. Fast Installation formula metal scaffolding as described in claim 1, it is characterised in that:
It is equipped with sliding slot in the outer peripheral sidewall of the scaffold ontology, the sliding slot is axially extending along the scaffold ontology, with
Connection sleeve the sliding axially along the scaffold ontology is guided,
It is equipped with sliding block in the inner circumferential side wall of the first part, the sliding block and the sliding slot are slidably connected, to guide the company
Female connector cylinder is slided along the sliding slot.
4. Fast Installation formula metal scaffolding as claimed in claim 3, it is characterised in that: be equipped with limit in the end of the scaffold
Position ring, the height of the relatively described scaffold body peripheral side wall of the stop collar are set greater than the relatively described foot hand of the sliding block
The height of frame body peripheral side wall, to prevent the connection sleeve from skidding off the end of the scaffold ontology.
5. Fast Installation formula metal scaffolding as described in claim 1, it is characterised in that: it is logical to be equipped with first in the first part
Hole, the first through hole is axially extending along the first part, and the first through hole is through the first part for described
Scaffold ontology passes through.
6. Fast Installation formula metal scaffolding as claimed in claim 5, it is characterised in that: it is logical to be equipped with second in the second part
Hole, second through-hole is along the axially extending of the second part, and second through-hole is through the second part and described the
The connection of one through-hole is passed through for the scaffold ontology.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910594577.2A CN110439243A (en) | 2019-07-03 | 2019-07-03 | A kind of Fast Installation formula metal scaffolding |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910594577.2A CN110439243A (en) | 2019-07-03 | 2019-07-03 | A kind of Fast Installation formula metal scaffolding |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110439243A true CN110439243A (en) | 2019-11-12 |
Family
ID=68429347
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910594577.2A Pending CN110439243A (en) | 2019-07-03 | 2019-07-03 | A kind of Fast Installation formula metal scaffolding |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110439243A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112211384A (en) * | 2020-09-28 | 2021-01-12 | 安徽长青建筑制品有限公司 | Scaffold for building site |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE202012100091U1 (en) * | 2012-01-11 | 2012-02-27 | Goodwell Management Ltd. | pipe connection |
CN202531566U (en) * | 2012-02-28 | 2012-11-14 | 江泽炼 | Connector and combined sectional pipe |
CN102877578A (en) * | 2012-09-29 | 2013-01-16 | 冯文钦 | Dry-hanging stone curtain wall mounting and maintaining method and sleeve |
CN205036695U (en) * | 2015-07-08 | 2016-02-17 | 林政德 | Bushing spare |
CN208072917U (en) * | 2018-04-04 | 2018-11-09 | 中国建筑第二工程局有限公司 | Carrying frame is built in a kind of room |
-
2019
- 2019-07-03 CN CN201910594577.2A patent/CN110439243A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE202012100091U1 (en) * | 2012-01-11 | 2012-02-27 | Goodwell Management Ltd. | pipe connection |
CN202531566U (en) * | 2012-02-28 | 2012-11-14 | 江泽炼 | Connector and combined sectional pipe |
CN102877578A (en) * | 2012-09-29 | 2013-01-16 | 冯文钦 | Dry-hanging stone curtain wall mounting and maintaining method and sleeve |
CN205036695U (en) * | 2015-07-08 | 2016-02-17 | 林政德 | Bushing spare |
CN208072917U (en) * | 2018-04-04 | 2018-11-09 | 中国建筑第二工程局有限公司 | Carrying frame is built in a kind of room |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112211384A (en) * | 2020-09-28 | 2021-01-12 | 安徽长青建筑制品有限公司 | Scaffold for building site |
CN112211384B (en) * | 2020-09-28 | 2022-07-05 | 安徽长青建筑制品有限公司 | Scaffold for building site |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206785814U (en) | Expansion pin | |
CN204253540U (en) | Anti-loose Crank Pin on Pumping Units | |
CN110439243A (en) | A kind of Fast Installation formula metal scaffolding | |
CN203189389U (en) | Fixing structure of hydraulic oil cylinder guide sleeves and baffle rings | |
CN206653325U (en) | A kind of high-efficient automatic Screw driving machine | |
CN202812592U (en) | Sleeve and pipe quick connector | |
CN105065482B (en) | It is capable of the yielding coupling of the impaired parts of quick-replaceable | |
CN205384959U (en) | Plug -in strip operating means | |
CN209483448U (en) | A kind of assembled camshaft structure of engine | |
CN205649458U (en) | Jump ring formula quick detach hinge | |
CN206694432U (en) | One kind extruding tightening covering device | |
CN206998797U (en) | A kind of piston ring installing/dismounting mechanism | |
CN208468246U (en) | A kind of cuber copper coat dismounting tool, dedicated copper sheathing pedestal | |
CN205154951U (en) | Tooth coupler | |
CN210739927U (en) | Lubricating device for robot maintenance | |
CN204799356U (en) | Low -speed low speed coal mill abrasionproof decreases screw shell | |
CN211737803U (en) | Multistage combination formula profile of tooth spline housing | |
CN205533284U (en) | Connect formula water pump soon | |
CN110153946B (en) | Drawing device | |
CN204724592U (en) | A kind of finishing mill inlet guide edger roll | |
CN108302114A (en) | Hinging pin shaft | |
CN208450566U (en) | Die casting machine pull rod scraping | |
CN204512157U (en) | A kind of transmission shaft structure for car transmissions | |
CN208203781U (en) | A kind of shifting fork type actuator pin shaft structure | |
CN203322685U (en) | Automatic oiling device for steel billet fixture start and stop device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20191112 |
|
RJ01 | Rejection of invention patent application after publication |