CN110439012A - It paddles the construction method of open-cut foundation ditch combined steel sheet-pile cofferdam - Google Patents

It paddles the construction method of open-cut foundation ditch combined steel sheet-pile cofferdam Download PDF

Info

Publication number
CN110439012A
CN110439012A CN201910661277.1A CN201910661277A CN110439012A CN 110439012 A CN110439012 A CN 110439012A CN 201910661277 A CN201910661277 A CN 201910661277A CN 110439012 A CN110439012 A CN 110439012A
Authority
CN
China
Prior art keywords
plate
steel sheet
sliding
sheet pile
cover board
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910661277.1A
Other languages
Chinese (zh)
Other versions
CN110439012B (en
Inventor
胡先宽
陈明洋
夏永红
王伟
魏金龙
宣菲
冯晓见
何伟
朱成正
刘发
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Traffic Construction Ltd By Share Ltd
Original Assignee
Anhui Traffic Construction Ltd By Share Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Traffic Construction Ltd By Share Ltd filed Critical Anhui Traffic Construction Ltd By Share Ltd
Priority to CN201910661277.1A priority Critical patent/CN110439012B/en
Publication of CN110439012A publication Critical patent/CN110439012A/en
Application granted granted Critical
Publication of CN110439012B publication Critical patent/CN110439012B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • E02D19/02Restraining of open water
    • E02D19/04Restraining of open water by coffer-dams, e.g. made of sheet piles

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Revetment (AREA)

Abstract

The present invention relates to the construction methods for open-cut foundation ditch combined steel sheet-pile cofferdam of paddling, comprising the following steps: 1) preparation of construction;2) inside steel sheet pile and outside plate stake plug;3) stake kerbstone cage river bottom protection is constructed;4) clay filled body filling construction;5) obturator is laid in bag;6) cast-in-place cover board construction;7) balance pressure loaded vehicle is arranged.The beneficial effects of the present invention are: limit top plate is arranged on the top of inside steel sheet pile and outside plate stake in the present invention, and the setting connection anchor cable between limit top plate and foundation soil body, upper limit can be carried out to inside steel sheet pile and outside plate stake;Simultaneously, inner support control position bar and inner sidewall compression bar is arranged in the present invention between inside steel sheet pile and outside plate stake, lateral wall compression bar is respectively set between inside steel sheet pile and limit top plate, between outside plate stake and limit top plate, can synchronize and provide internal support and external support to inside steel sheet pile and outside plate stake.

Description

It paddles the construction method of open-cut foundation ditch combined steel sheet-pile cofferdam
Technical field
The present invention relates to one kind can reduce steel sheet pile control position difficulty, promotes cofferdam gap filling body construction efficiency, improvement The construction method of the open-cut foundation ditch combined steel sheet-pile cofferdam of paddling of cofferdam structure stability and waterproof performance, belongs to base pit engineering Field, suitable for open-cut foundation ditch construction work of paddling.
Background technique
It is to reduce surface water to the shadow of base pit stability when being influenced significant area progress excavation of foundation pit by surface water It rings, a certain amount of water-retaining structure object need to be often set.Cofferdam is to examine in current engineering using a kind of more universal water-retaining structure object Considering steel sheet pile cofferdam structure has many advantages, such as that construction efficiency is high, working procedure is few, recyclable, and the foundation pit that is commonly used for paddling is applied In work.However in steel sheet pile cofferdam construction, steel sheet pile sets quality, the water proof effect in cofferdam, the stability of cofferdam structure The often key points and difficulties of Engineering Control.
Have a kind of steel sheet-pile cofferdam for supporting cushion cap foundation pit in the prior art, feature include: inner support and by Multiple steel sheet piles be sequentially connected enclose set made of cofferdam main body;The section of cofferdam main body is rectangle, and inner support is located at cofferdam main body It is interior;Inner support includes side bar and horizontal brace, and side bar is arranged along the inner wall of cofferdam main body, and horizontal brace is opposite with cofferdam main body respectively Two sides connection.The steel sheet pile cofferdam structure solves the lateral stability control problem of cofferdam structure, but due to using single Steel sheet pile is arranged, closed water proof difficulty is larger;Moreover, the technology be not directed to steel sheet pile guiding set, impervious body inside steel sheet pile The problems such as filling, cofferdam structure stability dynamic control, and the solution situation of these problems exactly influences steel sheet-pile cofferdam The key of construction quality, water proof effect and stability.
In consideration of it, steel sheet pile control position difficulty can be reduced, promote cofferdam gap filling body construction by urgently inventing one kind at present The construction method of the open-cut foundation ditch combined steel sheet-pile cofferdam of paddling of efficiency, improvement cofferdam structure stability and waterproof performance.
Summary of the invention
The purpose of the present invention is overcoming deficiency in the prior art, providing a kind of can not only reduce steel sheet pile control position hardly possible Degree, and can promote cofferdam gap filling body construction efficiency, moreover it is possible to improve paddling for cofferdam structure stability and waterproof performance The construction method of open-cut foundation ditch combined steel sheet-pile cofferdam.
The construction method of this open-cut foundation ditch combined steel sheet-pile cofferdam of paddling, comprising the following steps:
1) preparation of construction: preparation inside steel sheet pile and outside plate stake are removed the weak soil in cofferdam construction region, are determined The technique and concrete mix of site operation prepare material and device that construction needs;
2) inside steel sheet pile and outside plate stake plug: plugging inside steel sheet pile and outside plate respectively in foundation soil body Stake, and limit top plate is set on the top of inside steel sheet pile and outside plate stake;It is arranged between limit top plate and foundation soil body Anchor cable is connected, and fastening pressure is applied to connection anchor cable by anchor cable fastening bolt;The lower surface of limit top plate be respectively set with The lateral wall compression bar that inside steel sheet pile and outside plate stake outer surface connect, and make the lateral wall pressing plate of lateral wall compression bar end with Pressing plate limits falcon and is connected;In limit top plate be arranged inner support control position bar, make the bottom end of inner support control position bar by corner adjust hinge and Inner sidewall compression bar is connected, and the rotational angle of inner sidewall compression bar is controlled by rotary spacing plate;
3) stake kerbstone cage river bottom protection is constructed: preposition obturator first is arranged inside gabion outsourcing muscle net, and makes gabion outsourcing muscle Net top is connected to guiding filling pipe;Gabion outsourcing muscle net is placed in inside steel sheet pile and outside together with preposition obturator together again The outside of steel sheet pile, and drop down onto it on foundation soil body under the effect of gravity;Then pipe is filled to gabion outsourcing muscle by guiding Filling guiding obturator in net;
4) clay filled body filling construction: being laid with plate top guide rail in limit top plate, and makes to slide two pieces of connecting plate insertion In the conduit that the opposite plate top guide rail of mirror image encloses;Make the top for sliding strut and bottom end respectively with sliding connecting plate and sliding Fagging is connected firmly, and in sliding fagging upper surface setting sliding feed supplement case;Deviate from glide direction in the lower surface of sliding fagging Set gradually sliding scraper plate, sliding feed supplement pipe and sliding plucking plate;It connect sliding connecting plate with drag-line is slid;It is drawn by sliding Rope control sliding connecting plate and the plan-position for sliding scraper plate, it is synchronous by the vertical height of sliding strut control sliding scraper plate The surface for carrying out clay filled body strikes off constructs with plucking;
5) obturator is laid in bag: clay filled body is filled to the absolute altitude of water proof pouch bottom surface, will be connected with pouch position-limited hoop It connects firm water proof pouch to be placed between inside steel sheet pile and outside plate stake, and pouch position-limited hoop and limit top plate is made to pass through capsule Bag control position muscle connection;The first obturator in filling baggy fabric into water proof pouch, then carry out the clay filled body construction of water proof pouch two sides;
6) it cast-in-place cover board construction: is first vertically spread in clay filled body with the seam crossing of outside plate stake and inside steel sheet pile If vertical separate layer, then clay filled body and water proof pouch upper surface are flattened, then in clay filled body and water proof capsule Bag upper surface is laid with lateral water barrier, and vertical separate layer and lateral water barrier is made to paste and connect;Make to slide strut bottom end and lid Plate wiping tablet is connected firmly, and sink wiping tablet is arranged close to outside plate stake side in cover board wiping tablet, by sliding drag-line control The position of cover board wiping tablet and sink wiping tablet processed;On lateral water barrier top, casting concrete forms cast-in-place cover board and longitudinal row Sink, it is synchronous to collect extra cement slurry by collecting benefit slurry case, local repair slurry is carried out, by plane vibration by plate benefit slurry hole Stamper carries out the surface vibration compacting of cast-in-place cover board concrete;
7) balance pressure loaded vehicle is arranged: after cast-in-place cover board forms intensity, balance pressure loaded vehicle being placed on cast-in-place cover board, and make to put down Weighing apparatus ballast vehicle is connect with drag-line control position plate by ballast vehicle drag-line, and the position of ballast vehicle cable control balance pressure loaded vehicle is passed through.
As preferred: the step 2) limit top plate uses steel plate, along the longitudinal direction of inside steel sheet pile and outside plate stake Even interval is laid, and limit top plate is respectively provided with top plate with the joint of inside steel sheet pile and outside plate stake and connect boots;The connection Anchor cable uses steel wire bundle or spiral;The lateral wall compression bar is formed by screw rod and bolt combination, and both ends are respectively provided with One adjust hinge, and make lateral wall compression bar one end first adjust hinge connect with limit top plate, the other end first adjust hinge with outside Side wall pressing plate is connected;The pressing plate limit falcon and inside steel sheet pile and the lateral wall of outside plate stake are welded to connect;The inside The both ends of wall pressure bar be respectively set corner adjust hinge and second adjust hinge, and make inner sidewall compression bar one end corner adjust hinge with it is interior Support control position bar connects, and the second of the other end adjusts hinge and be connected with inner sidewall pressing plate, and inner sidewall pressing plate is separately positioned on inside steel plate The inside of stake and outside plate stake;Rotary spacing plate is arranged in the top that inner support control position bar and corner adjust hinge connecting part, Inner support control position bar top and limit top plate joint setting control position bar regulation cock.
As preferred: step 3) the gabion outsourcing muscle net cross section is in a rectangular trapezoid or right angled triangle, using reinforcing bar Mesh sheet or metal welded mesh are bound;The preposition obturator uses concret block or block stone, and packed height is outside gabion The 1/4~1/3 of packet muscle net height;The guiding obturator uses gravel.
As preferred: step 4) the plate top guide rail cross section is L-shaped, with limit top plate by being welded to connect or passing through It is bolted;The sliding scraper plate is identical with the sliding bottom surface absolute altitude of feed supplement pipe, and the bottom surface absolute altitude for sliding scraper plate relatively slides plucking High 3~the 5cm of bottom surface absolute altitude of plate;The sliding feed supplement case is made of steel plate or alloy sheets material, is in box, lower surface with Feed supplement pipe connection is slid, side feed opening is arranged in sliding feed supplement case side, and sliding feed supplement case upper surface is connected to top feed pipe.
As preferred: step 5) the water proof pouch is sutured using geomembrane or sheet rubber, cross section in rectangle or Ellipse;Obturator uses lightweight concrete material in the bag;The pouch position-limited hoop is made of steel plate or bar material, It binds and connects with water proof pouch.
As preferred: step 6) the cover board wiping tablet and sink wiping tablet is all made of steel plate or alloy sheets roll, Cover board scraper plate and sink scraper plate is respectively set in the front end of its glide direction, and marks the bottom surface of cover board wiping tablet and cover board scraper plate It is high identical, keep sink wiping tablet identical as the bottom surface absolute altitude of sink scraper plate;The bottom surface of the cover board wiping tablet and cover board scraper plate is equal The inclined gradient of steel sheet pile outward is set, the inclined drainage slope of steel sheet pile outward is formed;Slurry case and lid are mended in the collection Plate scraper plate is welded to connect or is bolted, and collects and mends the upper surface that slurry case is placed in cover board wiping tablet, collects and mend slurry case and lid Plate in plate wiping tablet mends the connection of slurry hole;The plane vibrator is placed in the upper surface of cover board wiping tablet.
As preferred: step 7) the balance pressure loaded vehicle is mainly made of ballast compartment and ballast block, under ballast compartment Compartment idler wheel is arranged in surface;Described ballast vehicle drag-line one end is connected with balance pressure loaded vehicle, and the other end is connected with drag-line control position plate, and The position of equipment control balance pressure loaded vehicle is drawn by foreign volume;Drag-line control position plate is set to the lower surface of limit top plate, flat One block of drag-line control position plate is respectively arranged in weighing apparatus ballast vehicle two sides, and drag-line control position plate passes through ballast vehicle drag-line and connect with balance pressure loaded vehicle.
The beneficial effects of the present invention are:
(1) limit top plate is arranged on the top of inside steel sheet pile and outside plate stake in the present invention, and in limit top plate and ground Setting connection anchor cable between the base soil body can carry out upper limit to inside steel sheet pile and outside plate stake;Meanwhile including the present invention Inner support control position bar and inner sidewall compression bar are set between side steel sheet pile and outside plate stake, in inside steel sheet pile and limit top plate it Between, between outside plate stake and limit top plate lateral wall compression bar is respectively set, can synchronize to inside steel sheet pile and outside plate stake Internal support and external support are provided, the reliability of inside steel sheet pile and outside plate stake transverse direction control position is improved.
(2) present invention falls to gabion outsourcing muscle net on foundation soil body together together with preposition obturator, then by leading Guiding obturator is filled into gabion outsourcing muscle net to filling pipe, not only can effectively promote the positioning of gabion outsourcing muscle net sinking Precision, and can reduce the difficulty and project amount of guiding obturator filling, it can also be achieved the recycling of material.
(3) present invention can slide connecting plate by sliding cable control and slide the plan-position of scraper plate, be supportted by sliding The vertical height of bar control sliding scraper plate, improves the quality of clay filled body surface evening;Meanwhile the present invention can synchronize progress The surface of clay filled body strikes off constructs with plucking, it is closely knit can to improve obturator while improving site operation efficiency Spend the quality of control.
(4) water proof pouch is arranged in the present invention in clay filled body, and fills into water proof pouch and to fill out in the bag of low severe Body is filled, the water proof effect of structure can be not only improved, and can effectively reduce what outside plate stake and inside steel sheet pile were born Lateral pressure.
(5) present invention is provided with cast-in-place cover board, lateral water barrier and vertical on the outside between steel sheet pile and inside steel sheet pile Separate layer can not only improve the water isolating of cofferdam structure, and can reduce the difficulty that cast-in-place cover board is removed;Meanwhile this Drainage slope and longitudinal drainage slot is arranged in cast-in-place cover board top surface in invention, can meet the needs that precipitation quickly excludes at the top of cofferdam, Avoid water body lower the problem of seeping in cofferdam.
(6) balance pressure loaded vehicle is arranged in the present invention on cast-in-place cover board, and can be balanced by the ballast vehicle cable control of two sides The position of ballast vehicle can meet the needs of cofferdam structure stability dynamic control.
Detailed description of the invention
Fig. 1 is that the present invention paddles open-cut foundation ditch combined steel sheet-pile cofferdam construction process figure;
Fig. 2 is that inside steel sheet pile and outside plate stake plug constructing structure schematic diagram;
Fig. 3 is a kerbstone cage river bottom protection constructing structure schematic diagram;
Fig. 4 is clay filled body filling constructing structure schematic diagram;
Fig. 5 is that the clay filled body surface face of Fig. 4 strikes off and plucking constructing structure side schematic view;
Fig. 6 is obturator and top clay filled body structural schematic diagram in bag;
Fig. 7 is cast-in-place cover board and longitudinal drainage slot constructing structure schematic diagram;
Fig. 8 is the cover board wiping tablet and sliding strut connecting structure side schematic view of Fig. 7;
Fig. 9 is balance pressure loaded vehicle setting structure schematic diagram;
Figure 10 is balance pressure loaded vehicle structural schematic diagram.
Description of symbols: steel sheet pile on the inside of 1-;2- outside plate stake;3- foundation soil body;4- limit top plate;5- connection anchor Rope;6- anchor cable fastening bolt;7- lateral wall compression bar;8- lateral wall pressing plate;9- pressing plate limits falcon;10- inner support control position bar;11- corner Adjust hinge;12- inner sidewall compression bar;13- rotary spacing plate;14- gabion outsourcing muscle net;The preposition obturator of 15-;16- guiding filling Pipe;17- is oriented to obturator;18- plate top guide rail;19- slides connecting plate;20- slides strut;21- slides fagging;22- sliding is mended Hopper;23- slides scraper plate;24- slides feed supplement pipe;25- slides plucking plate;26- slides drag-line;27- clay filled body;28- every Water pocket bag;29- pouch position-limited hoop;30- pouch control position muscle;Obturator in 31- bags;The vertical separate layer of 32-;33- transverse direction water barrier; 34- cover board wiping tablet;35- sink wiping tablet;The cast-in-place cover board of 36-;37- longitudinal drainage slot;38-, which is collected, mends slurry case;39- plate is mended Starch hole;40- plane vibrator;41- balance pressure loaded vehicle;42- drag-line control position plate;43- ballast vehicle drag-line;44- top plate connects boots; 45- first adjusts hinge;46- second adjusts hinge;47- inner sidewall pressing plate;48- controls position bar regulation cock;The compartment 49- idler wheel;The side 50- Feed inlet;51- top feed pipe;52- cover board scraper plate;53- sink scraper plate;54- ballast compartment;55- ballast block;56- draining Slope.
Specific embodiment
The present invention is described further below with reference to embodiment.The explanation of following embodiments is merely used to help understand this Invention.It should be pointed out that for those skilled in the art, without departing from the principle of the present invention, also Can be with several improvements and modifications are made to the present invention, these improvement and modification also fall into the protection scope of the claims in the present invention It is interior.
Shown in referring to Fig.1, the construction method for open-cut foundation ditch combined steel sheet-pile cofferdam of paddling, including following construction procedure:
1) preparation of construction: preparation inside steel sheet pile 1 and outside plate stake 2 remove the weak soil in cofferdam construction region, really Determine the technique and concrete mix of site operation, prepares material and device that construction needs;
2) inside steel sheet pile and outside plate stake plug: plugging inside steel sheet pile 1 and outside steel respectively in foundation soil body 3 Sheet pile 2, and limit top plate 4 is set on the top of inside steel sheet pile 1 and outside plate stake 2;In limit top plate 4 and foundation soil body 3 Between setting connection anchor cable 5, and pass through anchor cable fastening bolt 6 pairs of connection anchor cables 5 application fastening pressures;In the following table of limit top plate 4 The lateral wall compression bar 7 to connect with inside steel sheet pile 1 and 2 outer surface of outside plate stake is respectively set in face, and makes 7 end of lateral wall compression bar The lateral wall pressing plate 8 in portion is connected with pressing plate limit falcon 9;Inner support control position bar 10 is set in limit top plate 4, makes inner support control position bar 10 Bottom end hinge adjusted by corner 11 be connected with inner sidewall compression bar 12, and pass through the control inner sidewall compression bar 12 of rotary spacing plate 13 Rotational angle;
3) stake kerbstone cage river bottom protection is constructed: preposition obturator 15 first is arranged inside gabion outsourcing muscle net 14, and makes outside gabion 14 top of packet muscle net is connected to guiding filling pipe 16;Gabion outsourcing muscle net 14 is placed in inside together with preposition obturator 15 together again The outside of steel sheet pile 1 and outside plate stake 2, and drop down onto it under the effect of gravity on foundation soil body 3;Then pass through guiding filling Pipe 16 fills guiding obturator 17 into gabion outsourcing muscle net 14;
4) clay filled body filling construction: being laid with plate top guide rail 18 in limit top plate 4, and makes to slide the insertion of connecting plate 19 In the conduit that the opposite plate top guide rail 18 of two blocks of mirror images encloses;Connect the top for sliding strut 20 and bottom end with sliding respectively Plate 19 and sliding fagging 21 are connected firmly, and in sliding 21 upper surface of fagging setting sliding feed supplement case 22;In sliding fagging 21 Lower surface sets gradually sliding scraper plate 23, sliding feed supplement pipe 24 and sliding plucking plate 25 away from glide direction;Make to slide connecting plate 19 connect with sliding drag-line 26;By the plan-position of the sliding control of drag-line 26 sliding connecting plate 19 and sliding scraper plate 23, pass through The vertical height of the control sliding scraper plate 23 of strut 20 is slid, the synchronous surface for carrying out clay filled body 27 strikes off constructs with plucking;
5) obturator is laid in bag: clay filled body 27 is filled to 28 bottom surface absolute altitude of water proof pouch, will be limited with pouch The water proof pouch 28 that hoop 29 is connected firmly is placed between inside steel sheet pile 1 and outside plate stake 2, and makes pouch position-limited hoop 29 and limit Position top plate 4 is connected by pouch control position muscle 30;The first obturator 31 in filling baggy fabric into water proof pouch 28, then carry out water proof pouch 28 The clay filled body 27 of two sides is constructed;
6) cast-in-place cover board construction: first in the seam crossing of clay filled body 27 and outside plate stake 2 and inside steel sheet pile 1 along perpendicular To being laid with vertical separate layer 32, then clay filled body 27 and 28 upper surface of water proof pouch are flattened, be then laid with laterally every Water layer 33, and paste vertical separate layer 32 with lateral water barrier 33 and connect;Make to slide 20 bottom end of strut and cover board wiping tablet 34 It is connected firmly, and sink wiping tablet 35 is set close to 2 side of outside plate stake in cover board wiping tablet 34, controlled by sliding drag-line 26 The position of cover board wiping tablet 34 and sink wiping tablet 35;Cast-in-place 36 He of cover board is formed in lateral 33 top casting concrete of water barrier Longitudinal drainage slot 37, it is synchronous that extra cement slurry is collected by collection benefit slurry case 38, mends progress local repair in slurry hole 39 by plate Slurry, the surface vibration compacting that cast-in-place 36 concrete of cover board is carried out by plane vibrator 40;
7) balance pressure loaded vehicle is arranged: after cast-in-place cover board 36 forms intensity, balance pressure loaded vehicle 41 is placed on cast-in-place cover board 36, And it connect balance pressure loaded vehicle 41 by ballast vehicle drag-line 43 with drag-line control position plate 42, balance pressure is controlled by ballast vehicle drag-line 43 The position of loaded vehicle 41.
Referring to shown in Fig. 2~Fig. 9, open-cut foundation ditch combined steel sheet-pile cofferdam of paddling, in limit top plate 4 and foundation soil body 3 Between setting connection anchor cable 5;Inner support control position bar 10 and inner sidewall compression bar 12 are set between inside steel sheet pile 1 and outside plate stake 2, Lateral wall compression bar 7 is set between inside steel sheet pile 1 and outside plate stake 2 and limit top plate 4;Pipe 16 is filled to gabion by guiding Filling guiding obturator 17 in outsourcing muscle net 14;Pass through the plane of the sliding control of drag-line 26 sliding connecting plate 19 and sliding scraper plate 23 Position passes through the vertical height of the sliding control sliding scraper plate 23 of strut 20;Water proof pouch 28 is set in clay filled body 27, and Obturator 31 in the bag of low severe is filled into water proof pouch 28;Setting drainage slope 56 and longitudinal row in cast-in-place 36 top surface of cover board Sink 37, is arranged vertical separate layer 32 between cast-in-place cover board 36 and outside plate stake 2 and inside steel sheet pile 1, cast-in-place cover board 36 with Lateral water barrier 33 is set between clay filled body 27, places balance pressure loaded vehicle 41 on cast-in-place cover board 36.
Inside steel sheet pile 1 and outside plate stake 2 are all made of SP-IV type Larsen steel sheet pile, and steel sheet pile width is 400mm, steel Plate thickness is 15.5mm, length 20m.
Foundation soil body 3 is the cohesive soil of hard plastic state.
Limit top plate 4 is used and is formed with a thickness of the steel plate rolling of 10mm, width 30cm, length 4m.
Anchor cable 5 is connected using the steel wire bundle of Φ 15.2.
Anchor cable fastening bolt 6 uses OVM type anchorage.
Lateral wall compression bar 7 uses diameter to form for the screw rod of 30mm with bolt combination, the screw of the screw rod of bolt two sides Fastening direction is opposite.
For lateral wall pressing plate 8 using forming with a thickness of the steel plate rolling of 2mm, planar dimension is 20cm × 20cm.
For pressing plate limit falcon 9 using forming with a thickness of 2mm steel plate rolling, planar dimension is 10cm × 30cm.
Inner support control position bar 10 is made of the steel pipe of diameter 60mm, wall thickness 2mm, and top setting connects with control position bar regulation cock 48 The screw connect;Using forming with a thickness of the steel plate rolling of 10mm, the center portion thereof position is arranged and inner support control position control position bar regulation cock 48 The screw that bar 10 connects.
Corner adjusts hinge 11 using the flexural pivot of diameter 30mm.
Inner sidewall compression bar 12 is made of the steel pipe of diameter 30mm.
Using forming with a thickness of the steel plate rolling of 10mm, width 10cm's rotary spacing plate 13 hangs down with inner support control position bar 10 It is straight to be welded to connect.
14 cross sections of gabion outsourcing muscle net are in a rectangular trapezoid, bound using reinforced mesh, and muscle net spacing is 2cm.
Preposition obturator 15 uses concret block, and packed height is the 1/3 of 14 height of gabion outsourcing muscle net, block width For 10cm.
Guiding filling pipe 16 is cut using pvc pipe.
It is oriented to obturator 17 and uses gravel, nominal diameter 6cm.
Plate top guide rail 18 is used and is formed with a thickness of the steel plate rolling of 2mm, groove width 20cm, groove depth 8cm.
Sliding connecting plate 19 is highly width 18cm, 10cm using being made with a thickness of the steel plate of 10mm.
Sliding strut 20 is made of the steel pipe of diameter 60mm.
Sliding fagging 21 is connect using being made with a thickness of the steel plate of 10mm with sliding 20 vertical welding of strut.
Sliding feed supplement case 22 is in box, volume 0.5m using being made with a thickness of the alloy sheets material of 3mm3
Sliding scraper plate 23 uses to be made with a thickness of the steel plate of 10mm, height 20cm, width 3m.
Sliding feed supplement pipe 24 uses diameter to be made of the steel pipe of 30mm.
Plucking plate 25 is slid using the steel plate with a thickness of 10mm, length 10cm, width 2cm.
Sliding drag-line 26 uses diameter to be made of the wirerope of 10mm.
Clay filled body 27 is using impervious good clay.
Water proof pouch 28 is used and is sutured with a thickness of the geomembrane of 2mm.
Pouch position-limited hoop 29 is used and is made with a thickness of the steel plate materials of 1mm, width 6cm.
Pouch control position muscle 30 uses diameter for the wirerope of 10mm.
Obturator 31 uses severe for 0.8g/cm in bag3Lightweight concrete material.
Vertical separate layer 32 and lateral water barrier 33 are all made of the geomembrane with a thickness of 2mm.
Using forming with a thickness of the steel plate rolling of 2mm, width is 30cm for cover board wiping tablet 34 and sink wiping tablet 35.
Cast-in-place cover board 36 uses strength grade to pour for the concrete material of C30.
The depth of longitudinal drainage slot 37 is 10cm, width 20cm.
Collection benefit slurry case 38 uses to be formed with a thickness of the steel plate rolling of 0.2mm, volume 0.5m3
It is 6cm that plate, which mends slurry 39 diameter of hole,.
40 operating voltage of plane vibrator is 220v.
Balance pressure loaded vehicle 41 is made of ballast compartment 54 and ballast block 55;Wherein ballast compartment 54 is using with a thickness of 2mm Steel plate rolling form, be highly width 1mm, 1m, length 2m.
Ballast block 55 uses the cube concrete precast block having a size of 20cm.
Drag-line control position plate 42 is used and is made with a thickness of the steel plate of 10mm.
Ballast vehicle drag-line 43 uses diameter to be made of the wirerope of 10mm.
Top plate connection boots 44 are highly 20cm using forming with a thickness of the steel plate rolling of 2mm, are placed on inside 1 He of steel sheet pile The top of outside plate stake 2.
First adjusting hinge 45 and second adjusts the directional rotating hinge that hinge 46 is all made of diameter as 30mm.
For inner sidewall pressing plate 47 using forming with a thickness of the steel plate rolling of 2mm, planar dimension is 10cm × 10cm.
Compartment idler wheel 49 uses 6 cun of steel idler wheels.
The width of side feed opening 50 is 30cm, is highly 10cm;
Top feed pipe 51 uses diameter for the steel pipe of 60mm.
Cover board scraper plate 52 and sink scraper plate 53 are all made of to be formed with a thickness of the steel plate rolling of 10mm, is highly 8cm.
The gradient of drainage slope 56 is 3%, is tilted to 37 direction of longitudinal drainage slot.

Claims (7)

1. the construction method for open-cut foundation ditch combined steel sheet-pile cofferdam of paddling, it is characterised in that: including following construction procedure:
1) preparation of construction: preparation inside steel sheet pile (1) and outside plate stake (2) remove the weak soil in cofferdam construction region, really Determine the technique and concrete mix of site operation, prepares material and device that construction needs;
2) inside steel sheet pile and outside plate stake plug: plugging inside steel sheet pile (1) and outside steel respectively in foundation soil body (3) Sheet pile (2), and limit top plate (4) are set on the top of inside steel sheet pile (1) and outside plate stake (2);Limit top plate (4) with Setting connection anchor cable (5) between foundation soil body (3), and fastening pressure is applied to connection anchor cable (5) by anchor cable fastening bolt (6); The lateral wall to connect with inside steel sheet pile (1) and outside plate stake (2) outer surface is respectively set in the lower surface of limit top plate (4) Compression bar (7), and so that the lateral wall pressing plate (8) of lateral wall compression bar (7) end is limited falcon (9) with pressing plate and be connected;In limit top plate (4) Upper setting inner support control position bar (10) makes the bottom end of inner support control position bar (10) adjust hinge (11) and inner sidewall compression bar (12) by corner It is connected, and passes through the rotational angle of rotary spacing plate (13) control inner sidewall compression bar (12);
3) stake kerbstone cage river bottom protection is constructed: preposition obturator (15) being first arranged inside gabion outsourcing muscle net (14), and makes outside gabion Pipe (16) is filled with guiding and is connected in packet muscle net (14) top;Again by gabion outsourcing muscle net (14) together with preposition obturator (15) together It is placed in the outside of inside steel sheet pile (1) and outside plate stake (2), and drops down onto it under the effect of gravity on foundation soil body (3);So (16) filling guiding obturator (17) into gabion outsourcing muscle net (14) is managed by guiding filling afterwards;
4) clay filled body filling construction: plate top guide rail (18) are laid on limit top plate (4), and keep sliding connecting plate (19) embedding Enter in the conduit that the opposite plate top guide rail (18) of two blocks of mirror images encloses;Make slide strut (20) top and bottom end respectively with cunning It moves connecting plate (19) and sliding fagging (21) is connected firmly, and in sliding fagging (21) upper surface setting sliding feed supplement case (22); Sliding scraper plate (23), sliding feed supplement pipe (24) and sliding is set gradually away from glide direction in the lower surface of sliding fagging (21) to draw Hair plates (25);It connect sliding connecting plate (19) with drag-line (26) are slid;Pass through sliding drag-line (26) control sliding connecting plate (19) and the plan-position of sliding scraper plate (23) is synchronized by the vertical height of sliding strut (20) control sliding scraper plate (23) The surface for carrying out clay filled body (27) strikes off constructs with plucking;
5) obturator is laid in bag: clay filled body (27) is filled to the absolute altitude of water proof pouch (28) bottom surface, will be limited with pouch The water proof pouch (28) that hoop (29) is connected firmly is placed between inside steel sheet pile (1) and outside plate stake (2), and limits pouch Hoop (29) is connect with limit top plate (4) by pouch control position muscle (30);The first obturator into water proof pouch (28) interior filling baggy fabric (31), then carry out water proof pouch (28) two sides clay filled body (27) construction;
6) cast-in-place cover board construction: first on the seam crossing edge of clay filled body (27) and outside plate stake (2) and inside steel sheet pile (1) It is vertically laid with vertical separate layer (32), then clay filled body (27) and water proof pouch (28) upper surface is flattened, then exist Clay filled body (27) and water proof pouch (28) upper surface are laid with lateral water barrier (33), and make vertical separate layer (32) and lateral Water barrier (33) pastes connection;Sliding strut (20) bottom end is set to be connected firmly with cover board wiping tablet (34), and in cover board wiping tablet (34) close to outside plate stake (2) side setting sink wiping tablet (35), pass through sliding drag-line (26) control cover board wiping tablet (34) And the position of sink wiping tablet (35);On lateral water barrier (33) top, casting concrete forms cast-in-place cover board (36) and longitudinal row Sink (37), it is synchronous to collect extra cement slurry by collecting benefit slurry case (38), mend slurry hole (39) progress local repair by plate Slurry, the surface vibration compacting that cast-in-place cover board (36) concrete is carried out by plane vibrator (40);
7) balance pressure loaded vehicle is arranged: after cast-in-place cover board (36) forms intensity, balance pressure loaded vehicle (41) being placed in cast-in-place cover board (36) On, and it connect balance pressure loaded vehicle (41) by ballast vehicle drag-line (43) with drag-line control position plate (42), pass through ballast vehicle drag-line (43) position of balance pressure loaded vehicle (41) is controlled.
2. the construction method of open-cut foundation ditch combined steel sheet-pile cofferdam according to claim 1 of paddling, it is characterised in that: step Rapid 2) the described limit top plate (4) uses steel plate, lays along inside steel sheet pile (1) and longitudinal uniform intervals of outside plate stake (2), Limit top plate (4) is respectively provided with top plate with the joint of inside steel sheet pile (1) and outside plate stake (2) and connect boots (44);The company Anchor cable (5) are connect using steel wire bundle or spiral;The lateral wall compression bar (7) is formed by screw rod and bolt combination, both ends It is respectively provided with the first adjusting hinge (45), and makes the first of lateral wall compression bar (7) one end to adjust hinge (45) and connects with limit top plate (4), The first of the other end adjusts hinge (45) and is connected with lateral wall pressing plate (8);Pressing plate limit falcon (9) and inside steel sheet pile (1) and The lateral wall of outside plate stake (2) is welded to connect;The both ends of the inner sidewall compression bar (12) are respectively set corner and adjust hinge (11) Hinge (46) is adjusted with second, and so that the corner of inner sidewall compression bar (12) one end is adjusted hinge (11) and connects with inner support control position bar (10), The second of the other end adjusts hinge (46) and is connected with inner sidewall pressing plate (47), and inner sidewall pressing plate (47) is separately positioned on inside steel sheet pile (1) and the inside of outside plate stake (2);The top that inner support control position bar (10) and corner adjust hinge (11) connecting part is arranged Rotary spacing plate (13), inner support control position bar (10) top and limit top plate (4) joint setting control position bar regulation cock (48).
3. the construction method of open-cut foundation ditch combined steel sheet-pile cofferdam according to claim 1 of paddling, it is characterised in that: step Rapid 3) described gabion outsourcing muscle net (14) cross section is in a rectangular trapezoid or right angled triangle, using reinforced mesh or metal welded mesh It binds;The preposition obturator (15) uses concret block or block stone, and packed height is that gabion outsourcing muscle net (14) is high The 1/4~1/3 of degree;The guiding obturator (17) uses gravel.
4. the construction method of open-cut foundation ditch combined steel sheet-pile cofferdam according to claim 1 of paddling, it is characterised in that: step Rapid 4) plate top guide rail (18) cross section is L-shaped, with limit top plate (4) by being welded to connect or being bolted;Institute State sliding scraper plate (23) and sliding the bottom surface absolute altitude of feed supplement pipe (24) it is identical, slide scraper plate (23) bottom surface absolute altitude relatively slide plucking High 3~the 5cm of bottom surface absolute altitude of plate (25);The sliding feed supplement case (22) is made of steel plate or alloy sheets material, is in box, Lower surface is connected to sliding feed supplement pipe (24), and sliding feed supplement case (22) side setting side feed opening (50) slides feed supplement case (22) upper surface is connected to top feed pipe (51).
5. the construction method of open-cut foundation ditch combined steel sheet-pile cofferdam according to claim 1 of paddling, it is characterised in that: step Rapid 5) the described water proof pouch (28) is sutured using geomembrane or sheet rubber, and cross section is in rectangle or ellipse;In the bag Obturator (31) uses lightweight concrete material;The pouch position-limited hoop (29) is made of steel plate or bar material, with water proof Pouch (28) binding connection.
6. the construction method of open-cut foundation ditch combined steel sheet-pile cofferdam according to claim 1 of paddling, it is characterised in that: step Rapid 6) the described cover board wiping tablet (34) and sink wiping tablet (35) is all made of steel plate or alloy sheets roll, in its glide direction Front end cover board scraper plate (52) and sink scraper plate (53) is respectively set, and make the bottom of cover board wiping tablet (34) Yu cover board scraper plate (52) Face absolute altitude is identical, keeps sink wiping tablet (35) identical as the bottom surface absolute altitude of sink scraper plate (53);The cover board wiping tablet (34) and The bottom surface of cover board scraper plate (52) is respectively provided with steel sheet pile (2) the inclined gradient outward, forms steel sheet pile (2) inclined row outward Water slope (56);The collection mends slurry case (38) and is welded to connect or is bolted with cover board scraper plate (52), collects and mends slurry case (38) it is placed in the upper surface of cover board wiping tablet (34), the plate mended on slurry case (38) and cover board wiping tablet (34) is collected and mends slurry hole (39) it is connected to;The plane vibrator (40) is placed in the upper surface of cover board wiping tablet (34).
7. the construction method of open-cut foundation ditch combined steel sheet-pile cofferdam according to claim 1 of paddling, it is characterised in that: step Rapid 7) the described balance pressure loaded vehicle (41) is mainly made of ballast compartment (54) and ballast block (55), ballast compartment (54) lower surface It is arranged compartment idler wheel (49);The ballast vehicle drag-line (43) one end is connected with balance pressure loaded vehicle (41), the other end and drag-line control position Plate (42) is connected, and the position of equipment control balance pressure loaded vehicle (41) is drawn by foreign volume;Drag-line control position plate (42) is set to One piece of drag-line control position plate (42), drag-line control position plate is respectively arranged in balance pressure loaded vehicle (41) two sides in the lower surface of limit top plate (4) (42) it is connect by ballast vehicle drag-line (43) with balance pressure loaded vehicle (41).
CN201910661277.1A 2019-07-22 2019-07-22 Construction method of wading open-cut foundation pit composite steel sheet pile cofferdam Active CN110439012B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910661277.1A CN110439012B (en) 2019-07-22 2019-07-22 Construction method of wading open-cut foundation pit composite steel sheet pile cofferdam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910661277.1A CN110439012B (en) 2019-07-22 2019-07-22 Construction method of wading open-cut foundation pit composite steel sheet pile cofferdam

Publications (2)

Publication Number Publication Date
CN110439012A true CN110439012A (en) 2019-11-12
CN110439012B CN110439012B (en) 2021-02-26

Family

ID=68431053

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910661277.1A Active CN110439012B (en) 2019-07-22 2019-07-22 Construction method of wading open-cut foundation pit composite steel sheet pile cofferdam

Country Status (1)

Country Link
CN (1) CN110439012B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111139849A (en) * 2020-01-03 2020-05-12 浙江大学城市学院 Construction method of deep-buried underwater bearing platform steel sheet pile cofferdam
CN111691443A (en) * 2020-06-22 2020-09-22 福建省华策建设集团有限公司 Larsen steel sheet pile cofferdam and construction method thereof
CN112227391A (en) * 2020-10-14 2021-01-15 安徽省交通建设股份有限公司 Ecological steel sheet pile island-building cofferdam and construction method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002061168A (en) * 2000-08-21 2002-02-28 Giken Seisakusho Co Ltd Breakwater for sheet pile wall and its construction method
CN101818500A (en) * 2010-05-01 2010-09-01 张锦松 Underwater plugging and water sealing method for bottom plate of concrete pouring jacket without back cover
CN103669375A (en) * 2013-12-27 2014-03-26 张安政 Double-layer steel sheet pile soil core composite cofferdam structure without inner support and application thereof
CN105862894A (en) * 2016-04-06 2016-08-17 中国十七冶集团有限公司 Installation method for anti-floating overall template of water collection pit
CN206607597U (en) * 2017-02-04 2017-11-03 南京萃智水利科技有限公司 Water-bag-type riverway cofferdam
CN206635769U (en) * 2017-01-22 2017-11-14 北京东地岩土工程有限公司 Deep pit support watch box
CN208650073U (en) * 2018-08-06 2019-03-26 合肥市市政设计研究总院有限公司 Cut and cover method subaqueous tunnel steel sheet-pile cofferdam construction

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002061168A (en) * 2000-08-21 2002-02-28 Giken Seisakusho Co Ltd Breakwater for sheet pile wall and its construction method
CN101818500A (en) * 2010-05-01 2010-09-01 张锦松 Underwater plugging and water sealing method for bottom plate of concrete pouring jacket without back cover
CN103669375A (en) * 2013-12-27 2014-03-26 张安政 Double-layer steel sheet pile soil core composite cofferdam structure without inner support and application thereof
CN105862894A (en) * 2016-04-06 2016-08-17 中国十七冶集团有限公司 Installation method for anti-floating overall template of water collection pit
CN206635769U (en) * 2017-01-22 2017-11-14 北京东地岩土工程有限公司 Deep pit support watch box
CN206607597U (en) * 2017-02-04 2017-11-03 南京萃智水利科技有限公司 Water-bag-type riverway cofferdam
CN208650073U (en) * 2018-08-06 2019-03-26 合肥市市政设计研究总院有限公司 Cut and cover method subaqueous tunnel steel sheet-pile cofferdam construction

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111139849A (en) * 2020-01-03 2020-05-12 浙江大学城市学院 Construction method of deep-buried underwater bearing platform steel sheet pile cofferdam
CN111691443A (en) * 2020-06-22 2020-09-22 福建省华策建设集团有限公司 Larsen steel sheet pile cofferdam and construction method thereof
CN111691443B (en) * 2020-06-22 2021-09-28 福建省华策建设集团有限公司 Larsen steel sheet pile cofferdam and construction method thereof
CN112227391A (en) * 2020-10-14 2021-01-15 安徽省交通建设股份有限公司 Ecological steel sheet pile island-building cofferdam and construction method

Also Published As

Publication number Publication date
CN110439012B (en) 2021-02-26

Similar Documents

Publication Publication Date Title
CN106759473B (en) The constructing structure and its construction method of underground pipe gallery and road
CN107524138B (en) Construction method of ultra-deep foundation pit underground diaphragm wall
CN103205978B (en) High-permeability zone under-water-level elevator foundation pit open caisson moulding bed construction method
CN110439012A (en) It paddles the construction method of open-cut foundation ditch combined steel sheet-pile cofferdam
CN105648867B (en) A kind of construction method of comprehensive ecological roadbed system
CN110344423A (en) A kind of drop shaft sinking forms the construction method of water level for local deep foundation pit under high water level
CN107151950A (en) The construction method of desert area railway underground water route moat
CN109537574A (en) The construction technology of diaphram wall in a kind of extremely hard rock
CN109653049A (en) The construction method in approach fill section in a kind of soft ground treatment
CN112281857A (en) Deep foundation pit excavation construction method
CN112482358A (en) Diaphragm wall construction method for diaphragm wall penetrating stratum
CN112878332A (en) Basement elevator shaft sump construction structure and method thereof
CN113529786B (en) Garbage filling and mountain-piling supporting and retaining structure and construction method
CN110424428A (en) The construction method of the comprehensive Yield rainfall relation system of deep basal pit
CN108589747A (en) EPS light road banks are widened in conjunction with plant biological bag protective slope structure and construction method
CN211312489U (en) High rich water faces sea area diaphragm wall and connects sealing device
CN108316237B (en) Revetment retaining wall
CN100523394C (en) Construction method for concrete shaft wall module masonry
CN111549789A (en) Reinforcing structure for foundation pit support and construction method thereof
CN108677999B (en) Silt bagged soil retaining wall structure and construction method
CN208293589U (en) A kind of EPS light road bank is widened in conjunction with plant biological bag protective slope structure
CN110805049A (en) Construction method of mountain slope ultra-thickness spray anchor permanent supporting structure
CN206736957U (en) A kind of high slope framed revetment
CN206220108U (en) Cut Slopes of Expansive Soil reinforced earth back-pressure antiseepage supporting construction
CN205975653U (en) Independent bearing platform structure of soil child mould construction

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant