CN110438990A - The construction method of cable bolting structure - Google Patents

The construction method of cable bolting structure Download PDF

Info

Publication number
CN110438990A
CN110438990A CN201910584648.0A CN201910584648A CN110438990A CN 110438990 A CN110438990 A CN 110438990A CN 201910584648 A CN201910584648 A CN 201910584648A CN 110438990 A CN110438990 A CN 110438990A
Authority
CN
China
Prior art keywords
anchor
rod
cable
hole
anchor cable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910584648.0A
Other languages
Chinese (zh)
Inventor
王强
袁龙泉
周宏�
鲁德利
孙强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ruitong Basic Engineering Technology (beijing) Co Ltd
China Railway 11th Bureau Group Co Ltd
China Railway Construction South China Construction Co Ltd
Original Assignee
Ruitong Basic Engineering Technology (beijing) Co Ltd
China Railway 11th Bureau Group Co Ltd
China Railway Construction South China Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ruitong Basic Engineering Technology (beijing) Co Ltd, China Railway 11th Bureau Group Co Ltd, China Railway Construction South China Construction Co Ltd filed Critical Ruitong Basic Engineering Technology (beijing) Co Ltd
Priority to CN201910584648.0A priority Critical patent/CN110438990A/en
Publication of CN110438990A publication Critical patent/CN110438990A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D15/00Handling building or like materials for hydraulic engineering or foundations
    • E02D15/02Handling of bulk concrete specially for foundation or hydraulic engineering purposes
    • E02D15/04Placing concrete in mould-pipes, pile tubes, bore-holes or narrow shafts
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/74Means for anchoring structural elements or bulkheads
    • E02D5/76Anchorings for bulkheads or sections thereof in as much as specially adapted therefor

Abstract

The present invention relates to a kind of construction methods of cable bolting structure comprising following steps: at least two pieces of bearing plates are arranged in the different length position of the anchor cable body of rod, weld a spiral reinforcement on every piece of bearing plate later by the installation anchor cable body of rod;Drilling forms anchor hole in construct;To carrying out once grouting in the anchor hole;It transfers in the anchor cable body of rod to the anchor hole and carries out secondary grouting;It constructs in the construct anchor, and the anchor is connect with the anchor cable body of rod.So, concentrfated load can be evenly spread on the first bearing plate and the second bearing plate in different length position, realize load peptizaiton in the different location of anchor cable induration, to which the peak value of adhesion strength be effectively reduced, the phenomenon that adhesion strength is disengaged or weakened probability reduces, and then the body of rod in entire supporting anchorage cable anchoring segment limit and boundary strength between induration, induration and stratum can be farthest improved, promote supporting performance.

Description

The construction method of cable bolting structure
Technical field
The present invention relates to building supporting construction technical fields, more particularly to a kind of construction method of cable bolting structure.
Background technique
Traditional, in loading process, load can not be evenly distributed in induration anchor cable, lead to stress concentration phenomenon It is more prominent, namely since anchor cable cohesive force is uneven, as load is continuously increased on induration, in load transmission to consolidating Before body least significant end, the interface between the anchor cable body of rod and induration, induration and stratum will generate adhesion strength gradually disengage or The phenomenon that reduction, causes failure of cable probability to increase, to the problems such as falling off, being broken easily occur, seriously affects supporting construction Service performance.
Summary of the invention
Based on this, it is necessary to provide a kind of construction method of cable bolting structure, being formed by cable bolting structure can Stress concentration phenomenon is mitigated or eliminated in effective distractive load, improves the anchor cable body of rod and induration, anchoring body and the bonding on stratum are strong Degree promotes supporting performance.
Its technical solution is as follows:
A kind of construction method of cable bolting structure comprising following steps:
The anchor cable body of rod is installed, at least two pieces of bearing plates are arranged in the different length position of the anchor cable body of rod, Zhi Hou A spiral reinforcement is welded on every piece of bearing plate;
Drilling forms anchor hole in construct;
To carrying out once grouting in the anchor hole;
It transfers in the anchor cable body of rod to the anchor hole and carries out secondary grouting;
It constructs in the construct anchor, and the anchor is connect with the anchor cable body of rod.
In the construction method of above-mentioned cable bolting structure, first the anchor cable body of rod is installed, is bored in construct later Into formation anchor hole, then to progress once grouting operation in anchor hole;After the completion of once grouting operation, the anchor cable body of rod is transferred In to anchor hole and secondary grouting is carried out, finally the construction and installation anchor in construct, and makes anchor and anchor cable bar Body connection, can complete the construction of cable bolting structure.In this way, concentrfated load can be evenly spread in different length On the first bearing plate and the second bearing plate of position, stress can be remained valid by the first dowel and the second dowel to be transmitted and divides It dissipates and consumes, can realize load peptizaiton in the different location of anchor cable induration, so that adhesion strength be effectively reduced The probability reduction of the phenomenon that peak value, adhesion strength is disengaged or weakened, and then can farthest improve entire supporting anchorage cable anchoring section The body of rod and induration, induration in range and boundary strength between stratum promote supporting performance.
The technical solution of the application is further described below:
In one of the embodiments, in the step installation anchor cable body of rod, further comprise:
One group of unit body of rod and anchorage are installed on every piece of bearing plate respectively, are sleeved on the spiral reinforcement described The outside of the unit body of rod.
In one of the embodiments, in the step installation anchor cable body of rod, further comprise: using the solution lock that is powered Anchorage, and it connect the energization solution lock anchorage with electric control gear well by conducting wire.
It creeps into and is formed in anchor hole in construct in the step in one of the embodiments, specifically included:
Location measurement is carried out in construct, is guaranteed that boring positioning deviation is less than or equal to 100mm, is adjusted drilling machine later Angle of drill bit, carry out at the uniform velocity drilling and forming hole.
The angle of drill bit of drilling machine is adjusted in the step in one of the embodiments, is carried out at the uniform velocity drilling and forming hole, Further comprise: in the drill bit housing tubing of the drilling machine, carrying out band pipe drilling construction.
In one of the embodiments, the step in the anchor hole carry out once grouting in, specifically include:
Proportioned cement slurry is injected in described sleeve pipe with preset pressure, when mixing mud is overflowed from sleeve opening, into Row side tube drawing marginal not slurry;Finally when pure cement slurry is overflowed from sleeve opening, i.e. stopping slip casting.
It transfers in the anchor cable body of rod to the anchor hole and carries out secondary in the step in one of the embodiments, In slip casting, specifically include:
The anchor cable body of rod is at the uniform velocity inserted into anchor hole, detects the recyclable segment length of the anchor cable body of rod later, guarantees anchor Gu section and the length of free segment are not less than design value requirement;After result to be detected is met the requirements, casing is extracted out.
It transfers in the anchor cable body of rod to the anchor hole and carries out secondary in the step in one of the embodiments, In slip casting, further comprise:
In 24 hours after described sleeve pipe to be removed, secondary grouting is carried out into the anchor hole by mending slurry pipe, until Cement grout stops slip casting after overflowing aperture.
It constructs in the construct anchor in the step in one of the embodiments, and by the anchoring Device specifically includes in connecting with the anchor cable body of rod: successively construct on the alien invasion of the construct mask and anchor cable waist Beam installs wedge-shaped pedestal, anchor plate and anchor head anchorage on the anchor cable waist rail again later, finally will be in each unit body of rod Steel strand wires connect with the anchor head anchorage.
In one of the embodiments, in the step by each intracorporal steel strand wires of unit bar and the anchor head anchorage Before connection, further includes: carry out grading tension and locking to each intracorporal steel strand wires of unit bar.
Detailed description of the invention
Fig. 1 is the process flow chart of the construction method of cable bolting structure described in one embodiment of the invention.
Specific embodiment
To make the objectives, technical solutions, and advantages of the present invention more comprehensible, below in conjunction with attached drawing and specific embodiment party Formula, the present invention is further described in detail.It should be understood that the specific embodiments described herein are only to solve The present invention is released, and the scope of protection of the present invention is not limited.
It should be noted that when element is referred to as " being fixedly arranged on ", " being set to " or " install in " another element, it can be with Directly on the other element or there may also be elements placed in the middle.When an element is considered as " connection " another yuan Part, it can be directly to another element or may be simultaneously present centering elements;One element and another element The concrete mode being fixedly connected can be achieved by the prior art, and details are not described herein, it is preferred to use the fixation side of threaded connection Formula.
Unless otherwise defined, all technical and scientific terms used herein and belong to technical field of the invention The normally understood meaning of technical staff is identical.Term as used herein in the specification of the present invention is intended merely to description tool The purpose of the embodiment of body, it is not intended that in the limitation present invention.Term " and or " used herein includes one or more Any and all combinations of relevant listed item.
Heretofore described " first ", " second " do not represent specific quantity and sequence, are only used for the differentiation of title.
As shown in Figure 1, the construction method of the cable bolting structure shown for one embodiment of the application, for being constructed to various Body is supported maintenance in the During Initial Stage Construction stage, guarantees operation safety.Such as when carrying out high-rise building construction, understand under stratum Side excavates several rice even more than ten meters of depth and forms pit-hole, to build solid ground.It is dug around the pit-hole to be formed at this time Soil be loosen, easily the evils such as rainwater omit weather loosen, collapse, construction is impacted, or even cause safety accident.This When just need that Zinc fractions barrier effect is avoided collapsing along circumferential build support pile (wall) of pit-hole.And in order to add The structural strength of strong supporting stake then needs to install anchor cable to depth of stratum, to reinforce its barrier ability.
Specifically, which includes the following steps:
S100: at least two pieces of bearing plates are arranged in the different length position of the anchor cable body of rod by the installation anchor cable body of rod, it A spiral reinforcement is welded on every piece of bearing plate afterwards.
S200: drilling forms anchor hole in construct.
S300: to carrying out once grouting in the anchor hole.
S400: it transfers in the anchor cable body of rod to the anchor hole and carries out secondary grouting.
S500: anchor of constructing in the construct, and the anchor is connect with the anchor cable body of rod.
In the construction method of above-mentioned cable bolting structure, first the anchor cable body of rod is installed, later construct (can be with Be interpreted as above-mentioned pit-hole, or other buildings of other construction sites in the prior art) on drilling form anchor hole, then to anchor Once grouting operation is carried out in solid hole;After the completion of once grouting operation, the anchor cable body of rod is transferred in anchor hole and carrying out two Secondary slip casting, the last construction and installation anchor in construct, and it connect anchor with the anchor cable body of rod, anchor cable can be completed The construction of supporting construction.In this way, concentrfated load can evenly spread to the first bearing plate in different length position and On second bearing plate, stress can be remained valid by the first dowel and the second dowel transmitting and disperse consume, can be real Existing load peptizaiton is in the different location of anchor cable induration, so that the peak value of adhesion strength be effectively reduced, adhesion strength is disengaged Or the phenomenon that reduction probability reduces, and then can farthest improve the body of rod and consolidation in entire supporting anchorage cable anchoring segment limit Boundary strength between body, induration and stratum promotes supporting performance.
Further, in the step installation anchor cable body of rod, further comprise: pacifying on every piece of bearing plate respectively One group of unit body of rod and anchorage are filled, the spiral reinforcement is made to be sleeved on the outside of the unit body of rod.Spiral reinforcement cuff is in list The outside of first body of rod can play effect of contraction, and the diametric rigidity of the reinforcement unit body of rod, promote bearing capacity.It adopts The unit body of rod is fixed on bearing plate with anchorage, then is capable of forming the supporting anchorage cable structure of stable structure, makes to hold on bearing plate The stress of load is successively transferred on spiral reinforcement and the unit body of rod, reduces stress concentration effect.And the dowel of helical structure is used, The continuity that can be then transmitted with proof stress, makes load disperse to consume rapidly.
When construction, the anchor cable body of rod needs to be inserted into the depths of construct, is stablized with ensuring to anchor, and just needs constructing at this time Excavation and anchorage hole on body.In one embodiment, creeps into and formed in anchor hole in construct in the step, specifically included: in structure Location measurement is carried out in building body, is guaranteed that boring positioning deviation is less than or equal to 100mm, is adjusted the angle of drill bit of drilling machine later, Carry out at the uniform velocity drilling and forming hole.
The anchoring hole site of excavation need to construct according to layout design, preferably, support pile can be arranged more anchors Rope, to promote support capacity.It just needs to carry out precise measurement to the hole location of multiple anchor holes at this time, must guarantee that deviations are enough It is small, it avoids can not be successfully the installation anchor cable body of rod because subsequent caused by digging tiltedly.And use and at the uniform velocity feed drill bit, then can utmostly it subtract The abrasion of small drill bit guarantees service life;And when encountering competent bed, it is also convenient for avoidable drill bit and breaks, hold drill bit Easy withdrawing.
Further, the angle of drill bit of drilling machine is adjusted in the step, is carried out at the uniform velocity drilling and forming hole, is further wrapped It includes: in the drill bit housing tubing of the drilling machine, carrying out band pipe drilling construction.Casing can carry out brokenly with drill bit coordinated Rock is conducive to improve drilling efficiency;And the installation of casing synchronous with bore operation can carry out, and simplify construction procedure, after being convenient for It is continuous to carry out slip casting operation.
It should be noted that should be according to the effective length of anchor cable, anchoring section requirement, drilling machine and support pile (wall) when construction Spacing gets out corresponding casing quantity and is crept into, and casing model is selected according to product parameters, guarantee construction it is smooth into Row.
And after being bored into anchorage cable design depth, it is also necessary to hole wall is rinsed using the cement grout of ground concentration, with Rubble remaining in hole, soil are cemented out, guarantee the intensity for the knot solid that subsequent slip casting is formed.
In addition, the step in the anchor hole carry out once grouting in, specifically include:
Proportioned cement slurry is injected in described sleeve pipe with preset pressure, when mixing mud is overflowed from sleeve opening, into Row side tube drawing marginal not slurry;Finally when pure cement slurry is overflowed from sleeve opening, i.e. stopping slip casting.Can so it guarantee in hole Impurity and air are effectively discharged, and it is intracavitary that cement grout can utmostly fill hole.
Further, it transfers in the anchor cable body of rod to the anchor hole and is carried out in secondary grouting in the step, had Body includes: at the uniform velocity to be inserted into the anchor cable body of rod in anchor hole, detects the recyclable segment length of the anchor cable body of rod later, guarantees anchoring Section and the length of free segment are not less than design value requirement;After result to be detected is met the requirements, casing is extracted out.It can so guarantee anchor Gu length is met the requirements, it is ensured that anchoring strength promotes supporting performance;It is also convenient for subsequent progress steel strand wires retightening operation simultaneously.
The step transfer in the anchor cable body of rod to the anchor hole and carry out further comprise in secondary grouting: In 24 hours after described sleeve pipe to be removed, secondary grouting is carried out into the anchor hole by mending slurry pipe, until cement grout Stop slip casting after overflowing aperture.Because during practice of construction, due to stratum geological conditions or operating reason, inevitably Making knot solid, there are bubble and gap, the bubble and gaps will affect the structural strength for tying solid.Therefore pass through secondary grouting (i.e. benefit slurry), can make the effective filling chink of slurries of supplement, and bubble is squeezed and is discharged, and keep knot solid more closely knit, structure Intensity is higher.
It should be noted that prepared cement grout must not be placed more than 2h, to prevent water slurry liquid from generating isolation, shadow The uniformity is rung, the intensity of knot solid is impacted.
After slip casting operation whole, will form by standing several hours, between anchor cable and stratum a thickness it is real, Firm induration, plays power transmission and anastomosis.
It constructs in the construct anchor in the step, and the anchor and the anchor cable body of rod is connected In connecing, specifically include: successively construct on the alien invasion of the construct mask and anchor cable waist rail, later again in the anchor cable waist Wedge-shaped pedestal, anchor plate and anchor head anchorage are installed, finally by each intracorporal steel strand wires of unit bar and the anchor head anchor on beam Tool connection.It can so guarantee to be strained and fixed to the anchor cable body of rod and its steel strand wires, guarantee the support capacity of anchor cable, improve power transmission effect Can, it farthest improves the body of rod in entire anchorage cable anchoring segment limit and the interface between induration, induration and stratum is strong Degree.
In addition, also being wrapped before each intracorporal steel strand wires of unit bar are connect by the step with the anchor head anchorage It includes step: grading tension and locking is carried out to each intracorporal steel strand wires of unit bar.It can so guarantee each steel strand wires and cloth If length matches and is tensioned and is straightened, load efficiency is improved, guarantees supporting performance.It should be noted that steel strand tension Shi Yingbao It demonstrate,proves anchor head anchorage and each unit body of rod is on the same line, avoiding the formation of angle causes to cause prestressing force impaired;Also, When drawing in addition to it should be classified and carry out according to certain load, also need to guarantee that the stress after the tensioning of each unit body of rod is consistent, to avoid There is stress concentration phenomenon.
To reduce engineering cost, improving resource circulation utilization rate can be to unit in this programme after supporting operation Steel strand wires inside the body of rod realize recycling.Specifically, further comprising: using energization in the step installation anchor cable body of rod Lock anchorage is solved, and connect the energization solution lock anchorage with electric control gear well by conducting wire.
In this case, each unit body of rod includes outermost overclad tubes, and interval is provided on the outer tube wall of the overclad tubes Two bar shaped convex bodys being arranged, the bar shaped convex body offer duct, are equipped with positive conductor in one of them described duct, another Negative conductor is equipped in a duct;The positive conductor and the negative conductor are electrically connected with energization solution lock anchorage respectively It connects.The solution that is powered lock anchorage includes shell, the thermal insulation layer on the inner wall for being set to the shell, is set to the interior of the thermal insulation layer Heating member and the melting layer being set on the inner sidewall of the heating member on side wall, the steel strand wires and the melting layer fasten Cooperation;The melting layer is electrically connected with the positive conductor and the negative conductor.
After the supporting operation of construction site, the steel strand wires in supporting anchorage cable can be recycled.Concrete operations side Formula are as follows: open recyclable device, positive and negative conducting wire is powered;Generation high temperature makes to melt melting layer after heating member obtains electric energy, this When steel strand wires can be detached from the gripping force of melting layer, i.e. anchorage is powered unlock.Steel strand wires can be pulled out realization recycling.It is heat-insulated The setting of layer can avoid the high temperature that heating member generates and transmit and damage outward to other component.
It should be understood that melting layer can be molten metal, such as aluminium, copper alloy etc..
Each technical characteristic of embodiment described above can be combined arbitrarily, for simplicity of description, not to above-mentioned reality It applies all possible combination of each technical characteristic in example to be all described, as long as however, the combination of these technical characteristics is not deposited In contradiction, all should be considered as described in this specification.
The embodiments described above only express several embodiments of the present invention, and the description thereof is more specific and detailed, but simultaneously It cannot therefore be construed as limiting the scope of the patent.It should be pointed out that coming for those of ordinary skill in the art It says, without departing from the inventive concept of the premise, various modifications and improvements can be made, these belong to protection of the invention Range.Therefore, the scope of protection of the patent of the invention shall be subject to the appended claims.

Claims (10)

1. a kind of construction method of cable bolting structure, which comprises the steps of:
The anchor cable body of rod is installed, at least two pieces of bearing plates are arranged in the different length position of the anchor cable body of rod, later at every piece A spiral reinforcement is welded on the bearing plate;
Drilling forms anchor hole in construct;
To carrying out once grouting in the anchor hole;
It transfers in the anchor cable body of rod to the anchor hole and carries out secondary grouting;
It constructs in the construct anchor, and the anchor is connect with the anchor cable body of rod.
2. the construction method of cable bolting structure according to claim 1, which is characterized in that install anchor cable in the step In the body of rod, further comprise:
One group of unit body of rod and anchorage are installed on every piece of bearing plate respectively, the spiral reinforcement is made to be sleeved on the unit The outside of the body of rod.
3. the construction method of cable bolting structure according to claim 2, which is characterized in that install anchor cable in the step In the body of rod, further comprise: using the solution lock anchorage that is powered, and the energization solution lock anchorage being made to pass through conducting wire and electric control gear Connection is good.
4. the construction method of cable bolting structure according to claim 1, which is characterized in that in the step in construct Upper drilling is formed in anchor hole, is specifically included:
Location measurement is carried out in construct, is guaranteed that boring positioning deviation is less than or equal to 100mm, is adjusted the brill of drilling machine later Brilliance degree carries out at the uniform velocity drilling and forming hole.
5. the construction method of cable bolting structure according to claim 4, which is characterized in that adjust brill in the step The angle of drill bit of machine, carry out further comprise at the uniform velocity in drilling and forming hole: in the drill bit housing tubing of the drilling machine, carry out band Pipe drilling construction.
6. the construction method of cable bolting structure according to claim 5, which is characterized in that in the step to the anchor It carries out in once grouting, specifically includes in solid hole:
By proportioned cement slurry when mixing mud is overflowed from sleeve opening, to carry out side in preset pressure injection described sleeve pipe Tube drawing marginal not slurry;Finally when pure cement slurry is overflowed from sleeve opening, i.e. stopping slip casting.
7. the construction method of cable bolting structure according to claim 1, which is characterized in that described in step decentralization In the anchor cable body of rod to the anchor hole and specifically include in secondary grouting:
The anchor cable body of rod is at the uniform velocity inserted into anchor hole, detects the recyclable segment length of the anchor cable body of rod later, guarantees anchoring section Length with free segment is not less than design value requirement;After result to be detected is met the requirements, casing is extracted out.
8. the construction method of cable bolting structure according to claim 7, which is characterized in that described in step decentralization In the anchor cable body of rod to the anchor hole and carry out further comprise in secondary grouting:
In 24 hours after described sleeve pipe to be removed, secondary grouting is carried out into the anchor hole by mending slurry pipe, until cement Stop slip casting after slurries overfolw hole mouth.
9. the construction method of cable bolting structure according to claim 2, which is characterized in that in the step in the structure It constructs in building body anchor, and the anchor is connect with the anchor cable body of rod, specifically include: in the construct Alien invasion on successively construct mask and anchor cable waist rail, installed on the anchor cable waist rail again later wedge-shaped pedestal, anchor plate and Each intracorporal steel strand wires of unit bar are finally connect by anchor head anchorage with the anchor head anchorage.
10. the construction method of cable bolting structure according to claim 9, which is characterized in that in the step by each institute It states before the intracorporal steel strand wires of unit bar connect with the anchor head anchorage, further includes: to each intracorporal steel strand wires of unit bar Carry out grading tension and locking.
CN201910584648.0A 2019-07-01 2019-07-01 The construction method of cable bolting structure Pending CN110438990A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910584648.0A CN110438990A (en) 2019-07-01 2019-07-01 The construction method of cable bolting structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910584648.0A CN110438990A (en) 2019-07-01 2019-07-01 The construction method of cable bolting structure

Publications (1)

Publication Number Publication Date
CN110438990A true CN110438990A (en) 2019-11-12

Family

ID=68429372

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910584648.0A Pending CN110438990A (en) 2019-07-01 2019-07-01 The construction method of cable bolting structure

Country Status (1)

Country Link
CN (1) CN110438990A (en)

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104895073A (en) * 2015-05-08 2015-09-09 霍炳旭 Anchor rope construction system capable of being disassembled for many times and construction method thereof
JP2019027011A (en) * 2017-07-25 2019-02-21 積水化学工業株式会社 Reinforced anchor

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104895073A (en) * 2015-05-08 2015-09-09 霍炳旭 Anchor rope construction system capable of being disassembled for many times and construction method thereof
JP2019027011A (en) * 2017-07-25 2019-02-21 積水化学工業株式会社 Reinforced anchor

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
王建强: "一种新的压力分散型热熔式可回收锚索的工程试验", 《中国优秀硕士学位论文全文数据库.工程科技Ⅱ辑》 *

Similar Documents

Publication Publication Date Title
CN106320346B (en) Campshed adds anchor cable grouting behind shaft or drift lining deep foundation pit supporting construction method
WO2020253001A1 (en) Two-step fast closed tunnel support structure having inverted arch and construction method therefor
CN101614125B (en) Construction method of V-level surrounding rock tunnel
CN106193030B (en) A kind of prestressing force grouted anchor bar and construction method with hangnail head
CN111119935B (en) Multi-layer grouting reinforcement method for surrounding rock of soft and broken roadway structure
CN102828518B (en) Construction method for manual hole digging support pile prestress anchor cable anchoring structure
CN107642360A (en) Tunneling boring front pre-grouting construction method
CN104727318B (en) A kind of foundation ditch composite soil nailed wall and method
CN107255035A (en) A kind of extrusion pressing type weak surrounding rock large section tunnel support system and its construction method
CN101768967B (en) Soil anchor quick construction method and anchor thereof
CN102051880B (en) Detachable anchor
CN106498950A (en) Anchor head is placed in the Pile-Anchor Supporting for Deep Excavation system and its implementation of pile body
CN109837895A (en) A kind of big pressure dispersing anchorage cable construction of depth
CN107060774A (en) A kind of anti-tunnel portal wall damage device and construction method
CN109595004A (en) A kind of tunnel two expands four and digs method
CN107965341A (en) A kind of large-section underground pipe canopy pipe network concrete support method
CN101899837A (en) Active anti-shear concrete supporting structure for reinforcing deep sliding surfaces of rock slopes
CN201924356U (en) Detachable anchor rod
CN105350988A (en) Tunnel base reinforcing method
CN107420104A (en) The horizontal prebored hole static blasting excavation construction method of shallow tunnel super-large diameter
CN108914945A (en) A kind of deep basal pit pile for prestressed pipe, prestress anchorage cable combined supporting construction method
CN106120820B (en) The anchoring process and structure of a kind of rock side slope
CN109113749A (en) Four line large section railway tunnel construction method of weak surrounding rock
CN207484290U (en) The hollow clump of piles anchorage of super-large diameter
CN210370522U (en) Drilling pile machine provided with double guide rails and double drilling machines

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20191112