CN110424774A - A kind of assembled-type house formula glass sunlight house - Google Patents
A kind of assembled-type house formula glass sunlight house Download PDFInfo
- Publication number
- CN110424774A CN110424774A CN201910607988.0A CN201910607988A CN110424774A CN 110424774 A CN110424774 A CN 110424774A CN 201910607988 A CN201910607988 A CN 201910607988A CN 110424774 A CN110424774 A CN 110424774A
- Authority
- CN
- China
- Prior art keywords
- aluminum alloy
- assembled
- glass sunlight
- formula glass
- outside
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 239000011521 glass Substances 0.000 title claims abstract description 33
- 229910000838 Al alloy Inorganic materials 0.000 claims abstract description 46
- 239000004570 mortar (masonry) Substances 0.000 claims abstract description 9
- 229910000831 Steel Inorganic materials 0.000 claims description 18
- 239000010959 steel Substances 0.000 claims description 18
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 15
- NJPPVKZQTLUDBO-UHFFFAOYSA-N novaluron Chemical compound C1=C(Cl)C(OC(F)(F)C(OC(F)(F)F)F)=CC=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F NJPPVKZQTLUDBO-UHFFFAOYSA-N 0.000 claims description 13
- 238000010586 diagram Methods 0.000 description 5
- 238000009434 installation Methods 0.000 description 3
- 239000000126 substance Substances 0.000 description 3
- 239000011083 cement mortar Substances 0.000 description 2
- 238000003466 welding Methods 0.000 description 2
- ZPUCINDJVBIVPJ-LJISPDSOSA-N cocaine Chemical compound O([C@H]1C[C@@H]2CC[C@@H](N2C)[C@H]1C(=O)OC)C(=O)C1=CC=CC=C1 ZPUCINDJVBIVPJ-LJISPDSOSA-N 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 230000003111 delayed effect Effects 0.000 description 1
- 230000009977 dual effect Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 229910052751 metal Inorganic materials 0.000 description 1
- 239000002184 metal Substances 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 239000000523 sample Substances 0.000 description 1
- 239000004576 sand Substances 0.000 description 1
- 230000003319 supportive effect Effects 0.000 description 1
- 230000009466 transformation Effects 0.000 description 1
- 230000000007 visual effect Effects 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B7/00—Roofs; Roof construction with regard to insulation
- E04B7/02—Roofs; Roof construction with regard to insulation with plane sloping surfaces, e.g. saddle roofs
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H1/00—Buildings or groups of buildings for dwelling or office purposes; General layout, e.g. modular co-ordination or staggered storeys
- E04H1/12—Small buildings or other erections for limited occupation, erected in the open air or arranged in buildings, e.g. kiosks, waiting shelters for bus stops or for filling stations, roofs for railway platforms, watchmen's huts or dressing cubicles
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H1/00—Buildings or groups of buildings for dwelling or office purposes; General layout, e.g. modular co-ordination or staggered storeys
- E04H1/12—Small buildings or other erections for limited occupation, erected in the open air or arranged in buildings, e.g. kiosks, waiting shelters for bus stops or for filling stations, roofs for railway platforms, watchmen's huts or dressing cubicles
- E04H1/1205—Small buildings erected in the open air
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Roof Covering Using Slabs Or Stiff Sheets (AREA)
Abstract
The invention discloses a kind of assembled-type house formula glass sunlight houses, it includes mortar ground (1), the mortar ground (1) is equipped with the two rows of Aluminum alloy columns (2) in left and right, it is provided with stringer one (5) along the longitudinal direction at the top of the two rows of Aluminum alloy columns (2) in left and right, it is connected between two stringers one (5) in left and right by the screw rod (6) of front and back two, left and right is provided with gable roof (7) between two rows of Aluminum alloy columns (2) tops.A kind of assembled-type house formula glass sunlight house of the present invention, it is able to solve the problem of existing glass sunlight house " the heavenly maids scatter blossoms " formula existing for bad weather is collapsed.
Description
Technical field
The present invention relates to a kind of assembled-type house formula glass sunlight houses, belong to glass sunlight house technical field.
Background technique
Glass sunlight house is also referred to as glass room, and the complete bright non-traditional building built using glass and metal framework is enjoyed with reaching
Sunlight gets close to natural purpose, while ingenious can utilize lamp, reduction power consumption.Be it is domestic and international pursue nature, environmental protection, when
The still building praised highly of personage.Glass sunlight house needs are designed and build according to place use demand and personal preference, indoor
Arrangement can be decorated according to personal preference.Balcony or balcony glass sunlight house, in a whole set of room, therefore visual connectivity is non-
It is often important.Need to consider that it will be consistent with building whole style, while integral color will be consistent as far as possible.
Current glass sunlight house is directly aluminium alloy structure, does not carry out depth to its structure and probes into, the ununified mark of country
It is quasi-.Current glass sunlight house because sun roof weight or accumulated snow when have the event of collapsing, in the Wind-Pressure Resistance of stormy weather
Intensity is also inadequate.Moreover, the column bottom of general glass sunlight house can be all embedded in cement mortar, can be said to be than stronger, top is then straight
It connects to connect with the top plate of glass sunlight house and play a supportive role, the connectivity robustness at top can not show a candle to bottom, therefore once catch in a blizzard
Equal bad weathers, often occur collapsing for " the heavenly maids scatter blossoms " formula.
Summary of the invention
The present invention is directed to provide a kind of assembled-type house formula glass sunlight house in place of overcome the deficiencies in the prior art, it can be solved
The problem of certainly existing glass sunlight house " the heavenly maids scatter blossoms " formula existing for bad weather is collapsed.
The present invention solves the above problems used technical solution are as follows: a kind of assembled-type house formula glass sunlight house, it includes sand
Ground is starched, the mortar ground is equipped with the two rows of Aluminum alloy columns in left and right, and the two rows of Aluminum alloy columns tops in left and right are along front and back
To stringer one is provided with, it is connected between two stringers one in left and right by the screw rod of front and back two, left and right two rows of Aluminum alloy columns top
Gable roof is provided between portion.
Preferably, it is equipped with pre-embedded steel slab below each Aluminum alloy column, the equal side of being coated with inside each Aluminum alloy column
Steel, the Aluminum alloy column and square steel lower end are fixedly connected with pre-embedded steel slab.
Preferably, the more crossbeams in front and back, the crossbeam left and right ends difference are provided between the two rows of Aluminum alloy columns in left and right
It is connected by active connection with the Aluminum alloy column of its left and right sides corresponding position, the active connection is set to crossbeam
The internal left and right sides, the active connection includes connector ontology, and the connector outer body is provided with screw thread one, described
Connector bodies top is provided with threaded hole two, and the Aluminum alloy column passes through bolt and one phase of screw thread on the outside of active connection
Connection, the crossbeam are connected by bolt with the threaded hole two at the top of active connection.
Preferably, the connector ontology includes frame shape pedestal, and connecting plate, the connection are equipped in the frame shape pedestal
Board bottom portion is provided with two snap-gauges in left and right, is provided with latch on the outside of the snap-gauge, the connecting plate by the snap-gauges of left and right two with
Frame shape pedestal fastens.
Preferably, it is provided with chuck on the outside of the frame shape pedestal, the threaded hole one is opened in chuck, the threaded hole
Two are opened on connection plate top surface.
Preferably, opened up along the vertical direction on four lateral surfaces of the Aluminum alloy column it is fluted, the chuck with
The groove of Aluminum alloy column lateral surface fastens.
Preferably, the gable roof includes two stringers two of left and right parallel arrangement, and the stringer two of left and right two is distinguished
It is set at the top of the two rows of Aluminum alloy columns in left and right, the auxiliary beam in front and back two is provided between two stringers two in left and right, the auxiliary beam is left
Right both ends pass through connector respectively and are connected with two stringers two in left and right, are provided with support column in the middle part of the auxiliary beam in front and back two, preceding
It is provided with switching beam between at the top of latter two support column, is respectively provided between two stringers two in left and right at left and right sides of the switching beam
There is girder.
Preferably, the screw rod of front and back two is threaded onto respectively inside the auxiliary beam in front and back two.
Preferably, it is provided with arc strip one at left and right sides of the switching beam, is provided with arc card at the top of the stringer two
Item two, the girder are provided with arc bayonet in two sides up and down, the girder up and down two sides arc bayonet not with arc strip
One and arc strip two be interlocked.
Preferably, water fender component is provided with above the gap between the girder top of left and right two;The water fender component
Including intermediate transit plate, card slot is opened in the middle part of the intermediate transit plate, roofing board, the roofing board bottom are provided in the card slot
Two card adapter plates in left and right are provided with, the roofing board is matched by two card adapter plates in left and right with card slot, the intermediate transit plate
The left and right sides is provided with extension board, and the extension board is connected by buckle structure with intermediate transit plate;One outside of stringer
It is provided with water receiving tank, deflector is provided on the outside of the girder, is extended on the outside of the deflector above water receiving tank.
Compared with the prior art, the advantages of the present invention are as follows:
1, square steel is worn inside Aluminum alloy column of the present invention, and is connected by welding manner with pre-embedded steel slab, pre-embedded steel slab
It is embedded in cement mortar in advance by chemical bolt, increases facade intensity, existing glass sunlight house " the heavenly maids scatter blossoms " can be effectively prevent
The problem of collapsing of formula;
2, Aluminum alloy column independent is connected into an entirety by screw rod and nut by the present invention, can be prevented
The problem of collapsing of " the heavenly maids scatter blossoms " formula, moreover it is possible to increase it in the wind pressure resistant strength of stormy weather;
3, screw rod of the present invention is hollow, and inside is equipped with wirerope, can play the role of dual fail-safe, under extreme conditions, i.e.,
It is broken screw rod, can support there are also wirerope and just break a little while, has effectively delayed the speed of collapsing of entire glass sunlight house;
4, the present invention uses gable roof, and gable roof's girder upper and lower ends pass through arc buckle structure respectively and turn
It connects beam to be connected with stringer two, installation is very convenient, effectively increases installation effectiveness;It is additionally provided between two stringers two in left and right
Auxiliary beam is provided with support column on auxiliary beam, effectively increases the overall structural strength of gable roof;
5, it is also provided with crossbeam between Aluminum alloy column of the present invention, active connection is used between crossbeam and Aluminum alloy column
It is connected, not only increases bonding strength, and reduce construction intensity, reduce manpower and material resources, accelerates installation speed.
Detailed description of the invention
Fig. 1 is a kind of structural schematic diagram of assembled-type house formula glass sunlight house of the present invention.
Fig. 2 is the A-A cross-sectional view of Fig. 1.
Fig. 3 is the local matching relationship schematic diagram of gable roof in Fig. 1.
Fig. 4 is the matching relationship schematic diagram of Aluminum alloy column and crossbeam in Fig. 1.
Fig. 5 is the structural schematic diagram of active connection in Fig. 4.
Fig. 6 is the structural schematic diagram of water fender component in Fig. 1.
Wherein:
Mortar ground 1
Aluminum alloy column 2
Pre-embedded steel slab 3
Chemical bolt 4
Stringer 1
Screw rod 6
Gable roof 7
Stringer 2 7.1
Auxiliary beam 7.2
Support column 7.3
Switching beam 7.4
Girder 7.5
Arc strip 1
Arc strip 2 7.7
Arc bayonet 7.8
Nut 8
Square steel 9
Groove 10
Crossbeam 11
Active connection 12
Connector ontology 12.1
Frame shape pedestal 12.1.1
Connecting plate 12.1.2
Snap-gauge 12.1.3
Latch 12.1.4
Chuck 12.1.5
Screw thread 1
Screw thread 2 12.3
Water fender component 13
Pinboard 13.1
Card slot 13.2
Roofing board 13.3
Card adapter plate 13.4
Extension board 13.5
Water receiving tank 14
Deflector 15.
Specific embodiment
The present invention will be described in further detail below with reference to the embodiments of the drawings.
Referring to FIG. 1 to FIG. 6, a kind of assembled-type house formula glass sunlight house of the present invention, it includes mortar ground 1, described
Mortar ground 1 is equipped with the two rows of Aluminum alloy columns 2 in left and right, is equipped with pre-embedded steel slab 3, left and right two below each Aluminum alloy column 2
2 top of row's Aluminum alloy column is provided with stringer 1 along the longitudinal direction, passes through the spiral shell of front and back two between two stringers 1 in left and right
Bar 6 is connected, and left and right is provided with gable roof 7 between two rows of 2 tops of Aluminum alloy column;
6 inner hollow of screw rod is coated with wirerope inside the screw rod 6;
It is connected between the pre-embedded steel slab 3 and mortar ground 1 by four chemical bolts 4;
6 left and right ends of screw rod pass through nut 8 respectively and are connected with two stringers 1 in left and right;
Square steel 9 is coated with inside each Aluminum alloy column 2, the Aluminum alloy column 2 and 9 lower end of square steel pass through welding
Mode be connected with pre-embedded steel slab 3;
Fluted 10 are opened up along the vertical direction on four lateral surfaces of the Aluminum alloy column 2;
The more crossbeams 11 in front and back are provided between the two rows of Aluminum alloy columns 2 in left and right, 11 left and right ends of crossbeam lead to respectively
Active connection 12 is crossed to be connected with the Aluminum alloy column 2 of its left and right sides corresponding position;
The active connection 12 is set to the 11 inside left and right sides of crossbeam;
The active connection 12 includes connector ontology 12.1, is provided with screw thread one on the outside of the connector ontology 12.1
12.2, be provided with threaded hole 2 12.3 at the top of the connector ontology 12.1, the Aluminum alloy column 2 by bolt and activity even
The screw thread 1 in 12 outside of fitting is connected, the threaded hole two that the crossbeam 11 passes through 12 top of bolt and active connection
12.3 are connected;
The connector ontology 12.1 includes frame shape pedestal 12.1.1, is equipped with connecting plate in the frame shape pedestal 12.1.1
12.1.2, the bottom the connecting plate 12.1.2 is provided on the outside of left and right two snap-gauge 12.1.3, the snap-gauge 12.1.3 and is provided with
Latch 12.1.4, the connecting plate 12.1.2 are fastened by left and right two snap-gauge 12.1.3 and frame shape pedestal 12.1.1;
It is provided with chuck 12.1.5 on the outside of the frame shape pedestal 12.1.1, the threaded hole 1 is opened in chuck
12.1.5 on, the threaded hole 2 12.3 is opened on the top surface connecting plate 12.1.2;
The groove 10 of the chuck 12.1.5 and 2 lateral surface of Aluminum alloy column fasten;
The gable roof 7 includes two stringers 2 7.1 of left and right parallel arrangement, and the stringer 2 7.1 of left and right two is distinguished
Two rows of 2 tops of Aluminum alloy column in left and right are set to, are provided with the auxiliary beam 7.2 in front and back two between two stringers 2 7.1 in left and right, it is described
Auxiliary 7.2 left and right ends of beam pass through connector respectively and are connected with two stringers 2 7.1 in left and right, and auxiliary 7.2 middle part of beam in front and back two is
It is provided with support column 7.3, is provided with switching beam 7.4, the switching beam 7.4 or so two between former and later two 7.3 tops of support column
Girder 7.5 is provided between two stringers 2 7.1 in side and left and right;
The screw rod 6 of front and back two is threaded onto respectively inside the auxiliary beam 7.2 in front and back two;
Arc strip 1 is provided at left and right sides of the switching beam 7.4,2 7.1 top of stringer is provided with arc
Strip 2 7.7, about 7.5 two sides of girder are provided with arc bayonet 7.8, the arc card of about 7.5 two sides of girder
Mouth 7.8 is interlocked with arc strip 1 and arc strip 2 7.7 respectively;
Water fender component 13 is provided with above gap between 7.5 top of the girder of left and right two;
The water fender component 13 includes intermediate transit plate 13.1, opens card slot 13.2 in the middle part of the intermediate transit plate 13.1,
Roofing board 13.3 is provided in the card slot 13.2,13.3 bottom of roofing board is provided with two card adapter plates 13.4 in left and right, institute
It states roofing board 13.3 to match by two card adapter plates 13.4 in left and right with card slot 13.2,13.1 left and right sides of intermediate transit plate
It is provided with extension board 13.5, the extension board 13.5 is connected by buckle structure with intermediate transit plate 13.1;
One 5 outside of stringer is provided with water receiving tank 14, and deflector 15, the water conservancy diversion are provided on the outside of the girder 7.5
14 top of water receiving tank is extended on the outside of plate 15.
Outside above-described embodiment, the invention also includes have other embodiments, all use equivalent transformation or equivalent replacement sides
The technical solution that formula is formed, should all fall within the scope of the hereto appended claims.
Claims (10)
1. a kind of assembled-type house formula glass sunlight house, it is characterised in that: it includes mortar ground (1), is set on the mortar ground (1)
There are the two rows of Aluminum alloy columns (2) in left and right, be provided with stringer one (5) along the longitudinal direction at the top of the two rows of Aluminum alloy columns (2) in left and right,
It is connected between two stringers one (5) in left and right by the screw rod (6) of front and back two, between two rows of Aluminum alloy columns (2) tops in left and right
It is provided with gable roof (7).
2. a kind of assembled-type house formula glass sunlight house according to claim 1, it is characterised in that: each Aluminum alloy column (2)
Lower section is equipped with pre-embedded steel slab (3), is coated with square steel (9) inside each Aluminum alloy column (2), the Aluminum alloy column (2)
It is fixedly connected with square steel (9) lower end with pre-embedded steel slab (3).
3. a kind of assembled-type house formula glass sunlight house according to claim 1, it is characterised in that: the two rows of Aluminum alloy columns in left and right
(2) the more crossbeams (11) in front and back are provided between, crossbeam (11) left and right ends pass through active connection (12) and its respectively
The Aluminum alloy column (2) of left and right sides corresponding position is connected, and it is internal left that the active connection (12) is set to crossbeam (11)
Right two sides, the active connection (12) include connector ontology (12.1), are provided on the outside of the connector ontology (12.1)
Screw thread one (12.2), connector ontology (12.1) top are provided with threaded hole two (12.3), and the Aluminum alloy column (2) is logical
Bolt is crossed to be connected with the screw thread one (12.2) on the outside of active connection (12), the crossbeam (11) by bolt be flexibly connected
Threaded hole two (12.3) at the top of part (12) is connected.
4. a kind of assembled-type house formula glass sunlight house according to claim 3, it is characterised in that: the connector ontology
(12.1) include frame shape pedestal (12.1.1), be equipped with connecting plate (12.1.2), the company in the frame shape pedestal (12.1.1)
The bottom fishplate bar (12.1.2) is provided with two snap-gauges (12.1.3) in left and right, is provided with latch on the outside of the snap-gauge (12.1.3)
(12.1.4), the connecting plate (12.1.2) are fastened by two snap-gauges (12.1.3) in left and right with frame shape pedestal (12.1.1).
5. a kind of assembled-type house formula glass sunlight house according to claim 4, it is characterised in that: the frame shape pedestal
It is provided with chuck (12.1.5) on the outside of (12.1.1), the threaded hole one (12.2) is opened on chuck (12.1.5), the spiral shell
Pit two (12.3) is opened on the top surface connecting plate (12.1.2).
6. a kind of assembled-type house formula glass sunlight house according to claim 5, it is characterised in that: the Aluminum alloy column (2)
Four lateral surfaces on open up along the vertical direction fluted (10), on the outside of the chuck (12.1.5) and Aluminum alloy column (2)
The groove (10) in face fastens.
7. a kind of assembled-type house formula glass sunlight house according to claim 1, it is characterised in that: the gable roof (7)
Two stringers two (7.1) including left and right parallel arrangement, two stringers two (7.1) in left and right are respectively arranged at the two rows of aluminium alloys in left and right
At the top of column (2), the auxiliary beam (7.2) in front and back two, auxiliary beam (7.2) left and right are provided between two stringers two (7.1) in left and right
Both ends pass through connector respectively and are connected with two stringers two (7.1) in left and right, are provided with branch in the middle part of the auxiliary beam (7.2) in front and back two
Dagger (7.3), former and later two support columns (7.3) are provided with switching beam (7.4) between top, switching beam (7.4) left and right two
Girder (7.5) are provided between two stringers two (7.1) in side and left and right.
8. a kind of assembled-type house formula glass sunlight house according to claim 7, it is characterised in that: the screw rod (6) of front and back two point
It is internal that it is not threaded onto the auxiliary beam (7.2) in front and back two.
9. a kind of assembled-type house formula glass sunlight house according to claim 7, it is characterised in that: the switching beam (7.4) is left
Right two sides are provided with arc strip one (7.6), are provided with arc strip two (7.7), the girder at the top of the stringer two (7.1)
(7.5) two sides are provided with arc bayonet (7.8) up and down, the girder (7.5) up and down two sides arc bayonet (7.8) respectively with
Arc strip one (7.6) and arc strip two (7.7) are interlocked.
10. a kind of assembled-type house formula glass sunlight house according to claim 7, it is characterised in that: two girders (7.5) in left and right
Water fender component (13) are provided with above gap between top;The water fender component (13) includes intermediate transit plate
(13.1), it is opened card slot (13.2) in the middle part of the intermediate transit plate (13.1), is provided with roofing board in the card slot (13.2)
(13.3), roofing board (13.3) bottom is provided with two card adapter plates (13.4) in left and right, and the roofing board (13.3) passes through a left side
Right two card adapter plates (13.4) match with card slot (13.2), are provided with extension board at left and right sides of the intermediate transit plate (13.1)
(13.5), the extension board (13.5) is connected by buckle structure with intermediate transit plate (13.1);On the outside of the stringer one (5)
It is provided with water receiving tank (14), is provided with deflector (15) on the outside of the girder (7.5), extend to and connect on the outside of the deflector (15)
Above sink (14).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910607988.0A CN110424774A (en) | 2019-07-08 | 2019-07-08 | A kind of assembled-type house formula glass sunlight house |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910607988.0A CN110424774A (en) | 2019-07-08 | 2019-07-08 | A kind of assembled-type house formula glass sunlight house |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110424774A true CN110424774A (en) | 2019-11-08 |
Family
ID=68410326
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910607988.0A Pending CN110424774A (en) | 2019-07-08 | 2019-07-08 | A kind of assembled-type house formula glass sunlight house |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110424774A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112746671A (en) * | 2021-01-12 | 2021-05-04 | 佛山市安晨门窗科技有限公司 | Universal regulation angle sign indicating number on sunshine house roof |
CN114319607A (en) * | 2021-12-22 | 2022-04-12 | 广东皇派定制家居集团股份有限公司 | Ground foot connecting mode of circular tube stand column |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN204139322U (en) * | 2014-09-18 | 2015-02-04 | 佛山市广成铝业有限公司 | A kind of glass sunlight house |
WO2017024844A1 (en) * | 2015-08-13 | 2017-02-16 | 广东铝遊家科技有限公司 | Bolt connection structure between column and beam in aluminum alloy house |
WO2017028576A1 (en) * | 2015-08-18 | 2017-02-23 | 广东铝遊家科技有限公司 | Roofing system for aluminium alloy house |
CN206052955U (en) * | 2016-08-30 | 2017-03-29 | 江阴和吉家居有限公司 | The anti-collapse column agency of glass sunlight house |
CN207686093U (en) * | 2017-11-17 | 2018-08-03 | 重庆天豪虹淘实业有限公司 | A kind of spine structure for glass sunlight house |
CN208415704U (en) * | 2018-07-04 | 2019-01-22 | 厦门居室风智能门窗系统有限公司 | A kind of energy conservation glass sunlight house |
CN109386084A (en) * | 2018-08-08 | 2019-02-26 | 浙江亚厦幕墙有限公司 | A kind of connection structure of glass curtain wall crossbeam and column |
CN208815668U (en) * | 2018-08-23 | 2019-05-03 | 湖北亨威铝业有限公司 | Novel glass sunlight house structure |
CN211114981U (en) * | 2019-07-08 | 2020-07-28 | 江苏和吉家居有限公司 | Assembled residential type sunlight room |
-
2019
- 2019-07-08 CN CN201910607988.0A patent/CN110424774A/en active Pending
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN204139322U (en) * | 2014-09-18 | 2015-02-04 | 佛山市广成铝业有限公司 | A kind of glass sunlight house |
WO2017024844A1 (en) * | 2015-08-13 | 2017-02-16 | 广东铝遊家科技有限公司 | Bolt connection structure between column and beam in aluminum alloy house |
WO2017028576A1 (en) * | 2015-08-18 | 2017-02-23 | 广东铝遊家科技有限公司 | Roofing system for aluminium alloy house |
CN206052955U (en) * | 2016-08-30 | 2017-03-29 | 江阴和吉家居有限公司 | The anti-collapse column agency of glass sunlight house |
CN207686093U (en) * | 2017-11-17 | 2018-08-03 | 重庆天豪虹淘实业有限公司 | A kind of spine structure for glass sunlight house |
CN208415704U (en) * | 2018-07-04 | 2019-01-22 | 厦门居室风智能门窗系统有限公司 | A kind of energy conservation glass sunlight house |
CN109386084A (en) * | 2018-08-08 | 2019-02-26 | 浙江亚厦幕墙有限公司 | A kind of connection structure of glass curtain wall crossbeam and column |
CN208815668U (en) * | 2018-08-23 | 2019-05-03 | 湖北亨威铝业有限公司 | Novel glass sunlight house structure |
CN211114981U (en) * | 2019-07-08 | 2020-07-28 | 江苏和吉家居有限公司 | Assembled residential type sunlight room |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112746671A (en) * | 2021-01-12 | 2021-05-04 | 佛山市安晨门窗科技有限公司 | Universal regulation angle sign indicating number on sunshine house roof |
CN114319607A (en) * | 2021-12-22 | 2022-04-12 | 广东皇派定制家居集团股份有限公司 | Ground foot connecting mode of circular tube stand column |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110424774A (en) | A kind of assembled-type house formula glass sunlight house | |
CN206481251U (en) | A kind of photovoltaic bracket device of use truss string structure beam | |
CN211114981U (en) | Assembled residential type sunlight room | |
CN205847182U (en) | A kind of waterproof construction of photovoltaic generation cell panel | |
CN107165274A (en) | A kind of many high-rise assembled modularization Self-resetting steel construction H profile steel post frame systems | |
CN201248290Y (en) | Big-arch shelter bracket | |
CN208473077U (en) | A kind of light steel roof truss structure with second level cornice | |
CN208963284U (en) | Floating on water surface photovoltaic module support system | |
CN208916669U (en) | Tower crane steel structure combined gap bridge | |
CN211143441U (en) | Herringbone roof structure of sunlight room | |
CN206769158U (en) | A kind of cable-arch system lighting roof | |
CN206495383U (en) | A kind of energy-saving big lattice stainless steel flying wing structure | |
CN216380302U (en) | Open type decorative aluminum cornice hanging structure | |
CN206174125U (en) | Connecting elements of H shape steel column and I -shaped girder steel | |
CN202610699U (en) | Modularization aluminium alloy footbridge structure | |
CN209612205U (en) | A kind of tradition kite | |
CN211080537U (en) | Anti-collapse stand column mechanism for sunlight room | |
CN209179288U (en) | Joist under a kind of interior gutter | |
CN208634984U (en) | It is a kind of with the LED solar street light for stablizing wind force proofing design | |
CN208329181U (en) | A kind of easy-to-mount adjustable emergency building construction | |
CN211080589U (en) | Connecting structure of stand column and cross beam of sunlight room | |
CN206487186U (en) | A kind of novel assembled high intensity is solar vehicle-shed | |
CN207039512U (en) | photovoltaic bracket mounting structure | |
CN206110737U (en) | Steel construction bicycle shed | |
CN208540499U (en) | One kind saves land lightweight efficient-economical solar-greenhouse |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |