CN110424516A - A kind of branch pipe integrated regulation construction method for drainage system - Google Patents

A kind of branch pipe integrated regulation construction method for drainage system Download PDF

Info

Publication number
CN110424516A
CN110424516A CN201910638189.XA CN201910638189A CN110424516A CN 110424516 A CN110424516 A CN 110424516A CN 201910638189 A CN201910638189 A CN 201910638189A CN 110424516 A CN110424516 A CN 110424516A
Authority
CN
China
Prior art keywords
branch pipe
positioning
pipe
adjustment device
sliding rail
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910638189.XA
Other languages
Chinese (zh)
Other versions
CN110424516B (en
Inventor
支黎锋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongsheng Dingrui Group Co.,Ltd.
Original Assignee
Shengzhou Yuetong Trenchless Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shengzhou Yuetong Trenchless Construction Co Ltd filed Critical Shengzhou Yuetong Trenchless Construction Co Ltd
Priority to CN201910638189.XA priority Critical patent/CN110424516B/en
Publication of CN110424516A publication Critical patent/CN110424516A/en
Application granted granted Critical
Publication of CN110424516B publication Critical patent/CN110424516B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F3/00Sewer pipe-line systems
    • E03F3/04Pipes or fittings specially adapted to sewers
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F3/00Sewer pipe-line systems
    • E03F3/06Methods of, or installations for, laying sewer pipes

Landscapes

  • Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Hydrology & Water Resources (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • Sewage (AREA)

Abstract

The invention discloses a kind of branch pipe integrated regulation construction methods for drainage system, include the following steps: a, the production of branch pipe positioning adjustment device;B, positioning pipe makes;C, positioning pipe is installed;D, excavation of foundation pit;E, in the top mounting slip track of foundation pit;F, first branch pipe positioning adjustment device location and installation;G, remaining branch pipe positioning adjustment device location and installation;H, the tilt angle of integrated regulation branch pipe positioning adjustment device;I, branch pipe is installed;J, soil is backfilled in foundation pit.The present invention can carry out tilt angle adjustment simultaneously to more branch pipes simultaneously, so that the setting height of branch pipe is consistent, reduce the adjustment number of branch pipe installation site, improve installation accuracy;And branch pipe can be mutually aligned with the nozzle of supervisor, quickly be welded to connect the nozzle of branch pipe and supervisor convenient for the later period.

Description

A kind of branch pipe integrated regulation construction method for drainage system
Technical field
The invention belongs to branch pipe mounting technique field more particularly to a kind of branch pipe integrated regulation constructions for drainage system Method.
Background technique
Drainage system refers to what the facilities such as collection, conveying, the processing of water quality and the discharge of draining were combined into a certain way It is overall, to water logging control, prevention against water-logging, gutters at different levels (pipe) road of anti-salt and the general name of building.It is mainly by field drainage tune It saves net, gutter at different levels, store the compositions such as flooded lake, drainage gate, pump drainage pumping plant and the draining area Rong Guo.The extra water of drainage area is first It first imports field drainage and adjusts net, then through gutters at different levels or appearance is drained by drainage gate or pump drainage station again after the stagnant storage in lake let out Area.
Drainage pipeline plays the role of draining in drainage system, and the water being collected into collection system concentration is drained into In sewage disposal system.When drainage pipeline is arranged, need to carry out pipeline to connect between pipeline.Pipeline connection refers to according to setting The requirement for counting figure, connects into a complete system for processed prefabricated pipeline section.In pipeline connection, generally to pipeline Between using being welded to connect, which has the following characteristics that (1) interface is securely tight, and weld strength commonly reaches pipe 85% or more of intensity;(2) being welded to connect is directly connected between pipeline section, simple structure, and pipeline is beautiful and tidy;(3) interface is not It is limited by caliber, operating speed is fast.In drainage system, more branch pipes are arranged in parallel, and weld with the nozzle of supervisor It connects, during Specific construction, branch pipe is supported using single pipe collar, then pipe collar is installed on support frame, due to branch Pipe is all made of independent support, easily causes branch pipe height adjusted inconsistent, needs repeatedly to adjust the installation site of branch pipe;And it props up The distance between pipe is not easy to control.
Summary of the invention
Above-mentioned technical problem present in present invention aims to solve the prior art provides a kind of for drainage system Branch pipe integrated regulation construction method, tilt angle needed for branch pipe, integrated regulation branch pipe are fixed when can be docked according to branch pipe with supervisor The tilt angle of position adjustment device, enables the nozzle of branch pipe and supervisor to be mutually butted and be welded to connect, while to more branch pipes Tilt angle adjustment is carried out simultaneously, so that the setting height of branch pipe is consistent, reduces the adjustment number of branch pipe installation site, Improve installation accuracy;And the distance between center of circle of positioning pipe in two neighboring branch pipe positioning adjustment device is equal to adjacent two The distance between the center of circle of root branch pipe, is passed into positioning pipe when by branch pipe, then after branch pipe and positioning pipe are welded to connect, Branch pipe can be mutually aligned with the nozzle of supervisor, quickly be welded to connect the nozzle of branch pipe and supervisor convenient for the later period.
In order to solve the above-mentioned technical problem, the present invention adopts the following technical scheme:
A kind of branch pipe integrated regulation construction method for drainage system, it is characterised in that include the following steps:
A, branch pipe positioning adjustment device makes:
1) in the bottom welding location-plate of top plate, positioning plate is equipped with rectangular location hole, and positioning plate is arranged in parallel;
2) two pieces of symmetrically arranged fixed plates are welded between the bottom of positioning plate, fixed plate is equipped with through-hole;
3) rotating bracket is welded at the top of top plate, then welds sliding plate at the top of rotating bracket;
B, positioning pipe makes:
1) according to the diameter of branch pipe in drainage system, the positioning pipe of suitable diameter is selected, branch pipe is enabled to be mounted on positioning Guan Zhong;
2) center of circle of positioning pipe is overlapped with the design of the center of rectangular location hole, according to the diameter of positioning pipe, calculates positioning The distance between the inside in the outside of pipe and rectangular location hole, then support plate, the height of support plate are welded in the outside of positioning pipe For the outside of positioning pipe and the distance between the inside of rectangular location hole;
C, positioning pipe is installed: the positioning pipe for being welded with support plate being encased in rectangular location hole, then is carried out to positioning pipe Position adjustment, then will be welded and fixed on the inside of support plate and rectangular location hole;
D, excavation of foundation pit;
E, in the top mounting slip track of foundation pit;
F, first branch pipe positioning adjustment device location and installation:
1) first branch pipe positioning adjustment device for being equipped with positioning pipe is installed on sliding rail, sliding plate is slid into Adjustment is set in the enterprising line position of sliding rail into sliding rail, then to first branch pipe positioning adjustment device, then by first Branch pipe positioning adjustment device is fixed on sliding rail, and first branch pipe positioning adjustment device is in the left end of sliding rail;
2) it is laterally passed through adjustment threaded rod in the through-hole of fixed plate, then is screwed into adjustment respectively at the both ends of adjustment threaded rod Nut, adjusting nut are tightened on the side of fixed plate;
G, remaining branch pipe positioning adjustment device location and installation:
1) second branch pipe positioning adjustment device is installed on adjustment threaded rod, left side adjusting nut is first screwed into adjustment On threaded rod, then second branch pipe positioning adjustment device be installed on sliding rail, sliding plate slid into sliding rail, The center of circle for measuring the positioning pipe in second branch pipe positioning adjustment device and the positioning pipe in first branch pipe positioning adjustment device The distance between the center of circle, then turn left side adjusting nut, position of the adjustment left side adjusting nut on adjustment threaded rod, when The circle in the center of circle of the positioning pipe in second branch pipe positioning adjustment device and the positioning pipe in first branch pipe positioning adjustment device The distance between heart is equal to the distance between the center of circle of adjacent two branch pipes, and left side adjusting nut is screwed to second branch pipe positioning On the side for adjusting the fixed plate of device, it is then screwed into right side adjusting nut on adjustment threaded rod, right side adjusting nut is twisted Onto the side of another fixed plate of second branch pipe positioning adjustment device, second branch pipe positioning adjustment device positioning peace is completed Dress;
2) successively remaining branch pipe is positioned one by one according to the locating mounting method of second branch pipe positioning adjustment device and is adjusted Device carries out location and installation;
3) the branch pipe positioning adjustment device of the right end in sliding rail is fixed on sliding rail;
H, the tilt angle of integrated regulation branch pipe positioning adjustment device: incline needed for branch pipe when being docked according to branch pipe with supervisor Rake angle exerts a force to adjustment threaded rod, and rotating bracket generates angle change, and integrated regulation branch pipe positioning adjustment device inclines Rake angle, then twisted in the rotating bar of rotating bracket that is connected of branch pipe positioning adjustment device of the left end in sliding rail Enter locking nut, and the rotating bar of the rotating bracket connected in the branch pipe positioning adjustment device of the right end in sliding rail On be screwed into locking nut;
I, branch pipe is installed: branch pipe is passed into positioning pipe, then branch pipe and positioning pipe are welded to connect, the end of branch pipe Portion is in sustained height;
J, soil is backfilled in foundation pit.
Further, in step e, foundation pit top mounting slip track the specific steps are first install mould on the ground Plate, then sliding rail is placed in the template installed, the sliding slot of sliding rail is arranged upward, then pours in the template installed Concrete is built, concrete mounting plate is formed, then concrete mounting plate is mounted on to the top of foundation pit, by the sliding slot court of sliding rail Lower setting.By concreting, sliding rail is mounted in concrete mounting plate, base is mounted on by concrete mounting plate The top in hole realizes the top mounting slip track in foundation pit, avoids causing sliding rail to become in mounting slip track Shape phenomenon.
Further, the branch pipe positioning adjustment device of the left end in sliding rail and the right end in sliding rail is solid The concrete operations being scheduled on sliding rail are limit steel plate to be slid on sliding rail, then limit steel plate is welded on sliding rail On, then branch pipe positioning adjustment device and limit steel plate are welded and fixed, branch pipe positioning adjustment device can be prevented in sliding rail Upper sliding avoids the installation site of branch pipe from deviation occur.
Further, in step i, before branch pipe is passed into positioning pipe, branch pipe is measured, in the identical of every branch pipe Position is marked, and mark is the welding position of branch pipe and positioning pipe.The unified welding position for determining branch pipe and positioning pipe, makes After obtaining branch pipe and positioning pipe welded connecting, the length that branch pipe stretches out positioning pipe is all the same, and then the end for playing branch pipe is in The effect of sustained height.
Further, in step j, in foundation pit backfill soil before, fill in waste paper at two nozzles of branch pipe, when After backfilling soil in foundation pit, the waste paper at two nozzles of branch pipe is taken out, prevents the impurity when backfilling soil from entering in branch pipe.
The present invention is by adopting the above-described technical solution, have the advantages that
Branch pipe in the present invention is mounted in positioning pipe, and positioning pipe is welded by the inside of support plate and rectangular location hole It connects fixed realization positioning pipe to be mounted in rectangular location hole, since weight is designed at the center in the center of circle of positioning pipe and rectangular location hole It closes, according to the diameter of positioning pipe, calculates the outside of positioning pipe and the distance between the inside of rectangular location hole, to design support Plate, therefore after positioning pipe installation, the center of circle of positioning pipe is overlapped with the center of rectangular location hole, so that branch pipe can be mounted on positioning At the same position of plate.
The present invention controls branch pipe positioning adjustment device by left side adjusting nut and is in position locating for the left side of adjustment threaded rod It sets, the right side present position that branch pipe positioning adjustment device is in adjustment threaded rod is controlled by right side adjusting nut, so that adjacent The distance between center of circle of positioning pipe in two branch pipe positioning adjustment devices be equal to adjacent two branch pipes the center of circle between away from From being passed into positioning pipe when by branch pipe, then after branch pipe and positioning pipe are welded to connect, branch pipe can be with the nozzle of supervisor It is mutually aligned, is quickly welded to connect the nozzle of branch pipe and supervisor convenient for the later period.
The present invention will be in the branch pipe positioning adjustment device of the left end and the right end in sliding rail of sliding rail It is fixed on sliding rail, can determine that the installation site of first branch pipe positioning adjustment device, and then determine first branch pipe Link position, and it can be determined entirely by the position of all branch pipes, avoid the installation site of branch pipe from deviation occur.
Branch pipe positioning adjustment device in the present invention be installed in same root adjustment threaded rod on, when to adjustment threaded rod into Row force, when rotating bracket generates angle change, tilt angle needed for branch pipe, whole to adjust when can be docked according to branch pipe with supervisor The tilt angle of whole branch pipe positioning adjustment device enables the nozzle of branch pipe and supervisor to be mutually butted and be welded to connect, while right More branch pipes carry out tilt angle adjustment simultaneously, so that the setting height of branch pipe is consistent, reduce branch pipe installation site Number is adjusted, installation accuracy is improved.
Detailed description of the invention
The present invention will be further explained below with reference to the attached drawings:
Fig. 1 is the structural schematic diagram when present invention makes in branch pipe positioning adjustment device;
Fig. 2 is the structural schematic diagram when present invention makes in positioning pipe;
Fig. 3 is the structural schematic diagram when present invention is installed in positioning pipe;
Fig. 4 is the structural schematic diagram when present invention is installed in sliding rail;
Fig. 5 is the structural schematic diagram when present invention is in first branch pipe positioning adjustment device location and installation;
Fig. 6 is the structural schematic diagram when present invention is in remaining branch pipe positioning adjustment device location and installation;
Fig. 7 is the main view of Fig. 6;
Structural schematic diagram when Fig. 8 is tilt angle of the present invention in integrated regulation branch pipe positioning adjustment device;
Fig. 9 is the structural schematic diagram when present invention is installed in branch pipe;
Figure 10 is the present invention in structural schematic diagram when backfilling soil in foundation pit.
In figure, 1- branch pipe positioning adjustment device;2- top plate;3- positioning plate;The rectangular location hole of 4-;5- fixed plate;6- through-hole; 7- rotating bracket;8- sliding plate;9- positioning pipe;10- support plate;11- concrete mounting plate;12- sliding rail;13- adjusts spiral shell Rasp bar;14- adjusting nut;15- limits steel plate;16- rotating bar;17- locking nut;18- branch pipe;19- soil.
Specific embodiment
It as shown in Figures 1 to 10, is a kind of branch pipe integrated regulation construction method for drainage system of the present invention, including such as Lower step:
A, branch pipe positioning adjustment device 1 makes:
1) in the bottom welding location-plate 3 of top plate 2, positioning plate 3 is equipped with rectangular location hole 4, and positioning plate 3, which is parallel to each other, to be set It sets.
2) two pieces of symmetrically arranged fixed plates 5 are welded between the bottom of positioning plate 3, fixed plate 5 is equipped with through-hole 6.
3) rotating bracket 7 is welded at the top of top plate 2, rotating bracket 7 can produce angle change, and rotating bracket 7 includes upper The two sides of rotor plate and lower rotor plate, lower rotor plate are equipped with rotating bar, and rotating bar rotates on upper rotor plate.Again in rotating bracket Weld sliding plate 8 in 7 top.
B, positioning pipe 9 makes:
1) according to the diameter of branch pipe 18 in drainage system, the positioning pipe 9 of suitable diameter is selected, branch pipe 18 is mounted on In positioning pipe 9.
2) center of circle of positioning pipe 9 is overlapped with the design of the center of rectangular location hole 4, according to the diameter of positioning pipe 9, it is fixed to calculate The outside of position pipe 9 and the distance between the inside of rectangular location hole 4, then support plate 10, support plate are welded in the outside of positioning pipe 9 10 height is the outside of positioning pipe 9 and the distance between the inside of rectangular location hole 4.
C, positioning pipe 9 is installed:
The positioning pipe 9 for being welded with support plate 10 is encased in rectangular location hole 4, then position adjustment is carried out to positioning pipe 9, Then support plate 10 and the inside of rectangular location hole 4 are welded and fixed.
D, excavation of foundation pit.
E, in the top mounting slip track 12 of foundation pit:
First supporting module on the ground, then sliding rail 12 is placed in the template installed, the sliding slot of sliding rail 12 It is arranged upward.Then the casting concrete in the template installed forms concrete mounting plate 11.Concrete mounting plate 11 is pacified again Mounted in the top of foundation pit, the sliding slot of sliding rail 12 is arranged downward.By concreting, sliding rail 12 is mounted on mixed In solidifying soil mounting plate 11, it is mounted on the top of foundation pit by concrete mounting plate 11, realizes the top mounting slip rail in foundation pit Road 12 avoids causing sliding rail 12 metaboly occur in mounting slip track 12.
F, first 1 location and installation of branch pipe positioning adjustment device:
1) first branch pipe positioning adjustment device 1 for being equipped with positioning pipe 9 is installed on sliding rail 12, by sliding plate 8 slide into sliding rail 12, then set adjustment in the enterprising line position of sliding rail 12 to first branch pipe positioning adjustment device 1, so First branch pipe positioning adjustment device 1 is fixed on sliding rail 12 afterwards, first branch pipe positioning adjustment device 1 is in sliding The left end of track 12.
2) it is laterally passed through adjustment threaded rod 13 in the through-hole 6 of fixed plate 5, then is twisted respectively at the both ends of adjustment threaded rod 13 Enter adjusting nut 14, adjusting nut 14 is tightened on the side of fixed plate 5.
G, remaining 1 location and installation of branch pipe positioning adjustment device:
1) second branch pipe positioning adjustment device 1 is installed on adjustment threaded rod 13, is first screwed into left side adjusting nut 14 It is installed on sliding rail 12 onto adjustment threaded rod 13, then by second branch pipe positioning adjustment device 1, sliding plate 8 is slid into Into sliding rail 12, the center of circle and first branch pipe positioning for measuring the positioning pipe 9 in second branch pipe positioning adjustment device 1 are adjusted Then the distance between the center of circle of positioning pipe 9 in engagement positions 1 turns left side adjusting nut 14, adjustment left side adjusting nut 14 Position on adjustment threaded rod 13.The center of circle and first branch pipe when the positioning pipe 9 in second branch pipe positioning adjustment device 1 The distance between center of circle of positioning pipe 9 in positioning adjustment device 1 is equal to the distance between the center of circle of adjacent two branch pipes 18, will Left side adjusting nut 14 is screwed on the side of fixed plate 5 of second branch pipe positioning adjustment device 1.Then in adjustment threaded rod 13 On be screwed into right side adjusting nut 14, right side adjusting nut 14 is screwed to another fixed plate 5 of second branch pipe positioning adjustment device 1 Side on, complete second 1 location and installation of branch pipe positioning adjustment device.
2) successively remaining branch pipe is positioned one by one according to the locating mounting method of second branch pipe positioning adjustment device 1 and is adjusted Device 1 carries out location and installation.
3) the branch pipe positioning adjustment device 1 of the right end in sliding rail 12 is fixed on sliding rail 12.
H, the tilt angle of integrated regulation branch pipe positioning adjustment device 1:
Tilt angle needed for branch pipe 18 when being docked according to branch pipe 18 with supervisor exerts a force to adjustment threaded rod 13, turns Dynamic bracket 7 generates angle change, the tilt angle of integrated regulation branch pipe positioning adjustment device 1.It is being in sliding rail 12 again It is screwed into locking nut 17 in the rotating bar 16 for the rotating bracket 7 that the branch pipe positioning adjustment device 1 of left end is connected, and is being in Locking screw is screwed into the rotating bar 16 for the rotating bracket 7 that the branch pipe positioning adjustment device 1 of the right end of sliding rail 12 is connected Mother 17.
I, branch pipe 18 is installed:
Branch pipe 18 is passed into positioning pipe 9, then branch pipe 18 and positioning pipe 9 are welded to connect, the end of branch pipe 18 It is in sustained height.
Before branch pipe 18 is passed into positioning pipe 9, branch pipe 18 is measured, is marked in the same position of every branch pipe 18 Note, mark are the welding position of branch pipe 18 and positioning pipe 9.The unified welding position for determining branch pipe 18 with positioning pipe 9, so that branch After pipe 18 and positioning pipe 9 are welded to connect, the length that branch pipe 18 stretches out positioning pipe 9 is all the same, and then the end for playing branch pipe 18 is equal Effect in sustained height.
J, soil 19 is backfilled in foundation pit.Before backfilling soil 19 in foundation pit, filled at two nozzles of branch pipe 18 Waste paper at two nozzles of branch pipe 18 is taken out, is prevented when backfilling soil 19 after backfilling soil 19 in foundation pit by waste paper Impurity enters in branch pipe 18.
The branch pipe positioning adjustment device 1 of left end in sliding rail 12 and the right end in sliding rail 12 is fixed It is limit steel plate 15 to be slid on sliding rail 12, then limit steel plate 15 is welded on cunning in the concrete operations on sliding rail 12 It moves on track 12, then branch pipe positioning adjustment device 1 and limit steel plate 15 is welded and fixed, branch pipe positioning adjustment device can be prevented 1 slides on sliding rail 12, and the installation site of branch pipe 18 is avoided deviation occur.
Branch pipe 18 in the present invention is mounted in positioning pipe 9, and positioning pipe 9 passes through support plate 10 and rectangular location hole 4 Inside be welded and fixed and realize that positioning pipe 9 is mounted in rectangular location hole 4, due to by the center of circle of positioning pipe 9 and rectangular location hole 4 Center design and be overlapped, according to the diameter of positioning pipe 9, calculate between the outside of positioning pipe 9 and the inside of rectangular location hole 4 away from From, to design support plate 10, therefore after the installation of positioning pipe 9, the center of circle of positioning pipe 9 is overlapped with the center of rectangular location hole 4, so that Branch pipe 18 can be mounted at the same position of positioning plate 3.
The present invention controls the left side institute that branch pipe positioning adjustment device 1 is in adjustment threaded rod 13 by left side adjusting nut 14 Locate position, the right side present position that branch pipe positioning adjustment device 1 is in adjustment threaded rod 13 controlled by right side adjusting nut 14, So that the distance between the center of circle of positioning pipe 9 in two neighboring branch pipe positioning adjustment device 1 is equal to adjacent two branch pipes 18 The distance between center of circle is passed into positioning pipe 9 when by branch pipe 18, then after branch pipe 18 and positioning pipe 9 are welded to connect, branch Pipe 18 can be mutually aligned with the nozzle of supervisor, quickly be welded to connect branch pipe 18 and the nozzle of supervisor convenient for the later period.
The branch pipe of left end in sliding rail 12 and the right end in sliding rail 12 is positioned adjustment by the present invention Device 1 is fixed on sliding rail 12, can determine that the installation site of first branch pipe positioning adjustment device 1, and then determine first The link position of root branch pipe 18, and it can be determined entirely by the position of all branch pipes 18, avoid the installation site of branch pipe 18 from deviation occur.
Branch pipe positioning adjustment device 1 in the present invention is installed on same root adjustment threaded rod 13, when to adjustment screw thread Bar 13 exerts a force, when rotating bracket 7 generates angle change, inclination needed for branch pipe 18 when can be docked according to branch pipe 18 with supervisor Angle, the tilt angle of integrated regulation branch pipe positioning adjustment device 1 enable the nozzle of branch pipe 18 and supervisor to be mutually butted and weld It connects in succession, while tilt angle adjustment is carried out simultaneously to more branch pipes 18, so that the setting height of branch pipe 18 is consistent, subtract The adjustment number of few 18 installation site of branch pipe, improves installation accuracy.
The above is only specific embodiments of the present invention, but technical characteristic of the invention is not limited thereto.It is any with this hair Based on bright, to solve essentially identical technical problem, essentially identical technical effect is realized, made simple change, etc. With replacement or modification etc., all it is covered by among protection scope of the present invention.

Claims (5)

1. a kind of branch pipe integrated regulation construction method for drainage system, it is characterised in that include the following steps:
A, branch pipe positioning adjustment device makes:
1) in the bottom welding location-plate of top plate, positioning plate is equipped with rectangular location hole, and positioning plate is arranged in parallel;
2) two pieces of symmetrically arranged fixed plates are welded between the bottom of positioning plate, fixed plate is equipped with through-hole;
3) rotating bracket is welded at the top of top plate, rotating bracket includes upper rotor plate and lower rotor plate, the two sides of lower rotor plate Equipped with rotating bar, rotating bar rotates on upper rotor plate, then welds sliding plate at the top of rotating bracket;
B, positioning pipe makes:
1) according to the diameter of branch pipe in drainage system, the positioning pipe of suitable diameter is selected, branch pipe is mounted in positioning pipe;
2) center of circle of positioning pipe is overlapped with the design of the center of rectangular location hole, according to the diameter of positioning pipe, calculates positioning pipe The distance between the inside in outside and rectangular location hole, then support plate is welded in the outside of positioning pipe, the height of support plate is fixed The outside of position pipe and the distance between the inside of rectangular location hole;
C, positioning pipe is installed: the positioning pipe for being welded with support plate being encased in rectangular location hole, then carries out position to positioning pipe Adjustment, then will be welded and fixed on the inside of support plate and rectangular location hole;
D, excavation of foundation pit;
E, in the top mounting slip track of foundation pit;
F, first branch pipe positioning adjustment device location and installation:
1) first branch pipe positioning adjustment device for being equipped with positioning pipe is installed on sliding rail, sliding plate is slid into cunning It moves in track, then adjustment is set in sliding rail enterprising line position to first branch pipe positioning adjustment device, then by first branch pipe Positioning adjustment device is fixed on sliding rail, and first branch pipe positioning adjustment device is in the left end of sliding rail;
2) it is laterally passed through adjustment threaded rod in the through-hole of fixed plate, then is screwed into adjustment spiral shell respectively at the both ends of adjustment threaded rod Mother, adjusting nut are tightened on the side of fixed plate;
G, remaining branch pipe positioning adjustment device location and installation:
1) second branch pipe positioning adjustment device is installed on adjustment threaded rod, left side adjusting nut is first screwed into adjustment screw thread On bar, then second branch pipe positioning adjustment device be installed on sliding rail, sliding plate is slid into sliding rail, measured The circle in the center of circle of the positioning pipe in second branch pipe positioning adjustment device and the positioning pipe in first branch pipe positioning adjustment device Then the distance between heart turns left side adjusting nut, position of the adjustment left side adjusting nut on adjustment threaded rod, when second The center of circle of the center of circle of positioning pipe in a branch pipe positioning adjustment device and the positioning pipe in first branch pipe positioning adjustment device it Between distance be equal to the distance between the centers of circle of adjacent two branch pipes, left side adjusting nut is screwed to the positioning adjustment of second branch pipe On the side of the fixed plate of device, it is then screwed into right side adjusting nut on adjustment threaded rod, right side adjusting nut is screwed to the On the side of another fixed plate of two branch pipe positioning adjustment devices, second branch pipe positioning adjustment device location and installation is completed;
2) according to the locating mounting method of second branch pipe positioning adjustment device one by one successively to remaining branch pipe positioning adjustment device Carry out location and installation;
3) the branch pipe positioning adjustment device of the right end in sliding rail is fixed on sliding rail;
H, the tilt angle of integrated regulation branch pipe positioning adjustment device: inclination angle needed for branch pipe when being docked according to branch pipe with supervisor Degree exerts a force to adjustment threaded rod, and rotating bracket generates angle change, the inclination angle of integrated regulation branch pipe positioning adjustment device Degree, then lock is screwed into the rotating bar of rotating bracket that is connected of branch pipe positioning adjustment device of the left end in sliding rail Tight nut, and twisted in the rotating bar for the rotating bracket that the branch pipe positioning adjustment device of the right end in sliding rail is connected Enter locking nut;
I, branch pipe is installed: branch pipe being passed into positioning pipe, then branch pipe and positioning pipe are welded to connect, the end of branch pipe is equal In sustained height;
J, soil is backfilled in foundation pit.
2. a kind of branch pipe integrated regulation construction method for drainage system according to claim 1, it is characterised in that: In In step e, foundation pit top mounting slip track the specific steps are first supporting modules on the ground, then sliding rail is put It sets in the template installed, the sliding slot of sliding rail is arranged upward, then the casting concrete in the template installed, forms coagulation Native mounting plate, then concrete mounting plate is mounted on to the top of foundation pit, the sliding slot of sliding rail is arranged downward.
3. a kind of branch pipe integrated regulation construction method for drainage system according to claim 1, it is characterised in that: place The branch pipe positioning adjustment device of left end in sliding rail and the right end in sliding rail is fixed on sliding rail Concrete operations are limit steel plate to be slid on sliding rail, then limit steel plate is welded on sliding rail, then determine branch pipe Position adjustment device is welded and fixed with limit steel plate.
4. a kind of branch pipe integrated regulation construction method for drainage system according to claim 1, it is characterised in that: In In step i, before branch pipe is passed into positioning pipe, branch pipe is measured, is marked in the same position of every branch pipe, is marked Place is the welding position of branch pipe and positioning pipe.
5. a kind of branch pipe integrated regulation construction method for drainage system according to claim 1, it is characterised in that: In In step j, before backfilling soil in foundation pit, waste paper is filled at two nozzles of branch pipe, after backfilling soil in foundation pit, Waste paper at two nozzles of branch pipe is taken out.
CN201910638189.XA 2019-07-16 2019-07-16 Branch pipe integral adjustment construction method for drainage system Active CN110424516B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910638189.XA CN110424516B (en) 2019-07-16 2019-07-16 Branch pipe integral adjustment construction method for drainage system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910638189.XA CN110424516B (en) 2019-07-16 2019-07-16 Branch pipe integral adjustment construction method for drainage system

Publications (2)

Publication Number Publication Date
CN110424516A true CN110424516A (en) 2019-11-08
CN110424516B CN110424516B (en) 2020-11-24

Family

ID=68409575

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910638189.XA Active CN110424516B (en) 2019-07-16 2019-07-16 Branch pipe integral adjustment construction method for drainage system

Country Status (1)

Country Link
CN (1) CN110424516B (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6021199A (en) * 1983-07-14 1985-02-02 Mitsubishi Electric Corp Rotating, holding and pressing device for work
US4750662A (en) * 1987-02-10 1988-06-14 Larry And Associates Pipe welding alignment tool
CN103097793A (en) * 2010-02-04 2013-05-08 锡特卡发展有限公司 Multiple position pipe hanger clamp
CN103084775A (en) * 2013-01-15 2013-05-08 中国核工业二三建设有限公司 Method of assembling main pipe and branch pipe of welded pipeline and tooling used for assembling and welding
CN204524692U (en) * 2015-04-09 2015-08-05 烟台中集来福士海洋工程有限公司 Precision controlling frock
CN106884439A (en) * 2017-03-16 2017-06-23 中交公局厦门工程有限公司 A kind of Large Tube, the prefabricated components of case and its plane Dock With Precision Position method
CN106989212A (en) * 2017-06-05 2017-07-28 大丰市天曌机械科技有限公司 A kind of multitubular bundles pipeline positioning device
CN207064853U (en) * 2017-06-04 2018-03-02 周士云 A kind of sliding support for pipe

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6021199A (en) * 1983-07-14 1985-02-02 Mitsubishi Electric Corp Rotating, holding and pressing device for work
US4750662A (en) * 1987-02-10 1988-06-14 Larry And Associates Pipe welding alignment tool
CN103097793A (en) * 2010-02-04 2013-05-08 锡特卡发展有限公司 Multiple position pipe hanger clamp
CN103084775A (en) * 2013-01-15 2013-05-08 中国核工业二三建设有限公司 Method of assembling main pipe and branch pipe of welded pipeline and tooling used for assembling and welding
CN204524692U (en) * 2015-04-09 2015-08-05 烟台中集来福士海洋工程有限公司 Precision controlling frock
CN106884439A (en) * 2017-03-16 2017-06-23 中交公局厦门工程有限公司 A kind of Large Tube, the prefabricated components of case and its plane Dock With Precision Position method
CN207064853U (en) * 2017-06-04 2018-03-02 周士云 A kind of sliding support for pipe
CN106989212A (en) * 2017-06-05 2017-07-28 大丰市天曌机械科技有限公司 A kind of multitubular bundles pipeline positioning device

Also Published As

Publication number Publication date
CN110424516B (en) 2020-11-24

Similar Documents

Publication Publication Date Title
CN106836445A (en) A kind of trapezoidal gutter based on adjustable groove mould pours forming method
CN106661855A (en) Foundations system for towers and method for installing the foundations system for towers
CN108331348A (en) The construction method of assembled wall
CN108487256B (en) Reinforced structure and method for deepening and super-digging foundation pit
CN112323818A (en) Soil nailing wall supporting construction
CN110469718A (en) It is a kind of for adjusting the mounting device of pipe angle
CN110016938A (en) A kind of contrary sequence method foundation pit rectangle lattice column positioning and plumbing device
CN107841953A (en) Across the cast-in-place section construction support in high-altitude obliquely-intersected beams abrupt slope side and construction method
CN108842796A (en) The installation method of catch pit anti-floating monoblock type template system and the template system
CN108505500A (en) It is a kind of to tilt seamless spliced prefab-form and its installation method
CN108396707A (en) A kind of novel ecological channel revetment structure and its construction method
CN110424516A (en) A kind of branch pipe integrated regulation construction method for drainage system
KR20130025188A (en) Bar support for mass reinforced concrete member and method of upper bar arrangement using the same
CN108018828A (en) A kind of protective slope structure
CN106759264A (en) One kind grouting pipe network and its construction method
CN110468939A (en) A kind of concrete reinforcement for seal for pipe joints junction
CN110453706A (en) Underwater canopy cofferdam for channel side slopes reparation
CN109024649A (en) Bottom plate multilayer Large-size rebar installs system and construction method
CN109631867A (en) A kind of portable forced centering pier and its installation method
CN108661301A (en) Derrick stand modularization assembling platform and application method
CN109281301B (en) Construction method for hanging irrigation channel
CN210797599U (en) Quick drainage equipment is used in hydraulic engineering construction
CN208650088U (en) A kind of street lamp post installation armored concrete prefabricated foundation structure
CN207469267U (en) One kind prevents erosion system
CN207714149U (en) Across the cast-in-place section construction holder in high-altitude obliquely-intersected beams abrupt slope side

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20240315

Address after: 067603 No.13 Dazhuang Middle Street, Lijiawo Village, Tangdaohe Town, Kuancheng Manchu Autonomous County, Chengde City, Hebei Province

Patentee after: Yang Qun

Country or region after: China

Address before: Room 1109, 11th floor, 555 Guanhe South Road, Sanjiang street, Shengzhou City, Shaoxing City, Zhejiang Province

Patentee before: SHENGZHOU YUETONG NON-EXCAVATION CONSTRUCTION Co.,Ltd.

Country or region before: China

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20240607

Address after: 067000 Office Building 315-4, Phase III, Century City, Qiaodong Airport, Shuangqiao District, Chengde City, Hebei Province, China

Patentee after: Zhongsheng Dingrui Group Co.,Ltd.

Country or region after: China

Address before: 067603 No.13 Dazhuang Middle Street, Lijiawo Village, Tangdaohe Town, Kuancheng Manchu Autonomous County, Chengde City, Hebei Province

Patentee before: Yang Qun

Country or region before: China