CN110424373A - The capsule roof construction of flexible liquid capsule for diaphram wall header space packing - Google Patents

The capsule roof construction of flexible liquid capsule for diaphram wall header space packing Download PDF

Info

Publication number
CN110424373A
CN110424373A CN201910806256.4A CN201910806256A CN110424373A CN 110424373 A CN110424373 A CN 110424373A CN 201910806256 A CN201910806256 A CN 201910806256A CN 110424373 A CN110424373 A CN 110424373A
Authority
CN
China
Prior art keywords
capsule
pipe
utricule
water
drinking
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910806256.4A
Other languages
Chinese (zh)
Inventor
李向阳
姜兆礼
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Csi Artificial Intelligence Big Data Co Ltd
Original Assignee
Shenzhen Csi Artificial Intelligence Big Data Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Csi Artificial Intelligence Big Data Co Ltd filed Critical Shenzhen Csi Artificial Intelligence Big Data Co Ltd
Priority to CN201910806256.4A priority Critical patent/CN110424373A/en
Publication of CN110424373A publication Critical patent/CN110424373A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/16Arrangement or construction of joints in foundation structures
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/02Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against ground humidity or ground water
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/20Bulkheads or similar walls made of prefabricated parts and concrete, including reinforced concrete, in situ

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Hydrology & Water Resources (AREA)
  • Tents Or Canopies (AREA)

Abstract

The present invention relates to the capsule roof constructions of the flexible liquid capsule for diaphram wall header space packing, including into drinking-water pipe, water inlet pipe, exhaust pipe, match repeated hole and pressure gauge;Into inside the first end insertion utricule of drinking-water pipe, second end is connected with self priming pump;Inside the first end insertion utricule of water inlet pipe, second end is connect with running water pipe;Inside the first end insertion utricule of exhaust pipe, second end connects utricule outside atmosphere, and exhaust pipe is equipped with vent valve, and pressure gauge is mounted on exhaust pipe, inside and outside repeated hole connection utricule.After flexible liquid capsule lifts slot, self priming pump is filled the water into drinking-water pipe into utricule, while tap water enters in utricule through water inlet pipe, stops water filling when pressure reaches preset value in utricule;Before extracting flexible liquid capsule, the intracorporal clear water of capsule is passed through into drinking-water pipe and is drawn into pulping device by self priming pump, and the outside that new slurry pours into utricule is made, and clear water is all made new slurry and pours into header space.The present invention can quick packing connection wall header space, use manpower and material resources sparingly.

Description

The capsule roof construction of flexible liquid capsule for diaphram wall header space packing
Technical field
The invention belongs to underground continuous wall construction technique fields, more particularly to a kind of diaphram wall header space that is used for seal The capsule roof construction for the flexible liquid capsule filled out.
Background technique
Each state of our times is all seizing the opportunity, and carries forward vigorously underground space development and construction;China modern times city in recent years City's rail traffic is developed rapidly, and underground garage, market are also being built energetically.Currently, underground space building enclosure is using ground Lower diaphragm wall, construction of underground continuous wall jointing link is complicated, and common construction method has throwing mud drum+package and utilizes mud It is encapsulated and fills out.
Throwing mud drum+package construction method has the disadvantages that (1) if joint brush wall is not in place, Wu Fabao It demonstrate,proves the second stage of steel reinforcement cage smoothly to transfer, steel reinforcement cage horizontal reinforcement is difficult to be inserted into a phase I-steel link slot, and seam crossing is easy to out It now leaks, moreover, mud drum is in great demand, occupies large-area construction place, standardized construction requirement is not achieved;(2) because of envelope There are gaps around head case, locking notch pipe, stream concrete package header tank, locking notch pipe, under the action of the lateral pressure of concrete, header tank, Locking notch pipe joint easily bends, so needing continuous promotion header tank, locking notch pipe while concrete is perfused, prevents from sealing Head case, locking notch pipe are streamed concrete locking, if slot can not be extracted, subsequent processing will cause huge economic loss, and Schedule delays, also, header tank, locking notch pipe disengaging field freight are high.To sum up, throwing mud drum+package construction method pole The earth wastes human and material resources, financial resources and time, delays the duration.
The patent of invention of Publication No. CN104278697A discloses a kind of for diaphram wall header space packing Mud capsule is provided at the top of the mud capsule and penetrates hole, and mud is intracapsular to be provided with counter balance pocket, and counter balance pocket is worn by steel wire penetrating Enter hole, air inlet is provided at the top of mud capsule, air inlet pipe passes through the bottom that air inlet is inserted into mud capsule, the top of mud capsule It is additionally provided with grouting valve and pressure gauge, the bottom of mud capsule is equipped with into slurry-supplying valve.Diaphram wall end is carried out using the mud capsule The method of head packing are as follows: mud capsule is put into two end slots of diaphram wall end, is provided with counter balance pocket since mud is intracapsular, Mud capsule bottom can fall into slurry-supplying valve in slot, enter when slot falls into slurry-supplying valve and automatically open, mud can pass through at this time It is intracapsular that mud capsule bottom hole enters mud.It when mud capsule, which is hung, drops down onto slot bottom, is closed into slurry-supplying valve, mud stops to mud Then intracapsular perfusion connects slip casting valve at the top of grouting pump and mud capsule, open grouting pump to mud is perfused in mud capsule, observe When pressure gauge reading reaches design value, closes slip casting valve at the top of mud capsule and stop perfusion mud.Mud capsule is promoted by hanging ring When, it is first turned on slip casting valve at the top of mud capsule, mud intraluminal pressure reduces, and the mud outflow in mud capsule, mud capsule is sling When mud capsule bottom will be opened into and out of ball valve, mud intracapsular mud is flowed out from bottom into slurry-supplying valve, whole to mud capsule After taking-up, rinsed well with clear water in case next time uses.The mud capsule needs the slip casting at the top of mud capsule when being irrigated mud Valve, air inlet, pressure gauge, internal counter balance pocket and bottom cooperate into slurry-supplying valve, and operation is more complex, need a large amount of people Force-fitting is completed.Moreover, being opened into slurry-supplying valve by gravity, resisted using slot bottom into slurry-supplying valve and realize closing, opened and closed Mode there are randomnesss, if opening or closing failure, will lead to packing failure, schedule delays.
Summary of the invention
In view of the deficiencies of the prior art, the present invention provides a kind of flexible liquid for diaphram wall header space packing The capsule roof construction of capsule, be equipped with into drinking-water pipe, water inlet pipe, exhaust pipe and pressure gauge, connect into drinking-water pipe with self priming pump, water inlet pipe and Running water pipe connection, after flexible liquid capsule lifts slot, self priming pump into drinking-water pipe into the utricule of flexible liquid capsule by infusing Water, while tap water enters in utricule through water inlet pipe, stops water filling when pressure reaches preset value in utricule;Extract flexible liquid capsule Before, the intracorporal clear water of capsule is passed through into drinking-water pipe and is drawn into pulping device by self priming pump, the outside that new slurry pours into utricule is made, with soft Property the intracapsular clear water of liquid constantly reduce, the utricule of flexible liquid capsule gradually tapers up from top to bottom, until in utricule clear water extract it is dry When net, clear water is all made new slurry and pours into header space, and entire utricule, which is also shunk, to resile, and flexible liquid capsule is hung out slot The packing of diaphram wall header space is completed in hole.The design of the capsule roof construction of flexible liquid capsule shortens the packing time, can Quick packing connection wall header space, and what is be perfused in utricule is liquid and unconventional mud, and easy to operate, safety can It leans on, use manpower and material resources sparingly.
In order to solve the above technical problems, the invention provides the following technical scheme:
A kind of capsule roof construction of the flexible liquid capsule for diaphram wall header space packing, including into drinking-water pipe, into Water pipe, exhaust pipe and the pressure gauge for detecting the flexible liquid capsule utricule internal pressure;The first end into drinking-water pipe It is inserted into inside the utricule of the flexible liquid capsule, the suction hose or outlet pipe phase of the second end into drinking-water pipe and self priming pump Even;The first end of the water inlet pipe is inserted into inside the utricule of the flexible liquid capsule, the second end and tap water of the water inlet pipe Pipe connection;The first end of the exhaust pipe is inserted into inside the utricule of the flexible liquid capsule, the second end connection of the exhaust pipe Utricule outside atmosphere;The exhaust pipe is equipped with vent valve, and the pressure gauge is mounted on the exhaust pipe;It is described to connect with repeated hole Lead to inside and outside the utricule of the flexible liquid capsule.
Preferably, the capsule roof construction further includes the anchor ear of capsule top outer end cap, capsule top inner end cap and twice arranged in dislocation, institute It states capsule top inner end cap to be installed on inside utricule and held tightly with the anchor ear of twice arranged in dislocation, capsule top outer end cap is mounted on Nang Ding Outer end face on, it is described to both pass through capsule top outer end cap and capsule top inner end cap and utricule into drinking-water pipe, water inlet pipe and exhaust pipe Inside connection.
Preferably, the outer cover into drinking-water pipe is equipped with casing, and the first end of described sleeve pipe passes through the first fiber tube and institute The connection of capsule top inner end cap is stated, the second end of described sleeve pipe is connect with described into drinking-water pipe by variable-diameter joint.
Preferably, the outer cover into drinking-water pipe is equipped with casing, and the first end of described sleeve pipe passes through the first fiber tube and institute The connection of capsule top inner end cap is stated, the second end of described sleeve pipe is welded with described into drinking-water pipe.
Preferably, the water inlet pipe is connect by the second fiber tube with capsule top inner end cap.
Preferably, to be connected with first between the suction hose or outlet pipe of the second end and self priming pump into drinking-water pipe curved Head is connected with the second elbow between the second end and running water pipe of the water inlet pipe.
Preferably, the second end into drinking-water pipe is connect with the first elbow by the first bipitch silk section, the water inlet pipe Second end connect with the second elbow by the second bipitch silk section.
Compared with prior art, the invention has the following advantages:
The capsule roof construction of flexible liquid capsule for diaphram wall header space packing of the invention, equipped with into drawing water Pipe, water inlet pipe, exhaust pipe and pressure gauge are connect into drinking-water pipe with self priming pump, and water inlet pipe is connect with running water pipe, in flexible liquid After capsule lifts slot, self priming pump by being filled the water into drinking-water pipe into the utricule of flexible liquid capsule, while tap water through water inlet pipe into Enter in utricule, stops water filling when pressure reaches preset value in utricule;In the injecting process, the vent valve on exhaust pipe is opened net to put The intracorporal air of capsule, makes to be clear water entirely in utricule, and after guaranteeing that pressurization reaches preset value, utricule will not be because of the pressure volume of receiving concrete It changes;Before extracting flexible liquid capsule, the intracapsular clear water of flexible liquid is passed through into drinking-water pipe and is drawn into pulping device by self priming pump, The outside that new slurry pours into utricule is made, as the intracapsular clear water of flexible liquid is constantly reduced, the utricule of flexible liquid capsule is from top to bottom It gradually tapers up, until clear water is all made new slurry and pours into header space, and entire utricule also shrinks extensive when intracapsular clear water extracts clean Shape is restored, flexible liquid capsule is hung out into slot.The capsule roof construction of flexible liquid capsule can quick packing connection wall header space, contracting It is short packing time, and what is be perfused in utricule is liquid and unconventional mud, easy to operate, safe and reliable, save people Power material resources.
Detailed description of the invention
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below There is attached drawing needed in technical description to do simply to introduce, it should be apparent that, the accompanying drawings in the following description is this hair Bright some embodiments for those of ordinary skill in the art without any creative labor, can be with It obtains other drawings based on these drawings.
Fig. 1 is that the structure of the capsule roof construction of the flexible liquid capsule for diaphram wall header space packing of the invention is shown It is intended to;
Fig. 2 is the Nang Ding of the flexible liquid capsule for diaphram wall header space packing of another embodiment of the present invention The structural schematic diagram of structure.
In figure: 1- is into drinking-water pipe, 2- water inlet pipe, 3- exhaust pipe, 4- capsule top outer end cap, 5- capsule top inner end cap, and 6- twice are wrong The anchor ear of position installation, 7- casing, the first fiber tube of 8-, the second fiber tube of 80-, 9- the first bipitch silk section, 90- the second bipitch silk section, 10- First elbow, the second elbow of 100-, 11- vent valve, 12- pressure gauge, the first valve of 13-, the second valve of 130-, 14- utricule, 15- variable-diameter joint, 16- match repeated hole, 17- traction rope, 18- mass.
Specific embodiment
A specific embodiment of the invention is described in detail with reference to the accompanying drawing, rather than to protection scope of the present invention Limitation.It will be appreciated that in the description of the present invention, the side of the instructions such as term "front", "rear", "left", "right", "upper", "lower" Position or positional relationship are to be based on the orientation or positional relationship shown in the drawings, and are merely for convenience of description of the present invention and simplification of the description, Rather than the device or element of indication or suggestion meaning must have a particular orientation, be constructed and operated in a specific orientation, because This is not considered as limiting the invention.Term " first ", " second ", " third " etc. are only used for simplifying verbal description to distinguish In similar object, and it should not be understood as the precedence relationship between specific order.
In this application unless specifically defined or limited otherwise, term " installation ", " connected ", " connection ", " fixation " etc. Term shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or be integrally connected;It can be machine Tool connection, is also possible to be electrically connected;It can be directly connected, two members can also be can be indirectly connected through an intermediary Connection inside part.For the ordinary skill in the art, above-mentioned term can be understood in this Shen as the case may be Please in concrete meaning.
As illustrated in fig. 1 and 2, the present invention provides a kind of capsule of flexible liquid capsule for diaphram wall header space packing Roof construction, including into drinking-water pipe 1, water inlet pipe 2, exhaust pipe 3 and pressure for detecting 14 internal pressure of flexible liquid capsule utricule Table 12;Into inside the utricule 14 of the first end insertion flexible liquid capsule of drinking-water pipe 1, into the second end and self priming pump of drinking-water pipe 1 Suction hose or outlet pipe are connected;When being connected into drinking-water pipe 1 with the suction hose of self priming pump, it is used as drinking-water pipe, it will be clear in utricule 14 Water extraction;When being connected into drinking-water pipe 1 with the outlet pipe of self priming pump, it is used as water inlet pipe, the injected clear water into utricule 14;Water inlet pipe 2 First end insertion flexible liquid capsule utricule 14 inside, the second end of water inlet pipe 2 is connect with running water pipe, is used for utricule 14 Interior injected clear water;Inside the utricule 14 of the first end insertion flexible liquid capsule of exhaust pipe 3, the second end of exhaust pipe 3 connects utricule 14 outside atmospheres, exhaust pipe 3 are equipped with vent valve 11, for the gas in utricule 14 to be discharged;Pressure gauge 12 is mounted on exhaust On pipe 3, pressure gauge 12 guarantees going on smoothly for packing process for the pressure in real-time detection utricule 14;It is connected to repeated hole 16 Inside and outside the utricule 14 of flexible liquid capsule, traction rope 17 passes through the mass 18 for connecting traction rope end with repeated hole 16 and is sent into utricule Inside 14.
Be encapsulated using flexible liquid fill out diaphram wall header space method it is as follows: first by traction rope 17 pass through top Mass 18 is sent into utricule by portion with repeated hole 16, and flexible hydraulic somatocyst is made to fall under the gravity of mass 18, flexible After liquid capsule lifts slot, self priming pump by clear water pass through into drinking-water pipe 1 inject flexible liquid capsule utricule in, while tap water pass through into Water pipe 2 enters in the utricule of flexible liquid capsule, intakes simultaneously into drinking-water pipe 1 and water inlet pipe 2, shortens water injection time;It filled the water Cheng Zhong, the pressure in 12 real-time detection utricule 14 of pressure gauge, pressure stop water filling when reaching preset value;In the injecting process, exhaust Vent valve 11 on pipe 3 is opened to put the intracorporal air of net capsule, guarantees that clear water smoothly injects in utricule, and utricule after water filling Interior all clear water, it is ensured that after pressure reaches preset value, utricule will not change because bearing the pressure volume of concrete;It extracts flexible Before liquid capsule, first mass 18 is pulled out outside utricule by traction rope 17, self priming pump passes through the intracorporal clear water of flexible liquid capsule capsule It is drawn into pulping device into drinking-water pipe 1, the outside for pouring into utricule after newly starching is made, it is soft as the intracorporal clear water of capsule is constantly reduced Property liquid capsule utricule 14 gradually taper up from top to bottom, until new slurry is all made in clear water when the intracorporal clear water of capsule extracts clean Header space is poured into, entire utricule, which is also shunk, to resile, and flexible liquid capsule is hung out slot, completes packing.
The capsule roof construction of flexible liquid capsule of the invention changes traditional diaphram wall header space packing mode, capsule What is injected in vivo is clear water, is no longer mud, reduces the load-bearing of utricule;And the intracorporal clear water of capsule is all made of from top and infuses The mode for entering, being discharged from top, is different from the mode of traditional bottom discharge, and the water extracted out from top is used for slurrying, saves and uses Water, and packing effect is good.
As illustrated in fig. 1 and 2, the capsule roof construction of flexible liquid capsule further includes capsule top outer end cap 4, capsule top inner end cap 5 and twice The anchor ear 6 of arranged in dislocation, capsule top inner end cap 5 is installed on 14 inside of utricule and is held tightly with the anchor ear of twice arranged in dislocation 6, outside Nang Ding End cap 4 is mounted on the outer end face of Nang Ding, is both passed through in capsule top outer end cap 4 and capsule top into drinking-water pipe 1, water inlet pipe 2 and exhaust pipe 3 It is connected to inside end cap 5 and utricule 14.It is additionally provided with hanging ring on capsule top outer end cap 4, for lifting flexible liquid capsule.
Outer cover into drinking-water pipe 1 is equipped with casing 7, and the first end of casing 7 is connected by the first fiber tube 8 with capsule top inner end cap 5 Connect, as shown in Figure 1, the second end of casing 7 is connect by variable-diameter joint 15 with into drinking-water pipe 1, one end that variable-diameter joint 9 is relatively large in diameter and Casing 7 connect, and the lesser one end of 9 diameter of variable-diameter joint connects or welds with into drinking-water pipe 1.Alternatively, as shown in Fig. 2, the of casing 7 It is welded with into drinking-water pipe 1 at two ends.Using variable-diameter joint or the connection type of welding, on the one hand guarantee the leakproofness of pipeline, another party Face, it is ensured that the stability of structure extends the service life of flexible liquid capsule.
Second end into drinking-water pipe 1 is connected after the steering of the first elbow 10 with the suction hose of self priming pump or outlet pipe, into pumping The second end of water pipe 1 is connect with the first elbow 10 by the first bipitch silk section 9.When being filled the water into utricule, into drinking-water pipe 1 and certainly The outlet pipe of sucking pump is connected, and is used as water inlet pipe into drinking-water pipe 1;When being drained to outside utricule, into the water suction of drinking-water pipe 1 and self priming pump Pipe is connected, and is used as drinking-water pipe into drinking-water pipe 1, the clear water in utricule 14 is drawn in pulping device.
Water inlet pipe 2 is connect by the second fiber tube 80 with capsule top inner end cap 5, and the second end of water inlet pipe 2 is through 100 turns of the second elbow It is connect backward with running water pipe, the second end of water inlet pipe 2 is connect with the second elbow 100 by the second bipitch silk section 90.
The setting of elbow is for turning to, since flexible liquid capsule is relatively large equipment, when flexible liquid capsule lifts, into pumping Water pipe 1 and water inlet pipe 2 are vertical direction and are in eminence, and the self priming pump connecting with into drinking-water pipe is located at ground, with water inlet pipe 2 The running water pipe of connection also is located on ground, dead angle occurs in this junction that this may result in pipeline in hoisting process, is influenced clear The circulation of water, the design of elbow efficiently avoid the generation of such case.The design of elbow but also the connection between pipeline more It is convenient to add, and saves time and manpower.
It is equipped with the first valve 13 into drinking-water pipe 1, water inlet pipe 2 is equipped with the second valve 130, the first valve 13 and the second valve The setting of door 130 so that fill the water or draw water into utricule it is more convenient, quick, into drinking-water pipe 1 and self priming pump suction hose or Outlet pipe connection, after the completion of water inlet pipe 2 connect with running water pipe, when water filling, need to only open simultaneously into the first valve on drinking-water pipe 1 The second valve 130 on door 13 and water inlet pipe 2 after water filling, closes the first valve 13 and the second valve 130.It draws water When, the second valve 130 on water inlet pipe 2 remains off, and opens into the first valve 13 on drinking-water pipe 1, after drawing water It closes into the first valve 13 on drinking-water pipe 1.
After flexible liquid capsule lifts slot, open into the first valve 13 on drinking-water pipe 1 and the second valve on water inlet pipe 2 Door 130, self priming pump into drinking-water pipe 1 into the utricule of flexible liquid capsule by filling the water, while tap water enters utricule through water inlet pipe 2 Interior, intraluminal pressure stops water filling when reaching preset value, simultaneously closes off on the first valve 13 and water inlet pipe 2 on drinking-water pipe 1 Second valve 130;In the injecting process, the vent valve 11 on exhaust pipe 3 is opened to put the intracorporal air of net capsule, is guaranteed complete in utricule It is clear water, it is ensured that after pressure reaches preset value, utricule will not change because bearing the pressure volume of concrete;Extract flexible liquid capsule Before, it opens into the first valve 13 on drinking-water pipe 1, the intracapsular clear water of flexible liquid is passed through into drinking-water pipe 1 and is drawn into system by self priming pump It starches in device, the outside that new slurry pours into utricule 14 is made, as the intracapsular clear water of flexible liquid is constantly reduced, the utricule of flexible liquid capsule 14 gradually taper up from top to bottom, until clear water is all made new slurry and pours into header space, entire capsule when intracapsular clear water extracts clean Body, which is also shunk, to resile, and flexible liquid capsule is hung out slot, completes the packing of diaphram wall header space.Entire packing mistake Journey is safe and reliable, and easy to operate, quick, is not necessarily to excessive manpower.Capsule roof construction of the invention changes traditional grouting mode, What is injected in utricule is clear water rather than mud, and clear water enters from capsule teeming, and is extracted out from Nang Ding, and the load-bearing of utricule is reduced, and It operates simpler.
To sum up, the capsule roof construction of flexible liquid capsule of the present invention can quick packing connection wall header space, shorten packing Time, and it is easy to operate, safe and reliable, use manpower and material resources sparingly.
Finally, it should be noted that above embodiments are only to illustrate the present invention and not limit technology described in the invention Scheme;Therefore, although this specification is referring to the above embodiments, the present invention has been described in detail, this field It is to be appreciated by one skilled in the art that still can modify to the present invention or equivalent replacement;And all do not depart from the present invention Spirit and scope technical solution and its improvement, should all cover within the scope of the claims of the present invention.

Claims (7)

1. a kind of capsule roof construction of the flexible liquid capsule for diaphram wall header space packing, it is characterised in that: including into Drinking-water pipe (1), exhaust pipe (3), matches repeated hole (16) and for detecting flexible liquid capsule utricule (14) internal pressure at water inlet pipe (2) Pressure gauge (12);
The utricule (14) that the first end into drinking-water pipe (1) is inserted into the flexible liquid capsule is internal, described into drinking-water pipe (1) Second end is connected with the suction hose of self priming pump or outlet pipe;
The utricule (14) that the first end of the water inlet pipe (2) is inserted into the flexible liquid capsule is internal, and the second of the water inlet pipe (2) End is connect with running water pipe;
The utricule (14) that the first end of the exhaust pipe (3) is inserted into the flexible liquid capsule is internal, and the second of the exhaust pipe (3) End connection utricule (14) outside atmosphere;The exhaust pipe (3) is equipped with vent valve (11), and the pressure gauge (12) is mounted on described On exhaust pipe (3);
The utricule (14) for being connected to the flexible liquid capsule with repeated hole (16) is inside and outside.
2. the capsule roof construction of the flexible liquid capsule according to claim 1 for diaphram wall header space packing, Be characterized in that: the capsule roof construction further includes the anchor ear of capsule top outer end cap (4), capsule top inner end cap (5) and twice arranged in dislocation (6), capsule top inner end cap (5) is installed on utricule (14) inside and is held tightly with the anchor ear of twice arranged in dislocation (6), the Nang Ding Outer end cap (4) is mounted on the outer end face of Nang Ding, it is described into drinking-water pipe (1), water inlet pipe (2), exhaust pipe (3) and match repeated hole (16) It both passes through and is connected to inside capsule top outer end cap (4) and capsule top inner end cap (5) and utricule (14).
3. the capsule roof construction of the flexible liquid capsule according to claim 2 for diaphram wall header space packing, Be characterized in that: the outer cover into drinking-water pipe (1) is equipped with casing (7), and the first end of described sleeve pipe (7) passes through the first fiber tube (8) it is connect with capsule top inner end cap (5), the second end of described sleeve pipe (7) passes through variable-diameter joint (15) and described into drinking-water pipe (1) Connection.
4. the capsule roof construction of the flexible liquid capsule according to claim 2 for diaphram wall header space packing, Be characterized in that: the outer cover into drinking-water pipe (1) is equipped with casing (7), and the first end of described sleeve pipe (7) passes through the first fiber tube (8) it is connect with capsule top inner end cap (5), the second end of described sleeve pipe (7) is welded with described into drinking-water pipe (1).
5. the capsule roof construction of the flexible liquid capsule according to claim 2 for diaphram wall header space packing, Be characterized in that: the water inlet pipe (2) is connect by the second fiber tube (80) with capsule top inner end cap (5).
6. the capsule roof construction of the flexible liquid capsule according to claim 1 for diaphram wall header space packing, It is characterized in that: being connected with the first elbow between the suction hose or outlet pipe of the second end and self priming pump into drinking-water pipe (1) (10), the second elbow (100) are connected between the second end and running water pipe of the water inlet pipe (2).
7. the capsule roof construction of the flexible liquid capsule according to claim 6 for diaphram wall header space packing, Be characterized in that: the second end into drinking-water pipe (1) and the first elbow (10) are connect by the first bipitch silk section (9), it is described into The second end of water pipe (2) is connect with the second elbow (100) by the second bipitch silk section (90).
CN201910806256.4A 2019-08-29 2019-08-29 The capsule roof construction of flexible liquid capsule for diaphram wall header space packing Pending CN110424373A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910806256.4A CN110424373A (en) 2019-08-29 2019-08-29 The capsule roof construction of flexible liquid capsule for diaphram wall header space packing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910806256.4A CN110424373A (en) 2019-08-29 2019-08-29 The capsule roof construction of flexible liquid capsule for diaphram wall header space packing

Publications (1)

Publication Number Publication Date
CN110424373A true CN110424373A (en) 2019-11-08

Family

ID=68416515

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910806256.4A Pending CN110424373A (en) 2019-08-29 2019-08-29 The capsule roof construction of flexible liquid capsule for diaphram wall header space packing

Country Status (1)

Country Link
CN (1) CN110424373A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002285545A (en) * 2001-03-26 2002-10-03 Toyo Constr Co Ltd Sheet-pile wall constructing method
CN204000838U (en) * 2014-07-18 2014-12-10 武汉地质勘察基础工程有限公司 The anti-Flow Structure Around of diaphragm wall capsule-type
CN204163116U (en) * 2014-10-31 2015-02-18 姜兆礼 For the mud capsule of diaphragm wall header space packing
CN204959824U (en) * 2015-07-30 2016-01-13 上海市机械施工集团有限公司 Structure is flowed in lap guard of underground continuous wall gasbag formula
CN205142969U (en) * 2015-11-25 2016-04-13 福建绿宝食品集团有限公司 Cultivate material wrapping bag closing cap structure
CN109958146A (en) * 2019-04-17 2019-07-02 中国铁路设计集团有限公司 A kind of assembled underground structure prefabricated components seam crossing hermetic seal bar capsule

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002285545A (en) * 2001-03-26 2002-10-03 Toyo Constr Co Ltd Sheet-pile wall constructing method
CN204000838U (en) * 2014-07-18 2014-12-10 武汉地质勘察基础工程有限公司 The anti-Flow Structure Around of diaphragm wall capsule-type
CN204163116U (en) * 2014-10-31 2015-02-18 姜兆礼 For the mud capsule of diaphragm wall header space packing
CN204959824U (en) * 2015-07-30 2016-01-13 上海市机械施工集团有限公司 Structure is flowed in lap guard of underground continuous wall gasbag formula
CN205142969U (en) * 2015-11-25 2016-04-13 福建绿宝食品集团有限公司 Cultivate material wrapping bag closing cap structure
CN109958146A (en) * 2019-04-17 2019-07-02 中国铁路设计集团有限公司 A kind of assembled underground structure prefabricated components seam crossing hermetic seal bar capsule

Similar Documents

Publication Publication Date Title
CN105545250B (en) A kind of method for sealing of depth envelope type hole packer
CN110424374B (en) Flexible liquid bag for sealing and filling end space of underground continuous wall and sealing and filling method
CN106718670B (en) A method of it is irrigated using buried irrigation pipe
CN102913184A (en) Secondary composite high-pressure grouting and sealing process of gas drainage drilling artificial separation barrier
CN106930728A (en) A kind of gas injection row's halogen method and device of salt hole air reserved storeroom
CN110424373A (en) The capsule roof construction of flexible liquid capsule for diaphram wall header space packing
CN204163116U (en) For the mud capsule of diaphragm wall header space packing
CN206816224U (en) A kind of vehicle-mounted pressure break diverting agent automatic filling device
CN104278697B (en) Mud capsule for diaphram wall header space packing
CN210529679U (en) Capsule top structure of flexible liquid capsule for sealing and filling end space of underground continuous wall
CN110397744A (en) The bottom valve of flexible liquid capsule for diaphram wall header space packing
CN209494587U (en) To hole bottom hole ponding tapping equipment under one kind
CN210529678U (en) Flexible liquid bag for sealing and filling end space of underground continuous wall
CN214423393U (en) Precipitation system
CN210658319U (en) Flexible liquid bag for sealing and filling end space of underground continuous wall
CN108517886A (en) A kind of high hydraulic pressure plugging dewatering well method of high water level
CN208105274U (en) A kind of brill stake holes concrete secondary back cover device for casting
CN209385880U (en) A kind of gas drainage pipeline attachment device
CN209444311U (en) Dissolvant type rapid hole sealing device
CN206495658U (en) A kind of colliery hole packer
CN210049045U (en) Slurry leakage detector for sleeve grouting
CN209053563U (en) Injected hole sealing casing for underground extraction borehole operation
CN208815614U (en) Double prefabricated safety manholes of inspection socket fire protection pipeline
CN108265724A (en) A kind of brill stake holes concrete secondary back cover device for casting
CN206956755U (en) A kind of saturating drainpipe of Novel replaceable underground engineering

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20191108