CN104278697B - Mud capsule for diaphram wall header space packing - Google Patents

Mud capsule for diaphram wall header space packing Download PDF

Info

Publication number
CN104278697B
CN104278697B CN201410598133.3A CN201410598133A CN104278697B CN 104278697 B CN104278697 B CN 104278697B CN 201410598133 A CN201410598133 A CN 201410598133A CN 104278697 B CN104278697 B CN 104278697B
Authority
CN
China
Prior art keywords
mud
capsule
mud capsule
slurry
supplying valve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410598133.3A
Other languages
Chinese (zh)
Other versions
CN104278697A (en
Inventor
姜兆礼
姜力萌
顾瑞海
杨改运
章建民
冯元生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201410598133.3A priority Critical patent/CN104278697B/en
Publication of CN104278697A publication Critical patent/CN104278697A/en
Application granted granted Critical
Publication of CN104278697B publication Critical patent/CN104278697B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/18Bulkheads or similar walls made solely of concrete in situ
    • E02D5/185Bulkheads or similar walls made solely of concrete in situ with flexible joint members between sections

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Underground Or Underwater Handling Of Building Materials (AREA)

Abstract

The present invention relates to structures construction field, particularly relate to a kind of mud capsule for diaphram wall header space packing.The top of this mud capsule arranges suspension ring;The bottom of mud capsule is arranged into slurry-supplying valve;Enter slurry-supplying valve to enter when groove falls to open for mud capsule, and close when mud capsule falls into bottom land;It is provided with counter balance pocket in mud capsule.Utilizing mud to be encapsulated, to fill out diaphram wall header space simple and easy to do, and mud capsule single purchase can repeatedly use, and in normal conditions of use, access times are 80 120 times.Use mud to be encapsulated and fills out diaphram wall header space, change construction technology, decrease working procedure, reduce construction cost, saving fund, improve effect, reduction expense, accelerating construction progress, it is possible to obtain optimum economic benefit.

Description

Mud capsule for diaphram wall header space packing
Technical field
The present invention relates to structures construction field, particularly relate to a kind of for diaphram wall end The mud capsule of head space packing.
Background technology
At present, subway station main body foundation pit enclosure structure uses diaphram wall, and underground is continuous Wall packing header space uses traditional method for blocking, i.e. people's frock, machinery to transport, manually throw Fill out sandbag and erection joint case, during pouring concrete, promote a joint case every 10~20 minutes, After concrete solidifies completely, in time joint case is the most all extracted, then carry out jet-bedding brush wall. Use this technique waste of manpower, material resources.
Summary of the invention
It is an object of the invention to provide a kind of mud for diaphram wall header space packing Slurry capsule, to solve the problems referred to above.
In order to achieve the above object, the technical scheme is that and be achieved in that:
A kind of mud capsule for diaphram wall header space packing, the top of mud capsule sets Put suspension ring;The bottom of mud capsule is arranged into slurry-supplying valve;Enter slurry-supplying valve for mud capsule in groove Open during whereabouts, and close when mud capsule falls within bottom land;It is provided with counter balance pocket in mud capsule.
Preferably, the cross section of mud capsule is trapezoidal;Mud capsule uses rubber and fiber to strengthen Layer sulfuration forms.
Preferably, enter slurry-supplying valve be spherical enter slurry-supplying valve;Enter the side of slurry-supplying valve by universal Joint is fixed with mud capsule, and opposite side is freely.
Preferably, the top of mud capsule is provided with and penetrates hole;Counter balance pocket passes through steel wire penetrating This penetrates hole.
Preferably, the top of mud capsule is additionally provided with air inlet;Air inlet pipe is inserted through air inlet Enter the bottom to mud capsule.
Preferably, the top of mud capsule is additionally provided with grouting valve.
Preferably, the top of mud capsule is additionally provided with Pressure gauge;Pressure gauge is used for detecting mud Pressure in capsule.
Compared with prior art, this have the advantage that: mud capsule is put into ground In two end slots of lower diaphragm wall termination, owing to being provided with counter balance pocket in mud capsule, enter slurry-supplying valve Can fall in groove, the bottom of mud capsule is provided with into slurry-supplying valve, enters slurry-supplying valve and enters groove Time automatically open up, in now mud just can be by bottom mud capsule, hole enters into mud capsule. When mud capsule hangs and drops down onto bottom land, entering slurry-supplying valve and close, mud stops irrigating in mud capsule, Then connect grouting pump and mud capsule top slip casting valved tube, open grouting pump in mud capsule Perfusion mud, when observation pressure gauge reading reaches design load, closes mud capsule top grouting valve Door stops perfusion mud.
When promoting mud capsule by suspension ring, it is first turned on mud capsule top slip casting valve, mud Intraluminal pressure reduces, the mud outflow in mud capsule, enter bottom mud capsule when mud capsule is sling, Going out ball valve will open, the mud in mud capsule flows out from the slurry-supplying valve that enters of bottom, treats mud After capsule all takes out, rinse well with clear water in case next time uses.Use mud to be encapsulated and fill out end Head space, decrease working procedure, reduce construction cost, saving fund, improve effect, Reduction expense, accelerating construction progress, it is possible to obtain optimum economic benefit.
Accompanying drawing explanation
The structural representation of the mud capsule that Fig. 1 provides for the embodiment of the present invention;
The end face front view of the mud capsule that Fig. 2 provides for the embodiment of the present invention;
The bottom elevational view of the mud capsule that Fig. 3 provides for the embodiment of the present invention.
Detailed description of the invention
Below with reference to accompanying drawing, the technical scheme of various embodiments of the present invention is carried out clear, complete Description, it is clear that described embodiment is only a part of embodiment of the present invention, and It is not all, of embodiment.Based on the embodiment in the present invention, those of ordinary skill in the art All other embodiments obtained by the premise of not making creative work, broadly fall into The scope that the present invention is protected.
Embodiment 1
As shown in figures 1 and 3 for originally implementing the one of offer for diaphram wall termination The mud capsule of space packing, the top of mud capsule 103 arranges suspension ring 106;The end of mud capsule Portion 302 is arranged into slurry-supplying valve 301;Enter slurry-supplying valve 301 for mud capsule enter groove fall time Open, and close when mud capsule falls within bottom land;Counter balance pocket 102 it is provided with in mud capsule 103.
Mud capsule 103 is put in two end slots of diaphram wall termination, due in mud capsule It is provided with counter balance pocket 102, enters slurry-supplying valve 301 and can fall in groove, the bottom 302 of mud capsule It is provided with into slurry-supplying valve 301, enters slurry-supplying valve 301 and open when entering groove and falling, now mud Can pass and enter in mud capsule into slurry-supplying valve 301.When mud capsule hangs and falls bottom land, enter Slurry-supplying valve is closed, and mud stops irrigating in mud capsule, then connects grouting pump and mud capsule Top slip casting valved tube 105, opens grouting pump and irrigates mud in mud capsule, observe pressure When meter reading reaches design load, close mud capsule top slip casting valve and stop perfusion mud.
During by suspension ring lifting mud capsule, the mud in mud capsule enters slurry-supplying valve from bottom 301 flow out, and after mud capsule all takes out, rinse with clear water in case next time uses.Use Mud capsule construction header space, decreases working procedure, reduces construction cost, saving money Gold, raising effect, reduction expense, accelerating construction progress, it is possible to obtain optimum economic benefit.
Preferably, the cross section of mud capsule is trapezoidal;Mud capsule uses rubber and fiber to strengthen Layer sulfuration forms.
Owing to the joint of subterranean wall uses i shaped steel, in order to make mud capsule join with i shaped steel Closing tight, the cross section of mud capsule can be done in echelon, and mud capsule uses rubber and fiber simultaneously Enhancement Layer sulfuration forms, and the mud capsule pliability not irrigating mud is good, arbitrarily shrinks, arbitrarily Folded bent, and when irrigating mud expansion, mud capsule has enough intensity, can bear Outer expansion force produced by mud, when pouring concrete, mud capsule can bear the external pressure that concrete produces, Trapezoidal mud capsule coordinates tightly with i shaped steel.It addition, mud capsule uses this material, It is that any conventional rigid material is unrivaled, greatly reduces cost.
Preferably, slurry-supplying valve 301 is entered for globe valve;Enter the side of slurry-supplying valve 301 by ten thousand Fixing with mud capsule 103 to joint, opposite side is freely.Specifically, when mud capsule enters in groove, Entering slurry-supplying valve 301 due to side freely, it automatically opens up under gravity, in this time slot Mud can enter in mud capsule, the mud liquid level in mud capsule and outside mud liquid level Unanimously.When mud capsule drops into bottom land, bottom land can prop up into slurry-supplying valve, make into slurry-supplying valve Close.
Embodiment 2
On the basis of embodiment 1, as shown in Figure 2, it is preferable that the top 201 of mud capsule It is provided with counterweight hole 204;Counter balance pocket 102 (Fig. 1 illustrates) passes through steel wire rope 104 (Fig. 1 Illustrate) it is connected with counterweight hole 204.I.e. counter balance pocket is connected with counterweight hole by steel wire rope, joins Weight bag is taper counterweight sand steel bag.
Preferably, the top 201 of mud capsule is additionally provided with air inlet 202;Air inlet pipe 108 (Fig. 1 illustrates) is inserted into the bottom of mud capsule through air inlet 202.In order to prevent mud Mud in capsule stops circulation and occurs that glar sand blocks into slurry-supplying valve, arranges in mud capsule A piece air inlet pipe, air inlet tube head is located at bottom mud capsule, after diaphram wall concrete final set, opens Opening air compressor machine makes mud ceaselessly circulate, and does not produce precipitation silt blocking turnover bottom mud capsule Slurry valve.
Preferably, the top of mud capsule is additionally provided with grouting valve 203.Specifically, mud is worked as From bottom enter slurry-supplying valve enter in mud capsule time, in order to avoid the air pressure in mud capsule Power is increasing, hinders mud to enter in mud capsule, can arrange at the top of mud capsule Grouting valve 203.When i.e. mud capsule falls in mud, now grouting valve 203 is opened, mud Air in slurry capsule can be expressed into along with the entrance of mud outside mud capsule, makes mud capsule suitable The whereabouts of profit.
Preferably, the top 201 of mud capsule is additionally provided with Pressure gauge 206;Pressure gauge 206 Pressure in detecting mud capsule.Mud when counter balance pocket sinks to bottom land, in mud capsule Starch Level will be the most concordant with slotted eye mud liquid level, and at this moment counter balance pocket top tapered enters Enter slurry-supplying valve at the bottom of mud capsule, grouting valve connects slip casting pump line, opens grouting pump to mud Irrigate mud in slurry capsule, when observation pressure gauge reading reaches design load, close grouting pump and stop Perfusion mud.
During perfusion diaphram wall concrete, notice that the pressure gauge reading observing mud capsule has unchanged, If mud is full in unchanged explanation mud capsule, diaphram wall header space packing is tight, Effect is fine;Illustrate to lack in mud capsule mud if changed, diaphram wall termination is empty Between packing imprecision, poor effect, grouting pump should be opened immediately to mud capsule supplementary irrigation mud, When observation pressure gauge reading reaches design load, close grouting pump and stop supplementary irrigation mud.
The present embodiment utilize mud to be encapsulated to fill out diaphram wall header space simple and easy to do, mud Capsule single purchase, can repeatedly use, and in normal conditions of use, access times are 80-120 time.Use mud to be encapsulated and fill out diaphram wall header space, change construction work Skill, decrease working procedure, reduce construction cost, saving fund, improve effect, fall Low expense, accelerating construction progress, it is possible to obtain optimum economic benefit.
The above, be only presently preferred embodiments of the present invention, not appoint the present invention What pro forma restriction, any those skilled in the art, without departing from skill of the present invention In art aspects, when the technology contents of available the disclosure above makes a little change or modification For the Equivalent embodiments of equivalent variations, as long as being the content without departing from technical solution of the present invention, Any simple modification, equivalent that above example is made by the technical spirit of the foundation present invention become Change and modify, all still falling within the range of technical solution of the present invention.

Claims (2)

1. the mud capsule for diaphram wall header space packing, it is characterised in that institute The top stating mud capsule arranges suspension ring;The bottom of described mud capsule is arranged into slurry-supplying valve;
Described enter slurry-supplying valve open when described mud capsule falls in groove, and in institute State when mud capsule falls within bottom land and close;
It is provided with counter balance pocket in described mud capsule;
The top of described mud capsule is provided with and penetrates hole;Counter balance pocket passes through steel wire penetrating Described penetrate hole;
Described enter slurry-supplying valve be globe valve;
Described enter slurry-supplying valve side fixed with mud capsule by universal joint, opposite side from By;
The top of described mud capsule is additionally provided with air inlet;
Air inlet pipe is inserted into the bottom of described mud capsule through described air inlet;
The top of described mud capsule is additionally provided with grouting valve;
The top of described mud capsule is additionally provided with Pressure gauge;
Described Pressure gauge is for detecting the pressure in described mud capsule.
2. mud capsule as claimed in claim 1, it is characterised in that described mud capsule transversal Face is trapezoidal;
Described mud capsule uses rubber and fabric reinforcement sulfuration to form.
CN201410598133.3A 2014-10-31 2014-10-31 Mud capsule for diaphram wall header space packing Active CN104278697B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410598133.3A CN104278697B (en) 2014-10-31 2014-10-31 Mud capsule for diaphram wall header space packing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410598133.3A CN104278697B (en) 2014-10-31 2014-10-31 Mud capsule for diaphram wall header space packing

Publications (2)

Publication Number Publication Date
CN104278697A CN104278697A (en) 2015-01-14
CN104278697B true CN104278697B (en) 2016-08-17

Family

ID=52254004

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410598133.3A Active CN104278697B (en) 2014-10-31 2014-10-31 Mud capsule for diaphram wall header space packing

Country Status (1)

Country Link
CN (1) CN104278697B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110397744B (en) * 2019-08-29 2020-08-25 深圳中科研人工智能大数据有限公司 Bottom valve of flexible liquid bag for sealing end space of underground continuous wall
CN111997095B (en) * 2020-07-15 2022-04-15 武汉速安达建筑橡塑制品有限公司 Construction method for underground diaphragm wall construction by bag-in-bag filling technology
CN115233741A (en) * 2022-08-22 2022-10-25 武汉谦诚桩工科技股份有限公司 Temporary filling construction method for diaphragm wall joint

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2380611Y (en) * 1999-06-15 2000-05-31 河南黄河工程局 Apparatus special for construction of underground continuous wall jointing
JP2004285801A (en) * 2003-03-25 2004-10-14 Kumagai Gumi Co Ltd Water cut off joining method and structure between members
CN102747722A (en) * 2012-07-27 2012-10-24 天津市勘察院 Underground continuous wall joint close grouting and covering construction method and expansion rubber plug
CN202577362U (en) * 2012-03-12 2012-12-05 张立丽 Flexible underground continuous wall connector
CN204163116U (en) * 2014-10-31 2015-02-18 姜兆礼 For the mud capsule of diaphragm wall header space packing

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2380611Y (en) * 1999-06-15 2000-05-31 河南黄河工程局 Apparatus special for construction of underground continuous wall jointing
JP2004285801A (en) * 2003-03-25 2004-10-14 Kumagai Gumi Co Ltd Water cut off joining method and structure between members
CN202577362U (en) * 2012-03-12 2012-12-05 张立丽 Flexible underground continuous wall connector
CN102747722A (en) * 2012-07-27 2012-10-24 天津市勘察院 Underground continuous wall joint close grouting and covering construction method and expansion rubber plug
CN204163116U (en) * 2014-10-31 2015-02-18 姜兆礼 For the mud capsule of diaphragm wall header space packing

Also Published As

Publication number Publication date
CN104278697A (en) 2015-01-14

Similar Documents

Publication Publication Date Title
CN208328950U (en) A kind of In-pit water drainage friction pile suitable for dregs loose structure slope
CN105545250B (en) A kind of method for sealing of depth envelope type hole packer
CN104278697B (en) Mud capsule for diaphram wall header space packing
CN206190318U (en) Tunnel drainage system
CN204163116U (en) For the mud capsule of diaphragm wall header space packing
CN206487508U (en) A kind of draining steel pipe device for rich water class earth tunnel face
CN107261587A (en) A kind of filter screen automatically cleaning dregs filter
CN107859064A (en) A kind of prefabricated piping lane is connected waterproof construction and construction method with cast-in-place piping lane
CN109137948A (en) Grouting behind shaft or drift lining occlusion water-stopping method and equipment between a kind of stake
CN109706934A (en) Drapery injected device and its working method in a kind of artesian water stratum
CN109944236A (en) Root pile actively follows track delamination pour slurry system and construction method
CN207672587U (en) A kind of bedrock surface subsurface pressure water burst dredges structure
CN204370462U (en) Open-cut station water drainage of deep foundation pit system
CN106703121A (en) Multi-level water taking method and structure for reservoir
CN206768917U (en) A kind of reservoir stratified pumping structure
CN206859211U (en) A kind of elastic steel cylinder of drilled pile solution cavity leak stopping
CN205895309U (en) Prevention of seepage water system for pitshaft driving
CN207485402U (en) A kind of fluid filling hole sealing device
CN205975587U (en) Fetch earth and press construction equipment who irritates
CN206571490U (en) The drainage bucket of water burst is administered in a kind of vertical shaft for mine construction
CN214738075U (en) Mud conveying and injecting device for building pile foundation construction
CN106122122B (en) A kind of large aperture flow-controllable siphoning installation
CN109137924A (en) It is a kind of that the long structure and method of deep soft soil stake is reduced by form compound foundation
CN209538204U (en) A kind of constructing structure being in the milk close to subway structurally fractured zone basement rock
CN103132536A (en) Drainage technology of geologic chemistry before grouting

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
DD01 Delivery of document by public notice
DD01 Delivery of document by public notice

Addressee: Jiang Zhaoli

Document name: payment instructions

DD01 Delivery of document by public notice
DD01 Delivery of document by public notice

Addressee: Jiang Zhaoli

Document name: Notice of Termination of Patent Rights