CN110424248A - A kind of horizontal suspension cable steel trestle - Google Patents

A kind of horizontal suspension cable steel trestle Download PDF

Info

Publication number
CN110424248A
CN110424248A CN201910781520.3A CN201910781520A CN110424248A CN 110424248 A CN110424248 A CN 110424248A CN 201910781520 A CN201910781520 A CN 201910781520A CN 110424248 A CN110424248 A CN 110424248A
Authority
CN
China
Prior art keywords
suspension cable
horizontal suspension
trestle
pier
ing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910781520.3A
Other languages
Chinese (zh)
Inventor
霍文星
邓世超
刘贵波
纪耀先
刘翰石
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Petroleum East China
CCCC Tunnel Engineering Co Ltd
Original Assignee
CCCC Tunnel Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC Tunnel Engineering Co Ltd filed Critical CCCC Tunnel Engineering Co Ltd
Priority to CN201910781520.3A priority Critical patent/CN110424248A/en
Publication of CN110424248A publication Critical patent/CN110424248A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D11/00Suspension or cable-stayed bridges
    • E01D11/02Suspension bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The present invention relates to a kind of horizontal suspension cable steel trestles, the trestle stake including pier of main beam downstream side is arranged in;Horizontal suspension cable is equipped between two adjacent pier of main beam, the horizontal suspension cable connects the trestle stake by back(ing) bar.The upstream side of the horizontal suspension cable connection host bridge bridge pier.The beneficial effects of the present invention are: tighten steel trestle in the horizontal direction using the horizontal suspension cable connecting with main pier, infrastructure cost itself that the ability that trestle resists flood impact can be significantly increased, and reduce steel trestle;Back(ing) bar connects trestle stake by being equipped with the lifting lug of safety pin, can avoid horizontal suspension cable load and crosses macrolesion pier of main beam, guarantees the safety of pier of main beam.

Description

A kind of horizontal suspension cable steel trestle
Technical field
The invention belongs to field of bridge construction more particularly to a kind of horizontal suspension cable steel trestles.
Background technique
In deep-water bridge construction, underwater foundation construction becomes the emphasis of bridge construction, difficult point.Steel trestle is as entire bridge The supply line of personnel, material, machinery in beam process of construction, function is quite important in bridge construction process, deep water steel trestle Maximum challenge is how to guarantee the trestle stake lateral stability in the case where flowing water pressure acts on.The destruction of steel trestle is typically all to wash away Rather than crush, so the design of steel trestle needs the flow velocity of reasonable consideration flood to the flowing water pressure of trestle stake, determines and close Ability from the trestle anti-side of reason to flowing water pressure, the ability of the anti-lateral impact of trestle can neither it is too high can not be too low, anti-impact It is too high to hit ability, trestle economy is very low, and impact resistance is too low, is easy to be washed away, can mention by reinforcing means appropriate The impact resistance of high trestle and the construction cost for reducing trestle.
Summary of the invention
The purpose of the present invention is to propose to a kind of technical solutions of horizontal suspension cable steel trestle, improve trestle and resist flood impact Ability, and ensure the safety of pier of main beam.
To achieve the goals above, the technical scheme is that a kind of horizontal suspension cable steel trestle, including it is arranged in main bridge The trestle stake in bridge pier downstream side is equipped with multiple trestle stakes between two adjacent pier of main beam;In two adjacent pier of main beam Between be equipped with horizontal suspension cable, the horizontal suspension cable connects the trestle stake by back(ing) bar.
Further, in order to resist water flow to the impact force of steel trestle, the horizontal suspension cable connects host bridge bridge pier Upstream side.
Further, in order to firmly draw solid steel trestle, each trestle stake passes through two back(ing) bar connections The horizontal suspension cable.
Further, in order to balance more back(ing) bars to the pulling force of horizontal suspension cable, the back(ing) bar passes through stretcher Connect the trestle stake.
Further, the stretcher adjusts the sunpender to the pulling force of horizontal suspension cable, the drawing of multiple back(ing) bars Power makes between two adjacent pier of main beam horizontal suspension cable at catenary shape.
Further, in order to avoid damaging pier of main beam in the overload of horizontal suspension cable pulling force, the back(ing) bar is by hanging Ear connects the trestle stake, and the lifting lug is equipped with safety pin, and the safety pin is cut off when load is more than safety margins Pin shaft.
Further, as one kind, more preferably safety pin, the ultimate load of the safety pin are 20kN.
Further, a kind of preferred horizontal suspension cable and back(ing) bar structure be, the horizontal suspension cable use diameter for The wirerope of 50mm, the back(ing) bar use diameter for the wirerope of 15mm.
The beneficial effects of the present invention are: after the drilled pile construction of main body cushion cap is completed, before flood period does not arrive, Using the horizontal suspension cable connecting with main pier, steel trestle is tensed in water (flow) direction, trestle can be significantly increased and resist flood impact Ability, and the infrastructure cost for reducing steel trestle itself;Back(ing) bar connects trestle stake by being equipped with the lifting lug of safety pin, can avoid Horizontal suspension cable load crosses macrolesion pier of main beam, guarantees the safety of pier of main beam.
The present invention will be described in detail with reference to the accompanying drawings and examples.
Detailed description of the invention
Fig. 1 is plane structure chart of the present invention;
Fig. 2 is facade structures figure of the present invention;
Fig. 3 is the A partial enlarged view of Fig. 2;
Fig. 4 is overall structure figure of the present invention (line frame graph).
Specific embodiment
As shown in Figure 1, Figure 2, Fig. 3, a kind of horizontal suspension cable steel trestle, the trestle stake including 10 downstream side of pier of main beam is arranged in 20, multiple trestle stakes are equipped between two adjacent pier of main beam;Horizontal suspension cable is equipped between two adjacent pier of main beam 30, the horizontal suspension cable connects the trestle stake by back(ing) bar 40.
The upstream side of the horizontal suspension cable connection host bridge bridge pier.
Each trestle stake connects the horizontal suspension cable by two back(ing) bars.
Back(ing) bar connects trestle stake by stretcher 50.
Stretcher adjusts sunpender to the pulling force of horizontal suspension cable, the pulling force of multiple back(ing) bars make two adjacent pier of main beam it Between horizontal suspension cable at catenary shape.
The back(ing) bar connects the trestle stake by lifting lug 60, and the lifting lug is equipped with safety pin 61, the safety pin It is the pin shaft cut-off when load is more than safety margins.
The ultimate load of the safety pin is 20kN.
The horizontal suspension cable uses diameter D for the wirerope of 50mm, and the back(ing) bar uses diameter d for the steel wire of 15mm Rope.
Embodiment one:
As shown in Figure 1, Figure 2, Fig. 3, a kind of horizontal suspension cable steel trestle, the trestle stake 20 including 10 downstream side of pier of main beam is arranged in, phase Multiple trestle stakes are equipped between two adjacent pier of main beam, trestle stake supports trestle bridge floor 21, and trestle is for the main bridge into construction Transport personnel, material and mechanical equipment.
A horizontal suspension cable 30, the upstream side of horizontal suspension cable connection pier of main beam are equipped between two adjacent pier of main beam (as shown in Figure 1).Horizontal suspension cable uses the wirerope (1860Mpa) of diameter D=50mm.Horizontal suspension cable is fixed on pier of main beam bottom Portion, cushion cap top surface.
Trestle stake includes bottom concrete 22, and steel pipe column 23 is equipped on bottom concrete, is equipped on the top of steel pipe column I-shaped gooseneck 24 is equipped with the stringer 25 that Bailey beam is constituted in I-shaped gooseneck, and bridge floor 21 uses anti-skid design steel plate.
Horizontal suspension cable connects trestle stake by back(ing) bar 40.Back(ing) bar uses the wirerope of diameter d=15mm.Each Trestle stake states the horizontal suspension cable of back(ing) bar connection by two.One end that back(ing) bar is connect with trestle stake is equipped with stretcher 50, Stretcher includes the opposite screw rod 51 of the hand of spiral at both ends.Stretcher connects lifting lug 60, and lifting lug connects the I-steel of trestle stake Crossbeam 24 is achieved in the connection structure of back(ing) bar Yu trestle stake.Due to being equipped with multiple stacks between two adjacent pier of main beam Bridge pier has the back(ing) bar mostly with connection horizontal suspension cable and trestle stake.The function of stretcher is to adjust back(ing) bar to hang level The pulling force of rope is balanced more back(ing) bars to the pulling force of horizontal suspension cable, when drawing of the more back(ing) bars to horizontal suspension cable When power is balanced, horizontal suspension cable can be made between two adjacent pier of main beam at catenary shape.
Lifting lug is equipped with safety pin 61, and safety pin is the pin shaft cut-off when load is more than safety margins.In the present embodiment, The ultimate load of safety pin is 20kN.
Bottom concrete is equivalent to the Extended chemotherapy of trestle, prevents steel trestle unstability under general water velocity;Tubular pole column Upper load is supported with the stringer of Bailey beam composition.Horizontal suspension cable plays the role of resisting flowing water pressure in flood period.Steel trestle In main structure downstream, horizontal suspension cable anchor is horizontal on completed drilled pile steel pile casting or the pier stud of main structure Suspension cable uses catenary, and back(ing) bar is attached using adjustable stretcher with trestle stake, in the construction process can be into Row adjusts pulling force, and suspension cable form is made to be more nearly catenary.Trestle stake is connect by lifting lug with stretcher, and lifting lug is equipped with safety Pin, safety pin carry out destruction calculating according to the maximum pull that can bear, and intensity selects 0.8 times of shearing strength, in this way excessive It destroys back(ing) bar and the connection of trestle stake automatically, under the action of trestle is by excessive flowing water pressure, prevents Main bridge structure is destroyed.Not only it can increase the ability that structure resists flood, but also be unlikely to impact main structure.Increase Steel trestle after adding suspension cable changes structure type, and steel trestle is enable preferably to resist flood pressure, and stretcher is adjustable to be hung The pulling force of bar applies initial tensile force, and lifting lug plays the role of protector, destroys automatically in the maximum pull for reaching design, right Main structure plays a protective role.

Claims (8)

1. a kind of horizontal suspension cable steel trestle, the trestle stake including pier of main beam downstream side is arranged in, two adjacent pier of main beam it Between be equipped with multiple trestle stakes;It is characterized in that, horizontal suspension cable is equipped between two adjacent pier of main beam, it is described horizontal outstanding Rope connects the trestle stake by back(ing) bar.
2. a kind of horizontal suspension cable steel trestle according to claim 1, which is characterized in that the horizontal suspension cable connects the master The upstream side of bridge bridge pier.
3. a kind of horizontal suspension cable steel trestle according to claim 1, which is characterized in that each trestle stake passes through two The back(ing) bar connects the horizontal suspension cable.
4. a kind of horizontal suspension cable steel trestle according to claim 1, which is characterized in that the back(ing) bar passes through stretcher Connect the trestle stake.
5. a kind of horizontal suspension cable steel trestle according to claim 4, which is characterized in that the stretcher adjusts the sunpender To the pulling force of horizontal suspension cable, the pulling force of multiple back(ing) bars makes between two adjacent pier of main beam horizontal suspension cable at catenary Shape.
6. a kind of horizontal suspension cable steel trestle according to claim 1, which is characterized in that the back(ing) bar is connected by lifting lug The trestle stake is connect, the lifting lug is equipped with safety pin, and the safety pin is the pin shaft cut-off when load is more than safety margins.
7. a kind of horizontal suspension cable steel trestle according to claim 1, which is characterized in that the ultimate load of the safety pin is 20kN。
8. a kind of horizontal suspension cable steel trestle according to claim 1, which is characterized in that the horizontal suspension cable use diameter for The wirerope of 50mm, the back(ing) bar use diameter for the wirerope of 15mm.
CN201910781520.3A 2019-08-23 2019-08-23 A kind of horizontal suspension cable steel trestle Pending CN110424248A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910781520.3A CN110424248A (en) 2019-08-23 2019-08-23 A kind of horizontal suspension cable steel trestle

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910781520.3A CN110424248A (en) 2019-08-23 2019-08-23 A kind of horizontal suspension cable steel trestle

Publications (1)

Publication Number Publication Date
CN110424248A true CN110424248A (en) 2019-11-08

Family

ID=68417279

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910781520.3A Pending CN110424248A (en) 2019-08-23 2019-08-23 A kind of horizontal suspension cable steel trestle

Country Status (1)

Country Link
CN (1) CN110424248A (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN207878458U (en) * 2018-01-03 2018-09-18 中交武汉港湾工程设计研究院有限公司 Interim steel trestle with resistance to plucking auxiliary pile
CN208201658U (en) * 2018-05-09 2018-12-07 中建三局基础设施建设投资有限公司 A kind of steel trestle rapid construction device
CN108999099A (en) * 2018-09-10 2018-12-14 中建市政工程有限公司 The method and its bracing means that a kind of steel trestle middle part cross spacing is reinforced
CN211256623U (en) * 2019-08-23 2020-08-14 中交隧道工程局有限公司 Horizontal suspension cable steel trestle

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN207878458U (en) * 2018-01-03 2018-09-18 中交武汉港湾工程设计研究院有限公司 Interim steel trestle with resistance to plucking auxiliary pile
CN208201658U (en) * 2018-05-09 2018-12-07 中建三局基础设施建设投资有限公司 A kind of steel trestle rapid construction device
CN108999099A (en) * 2018-09-10 2018-12-14 中建市政工程有限公司 The method and its bracing means that a kind of steel trestle middle part cross spacing is reinforced
CN211256623U (en) * 2019-08-23 2020-08-14 中交隧道工程局有限公司 Horizontal suspension cable steel trestle

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
张战凯等: "深水钢栈桥设计方案对比分析", 《公路》, no. 6, pages 177 - 180 *

Similar Documents

Publication Publication Date Title
CN101649604B (en) Construction bracket of 1# block of inclined pull bridge and constructing method thereof
CN105672678A (en) Method for mounting overall steel protective shed cantilever frame
CN103225287A (en) Supporting system of hydraulic moving dam
CN106758752B (en) Leaning tower oblique pull abnormity arch bridge and its construction method
CN209568685U (en) A kind of overhanging frame support structure
CN211256623U (en) Horizontal suspension cable steel trestle
CN204282803U (en) To encorbelment formwork structure for mounting platform
CN102454292A (en) Supporting steel frame of high altitude large-span cantilever structure mold frame
CN104264578A (en) Steel-concrete combining bridge of self-anchored suspension cable-cable-stayed cooperative system
CN204385629U (en) A kind of support for the construction of suspension bridge king-tower top rail
CN110424248A (en) A kind of horizontal suspension cable steel trestle
CN104264577A (en) Self-anchoring suspension cable and stay cable cooperative system bridge with girder having variable cross-section
CN208533997U (en) A kind of climbing frame refuge story structure
CN207846186U (en) A kind of bridge with load-bearing deformation structure
CN208701668U (en) Reinforcing bar soil nailing
CN201943350U (en) Supporting steel frame for die holder of high-altitude large span overhanging structure
CN203174516U (en) Suspension bridge closure segment construction beam segment traction pre-deflection device
CN112627129B (en) Pressure regulating chamber device for hydropower station
CN202689585U (en) Ground fitting up assembly mould of large steel truss
CN205171343U (en) Combination beam self anchored suspension bridge
CN204079226U (en) A kind of movable beam string hanging apparatus that can increase rigidity when tubular truss lifts
CN203188109U (en) Multi-span ground anchor type suspension bridge
CN205443896U (en) Batter post bridge
CN108867548B (en) Construction platform and construction platform erection method for on-site watering high pile wharf
CN209277521U (en) A kind of builder's jack support construction

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Huo Wenxing

Inventor after: Xue Shifeng

Inventor after: Deng Shichao

Inventor after: Liu Guibo

Inventor after: Ji Yaoxian

Inventor after: Liu Hanshi

Inventor before: Huo Wenxing

Inventor before: Deng Shichao

Inventor before: Liu Guibo

Inventor before: Ji Yaoxian

Inventor before: Liu Hanshi

TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20200414

Address after: 100102 Beijing City, Chaoyang District Lizedong two Road No. two building No. two hospital

Applicant after: CCCC TUNNEL ENGINEERING Co.,Ltd.

Applicant after: China University of Petroleum (East China)

Address before: 100102 Beijing City, Chaoyang District Lizedong two Road No. two building No. two hospital

Applicant before: CCCC TUNNEL ENGINEERING Co.,Ltd.