CN110413281A - One kind is based on towed building enterprise circulation flow management and control method - Google Patents

One kind is based on towed building enterprise circulation flow management and control method Download PDF

Info

Publication number
CN110413281A
CN110413281A CN201910706241.0A CN201910706241A CN110413281A CN 110413281 A CN110413281 A CN 110413281A CN 201910706241 A CN201910706241 A CN 201910706241A CN 110413281 A CN110413281 A CN 110413281A
Authority
CN
China
Prior art keywords
list
configuration
task
flow
branch
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910706241.0A
Other languages
Chinese (zh)
Other versions
CN110413281B (en
Inventor
胡春廷
薛江涛
李文豪
常世光
肖亚东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NANJING XINYE ENERGY TECHNOLOGY Co Ltd
Original Assignee
NANJING XINYE ENERGY TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NANJING XINYE ENERGY TECHNOLOGY Co Ltd filed Critical NANJING XINYE ENERGY TECHNOLOGY Co Ltd
Priority to CN201910706241.0A priority Critical patent/CN110413281B/en
Publication of CN110413281A publication Critical patent/CN110413281A/en
Application granted granted Critical
Publication of CN110413281B publication Critical patent/CN110413281B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F8/00Arrangements for software engineering
    • G06F8/30Creation or generation of source code
    • G06F8/38Creation or generation of source code for implementing user interfaces
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • Theoretical Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • General Engineering & Computer Science (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Software Systems (AREA)
  • General Physics & Mathematics (AREA)
  • Operations Research (AREA)
  • Tourism & Hospitality (AREA)
  • General Business, Economics & Management (AREA)
  • Quality & Reliability (AREA)
  • Marketing (AREA)
  • Human Computer Interaction (AREA)
  • Economics (AREA)
  • Data Mining & Analysis (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

Present invention relates particularly to one kind efficiently to construct enterprise's circulation flow management and control method based on towed, comprising steps of one provides the visual configuration page that can pull form controls, user's customizing form attribute information is collected by the visual configuration page, being automatically generated according to form configuration information can be used for the list model of gather data and stores to list model library, flow chart is drawn using visual configuration tool, list needed for each task link candidate processes people of configuration flow and process disposes process;The process that user is specified saves, and provides stringent process version control function, constructs list model library;Two: start flow Booting sequence example executes each task link automatic flow of flow instance control flow.The present invention provides visual configuration interface and formulates oneself desired process using the mode that some simple icons equally allow user to be pulled through dragging, and enterprise can need formulation process rapidly and efficiently to greatly reduce time and human cost according to oneself.

Description

One kind is based on towed building enterprise circulation flow management and control method
Technical field
The present invention relates to field of computer technology, and in particular to one kind is based on circulation flow management and control side, towed building enterprise Method.
Background technique
It is all be unable to do without process during most enterprises management at present, it is present in the every aspect of enterprise, through Data management, administration, expenses management, project management, contract management, asset management, purchasing management, market management, occurrences in human life Among numerous business scenarios such as management, it may be said that the essence of management is exactly workflow management.Process can allow the power and responsibility of enterprise to be distributed It is more reasonable, and allow enterprise certain affairs can preset rule carry out automation circulation, can be assorted in specification enterprise Whom when item completed by, and the system of enterprise can effectively be landed, and thus enterprise be unable to do without process, But if it is desired to process for using, a process just need to put into many manpower and time.
Traditional process development procedure are as follows: such as certain enterprise wants using a management process of asking for leave, it may be necessary to do following Work: 1, process first had using presenter a process substantially version i.e. process substantially what, such as ask for leave and need several steps Suddenly, whom each step needs examine;2, have substantially version may organize related personnel discuss process specific steps, beg for A draft may be gone out after having discussed;3, draft at this moment may needs that suitable technology company is looked for open according to the needs of oneself Process function is sent out, technology company is found and the idea of oneself is informed into technology company and draft is issued into technology company;4, technology is public Department, which understands, goes out detailed technical solution according to the demand recognized after corresponding demand, this technical solution may need with it is corresponding Enterprise confirm there is deviation to avoid understanding repeatedly;5, by confirming repeatedly, modify, adjustment final scheme is finalized a text, at this time technology Company can just arrange technical staff to develop;Development cycle may be a very long waiting again;Investment makes after having developed With optimizing and revising in use process if necessary to being made to process, this will repeat above-mentioned operation repeatedly again.From above may be used To make process, enterprise and technology company require investment a lot of manpower and time cost for enterprise out.Therefore a kind of energy is needed Enough reduce the flow management method of manpower and time cost.
Summary of the invention
1. technical problem to be solved:
For the above technical issues, the present invention proposes a kind of based on towed building enterprise circulation flow management and control method, uses This method can allow enterprise need formulation process rapidly and efficiently to greatly reduce time and human cost according to oneself.
2. technical solution:
One kind is based on towed building enterprise circulation flow management and control method, it is characterised in that: the following steps are included:
Step 1: providing the visual configuration page that can pull form controls, constructs list model library;Specifically include step S11 To S17:
S11 provides the visual configuration page that can pull form controls;Specifically: the page and corresponding Webpage correlation will be configured, As configure the corresponding network address of page setup;When user accesses the network address of the configuration page, then corresponding configuration page can be recalled Face;The configuration page face includes the Form Element collection for dragging;The Form Element collection for dragging include: text box, Combobox, digital frame, radio box, multiselect frame, date control, multiline text frame;The configuration page further includes layout panel;Institute The Form Element that user pulls out from Form Element concentration can be used to store by stating layout panel;It is dragged in layout panel Form Element is that user needs according to specific a certain function and selected, and user carries out according to function to corresponding table unit Element is defined;The layout panel can control the display position for the Form Element that user chooses;The configuration page can Preview is realized, i.e. it can be seen that oneself pulling and the Form Element collection after definition after user can be allowed to pull.
S12 collects user's customizing form attribute information by the visual configuration page;User pulls according to functional requirement Form Element pulls good institute's Form Element in need and constitutes the corresponding complete form of function.
The complete form further includes version management information;It is able to select whether to upgrade when the unifunctional change of complete table The version of list;After the good list of user configuration, if selection upgraded version list can rise a version, otherwise not upgrade version This.
S13 is automatically generated according to form configuration information can be used for the list model of gather data and stores to list model library; I.e. to the carry out configuration information of the complete form generated in step S12;Specifically: generate the unique identification of complete form;It is described Unique identification includes unique mark of each Form Element;All Form Elements and corresponding unique identification are generated into table Single model is simultaneously stored into list model library, and list version is added on list model;The list model library can pass through The configuration page recalls.
S14: flow chart is drawn using visual configuration tool;The visual configuration tool is visualized graphs editor Device;The visual configuration tool provides following several figures: empty circles represent process starting point;Round rectangle represents process In each task link;Line with arrow is for being connected each task link;Branch condition can be configured on line;With one heart Circle, which represents process, to be terminated.
S15: list needed for each task link candidate processes people of configuration flow and process;Demographic data's library initialization is provided Processing people needed for process is stored in personnel's initial configuration table and generates personnel's initial table by allocation list;The personnel are initial Change unique identification and deposit personnel's name that table saves deposit personnel.
To each task link configuration candidate processes people of process drawn, at the beginning of candidate processes people's range of choice comes from personnel Beginningization allocation list;
List needed for executing to process configuration, the list then correspond to process institute thing which be needed to be done, and list derives from the table that S13 is generated Single model library, the list are the shared lists of each task link of whole flow process, and a list contains multiple Form Elements;To stream The each task link of journey configures the power of filling in of corresponding Form Element.
S16: configuration branch condition;
According to corresponding requirements of process, if process is there are branch and needs branch condition, can match to the branch needed Branch condition being set, which specific branch of process being selected according to branch condition when for determining workflow to branch;Set phase It is managed collectively after closing flow chart branches rule, is called when flow tasks link is forward and backward or condition routing decision.
S17 disposes process;The process that user is specified saves, and provides stringent process version control function.
Step 2: according to the process flow operation process of drafting;S21 is specifically included to S22;
S21 start flow Booting sequence example;The process needed to be implemented is selected, visioning procedure example allows process to enter beginning shape Form object needed for state and visioning procedure.
S22 executes each task link automatic flow of flow instance control flow;It is searched according to the flow chart loops of formulation Next task link then creates task if there is next task link;After creating task, the corresponding executor's root of task List content is filled according to the Form Element permission that could fill out that this task configures;It can choose after having filled in and be committed to next Business is rejected to previous task;If the rejection previous step that can choose dissatisfied to previous task implementing result re-executes, It is submitted if satisfied;Judgement whether there is branch in next step after submitting;Branch condition is then calculated if there is branch, according to Branch condition searches next step task;Next task is then directly searched if there is no branch;It finds and then continues to hold in next step Row aforesaid operations;Such circulation searching executes, and process terminates until it can not find next task.
3. the utility model has the advantages that
The present invention can be very good to solve above-mentioned two problems, be changed into list in (1) process institute thing which be needed to be done present invention Concept draws visual What You See Is What You Get list configuration feature by offer and makes user fixed according to the needs of our laboratory procedure The list of justice oneself;(2) process is formulated.The present invention, which provides visual configuration interface, equally allows use using some simple icons The mode that family is pulled through dragging formulates oneself desired process, and without redevelopment, enterprise can be with for flow technologies companies most of in this way Formulation process rapidly and efficiently is needed to greatly reduce time and human cost according to oneself.
Detailed description of the invention
Fig. 1 is overall flow figure of the invention;
Fig. 2 is in the present invention according to the flow chart of the process flow operation process of drafting;
Fig. 3 is the flow chart of specific embodiment.
Specific embodiment
The present invention is specifically described with reference to the accompanying drawing.
As shown in attached drawing 1 to 2, one kind is based on towed building enterprise circulation flow management and control method, it is characterised in that: including Following steps:
Step 1: providing the visual configuration page that can pull form controls, constructs list model library;Specifically include step S11 To S17:
S11 provides the visual configuration page that can pull form controls;Specifically: the page and corresponding Webpage correlation will be configured, As configure the corresponding network address of page setup;When user accesses the network address of the configuration page, then corresponding configuration page can be recalled Face;The configuration page face includes the Form Element collection for dragging;The Form Element collection for dragging include: text box, Combobox, digital frame, radio box, multiselect frame, date control, multiline text frame;The configuration page further includes layout panel;Institute The Form Element that user pulls out from Form Element concentration can be used to store by stating layout panel;It is dragged in layout panel Form Element is that user needs according to specific a certain function and selected, and user carries out according to function to corresponding table unit Element is defined;The layout panel can control the display position for the Form Element that user chooses;The configuration page can Preview is realized, i.e. it can be seen that oneself pulling and the Form Element collection after definition after user can be allowed to pull.
S12 collects user's customizing form attribute information by the visual configuration page;User pulls according to functional requirement Form Element pulls good institute's Form Element in need and constitutes the corresponding complete form of function.
The complete form further includes version management information;It is able to select whether to upgrade when the unifunctional change of complete table The version of list;After the good list of user configuration, if selection upgraded version list can rise a version, otherwise not upgrade version This.
S13 is automatically generated according to form configuration information can be used for the list model of gather data and stores to list model library; I.e. to the carry out configuration information of the complete form generated in step S12;Specifically: generate the unique identification of complete form;It is described Unique identification includes unique mark of each Form Element;All Form Elements and corresponding unique identification are generated into table Single model is simultaneously stored into list model library, and list version is added on list model;The list model library can pass through The configuration page recalls.
S14: flow chart is drawn using visual configuration tool;The visual configuration tool is visualized graphs editor Device;The visual configuration tool provides following several figures: empty circles represent process starting point;Round rectangle represents process In each task link;Line with arrow is for being connected each task link;Branch condition can be configured on line;With one heart Circle, which represents process, to be terminated.This step is capable of providing visualization, graphical, pull-alongs drafting operation, promotes process and draws efficiency.
S15: list needed for each task link candidate processes people of configuration flow and process;Demographic data's library initialization is provided Processing people needed for process is stored in personnel's initial configuration table and generates personnel's initial table by allocation list;The personnel are initial Change unique identification and deposit personnel's name that table saves deposit personnel.At each task link configuration candidate of process drawn People is managed, candidate processes people's range of choice comes from personnel's initial configuration table;List needed for executing to process configuration, the list is then Corresponding process institute thing which be needed to be done, list derive from the list model library that S13 is generated, which is each task link of whole flow process Shared list, a list contain multiple Form Elements;Filling in for corresponding Form Element is configured to each task link of process Power.
S16: configuration branch condition;
According to corresponding requirements of process, if process is there are branch and needs branch condition, can match to the branch needed Branch condition being set, which specific branch of process being selected according to branch condition when for determining workflow to branch;Set phase It is managed collectively after closing flow chart branches rule, is called when flow tasks link is forward and backward or condition routing decision.Pass through This step greatly reduces maintenance workload when rule variation.
S17 disposes process;The process that user is specified saves, and provides stringent process version control function.
Step 2: according to the process flow operation process of drafting;S21 is specifically included to S22;
S21 start flow Booting sequence example;The process needed to be implemented is selected, visioning procedure example allows process to enter beginning shape Form object needed for state and visioning procedure.
S22 executes each task link automatic flow of flow instance control flow;It is searched according to the flow chart loops of formulation Next task link then creates task if there is next task link;After creating task, the corresponding executor's root of task List content is filled according to the Form Element permission that could fill out that this task configures;It can choose after having filled in and be committed to next Business is rejected to previous task;If the rejection previous step that can choose dissatisfied to previous task implementing result re-executes, It is submitted if satisfied;Judgement whether there is branch in next step after submitting;Branch condition is then calculated if there is branch, according to Branch condition searches next step task;Next task is then directly searched if there is no branch;It finds and then continues to hold in next step Row aforesaid operations;Such circulation searching executes, and process terminates until it can not find next task.
Specific embodiment: as shown in Fig. 3, by taking the process asked for leave as an example: following information is filled in requirements of process of asking for leave: being asked False reason, initial time of asking for leave, asks for leave the end time, duration of asking for leave, line manager's suggestions made after examination, general manager's suggestions made after examination.Benefit With process of the invention specifically:
The Form Element needed is pulled out from Form Element concentration into the visual configuration page and enters layout panel, is respectively necessary for This text box can be named as ask for leave reason by pulling out text box (name taken can fill in front of text box);It pulls out Date control is named as initial time of asking for leave;It pulls out date control and is named as the end time of asking for leave;Pull out text This frame is named as line manager's suggestions made after examination;It pulls out text box and is named as general manager's suggestions made after examination;It is pulled in layout panel Each Form Element as defined above arranges its Show Styles, such as can be as above totally six Form Elements are divided into the column progress of three rows two Arrangement, or three column that are divided into two lines are pulled according to oneself hobby, and the appearance pulled is as asked for leave the list sample of request slip Son, What You See Is What You Get;It has dragged all Form Elements and has sequenced pattern, and a name can have been taken for the list of oneself, such as " asked for leave Request slip " can be reserved for the list after having taken name, then be not necessarily to choose whether upgrade version if it is first time creation list This, list version is 1;It defines list later and comes into operation, demand changes such as request slip needs of asking for leave later When increasing fill substance, " request slip of asking for leave " before need to only modifying at this time, and list is upgraded into No. 2 versions, The change for so simply just completing this demand, realizes the segmentation of list and process, the change of list will not influence original Process, so can fast and easy definitim flow need the thing done, greatly improve working efficiency.
Formulate flow chart: as shown in Fig. 3: first dragging a circle as process starting point, then a round rectangle is dragged to make It is named as application of asking for leave for first flow tasks, drags an arrow line connection starting point and application of asking for leave;Drag two fillets Rectangle be named as respectively line manager examination & approval, general manager examination & approval, using line with the arrow will ask for leave application and manager examination & approval and General manager's examination & approval are attached;Drag a round rectangle be named as occurrences in human life filing, using line with the arrow will manager examination & approval and General manager's examination & approval are attached;Drag a concentric circles as process end of identification, using line with the arrow by occurrences in human life filing with Concentric circles connection.
The above-mentioned list for asking for leave process configuration is then request slip of asking for leave;Corresponding table unit is configured to each task link of process Element fills in permission, above-mentioned process of asking for leave, and first task " apply of asking for leave " only ask for leave reason of asking for leave in request slip by configuration, asks for leave Initial time is asked for leave the end time, these elements of duration of asking for leave fill in permission, and second task " line manager's examination & approval " is only What this element of line manager's suggestions made after examination in request slip was asked for leave in configuration fills in permission, third task " general manager's examination & approval " What this element of general manager's suggestions made after examination in request slip was asked for leave in configuration fills in permission, and the last one task " occurrences in human life filing " is then The permission that all Form Elements are not all filled in can only be checked.
Branch condition is configured, as branch condition is when being filled in the duration of asking for leave in request slip of asking for leave in process of asking for leave Number of days is less than or equal to then only line manager be needed to examine in 3 days, and line manager has examined then occurrences in human life filing, when the day that duration of asking for leave is filled in Number, which is greater than 3 days, then to be examined by general manager, and then occurrences in human life are filed.Above-mentioned process is saved.
Although the present invention has been described by way of example and in terms of the preferred embodiments, they be not it is for the purpose of limiting the invention, it is any ripe This those skilled in the art is practised, without departing from the spirit and scope of the invention, can make various changes or retouch from working as, therefore guarantor of the invention Shield range should be subject to what claims hereof protection scope was defined.

Claims (1)

1. one kind is based on towed building enterprise circulation flow management and control method, it is characterised in that: the following steps are included:
Step 1: providing the visual configuration page that can pull form controls, constructs list model library;Specifically include step S11 To S17:
S11 provides the visual configuration page that can pull form controls;Specifically: the page and corresponding Webpage correlation will be configured, As configure the corresponding network address of page setup;When user accesses the network address of the configuration page, then corresponding configuration page can be recalled Face;The configuration page face includes the Form Element collection for dragging;The Form Element collection for dragging include: text box, Combobox, digital frame, radio box, multiselect frame, date control, multiline text frame;The configuration page further includes layout panel;Institute The Form Element that user pulls out from Form Element concentration can be used to store by stating layout panel;It is dragged in layout panel Form Element is that user needs according to specific a certain function and selected, and user carries out according to function to corresponding table unit Element is defined;The layout panel can control the display position for the Form Element that user chooses;The configuration page can Preview is realized, i.e. it can be seen that oneself pulling and the Form Element collection after definition after user can be allowed to pull;
S12 collects user's customizing form attribute information by the visual configuration page;User pulls list according to functional requirement Element pulls good institute's Form Element in need and constitutes the corresponding complete form of function;
The complete form further includes version management information;Upgrading list is able to select whether when the unifunctional change of complete table Version;After the good list of user configuration, if selection upgraded version list can rise a version, otherwise not upgraded version;
S13 is automatically generated according to form configuration information can be used for the list model of gather data and stores to list model library;I.e. pair The carry out configuration information of the complete form generated in step S12;Specifically: generate the unique identification of complete form;It is described unique Mark includes unique mark of each Form Element;All Form Elements and corresponding unique identification are generated into list mould Type is simultaneously stored into list model library, and list version is added on list model;The list model library, which can pass through, to be configured The page recalls;
S14: flow chart is drawn using visual configuration tool;The visual configuration tool is visualized graphs editing machine;Institute State visual configuration tool and provide following several figures: empty circles represent process starting point;Round rectangle represents each in process A task link;Line with arrow is for being connected each task link;Branch condition can be configured on line;Concentric circles generation Surface low journey terminates;
S15: list needed for each task link candidate processes people of configuration flow and process;The configuration of demographic data's library initialization is provided Processing people needed for process is stored in personnel's initial configuration table and generates personnel's initial table by table;Personnel's initial table Save the unique identification and deposit personnel's name of deposit personnel;
To each task link configuration candidate processes people of process drawn, candidate processes people's range of choice is initialized from personnel Allocation list;
List needed for executing to process configuration, the list then correspond to process institute thing which be needed to be done, and list derives from the table that S13 is generated Single model library, the list are the shared lists of each task link of whole flow process, and a list contains multiple Form Elements;To stream The each task link of journey configures the power of filling in of corresponding Form Element;
S16: configuration branch condition;
According to corresponding requirements of process, if process is there are branch and needs branch condition, can match to the branch needed Branch condition being set, which specific branch of process being selected according to branch condition when for determining workflow to branch;Set phase It is managed collectively after closing flow chart branches rule, is called when flow tasks link is forward and backward or condition routing decision;
S17 disposes process;The process that user is specified saves, and provides stringent process version control function;
Step 2: according to the process flow operation process of drafting;S21 is specifically included to S22;
S21 start flow Booting sequence example;The process needed to be implemented is selected, visioning procedure example allows process to enter beginning shape Form object needed for state and visioning procedure;
S22 executes each task link automatic flow of flow instance control flow;It is searched according to the flow chart loops of formulation next Task link then creates task if there is next task link;After creating task, the corresponding executor of task is according to this The Form Element permission that could fill out of task configuration fills in list content;Can choose after having filled in be committed to next task or Person rejects to previous task;If the rejection previous step that can choose dissatisfied to previous task implementing result re-executes, if It is satisfied then submit;Judgement whether there is branch in next step after submitting;Branch condition is then calculated if there is branch, according to branch Conditional search next step task;Next task is then directly searched if there is no branch;It finds and then continues to execute in next step State operation;Such circulation searching executes, and process terminates until it can not find next task.
CN201910706241.0A 2019-08-01 2019-08-01 Drag-based enterprise circulation flow management and control method Active CN110413281B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910706241.0A CN110413281B (en) 2019-08-01 2019-08-01 Drag-based enterprise circulation flow management and control method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910706241.0A CN110413281B (en) 2019-08-01 2019-08-01 Drag-based enterprise circulation flow management and control method

Publications (2)

Publication Number Publication Date
CN110413281A true CN110413281A (en) 2019-11-05
CN110413281B CN110413281B (en) 2022-08-12

Family

ID=68365063

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910706241.0A Active CN110413281B (en) 2019-08-01 2019-08-01 Drag-based enterprise circulation flow management and control method

Country Status (1)

Country Link
CN (1) CN110413281B (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112508501A (en) * 2020-10-30 2021-03-16 福建亿能达信息技术股份有限公司 Method, device, equipment and medium for configuring multistage process
CN112631584A (en) * 2020-12-17 2021-04-09 武汉唯案软件有限公司 Metadata dynamic form generation method and system
CN112667236A (en) * 2020-12-28 2021-04-16 珠海新华通软件股份有限公司 Method, system and medium for implementing workflow of gridding layout
CN112819429A (en) * 2021-01-29 2021-05-18 贵州惠智电子技术有限责任公司 Flow management system and management method based on big data autonomous learning function
CN113297825A (en) * 2021-07-23 2021-08-24 苏州恒力智能科技有限公司 Dynamically visualized form application design system and computer readable storage medium
CN113805853A (en) * 2021-09-28 2021-12-17 重庆允成互联网科技有限公司 Software product development system based on industrial internet
CN114168113A (en) * 2022-02-10 2022-03-11 湖南新云网科技有限公司 Business process management and control configuration method
CN115934086A (en) * 2022-12-28 2023-04-07 苏州峰之鼎信息科技有限公司 Information sharing method, device, equipment and medium for blueprint and page design

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105700888A (en) * 2016-01-14 2016-06-22 国网山东省电力公司物资公司 Visualization rapid developing platform based on jbpm workflow engine
CN107122173A (en) * 2017-03-28 2017-09-01 成都优易数据有限公司 A kind of adaptation activiti, the list generation method that can be pulled
CN107544806A (en) * 2017-09-04 2018-01-05 江苏中威科技软件系统有限公司 Visualize list method for drafting

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105700888A (en) * 2016-01-14 2016-06-22 国网山东省电力公司物资公司 Visualization rapid developing platform based on jbpm workflow engine
CN107122173A (en) * 2017-03-28 2017-09-01 成都优易数据有限公司 A kind of adaptation activiti, the list generation method that can be pulled
CN107544806A (en) * 2017-09-04 2018-01-05 江苏中威科技软件系统有限公司 Visualize list method for drafting

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112508501A (en) * 2020-10-30 2021-03-16 福建亿能达信息技术股份有限公司 Method, device, equipment and medium for configuring multistage process
CN112631584A (en) * 2020-12-17 2021-04-09 武汉唯案软件有限公司 Metadata dynamic form generation method and system
CN112667236A (en) * 2020-12-28 2021-04-16 珠海新华通软件股份有限公司 Method, system and medium for implementing workflow of gridding layout
CN112819429A (en) * 2021-01-29 2021-05-18 贵州惠智电子技术有限责任公司 Flow management system and management method based on big data autonomous learning function
CN112819429B (en) * 2021-01-29 2024-06-07 贵州惠智电子技术有限责任公司 Flow management system and method based on big data autonomous learning function
CN113297825A (en) * 2021-07-23 2021-08-24 苏州恒力智能科技有限公司 Dynamically visualized form application design system and computer readable storage medium
CN113805853A (en) * 2021-09-28 2021-12-17 重庆允成互联网科技有限公司 Software product development system based on industrial internet
CN114168113A (en) * 2022-02-10 2022-03-11 湖南新云网科技有限公司 Business process management and control configuration method
CN115934086A (en) * 2022-12-28 2023-04-07 苏州峰之鼎信息科技有限公司 Information sharing method, device, equipment and medium for blueprint and page design

Also Published As

Publication number Publication date
CN110413281B (en) 2022-08-12

Similar Documents

Publication Publication Date Title
CN110413281A (en) One kind is based on towed building enterprise circulation flow management and control method
CN110610240B (en) Virtual automation assistance based on artificial intelligence
JP4625337B2 (en) Process management apparatus, process management method, and process management program
CN105700888B (en) A kind of visualization quick development platform based on jbpm workflow engine
CN104679488B (en) A kind of flow custom development platform and flow custom development approach
CN104021460B (en) A kind of operation procedure management system and work flow processing method
US11093242B2 (en) Automatically mapping data while designing process flows
CN105607907B (en) A kind of model-driven control system of workflow engine switching at runtime
US10867273B2 (en) Interface for expanding logical combinations based on relative placement
US20150127579A1 (en) Method and apparatus to present an integrated process modeler
WO2023045862A1 (en) Application page development method and apparatus, and system, computing device and storage medium
US20120260254A1 (en) Visual scripting of web services for task automation
CN105989440A (en) Process customization processing method and workflow engine thereof
EP3365813A1 (en) Display of dynamic contextual pivot grid analytics
CN105719126B (en) system and method for scheduling Internet big data tasks based on life cycle model
CN110348820A (en) A kind of intelligent work Workflow Management System
WO2022048648A1 (en) Method and apparatus for achieving automatic model construction, electronic device, and storage medium
CN108536718A (en) A kind of method and system for the IT application in management realized based on input and output semantization
CN115170048B (en) Workflow realization method, system and medium based on model and rule
CN108153754A (en) A kind of data processing method and its device
Bingley et al. A design platform for the NELSIS CAD framework
JPH11102293A (en) Program automatic generating method
CN111045662A (en) Graphical automatic dialogue program development system, method and computer readable memory
CN117406979B (en) Interface interaction design method and system for computing workflow
US11875111B2 (en) Block level document revision

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant