CN110412894B - Multi-load start control method, storage medium, control device and relay - Google Patents

Multi-load start control method, storage medium, control device and relay Download PDF

Info

Publication number
CN110412894B
CN110412894B CN201910518609.0A CN201910518609A CN110412894B CN 110412894 B CN110412894 B CN 110412894B CN 201910518609 A CN201910518609 A CN 201910518609A CN 110412894 B CN110412894 B CN 110412894B
Authority
CN
China
Prior art keywords
current
information
load
starting
control device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201910518609.0A
Other languages
Chinese (zh)
Other versions
CN110412894A (en
Inventor
黎新平
李向兵
谭溪安
衣绍鹏
彭荣忠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHENZHEN RYDER ELECTRONICS CO Ltd
Original Assignee
SHENZHEN RYDER ELECTRONICS CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHENZHEN RYDER ELECTRONICS CO Ltd filed Critical SHENZHEN RYDER ELECTRONICS CO Ltd
Priority to CN201910518609.0A priority Critical patent/CN110412894B/en
Publication of CN110412894A publication Critical patent/CN110412894A/en
Application granted granted Critical
Publication of CN110412894B publication Critical patent/CN110412894B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/04Programme control other than numerical control, i.e. in sequence controllers or logic controllers

Abstract

The invention discloses a multi-load starting control method, which solves the problem that a plurality of loads need to be started one by related personnel to avoid that a power supply cannot drag all the loads to be started simultaneously; searching current instruction information corresponding to the current starting trigger information; the instruction information comprises starting execution information corresponding to the starting trigger information; according to the method, the artificial process of starting one by one can be simulated, so that the related personnel can still carry out the operation of simultaneously starting multiple loads, and the control of starting one by one is achieved in a program simulation mode, so that the inconvenience on the work of the personnel is avoided, and meanwhile, the safety is also prevented from being influenced by misoperation.

Description

Multi-load start control method, storage medium, control device and relay
Technical Field
The present invention relates to a relay, and more particularly, to a multi-load start control method, a storage medium, a control device, and a relay.
Background
A relay (english name: relay) is an electric control device, and is an electric appliance that generates a predetermined step change in a controlled amount in an electric output circuit when a change in an input amount (excitation amount) meets a predetermined requirement. It has an interactive relationship between a control system (also called an input loop) and a controlled system (also called an output loop). It is commonly used in automated control circuits, which are actually a "recloser" that uses low current to control high current operation. Therefore, the circuit plays the roles of automatic regulation, safety protection, circuit conversion and the like.
If a plurality of loads are started simultaneously, because the current is multiplied at the moment of starting the loads, the voltage drop is increased, the capacity of the power supply is not output at the moment, the impact is formed on a power grid, the voltage of the power grid is reduced instantly, and the voltage rises again after the loads operate normally; thereby lead to a plurality of loads can't accomplish the simultaneous start, and the independent start load in proper order can not produce great influence, can all keep in operating condition after starting a plurality of loads simultaneously, through the mode of independent start, the user needs the interval a period to start a load, has brought the inconvenience for the user operation, needs extravagant longer time, so certain improvement space has.
Disclosure of Invention
The first objective of the present invention is to provide a multi-load start control method, so that when multiple loads are started simultaneously, one-by-one start is simulated to avoid the situation that the power supply cannot be driven.
The technical purpose of the invention is realized by the following technical scheme:
a multi-load start-up control method comprising:
acquiring current behavior information of a current user, wherein the behavior information comprises load starting information;
judging whether at least two pieces of load starting information are acquired or not according to all the acquired load starting information; if at least two pieces of load starting information are acquired, current starting trigger information is formed;
searching current instruction information corresponding to the current starting trigger information from a preset corresponding relation between the starting trigger information and the instruction information; the instruction information comprises starting execution information corresponding to the starting trigger information;
and forming a starting priority for the loads which need to be started at the same time according to the current starting execution information, and sequentially spacing preset interval periods according to the starting priority to start the related loads.
By adopting the scheme, the corresponding starting trigger information is formed when a plurality of users start the load simultaneously or a single user starts a plurality of loads simultaneously, that is, the start triggering information corresponds to the condition that a plurality of loads are started simultaneously, so that the start execution information corresponding to the start triggering information is searched to form the starting priority of the related loads needing to be started at the same time, then the loads are started in sequence, so that a buffering time is provided after each load is started, the failure of starting all the loads due to the fact that the power supply voltage is pulled down when a plurality of loads are started simultaneously is avoided, and during the process of simulating one-by-one starting, can ensure that the load is continuously started after the power supply fluctuation disappears, ensure that the load can be normally started, meanwhile, related personnel can perform the operation of simultaneously starting multiple loads, so that the inconvenience of working brought to the working personnel is avoided, and the safety problem caused by the fact that the working personnel simultaneously start the multiple loads due to misoperation is also avoided.
Preferably, the method for determining the loads required to be started at the same time is as follows:
acquiring time nodes corresponding to relevant formed load starting information;
taking a time node corresponding to the first formed load starting information as an initial time node, and judging whether the time node corresponding to the rest load starting information is in a preset time period or not according to the initial time node;
if the load is in the preset time period, the load belongs to the load started at the same time.
By adopting the scheme, because only the load started at the same time can influence the power supply, the influence of the gradually added load on the power supply is relatively small, and the load can be ensured to be started, whether the load started at the same time needs to be judged, namely, when the judgment needs to have an initial point, the first time node for accessing the load is taken as the initial time node; and defining all started loads from the time node of the first access load to a preset time period as the loads started at the same time.
Preferably, the loads that need to be started at the same time are made to form a start priority according to a random algorithm.
Preferably, the method for randomly forming the boot priority is as follows:
acquiring current voltage information and current frequency information when a current load is accessed;
performing logical operation on a numerical value corresponding to the current voltage information and a numerical value corresponding to the current frequency information to form sequencing data information;
and sequencing the loads needing to be started at the same time from large to small or from small to large according to the numerical values corresponding to the sequencing data information to form a starting priority.
By adopting the scheme, because the load with large power and the actual condition of the load cannot be known in the process of not starting the load, the corresponding priority is formed in a random mode, a sequence is ensured, and the function of starting the load one by one is realized conveniently according to the sequence.
Preferably, the method for monitoring the voltage of the current power supply during the start-up of each load is as follows:
acquiring current voltage information of a current power supply, wherein the voltage information comprises voltage drop information;
comparing the pressure drop value corresponding to the pressure drop information with a value corresponding to preset pressure drop reference information;
if the pressure drop value corresponding to the pressure drop information is larger than or equal to the value corresponding to the pressure drop reference information; and stopping starting the load after the current load according to the starting priority.
By adopting the scheme, the current voltage information of the current power supply is monitored, and once the voltage drop is overlarge, the situation that the current power supply cannot access more loads is shown, and if the voltage drop is overlarge, all the loads are possibly turned off, so that in the process of sequentially starting the loads according to the starting priority, once the voltage drop is overlarge, the loads are stopped to be started, and the started loads are ensured not to be turned off.
Preferably, the method for controlling the on and off of the electric control device is as follows:
switching in the action current according to the action current required by the current electric control device;
keeping the action current for a preset action time period;
after the action time period passes, switching the accessed action current to a holding current required by the current electric control device; wherein the holding current is less than the action current.
By adopting the scheme, when the electric control device is started, the action current is switched in to ensure that the electric control device can be normally started as a large current is required in the starting process, and after the electric control device is started, the electric control device only needs to be kept in a closed state, so that the electric control device can be kept in the closed state as long as a large current is not required, the starting current is switched to a holding current, the electric control device is kept closed through a small current, the heating condition can be effectively reduced, and the service life of the electric control device is prolonged.
Preferably, the voltage of the present power supply is monitored after the holding current required by the present electric control device is switched on, and the specific method is as follows:
acquiring current voltage information of a current power supply, wherein the voltage information comprises voltage pulse fluctuation information;
judging whether current voltage pulse fluctuation information appears or not;
if the current voltage pulse fluctuation information exists, controlling whether to continuously access the holding current required by the current electric control device according to the duration of the current voltage pulse fluctuation information;
whether the duration of the current voltage pulse fluctuation information is longer than a preset duration period or not;
if the duration of the current voltage pulse fluctuation information is less than the duration period, continuing to access the holding current required by the current electric control device;
and if the duration of the current voltage pulse fluctuation information is longer than the duration period, stopping switching in the holding current required by the current electric control device to switch off the current electric control device.
By adopting the scheme, in the process of continuously accessing the load, the voltage is influenced, relevant pulse fluctuation is generated, the pulse fluctuation can cause correspondence, different pulse fluctuations correspond to different states, the corresponding pulse fluctuation condition is distinguished according to the duration time of the pulse, and whether the corresponding holding current needs to be continuously accessed or not is analyzed according to the current condition so as to enable the current electric control device to be switched on; if the pulse fluctuation is less than the corresponding duration period, it is indicated that only some simple interferences are generated at the moment, namely voltage fluctuation generated in the process of accessing the load, so the influence generated by the voltage fluctuation is avoided directly through related algorithm filtering, and if the pulse fluctuation is greater than the corresponding duration period, it is indicated that the power supply is dead at the moment, so that the electric energy corresponding to the load cannot be provided, so the current electric control device is directly turned off, and the danger is avoided.
A second object of the present invention is to provide a computer-readable storage medium, which can store a corresponding program, so that when multiple loads are started simultaneously, one-by-one start is simulated to avoid the situation that the power supply cannot be driven.
The technical purpose of the invention is realized by the following technical scheme:
a computer-readable storage medium comprising a program which, when loaded and executed by a processor, implements the multi-load boot control method of the preceding claim.
A third objective of the present invention is to provide a control device, which can simulate a one-by-one start-up when multiple loads are started simultaneously to avoid the situation that the power supply cannot be driven.
The technical purpose of the invention is realized by the following technical scheme:
a control device comprising a memory, a processor and a program stored on said memory and executable on said processor, the program being capable of being loaded and executed by the processor to implement the multi-load startup control method as claimed above.
A fourth objective of the present invention is to provide a relay, which can simulate a one-by-one start when multiple loads are started simultaneously, so as to avoid the situation that the power supply cannot be driven.
The technical purpose of the invention is realized by the following technical scheme:
a relay comprising a memory, a processor and a program stored on said memory and executable on said processor, the program being capable of being loaded and executed by the processor to implement the multi-load start-up control method as claimed above.
In conclusion, the invention has the following beneficial effects: can simulate the artificial process that starts one by one for relevant personnel still can carry out the operation that starts many loads simultaneously, and the management and control of starting one by one is avoided bringing the inconvenience of work for the staff in order to reach through program simulation's mode, also avoids the maloperation simultaneously and influences the security.
Drawings
FIG. 1 is a block flow diagram of a multi-load startup control method;
FIG. 2 is a block flow diagram of a method for determining the relative loads that need to be started at the same time;
FIG. 3 is a block flow diagram of a method for developing a boot priority from loads that require a same time to boot according to a stochastic algorithm;
FIG. 4 is a block flow diagram of a method for prioritizing node starts according to load start time;
FIG. 5 is a block flow diagram of a method of monitoring the voltage of the present power supply during startup of each load;
FIG. 6 is a flow chart diagram of a method of on-off control of an electrical control device;
fig. 7 is a flow chart diagram of a method of monitoring the voltage of a current power supply.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings.
The present embodiment is only for explaining the present invention, and it is not limited to the present invention, and those skilled in the art can make modifications of the present embodiment without inventive contribution as needed after reading the present specification, but all of them are protected by patent law within the scope of the claims of the present invention.
The embodiment of the invention provides a multi-load starting control method, which comprises the following steps: acquiring current behavior information of a current user, wherein the behavior information comprises load starting information; judging whether at least two pieces of load starting information are acquired or not according to all the acquired load starting information; if at least two pieces of load starting information are acquired, current starting trigger information is formed; searching current instruction information corresponding to the current starting trigger information from a preset corresponding relation between the starting trigger information and the instruction information; the instruction information comprises starting execution information corresponding to the starting trigger information; and forming a starting priority for the loads which need to be started at the same time according to the current starting execution information, and sequentially spacing preset interval periods according to the starting priority to start the related loads.
In the embodiment of the invention, when a plurality of users start the load simultaneously or a single user starts a plurality of loads simultaneously, corresponding start trigger information is formed, that is, the start triggering information corresponds to the condition that a plurality of loads are started simultaneously, so that the start execution information corresponding to the start triggering information is searched to form the starting priority of the related loads needing to be started at the same time, then the loads are started in sequence, so that a buffering time is provided after each load is started, the failure of starting all the loads due to the fact that the power supply voltage is pulled down when a plurality of loads are started simultaneously is avoided, and during the process of simulating one-by-one starting, can ensure that the load is continuously started after the power supply fluctuation disappears, ensure that the load can be normally started, meanwhile, related personnel can perform the operation of simultaneously starting multiple loads, so that the inconvenience of working brought to the working personnel is avoided, and the safety problem caused by the fact that the working personnel simultaneously start the multiple loads due to misoperation is also avoided.
In order to make the objects, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are some, but not all, embodiments of the present invention. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
In addition, the term "and/or" herein is only one kind of association relationship describing an associated object, and means that there may be three kinds of relationships, for example, a and/or B, which may mean: a exists alone, A and B exist simultaneously, and B exists alone. In addition, the character "/" herein generally indicates that the former and latter related objects are in an "or" relationship, unless otherwise specified.
The embodiments of the present invention will be described in further detail with reference to the drawings attached hereto.
Referring to fig. 1, an embodiment of the invention provides a multi-load startup control method, and a main flow of the method is described as follows.
As shown in fig. 1:
step 1000: acquiring current behavior information of a current user; the behavior information includes load start information.
Wherein, the current user refers to a user who wants to start the load; when a plurality of users start a single load or a plurality of loads simultaneously and a single user starts a plurality of loads simultaneously, corresponding load starting information is formed; the current behavior information can be acquired by a mechanical key triggering mode or a virtual key triggering mode; the mechanical key triggering mode can start the related load by pressing the start key, so as to obtain the corresponding current behavior information; the virtual key triggering mode can realize starting of the related load by pressing the related virtual triggering key in the interface of the corresponding software, so as to obtain the corresponding current behavior information.
Step 2000: and judging whether at least two pieces of load starting information are acquired or not according to all the acquired load starting information.
Step 3000: and if at least two pieces of load starting information are acquired, current starting trigger information is formed.
And forming corresponding starting trigger information according to the load starting information, wherein the starting trigger information corresponds to the condition that a plurality of loads are started simultaneously.
Step 4000: searching current instruction information corresponding to the current starting trigger information from a preset corresponding relation between the starting trigger information and the instruction information; the instruction information includes start execution information corresponding to the start trigger information.
After the current starting trigger information is acquired, inquiring between the preset starting trigger information and the instruction information, and after the instruction information corresponding to the current starting trigger information is inquired, the inquired instruction information is the starting execution information.
Step 5000: and forming a starting priority for the loads which need to be started at the same time according to the current starting execution information, and sequentially spacing preset interval periods according to the starting priority to start the related loads.
The judgment method of the load needing to be started at the same time comprises the following steps:
searching corresponding starting execution information to form starting priority for related loads needing to be started at the same time, and then sequentially starting the loads; as shown in fig. 2, the method for determining the loads required to be started at the same time is as follows:
step 5110: and acquiring time nodes corresponding to the related formed load starting information.
Step 5120: and taking the time node corresponding to the first formed load starting information as an initial time node, and judging whether the time nodes corresponding to the rest load starting information are in a preset time period or not according to the initial time node.
Step 5130: if the load is in the preset time period, the load belongs to the load started at the same time.
Step 5140: if the load is not in the preset time period, the load does not belong to the load started at the same time.
The time period in this embodiment may be any number between 1-100 microseconds, and this embodiment preferably uses 10 microseconds; because only the load started at the same time can affect the power supply, the influence of the gradually added load on the power supply is relatively small, and the load can be ensured to be started, whether the load started at the same time needs to be judged, namely, when the judgment needs to have a starting point, the first time node for accessing the load is taken as the starting time node; and defining all started loads from the time node of the first access load to a preset time period as the loads started at the same time.
Regarding the method of initiating the priority formation:
the starting priority may be formed in various ways, and the corresponding priority may be randomly generated, formed according to a preset sequence, or read by a corresponding number to form the corresponding priority.
In one embodiment, as shown in FIG. 3, loads that require the same time to start are based on a random algorithm to form a start priority; forming a corresponding starting priority through a random algorithm; the stochastic algorithm may be any conventional stochastic algorithm such as a numerical ranking algorithm, a numerical probability algorithm, a Las Vegas algorithm (LasVegas), a Monte Carlo algorithm (MonteCarlo), a Sheward algorithm (Sherwood), and so on. In this embodiment, a numerical sorting algorithm is preferably adopted, and the method for randomly forming the start priority is as follows:
step 5210: and acquiring current voltage information and current frequency information when the current load is accessed.
The voltage value and the voltage frequency value corresponding to the current load are formed when the current load is connected, and two parameters are obtained so as to facilitate subsequent data processing.
Step 5220: and performing logical operation on the numerical value corresponding to the current voltage information and the numerical value corresponding to the current frequency information to form sequencing data information.
The logical operation may be an exclusive-or operation, an and operation, an addition, subtraction, multiplication, division, or other types of operation, or other existing operation manners may be adopted, which is not described herein, and only data processing needs to be completed, and the exclusive-or operation is preferably adopted in this embodiment.
Step 5230: and sequencing the loads needing to be started at the same time from large to small or from small to large according to the numerical values corresponding to the sequencing data information to form a starting priority.
In the process of not starting the load, the current load is the load with a large power and the actual condition of the load cannot be known, so that the corresponding priority is formed in a random mode, a sequence is ensured, and the function of starting the load one by one is realized conveniently according to the sequence.
In one embodiment, as shown in fig. 4, the nodes form a start priority according to the time of load start; the method for forming the starting priority is as follows:
step 5310: and acquiring time nodes corresponding to the related formed load starting information.
Step 5320: and forming corresponding starting priority according to the sequence of the time nodes corresponding to all the load starting information.
And recording corresponding time nodes at the moment of starting the load, so as to obtain the time nodes, and sequencing the time nodes according to the sequence of the time nodes, thereby forming corresponding starting priority.
As shown in fig. 5, the method for monitoring the voltage of the current power supply during the start-up of each load is as follows:
step 6100: and acquiring current voltage information of the current power supply, wherein the voltage information comprises voltage drop information.
In the process that the load is connected into the power supply, instantaneous voltage drop occurs, namely the voltage condition of the current power supply is detected, and corresponding voltage drop information is formed once the instantaneous voltage drop occurs.
Step 6200: and comparing the pressure drop value corresponding to the pressure drop information with the value corresponding to the preset pressure drop reference information.
Step 6300: if the pressure drop value corresponding to the pressure drop information is larger than or equal to the value corresponding to the pressure drop reference information; and stopping starting the load after the current load according to the starting priority.
The current voltage information of the current power supply is monitored, and once the voltage drop is too large, the situation that the current power supply cannot access more loads is shown, and if the voltage drop is too large, all the loads are possibly turned off.
The access of a common load is realized through a relay, the triode is required to be in a conducting state in the action and the holding process of the relay, the current required by the action of closing a contact of the relay is higher, and the current required by the holding process is lower than the current required by the action, but the current required by the action and the current required by the holding process are always kept the same in the existing control mode, so that more heat can be generated when the relay is in the holding state, the relay is easy to age, the service life of the relay is shortened, and the electric energy is wasted; as shown in fig. 6, the method for controlling the on/off of the electric control device is as follows:
step 7000: the action current is switched on according to the action current required by the current electric control device.
Among these, an electric control device is an electric appliance that generates a predetermined step change in a controlled amount in an electric output circuit when a change in an input amount (excitation amount) meets a predetermined requirement. It has an interactive relationship between a control system (also called an input loop) and a controlled system (also called an output loop). It is commonly used in automated control circuits, which are actually a "recloser" that uses low current to control high current operation. Therefore, the circuit plays the roles of automatic regulation, safety protection, circuit conversion and the like.
In this embodiment, the electric control device preferably used is a relay, and the action current of the relay is a current value that must be reached in the corresponding starting process of the current relay, otherwise, the magnetic force formed after the coil of the relay is turned on cannot complete the contact attracting function, so in the starting process, the corresponding action overcurrent needs to be accessed first to ensure that the contact of the relay can be closed, so that the power supply loop corresponding to the load is turned on.
Step 8000: keeping the action current for a preset action time period.
The action time period is the time interval from the moment of applying an input excitation specified value to the moment of switching the contact point of the relay in a release state in the action process of the relay under a specified condition; i.e. maintaining the corresponding time ensures that the present relay is in a closed state.
Step 9000: after the action time period passes, switching the accessed action current to a holding current required by the current electric control device; wherein the holding current is less than the operating current.
The current connected to the current control device is regulated in a relevant regulation and control mode, the current can be changed by connecting resistors with different resistance values at most basically, and the corresponding output current can be controlled by regulating the duty ratio.
In the present embodiment, it is preferable to adjust the duty ratio to adjust the current to be switched in, by adjusting the ratio of the on time and the off time of the power switch device to respond to the change of the input or output voltage. In this regard, common duty cycle control and current mode control are similar, both of which accomplish output regulation by adjusting the duty cycle. They differ in that the duty cycle can only be adjusted by conventional duty cycle control based on changes in the output voltage, whereas current mode control adjusts the duty cycle based on changes in the main (power) inductor current.
In the process of continuously accessing the load, the voltage is influenced, relevant pulse fluctuation is generated, the pulse fluctuation can cause correspondence, different pulse fluctuation corresponds to different states, the corresponding pulse fluctuation condition is distinguished according to the duration time of the pulse, and whether the corresponding holding current needs to be continuously accessed or not is analyzed according to the current condition so as to enable the current electric control device to be conducted; therefore, after the holding current required by the current electric control device is switched on, the voltage of the current power supply is monitored, as shown in fig. 7, the specific method is as follows:
step 9100: and acquiring current voltage information of the current power supply, wherein the voltage information comprises voltage pulse fluctuation information.
The current voltage information is a voltage value corresponding to the current power supply, and in the continuous detection process of the voltage value, if corresponding pulse fluctuation occurs, the pulse fluctuation is voltage pulse fluctuation information.
Step 9200: and judging whether the current voltage pulse fluctuation information appears.
In the process of continuously acquiring the current voltage information, judging whether the current voltage has corresponding pulse fluctuation or not, namely judging whether the current voltage pulse fluctuation information exists or not; when the corresponding current voltage pulse fluctuation information is acquired, the current voltage pulse fluctuation information can be stored in a corresponding database so as to be convenient for subsequent calling and analysis, and the current service life of the relay and some factors influencing the service life are judged.
Step 9300: and if the current voltage pulse fluctuation information exists, controlling whether to continuously access the holding current required by the current electric control device according to the duration of the current voltage pulse fluctuation information.
If the pulse fluctuation is less than the corresponding duration period, it is indicated that only some simple interferences are caused at the moment, namely voltage fluctuation generated in the process of accessing the load, so that the influence generated by the voltage fluctuation is avoided directly through related algorithm filtering, and if the pulse fluctuation is greater than the corresponding duration period, the power supply is dead at the moment, so that electric energy corresponding to so much load cannot be provided, and the current electric control device is directly turned off; the method for judging the duration of the current voltage pulse fluctuation information comprises the following steps:
step 9310: whether the duration of the current voltage pulse fluctuation information is longer than a preset duration period.
The corresponding voltage pulse fluctuation information has a duration, so that the duration corresponding to the current voltage pulse fluctuation information is judged, the duration period is preferably 100 microseconds-1 millisecond, and the duration period in the application can be a time value or a time range; in one embodiment, the duration period is a time value, and the time value can be any number between 100 microseconds and 1 millisecond, and 100 microseconds is preferably adopted in the application, namely the duration of the current voltage pulse fluctuation information is compared with 100 microseconds; in one embodiment, the duration period is a time range, the time range is 100 microseconds to 1 millisecond, and the duration of the current voltage pulse fluctuation information is preferably compared with 100 microseconds and 1 millisecond in the present application, that is, whether the duration of the current voltage pulse fluctuation information is less than 100 microseconds or not and whether the duration of the current voltage pulse fluctuation information is more than 1 millisecond or not are judged. In the examples of the application, a mode in which the duration period is one time range is preferably employed.
Step 9320: and if the duration of the current voltage pulse fluctuation information is less than the duration period, continuing to switch in the holding current required by the current electric control device.
And judging whether the duration of the current voltage pulse fluctuation information is less than 100 microseconds or not, if so, judging that the duration is less than 100 microseconds, and only the interference is carried out at the moment but not the situation that the power supply is not powered off, so that the holding current required by the current electric control device is continuously accessed. In addition, the method for continuing to switch on the holding current required by the current electric control device is as follows:
step 9321: and comparing the voltage value corresponding to the current voltage pulse fluctuation information with a preset fluctuation reference value.
Step 9322: if the voltage value corresponding to the current voltage pulse fluctuation information is smaller than the preset fluctuation reference value; and adjusting the current value corresponding to the current voltage pulse fluctuation information to a current value corresponding to a fluctuation reference value by adjusting the duty ratio of the PWM, and keeping the current value corresponding to the fluctuation reference value.
The preset fluctuation reference value is any number between 4V and 8V, and is preferably 5V in the embodiment; in the process of continuing to access the holding current, the current voltage pulse fluctuation information is detected, once the voltage value corresponding to the current voltage pulse fluctuation information is smaller than a preset fluctuation reference value, the interference influence on the current voltage pulse fluctuation information is larger, and in order to avoid the condition that the current electric control device is tripped, the duty ratio of PWM is regulated and controlled so that the current value can be stabilized at the current value corresponding to the fluctuation reference value, and the service life of the current electric control device is prevented from being influenced after the current electric control device is sent for multiple times of tripping.
Step 9330: if the duration of the current voltage pulse fluctuation information is longer than the duration period, stopping accessing the holding current required by the current electric control device to switch off the current electric control device; and sending corresponding feedback information to the current user.
If the pulse fluctuation is greater than the corresponding duration period, the power supply is dead, so that the electric energy corresponding to the load cannot be provided, and the current electric control device is directly turned off; after the power is turned off, information feedback is carried out on the current user to remind the current user of power replacement or maintenance, and the feedback information comprises sound feedback information and/or lamplight feedback information and/or short message feedback information and/or pop-up window feedback information; the feedback information can be realized in various forms, and can be adjusted according to actual conditions by adopting the combination of one or more feedback information; after the current electric control device is turned off, the specific method for detecting the current voltage information is as follows:
step 9331: and comparing the voltage value corresponding to the current voltage information with the preset voltage reference value.
Step 9332: and if the voltage value corresponding to the current voltage information is larger than the preset voltage reference value, switching in the action current according to the action current required by the current electric control device, and switching the accessed action current to the holding current required by the current electric control device after the action time period.
The preset voltage reference value is any number between 4V and 8V, and is preferably 5V in the embodiment; and continuing to monitor the current voltage information after the current voltage information is turned off, and once the voltage value corresponding to the current voltage information is larger than the preset voltage reference value, indicating that the current power supply can continue to supply power, so that the action current is switched in again, and the action current is switched to the holding current after an action time period, so that the processes of starting and keeping on of the current electric control device are completed.
If the pulse fluctuation is larger than the corresponding duration period, the voltage is reduced due to excessive load, and the power supply of excessive load cannot be borne; so during the process of stopping the holding current required by the present electric control device to turn off the present electric control device, it is possible to try to disconnect some of the loads in such a way that the power supply can supply power to the remaining loads, as follows:
step 9341: acquiring current rated power information corresponding to current equipment;
step 9342: forming a priority according to the numerical value of the current rated power information corresponding to the current equipment from big to small;
step 9343: and sequentially closing the current equipment according to the priority.
Embodiments of the present invention provide a computer-readable storage medium including instructions that, when loaded and executed by a processor, implement the methods of fig. 1-7. The individual steps described in the flow.
The computer-readable storage medium includes, for example: various media capable of storing program codes, such as a usb disk, a removable hard disk, a Read-Only Memory (ROM), a Random Access Memory (RAM), a magnetic disk, or an optical disk.
Based on the same inventive concept, embodiments of the present invention provide a control device, which includes a memory, a processor, and a program stored in the memory and executable on the processor, and the program can be loaded and executed by the processor to implement fig. 1 to 7. The multi-load start control method in the flow.
Based on the same inventive concept, embodiments of the present invention provide a relay, which includes a memory, a processor, and a program stored in the memory and executable on the processor, and the program can be loaded and executed by the processor to implement fig. 1 to 7. The multi-load start control method in the flow.
It will be clear to those skilled in the art that, for convenience and simplicity of description, the foregoing division of the functional modules is merely used as an example, and in practical applications, the above function distribution may be performed by different functional modules according to needs, that is, the internal structure of the device is divided into different functional modules to perform all or part of the above described functions. For the specific working processes of the system, the apparatus and the unit described above, reference may be made to the corresponding processes in the foregoing method embodiments, and details are not described here again.
In the several embodiments provided in the present application, it should be understood that the disclosed system, apparatus and method may be implemented in other manners. For example, the above-described apparatus embodiments are merely illustrative, and for example, the division of the modules or units is only one logical division, and there may be other divisions when actually implemented, for example, a plurality of units or components may be combined or may be integrated into another system, or some features may be omitted, or not executed. In addition, the shown or discussed mutual coupling or direct coupling or communication connection may be an indirect coupling or communication connection through some interfaces, devices or units, and may be in an electrical, mechanical or other form.
The units described as separate parts may or may not be physically separate, and parts displayed as units may or may not be physical units, may be located in one place, or may be distributed on a plurality of network units. Some or all of the units can be selected according to actual needs to achieve the purpose of the solution of the embodiment.
In addition, functional units in the embodiments of the present application may be integrated into one processing unit, or each unit may exist alone physically, or two or more units are integrated into one unit. The integrated unit can be realized in a form of hardware, and can also be realized in a form of a software functional unit.
The integrated unit, if implemented in the form of a software functional unit and sold or used as a stand-alone product, may be stored in a computer readable storage medium. Based on such understanding, the technical solution of the present application may be substantially implemented or contributed by the prior art, or all or part of the technical solution may be embodied in a software product, which is stored in a storage medium and includes instructions for causing a computer device (which may be a personal computer, a server, a network device, or the like) or a processor (processor) to execute all or part of the steps of the method according to the embodiments of the present application. And the aforementioned storage medium includes: u disk, removable hard disk, read only memory, random access memory, magnetic or optical disk, etc. for storing program codes.
The above embodiments are only used to describe the technical solutions of the present application in detail, but the above embodiments are only used to help understanding the method and the core idea of the present invention, and should not be construed as limiting the present invention. Those skilled in the art should also appreciate that they can easily conceive of various changes and substitutions within the technical scope of the present disclosure.

Claims (8)

1. A multi-load starting control method is characterized by comprising the following steps:
acquiring current behavior information of a current user, wherein the behavior information comprises load starting information;
judging whether at least two pieces of load starting information are acquired or not according to all the acquired load starting information; if at least two pieces of load starting information are acquired, current starting trigger information is formed;
searching current instruction information corresponding to the current starting trigger information from a preset corresponding relation between the starting trigger information and the instruction information; the instruction information comprises starting execution information corresponding to the starting trigger information;
forming a starting priority for the related loads which need to be started at the same time according to the current starting execution information, and sequentially spacing a preset interval period according to the starting priority to start the related loads;
loads needing to be started at the same time are subjected to a random algorithm to form a starting priority;
the method for randomly forming the starting priority is as follows:
acquiring current voltage information and current frequency information when a current load is accessed;
performing logical operation on a numerical value corresponding to the current voltage information and a numerical value corresponding to the current frequency information to form sequencing data information;
and sequencing the loads needing to be started at the same time from large to small or from small to large according to the numerical values corresponding to the sequencing data information to form a starting priority.
2. The multi-load start-up control method according to claim 1, wherein the judgment method of the loads required to start up at the same time is as follows:
acquiring time nodes corresponding to relevant formed load starting information;
taking a time node corresponding to the first formed load starting information as an initial time node, and judging whether the time node corresponding to the rest load starting information is in a preset time period or not according to the initial time node;
if the load is in the preset time period, the load belongs to the load started at the same time.
3. The multi-load start-up control method according to claim 1, wherein: the method for monitoring the voltage of the current power supply in the starting process of each load is as follows:
acquiring current voltage information of a current power supply, wherein the voltage information comprises voltage drop information;
comparing the pressure drop value corresponding to the pressure drop information with a value corresponding to preset pressure drop reference information;
if the pressure drop value corresponding to the pressure drop information is larger than or equal to the value corresponding to the pressure drop reference information; and stopping starting the load after the current load according to the starting priority.
4. A multiple load start-up control method according to any one of claims 1 to 3, characterized in that the method of on-off control of the electric control device is as follows:
switching in the action current according to the action current required by the current electric control device;
keeping the action current for a preset action time period;
after the action time period passes, switching the accessed action current to a holding current required by the current electric control device; wherein the holding current is less than the action current.
5. The multi-load start-up control method according to claim 4, wherein: after the holding current required by the current electric control device is switched on, the voltage of the current power supply is monitored, and the specific method comprises the following steps:
acquiring current voltage information of a current power supply, wherein the voltage information comprises voltage pulse fluctuation information;
judging whether current voltage pulse fluctuation information appears or not;
if the current voltage pulse fluctuation information exists, controlling whether to continuously access the holding current required by the current electric control device according to the duration of the current voltage pulse fluctuation information;
whether the duration of the current voltage pulse fluctuation information is longer than a preset duration period or not;
if the duration of the current voltage pulse fluctuation information is less than the duration period, continuing to access the holding current required by the current electric control device;
and if the duration of the current voltage pulse fluctuation information is longer than the duration period, stopping switching in the holding current required by the current electric control device to switch off the current electric control device.
6. A computer-readable storage medium, comprising a program which is loadable by a processor and which, when executed, implements the multi-load startup control method of any of claims 1 to 5.
7. A control apparatus comprising a memory, a processor and a program stored on the memory and executable on the processor, the program being capable of being loaded and executed by the processor to implement a multi-load startup control method as claimed in any one of claims 1 to 5.
8. A kind of relay, its characteristic is: comprising a memory, a processor and a program stored on said memory and executable on said processor, which program is capable of being loaded and executed by the processor to implement the multi-load startup control method according to any of claims 1 to 5.
CN201910518609.0A 2019-06-15 2019-06-15 Multi-load start control method, storage medium, control device and relay Active CN110412894B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910518609.0A CN110412894B (en) 2019-06-15 2019-06-15 Multi-load start control method, storage medium, control device and relay

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910518609.0A CN110412894B (en) 2019-06-15 2019-06-15 Multi-load start control method, storage medium, control device and relay

Publications (2)

Publication Number Publication Date
CN110412894A CN110412894A (en) 2019-11-05
CN110412894B true CN110412894B (en) 2021-02-19

Family

ID=68359140

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910518609.0A Active CN110412894B (en) 2019-06-15 2019-06-15 Multi-load start control method, storage medium, control device and relay

Country Status (1)

Country Link
CN (1) CN110412894B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113162585B (en) * 2021-04-02 2023-02-17 浙江清华柔性电子技术研究院 Pulse control method and device and electronic equipment
CN113391689A (en) * 2021-05-20 2021-09-14 浙江大华技术股份有限公司 Hard disk electrifying method and device, electronic device and storage medium

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107147091A (en) * 2017-06-12 2017-09-08 中国神华能源股份有限公司 Method, apparatus and system for triggering fast cut back
CN107548142A (en) * 2017-07-31 2018-01-05 努比亚技术有限公司 A kind of electricity-saving control method, terminal and computer-readable recording medium
CN108377023A (en) * 2018-05-14 2018-08-07 深圳市华思旭科技有限公司 Startup power supply
CN109522054A (en) * 2018-10-31 2019-03-26 漳州科华技术有限责任公司 Consumption of data center equipment scheduling method and device

Family Cites Families (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100440999B1 (en) * 2001-11-08 2004-07-21 삼성전자주식회사 Starting control apparatus for home automation and therof method
JP4201050B2 (en) * 2006-10-11 2008-12-24 トヨタ自動車株式会社 Electric load control device, electric load control method, electric load control device, and electric load control method
CN101599660B (en) * 2008-06-06 2011-05-18 海洋王照明科技股份有限公司 Method and system for randomly switching alternating current
CN102163518B (en) * 2011-04-12 2013-11-06 上海沪工汽车电器有限公司 Control circuit of relay coil of electric vehicle
JP5766097B2 (en) * 2011-11-15 2015-08-19 京セラ株式会社 Power conditioner, control method for power conditioner, and power conditioner system
CN103425172B (en) * 2012-05-16 2015-08-19 深圳市金正方科技股份有限公司 A kind of method and system controlling consumer electricity consumption order
CN103606486B (en) * 2013-11-21 2015-04-22 宁波市鄞州华谦电子有限公司 Relay drive circuit, relay and control method of relay drive circuit
CN106839574A (en) * 2017-01-22 2017-06-13 合肥华凌股份有限公司 Household electrical appliance and its load start control method
CN107192103A (en) * 2017-05-23 2017-09-22 重庆美的通用制冷设备有限公司 Air-conditioning system, air-conditioner set and its oil return control system and method for controlling oil return
CN108400587B (en) * 2018-03-05 2020-07-28 中国商用飞机有限责任公司北京民用飞机技术研究中心 Load management method and system for civil aircraft multi-power system

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107147091A (en) * 2017-06-12 2017-09-08 中国神华能源股份有限公司 Method, apparatus and system for triggering fast cut back
CN107548142A (en) * 2017-07-31 2018-01-05 努比亚技术有限公司 A kind of electricity-saving control method, terminal and computer-readable recording medium
CN108377023A (en) * 2018-05-14 2018-08-07 深圳市华思旭科技有限公司 Startup power supply
CN109522054A (en) * 2018-10-31 2019-03-26 漳州科华技术有限责任公司 Consumption of data center equipment scheduling method and device

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
馈能式电子负载控制系统及负载模型库的设计与研究;程华伟;《中国优秀硕士学位论文全文数据库工程科技Ⅱ辑》;20140115(第1期);C042-140 *

Also Published As

Publication number Publication date
CN110412894A (en) 2019-11-05

Similar Documents

Publication Publication Date Title
CN110412894B (en) Multi-load start control method, storage medium, control device and relay
CN105929923B (en) A kind of management method and device of power
CN105912090A (en) Dynamic power capping of a subset of servers when a power consumption threshold is reached and allotting an amount of discretionary power to the servers that have power capping enabled
CN106642727B (en) Electric water heater preheating method and device
CN102362259B (en) System and method for altering a user interface of a power device
CN107526633A (en) Energy-saving control method, device, energy conserving system and the storage medium of electrical equipment
CN104484025A (en) Power-on control system and method for equipment cluster
CN106155797B (en) Terminal equipment and switching method of performance modes thereof
CN109932592A (en) The method and apparatus that failure for power equipment determines
JP6465106B2 (en) TEACHER DATA GENERATION DEVICE, ELECTRIC DEVICE MONITORING SYSTEM, TEACHER DATA GENERATION METHOD, AND PROGRAM
CN110286620B (en) On-off control method of electric control device, storage medium, control device and relay
CN110737322A (en) Information processing method and electronic equipment
CN113784271A (en) High-temperature protection method and system for sound equipment
US20150192944A1 (en) Power Socket and Method for Monitoring Appliance Event of Load
CN107391324B (en) Test control device and method of storage system
CN106546906B (en) Method and device for testing integrity of power supply
KR20200061200A (en) Operation apparatus for substation and the control method thereof
EP0660486A1 (en) Improvement in an electric load management arrangement
CN108631438A (en) A kind of intelligent power control method and its intelligent power, cloud computing center based on cloud computing
CN114120491A (en) Door lock control method and device, intelligent door lock and storage medium
CN117353190B (en) Intelligent power distribution method and system for inflatable cabinet
CN109932594A (en) The method and apparatus of fault detection for power equipment
CN117471928B (en) Intelligent household electricity monitoring method and system
EP4160846A1 (en) Device and method for avoidance of undesired oscillations in an electrical grid
CN112684331B (en) Method, device and equipment for monitoring service life of contactor and storage medium

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant