CN110409913A - Building site hoarding - Google Patents
Building site hoarding Download PDFInfo
- Publication number
- CN110409913A CN110409913A CN201910536769.8A CN201910536769A CN110409913A CN 110409913 A CN110409913 A CN 110409913A CN 201910536769 A CN201910536769 A CN 201910536769A CN 110409913 A CN110409913 A CN 110409913A
- Authority
- CN
- China
- Prior art keywords
- locating rod
- bottom plate
- building site
- partition
- site hoarding
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H17/00—Fencing, e.g. fences, enclosures, corrals
- E04H17/14—Fences constructed of rigid elements, e.g. with additional wire fillings or with posts
- E04H17/16—Fences constructed of rigid elements, e.g. with additional wire fillings or with posts using prefabricated panel-like elements, e.g. wired frames
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H17/00—Fencing, e.g. fences, enclosures, corrals
- E04H17/14—Fences constructed of rigid elements, e.g. with additional wire fillings or with posts
- E04H17/16—Fences constructed of rigid elements, e.g. with additional wire fillings or with posts using prefabricated panel-like elements, e.g. wired frames
- E04H17/168—Fences constructed of rigid elements, e.g. with additional wire fillings or with posts using prefabricated panel-like elements, e.g. wired frames using panels fitted in grooves of posts
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H17/00—Fencing, e.g. fences, enclosures, corrals
- E04H17/14—Fences constructed of rigid elements, e.g. with additional wire fillings or with posts
- E04H17/20—Posts therefor
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H17/00—Fencing, e.g. fences, enclosures, corrals
- E04H17/14—Fences constructed of rigid elements, e.g. with additional wire fillings or with posts
- E04H17/20—Posts therefor
- E04H17/22—Anchoring means therefor, e.g. specially-shaped parts entering the ground; Struts or the like
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Fencing (AREA)
Abstract
The present invention provides a kind of building site hoardings, belong to field of mechanical technique.It is poor that it solves the problems, such as the prior art there is stability.This building site hoarding includes pedestal, bottom plate and partition, the quantity of above-mentioned pedestal is two and two pedestals are connected at bottom plate both ends, the quantity of aforementioned barriers is that several and several partition lower ends are both connected to bottom plate top, and several partitions are uniformly disposed adjacent along the length direction of bottom plate.This building site hoarding stability is high.
Description
Technical field
The invention belongs to field of mechanical technique, are related to a kind of building site hoarding.
Background technique
According to " construction safety check criteria JGJ59-99 ", building temporary construction occasion must be provided with hoarding.
Construction site is set to carry out closed management, the resignation system of marching into the arena of strict implement nonnative personnel by hoarding.
Existing hoarding generallys use color steel tile or corresponding fence.As can be seen that when the setting of above-mentioned hoarding
It needs to be fixed in bottom surface by fastener, loads and unloads cumbersome and time-consuming and laborious.
Summary of the invention
It is high the purpose of the present invention is in view of the above-mentioned problems existing in the prior art, providing a kind of easy to loading and unloading and stability
Building site hoarding.
Object of the invention can be realized by the following technical scheme:
A kind of building site hoarding, which is characterized in that including pedestal, bottom plate and partition, the quantity of above-mentioned pedestal is two
And two pedestals are connected at bottom plate both ends, the quantity of aforementioned barriers is that several and several partition lower ends are both connected to bottom
Plate top, several partitions are uniformly disposed adjacent along the length direction of bottom plate.
This building site hoarding is creative to be supported bottom plate by two pedestals, and such structure is avoided that bottom plate
Directly contacted with bottom surface.The pedestal material relatively high using corrosion resistance, such as concrete material.Bottom plate is relatively high using intensity
Metal material.
Several partitions are connected on bottom plate along what the length direction of bottom plate was uniformly disposed adjacent, ultimately form hoarding.
As can be seen that during installation, two pedestals being connected to bottom plate both ends, are then connected to partition on bottom plate i.e.
Can, it is easy to loading and unloading.
Certainly, as soon as bottom plate, two pedestals and several partitions form fence unit, several fence units, which are disposed adjacent, to incite somebody to action
Construction operation occasion fully encases.
In above-mentioned building site hoarding, the partition is foam battenboard.
The separator of this material is light, and enclosure wall can be made easy to loading and unloading laborsaving.Moreover, the partition cost of this material also compares
It is lower.
In above-mentioned building site hoarding, the pedestal top has recessed positioning recess, the both ends of above-mentioned bottom plate
Respectively at the positioning recess of corresponding pedestal.
Positioning recess cooperation on bottom plate and pedestal can make being connected on pedestal of base slab stability.
In above-mentioned building site hoarding, several partitions or so are disposed adjacent and the height of each partition is identical.
It further include section C-shaped locating rod one and locating rod two, above-mentioned locating rod in above-mentioned building site hoarding
One end of one connecting bottom board, above-mentioned locating rod two are connected to the other end of bottom plate, and the septum border in the leftmost side is embedded in positioning
The C-shaped indent of bar one, the septum border in the rightmost side are embedded in the C-shaped indent of locating rod two.
It further include the C-shaped locating rod three in section, the upper end of several partitions is embedded in above-mentioned building site hoarding
The C-shaped indent of locating rod three.
In above-mentioned building site hoarding, the locating rod one, locating rod two and locating rod three are metal material.
In above-mentioned building site hoarding, the locating rod one and bottom end are connected by fastener.
In above-mentioned building site hoarding, the locating rod two and bottom end are connected by fastener.
Since locating rod one and bottom plate are fixed together by fastener, what locating rod one can be stable be coated on every
Plate edge.Similarly, it is fixed together due to locating rod two and bottom plate by fastener, the packet that locating rod two can be stable
It overlays at septum border.
Several partitions or so arranged adjacent forms a wall, and the left and right sides of wall is respectively by locating rod one and locating rod two
Cladding, the upside of wall is coated by locating rod three, can effectively increase the intensity of entire hoarding edge in this way, its can be made resistance to
By external force appropriate.
In above-mentioned building site hoarding, the bottom plate top has recessed locating slot along its length, above-mentioned
Partition lower end is at locating slot.
It can make wall lower end is stable to be connected on bottom plate under the action of locating slot.
Compared with prior art, this building site hoarding due to partition be foam battenboard, entire enclosure wall weight,
It is convenient that it is loaded and unloaded.
Meanwhile being avoided that bottom plate is directly contacted with bottom surface under the action of pedestal, it is avoided that bottom plate is corroded, suitably mentions
Its high stability.
In addition, since the both ends of bottom plate are connected on corresponding pedestal, it is simple and compact for structure, there is very high reality
With value.
Detailed description of the invention
Fig. 1 is the schematic view of the front view of this building site hoarding.
Fig. 2 is the side structure schematic view of this building site hoarding.
In figure, 1, pedestal;1a, positioning recess;2, bottom plate;2a, locating slot;3, partition;4, locating rod one;5, locating rod
Two;6, locating rod three.
Specific embodiment
As depicted in figs. 1 and 2, this building site hoarding includes pedestal 1, bottom plate 2 and partition 3, and the quantity of above-mentioned pedestal 1 is
Two and two pedestals 1 are connected at 2 both ends of bottom plate, and the quantity of aforementioned barriers 3 is that several and 3 lower end of several partitions are equal
It is connected to 2 top of bottom plate, several partitions 3 are uniformly disposed adjacent along the length direction of bottom plate 2.
The partition 3 is foam battenboard.
1 top of pedestal has recessed positioning recess 1a, and the both ends of above-mentioned bottom plate 2 are embedded in corresponding pedestal 1 respectively
At positioning recess 1a.
Several partitions 3 or so are disposed adjacent and the height of each partition 3 is identical.
It further include section C-shaped locating rod 1 and locating rod 25, one end of above-mentioned one 4 connecting bottom board 2 of locating rod, on
The other end that locating rod 25 is connected to bottom plate 2 is stated, 3 edge of partition in the leftmost side is embedded in the C-shaped indent of locating rod 1,
3 edge of partition in the rightmost side is embedded in the C-shaped indent of locating rod 25.
It further include the C-shaped locating rod 36 in section, the upper end of several partitions 3 is embedded in the C-shaped indent of locating rod 36.
The locating rod 1, locating rod 25 and locating rod 36 are metal material.
The locating rod 1 is connected with 2 end of bottom plate by fastener.
The locating rod 25 is connected with 2 end of bottom plate by fastener.
2 top of bottom plate has recessed locating slot 2a along its length, and 3 lower end of aforementioned barriers is embedded in locating slot 2a
Place.
This building site hoarding is creative to be supported bottom plate by two pedestals, and such structure is avoided that bottom plate
Directly contacted with bottom surface.The pedestal material relatively high using corrosion resistance, such as concrete material.Bottom plate is relatively high using intensity
Metal material.
Several partitions are connected at the locating slot of bottom plate along what the length direction of bottom plate was uniformly disposed adjacent.
Since locating rod one and bottom plate are fixed together by fastener, what locating rod one can be stable be coated on every
Plate edge.Similarly, it is fixed together due to locating rod two and bottom plate by fastener, the packet that locating rod two can be stable
It overlays at septum border.
Several partitions or so arranged adjacent forms a wall, and the left and right sides of wall is respectively by locating rod one and locating rod two
Cladding, the upside of wall is coated by locating rod three, can effectively increase the intensity of entire hoarding edge in this way, its can be made resistance to
By external force appropriate.
During installation, two pedestals are connected to bottom plate both ends, partition is then connected to bottom plate, finally connects locating rod
One, locating rod two and locating rod three, it is easy to loading and unloading.
Certainly, locating rod one, locating rod two, locating rod three, bottom plate, two pedestals and several partitions form an enclosure wall list
Member, several fence units, which are disposed adjacent, to fully encase construction operation occasion.
Claims (10)
1. a kind of building site hoarding, which is characterized in that including pedestal, bottom plate and partition, the quantity of above-mentioned pedestal be two and
Two pedestals are connected at bottom plate both ends, and the quantity of aforementioned barriers is that several and several partition lower ends are both connected to bottom plate
Top, several partitions are uniformly disposed adjacent along the length direction of bottom plate.
2. building site hoarding according to claim 1, which is characterized in that the partition is foam battenboard.
3. building site hoarding according to claim 2, which is characterized in that the pedestal top has recessed positioning recessed
Mouthful, the both ends of above-mentioned bottom plate are embedded in respectively at the positioning recess of corresponding pedestal.
4. building site hoarding according to claim 3, which is characterized in that several partitions or so be disposed adjacent and each every
The height of plate is identical.
5. building site hoarding according to claim 4, which is characterized in that further include C-shaped one He of locating rod in section
Locating rod two, one end of above-mentioned one connecting bottom board of locating rod, above-mentioned locating rod two are connected to the other end of bottom plate, are in the leftmost side
Septum border be embedded in locating rod one C-shaped indent, the septum border in the rightmost side be embedded in locating rod two C-shaped recess
Place.
6. building site hoarding according to claim 5, which is characterized in that it further include the C-shaped locating rod three in section, if
The upper end of dry partition is embedded in the C-shaped indent of locating rod three.
7. building site hoarding according to claim 6, which is characterized in that the locating rod one, locating rod two and positioning
Bar three is metal material.
8. building site hoarding according to claim 7, which is characterized in that the locating rod one passes through tight with bottom end
Firmware is connected.
9. building site hoarding according to claim 8, which is characterized in that the locating rod two passes through tight with bottom end
Firmware is connected.
10. building site hoarding according to claim 9, which is characterized in that the bottom plate top has along its length
There is recessed locating slot, aforementioned barriers lower end is at locating slot.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910536769.8A CN110409913A (en) | 2019-06-20 | 2019-06-20 | Building site hoarding |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910536769.8A CN110409913A (en) | 2019-06-20 | 2019-06-20 | Building site hoarding |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110409913A true CN110409913A (en) | 2019-11-05 |
Family
ID=68359396
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910536769.8A Pending CN110409913A (en) | 2019-06-20 | 2019-06-20 | Building site hoarding |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110409913A (en) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201486215U (en) * | 2008-08-22 | 2010-05-26 | 史金生 | Light and safe fencing wall for construction site |
CN201605858U (en) * | 2010-03-25 | 2010-10-13 | 中十冶集团有限公司 | Easy assembly and disassembly road construction fence |
CN203066607U (en) * | 2013-01-26 | 2013-07-17 | 宋家志 | Novel hoarding |
CN204186142U (en) * | 2014-11-03 | 2015-03-04 | 中建七局(上海)有限公司 | A kind of fixed bearing building enclosing |
CN204492336U (en) * | 2015-03-18 | 2015-07-22 | 熊承勇 | A kind of combined type fencing for building |
CN207211962U (en) * | 2017-09-21 | 2018-04-10 | 昆山市鹿通交通安全设施有限公司 | A kind of enclosing |
-
2019
- 2019-06-20 CN CN201910536769.8A patent/CN110409913A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201486215U (en) * | 2008-08-22 | 2010-05-26 | 史金生 | Light and safe fencing wall for construction site |
CN201605858U (en) * | 2010-03-25 | 2010-10-13 | 中十冶集团有限公司 | Easy assembly and disassembly road construction fence |
CN203066607U (en) * | 2013-01-26 | 2013-07-17 | 宋家志 | Novel hoarding |
CN204186142U (en) * | 2014-11-03 | 2015-03-04 | 中建七局(上海)有限公司 | A kind of fixed bearing building enclosing |
CN204492336U (en) * | 2015-03-18 | 2015-07-22 | 熊承勇 | A kind of combined type fencing for building |
CN207211962U (en) * | 2017-09-21 | 2018-04-10 | 昆山市鹿通交通安全设施有限公司 | A kind of enclosing |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110409913A (en) | Building site hoarding | |
US20170328061A1 (en) | Deck panel for construction | |
CN103696491A (en) | Novel mounting structure of building and house using mounting structure | |
CN104695605A (en) | Assembling type die of rib floor | |
CN110656701B (en) | Assembled steel construction building | |
CN205224294U (en) | Seam component is drawn to vertical structure | |
CN210342227U (en) | Novel assembly type building frame | |
KR200439291Y1 (en) | Joint member for joining wall form and slab form | |
CN104452967A (en) | Ecological wooden house system | |
CN108951983A (en) | Steel bar truss floor support plate and combination floor support plate | |
CN205476249U (en) | Quick detachable portable wall | |
CN208844908U (en) | A kind of spliced aluminum alloy pattern plate | |
CN210636660U (en) | Bottom die assembly structure based on steel bar truss floor support plate | |
CN113494133A (en) | Movable reusable steel-concrete composite structure | |
CN209339377U (en) | A kind of installation fixed structure of building wall board | |
CN204258089U (en) | A kind of power distribution cabinet assembly being easy to locate based on square and arc splice plate | |
CN204243544U (en) | A kind of power distribution cabinet assembly being easy to locate based on fan-shaped splice plate | |
CN204258060U (en) | A kind of based on the power distribution cabinet assembly being easy to locate that is square and triangle splice plate | |
CN112252648A (en) | Assembled inorganic matter mineral board leveling mounting structure | |
CN214995106U (en) | Closed floor support plate with detachable structure | |
CN204243542U (en) | A kind of power distribution cabinet assembly being easy to locate based on square and arc splice plate | |
CN204243543U (en) | A kind of power distribution cabinet assembly being easy to locate based on triangle splice plate | |
CN204243547U (en) | A kind of based on square and power distribution cabinet assembly that is triangle splice plate | |
CN204258088U (en) | A kind of power distribution cabinet assembly based on square and fan-shaped splice plate | |
CN219431129U (en) | Hollow sandwich plate convenient to connect for civil engineering |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20191105 |