CN110400080A - Examination data monitoring method, device, computer equipment and storage medium - Google Patents

Examination data monitoring method, device, computer equipment and storage medium Download PDF

Info

Publication number
CN110400080A
CN110400080A CN201910683706.5A CN201910683706A CN110400080A CN 110400080 A CN110400080 A CN 110400080A CN 201910683706 A CN201910683706 A CN 201910683706A CN 110400080 A CN110400080 A CN 110400080A
Authority
CN
China
Prior art keywords
examination
target
target assessment
assessment
data
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910683706.5A
Other languages
Chinese (zh)
Inventor
王彦
阮卫挺
瞿连飞
梁新荣
纪振儒
柳庄园
毛康
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Dasou Vehicle Software Technology Co Ltd
Original Assignee
Zhejiang Dasou Vehicle Software Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Dasou Vehicle Software Technology Co Ltd filed Critical Zhejiang Dasou Vehicle Software Technology Co Ltd
Priority to CN201910683706.5A priority Critical patent/CN110400080A/en
Publication of CN110400080A publication Critical patent/CN110400080A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/90Details of database functions independent of the retrieved data types
    • G06F16/95Retrieval from the web
    • G06F16/951Indexing; Web crawling techniques
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • G06Q10/06393Score-carding, benchmarking or key performance indicator [KPI] analysis

Abstract

This application involves a kind of examination data monitoring method, device, computer equipment and storage mediums.Method includes: to obtain user list to be examined, and reads user identifier to be examined from wait examine in user list;The corresponding target monitoring information of user identifier to be examined is searched, target network address and target assessment index in target monitoring information are obtained;The corresponding target assessment achievement data of target assessment index is obtained from the corresponding targeted website of target network address;The target assessment risk parameter that the objectives performance assessment criteria is calculated according to performance assessment criteria data generates examination monitoring table according to examination risk parameter;Examination monitoring table is pushed into the corresponding user terminal of examination user identifier.User's artificial enquiry target assessment achievement data to be examined is not necessarily to using this method, realize the purpose being monitored automatically to target assessment achievement data according to user demand to be examined with analysis, user can obtain effectively examining monitoring table in time, to improve the acquisition efficiency of target assessment achievement data.

Description

Examination data monitoring method, device, computer equipment and storage medium
Technical field
This application involves field of computer technology, set more particularly to a kind of examination data monitoring method, device, computer Standby and storage medium.
Background technique
With flourishing for computer technology and Internet technology, daily life is more and more transferred to On line.There are a large amount of data to be handled and interacted on computers daily.In order to guarantee that the processing of data can be normal Operation, needs to be monitored data, such as: the data on website are monitored in network connection environment, are tieed up in website Online number is monitored during shield etc..
Such as some car category websites not only need to push a large amount of articles in relation to automobile for user, while can also be to entering The car dealer stayed carries out examination assessment to determine ranking of the car dealer on website.
Currently, the website of car category has multiple examination evaluation indexes to the car dealer entered, and different Evaluation index data are examined to show that, in different positions, car dealer needs to obtain corresponding examination evaluation index data The different location of car website is gone to check.
In the conventional technology, the examination evaluation index data by artificial enquiry car dealer on car website exist Data acquisition inefficiency, obtain information not in time the technical issues of.
Summary of the invention
Based on this, it is necessary in view of the above technical problems, provide a kind of examination data that can be improved data acquisition efficiency Monitoring method, device, computer equipment and storage medium.
A kind of examination data monitoring method, which comprises user list to be examined is obtained, from the user to be examined User identifier to be examined is read in list;The corresponding target monitoring information of the user identifier to be examined is searched, the mesh is obtained Mark the target network address and target assessment index in monitoring information;The target is obtained from the corresponding targeted website of the target network address The corresponding target assessment achievement data of performance assessment criteria;Every target assessment is calculated according to the target assessment achievement data The target assessment risk parameter of index generates examination monitoring table according to the target assessment risk parameter;The examination is monitored Table pushes to the corresponding user terminal of the examination user identifier.
It is described in one of the embodiments, to obtain wait examine before user list, further includes: to receive user terminal and send Monitoring demand data, the mark that Adds User, newly-increased account information and newly-increased monitoring are extracted from the monitoring demand data and is believed Breath;The mark that Adds User is added to described wait examine in user list;By the newly-increased account information, the newly-increased prison Control information and the mark that Adds User are associated binding.
It is described in one of the embodiments, to refer to from the target network address corresponding targeted website acquisition target assessment Mark corresponding target assessment achievement data, comprising: search the corresponding account information to be examined of the user identifier to be examined, obtain The user account and user password wait examine in account information;Institute is logged according to the user account and the user password State targeted website;When successfully logging in the targeted website, the target assessment index is periodically obtained from the targeted website Corresponding target assessment achievement data stores the target assessment achievement data to examination data library.
It is described in one of the embodiments, that every target assessment is calculated according to the target assessment achievement data The target assessment risk parameter of index generates examination monitoring table according to the target assessment risk parameter, comprising: default when reaching When detection time, examined from target of every target assessment index within the default monitoring period is obtained in the examination data library Core achievement data extracts target assessment risk parameter from the target assessment achievement data;Every target is obtained to examine The examination risk parameter is compared by the target assessment value of core index with the corresponding target assessment value;It is examined when described When core risk parameter is not consistent with the target assessment value, the target assessment is generated according to the target assessment risk parameter and is referred to Target examines early warning;
Examination monitoring table is generated according to the target assessment risk parameter and the examination early warning.
It is described in one of the embodiments, to be generated according to the target assessment risk parameter and the examination early warning Examination monitoring table, comprising: by the target assessment risk parameter of every target assessment index, input respectively corresponding pre- If risk evaluation model obtains examination risk score;According to the target assessment risk score of every target assessment index The risk integrative score of user to be examined is obtained, and corresponding examination risk class is obtained according to the risk integrative score;Root It is examined according to the generation of target assessment risk parameter, the examination early warning, the examination risk score and the examination risk class Core monitors table.
In one of the embodiments, the method also includes: from the target assessment achievement data extract target Examine risk parameter;The target assessment value for obtaining every target assessment index, by the target assessment risk parameter with it is right The target assessment value answered is compared;When the target assessment risk parameter is not consistent with the target assessment value, root The examination early warning of the target assessment index is generated according to the examination risk parameter;The examination early warning is pushed to The corresponding user terminal of the examination user identifier.
In one of the embodiments, the method also includes: when receive user terminal transmission real time monitoring instruction When, the corresponding current performance assessment criteria of the target assessment index is obtained from the targeted website according to real time monitoring instruction Data;According to the current performance assessment criteria data to the performance assessment criteria of the target assessment index every in the examination data library Data are updated, and extract examination risk parameter from the updated performance assessment criteria data;Obtain every target The examination risk parameter is compared by the target assessment value of performance assessment criteria with the corresponding target assessment value;When described When examination risk parameter is not consistent with the target assessment value, the target assessment index is generated according to the examination risk parameter Examination early warning;Real time monitoring table is generated according to the examination risk parameter and the examination early warning, by the reality When monitoring table push to the corresponding user terminal of the examination user identifier.
A kind of examination data monitoring device, described device include: User profile acquisition module, for obtaining user to be examined List reads user identifier to be examined wait examine in user list from described;Searching module, for searching the examination user mark Know corresponding target monitoring information, obtains target network address and target assessment index in the target monitoring information;Data acquisition Module, for obtaining the corresponding target assessment achievement data of the target assessment index from the corresponding website of the target network address; Computing module, for calculating the target assessment risk of every target assessment index according to the target assessment achievement data Parameter generates examination monitoring table according to the target assessment risk parameter;Pushing module, for pushing examination monitoring table To the corresponding user terminal of the examination user identifier.
Described device in one of the embodiments, further include: newly-added information extraction module, it is whole for receiving the user The monitoring demand data sent is held, the mark that Adds User, newly-increased account information are extracted from the monitoring demand data and is increased newly Monitoring information;User list update module, it is described wait examine in user list for the mark that Adds User to be added to;It closes Join binding module, for the newly-increased account information, the newly-increased monitoring information and the mark that Adds User to be associated Binding.
The data acquisition module includes: account information acquiring unit in one of the embodiments, described for searching The corresponding account information to be examined of user identifier to be examined, obtains the user account wait examine in account information and user is close Code;Website log unit, for logging in the targeted website according to the user account and the user password;Achievement data is deposited Storage unit, for periodically obtaining the target assessment index from the targeted website when successfully logging in the targeted website Corresponding target assessment achievement data stores the target assessment achievement data to examination data library.
The computing module includes: risk parameter extraction unit in one of the embodiments, for when the default inspection of arrival When surveying the time, from every target assessment index is obtained in the examination data library in the default target assessment monitored in the period Achievement data extracts target assessment risk parameter from the target assessment achievement data;Comparing unit, for obtaining items The target assessment value of the target assessment index carries out the target assessment risk parameter with the corresponding target assessment value Compare;Generation unit is prompted, for when the target assessment risk parameter is not consistent with the target assessment value, according to described Target assessment risk parameter generates the examination early warning of the target assessment index;Table generation unit is monitored, for according to institute It states examination risk parameter and the examination early warning generates examination monitoring table.
The monitoring table generation unit includes: score computation subunit in one of the embodiments, is used for every institute The target assessment risk parameter for stating target assessment index inputs corresponding default risk evaluation model respectively and obtains examination wind Dangerous score;Risk class computation subunit, for the target assessment risk score according to every target assessment index, The risk integrative score of user to be examined is obtained, and corresponding examination risk class is obtained according to the risk integrative score;Prison It controls table and generates subelement, for according to the target assessment risk parameter, the examination early warning, the examination risk score Examination monitoring table is generated with the examination risk class.
Described device in one of the embodiments, further include: the first parameter extraction module is used for from the target assessment Target assessment risk parameter is extracted in achievement data;First comparison module, for obtaining every target assessment index The target assessment risk parameter is compared by target assessment value with the corresponding target assessment value;First cue module, For generating institute according to the examination risk parameter when the target assessment risk parameter is not consistent with the target assessment value State the examination early warning of target assessment index;First prompt pushing module, for the examination early warning to be pushed to institute State the corresponding user terminal of examination user identifier.
Described device in one of the embodiments, further include: achievement data obtains module, for whole when receiving user When the real time monitoring instruction that end is sent, the target assessment is obtained from the targeted website according to real time monitoring instruction and is referred to Mark corresponding current performance assessment criteria data;Second parameter extraction module is used for according to the current performance assessment criteria data, to described The performance assessment criteria data of every target assessment index are updated in examination data library, from the updated target assessment Target assessment risk parameter is extracted in achievement data;Second comparison module, for obtaining every target assessment index The target assessment risk parameter is compared by target assessment value with the corresponding target assessment value;Second cue module, For being given birth to according to the target assessment risk parameter when the target assessment risk parameter is not consistent with the target assessment value At the examination early warning of the target assessment index;Second prompt pushing module, according to the target assessment risk parameter and The examination early warning generates real time monitoring table, and the real time monitoring table is pushed to the corresponding use of the examination user identifier Family terminal.
A kind of computer equipment, including memory and processor, the memory are stored with computer program, the processing The step of device realizes above-mentioned examination data monitoring method when executing the computer program.
A kind of computer readable storage medium, is stored thereon with computer program, and the computer program is held by processor The step of above-mentioned examination data monitoring method is realized when row.
Above-mentioned examination data monitoring method, device, computer equipment and storage medium, server obtain user's to be examined Target monitoring information obtains target assessment index number by web crawlers technology from the targeted website in target monitoring information According to, calculation processing is carried out to target assessment achievement data and obtains target assessment risk parameter, it will be according to target assessment risk parameter The examination monitoring table of generation feeds back to user to be examined, and without user's artificial enquiry target assessment achievement data to be examined, realizes According to user demand to be examined automatically to target assessment achievement data be monitored with the purpose analyzed, user can be timely To effective examination monitoring table, to improve the acquisition efficiency of target assessment achievement data.
Detailed description of the invention
Fig. 1 is the application scenario diagram of examination data monitoring method in one embodiment;
Fig. 2 is the flow diagram of examination data monitoring method in one embodiment;
Fig. 3 is the flow diagram of the binding associated account number method in one embodiment;
Fig. 4 is that the data in one embodiment crawl timing diagram;
Fig. 5 is message pushing module timing diagram in one embodiment;
Fig. 6 is the structural block diagram of examination data monitoring device in one embodiment;
Fig. 7 is the internal structure chart of computer equipment in one embodiment.
Specific embodiment
It is with reference to the accompanying drawings and embodiments, right in order to which the objects, technical solutions and advantages of the application are more clearly understood The application is further elaborated.It should be appreciated that specific embodiment described herein is only used to explain the application, not For limiting the application.
Examination data monitoring method provided by the present application, can be applied in application environment as shown in Figure 1.Wherein, it uses Family terminal 102 is communicated by network with server 104.User terminal 102 can upload monitoring demand number to server 104 According to server 104 receives monitoring demand data and is monitored to target assessment achievement data.Specifically, server 104 obtain to User list is examined, and reads user identifier to be examined from wait examine in user list;It is corresponding to search user identifier to be examined Target monitoring information obtains target network address and target assessment index in target monitoring information;From the corresponding target of target network address Website obtains the corresponding target assessment achievement data of target assessment index;The objectives are calculated according to target assessment achievement data The target assessment risk parameter of performance assessment criteria generates examination monitoring table according to target assessment risk parameter;Examination monitoring table is pushed away Send user terminal 102 corresponding to user identifier to be examined.
Wherein, user terminal 102 can be, but not limited to be various personal computers, laptop, smart phone, plate Computer and portable wearable device, server 104 can use the service of the either multiple server compositions of independent server Device cluster is realized.When server 104 is independent server, multiple databases, every number can be disposed in server 104 According to the business datum table that can store specific transactions in library;When server 104 is the server cluster of multiple servers composition, It can store the business datum table of specific transactions in the database disposed in each server.
In one embodiment, as shown in Fig. 2, providing a kind of examination data monitoring method, it is applied to Fig. 1 in this way In server for be illustrated, comprising the following steps:
S210 obtains user list to be examined, and reads user identifier to be examined from wait examine in user list.
Specifically, user list to be examined is the set being made of the user identifier of at least one user to be examined, wherein User identifier to be examined carries out unique identification for treating examination user, and user identifier to be examined can be ID users code, use Name in an account book claims, wherein User ID number can be the form of character string, may include letter, number in character string, in symbol It is at least one.Server currently needs to carry out examination data from wait examine to read one by one in multiple user identifiers in user list The user identifier to be examined of monitoring.
S220 searches the corresponding target monitoring information of user identifier to be examined, and obtains the target network in target monitoring information Location and target assessment index.
Specifically, server obtains Demand mapping data, store in Demand mapping data respectively user identifier to be examined with Mapping relations between target monitoring information.When carrying out examination data monitoring, server is from wait examine in user list one by one User identifier to be examined is read, maps the corresponding target monitoring information of data acquisition user identifier to be examined according to demand, wherein Target monitoring information is that currently user to be examined needs the data information being monitored, and may include needing to monitor in data information Target network address and target assessment index.Wherein, target network address is the corresponding web page address in targeted website for needing to be monitored, mesh Mark performance assessment criteria is the indication information in the webpage that user to be examined needs to be monitored, such as can be to need checking core user at this Article publication index, 400 phone average waiting durations in the ranking period etc..
Server searches the corresponding target monitoring information of user identifier from Demand mapping data, and from target monitoring information Middle acquisition target network address and target assessment index further obtain the corresponding mesh of target assessment index from target network address Mark performance assessment criteria data.
For monitoring automotive-type website, user to be examined is the automobile dealer resided in the automotive-type website.Target The entry address for the automotive-type website that network address can need to be monitored for automobile dealer, the target network address can be the automobile The web page address where data in class website for monitoring automobile dealer's formation.
Automotive-type website carries out performance assessment criteria data monitoring to the automobile dealer entered in it and refers to the examination monitored Mark data carry out data analysis, scoring and carry out ranking to the automobile dealer entered to realize.The website of automotive-type is to automobile dealer Performance assessment criteria may include the APP liveness of automobile dealer, automobile dealer recommend planned number utilization rate, automobile dealer effective vehicle Be template article coverage, automobile dealer 400 phones pick up 400 call average waiting durations of rate and automobile dealer Deng.Automotive-type website carries out ranking to automobile dealer according to the performance assessment criteria data that monitoring automobile dealer obtains, and automobile dealer exists Ranking on car website influences it and obtains objective quantity on car website.And automobile dealer's difference is examined in the website of automotive-type The monitoring data of core index can be distributed on different webpages, that is to say, that automotive-type website obtains not monitoring automobile dealer There is different web page addresses with performance assessment criteria data.
Performance assessment criteria can be the monitoring of examination side by the index factor of examination side, and target assessment index is by the setting of the side of examination The index factor that is monitored of needs.Target assessment index can be by examination side than more sensitive performance assessment criteria, specifically, It can be to the performance assessment criteria being affected by the grading of examination side.
For monitoring automotive-type website, different automobile dealers has different target assessment indexs, for example, car dealer The target assessment index of family A includes: the recommendation planned number utilization rate of the APP liveness of automobile dealer, automobile dealer;Automobile dealer B Target assessment index include: effective vehicle system template article coverage of automobile dealer, automobile dealer 400 phones pick up rate; The target assessment index of automobile dealer C includes: 400 electricity of effective vehicle system template article coverage of automobile dealer, automobile dealer Words pick up 400 calling average waiting durations of rate and automobile dealer.According to the target assessment index selection of the automobile dealer target Corresponding target website data of the performance assessment criteria on automotive-type website.
S230 obtains the corresponding target assessment achievement data of target assessment index from the corresponding targeted website of target network address.
Specifically, server obtains the target monitoring information of user to be examined, inquires ownership goal monitoring information to be examined In target network address and target assessment index, the corresponding targeted website of target network address is obtained according to target network address, is climbed using network Worm technology crawls target assessment achievement data corresponding to the target assessment index on the targeted website, obtains each target Performance assessment criteria data.Data are obtained by web crawlers technology it should be noted that crawling finger, in other embodiments to from mesh The mode that target assessment achievement data is obtained on mark website is not limited to web crawlers technology.
Server can obtain the target assessment achievement data on targeted website in the preset time, server The real-time acquisition data command that can be sent according to user terminal, in real time crawls current target assessment achievement data.
Further, the target assessment achievement data that web crawlers acquires is stored.Still further, being climbed The target assessment achievement data got may include multiple target assessment achievement datas, to the different types of target crawled Performance assessment criteria data carry out classification storage.
S240 calculates the target assessment risk parameter of the objectives performance assessment criteria, root according to target assessment achievement data Examination monitoring table is generated according to target assessment risk parameter.
Specifically, target assessment risk parameter is the risks and assumptions for assessing current goal performance assessment criteria.It can basis The corresponding target assessment risk parameter of the target assessment index is calculated in each target assessment achievement data.Wherein target assessment Risk parameter can be the supplemental characteristic for reflecting this target assessment index task performance in predetermined period, such as count It calculates having completed for task and obtains target assessment risk parameter with the ratio that should complete task in predetermined period, in this ratio It may be defined as task completeness;Target assessment risk parameter may be to calculate each target assessment index in predetermined period Task complete scoring event, such as by the task completeness numerical value conversion being calculated be scoring values, specifically, when task is complete When at degree value between 60%-70%, score is denoted as 60 points, when task completeness numerical value is between 70%-80%, score It is denoted as 70 points etc.;Target assessment risk parameter may be this target assessment index existing Risk-warning letter in predetermined period Breath etc., for example, generating this target when server judges target assessment index and goal task gap is greater than preset threshold and examining The Risk-warning information of core index, and Risk-warning information is shown or is pushed to user terminal, to issue the user with Early warning.It should be noted that not done at this to the parameter type of the corresponding target assessment risk parameter of target assessment index It limits, i.e., can have different target assessment risk parameters in different target assessment indexs, as long as the target assessment risk Parameter can be used in assessing risk and task performance existing for current goal performance assessment criteria.
Further, for monitoring automotive-type website, ranking update is carried out to automobile dealer with the automotive-type website Period be a week for be illustrated.Each target assessment of the automotive-type web publishing automobile dealer within this week is obtained to refer to Mark data, such as automotive-type website provides that each automobile dealer in one week article publication quantity is 10, wherein vehicle system article Coverage is not less than 80%, and server crawls automobile vendor from the corresponding targeted website of target network address by web crawlers technology The corresponding target assessment achievement data of target assessment index, wherein this week article in target assessment achievement data issues quantity It is 5, vehicle system article is 2, and it is 5 that the article quantity that this week should also be issued, which is calculated, the vehicle system text that this week should also be issued Chapter is 6.That is for Zhou Wenzhang issues this target assessment index, corresponding target assessment risk parameter can Think that the remaining vehicle system's article publication quantity of Zhou Wenzhang residue publication quantity, week, the risk parameter of target assessment index can be week Task completeness 50%, all tasks of target assessment index complete risk 50% and all tasks of target assessment index are completed Scoring event 50 divides.
It further, further include to each after calculating the corresponding target assessment risk parameter of the objectives performance assessment criteria The integrated risk factor is calculated in item target assessment risk parameter.Wherein the objectives can be examined risk ginseng by the integrated risk factor Number handles to obtain according to certain weighted calculation principle, specifically, the target assessment setup measures that can will be affected to ranking Biggish weight factor, with the prominent target assessment index to the influence power of the integrated risk factor.
It may include the Check of the objectives performance assessment criteria in preset period of time in examination monitoring table, according to each The corresponding target assessment index risk parameter of target performance assessment criteria and the corresponding integrated risk of all target assessment indexs because Son generates examination monitoring table, further, in examination monitoring table can also include the warning information etc. of the objectives performance assessment criteria.
Examination monitoring table is pushed to the corresponding user terminal of examination user identifier by S250.
Specifically, examination monitoring table is generated according to target assessment risk parameter, includes each target assessment in examination monitoring table Index and the corresponding target assessment risk parameter of each target assessment index, further, examining in monitoring table further includes each mesh The Risk-warning information for marking performance assessment criteria, more specifically, such as can pass through mail, application notification, short message, multimedia message etc. Mode is by Risk-warning information recommendation to user terminal.User to be examined obtains the corresponding examination of current goal performance assessment criteria in time The case where monitoring table, and take countermeasure in time to risk indicator, and then avoiding deduction of points occurs to influence its Rank scores.
In above-mentioned examination data monitoring method, server obtains the target monitoring information of user to be examined, is climbed by network Worm technology crawls target assessment achievement data from the targeted website in target monitoring information, carries out to target assessment achievement data Calculation processing obtains target assessment risk parameter, and the examination monitoring table generated according to target assessment risk parameter is fed back to and is needed checking Core user, without user's artificial enquiry target assessment achievement data to be examined, it is automatically right according to user demand to be examined to realize Target assessment achievement data is monitored the purpose with analysis, and user can obtain effectively examining monitoring table in time, to mention The acquisition efficiency of high target assessment achievement data.
In one embodiment, a kind of examination data monitoring method is provided, with reference to Fig. 3, obtains user list to be examined Before, further includes:
S202, receive user terminal send monitoring demand data, from monitoring demand data in extract Add User mark, Newly-increased account information and newly-increased monitoring information.
Specifically, when examining user that there is monitoring demand to the examination data on platform, user terminal can be passed through Send monitoring demand data to server, user to be examined can input monitoring demand data at the terminal, monitor demand data In may include user identifier, user account information and target monitoring information of user to be examined etc..
Wherein, the mark that Adds User can be the unique identification for identifying currently user to be examined;Newly-increased account information can be The currently account and encrypted message of user to be examined;Newly-increased monitoring information may include that currently user to be examined needs to examine monitoring Target network address and target assessment index.
S204, the mark that will Add User are added to wait examine in user list.
Specifically, after examining user to determine monitoring demand information, user terminal is sent to clothes for demand information is monitored Business device, server receives monitoring demand data, and extracts user identifier and target monitoring to be examined from monitoring demand data Demand information, server the user identifier to be examined extracted is added to be locally stored wait examine in user list, simultaneously Mapping relations between user identifier to be examined and target monitoring information are associated binding.By the mark addition that Adds User To wait examine in user list, so that this Adds User, mark becomes an element wait examine in user list.
Newly-increased account information, newly-increased monitoring information and the mark that Adds User are associated binding by S206.
The mapping that wherein association binding, i.e. record Add User between mark and newly-increased account information, newly-increased monitoring information Relationship, so that server obtains corresponding monitoring information from the related information in the user identifier to be examined.
In other embodiments, which can also include carrying out unbundlings behaviour to the account bound Make.When examining user not need to be monitored the examination data on website, it can be sent out by user terminal to server It send monitoring to release instruction, for example, the examination data option of operation that monitoring releases can be provided in the application program of user terminal, uses After family terminal detects that user chooses the option of operation, the examination data monitoring releasing instruction for carrying user identifier to be examined is generated And it is sent to server, after server receives releasing instruction, user identifier is extracted from instruction, from user list to be examined User identifier to be examined is somebody's turn to do in middle deletion, and searches the related information with user identifier binding, and the related information found is deleted It removes, to complete the unbundlings work of demand user.
The above method can record the mapping relations of user identifier to be examined and target monitoring information, Ke Yiwei Multiple users provide the service of customization, realize the concurrent processing of data monitoring.
In one embodiment, the corresponding target assessment of target assessment index is obtained from the corresponding targeted website of target network address Achievement data, comprising: search the corresponding account information to be examined of user identifier to be examined, obtain the use wait examine in account information Family account and user password;Targeted website is logged according to user account and user password;When successfully logging in targeted website, timing The corresponding performance assessment criteria data of target assessment index are obtained from targeted website, and performance assessment criteria data are stored to examination data Library.
Specifically, if website could access data after needing user to log in, server is first searched before obtaining data The corresponding user account information of subscriber identity data to be examined, user account information may include user account, user password etc. Data, server carry out corresponding data acquisition work after carrying out website log using user account information again.
In one embodiment, the corresponding mesh of target assessment index in targeted website is crawled by web crawlers technology timing Performance assessment criteria data are marked, and the data crawled are stored to examination data library.Here, timing can be regarded as server every Remove to crawl the target assessment achievement data in targeted website at regular intervals.Further, by the examination data of the application Monitoring method is applied to for the website of monitoring automotive-type, crawls target network address pair at interval of 30 minutes using web crawlers technology The objectives performance assessment criteria data on the targeted website answered, and the objectives performance assessment criteria data and the objectives examination are referred to Mark data the generation time generate the objectives performance assessment criteria daily record data, by the objectives performance assessment criteria daily record data store to Local data base.
Further, in other embodiments, can according to different target assessment setup measures it is different crawl the time Interval.Such as 400 phone to pick up rate be that data update faster target assessment index, can be set and more frequently crawl Frequency, article issue predicted quantitative objectives performance assessment criteria be the relatively slow target assessment index of a renewal frequency, can be set compared with Long crawls time interval, crawls frequency by the data different to different target assessment setup measures, not only realizes Even distribution Internet resources more efficiently obtain the technical effect of Internet resources, while can also be obtained more according to practical situation Add effective target assessment achievement data.
In one embodiment, the timing diagram that crawls of target assessment achievement data is referred to Fig. 4, the crawler in server Module timing crawls data, and the data crawled are inserted into crawler database, when crawler database detection is inserted into new data When, insertion data are synchronized to examination data library, such as data can be carried out by database binlog method and synchronized, so that calculating Module can directly obtain each target assessment achievement data to be analyzed from examination data library and be focused on, to will examine Other data crawled in core achievement data and crawler database are effectively isolated, and data read rates are improved.And it will climb The data that worm obtains are synchronized to examination data library in the form of binlog can be improved the safety of data storage, reduce by data Lose bring risk.
The above method periodically crawls the corresponding performance assessment criteria data of target assessment index on targeted website, and this is examined Core achievement data is stored to examination data library, is generated based on performance assessment criteria data and is generated examining for the performance assessment criteria data time Core achievement data log information.The target assessment achievement data on targeted website is obtained by web crawlers technology, and will be obtained Target assessment achievement data stored, performance assessment criteria data can be stored in time.
In one embodiment, method further include: when logging in targeted website not successfully, be used for according to the generation of target network address It reminds user to log in the website log prompt of targeted website, website log prompt is sent to the corresponding use of user identifier to be examined Family terminal;When detecting the register success of the targeted website carried out according to website log prompt, it is further continued for executing from mesh Mark the step of corresponding target assessment achievement data of target assessment index is obtained in website.
Specifically, in one embodiment, when server cannot successfully log in targeted website, according to target network address generation use In the website log prompt for reminding user to log in targeted website, user's manual entry targeted website is prompted.In another embodiment In, server detects user's login-timeout, cannot successfully log in targeted website, is generated according to target network address for prompting user The message of login-timeout.It is further continued for executing after server detects that user logins successfully and obtains target assessment from targeted website The step of index corresponding target assessment achievement data.
The above method, by detecting the logging state of user to be examined and timely feedbacking the logging state of user to user Terminal, when logging in unsuccessful, prompt user is handled in time, improves the efficiency of user's Website login.
In one embodiment, the examination risk parameter of the objectives performance assessment criteria is calculated according to performance assessment criteria data, Generating the step of examining monitoring table according to examination risk parameter may include:
When reaching default detection time, the objectives performance assessment criteria is obtained from examination data library in the default monitoring period Interior performance assessment criteria data, extract examination risk parameter from performance assessment criteria data.
Specifically, default detection time can be the preset time, and default detection time, root is previously set in server Target assessment achievement data is monitored according to preset detection time.Wherein, different users to be examined can have difference Default detection time.
The default monitoring period can be the preset period, and server is previously set the default detection monitoring period, extracts Examination risk parameter in the default monitoring period in target assessment achievement data.Wherein, different users to be examined can have The different default monitoring periods.Such as the default monitoring period can be one day, a week, one month etc., it herein can be according to specific Situation is determining, in the present invention with no restrictions to the preset monitoring period.
It further, by taking the website for monitoring automotive-type as an example, such as wait examine default detection time set by user is every Its morning 7:30 and 7:30 every night, the preset monitoring period be one day.
When reaching default detection time, server refers to from the examination extracted within the default monitoring period in examination data library Data are marked, such as when the time is 7:30 in morning, server obtains the objectives performance assessment criteria previous from examination data library Target assessment achievement data between its evening 7:30 to 7:30 this morning, and extract and examine from target assessment achievement data Core risk parameter, the concrete mode that target assessment risk parameter is extracted from target assessment achievement data can refer to according to examination Achievement data calculates the specific steps of the target assessment risk parameter of the objectives performance assessment criteria.
Further, examination monitoring table is generated according to examination risk parameter, examination monitoring table is pushed into examination user's mark Corresponding user terminal is known, here, examination monitoring table is morning newspaper's table of merit rating.
In another embodiment, current time is evening 7:30, and server obtains the objectives from examination data library Performance assessment criteria this morning 7:30 to the target assessment achievement data between the current time, and from target assessment achievement data Target assessment risk parameter is calculated, further, examination monitoring table is generated according to target assessment risk parameter, examination is monitored Table pushes to the corresponding user terminal of user identifier to be examined, here, examination monitoring table is evening paper table of merit rating.
The target assessment value for obtaining the objectives performance assessment criteria, by target assessment risk parameter and corresponding target assessment value It is compared;When examining risk parameter not to be consistent with target assessment value, target assessment index is generated according to examination risk parameter Examination early warning.
Target assessment value can be the numerical value being previously set, and represent currently to the corresponding standard figures of performance assessment criteria, when examining When core risk parameter is not consistent with target assessment value, it may include target assessment risk parameter is more than or less than target assessment value, The examination early warning of target assessment index is generated according to examination risk parameter.
In one embodiment, morning newspaper's module in server generates morning newspaper's table of merit rating, and evening paper module generates evening paper examination Table, warning module generate early warning information, and the message pushing module in server receives morning newspaper's module, evening paper module or early warning Morning newspaper's table of merit rating, evening paper table of merit rating or early warning information are pushed into user terminal after the message push instruction of module, specifically Message push process timing diagram can refer to Fig. 5.In Fig. 5, when reaching default detection time, timers trigger timing length Statistics instructs and is sent to morning newspaper's module or evening paper module, and morning newspaper or evening paper module receive the statistics instruction of timing length Afterwards, server generates examination risk parameter early from the examination risk parameter obtained in the default monitoring period in examination data library Table of merit rating or evening paper table of merit rating are reported, morning newspaper's table of merit rating of acquisition or evening paper table of merit rating are pushed into user through message pushing module Terminal.When examining risk parameter not to be consistent with target assessment value, the examination early warning that warning module generates target assessment index is mentioned Show, message pushing module receives the examination early warning instruction of warning module generation, and message pushing module is by the examination of acquisition Early warning message pushes to user terminal.
With continued reference to Fig. 5, the corresponding examination risk parameter of the performance assessment criteria data that server will acquire and target assessment value It is compared, when the two is not consistent, generates the corresponding early warning of target assessment index, warning module passes through early warning Message pushing module pushes to user terminal.
Further, for monitoring automotive-type website, in one embodiment, target assessment index 400 is calculated Phone effectively pick up rate be 80%, search data obtain 400 phones effectively pick up rate target assessment value should be greater than 90%, this When may determine that the examination risk parameter of current goal performance assessment criteria is not consistent with target assessment value, that is, it is effective to provide 400 phones Pick up the examination early warning of rate.It more specifically, will be risky during generating morning newspaper's table of merit rating and evening paper table of merit rating Target assessment risk parameter push to user terminal in time.
Examination monitoring table is generated according to examination risk parameter and examination early warning.
Specifically, by the examination risk parameter and the objectives performance assessment criteria of the objectives performance assessment criteria being calculated Examination early warning generate examination monitoring table, and monitoring table is pushed into user terminal in time, wherein early warning can pass through It is highlighted the target assessment index with early warning risk, early warning is also possible to there will be early warning risk in the form of alarm Performance assessment criteria be sent to the user terminal or early warning can also push to user terminal in a manner of short message, mail etc..In This with no restrictions to the push mode of early warning as long as user terminal can be pushed to early warning information in time, causes user The attention of terminal.Further, after user terminal obtains early warning, can be to the early warning risk indicator at Reason, to eliminate or reduce the risk deducted points, such as in one embodiment, user terminal receive 400 phones do not connect it is pre- Alert prompt, user can take the mode to call back to eliminate the early warning at this time, and realization avoids risk of potentially deducting points.
The above method can be at a fixed time to user's end by the way that default detection time and default monitoring period is arranged End push examination monitoring table, enables user to be examined more accurately to obtain target assessment examination data.
In one embodiment, the step of generating examination monitoring table according to examination risk parameter and examination early warning is also wrapped It includes:
By the target assessment risk parameter of the objectives performance assessment criteria, corresponding default risk evaluation model is inputted respectively and is obtained To examination risk score;
Here, risk evaluation model, which can be a training pattern, is also possible to a calculation formula, such as it can be root According to the neural network model that the target assessment risk data that obtains in advance and examination risk score training obtain, train at this Neural network model in input a target assessment risk parameter, correspondingly the neural network model export an examination risk Score.Since the examination risk parameter to different target performance assessment criteria has different standards of grading, so each target assessment Index corresponds to a default risk evaluation model.
Further, it is illustrated by taking the website of automotive-type as an example, in one embodiment, 400 phones pick up rate target Corresponding 400 phones of performance assessment criteria pick up rate risk evaluation model.Specifically, which picks up rate risk evaluation model It is to pick up the scoring statistical data of rate according to 400 previous phones and establish, such as the ginseng that may include in the statistical model Number are as follows: remaining time apart from ranking statistics, in the ranking period task completeness, it is estimated within the ranking period not Achievable degree of completion task etc., by the way that the target assessment risk parameter of current goal performance assessment criteria is input to the risk assessment In model, the corresponding examination risk score of the target assessment risk parameter is obtained.
Examination risk score realize the target for quantifying current examination risk parameter so that user terminal to Examination user can observe the task performance of current goal performance assessment criteria more intuitive and conveniently.
The risk integrative of all target assessment indexs is obtained according to every examination risk score of the objectives performance assessment criteria Score, and corresponding examination risk class is obtained according to risk integrative score.
Specifically, the calculating process of risk integrative score can be weighted score meter to different target assessment indexs It calculates, maximum target assessment index is influenced on ranking and gives higher weight, is referred to improving user to be examined to the target assessment Target is paid attention to, and higher weight is given on the target assessment index that will influence ranking, to remind user to be examined to handle in time The risky target assessment risk parameter of the tool.
For example, examination risk class can be divided into safety, low danger, middle danger, high-risk etc..
Examination monitoring is generated according to examination risk parameter, examination early warning, examination risk score and examination risk class Table.
Specifically, the examination risk parameter of acquisition, examination early warning, examination risk score and examination risk class is raw Table is monitored at examination, and monitoring table is pushed to user terminal in the scheduled time, so that user terminal can understand in time Current ranking.
The above method, by the way that risk parameter data will be examined to be converted to examination risk score and examination risk class data, The technical effect that risk parameter will be examined to quantify is realized, allows users to that current target is more intuitively well understood The risk class of performance assessment criteria, in time to presently, there are the risk data method of making reply.
In one embodiment, examination data monitoring method further include: examination risk is extracted from performance assessment criteria data Parameter;The target assessment value for obtaining the objectives performance assessment criteria compares examination risk parameter with corresponding target assessment value Compared with;When examining risk parameter not to be consistent with target assessment value, the examination of target assessment index is generated according to examination risk parameter Early warning;Examination early warning is pushed into the corresponding user terminal of examination user identifier.
Server obtains the corresponding target assessment achievement data of target assessment index from targeted website, is examined according to the target Corresponding target assessment risk parameter is calculated in core achievement data, by target assessment achievement data and corresponding target Examination risk parameter is stored to examination data library.Examination risk parameter is extracted from the examination data library, and by the examination risk Parameter is compared with target assessment value, when the two is not consistent, provides examination early warning in time, can be to disappear specifically The early warning for ceasing push, is also possible to alarm early warning etc..
The above method is compared by the target assessment risk parameter that will be obtained in real time with target assessment value, when being supervised When the examination risk parameter measured is not consistent with target assessment value, in time by the early warning of the target assessment index monitored Push to user terminal so that user terminal obtain in time there is currently risk, the risk is handled in time.
In one embodiment, examination data monitoring method further include:
When receiving the real time monitoring instruction of user terminal transmission, obtained from targeted website according to real time monitoring instruction The corresponding current performance assessment criteria data of target assessment index;According to current performance assessment criteria data to the objectives in examination data library The performance assessment criteria data of performance assessment criteria are updated, and extract examination risk parameter from updated performance assessment criteria data.
Specifically, target assessment risk parameter not only can be pushed to user's end in preset detection time by server End, server can also receive the real time monitoring instruction of user terminal transmission, target assessment risk parameter pushed to use in real time Family terminal.For example, when user to be examined wants the data Check of the current target assessment index of detection, it can be in user terminal A key detection instruction is triggered, server receives a key detection instruction of user terminal transmission, target is crawled from targeted website The corresponding current performance assessment criteria data of performance assessment criteria examine the objectives in examination data library according to current performance assessment criteria data The performance assessment criteria data of index are updated, and examination risk parameter are extracted from updated performance assessment criteria data, and will examine Core risk parameter pushes to user terminal.
This method not only includes the target assessment achievement data periodically crawled in targeted website, further includes when server receives When the real time monitoring instruction that arrival user terminal sends over, targeted website is crawled immediately under the triggering of real time monitoring instruction In the corresponding performance assessment criteria data of performance assessment criteria.In one embodiment, network crawls technology every 30 minutes from target network Station crawls target assessment achievement data, and the performance assessment criteria data crawled are stored to crawler database, receives in server When the real time monitoring sended over to user terminal instructs, the target assessment that server is also used to crawl immediately in targeted website refers to Corresponding target assessment achievement data is marked, and the target assessment achievement data crawled in real time is stored to crawler database, Realize the update to crawler database.
The target assessment value for obtaining the objectives performance assessment criteria carries out examination risk parameter with corresponding target assessment value Compare.
Server obtains the crawler data for the objectives performance assessment criteria being updated from crawler database, and will arrange Target assessment achievement data in the name period is compared with target assessment value.
When examining risk parameter not to be consistent with target assessment value, target assessment index is generated according to examination risk parameter Examine early warning;Real time monitoring table is generated according to examination risk parameter and examination early warning, real time monitoring table is pushed to Examine the corresponding user terminal of user identifier.
Wherein, the generation method of real time monitoring table can refer to according to target assessment risk parameter, examination early warning, examination The method that risk score and examination risk class generate examination monitoring table, this will not be repeated here.
In above-mentioned examination data monitoring method, server receives the real time monitoring instruction that user terminal is sent, and in the reality When monitoring instruction triggering under obtain target assessment achievement data on targeted website, by analyzing the real time monitoring number that gets According to the data status of the target assessment index obtained in current site.User master to be examined is supported in the setting of the one key detection function The dynamic detection newest Check of its examination data, can obtain the newest target assessment achievement data in the automobile dealer website with And risk class, improve the control and monitoring to automobile dealer website.
It should be understood that although each step in the flow chart of Fig. 2 to Fig. 5 is successively shown according to the instruction of arrow, But these steps are not that the inevitable sequence according to arrow instruction successively executes.Unless expressly state otherwise herein, these There is no stringent sequences to limit for the execution of step, these steps can execute in other order.Moreover, Fig. 2 is into Fig. 5 At least part step may include that perhaps these sub-steps of multiple stages or stage are not necessarily same to multiple sub-steps One moment executed completion, but can execute at different times, and the execution in these sub-steps or stage sequence is also not necessarily Be successively carry out, but can at least part of the sub-step or stage of other steps or other steps in turn or Alternately execute.
In one embodiment, as shown in fig. 6, providing a kind of examination data monitoring device, comprising: user information obtains Module 610, searching module 620, data acquisition module 630, computing module 640 and pushing module 650, in which: user information obtains Modulus block 610 reads user identifier to be examined from wait examine in user list for obtaining user list to be examined.Search mould Block 620 obtains the target network address and mesh in target monitoring information for searching the corresponding target monitoring information of examination user identifier Mark performance assessment criteria.Data acquisition module 630, for obtaining the corresponding target of target assessment index from the corresponding website of target network address Performance assessment criteria data.Computing module 640, for calculating the target of the objectives performance assessment criteria according to target assessment achievement data Risk parameter is examined, examination monitoring table is generated according to examination risk parameter.Pushing module 650, for monitoring table push will to be examined To the corresponding user terminal of examination user identifier.
In one embodiment, examination data monitoring device can also include: data reception module, for receiving user's end The monitoring demand data sent is held, the mark that Adds User, newly-increased account information and newly-increased monitoring are extracted from monitoring demand data Information.Adding module is identified, mark is added to wait examine in user list for that will Add User.Binding module, being used for will be new Increase account information, newly-increased monitoring information and the mark that Adds User and is associated binding.
In one embodiment, User profile acquisition module 610 may include: account information searching module, for searching The corresponding account information to be examined of user identifier to be examined, obtains the user account and user password wait examine in account information. Account login module, for logging in targeted website according to user account and user password.Data memory module, for ought successfully step on When recording targeted website, the corresponding target assessment achievement data of target assessment index is periodically obtained from targeted website, target is examined Core achievement data is stored to examination data library.
In one embodiment, examination data monitoring device further include: reminding module, for target network ought to be logged in not successfully It when standing, is prompted according to the website log that target network address is generated for reminding user to log in targeted website, website log is prompted to send out Give user identifier to be examined corresponding user terminal.Detection module is detected for working as according to website log prompt progress When the register success of targeted website, it is further continued for executing the corresponding target assessment of acquisition target assessment index from targeted website The step of achievement data.
In one embodiment, computing module 640 can also include: data extracting unit, for when the default detection of arrival When the time, the target assessment achievement data in the monitoring period is being preset from the objectives performance assessment criteria is obtained in examination data library, Target assessment risk parameter is extracted from target assessment achievement data.Data comparing unit, for obtaining the objectives examination Target assessment risk parameter is compared by the target assessment value of index with corresponding target assessment value.Early warning generation unit is used In when target assessment risk parameter is not consistent with target assessment value, target assessment index is generated according to target assessment risk parameter Examination early warning.Table generation unit is monitored, for generating examination monitoring according to examination risk parameter and examination early warning Table.
In one embodiment, monitoring table generation unit may include: examination risk score generation unit, and being used for will be every The target assessment risk parameter of target assessment index inputs corresponding default risk evaluation model respectively and obtains that risk is examined to obtain Point.Risk class generation unit is examined, for obtaining according to the target assessment risk score of the objectives performance assessment criteria wait examine The risk integrative score of user, and corresponding examination risk class is obtained according to risk integrative score.Examination monitoring table generates single Member, for generating examination prison according to target assessment risk parameter, examination early warning, examination risk score and examination risk class Control table.
In one embodiment, examination data monitoring device can also include: target assessment risk parameter extraction module, use In extracting target assessment risk parameter from target assessment achievement data.Data comparison module is examined for obtaining the objectives Target assessment risk parameter is compared by the target assessment value of core index with corresponding target assessment value.First early warning Module, for generating target assessment according to examination risk parameter when target assessment risk parameter is not consistent with target assessment value The examination early warning of index.Pushing module, it is whole for early warning will to be examined to push to the corresponding user of examination user identifier End.
In one embodiment, examination data monitoring device can also include: real-time monitoring module, receive use for working as When the real time monitoring instruction that family terminal is sent, it is corresponding that target assessment index is obtained from targeted website according to real time monitoring instruction Current performance assessment criteria data.Data extraction module is updated, is used for according to current performance assessment criteria data to every in examination data library The performance assessment criteria data of target assessment index are updated, and extract target assessment from updated target assessment achievement data Risk parameter.Data comparison module, for obtaining the target assessment value of the objectives performance assessment criteria, by target assessment risk parameter It is compared with corresponding target assessment value.Second early warning module, for working as target assessment risk parameter and target assessment When value is not consistent, the examination early warning of target assessment index is generated according to target assessment risk parameter.Pushing module is used for root Real time monitoring table is generated according to target assessment risk parameter and examination early warning, real time monitoring table is pushed into examination user identifier Corresponding user terminal.
Specific about examination data monitoring device limits the limit that may refer to above for examination data monitoring method Fixed, details are not described herein.Modules in above-mentioned examination data monitoring device can fully or partially through software, hardware and its Combination is to realize.Above-mentioned each module can be embedded in the form of hardware or independently of in the processor in computer equipment, can also be with It is stored in the memory in computer equipment in a software form, in order to which processor calls the above modules of execution corresponding Operation.
In one embodiment, a kind of computer equipment is provided, which can be server, internal junction Composition can be as shown in Figure 7.The computer equipment include by system bus connect processor, memory, network interface and Database.Wherein, the processor of the computer equipment is for providing calculating and control ability.The memory packet of the computer equipment Include non-volatile memory medium, built-in storage.The non-volatile memory medium is stored with operating system, computer program and data Library.The built-in storage provides environment for the operation of operating system and computer program in non-volatile memory medium.The calculating The database of machine equipment is for storing examination data monitoring data.The network interface of the computer equipment is used for and external terminal It is communicated by network connection.To realize a kind of examination data monitoring method when the computer program is executed by processor.
It will be understood by those skilled in the art that structure shown in Fig. 7, only part relevant to application scheme is tied The block diagram of structure does not constitute the restriction for the computer equipment being applied thereon to application scheme, specific computer equipment It may include perhaps combining certain components or with different component layouts than more or fewer components as shown in the figure.
In one embodiment, a kind of computer equipment, including memory and processor are provided, which is stored with Computer program, which performs the steps of when executing computer program and obtains user list to be examined, from use to be examined User identifier to be examined is read in the list of family;The corresponding target monitoring information of user identifier to be examined is searched, target monitoring is obtained Target network address and target assessment index in information;It is corresponding that target assessment index is obtained from the corresponding targeted website of target network address Target assessment achievement data;The target assessment risk ginseng of the objectives performance assessment criteria is calculated according to target assessment achievement data Number generates examination monitoring table according to target assessment risk parameter;Examination monitoring table is pushed into the corresponding use of examination user identifier Family terminal.
In one embodiment, it is also performed the steps of when processor executes computer program and receives user terminal transmission Monitoring demand data, the mark that Adds User is extracted from monitoring demand data, increases account information and newly-increased monitoring information newly;It will The mark that Adds User is added to wait examine in user list;By newly-increased account information, newly-increased monitoring information and the mark that Adds User It is associated binding.
In one embodiment, it realizes when processor executes computer program and is obtained from the corresponding targeted website of target network address It is also used to when the corresponding target assessment achievement data step of target assessment index: it is corresponding wait examine to search user identifier to be examined Account information obtains user account and user password wait examine in account information;It is logged according to user account and user password Targeted website;When successfully logging in targeted website, the corresponding target assessment of target assessment index is periodically obtained from targeted website Achievement data stores target assessment achievement data to examination data library.
In one embodiment, target ought be logged in not successfully by also performing the steps of when processor executes computer program When website, is prompted according to the website log that target network address is generated for reminding user to log in targeted website, website log is prompted It is sent to the corresponding user terminal of user identifier to be examined;Stepping on for the targeted website carried out is prompted according to website log when detecting When record is operated successfully, it is further continued for executing the step that the corresponding target assessment achievement data of target assessment index is obtained from targeted website Suddenly.
In one embodiment, it is realized when processor executes computer program and calculates projects according to performance assessment criteria data The target assessment risk parameter for marking performance assessment criteria is also used when generating the step of examination monitoring table according to target assessment risk parameter In: when reaching default detection time, monitored in the period from the objectives performance assessment criteria is obtained in examination data library default Target assessment achievement data extracts target assessment risk parameter from target assessment achievement data;Obtain the objectives examination Target assessment risk parameter is compared by the target assessment value of index with corresponding target assessment value;When target assessment risk When parameter is not consistent with target assessment value, the examination early warning of target assessment index is generated according to target assessment risk parameter; Examination monitoring table is generated according to examination risk parameter and examination early warning.
In one embodiment, it is realized when processor executes computer program pre- according to target assessment risk parameter and examination Alert prompt generates the step of examining monitoring table and is also used to: defeated respectively by the target assessment risk parameter of the objectives performance assessment criteria Enter corresponding default risk evaluation model and obtains examination risk score;It is obtained according to the target assessment risk of the objectives performance assessment criteria Get the risk integrative score of user to be examined, and corresponding examination risk class is obtained according to risk integrative score;According to Target assessment risk parameter, examination early warning, examination risk score and examination risk class generate examination monitoring table.
In one embodiment, it also performs the steps of when processor executes computer program from target assessment index number Target assessment risk parameter is extracted in;The target assessment value for obtaining the objectives performance assessment criteria, target assessment risk is joined Number is compared with corresponding target assessment value;When target assessment risk parameter is not consistent with target assessment value, according to examination The examination early warning of risk parameter generation target assessment index;It is corresponding that examination early warning is pushed into examination user identifier User terminal.
In one embodiment, it also performs the steps of to work as when processor executes computer program and receives user terminal When the real time monitoring instruction of transmission, obtain that target assessment index is corresponding currently examines from targeted website according to real time monitoring instruction Core achievement data;According to current performance assessment criteria data to the performance assessment criteria data of the objectives performance assessment criteria in examination data library into Row updates, and extracts target assessment risk parameter from updated target assessment achievement data;The objectives examination is obtained to refer to Target assessment risk parameter is compared by target target assessment value with corresponding target assessment value;When target assessment risk is joined When number is not consistent with target assessment value, the examination early warning of target assessment index is generated according to target assessment risk parameter;Root Real time monitoring table is generated according to target assessment risk parameter and examination early warning, real time monitoring table is pushed into examination user identifier Corresponding user terminal.
In one embodiment, a kind of computer readable storage medium is provided, computer program is stored thereon with, is calculated Machine program performs the steps of when being executed by processor obtains user list to be examined, from wait examine in user list read to Examine user identifier;The corresponding target monitoring information of user identifier to be examined is searched, the target network in target monitoring information is obtained Location and target assessment index;The corresponding target assessment index number of target assessment index is obtained from the corresponding targeted website of target network address According to;The target assessment risk parameter that the objectives performance assessment criteria is calculated according to target assessment achievement data, according to target assessment Risk parameter generates examination monitoring table;Examination monitoring table is pushed into the corresponding user terminal of examination user identifier.
In one embodiment, it is also performed the steps of when computer program is executed by processor and receives user terminal hair The monitoring demand data sent extracts the mark that Adds User, newly-increased account information and newly-increased monitoring information from monitoring demand data; The mark that will Add User is added to wait examine in user list;By newly-increased account information, newly-increased monitoring information and the mark that Adds User Knowledge is associated binding.
In one embodiment, it realizes when computer program is executed by processor and is obtained from the corresponding targeted website of target network address It is also used to when taking the corresponding target assessment achievement data step of target assessment index: searching that user identifier to be examined is corresponding to need checking Core account information obtains user account and user password wait examine in account information;It is stepped on according to user account and user password Record targeted website;When successfully logging in targeted website, the corresponding target of target assessment index is periodically obtained from targeted website and is examined Core achievement data stores target assessment achievement data to examination data library.
In one embodiment, mesh ought be logged in not successfully by also performing the steps of when computer program is executed by processor When marking website, is prompted according to the website log that target network address is generated for reminding user to log in targeted website, website log is mentioned Show and is sent to the corresponding user terminal of user identifier to be examined;The targeted website carried out is prompted according to website log when detecting When register success, it is further continued for executing the corresponding target assessment achievement data of acquisition target assessment index from targeted website Step.
In one embodiment, it is realized when computer program is executed by processor and calculates items according to performance assessment criteria data The target assessment risk parameter of target assessment index is also used when generating the step of examination monitoring table according to target assessment risk parameter In: when reaching default detection time, monitored in the period from the objectives performance assessment criteria is obtained in examination data library default Target assessment achievement data extracts target assessment risk parameter from target assessment achievement data;Obtain the objectives examination Target assessment risk parameter is compared by the target assessment value of index with corresponding target assessment value;When target assessment risk When parameter is not consistent with target assessment value, the examination early warning of target assessment index is generated according to target assessment risk parameter; Examination monitoring table is generated according to examination risk parameter and examination early warning.
In one embodiment, it realizes when computer program is executed by processor according to target assessment risk parameter and examination The step of early warning generation examination monitoring table, is also used to: by the target assessment risk parameter of the objectives performance assessment criteria, respectively It inputs corresponding default risk evaluation model and obtains examination risk score;According to the target assessment risk of the objectives performance assessment criteria Score obtains the risk integrative score of user to be examined, and obtains corresponding examination risk class according to risk integrative score;Root Examination monitoring table is generated according to target assessment risk parameter, examination early warning, examination risk score and examination risk class.
In one embodiment, it is also performed the steps of when computer program is executed by processor from target assessment index Target assessment risk parameter is extracted in data;The target assessment value for obtaining the objectives performance assessment criteria, by target assessment risk Parameter is compared with corresponding target assessment value;When target assessment risk parameter is not consistent with target assessment value, according to examining The examination early warning of core risk parameter generation target assessment index;It is corresponding that examination early warning is pushed into examination user identifier User terminal.
In one embodiment, it is also performed the steps of when computer program is executed by processor whole when receiving user When the real time monitoring instruction that end is sent, it is corresponding current that target assessment index is obtained from targeted website according to real time monitoring instruction Performance assessment criteria data;According to current performance assessment criteria data to the performance assessment criteria data of the objectives performance assessment criteria in examination data library It is updated, extracts target assessment risk parameter from updated target assessment achievement data;Obtain the objectives examination Target assessment risk parameter is compared by the target assessment value of index with corresponding target assessment value;When target assessment risk When parameter is not consistent with target assessment value, the examination early warning of target assessment index is generated according to target assessment risk parameter; Real time monitoring table is generated according to target assessment risk parameter and examination early warning, real time monitoring table is pushed into examination user's mark Know corresponding user terminal.
Those of ordinary skill in the art will appreciate that realizing all or part of the process in above-described embodiment method, being can be with Instruct relevant hardware to complete by computer program, computer program to can be stored in a non-volatile computer readable It takes in storage medium, the computer program is when being executed, it may include such as the process of the embodiment of above-mentioned each method.Wherein, this Shen Please provided by any reference used in each embodiment to memory, storage, database or other media, may each comprise Non-volatile and/or volatile memory.Nonvolatile memory may include read-only memory (ROM), programming ROM (PROM), electrically programmable ROM (EPROM), electrically erasable ROM (EEPROM) or flash memory.Volatile memory may include Random access memory (RAM) or external cache.By way of illustration and not limitation, RAM is available in many forms, Such as static state RAM (SRAM), dynamic ram (DRAM), synchronous dram (SDRAM), double data rate sdram (DDRSDRAM), enhancing Type SDRAM (ESDRAM), synchronization link (Synchlink) DRAM (SLDRAM), memory bus (Rambus) direct RAM (RDRAM), direct memory bus dynamic ram (DRDRAM) and memory bus dynamic ram (RDRAM) etc..
Each technical characteristic of above embodiments can be combined arbitrarily, for simplicity of description, not to above-described embodiment In each technical characteristic it is all possible combination be all described, as long as however, the combination of these technical characteristics be not present lance Shield all should be considered as described in this specification.
The several embodiments of the application above described embodiment only expresses, the description thereof is more specific and detailed, but simultaneously It cannot therefore be construed as limiting the scope of the patent.It should be pointed out that coming for those of ordinary skill in the art It says, without departing from the concept of this application, various modifications and improvements can be made, these belong to the protection of the application Range.Therefore, the scope of protection shall be subject to the appended claims for the application patent.

Claims (16)

1. a kind of examination data monitoring method, which comprises
User list to be examined is obtained, reads user identifier to be examined wait examine in user list from described;
The corresponding target monitoring information of the user identifier to be examined is searched, the target network address in the target monitoring information is obtained With target assessment index;
The corresponding target assessment achievement data of the target assessment index is obtained from the corresponding targeted website of the target network address;
The target assessment risk parameter that every target assessment index is calculated according to the target assessment achievement data, according to The target assessment risk parameter generates examination monitoring table;
The examination monitoring table is pushed into the corresponding user terminal of the examination user identifier.
2. examination data monitoring method according to claim 1, which is characterized in that it is described obtain user list to be examined it Before, further includes:
Receive the monitoring demand data that the user terminal is sent, from the monitoring demand data extraction Add User mark, Newly-increased account information and newly-increased monitoring information;
The mark that Adds User is added to described wait examine in user list;
The newly-increased account information, the newly-increased monitoring information and the mark that Adds User are associated binding.
3. examination data monitoring method according to claim 2, which is characterized in that described corresponding from the target network address Targeted website obtains the corresponding target assessment achievement data of the target assessment index, comprising:
The corresponding account information to be examined of the user identifier to be examined is searched, the user wait examine in account information is obtained Account and user password;
The targeted website is logged according to the user account and the user password;
When successfully logging in the targeted website, the corresponding mesh of the target assessment index is periodically obtained from the targeted website Performance assessment criteria data are marked, the target assessment achievement data is stored to examination data library.
4. examination data monitoring method according to claim 3, which is characterized in that described according to the target assessment index Data calculate the target assessment risk parameter of every target assessment index, are generated according to the target assessment risk parameter Examination monitoring table, comprising:
When reaching default detection time, every target assessment index is obtained from the examination data library in default monitoring Target assessment achievement data in period extracts target assessment risk parameter from the target assessment achievement data;
The target assessment value for obtaining every target assessment index, by the target assessment risk parameter and the corresponding mesh Mark examination value is compared;
It is raw according to the target assessment risk parameter when the target assessment risk parameter is not consistent with the target assessment value At the examination early warning of the target assessment index;
Examination monitoring table is generated according to the examination risk parameter and the examination early warning.
5. examination data monitoring method according to claim 4, which is characterized in that described according to the target assessment risk Parameter and the examination early warning generate examination monitoring table, comprising:
By the target assessment risk parameter of every target assessment index, corresponding default risk assessment mould is inputted respectively Type obtains examination risk score;
According to the target assessment risk score of every target assessment index, the risk integrative for obtaining user to be examined is obtained Point, and corresponding examination risk class is obtained according to the risk integrative score;
According to the target assessment risk parameter, the examination early warning, the examination risk score and the examination risk Grade generates examination monitoring table.
6. examination data monitoring method according to claim 3, which is characterized in that the method also includes:
Target assessment risk parameter is extracted from the target assessment achievement data;
The target assessment value for obtaining every target assessment index, by the target assessment risk parameter and the corresponding mesh Mark examination value is compared;
When the target assessment risk parameter is not consistent with the target assessment value, institute is generated according to the examination risk parameter State the examination early warning of target assessment index;
The examination early warning is pushed into the corresponding user terminal of the examination user identifier.
7. examination data monitoring method according to claim 3, which is characterized in that the method also includes:
When receiving the real time monitoring instruction of user terminal transmission, according to real time monitoring instruction from the targeted website Obtain the corresponding current performance assessment criteria data of the target assessment index;
According to the current performance assessment criteria data, to the performance assessment criteria of the target assessment index every in the examination data library Data are updated, and extract target assessment risk parameter from the updated target assessment achievement data;
The target assessment value for obtaining every target assessment index, by the target assessment risk parameter and the corresponding mesh Mark examination value is compared;
It is raw according to the target assessment risk parameter when the target assessment risk parameter is not consistent with the target assessment value At the examination early warning of the target assessment index;
Real time monitoring table is generated according to the target assessment risk parameter and the examination early warning, by the real time monitoring table Push to the corresponding user terminal of the examination user identifier.
8. a kind of examination data monitoring device, described device include:
User profile acquisition module is read wait examine in user list wait examine for obtaining user list to be examined from described User identifier;
Searching module obtains the target monitoring information for searching the corresponding target monitoring information of the examination user identifier In target network address and target assessment index;
Data acquisition module is examined for obtaining the corresponding target of the target assessment index from the corresponding website of the target network address Core achievement data;
Computing module, for calculating the target assessment of every target assessment index according to the target assessment achievement data Risk parameter generates examination monitoring table according to the target assessment risk parameter;
Pushing module, for the examination monitoring table to be pushed to the corresponding user terminal of the examination user identifier.
9. device according to claim 8, which is characterized in that described device further include:
Newly-added information extraction module, the monitoring demand data sent for receiving the user terminal, from the monitoring demand number The mark that Adds User, newly-increased account information and newly-increased monitoring information are extracted according to middle;
User list update module, it is described wait examine in user list for the mark that Adds User to be added to;
Be associated with binding module, for by the newly-increased account information, the newly-increased monitoring information and it is described Add User identify into Row association binding.
10. device according to claim 9, which is characterized in that the data acquisition module includes:
Account information acquiring unit, for searching the corresponding account information to be examined of the user identifier to be examined, described in acquisition User account and user password wait examine in account information;
Website log unit, for logging in the targeted website according to the user account and the user password;
Achievement data storage unit, for periodically obtaining institute from the targeted website when successfully logging in the targeted website The corresponding target assessment achievement data of target assessment index is stated, the target assessment achievement data is stored to examination data library.
11. device according to claim 10, which is characterized in that the computing module includes:
Risk parameter extraction unit, for being obtained described in items from the examination data library when reaching default detection time Target assessment achievement data of the target assessment index within the default monitoring period, extracts from the target assessment achievement data Target assessment risk parameter;
Comparing unit, for obtaining the target assessment value of every target assessment index, by the target assessment risk parameter It is compared with the corresponding target assessment value;
Generation unit is prompted, for when the target assessment risk parameter is not consistent with the target assessment value, according to described Target assessment risk parameter generates the examination early warning of the target assessment index;
Table generation unit is monitored, for generating examination monitoring table according to the examination risk parameter and the examination early warning.
12. device according to claim 11, which is characterized in that the monitoring table generation unit includes:
Score computation subunit, for being inputted respectively by the target assessment risk parameter of every target assessment index Corresponding default risk evaluation model obtains examination risk score;
Risk class computation subunit is obtained for the target assessment risk score according to every target assessment index Corresponding examination risk class is obtained to the risk integrative score of user to be examined, and according to the risk integrative score;
It monitors table and generates subelement, for according to the target assessment risk parameter, the examination early warning, the examination wind Dangerous score and the examination risk class generate examination monitoring table.
13. device according to claim 10, which is characterized in that described device further include:
First parameter extraction module, for extracting target assessment risk parameter from the target assessment achievement data;
First comparison module, for obtaining the target assessment value of every target assessment index, by the target assessment risk Parameter is compared with the corresponding target assessment value;
First cue module, for when the target assessment risk parameter is not consistent with the target assessment value, according to described Examination risk parameter generates the examination early warning of the target assessment index;
First prompt pushing module, it is whole for the examination early warning to be pushed to the corresponding user of the examination user identifier End.
14. device according to claim 10, which is characterized in that described device further include:
Achievement data obtain module, for when receive user terminal transmission real time monitoring instruction when, according to the real-time prison Control instruction obtains the corresponding current performance assessment criteria data of the target assessment index from the targeted website;
Second parameter extraction module is used for according to the current performance assessment criteria data, to described in items in the examination data library The performance assessment criteria data of target assessment index are updated, and extract target from the updated target assessment achievement data Examine risk parameter;
Second comparison module, for obtaining the target assessment value of every target assessment index, by the target assessment risk Parameter is compared with the corresponding target assessment value;
Second cue module, for when the target assessment risk parameter is not consistent with the target assessment value, according to described Target assessment risk parameter generates the examination early warning of the target assessment index;
Second prompt pushing module, generates real time monitoring according to the target assessment risk parameter and the examination early warning The real time monitoring table is pushed to the corresponding user terminal of the examination user identifier by table.
15. a kind of computer equipment, including memory and processor, the memory are stored with computer program, feature exists In the processor realizes examination data monitoring side described in any one of claims 1 to 7 when executing the computer program The step of method.
16. a kind of computer readable storage medium, is stored thereon with computer program, which is characterized in that the computer program The step of examination data monitoring method described in any one of claims 1 to 7 is realized when being executed by processor.
CN201910683706.5A 2019-07-26 2019-07-26 Examination data monitoring method, device, computer equipment and storage medium Pending CN110400080A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910683706.5A CN110400080A (en) 2019-07-26 2019-07-26 Examination data monitoring method, device, computer equipment and storage medium

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910683706.5A CN110400080A (en) 2019-07-26 2019-07-26 Examination data monitoring method, device, computer equipment and storage medium

Publications (1)

Publication Number Publication Date
CN110400080A true CN110400080A (en) 2019-11-01

Family

ID=68325143

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910683706.5A Pending CN110400080A (en) 2019-07-26 2019-07-26 Examination data monitoring method, device, computer equipment and storage medium

Country Status (1)

Country Link
CN (1) CN110400080A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111028942A (en) * 2019-12-10 2020-04-17 医渡云(北京)技术有限公司 Data processing method and device, storage medium and electronic terminal
CN112783727A (en) * 2021-01-28 2021-05-11 北京百度网讯科技有限公司 Work amount monitoring method and device, electronic equipment and computer readable medium
CN113887889A (en) * 2021-09-15 2022-01-04 北京市农林科学院信息技术研究中心 Assessment data generation method and device
CN114693188A (en) * 2022-05-31 2022-07-01 四川骏逸富顿科技有限公司 Risk supervision method, system and equipment for drug retail industry

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103618649A (en) * 2013-12-03 2014-03-05 北京人民在线网络有限公司 Website data acquisition method and device
CN104636447A (en) * 2015-01-21 2015-05-20 上海天呈医流科技股份有限公司 Intelligent evaluation method and system for medical instrument B2B website users
CN104991956A (en) * 2015-07-21 2015-10-21 中国人民解放军信息工程大学 Microblog transmission group division and account activeness evaluation method based on theme possibility model
CN105321131A (en) * 2015-11-06 2016-02-10 厦门均达网络科技有限公司 Real estate value evaluation system and evaluation method
CN105915394A (en) * 2016-06-20 2016-08-31 河南派亚尼尔自动化设备有限公司 Visual monitoring platform based on HTML5 and application method
CN105931014A (en) * 2016-04-13 2016-09-07 中国农业大学 Gridding management service system and method for town community
CN107330630A (en) * 2017-07-07 2017-11-07 山东浪潮云服务信息科技有限公司 A kind of on-line examination system based on government's big data sharing application platform
CN107590733A (en) * 2017-08-08 2018-01-16 杭州灵皓科技有限公司 Platform methods of risk assessment is borrowed based on the net of geographical economy and social networks
CN107689951A (en) * 2017-07-26 2018-02-13 上海壹账通金融科技有限公司 Web data crawling method, device, user terminal and readable storage medium storing program for executing
CN109492871A (en) * 2018-10-11 2019-03-19 平安科技(深圳)有限公司 Method, apparatus and computer equipment based on system monitoring management supplier
CN109636084A (en) * 2018-10-22 2019-04-16 中国平安人寿保险股份有限公司 Consumer's risk type evaluation method, storage medium and equipment based on big data
CN109684848A (en) * 2018-09-07 2019-04-26 平安科技(深圳)有限公司 Methods of risk assessment, device, equipment and readable storage medium storing program for executing

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103618649A (en) * 2013-12-03 2014-03-05 北京人民在线网络有限公司 Website data acquisition method and device
CN104636447A (en) * 2015-01-21 2015-05-20 上海天呈医流科技股份有限公司 Intelligent evaluation method and system for medical instrument B2B website users
CN104991956A (en) * 2015-07-21 2015-10-21 中国人民解放军信息工程大学 Microblog transmission group division and account activeness evaluation method based on theme possibility model
CN105321131A (en) * 2015-11-06 2016-02-10 厦门均达网络科技有限公司 Real estate value evaluation system and evaluation method
CN105931014A (en) * 2016-04-13 2016-09-07 中国农业大学 Gridding management service system and method for town community
CN105915394A (en) * 2016-06-20 2016-08-31 河南派亚尼尔自动化设备有限公司 Visual monitoring platform based on HTML5 and application method
CN107330630A (en) * 2017-07-07 2017-11-07 山东浪潮云服务信息科技有限公司 A kind of on-line examination system based on government's big data sharing application platform
CN107689951A (en) * 2017-07-26 2018-02-13 上海壹账通金融科技有限公司 Web data crawling method, device, user terminal and readable storage medium storing program for executing
CN107590733A (en) * 2017-08-08 2018-01-16 杭州灵皓科技有限公司 Platform methods of risk assessment is borrowed based on the net of geographical economy and social networks
CN109684848A (en) * 2018-09-07 2019-04-26 平安科技(深圳)有限公司 Methods of risk assessment, device, equipment and readable storage medium storing program for executing
CN109492871A (en) * 2018-10-11 2019-03-19 平安科技(深圳)有限公司 Method, apparatus and computer equipment based on system monitoring management supplier
CN109636084A (en) * 2018-10-22 2019-04-16 中国平安人寿保险股份有限公司 Consumer's risk type evaluation method, storage medium and equipment based on big data

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
于小迪: "北京现代O2O体系构建研究", 《中国优秀硕士学位论文全文数据库 经济与管理科学辑》 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111028942A (en) * 2019-12-10 2020-04-17 医渡云(北京)技术有限公司 Data processing method and device, storage medium and electronic terminal
CN111028942B (en) * 2019-12-10 2023-11-03 医渡云(北京)技术有限公司 Data processing method and device, storage medium and electronic terminal
CN112783727A (en) * 2021-01-28 2021-05-11 北京百度网讯科技有限公司 Work amount monitoring method and device, electronic equipment and computer readable medium
CN113887889A (en) * 2021-09-15 2022-01-04 北京市农林科学院信息技术研究中心 Assessment data generation method and device
CN114693188A (en) * 2022-05-31 2022-07-01 四川骏逸富顿科技有限公司 Risk supervision method, system and equipment for drug retail industry

Similar Documents

Publication Publication Date Title
CN110399925B (en) Account risk identification method, device and storage medium
CN110400080A (en) Examination data monitoring method, device, computer equipment and storage medium
CN104615852B (en) The method for order and the raising source service efficiency of registering for guarantee online booking
JP2012504288A (en) Evaluating online marketing efficiency
CN110442712B (en) Risk determination method, risk determination device, server and text examination system
CN109523301A (en) Product trading data processing method, device, computer equipment and storage medium
US11550937B2 (en) Privacy trustworthiness based API access
CN110020002A (en) Querying method, device, equipment and the computer storage medium of event handling scheme
CN110750710A (en) Wind control protocol early warning method and device, computer equipment and storage medium
CN110598478A (en) Block chain based evidence verification method, device, equipment and storage medium
CN107508809A (en) Identify the method and device of website type
CN109543891A (en) Method for building up, equipment and the computer readable storage medium of capacity prediction model
CN109325868A (en) Questionnaire data processing method, device, computer equipment and storage medium
CN115033876A (en) Log processing method, log processing device, computer device and storage medium
CN110751317A (en) Power load prediction system and prediction method
CN112100219A (en) Report generation method, device, equipment and medium based on database query processing
CN116860311A (en) Script analysis method, script analysis device, computer equipment and storage medium
CN105302844B (en) Internet surveillance method, apparatus and system
CN111046382A (en) Database auditing method, device, storage medium and device
CN108257011B (en) Drop list processing method and device
CN110263283A (en) Website detection method and device
CN115174205A (en) Network space safety real-time monitoring method, system and computer storage medium
CN116226865A (en) Security detection method, device, server, medium and product of cloud native application
CN109471852A (en) Medical data base method for building up, device, computer equipment and storage medium
CN114416806A (en) Method and device for acquiring power safety knowledge data and computer equipment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20191101

RJ01 Rejection of invention patent application after publication