CN110397269A - A kind of formwork keel and its construction method for big section composite steel concrete column - Google Patents
A kind of formwork keel and its construction method for big section composite steel concrete column Download PDFInfo
- Publication number
- CN110397269A CN110397269A CN201910599932.5A CN201910599932A CN110397269A CN 110397269 A CN110397269 A CN 110397269A CN 201910599932 A CN201910599932 A CN 201910599932A CN 110397269 A CN110397269 A CN 110397269A
- Authority
- CN
- China
- Prior art keywords
- galvanized steel
- snap
- gauges
- gauge
- steel snap
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 81
- 239000010959 steel Substances 0.000 title claims abstract description 81
- 238000009415 formwork Methods 0.000 title claims abstract description 42
- 239000004567 concrete Substances 0.000 title claims abstract description 35
- 239000002131 composite material Substances 0.000 title claims abstract description 17
- 238000010276 construction Methods 0.000 title claims description 20
- 229910001335 Galvanized steel Inorganic materials 0.000 claims abstract description 171
- 239000008397 galvanized steel Substances 0.000 claims abstract description 171
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 claims abstract description 40
- 229910052742 iron Inorganic materials 0.000 claims abstract description 18
- 238000005452 bending Methods 0.000 claims description 8
- 239000000203 mixture Substances 0.000 claims description 7
- 238000009434 installation Methods 0.000 claims description 5
- HCHKCACWOHOZIP-UHFFFAOYSA-N Zinc Chemical compound [Zn] HCHKCACWOHOZIP-UHFFFAOYSA-N 0.000 claims description 3
- 238000003780 insertion Methods 0.000 claims description 3
- 230000037431 insertion Effects 0.000 claims description 3
- 238000007747 plating Methods 0.000 claims description 3
- 239000011701 zinc Substances 0.000 claims description 3
- 229910052725 zinc Inorganic materials 0.000 claims description 3
- 238000005553 drilling Methods 0.000 abstract description 4
- 238000000465 moulding Methods 0.000 abstract description 4
- 230000008447 perception Effects 0.000 abstract description 4
- 238000005728 strengthening Methods 0.000 abstract description 4
- 238000000926 separation method Methods 0.000 abstract description 3
- 230000000694 effects Effects 0.000 abstract description 2
- 238000003466 welding Methods 0.000 description 5
- 238000000034 method Methods 0.000 description 4
- 230000003014 reinforcing effect Effects 0.000 description 2
- 229910000746 Structural steel Inorganic materials 0.000 description 1
- 238000007792 addition Methods 0.000 description 1
- 238000005345 coagulation Methods 0.000 description 1
- 230000015271 coagulation Effects 0.000 description 1
- 230000006835 compression Effects 0.000 description 1
- 238000007906 compression Methods 0.000 description 1
- 230000008602 contraction Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 239000011150 reinforced concrete Substances 0.000 description 1
- 238000010008 shearing Methods 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G13/00—Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills
- E04G13/02—Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills for columns or like pillars; Special tying or clamping means therefor
Abstract
The present invention discloses a kind of formwork keel for big section composite steel concrete column, including two piece of the first U galvanized steel snap-gauge and two piece of the 2nd U galvanized steel snap-gauge, two pieces two pieces the first U galvanized steel snap-gauges are arranged in parallel, two piece of the 2nd U galvanized steel snap-gauge is arranged in parallel, and two piece of the 2nd U galvanized steel snap-gauge is vertically arranged with two piece of the first U galvanized steel snap-gauge;The present invention is made of square steel and U galvanized steel snap-gauges, surpass the big section strengthening concrete column template of 2m × 2m suitable for different specification size, it can be a set of multi-purpose in the cylinder of different big sectional dimensions is built, simple, convenient disassembly is installed, only need two people that can easily just carry out tightening operation, when needing to dismantle, wedge-shaped iron is removed, four pieces of U galvanized steel snap-gauge natural separations, formwork system stability is high, good forming effect, verticality, flatness are easy to control, and inner template, without drilling, non-bolt hole, perception are preferable after molding.
Description
Technical field
The invention belongs to concrete construction mounting technology fields, and in particular to arrive formwork keel, more particularly a kind of use
In the formwork keel and its construction method of big section composite steel concrete column.
Background technique
With the increase of the high building structure number of plies, extended height, structural column internal force increases sharply, in Aseismic Design,
To guarantee that there is pillar certain ductility must control the axial compression ratio of pillar, the section of column is correspondingly required to increase, therefore big section
More and more to solve, building arrangements are difficult, actually make in large-span structure and earthquake territory application in tall buildings for Structural Steel Reinforced Concrete
The problems such as being reduced with area;
But in the actual construction process, since fashioned iron core causes conventional formwork difficulty to increase, conventional " Screw arbor with nut at both-ends adds
Solid model plate " need to will be fixed using mountain type due to outside the wooden a tree, used in making timber for boats, steel pipe after Screw arbor with nut at both-ends and fashioned iron core firm welding, but Screw arbor with nut at both-ends welds
Welding residual stress is generated in termination process, so that fashioned iron core is generated different degrees of horizontal and vertical contraction distortion, is directly affected type
The stress performance of steel core;Composite steel concrete column reinforcing bar is intensive, and screw rod and reinforcing bar welding difficulty are big, and welding quality requires high, inconvenience
In operation;As the super 2m × 2m of strengthening concrete column dimension, the wooden a tree, used in making timber for boats and steel tube framework bending resistance, shearing resistance, amount of deflection do not meet actual condition
It easily causes that quick-fried mould in concreting process, rise mould, at this moment needs to design Novel keel and formwork way solves big section stiffness
The problem of column formwork construction.
Summary of the invention
In order to overcome above-mentioned technical problem, the purpose of the present invention is to provide one kind to be used for big section composite steel concrete column
Formwork keel, the present invention is made of square steel and U galvanized steel snap-gauges, is suitable for the big section strength of the super 2m × 2m of different specification size
Property concrete column template, can be a set of multi-purpose in the cylinder of different big sectional dimensions is built, installation is simple, convenient disassembly, only needs
Two people can easily just carry out tightening operation, and when needing to dismantle, wedge-shaped iron is removed, four pieces of U galvanized steel snap-gauge natural separations,
Formwork system stability is high, and good forming effect, verticality, flatness are easy to control, and inner template is not necessarily to drilling, non-bolt after molding
Hole, perception are preferable.
The purpose of the present invention can be achieved through the following technical solutions:
A kind of formwork keel for big section composite steel concrete column, including two piece of the first U galvanized steel snap-gauge and two pieces
2nd U galvanized steel snap-gauges, two pieces two pieces the first U galvanized steel snap-gauges are arranged in parallel, and two piece of the 2nd U galvanized steel snap-gauge is parallel
Setting, and two piece of the 2nd U galvanized steel snap-gauge is vertically arranged with two piece of the first U galvanized steel snap-gauge, two piece of the first U galvanized steel
Both ends of the both ends of snap-gauge respectively with two piece of the 2nd U galvanized steel snap-gauge are mutually clamped, and run through the first U galvanized steel snap-gauges and second
One end of U galvanized steel snap-gauges offers several groups square hole, and two piece of the 2nd U galvanized steel snap-gauge and two piece of the first U plating
It is connected with several square steel on the inside of zinc steel snap-gauge, inner template, two piece of the 2nd U galvanized steel are connected on the inside of several square steel
The outside of snap-gauge and two piece of the first U galvanized steel snap-gauge is respectively welded with one piece of bending resistant steel plate, and the inside insertion of square hole is equipped with wedge
Shape iron.
As a further solution of the present invention: the square enclosed construction of inner template, and the inside of square enclosed construction
Concrete column is formed by concreting, the inside installation of concrete column is embedded with the first steelframe and the second steelframe, the
One steelframe and the second steel frame vertical composition cross structure arranged in a crossed manner.
As a further solution of the present invention: square steel is rectangular steel pipe, and the length scale of square steel is 40mm, width size
For 40mm, the thickness size of the inside hollow out of square steel, and the outer wall of square steel to inner wall is 3mm.
As further scheme of the invention: one end of the first U galvanized steel snap-gauges and the 2nd U galvanized steel snap-gauges is in
U-shaped setting, and the other end of the first U galvanized steel snap-gauges and the 2nd U galvanized steel snap-gauges is in flat setting, square hole is provided with
The flat end of first U galvanized steel snap-gauges and the 2nd U galvanized steel snap-gauges, and the flat end clamping of the 2nd U galvanized steel snap-gauges
At the U-shaped end of the first U galvanized steel snap-gauges, two piece of the 2nd U galvanized steel snap-gauge mutually blocks with two piece of the first U galvanized steel snap-gauge
It connects and constitutes four frame shape structures.
A kind of construction method of the formwork keel for big section composite steel concrete column, which specifically includes as follows
Step:
Step 1: being located at construction surface for inner template branch first, and square steel is mounted on inner template according to actual design spacing
Surface, square steel is as formwork main joist secondary joist, by two piece of the first U galvanized steel snap-gauge and two piece of the 2nd U galvanized steel snap-gauge
It is mutually clamped, the flat end on the first U galvanized steel snap-gauges snaps onto the U-shaped end of the 2nd U galvanized steel snap-gauges, and the first U head
Galvanized steel snap-gauge is vertical with the 2nd U galvanized steel snap-gauge holdings, two piece of the first U galvanized steel snap-gauge and two piece the 2nd U it is zinc-plated
Steel snap-gauge is mutually clamped four frame shape structures of composition as formwork main joist, the concrete main body height system poured according to actual needs
Make multiple four frame shapes structures;
Step 2: the U galvanized steel snap-gauges of multiple groups the first are mutually clamped to four frame shapes of composition with the 2nd U galvanized steel snap-gauges
Structure is connected to the periphery of square steel according to actual design spacing, makes the first U galvanized steel snap-gauges and the 2nd U galvanized steel snap-gauges
The outer wall of inner wall and square steel fits, and wedge-shaped iron is inserted on the first U galvanized steel snap-gauges outside the 2nd U galvanized steel snap-gauges
In the nearest square hole of wall, then it is inserted into the nearest square hole of the first U galvanized steel snap-gauge outer walls on the 2nd U galvanized steel snap-gauges
The connection structure of the first U galvanized steel snap-gauges and the 2nd U galvanized steel snap-gauges is reinforced in wedge-shaped iron, completion, entire formwork
The constructing operation of keel is completed.
The invention has the following advantages:
1, the present invention constitutes entire branch by the first U galvanized steel snap-gauges, the 2nd U galvanized steel snap-gauges, square steel and inner template
By the way of mould keel structure, the first U galvanized steel snap-gauges and the 2nd U galvanized steel snap-gauges are mutually clamped using U-shaped end with flat end
Composition, and installed between inner template and the first U galvanized steel snap-gauges and the 2nd U galvanized steel snap-gauges using square steel, it is installing
When it is more convenient, and inner template without drilling, concrete column surface non-bolt hole after molding, perception is preferable, and entire formwork
Keel structure can reuse, and be constructed being clamped with by way of socket when installing, convenient for entire formwork system
Verticality and flatness controlled;
2, by the first U galvanized steel snap-gauges and the 2nd U galvanized steel snap-gauges composition formwork main joists, the first U it is zinc-plated
Due to being provided with multiple square holes when steel snap-gauge and the 2nd U galvanized steel snap-gauges are mutually clamped, it is fixed using wedge-shaped iron
Position it is adjustable, the first U galvanized steel snap-gauges and the 2nd U galvanized steel snap-gauges can form four side of different specifications and sizes
Frame-shaped construction is suitable for the big section strengthening concrete column template of the super 2m × 2m of different specification size, can be in different big sectional dimensions
Cylinder build in it is a set of multi-purpose;
3, group is carried out using the first U galvanized steel snap-gauges and the 2nd U galvanized steel snap-gauges by way of being mutually clamped
Dress, and square steel is installed using direct-insert mode, thus entire formwork keel structure convenient disassembly, and install simply,
It only needs two people that can easily just fasten to formwork keel structure, when needing to dismantle, wedge-shaped iron is removed, inner template is utilized
Tension is detached from the first U galvanized steel snap-gauges and the 2nd U galvanized steel snap-gauges naturally, easy to operate.
Detailed description of the invention
The present invention will be further described below with reference to the drawings.
Fig. 1 is a kind of top view of the formwork keel for big section composite steel concrete column of the present invention.
Fig. 2 is that the first U galvanized steel snap-gauges cut open in a kind of formwork keel for big section composite steel concrete column of the present invention
Face figure.
1, the first U galvanized steel snap-gauges in figure;2, the 2nd U galvanized steel snap-gauges;3, square hole;4, square steel;5, inner template;6,
Concrete column;7, the first steelframe;8, the second steelframe;9, bending resistant steel plate;10, wedge-shaped iron.
Specific embodiment
Below in conjunction with the embodiment of the present invention, technical scheme in the embodiment of the invention is clearly and completely described,
Obviously, described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.Based in the present invention
Embodiment, all other embodiment obtained by those of ordinary skill in the art without making creative efforts, all
Belong to the scope of protection of the invention.
As shown in Figs. 1-2, a kind of formwork keel for big section composite steel concrete column, including two piece the first U zinc-plated
Steel snap-gauge 1 and two piece of the 2nd U galvanized steel snap-gauge 2, two pieces two pieces the first U galvanized steel snap-gauges 1 are arranged in parallel, two piece of the 2nd U
Head galvanized steel snap-gauge 2 is arranged in parallel, and two piece of the 2nd U galvanized steel snap-gauge 2 is vertical with two piece of the first U galvanized steel snap-gauge 1 sets
It sets, both ends of the both ends of two piece of the first U galvanized steel snap-gauge 1 respectively with two piece of the 2nd U galvanized steel snap-gauge 2 are mutually clamped, and are run through
One end of first U galvanized steel snap-gauges 1 and the 2nd U galvanized steel snap-gauges 2 offers several groups square hole 3, and two piece of the 2nd U head
The inside of galvanized steel snap-gauge 2 and two piece of the first U galvanized steel snap-gauge 1 is connected with several square steel 4, the inside of several square steel 4
It is connected with inner template 5, the outside of two piece of the 2nd U galvanized steel snap-gauge 2 and two piece of the first U galvanized steel snap-gauge 1 is respectively welded with one
The inside insertion of block bending resistant steel plate 9, square hole 3 is equipped with wedge-shaped iron 10, bending resistant steel plate 9 and the first U galvanized steel snap-gauges 1 and second
U galvanized steel snap-gauges 2 are fixed by the way of butt welding, so as to improve the first U galvanized steel snap-gauges 1 and the 2nd U head
The bending resistance of galvanized steel snap-gauge 2 carries n ability, and makes the first U galvanized steel snap-gauges 1 and the 2nd U galvanized steel snap-gauges 2 and bending resistance
Steel plate 9 docks staggered edge free, and butting error controls within ± 1mm.
The square enclosed construction of inner template 5, and the inside of square enclosed construction forms coagulation by concreting
The inside installation of earth pillar body 6, concrete column 6 is embedded with the first steelframe 7 and the second steelframe 8, the first steelframe 7 and the second steelframe 8
Square crossing setting constitute cross structure, using the first steelframe 7 and 8 square crossing of the second steelframe setting to concrete column 6 into
Row is reinforced.
Square steel 4 is rectangular steel pipe, and the length scale of square steel 4 is 40mm, and width size is 40mm, and the inside of square steel 4 is engraved
Sky, and the thickness size of the outer wall of square steel 4 to inner wall is 3mm.
The U-shaped setting in one end of first U galvanized steel snap-gauges 1 and the 2nd U galvanized steel snap-gauges 2, and the first U it is zinc-plated
The other end of steel snap-gauge 1 and the 2nd U galvanized steel snap-gauges 2 is in flat setting, and square hole 3 is provided with the first U galvanized steel snap-gauges 1
With the flat end of the 2nd U galvanized steel snap-gauges 2, and the flat end of the 2nd U galvanized steel snap-gauges 2 is connected to the first U galvanized steels
The U-shaped end of snap-gauge 1, two piece of the 2nd U galvanized steel snap-gauge 2 and the mutually clamping of two piece of the first U galvanized steel snap-gauge 1 constitute four frames
Shape structure facilitates the first U head in such a way that the first U galvanized steel snap-gauges 1 and the 2nd U galvanized steel snap-gauges 2 are mutually clamped
The disassembly of galvanized steel snap-gauge 1 and the 2nd U galvanized steel snap-gauges 2, is inserted into square hole 3 using wedge-shaped iron 10 and is reinforced, needed
When disassembly, wedge-shaped iron 10 is removed, the extruding of the first U galvanized steel snap-gauges 1 and the 2nd U galvanized steel snap-gauges 2 by inner template 5
Natural separation only needs two people that can facilitate and fasten and disassembling section, saving manpower.
A kind of construction method of the formwork keel for big section composite steel concrete column, which specifically includes as follows
Step:
Step 1: being located at construction surface for inner template 5 first, and square steel 4 is mounted on inner template 5 according to actual design spacing
Surface, square steel 4 be used as formwork main joist secondary joist, by two piece of the first U galvanized steel snap-gauge 1 and two piece of the 2nd U galvanized steel
The clamping of 2 phase of snap-gauge, the flat end on the first U galvanized steel snap-gauges 1 snap onto the U-shaped end of the 2nd U galvanized steel snap-gauges 2, and
First U galvanized steel snap-gauges 1 keep vertical with the 2nd U galvanized steel snap-gauges 2, two piece of the first U galvanized steel snap-gauge 1 and two piece
Two U 2 phase of galvanized steel snap-gauge clamping forms four frame shape structures as formwork main joist, the concrete poured according to actual needs
Cylinder 6 highly makes multiple four frame shapes structures;
Step 2: four frames that the U galvanized steel snap-gauges 1 of multiple groups the first are formed with the 2nd U 2 phase of galvanized steel snap-gauge clampings
Shape structure is connected to the periphery of square steel 4 according to actual design spacing, makes the first U galvanized steel snap-gauges 1 and the 2nd U galvanized steel cards
The inner wall of plate 2 and the outer wall of square steel 4 fit, and wedge-shaped iron 10 is inserted on the first U galvanized steel snap-gauges 1 by the 2nd U platings
In the nearest square hole 3 of zinc steel 2 outer walls of snap-gauge, then on the 2nd U galvanized steel snap-gauges 2 by the first U 1 outer walls of galvanized steel snap-gauge most
It is inserted into wedge-shaped iron 10 in close square hole 3, completes the connection knot to the first U galvanized steel snap-gauges 1 and the 2nd U galvanized steel snap-gauges 2
Structure is reinforced, and the constructing operation of entire formwork keel is completed.
The present invention is made of entirely the first U the 1, the 2nd U galvanized steel snap-gauges 2 of galvanized steel snap-gauge, square steel 4 and inner template 5
Formwork keel structure, the first U galvanized steel snap-gauges 1 are mutually clamped using U-shaped end with flat end with the 2nd U galvanized steel snap-gauges 2
Mode forms, and using square steel 4 install inner template 5 and the first U galvanized steel snap-gauges 1 and the 2nd U galvanized steel snap-gauges 2 it
Between, it is more convenient during installation, and inner template 5, without drilling, 6 surface non-bolt hole of concrete column after molding, perception is preferable,
And entire formwork keel structure can reuse, and be constructed being clamped with by way of socket when installing, convenient for whole
The verticality and flatness of a formwork system are controlled;Pass through the first U galvanized steel snap-gauges 1 and the 2nd U galvanized steel cards
Plate 2 forms formwork main joist, due to being provided with when the first U galvanized steel snap-gauges 1 and the 2nd U galvanized steel snap-gauges 2 are mutually clamped
Multiple square holes 3, therefore, first U galvanized steel snap-gauges 1 and twoth U head adjustable using the position that wedge-shaped iron 10 is fixed
Galvanized steel snap-gauge 2 can form four frame shapes structure of different specifications and sizes, be suitable for the super 2m × 2m of different specification size and cut greatly
Face strengthening concrete column template, can be a set of multi-purpose in the cylinder of different big sectional dimensions is built;By by the first U galvanized steels
Snap-gauge 1 and the 2nd U galvanized steel snap-gauges 2 are assembled by the way of being mutually clamped, and square steel 4 uses direct-insert mode
It is installed, thus entire formwork keel structure convenient disassembly, and install simply, only need two people just can easily be to formwork keel
Structure is fastened, and when needing to dismantle, wedge-shaped iron 10 is removed, and makes the first U galvanized steel snap-gauges using the tension of inner template 5
1 and the 2nd U galvanized steel snap-gauges 2 be detached from naturally, it is easy to operate.
Above content is only to structure of the invention example and explanation, affiliated those skilled in the art couple
Described specific embodiment does various modifications or additions or is substituted in a similar manner, without departing from invention
Structure or beyond the scope defined by this claim, is within the scope of protection of the invention.
Claims (5)
1. a kind of formwork keel for big section composite steel concrete column, which is characterized in that including two piece of the first U galvanized steel card
Plate (1) and two piece of the 2nd U galvanized steel snap-gauge (2), two pieces of described two piece the first U galvanized steel snap-gauges (1) are arranged in parallel, and two pieces
Described 2nd U galvanized steel snap-gauges (2) are arranged in parallel, and two piece of the 2nd U galvanized steel snap-gauge (2) and two piece the first U it is zinc-plated
Steel snap-gauge (1) is vertically arranged, the both ends of two pieces of the described first U galvanized steel snap-gauges (1) respectively with two piece of the 2nd U galvanized steel card
The both ends of plate (2) are mutually clamped, and one end through the described first U galvanized steel snap-gauges (1) and the 2nd U galvanized steel snap-gauges (2) is equal
It offers several groups square hole (3), and two piece of the 2nd U galvanized steel snap-gauge (2) and two piece of the first U galvanized steel snap-gauge (1) is interior
Side is connected with several square steel (4), is connected with inner template (5) on the inside of several square steel (4), two pieces of the 2nd U heads
The outside of galvanized steel snap-gauge (2) and two piece of the first U galvanized steel snap-gauge (1) is respectively welded with one piece of bending resistant steel plate (9), the square hole
(3) inside insertion is equipped with wedge-shaped iron (10).
2. a kind of formwork keel for big section composite steel concrete column according to claim 1, which is characterized in that described
Inner template (5) square enclosed construction, and the inside of square enclosed construction forms concrete column by concreting
(6), the inside installation of the concrete column (6) is embedded with the first steelframe (7) and the second steelframe (8), first steelframe (7)
It is arranged with (8) square crossing of the second steelframe and constitutes cross structure.
3. a kind of formwork keel for big section composite steel concrete column according to claim 1, which is characterized in that described
Square steel (4) is rectangular steel pipe, and the length scale of square steel (4) is 40mm, and width size is 40mm, the inside of the square steel (4)
Hollow out, and the thickness size of the outer wall of square steel (4) to inner wall is 3mm.
4. a kind of formwork keel for big section composite steel concrete column according to claim 1, which is characterized in that described
The U-shaped setting in one end of first U galvanized steel snap-gauges (1) and the 2nd U galvanized steel snap-gauges (2), and the first U galvanized steel cards
Plate (1) and the other end of the 2nd U galvanized steel snap-gauges (2) are in flat setting, the square hole (3) be provided with the first U it is zinc-plated
The flat end of steel snap-gauge (1) and the 2nd U galvanized steel snap-gauges (2), and the flat end of the 2nd U galvanized steel snap-gauges (2) is connected to
The U-shaped end of first U galvanized steel snap-gauges (1), two pieces of the described 2nd U galvanized steel snap-gauges (2) and two piece of the first U galvanized steel card
Plate (1) mutually clamping constitutes four frame shape structures.
5. a kind of construction method of the formwork keel for big section composite steel concrete column, which is characterized in that construction method tool
Body includes the following steps:
Step 1: inner template (5) branch is located at construction surface first, square steel (4) is mounted on inner template according to actual design spacing
(5) surface, square steel (4) is used as formwork main joist secondary joist, by two piece of the first U galvanized steel snap-gauge (1) and two piece of the 2nd U head
Galvanized steel snap-gauge (2) is mutually clamped, and the flat end on the first U galvanized steel snap-gauges (1) snaps onto the 2nd U galvanized steel snap-gauges (2)
U-shaped end in, and the first U galvanized steel snap-gauges (1) are vertical with the 2nd U galvanized steel snap-gauge (2) holdings, two piece of the first U plating
Zinc steel snap-gauge (1) is mutually clamped four frame shape structures of composition with two piece of the 2nd U galvanized steel snap-gauge (2) as formwork main joist, root
Multiple four frame shapes structures are highly made according to the concrete main body (6) that actual needs pours;
Step 2: the U galvanized steel snap-gauges (1) of multiple groups the first are mutually clamped to four frames of composition with the 2nd U galvanized steel snap-gauges (2)
Shape structure is connected to the periphery of square steel (4) according to actual design spacing, make the first U galvanized steel snap-gauges (1) and the 2nd U it is zinc-plated
The inner wall of steel snap-gauge (2) and the outer wall of square steel (4) fit, and wedge-shaped iron (10) is inserted on the first U galvanized steel snap-gauges (1)
In the square hole (3) nearest by the 2nd U galvanized steel snap-gauge (2) outer walls, then the first U head is leaned on the 2nd U galvanized steel snap-gauges (2)
It is inserted into wedge-shaped iron (10) in the nearest square hole (3) of galvanized steel snap-gauge (1) outer wall, completes to the first U galvanized steel snap-gauges (1) and the
The connection structure of two U galvanized steel snap-gauge (2) is reinforced, and the constructing operation of entire formwork keel is completed.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910599932.5A CN110397269A (en) | 2019-07-04 | 2019-07-04 | A kind of formwork keel and its construction method for big section composite steel concrete column |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910599932.5A CN110397269A (en) | 2019-07-04 | 2019-07-04 | A kind of formwork keel and its construction method for big section composite steel concrete column |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110397269A true CN110397269A (en) | 2019-11-01 |
Family
ID=68323852
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910599932.5A Pending CN110397269A (en) | 2019-07-04 | 2019-07-04 | A kind of formwork keel and its construction method for big section composite steel concrete column |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110397269A (en) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2006169826A (en) * | 2004-12-16 | 2006-06-29 | Kajima Corp | Steel-concrete composite beam and its construction method |
CN203755661U (en) * | 2014-03-03 | 2014-08-06 | 山西四建集团有限公司 | Large-section stiffness steel rib column hoop erecting structure |
CN206625556U (en) * | 2017-02-14 | 2017-11-10 | 中建二局第一建筑工程有限公司 | Stiffening frame and template assembly |
CN207048312U (en) * | 2017-08-11 | 2018-02-27 | 青建国际集团有限公司 | Tool-type post formwork for Large area reinforced concrete post |
CN109853944A (en) * | 2018-12-29 | 2019-06-07 | 河南科建建设工程有限公司 | Building frame structure square column circumference button formwork and its construction method |
CN210828329U (en) * | 2019-07-04 | 2020-06-23 | 中建四局第六建筑工程有限公司 | Formwork keel for large-section stiff concrete column |
-
2019
- 2019-07-04 CN CN201910599932.5A patent/CN110397269A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2006169826A (en) * | 2004-12-16 | 2006-06-29 | Kajima Corp | Steel-concrete composite beam and its construction method |
CN203755661U (en) * | 2014-03-03 | 2014-08-06 | 山西四建集团有限公司 | Large-section stiffness steel rib column hoop erecting structure |
CN206625556U (en) * | 2017-02-14 | 2017-11-10 | 中建二局第一建筑工程有限公司 | Stiffening frame and template assembly |
CN207048312U (en) * | 2017-08-11 | 2018-02-27 | 青建国际集团有限公司 | Tool-type post formwork for Large area reinforced concrete post |
CN109853944A (en) * | 2018-12-29 | 2019-06-07 | 河南科建建设工程有限公司 | Building frame structure square column circumference button formwork and its construction method |
CN210828329U (en) * | 2019-07-04 | 2020-06-23 | 中建四局第六建筑工程有限公司 | Formwork keel for large-section stiff concrete column |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105569331B (en) | A kind of simple support method of concrete cylindrical template | |
KR101026118B1 (en) | Truss structure with high bearing capacity against secondary moment at inner supports and construction method of truss bridge using it | |
KR100731593B1 (en) | A pre-fabricating forms for concrete-structure and the construction method thereof | |
CN212200750U (en) | Assembled building frame structure combination braced system | |
CN110172924B (en) | Integral hydraulic box girder template construction method | |
CN109853944A (en) | Building frame structure square column circumference button formwork and its construction method | |
CN210828329U (en) | Formwork keel for large-section stiff concrete column | |
KR200422887Y1 (en) | Truss structure for beam beam formwork | |
CN105649329A (en) | Reinforcing structure for large-section framework column formworks and construction method | |
CN209686866U (en) | A kind of building frame structure square column circumference button formwork | |
CN111576620A (en) | Construction method for beam-column core area of stiffened concrete structure | |
CN109137757B (en) | Large-span corrugated steel web box girder buckling restrained structure and construction method | |
CN203937017U (en) | Stretch-draw assembly for the production of end-plate-free prestressed-concrete pile | |
CN110397269A (en) | A kind of formwork keel and its construction method for big section composite steel concrete column | |
CN112942660B (en) | Steel and recycled concrete combined beam slab and assembling method thereof | |
CN216552610U (en) | Cast-in-place area of assembled superimposed sheet hangs mould device can have enough to meet need | |
CN215907025U (en) | Connecting joint of U-shaped steel-clad concrete beam and steel-reinforced concrete precast column | |
CN212405468U (en) | Stiff concrete structure beam column core area structure | |
CN210177768U (en) | Assembly type composite structure dense rib floor | |
CN218479548U (en) | Assembled side form reinforcing fastener | |
CN216196610U (en) | Integral fixture for beam side wall | |
CN217974070U (en) | Steel-concrete beam wing plate construction formwork support | |
CN212715911U (en) | Archaize building semicircle half square column template prop up and establish structure | |
CN218375393U (en) | Superimposed sheet installation check structure of taking one's place | |
CN218234361U (en) | Special part reinforcing apparatus of shaped steel concrete integrated configuration |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |