CN110397269A - A kind of formwork keel and its construction method for big section composite steel concrete column - Google Patents

A kind of formwork keel and its construction method for big section composite steel concrete column Download PDF

Info

Publication number
CN110397269A
CN110397269A CN201910599932.5A CN201910599932A CN110397269A CN 110397269 A CN110397269 A CN 110397269A CN 201910599932 A CN201910599932 A CN 201910599932A CN 110397269 A CN110397269 A CN 110397269A
Authority
CN
China
Prior art keywords
galvanized steel
snap
gauges
gauge
steel snap
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910599932.5A
Other languages
Chinese (zh)
Inventor
关汝柯
王练
黎光军
潘怡华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fourth Engineering Division Corp Ltd
Sixth Construction Co Ltd of China Construction Fourth Engineering Division Co Ltd
Original Assignee
China Construction Fourth Engineering Division Corp Ltd
Sixth Construction Co Ltd of China Construction Fourth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fourth Engineering Division Corp Ltd, Sixth Construction Co Ltd of China Construction Fourth Engineering Division Co Ltd filed Critical China Construction Fourth Engineering Division Corp Ltd
Priority to CN201910599932.5A priority Critical patent/CN110397269A/en
Publication of CN110397269A publication Critical patent/CN110397269A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G13/00Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills
    • E04G13/02Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills for columns or like pillars; Special tying or clamping means therefor

Abstract

The present invention discloses a kind of formwork keel for big section composite steel concrete column, including two piece of the first U galvanized steel snap-gauge and two piece of the 2nd U galvanized steel snap-gauge, two pieces two pieces the first U galvanized steel snap-gauges are arranged in parallel, two piece of the 2nd U galvanized steel snap-gauge is arranged in parallel, and two piece of the 2nd U galvanized steel snap-gauge is vertically arranged with two piece of the first U galvanized steel snap-gauge;The present invention is made of square steel and U galvanized steel snap-gauges, surpass the big section strengthening concrete column template of 2m × 2m suitable for different specification size, it can be a set of multi-purpose in the cylinder of different big sectional dimensions is built, simple, convenient disassembly is installed, only need two people that can easily just carry out tightening operation, when needing to dismantle, wedge-shaped iron is removed, four pieces of U galvanized steel snap-gauge natural separations, formwork system stability is high, good forming effect, verticality, flatness are easy to control, and inner template, without drilling, non-bolt hole, perception are preferable after molding.

Description

A kind of formwork keel and its construction method for big section composite steel concrete column
Technical field
The invention belongs to concrete construction mounting technology fields, and in particular to arrive formwork keel, more particularly a kind of use In the formwork keel and its construction method of big section composite steel concrete column.
Background technique
With the increase of the high building structure number of plies, extended height, structural column internal force increases sharply, in Aseismic Design, To guarantee that there is pillar certain ductility must control the axial compression ratio of pillar, the section of column is correspondingly required to increase, therefore big section More and more to solve, building arrangements are difficult, actually make in large-span structure and earthquake territory application in tall buildings for Structural Steel Reinforced Concrete The problems such as being reduced with area;
But in the actual construction process, since fashioned iron core causes conventional formwork difficulty to increase, conventional " Screw arbor with nut at both-ends adds Solid model plate " need to will be fixed using mountain type due to outside the wooden a tree, used in making timber for boats, steel pipe after Screw arbor with nut at both-ends and fashioned iron core firm welding, but Screw arbor with nut at both-ends welds Welding residual stress is generated in termination process, so that fashioned iron core is generated different degrees of horizontal and vertical contraction distortion, is directly affected type The stress performance of steel core;Composite steel concrete column reinforcing bar is intensive, and screw rod and reinforcing bar welding difficulty are big, and welding quality requires high, inconvenience In operation;As the super 2m × 2m of strengthening concrete column dimension, the wooden a tree, used in making timber for boats and steel tube framework bending resistance, shearing resistance, amount of deflection do not meet actual condition It easily causes that quick-fried mould in concreting process, rise mould, at this moment needs to design Novel keel and formwork way solves big section stiffness The problem of column formwork construction.
Summary of the invention
In order to overcome above-mentioned technical problem, the purpose of the present invention is to provide one kind to be used for big section composite steel concrete column Formwork keel, the present invention is made of square steel and U galvanized steel snap-gauges, is suitable for the big section strength of the super 2m × 2m of different specification size Property concrete column template, can be a set of multi-purpose in the cylinder of different big sectional dimensions is built, installation is simple, convenient disassembly, only needs Two people can easily just carry out tightening operation, and when needing to dismantle, wedge-shaped iron is removed, four pieces of U galvanized steel snap-gauge natural separations, Formwork system stability is high, and good forming effect, verticality, flatness are easy to control, and inner template is not necessarily to drilling, non-bolt after molding Hole, perception are preferable.
The purpose of the present invention can be achieved through the following technical solutions:
A kind of formwork keel for big section composite steel concrete column, including two piece of the first U galvanized steel snap-gauge and two pieces 2nd U galvanized steel snap-gauges, two pieces two pieces the first U galvanized steel snap-gauges are arranged in parallel, and two piece of the 2nd U galvanized steel snap-gauge is parallel Setting, and two piece of the 2nd U galvanized steel snap-gauge is vertically arranged with two piece of the first U galvanized steel snap-gauge, two piece of the first U galvanized steel Both ends of the both ends of snap-gauge respectively with two piece of the 2nd U galvanized steel snap-gauge are mutually clamped, and run through the first U galvanized steel snap-gauges and second One end of U galvanized steel snap-gauges offers several groups square hole, and two piece of the 2nd U galvanized steel snap-gauge and two piece of the first U plating It is connected with several square steel on the inside of zinc steel snap-gauge, inner template, two piece of the 2nd U galvanized steel are connected on the inside of several square steel The outside of snap-gauge and two piece of the first U galvanized steel snap-gauge is respectively welded with one piece of bending resistant steel plate, and the inside insertion of square hole is equipped with wedge Shape iron.
As a further solution of the present invention: the square enclosed construction of inner template, and the inside of square enclosed construction Concrete column is formed by concreting, the inside installation of concrete column is embedded with the first steelframe and the second steelframe, the One steelframe and the second steel frame vertical composition cross structure arranged in a crossed manner.
As a further solution of the present invention: square steel is rectangular steel pipe, and the length scale of square steel is 40mm, width size For 40mm, the thickness size of the inside hollow out of square steel, and the outer wall of square steel to inner wall is 3mm.
As further scheme of the invention: one end of the first U galvanized steel snap-gauges and the 2nd U galvanized steel snap-gauges is in U-shaped setting, and the other end of the first U galvanized steel snap-gauges and the 2nd U galvanized steel snap-gauges is in flat setting, square hole is provided with The flat end of first U galvanized steel snap-gauges and the 2nd U galvanized steel snap-gauges, and the flat end clamping of the 2nd U galvanized steel snap-gauges At the U-shaped end of the first U galvanized steel snap-gauges, two piece of the 2nd U galvanized steel snap-gauge mutually blocks with two piece of the first U galvanized steel snap-gauge It connects and constitutes four frame shape structures.
A kind of construction method of the formwork keel for big section composite steel concrete column, which specifically includes as follows Step:
Step 1: being located at construction surface for inner template branch first, and square steel is mounted on inner template according to actual design spacing Surface, square steel is as formwork main joist secondary joist, by two piece of the first U galvanized steel snap-gauge and two piece of the 2nd U galvanized steel snap-gauge It is mutually clamped, the flat end on the first U galvanized steel snap-gauges snaps onto the U-shaped end of the 2nd U galvanized steel snap-gauges, and the first U head Galvanized steel snap-gauge is vertical with the 2nd U galvanized steel snap-gauge holdings, two piece of the first U galvanized steel snap-gauge and two piece the 2nd U it is zinc-plated Steel snap-gauge is mutually clamped four frame shape structures of composition as formwork main joist, the concrete main body height system poured according to actual needs Make multiple four frame shapes structures;
Step 2: the U galvanized steel snap-gauges of multiple groups the first are mutually clamped to four frame shapes of composition with the 2nd U galvanized steel snap-gauges Structure is connected to the periphery of square steel according to actual design spacing, makes the first U galvanized steel snap-gauges and the 2nd U galvanized steel snap-gauges The outer wall of inner wall and square steel fits, and wedge-shaped iron is inserted on the first U galvanized steel snap-gauges outside the 2nd U galvanized steel snap-gauges In the nearest square hole of wall, then it is inserted into the nearest square hole of the first U galvanized steel snap-gauge outer walls on the 2nd U galvanized steel snap-gauges The connection structure of the first U galvanized steel snap-gauges and the 2nd U galvanized steel snap-gauges is reinforced in wedge-shaped iron, completion, entire formwork The constructing operation of keel is completed.
The invention has the following advantages:
1, the present invention constitutes entire branch by the first U galvanized steel snap-gauges, the 2nd U galvanized steel snap-gauges, square steel and inner template By the way of mould keel structure, the first U galvanized steel snap-gauges and the 2nd U galvanized steel snap-gauges are mutually clamped using U-shaped end with flat end Composition, and installed between inner template and the first U galvanized steel snap-gauges and the 2nd U galvanized steel snap-gauges using square steel, it is installing When it is more convenient, and inner template without drilling, concrete column surface non-bolt hole after molding, perception is preferable, and entire formwork Keel structure can reuse, and be constructed being clamped with by way of socket when installing, convenient for entire formwork system Verticality and flatness controlled;
2, by the first U galvanized steel snap-gauges and the 2nd U galvanized steel snap-gauges composition formwork main joists, the first U it is zinc-plated Due to being provided with multiple square holes when steel snap-gauge and the 2nd U galvanized steel snap-gauges are mutually clamped, it is fixed using wedge-shaped iron Position it is adjustable, the first U galvanized steel snap-gauges and the 2nd U galvanized steel snap-gauges can form four side of different specifications and sizes Frame-shaped construction is suitable for the big section strengthening concrete column template of the super 2m × 2m of different specification size, can be in different big sectional dimensions Cylinder build in it is a set of multi-purpose;
3, group is carried out using the first U galvanized steel snap-gauges and the 2nd U galvanized steel snap-gauges by way of being mutually clamped Dress, and square steel is installed using direct-insert mode, thus entire formwork keel structure convenient disassembly, and install simply, It only needs two people that can easily just fasten to formwork keel structure, when needing to dismantle, wedge-shaped iron is removed, inner template is utilized Tension is detached from the first U galvanized steel snap-gauges and the 2nd U galvanized steel snap-gauges naturally, easy to operate.
Detailed description of the invention
The present invention will be further described below with reference to the drawings.
Fig. 1 is a kind of top view of the formwork keel for big section composite steel concrete column of the present invention.
Fig. 2 is that the first U galvanized steel snap-gauges cut open in a kind of formwork keel for big section composite steel concrete column of the present invention Face figure.
1, the first U galvanized steel snap-gauges in figure;2, the 2nd U galvanized steel snap-gauges;3, square hole;4, square steel;5, inner template;6, Concrete column;7, the first steelframe;8, the second steelframe;9, bending resistant steel plate;10, wedge-shaped iron.
Specific embodiment
Below in conjunction with the embodiment of the present invention, technical scheme in the embodiment of the invention is clearly and completely described, Obviously, described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.Based in the present invention Embodiment, all other embodiment obtained by those of ordinary skill in the art without making creative efforts, all Belong to the scope of protection of the invention.
As shown in Figs. 1-2, a kind of formwork keel for big section composite steel concrete column, including two piece the first U zinc-plated Steel snap-gauge 1 and two piece of the 2nd U galvanized steel snap-gauge 2, two pieces two pieces the first U galvanized steel snap-gauges 1 are arranged in parallel, two piece of the 2nd U Head galvanized steel snap-gauge 2 is arranged in parallel, and two piece of the 2nd U galvanized steel snap-gauge 2 is vertical with two piece of the first U galvanized steel snap-gauge 1 sets It sets, both ends of the both ends of two piece of the first U galvanized steel snap-gauge 1 respectively with two piece of the 2nd U galvanized steel snap-gauge 2 are mutually clamped, and are run through One end of first U galvanized steel snap-gauges 1 and the 2nd U galvanized steel snap-gauges 2 offers several groups square hole 3, and two piece of the 2nd U head The inside of galvanized steel snap-gauge 2 and two piece of the first U galvanized steel snap-gauge 1 is connected with several square steel 4, the inside of several square steel 4 It is connected with inner template 5, the outside of two piece of the 2nd U galvanized steel snap-gauge 2 and two piece of the first U galvanized steel snap-gauge 1 is respectively welded with one The inside insertion of block bending resistant steel plate 9, square hole 3 is equipped with wedge-shaped iron 10, bending resistant steel plate 9 and the first U galvanized steel snap-gauges 1 and second U galvanized steel snap-gauges 2 are fixed by the way of butt welding, so as to improve the first U galvanized steel snap-gauges 1 and the 2nd U head The bending resistance of galvanized steel snap-gauge 2 carries n ability, and makes the first U galvanized steel snap-gauges 1 and the 2nd U galvanized steel snap-gauges 2 and bending resistance Steel plate 9 docks staggered edge free, and butting error controls within ± 1mm.
The square enclosed construction of inner template 5, and the inside of square enclosed construction forms coagulation by concreting The inside installation of earth pillar body 6, concrete column 6 is embedded with the first steelframe 7 and the second steelframe 8, the first steelframe 7 and the second steelframe 8 Square crossing setting constitute cross structure, using the first steelframe 7 and 8 square crossing of the second steelframe setting to concrete column 6 into Row is reinforced.
Square steel 4 is rectangular steel pipe, and the length scale of square steel 4 is 40mm, and width size is 40mm, and the inside of square steel 4 is engraved Sky, and the thickness size of the outer wall of square steel 4 to inner wall is 3mm.
The U-shaped setting in one end of first U galvanized steel snap-gauges 1 and the 2nd U galvanized steel snap-gauges 2, and the first U it is zinc-plated The other end of steel snap-gauge 1 and the 2nd U galvanized steel snap-gauges 2 is in flat setting, and square hole 3 is provided with the first U galvanized steel snap-gauges 1 With the flat end of the 2nd U galvanized steel snap-gauges 2, and the flat end of the 2nd U galvanized steel snap-gauges 2 is connected to the first U galvanized steels The U-shaped end of snap-gauge 1, two piece of the 2nd U galvanized steel snap-gauge 2 and the mutually clamping of two piece of the first U galvanized steel snap-gauge 1 constitute four frames Shape structure facilitates the first U head in such a way that the first U galvanized steel snap-gauges 1 and the 2nd U galvanized steel snap-gauges 2 are mutually clamped The disassembly of galvanized steel snap-gauge 1 and the 2nd U galvanized steel snap-gauges 2, is inserted into square hole 3 using wedge-shaped iron 10 and is reinforced, needed When disassembly, wedge-shaped iron 10 is removed, the extruding of the first U galvanized steel snap-gauges 1 and the 2nd U galvanized steel snap-gauges 2 by inner template 5 Natural separation only needs two people that can facilitate and fasten and disassembling section, saving manpower.
A kind of construction method of the formwork keel for big section composite steel concrete column, which specifically includes as follows Step:
Step 1: being located at construction surface for inner template 5 first, and square steel 4 is mounted on inner template 5 according to actual design spacing Surface, square steel 4 be used as formwork main joist secondary joist, by two piece of the first U galvanized steel snap-gauge 1 and two piece of the 2nd U galvanized steel The clamping of 2 phase of snap-gauge, the flat end on the first U galvanized steel snap-gauges 1 snap onto the U-shaped end of the 2nd U galvanized steel snap-gauges 2, and First U galvanized steel snap-gauges 1 keep vertical with the 2nd U galvanized steel snap-gauges 2, two piece of the first U galvanized steel snap-gauge 1 and two piece Two U 2 phase of galvanized steel snap-gauge clamping forms four frame shape structures as formwork main joist, the concrete poured according to actual needs Cylinder 6 highly makes multiple four frame shapes structures;
Step 2: four frames that the U galvanized steel snap-gauges 1 of multiple groups the first are formed with the 2nd U 2 phase of galvanized steel snap-gauge clampings Shape structure is connected to the periphery of square steel 4 according to actual design spacing, makes the first U galvanized steel snap-gauges 1 and the 2nd U galvanized steel cards The inner wall of plate 2 and the outer wall of square steel 4 fit, and wedge-shaped iron 10 is inserted on the first U galvanized steel snap-gauges 1 by the 2nd U platings In the nearest square hole 3 of zinc steel 2 outer walls of snap-gauge, then on the 2nd U galvanized steel snap-gauges 2 by the first U 1 outer walls of galvanized steel snap-gauge most It is inserted into wedge-shaped iron 10 in close square hole 3, completes the connection knot to the first U galvanized steel snap-gauges 1 and the 2nd U galvanized steel snap-gauges 2 Structure is reinforced, and the constructing operation of entire formwork keel is completed.
The present invention is made of entirely the first U the 1, the 2nd U galvanized steel snap-gauges 2 of galvanized steel snap-gauge, square steel 4 and inner template 5 Formwork keel structure, the first U galvanized steel snap-gauges 1 are mutually clamped using U-shaped end with flat end with the 2nd U galvanized steel snap-gauges 2 Mode forms, and using square steel 4 install inner template 5 and the first U galvanized steel snap-gauges 1 and the 2nd U galvanized steel snap-gauges 2 it Between, it is more convenient during installation, and inner template 5, without drilling, 6 surface non-bolt hole of concrete column after molding, perception is preferable, And entire formwork keel structure can reuse, and be constructed being clamped with by way of socket when installing, convenient for whole The verticality and flatness of a formwork system are controlled;Pass through the first U galvanized steel snap-gauges 1 and the 2nd U galvanized steel cards Plate 2 forms formwork main joist, due to being provided with when the first U galvanized steel snap-gauges 1 and the 2nd U galvanized steel snap-gauges 2 are mutually clamped Multiple square holes 3, therefore, first U galvanized steel snap-gauges 1 and twoth U head adjustable using the position that wedge-shaped iron 10 is fixed Galvanized steel snap-gauge 2 can form four frame shapes structure of different specifications and sizes, be suitable for the super 2m × 2m of different specification size and cut greatly Face strengthening concrete column template, can be a set of multi-purpose in the cylinder of different big sectional dimensions is built;By by the first U galvanized steels Snap-gauge 1 and the 2nd U galvanized steel snap-gauges 2 are assembled by the way of being mutually clamped, and square steel 4 uses direct-insert mode It is installed, thus entire formwork keel structure convenient disassembly, and install simply, only need two people just can easily be to formwork keel Structure is fastened, and when needing to dismantle, wedge-shaped iron 10 is removed, and makes the first U galvanized steel snap-gauges using the tension of inner template 5 1 and the 2nd U galvanized steel snap-gauges 2 be detached from naturally, it is easy to operate.
Above content is only to structure of the invention example and explanation, affiliated those skilled in the art couple Described specific embodiment does various modifications or additions or is substituted in a similar manner, without departing from invention Structure or beyond the scope defined by this claim, is within the scope of protection of the invention.

Claims (5)

1. a kind of formwork keel for big section composite steel concrete column, which is characterized in that including two piece of the first U galvanized steel card Plate (1) and two piece of the 2nd U galvanized steel snap-gauge (2), two pieces of described two piece the first U galvanized steel snap-gauges (1) are arranged in parallel, and two pieces Described 2nd U galvanized steel snap-gauges (2) are arranged in parallel, and two piece of the 2nd U galvanized steel snap-gauge (2) and two piece the first U it is zinc-plated Steel snap-gauge (1) is vertically arranged, the both ends of two pieces of the described first U galvanized steel snap-gauges (1) respectively with two piece of the 2nd U galvanized steel card The both ends of plate (2) are mutually clamped, and one end through the described first U galvanized steel snap-gauges (1) and the 2nd U galvanized steel snap-gauges (2) is equal It offers several groups square hole (3), and two piece of the 2nd U galvanized steel snap-gauge (2) and two piece of the first U galvanized steel snap-gauge (1) is interior Side is connected with several square steel (4), is connected with inner template (5) on the inside of several square steel (4), two pieces of the 2nd U heads The outside of galvanized steel snap-gauge (2) and two piece of the first U galvanized steel snap-gauge (1) is respectively welded with one piece of bending resistant steel plate (9), the square hole (3) inside insertion is equipped with wedge-shaped iron (10).
2. a kind of formwork keel for big section composite steel concrete column according to claim 1, which is characterized in that described Inner template (5) square enclosed construction, and the inside of square enclosed construction forms concrete column by concreting (6), the inside installation of the concrete column (6) is embedded with the first steelframe (7) and the second steelframe (8), first steelframe (7) It is arranged with (8) square crossing of the second steelframe and constitutes cross structure.
3. a kind of formwork keel for big section composite steel concrete column according to claim 1, which is characterized in that described Square steel (4) is rectangular steel pipe, and the length scale of square steel (4) is 40mm, and width size is 40mm, the inside of the square steel (4) Hollow out, and the thickness size of the outer wall of square steel (4) to inner wall is 3mm.
4. a kind of formwork keel for big section composite steel concrete column according to claim 1, which is characterized in that described The U-shaped setting in one end of first U galvanized steel snap-gauges (1) and the 2nd U galvanized steel snap-gauges (2), and the first U galvanized steel cards Plate (1) and the other end of the 2nd U galvanized steel snap-gauges (2) are in flat setting, the square hole (3) be provided with the first U it is zinc-plated The flat end of steel snap-gauge (1) and the 2nd U galvanized steel snap-gauges (2), and the flat end of the 2nd U galvanized steel snap-gauges (2) is connected to The U-shaped end of first U galvanized steel snap-gauges (1), two pieces of the described 2nd U galvanized steel snap-gauges (2) and two piece of the first U galvanized steel card Plate (1) mutually clamping constitutes four frame shape structures.
5. a kind of construction method of the formwork keel for big section composite steel concrete column, which is characterized in that construction method tool Body includes the following steps:
Step 1: inner template (5) branch is located at construction surface first, square steel (4) is mounted on inner template according to actual design spacing (5) surface, square steel (4) is used as formwork main joist secondary joist, by two piece of the first U galvanized steel snap-gauge (1) and two piece of the 2nd U head Galvanized steel snap-gauge (2) is mutually clamped, and the flat end on the first U galvanized steel snap-gauges (1) snaps onto the 2nd U galvanized steel snap-gauges (2) U-shaped end in, and the first U galvanized steel snap-gauges (1) are vertical with the 2nd U galvanized steel snap-gauge (2) holdings, two piece of the first U plating Zinc steel snap-gauge (1) is mutually clamped four frame shape structures of composition with two piece of the 2nd U galvanized steel snap-gauge (2) as formwork main joist, root Multiple four frame shapes structures are highly made according to the concrete main body (6) that actual needs pours;
Step 2: the U galvanized steel snap-gauges (1) of multiple groups the first are mutually clamped to four frames of composition with the 2nd U galvanized steel snap-gauges (2) Shape structure is connected to the periphery of square steel (4) according to actual design spacing, make the first U galvanized steel snap-gauges (1) and the 2nd U it is zinc-plated The inner wall of steel snap-gauge (2) and the outer wall of square steel (4) fit, and wedge-shaped iron (10) is inserted on the first U galvanized steel snap-gauges (1) In the square hole (3) nearest by the 2nd U galvanized steel snap-gauge (2) outer walls, then the first U head is leaned on the 2nd U galvanized steel snap-gauges (2) It is inserted into wedge-shaped iron (10) in the nearest square hole (3) of galvanized steel snap-gauge (1) outer wall, completes to the first U galvanized steel snap-gauges (1) and the The connection structure of two U galvanized steel snap-gauge (2) is reinforced, and the constructing operation of entire formwork keel is completed.
CN201910599932.5A 2019-07-04 2019-07-04 A kind of formwork keel and its construction method for big section composite steel concrete column Pending CN110397269A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910599932.5A CN110397269A (en) 2019-07-04 2019-07-04 A kind of formwork keel and its construction method for big section composite steel concrete column

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910599932.5A CN110397269A (en) 2019-07-04 2019-07-04 A kind of formwork keel and its construction method for big section composite steel concrete column

Publications (1)

Publication Number Publication Date
CN110397269A true CN110397269A (en) 2019-11-01

Family

ID=68323852

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910599932.5A Pending CN110397269A (en) 2019-07-04 2019-07-04 A kind of formwork keel and its construction method for big section composite steel concrete column

Country Status (1)

Country Link
CN (1) CN110397269A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006169826A (en) * 2004-12-16 2006-06-29 Kajima Corp Steel-concrete composite beam and its construction method
CN203755661U (en) * 2014-03-03 2014-08-06 山西四建集团有限公司 Large-section stiffness steel rib column hoop erecting structure
CN206625556U (en) * 2017-02-14 2017-11-10 中建二局第一建筑工程有限公司 Stiffening frame and template assembly
CN207048312U (en) * 2017-08-11 2018-02-27 青建国际集团有限公司 Tool-type post formwork for Large area reinforced concrete post
CN109853944A (en) * 2018-12-29 2019-06-07 河南科建建设工程有限公司 Building frame structure square column circumference button formwork and its construction method
CN210828329U (en) * 2019-07-04 2020-06-23 中建四局第六建筑工程有限公司 Formwork keel for large-section stiff concrete column

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006169826A (en) * 2004-12-16 2006-06-29 Kajima Corp Steel-concrete composite beam and its construction method
CN203755661U (en) * 2014-03-03 2014-08-06 山西四建集团有限公司 Large-section stiffness steel rib column hoop erecting structure
CN206625556U (en) * 2017-02-14 2017-11-10 中建二局第一建筑工程有限公司 Stiffening frame and template assembly
CN207048312U (en) * 2017-08-11 2018-02-27 青建国际集团有限公司 Tool-type post formwork for Large area reinforced concrete post
CN109853944A (en) * 2018-12-29 2019-06-07 河南科建建设工程有限公司 Building frame structure square column circumference button formwork and its construction method
CN210828329U (en) * 2019-07-04 2020-06-23 中建四局第六建筑工程有限公司 Formwork keel for large-section stiff concrete column

Similar Documents

Publication Publication Date Title
CN105569331B (en) A kind of simple support method of concrete cylindrical template
KR101026118B1 (en) Truss structure with high bearing capacity against secondary moment at inner supports and construction method of truss bridge using it
KR100731593B1 (en) A pre-fabricating forms for concrete-structure and the construction method thereof
CN212200750U (en) Assembled building frame structure combination braced system
CN110172924B (en) Integral hydraulic box girder template construction method
CN109853944A (en) Building frame structure square column circumference button formwork and its construction method
CN210828329U (en) Formwork keel for large-section stiff concrete column
KR200422887Y1 (en) Truss structure for beam beam formwork
CN105649329A (en) Reinforcing structure for large-section framework column formworks and construction method
CN209686866U (en) A kind of building frame structure square column circumference button formwork
CN111576620A (en) Construction method for beam-column core area of stiffened concrete structure
CN109137757B (en) Large-span corrugated steel web box girder buckling restrained structure and construction method
CN203937017U (en) Stretch-draw assembly for the production of end-plate-free prestressed-concrete pile
CN110397269A (en) A kind of formwork keel and its construction method for big section composite steel concrete column
CN112942660B (en) Steel and recycled concrete combined beam slab and assembling method thereof
CN216552610U (en) Cast-in-place area of assembled superimposed sheet hangs mould device can have enough to meet need
CN215907025U (en) Connecting joint of U-shaped steel-clad concrete beam and steel-reinforced concrete precast column
CN212405468U (en) Stiff concrete structure beam column core area structure
CN210177768U (en) Assembly type composite structure dense rib floor
CN218479548U (en) Assembled side form reinforcing fastener
CN216196610U (en) Integral fixture for beam side wall
CN217974070U (en) Steel-concrete beam wing plate construction formwork support
CN212715911U (en) Archaize building semicircle half square column template prop up and establish structure
CN218375393U (en) Superimposed sheet installation check structure of taking one's place
CN218234361U (en) Special part reinforcing apparatus of shaped steel concrete integrated configuration

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination