CN110397262A - A kind of wall-connecting piece remove after scaffold method for strengthening and repairing - Google Patents

A kind of wall-connecting piece remove after scaffold method for strengthening and repairing Download PDF

Info

Publication number
CN110397262A
CN110397262A CN201910665800.8A CN201910665800A CN110397262A CN 110397262 A CN110397262 A CN 110397262A CN 201910665800 A CN201910665800 A CN 201910665800A CN 110397262 A CN110397262 A CN 110397262A
Authority
CN
China
Prior art keywords
window opening
clamping bar
bar
wall
connecting piece
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910665800.8A
Other languages
Chinese (zh)
Inventor
张作为
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC5 Group Shanghai Corp Ltd
Original Assignee
MCC5 Group Shanghai Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC5 Group Shanghai Corp Ltd filed Critical MCC5 Group Shanghai Corp Ltd
Priority to CN201910665800.8A priority Critical patent/CN110397262A/en
Publication of CN110397262A publication Critical patent/CN110397262A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/04Means for fastening, supporting, or bracing scaffolds on or against building constructions

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Working Measures On Existing Buildindgs (AREA)

Abstract

A kind of wall-connecting piece remove after scaffold method for strengthening and repairing, characterized by the following steps: a, the window opening position for selecting wall, b, it selects into the position of window opening bar, c, provide a window opening outer clamping bar, d, clamping bar in a window opening is provided again, e, the outer clamping bar of window opening is arranged in parallel with clamping bar in window opening, wherein: (1) into the position of window opening bar in the case where window opening aperture placed in the middle or approximate placed in the middle situation, the outer clamping bar of window opening and clamping bar in window opening window opening between two parties or the approximate left and right sides placed in the middle is arranged in parallel;(2) into the position of window opening bar at window opening aperture side, clamping bar is arranged in one jiao of window opening aperture oblique parallel in the outer clamping bar of window opening and window opening;(3) into the position of window opening bar in the case that window opening length is very long, height very high large scale window opening, the outer clamping bar of window opening is arranged in parallel with clamping bar in window opening in window opening aperture vertically downward.Invention has the advantages of apparatus structure is simple, sets up conveniently, and scaffold stability is good, and expense is few and reduces engineering cost.

Description

A kind of wall-connecting piece remove after scaffold method for strengthening and repairing
Technical field
The present invention relates to a kind of construction scaffold reinforcement means, specifically, being the foot after a kind of wall-connecting piece is removed Hand cradle method for strengthening and repairing.
Background technique
Wall-connecting piece is as the component for connecting scaffold frame body with major structure of construction, for reinforcing the whole steady of scaffold It is qualitative, it improves stable bearing capacity and is of crucial importance, however many times wall-connecting piece is carried out in work progress It removes and blocks, just can be carried out the painting of interior wall external wall plastering, and the dismounting of wall-connecting piece can bring scaffold overall stability seriously Safety hazard.
Therefore the dismounting mode of known wall-connecting piece there are problems that it is above-mentioned various inconvenient and.
Summary of the invention
The purpose of the present invention is to propose the scaffold method for strengthening and repairing after a kind of safe and reliable wall-connecting piece is removed.
To achieve the above object, the technical solution of the invention is as follows:
A kind of wall-connecting piece remove after scaffold method for strengthening and repairing, it is characterised in that the following steps are included:
A, the window opening position of wall is selected;
B, it selects into the position of window opening bar, overlaps a level into window opening bar with fastener in two upright bars of window opening external scaffolding, Protrude into it in window opening along window opening lower edge;
C, it provides a window opening outer clamping bar, is tightly adjacent to clamping bar outside window opening window opening outer clip bar cramp with fastener in window opening wall outer side Wall;
D, clamping bar in a window opening is provided again, tightly pastes clamping bar in window opening window opening outer clip bar cramp with fastener on the inside of window opening wall Tight wall;
E, the outer clamping bar of window opening is arranged in parallel with clamping bar in window opening, completes the scaffold reinforcing and repairing after wall-connecting piece is removed;
Wherein:
(1) into the position of window opening bar in the case where window opening aperture is placed in the middle or approximate situation placed in the middle, clamping bar exists in the outer clamping bar of window opening and window opening The left and right sides that window opening is placed in the middle or approximation is placed in the middle is arranged in parallel;
(2) into the position of window opening bar at window opening aperture side, clamping bar is in window opening aperture one in the outer clamping bar of window opening and window opening The setting of angle oblique parallel;
(3) into the position of window opening bar in the case that window opening length is very long, height very high large scale window opening, the outer clamping bar of window opening and window Clamping bar is arranged in parallel vertically downward in window opening aperture in hole.
Wall-connecting piece of the invention remove after scaffold method for strengthening and repairing can also using technical measures below come into One step is realized.
Method above-mentioned, wherein described protrude into the length in window opening into window opening bar as > 500mm.
Method above-mentioned, wherein the outer clamping bar of the window opening uses Φ 75mm, wall thickness 2.8mm specification steel pipe.
Method above-mentioned, wherein the fastener is made of malleable cast iron.
Method above-mentioned, wherein gum sleeve is arranged on the outer clamping bar of the window opening.
Method above-mentioned prevents from gliding wherein described will be placed on outside window opening on clamping bar into window opening bar.
Method above-mentioned, wherein the fastener carries out antitorque detection, when fastening bolt screw-down torque reaches 65N m, no It must destroy.
After adopting the above technical scheme, the scaffold method for strengthening and repairing after wall-connecting piece dismounting of the invention is with following excellent Point:
1, scaffold reinforcing and repairing apparatus structure is simple, sets up conveniently;
2, scaffolding work quality is solid and reliable, and the stability of outrigger frame body after wall-connecting piece is removed is effectively ensured;
3, Meteorological is few, reduces engineering cost.
Detailed description of the invention
Fig. 1 is window opening of the position into window opening bar of the embodiment of the present invention in window opening aperture between two parties or in approximate situation placed in the middle Outer clamping bar and window opening inner clip rod structure schematic diagram;
Fig. 2 is the position into window opening bar of the embodiment of the present invention outside window opening at window opening aperture side in clamping bar and window opening Clamping bar structural schematic diagram;
Fig. 3 is the position into window opening bar of the embodiment of the present invention window opening length is very long, the very high large scale window opening situation of height The outer clamping bar of lower window opening and window opening inner clip rod structure schematic diagram.
In figure: 1 upright bar, 2 cross bars, 3 into window opening bar, clamping bar in 4 window opening, the outer clamping bar of 5 window opening, 6 walls, 7 window opening, 8 fasteners.
Specific embodiment
With reference to embodiments and its attached drawing further explains the present invention.
Embodiment 1
Scaffold method for strengthening and repairing sequence of construction after wall-connecting piece dismounting of the invention:
Wall-connecting piece → determinations is removed into window opening bar placement type → set up on clamping bar outside window opening into window opening bar and protrude into indoor satisfaction Length requirement → set up clamping bar in window opening and meet the length for protruding into window side with connecting into window opening bar.
Scaffold method for strengthening and repairing after wall-connecting piece dismounting of the invention, it is characterised in that the following steps are included:
A, the window opening position of wall is selected;
B, it selects into the position of window opening bar, overlaps a level into window opening bar with fastener 8 in two upright bars 1 of window opening external scaffolding 3, protrude into it in window opening along window opening lower edge;It is described to protrude into the length in window opening into window opening bar as 600mm.The fastener uses Malleable cast iron production, the fastener carries out antitorque detection must not destroy when fastening bolt screw-down torque reaches 65N m.
C, it provides a window opening outer clamping bar 5, is tightly made window opening outer clip bar cramp outside window opening with fastener in 7 wall of window opening, 6 outside Clamping bar is adjacent to wall;The outer clamping bar of the window opening uses Φ 75mm, wall thickness 2.8mm specification steel pipe.It is arranged on the outer clamping bar of the window opening Gum sleeve.It is described to be placed on outside window opening on clamping bar into window opening bar, it prevents from gliding.
D, clamping bar 4 in a window opening is provided again, it is with fastener that window opening inner clip bar cramp is tight on the inside of window opening wall, make in window opening Clamping bar is adjacent to wall;Clamping bar uses Φ 75mm, wall thickness 2.8mm specification steel pipe in window opening.
E, the outer clamping bar of window opening is arranged in parallel with clamping bar in window opening, completes the scaffold reinforcing and repairing after wall-connecting piece is removed;
Referring now to Fig. 1, Fig. 1 is the position into window opening bar of the embodiment of the present invention window opening aperture is placed in the middle or approximate situation placed in the middle Under the outer clamping bar of window opening and window opening inner clip rod structure schematic diagram.As shown, the position into window opening bar occupies in window opening aperture In or approximate placed in the middle situation under, the outer clamping bar of window opening and clamping bar in window opening window opening between two parties or the approximate left and right sides placed in the middle is parallel sets It sets.
Embodiment 2
Except into the position of window opening bar, at window opening aperture side, the outer clamping bar 5 of window opening is with clamping bar 4 in window opening in window opening aperture one Oblique parallel setting in angle is outer, remaining is the same as embodiment 1.45 degree of oblique angle.
Embodiment 3
Except into the position of window opening bar in the case that window opening length is very long, height very high large scale window opening, the outer clamping bar of window opening and window Clamping bar is arranged in parallel vertically downward in window opening aperture in hole, remaining is the same as embodiment 1.
Scaffold after there is the present invention substantive distinguishing features and significant technological progress, wall-connecting piece of the invention to remove is reinforced Method for repairing and mending construction method is easy to operate, solid and reliable, and the stability of outrigger frame body after wall-connecting piece is removed is effectively guaranteed.
Above embodiments are used for illustrative purposes only, rather than limitation of the present invention, the technology people in relation to technical field Member, without departing from the spirit and scope of the present invention, can also make various transformation or variation.Therefore, all equivalent Technical solution also should belong to scope of the invention, should be limited by each claim.

Claims (7)

1. the scaffold method for strengthening and repairing after a kind of wall-connecting piece dismounting, it is characterised in that the following steps are included:
A, the window opening position of wall is selected;
B, it selects into the position of window opening bar, overlaps a level into window opening bar with fastener in two upright bars of window opening external scaffolding, Protrude into it in window opening along window opening lower edge;
C, provide a window opening outer clamping bar, it is in window opening wall outer side fastener that window opening outer clip bar cramp is tight, make the outer clamping bar patch of window opening Tight wall;
D, clamping bar in a window opening is provided again, it is with fastener that window opening inner clip bar cramp is tight on the inside of window opening wall, make clamping bar in window opening It is adjacent to wall;
E, the outer clamping bar of window opening is arranged in parallel with clamping bar in window opening, completes the scaffold reinforcing and repairing after wall-connecting piece is removed;
Wherein:
(1) into the position of window opening bar in the case where window opening aperture is placed in the middle or approximate situation placed in the middle, clamping bar exists in the outer clamping bar of window opening and window opening The left and right sides that window opening is placed in the middle or approximation is placed in the middle is arranged in parallel;
(2) into the position of window opening bar at window opening aperture side, clamping bar is in window opening aperture one in the outer clamping bar of window opening and window opening The setting of angle oblique parallel;
(3) into the position of window opening bar in the case that window opening length is very long, height very high large scale window opening, the outer clamping bar of window opening and window Clamping bar is arranged in parallel vertically downward in window opening aperture in hole.
2. the scaffold method for strengthening and repairing after wall-connecting piece dismounting as described in claim 1, which is characterized in that described into window opening It is > 500mm that bar, which protrudes into the length in window opening,.
3. the scaffold method for strengthening and repairing after wall-connecting piece dismounting as described in claim 1, which is characterized in that outside the window opening Clamping bar uses Φ 75mm, wall thickness 2.8mm specification steel pipe.
4. the scaffold method for strengthening and repairing after wall-connecting piece dismounting as described in claim 1, which is characterized in that the fastener is adopted It is made of malleable cast iron.
5. the scaffold method for strengthening and repairing after wall-connecting piece dismounting as described in claim 1, which is characterized in that outside the window opening Gum sleeve is set on clamping bar.
6. the scaffold method for strengthening and repairing after wall-connecting piece dismounting as described in claim 1, which is characterized in that described into window opening Bar will be placed on the outer clamping bar of window opening, prevent from gliding.
7. wall-connecting piece as described in claim 1 remove after scaffold method for strengthening and repairing, which is characterized in that the fastener into The antitorque detection of row must not be destroyed when fastening bolt screw-down torque reaches 65N m.
CN201910665800.8A 2019-07-23 2019-07-23 A kind of wall-connecting piece remove after scaffold method for strengthening and repairing Pending CN110397262A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910665800.8A CN110397262A (en) 2019-07-23 2019-07-23 A kind of wall-connecting piece remove after scaffold method for strengthening and repairing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910665800.8A CN110397262A (en) 2019-07-23 2019-07-23 A kind of wall-connecting piece remove after scaffold method for strengthening and repairing

Publications (1)

Publication Number Publication Date
CN110397262A true CN110397262A (en) 2019-11-01

Family

ID=68325792

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910665800.8A Pending CN110397262A (en) 2019-07-23 2019-07-23 A kind of wall-connecting piece remove after scaffold method for strengthening and repairing

Country Status (1)

Country Link
CN (1) CN110397262A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112554532A (en) * 2020-12-18 2021-03-26 北京城建六建设集团有限公司 Protective frame system free of pulling connection with wall surface and construction method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101368442A (en) * 2008-04-30 2009-02-18 中建七局第二建筑有限公司 Wall connector of scaffold and its construction method of buckling member type steel pipe scaffold
CN202347834U (en) * 2011-11-25 2012-07-25 江苏兴港建设集团有限公司 Novel scaffold wall fastener
CN104963498A (en) * 2015-06-12 2015-10-07 茅伟萍 Scaffold wall connecting piece
CN205063316U (en) * 2015-10-26 2016-03-02 江苏建筑职业技术学院 Device for connecting scaffold and door and window entrance to a cave
CN106013763A (en) * 2016-07-28 2016-10-12 江苏正方园建设集团有限公司 Flat iron fastener type external scaffold wall connecting piece

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101368442A (en) * 2008-04-30 2009-02-18 中建七局第二建筑有限公司 Wall connector of scaffold and its construction method of buckling member type steel pipe scaffold
CN202347834U (en) * 2011-11-25 2012-07-25 江苏兴港建设集团有限公司 Novel scaffold wall fastener
CN104963498A (en) * 2015-06-12 2015-10-07 茅伟萍 Scaffold wall connecting piece
CN205063316U (en) * 2015-10-26 2016-03-02 江苏建筑职业技术学院 Device for connecting scaffold and door and window entrance to a cave
CN106013763A (en) * 2016-07-28 2016-10-12 江苏正方园建设集团有限公司 Flat iron fastener type external scaffold wall connecting piece

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112554532A (en) * 2020-12-18 2021-03-26 北京城建六建设集团有限公司 Protective frame system free of pulling connection with wall surface and construction method
CN112554532B (en) * 2020-12-18 2022-04-12 北京城建六建设集团有限公司 Construction method of protective frame system without pulling and connecting with wall surface

Similar Documents

Publication Publication Date Title
CN104895318B (en) Aluminum alloy template system and construction method of same
CN206233596U (en) Building block exterior wall constructional column concrete casting device
CN110397262A (en) A kind of wall-connecting piece remove after scaffold method for strengthening and repairing
CN106013774A (en) Slip-form flexible platform device suitable for assigning
CN206479124U (en) Roof steel bar protective layer thickness detects instrument
CN207048312U (en) Tool-type post formwork for Large area reinforced concrete post
CN211228607U (en) Integrally formed construction structure of outer wall and bottom plate of cast-in-place concrete structure of structure
CN205036077U (en) Shear force wall formwork support suitable for narrow and small space usage
CN107989365A (en) Clear water hollow concrete column-form system and its construction method
CN205348724U (en) Detachable wire rope rings anchor structure of external scaffolding of encorbelmenting
CN208777720U (en) Wall hangs the detachable straight thread reinforced bar pedestal of mould diagonal brace
CN106499180B (en) A kind of novel exterior sheathing is reinforced and external scaffolding drawknot device and its construction method
CN208363666U (en) It is a kind of for build face side construction safety protection frame
CN214302829U (en) Scaffold wall connecting piece structure of high-impermeability shear wall
CN212359114U (en) Formwork-supporting-free type constructional column top concrete feeding and shaping structure
CN106481082B (en) A kind of improvement casting method of constructional column
CN108729673A (en) A kind of tool-typed formwork hoisting die construction method at plate face difference of height
CN205134921U (en) Building outer wall concrete constructional column hangs construction platform
CN219863999U (en) Scaffold beam side embedded wall connecting piece
CN207392752U (en) For preventing the constructing device of grout leakage of formwork root
CN110616890A (en) Novel shear wall template reinforcing system and installation method
CN205804376U (en) A kind of concreting template and reinforcement type template system
CN211229479U (en) Steel pipe fastener type packway step structure
CN206903185U (en) Pre-buried board-like carrier setting bolt structure
CN210858011U (en) Concrete wall template reinforcing apparatus

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20191101

RJ01 Rejection of invention patent application after publication